A method, apparatus, electronic device and storage medium for determining hydrological frequency curves
By selecting long-term characteristics and meteorological data from long-series hydrological data basins with similar features from short-term measured runoff data basins, the hydrological frequency curve is determined, which solves the problem of poor hydrological analysis results in short-term measured runoff data basins and improves the accuracy of the hydrological frequency curve.
Patent Information
- Application Number
- CN202311778609.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-12-22
AI Technical Summary
Existing technologies provide poor hydrological analysis results for watersheds with only short-term measured runoff data.
By identifying the characteristics of long-series hydrological data basins that are highly similar to the characteristics of short-term measured runoff data basins, and using the long-term characteristics of long-series hydrological data basins and meteorological data of short-term measured runoff data basins, hydrological frequency curves are determined.
It improves the accuracy of hydrological frequency curves and enhances the hydrological analysis effect on watersheds with only short-term measured runoff data.
Smart Images

Figure CN117688400B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of hydrological analysis technology, and in particular to a method, apparatus, electronic device and storage medium for determining hydrological frequency curves. Background Technology
[0002] Hydrological analysis is a fundamental task in the planning and design of water conservancy projects. It typically requires long-term, measured runoff data for the entire watershed (e.g., over 30 years). However, for watersheds lacking long-term measured runoff data, such as those with only short-term data, hydrological analysis is currently performed using methods such as hydrological analogy, empirical formulas, or contour maps. However, these methods have relatively low accuracy, resulting in poor analysis outcomes for watersheds with only short-term measured runoff data. Summary of the Invention
[0003] This application provides a method, apparatus, electronic device, and storage medium for determining hydrological frequency curves, in order to solve the problem that the hydrological analysis effect of watersheds with only short-term measured runoff data is poor in the prior art.
[0004] To solve the above-mentioned technical problems, this application is implemented as follows;
[0005] In a first aspect, embodiments of this application provide a method for determining a hydrological frequency curve, the method comprising:
[0006] The first target characteristics of the first watershed in the first period are determined, as well as the second target characteristics of multiple second watersheds in the first period, wherein the second watersheds are watersheds with long series of hydrological data;
[0007] Based on the feature similarity between the first target feature and the plurality of second target features, a target watershed that has a feature similarity to the first watershed is determined from the plurality of second watersheds;
[0008] A third target characteristic of the target watershed in the second period is determined; wherein the duration of the second period is longer than the duration of the first period, and the first period is located within the second period;
[0009] Based on the third target characteristics and the meteorological data of the first watershed in the second period, the hydrological frequency curve of the first watershed is determined.
[0010] Secondly, embodiments of this application provide a hydrological frequency curve determination device, comprising:
[0011] The first determining module is used to determine the first target characteristics of the first watershed in the first period, and the second target characteristics of multiple second watersheds in the first period, wherein the second watersheds are watersheds with long series of hydrological data;
[0012] The second determining module is used to determine, based on the feature similarity between the first target feature and the plurality of second target features, a target watershed whose feature similarity to the first watershed meets a preset condition from the plurality of second watersheds;
[0013] The third determining module is used to determine the third target characteristic of the target watershed in the second period; wherein the duration of the second period is longer than the duration of the first period, and the first period is located within the second period.
[0014] The fourth determining module is used to determine the hydrological frequency curve of the first watershed based on the third target characteristics and the meteorological data of the first watershed in the second period.
[0015] Thirdly, embodiments of this application provide an electronic device, including a processor, a memory, and a computer program stored in the memory and executable on the processor. When the computer program is executed by the processor, it implements the steps of the hydrological frequency curve determination method as described in the first aspect.
[0016] Fourthly, embodiments of this application provide a readable storage medium, characterized in that a program or instructions are stored on the readable storage medium, and when the program or instructions are executed by a processor, they implement the steps of the hydrological frequency curve determination method as described in the first aspect.
[0017] In this embodiment, a first target feature of a first watershed in a first period is determined, and multiple second target features of multiple second watersheds with long-series hydrological data in the first period are determined. Based on the feature similarity between the first target feature and the multiple second target features, a target watershed whose feature similarity with the first watershed meets a preset condition is determined from the multiple second watersheds with long-series hydrological data, so that the watershed features of the target watershed are relatively similar to those of the first watershed. Based on the third target feature of the target watershed in the second period and the meteorological data of the first watershed in the second period, the hydrological frequency curve of the first watershed is determined, wherein the duration of the second period is longer than that of the first period. In this embodiment, a target basin is determined from multiple second basins with long-term hydrological data. The target basin has similar basin characteristics to the first basin. When the long-term basin characteristics of the first basin are difficult to determine due to the lack of long-term measured hydrological data, the hydrological frequency curve of the first basin is determined by using the long-term third target characteristics of the target basin and the long-term meteorological data of the first basin. This helps to improve the accuracy of the hydrological frequency curve, thereby improving the hydrological analysis effect on basins with only short-term measured runoff data. Attached Figure Description
[0018] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0019] Figure 1 A flowchart illustrating a method for determining hydrological frequency curves provided in this application embodiment;
[0020] Figure 2 A structural diagram of a hydrological frequency curve determination device provided in an embodiment of this application;
[0021] Figure 3 This is a structural diagram of an electronic device provided in an embodiment of this application. Detailed Implementation
[0022] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0023] The terms "first," "second," etc., used in the specification and claims of this application are used to distinguish similar objects and not to describe a specific order or sequence. It should be understood that such terms can be used interchangeably where appropriate so that embodiments of this application can be implemented in orders other than those illustrated or described herein, and the objects distinguished by "first" and "second" are generally of the same class, not limited in number; for example, a first object can be one or more. Furthermore, in the specification and claims, "and / or" indicates at least one of the connected objects, and the character " / " generally indicates that the preceding and following objects are in an "or" relationship.
[0024] The following description, in conjunction with the accompanying drawings, details the hydrological frequency curve determination method, apparatus, electronic device, and storage medium provided in this application through specific embodiments and application scenarios.
[0025] See Figure 1 , Figure 1 This is a flowchart of a method for determining hydrological frequency curves provided in an embodiment of the present invention, as shown below. Figure 1 As shown, the method includes the following steps:
[0026] Step 101: Determine the first target characteristics of the first watershed in the first period, and the second target characteristics of multiple second watersheds in the first period, wherein the second watersheds are watersheds with long series of hydrological data;
[0027] Step 102: Based on the feature similarity between the first target feature and the plurality of second target features, determine the target watershed from the plurality of second watersheds that has a feature similarity to the first watershed that meets a preset condition;
[0028] Step 103: Determine the third target feature of the target watershed in the second period; wherein the duration of the second period is longer than the duration of the first period, and the first period is located within the second period;
[0029] Step 104: Based on the third target characteristics and the meteorological data of the first watershed in the second period, determine the hydrological frequency curve of the first watershed.
[0030] In step 101, the first watershed in engineering practice can be the watershed to be planned and designed for the project, which has a short series of measured hydrological data; therefore, the first watershed can also be called the design watershed. The second watershed is a pre-selected watershed with a long series of measured hydrological data; the second watershed can also be called the reference watershed. In addition, the first watershed and multiple second watersheds usually have long series of meteorological observation data. The aforementioned long series can usually be more than 30 years, and the aforementioned short series can usually be more than 10 years but less than 30 years.
[0031] The first period can be understood as short-term. Based on the above, the first watershed possesses short-series (in the first period) hydrological and meteorological data, thus allowing the determination of the first target characteristic of the first watershed during the first period. This first target characteristic can characterize some watershed characteristics of the first watershed during the first period. Similarly, based on the above, each second watershed also possesses short-series (in the first period) second hydrological and meteorological data, thus allowing the determination of the second target characteristic of each second watershed during the first period. This second target characteristic of each second watershed can characterize some watershed characteristics of that second watershed during the first period.
[0032] In some embodiments, the second watershed may be selected based on principles such as its geographical location being adjacent to the first watershed, and its watershed area and underlying surface conditions being similar to those of the first watershed.
[0033] In step 102, the higher the feature similarity between the first target feature and the second target feature, the more similar the watershed features of the second watershed corresponding to the second target feature are to the first watershed. The aforementioned preset condition can be: determining the target watershed as the one with the highest feature similarity to the first watershed among the plurality of second watersheds; or, the preset condition can be that all the plurality of second watersheds with a feature similarity greater than a preset threshold to the first watershed are considered candidate target watersheds, and any target watershed can be arbitrarily determined from the candidate target watersheds. Therefore, based on the above preset conditions, the watershed features of the target watershed are quite similar to those of the first watershed.
[0034] In step 103, the third target characteristic of the target watershed in the second period can be determined based on the third hydrological and third meteorological data of the target watershed in the second period. The second period can be understood as long-term, so the third target characteristic of the target watershed in the second period can better reflect the watershed characteristics of the target watershed. Since the watershed characteristics of the target watershed are quite similar to those of the first watershed, the third target characteristic is also quite similar to those of the first watershed. Therefore, in step 104, the third target characteristic can be used to replace the relevant target characteristics of the first watershed in the second period. Thus, based on the third target characteristic and the meteorological data of the first watershed in the second period, the hydrological frequency curve of the first watershed can be determined, which helps to improve the accuracy of the hydrological frequency curve.
[0035] Among them, the specific types of the first target feature, the second target feature, and the third target feature can be the same. In this case, if the second target feature and the first target feature have a high degree of feature similarity, the third target feature of the target watershed in the second period will also be more similar to the relevant target features of the first watershed in the second period.
[0036] In this embodiment, a target basin is determined from multiple second basins with long-term hydrological data. The target basin has similar basin characteristics to the first basin. When the long-term basin characteristics of the first basin are difficult to determine due to the lack of long-term measured hydrological data (i.e., when only scarce hydrological data of the first basin are available), the hydrological frequency curve of the first basin is determined by using the long-term third target characteristics of the target basin and the long-term meteorological data of the first basin. This helps to improve the accuracy of the hydrological frequency curve, thereby improving the hydrological analysis effect on basins with only short-term measured runoff data.
[0037] Optionally, the first target feature includes a first underlying surface parameter, and the plurality of second target features include a plurality of second underlying surface parameters. Step 101 includes:
[0038] Acquire first hydrological data and first meteorological data of the first watershed during the first period, and acquire multiple second hydrological data and multiple second meteorological data of the multiple second watersheds during the first period;
[0039] The parameters of the first underlying surface are determined based on the first hydrological data, the first meteorological data, and the predetermined hydrothermal coupling balance equation.
[0040] Based on the multiple second hydrological data, the multiple second meteorological data, and the hydrothermal coupling balance equation, the multiple second underlying surface parameters are determined respectively.
[0041] The above hydrological and meteorological data are all measured data. The hydrological data includes measured runoff data of the watershed, and the meteorological data includes measured precipitation, measured maximum temperature, measured minimum temperature, measured wind speed, measured relative humidity, and measured sunshine duration of the watershed.
[0042] The predetermined hydrothermal coupling equilibrium equations are as follows:
[0043]
[0044] In Formula 1, Q represents watershed runoff in mm / year; Ep represents potential evapotranspiration in mm / year; P represents watershed precipitation in mm / year; and ω represents underlying surface parameters.
[0045] Ep can be calculated using the Penman formula, which is as follows:
[0046]
[0047] In Formula 2, R nNet radiation (MJ / (m2·d)); G is soil heat flux (MJ / (m2·d)); γ is the slope of the saturated vapor pressure versus temperature curve (kPa / ℃); T is the average air temperature at 2m above the ground (℃); u2 is the wind speed at 2m above the ground (m / s); e s The saturated vapor pressure (kPa); e a Δ is the actual water vapor pressure (kPa); Δ is the hygrometer constant (kPa / ℃).
[0048] Substituting the net radiation, soil heat flux, slope of the saturated vapor pressure-temperature curve, average air temperature at 2m above the ground, wind speed at 2m above the ground, saturated vapor pressure, actual vapor pressure, and hygrometer constant of the first watershed in the first period from the first meteorological data into Formula 2, we can obtain the daily evapotranspiration of the first watershed in the first period. Further summing these values will yield the annual evapotranspiration of the first watershed in the first period.
[0049] To maintain consistency across time scales, all meteorological and hydrological data can be integrated into annual data for easier calculation using Formula 1.
[0050] Solving Equation 1 to obtain the first underlying surface parameters can be done using either the least squares method or the bisection method. When using the least squares method, the annual series data can be substituted into Equation 1, specifically the annual runoff, annual evapotranspiration, and annual precipitation of the first watershed during the first period, and then Equation 1 can be solved to obtain the first underlying surface parameters. When using the bisection method, the annual average data can be substituted into Equation 1, specifically the annual average runoff, annual average evapotranspiration, and annual average precipitation of the first watershed during the first period, and then Equation 1 can be solved to obtain the first underlying surface parameters.
[0051] It should be noted that the method for solving the second underlying surface parameters of the second watershed can be referred to the method for solving the first underlying surface parameters. The second meteorological data and the second hydrological data of a certain second watershed are substituted into Formula 1 and Formula 2 as required to obtain the second target characteristic parameters of the second watershed. To avoid repetition, this will not be elaborated further.
[0052] In this embodiment, the first target feature includes a first underlying surface parameter, and the second target feature includes a second underlying surface parameter. Therefore, when the feature similarity between the target watershed and the first watershed is high, the similarity of the underlying surface parameters between the target watershed and the first watershed is also high. It is easily understood that a high similarity in underlying surface parameters indicates that the underlying surface features of the target watershed and the first watershed are more similar, thus making the target watershed more verifiable than the first watershed. This is beneficial for further improving the accuracy of the hydrological frequency curve of the first watershed.
[0053] Optionally, the third target feature includes a third underlying surface parameter, and step 103 includes:
[0054] Acquire the third hydrological data and third meteorological data of the target watershed during the second period;
[0055] The third underlying surface parameters are determined based on the third hydrological data, the third meteorological data, and the hydrothermal coupling balance equation.
[0056] It should be noted that the method for solving the third underlying surface parameters of the second watershed can be referred to the method for solving the first underlying surface parameters. To avoid repetition, it will not be repeated here.
[0057] According to the above embodiments, when the first target feature includes a first underlying surface parameter and the second target feature includes a second underlying surface parameter, the similarity of the underlying surface parameters between the target watershed and the first watershed is also high. Therefore, the similarity between the third underlying surface parameter of the target watershed in the second period and the underlying surface parameter of the first watershed in the second period is also high. Thus, using the third underlying surface feature parameter to replace the underlying surface parameter of the first watershed in the second period is beneficial to further improve the accuracy of the hydrological frequency curve of the first watershed.
[0058] In this embodiment, the hydrological frequency curve can be the runoff frequency curve (also known as the runoff frequency distribution curve). The hydrological design value of runoff at a given frequency can be determined based on the runoff frequency curve. Considering that the runoff frequency curve needs to be determined using the runoff standard deviation correction coefficient, the runoff standard deviation correction coefficient determined based on short series of hydrological and meteorological data is not accurate enough. Therefore, the runoff frequency curve of the first watershed can be calculated based on the runoff standard deviation correction coefficient determined based on long series of hydrological and meteorological data of the target watershed, so as to improve the accuracy of the runoff frequency curve.
[0059] Specifically, the correction factors for the long series of runoff standard deviations in the target watershed are determined as follows:
[0060] Optionally, the hydrological frequency curve is a runoff frequency curve, the third target feature includes a third runoff standard deviation correction coefficient, and determining the third target feature of the target watershed in the second period includes:
[0061] Based on the third meteorological data of the target watershed in the second period, determine the first runoff standard deviation of the target watershed in the second period;
[0062] Based on the third hydrological data of the target watershed in the second period, determine the second runoff standard deviation of the target watershed in the second period;
[0063] The correction factor for the third runoff standard deviation is determined based on the first runoff standard deviation and the second runoff standard deviation.
[0064] The aforementioned first runoff standard deviation was determined based on the third meteorological data of the target watershed in the second period, rather than based on the hydrological data of the target watershed in the second period. Therefore, the first runoff standard deviation is not the measured runoff standard deviation, but a runoff standard deviation with a certain deviation.
[0065] The aforementioned second runoff standard deviation was determined based on the third hydrological data of the target watershed in the second period. Therefore, the second runoff standard deviation is the measured runoff standard deviation of the target watershed in the second period.
[0066] Based on the deviation between the first and second runoff standard deviations, a third runoff standard deviation correction factor can be determined. This correction factor corrects the first runoff standard deviation (biased runoff standard deviation) of the target watershed, ensuring consistency with the second runoff standard deviation (measured runoff standard deviation). Since the watershed characteristics of the first and target watersheds are quite similar, when calculating the runoff frequency curve of the first watershed, after determining the biased runoff difference in the first watershed during the second period based on meteorological data, the third runoff standard deviation can be used to correct this biased runoff difference, resulting in a runoff standard deviation (the seventh runoff standard deviation in the following examples) that is closer to the actual runoff standard deviation of the first watershed during the second period.
[0067] The following formulas explain how to determine the standard deviation of measured runoff, the standard deviation of biased runoff, and the correction factor for the standard deviation of runoff.
[0068] The standard deviation of measured runoff can be determined using Formula 3 below:
[0069]
[0070] In formula 3, Q i This represents the annual runoff of the watershed, expressed in mm / year. The average annual runoff of the watershed is expressed in mm / year; N represents the total sample size, i.e., the number of years; and i represents the runoff of the watershed in the i-th year.
[0071] The standard deviation of skewed runoff can be determined using Formula 4 below:
[0072]
[0073] In Formula 4, ε1 and ε2 represent the partial derivatives of watershed runoff with respect to precipitation and potential evapotranspiration, respectively, with respect to their respective multi-year averages. As shown in Formula 1, neglecting the variation of parameter ω, runoff is a function of precipitation and potential evapotranspiration, expressed as Q = g(P, Ep). σ P and σ EpThese represent the standard deviations of watershed precipitation and potential evapotranspiration calculated from measured meteorological and hydrological data, respectively. They can be calculated using Formula 3 by replacing the variables in the formula with precipitation and potential evapotranspiration. σ P >0, σ Ep >0, all in mm / year; Cov(P, Ep) represents the covariance between watershed precipitation and potential evapotranspiration.
[0074] The covariance between the basin precipitation and potential evapotranspiration can be determined according to Formula 5 below:
[0075]
[0076] In the formula, P i and Ep i These represent the annual precipitation and potential evapotranspiration of the basin, respectively, both in mm / year; and ...
[0077] The correction factor for runoff standard deviation can be determined according to Formula 6 below:
[0078]
[0079] In the formula, σ Q σ represents the standard deviation of measured runoff in the watershed (which can be determined according to Formula 3 above). Q >0, the unit is mm / year; This indicates a biased runoff standard deviation (which can be determined using formulas 4 and 5 above). The unit is mm / year.
[0080] Therefore, based on the third hydrological data of the target watershed in the second period, the annual runoff, the annual average runoff, and the number of years in the second period can be substituted into Formula 3 to determine the second runoff standard deviation (measured runoff standard deviation) of the target watershed in the second period.
[0081] Based on the third meteorological data of the target watershed in the second period, the annual potential evapotranspiration and annual average potential evapotranspiration of the target watershed in the second period are determined according to Formula 2. The standard deviation of precipitation and the standard deviation of evapotranspiration of the target watershed in the second period are determined by referring to the method of determining the runoff standard deviation in Formula 3. Then, the annual precipitation and potential evapotranspiration of the target watershed in the second period, as well as the annual average precipitation and potential evapotranspiration in the second period, are substituted into Formula 5 to obtain the corresponding covariance Cov(P,Ep). Finally, the corresponding covariance Cov(P,Ep), the standard deviation of precipitation and the standard deviation of evapotranspiration are substituted into Formula 4 to obtain the first runoff standard deviation (biased runoff standard deviation) of the target watershed in the second period.
[0082] By substituting the first runoff standard deviation (biased runoff standard deviation) and the second runoff standard deviation (measured runoff standard deviation) into Formula 6, the correction factor for the third standard deviation can be determined.
[0083] In this embodiment of the application, when the hydrological frequency curve is the runoff frequency curve, the third runoff standard deviation correction coefficient is determined based on the long series of hydrological and meteorological data of the target watershed, and then the runoff frequency curve of the first watershed is calculated based on the third runoff standard deviation correction coefficient, which is beneficial to improving the accuracy of the runoff frequency curve.
[0084] Optionally, the first target feature includes a first runoff standard deviation correction coefficient, and the plurality of second target features include a plurality of second runoff standard deviation correction coefficients. Determining the first target feature of the first watershed in the first period, and the plurality of second target features of the plurality of second watersheds in the first period, includes:
[0085] Based on the first meteorological data of the first watershed in the first period and the second meteorological data of the plurality of second watersheds in the first period, the third runoff standard deviation of the first watershed in the first period and the plurality of fourth runoff standard deviations of the plurality of second watersheds in the first period are determined.
[0086] Based on the first hydrological data of the first watershed in the first period and the second hydrological data of the plurality of second watersheds in the first period, the fifth runoff standard deviation of the first watershed in the first period and the plurality of sixth runoff standard deviations of the plurality of second watersheds in the first period are determined.
[0087] The correction factor for the first runoff standard deviation is determined based on the third runoff standard deviation and the fifth runoff standard deviation;
[0088] Based on the plurality of fourth runoff standard deviations and the plurality of sixth runoff standard deviations, the correction coefficients for the plurality of second runoff standard deviations are determined respectively.
[0089] The third runoff standard deviation of the first basin in the first period is a biased runoff standard deviation, which can be obtained by substituting the first hydrological data of the first basin in the first period into formulas 2, 4 and 5 above. Similarly, the multiple fourth runoff standard deviations of the multiple second basins in the first period are biased runoff standard deviations, which can be obtained by substituting the second meteorological data of each second basin in the first period into formulas 2, 4 and 5, thus obtaining multiple fourth runoff standard deviations.
[0090] The fifth runoff standard deviation of the first basin in the first period is the measured runoff standard deviation, which can be obtained by substituting the first hydrological data of the first basin in the first period into Formula 3 above; similarly, the multiple sixth runoff standard deviations of the multiple second basins in the first period are the measured runoff standard deviations, which can be obtained by substituting the second hydrological data of each second basin in the first period into Formula 3, thus obtaining the sixth runoff standard deviation corresponding to each second basin, thereby obtaining multiple sixth runoff standard deviations.
[0091] The first runoff standard deviation correction coefficient and multiple second runoff standard deviation correction coefficients mentioned above can be calculated according to Formula 6. For details, please refer to the above embodiment. To avoid repetition, they will not be described again.
[0092] When the third target feature parameter includes a third runoff standard deviation correction coefficient, the first target feature in this embodiment includes a first runoff standard deviation correction coefficient, and the second target feature includes a second runoff standard deviation correction coefficient. Therefore, when the feature similarity between the first watershed and the target watershed is high, the first runoff standard deviation correction coefficient of the first watershed and the second runoff standard deviation correction coefficient of the target watershed are also relatively close. Consequently, the third runoff standard deviation correction coefficient of the target watershed in the second period is also relatively close to the runoff standard deviation correction coefficient of the first watershed in the second period. Calculating the runoff frequency curve of the first watershed based on the third runoff standard deviation correction coefficient can further improve the accuracy of the runoff frequency curve.
[0093] Optionally, when the first target feature includes a first underlying surface parameter and a first runoff standard deviation correction coefficient, and the plurality of second target features include a plurality of second underlying surface parameters and a plurality of second runoff standard deviation correction coefficients, the method further includes, before step 102:
[0094] Based on the parameter similarity between the first underlying surface parameters and the plurality of second underlying surface parameters, a plurality of first portability coefficients for the plurality of second watersheds are determined respectively.
[0095] Based on the coefficient similarity between the first runoff standard deviation correction coefficient and the plurality of second runoff standard deviation correction coefficients, a plurality of second transplantation coefficients for the plurality of second watersheds are determined respectively.
[0096] Based on the plurality of first portability coefficients and the plurality of second portability coefficients, the feature similarity between the first target feature and the plurality of second target features is determined respectively.
[0097] The first portability coefficient for each second watershed can be determined according to the following formula:
[0098]
[0099] In the formula, This represents the first underlying surface parameter of the first watershed. DC represents the second underlying surface parameter of a second watershed. ω DC represents the first portability coefficient of the second watershed. ω >0.
[0100] The second portability coefficient for each second watershed can be determined according to the following formula:
[0101]
[0102] In the formula, This represents the correction factor for the standard deviation of the first runoff in the first watershed. DC represents the correction factor for the standard deviation of runoff in a second watershed. k DC represents the second portability coefficient of the second watershed. k >0.
[0103] DC of the aforementioned second basin ω and DC k The closer the value is to 1, the higher the similarity of the characteristics between the second watershed and the first watershed.
[0104] In some embodiments, DC can be assigned according to actual needs. ω and DC k A certain weight is used to determine the second target feature of each second watershed.
[0105] Considering that the third runoff standard deviation correction coefficient and the third underlying surface characteristic parameter of the target watershed can be used simultaneously in the process of calculating the runoff frequency distribution curve, the closer the runoff standard deviation and underlying surface characteristic parameter of the target watershed are to those of the first watershed, the better it is for improving the accuracy of the runoff frequency curve. Therefore, in this embodiment, DC can be assigned... ω and DC k The same weights are applied. Therefore, the feature similarity between each second watershed and the first watershed can be determined using the following formula:
[0106]
[0107] In the formula, DCω DC represents the first portability coefficient of a second watershed. k DC represents the second portability coefficient of the second watershed, and DC represents the feature similarity between the second watershed and the first watershed. ω >0, DC k >0, DC>0.
[0108] In this embodiment, the feature similarity between the first target feature and the plurality of second target features is determined by simultaneously considering the underlying surface parameters and the runoff standard deviation correction coefficient. This allows for a more comprehensive consideration of the watershed characteristics of the first and second watersheds, thereby making the target watershed determined based on feature similarity more similar to the first watershed.
[0109] In existing technologies, the hydrological analogy method typically obtains the runoff characteristic values of a design watershed with short-term measured runoff data by directly correcting the runoff characteristic values of a reference watershed with long-term measured runoff data. For example, if the annual precipitation of the two watersheds differs, the design watershed can be determined based on Q. 设 / P 设 =Q 参 / P 参 To determine the runoff of the design watershed, where Q is... 设 and Q 参 The runoff in the design basin and the reference basin are respectively, where P 设 and P 参 These are the annual precipitation for the design basin and the reference basin, respectively.
[0110] Considering the significant errors in the existing hydrological analogy method for direct correction, this application embodiment utilizes the third runoff standard deviation correction coefficient of the target watershed, the third underlying surface characteristic parameters, and long-series meteorological data of the first watershed simultaneously to determine the runoff frequency curve of the first watershed. Then, based on the runoff frequency curve, the hydrological design value of the runoff at the characteristic frequency is determined to reduce the error in the hydrological design value of the runoff. Specifically, see below:
[0111] Optionally, when the third target feature includes a third underlying surface characteristic parameter and a third runoff standard deviation correction coefficient, determining the hydrological frequency curve of the first watershed based on the third target feature and meteorological data of the first watershed in the second period includes:
[0112] Based on the third underlying surface characteristic parameters and the meteorological data of the first watershed in the second period, the average runoff of the first watershed in the second period is determined;
[0113] Based on the third runoff standard deviation correction coefficient and the meteorological data of the first watershed in the second period, the seventh runoff standard deviation of the first watershed is determined;
[0114] Based on the average runoff and the seventh runoff standard deviation, determine the runoff variation coefficient of the first watershed in the second period;
[0115] Based on the runoff variation coefficient, determine the runoff skewness coefficient of the first watershed in the second period;
[0116] The runoff frequency curve of the first watershed is determined based on the average runoff, the runoff variation coefficient, and the runoff skewness coefficient.
[0117]
[0118] In the formula, This indicates the estimated average runoff of the first watershed during the second period, expressed in mm / year; and These represent the average annual precipitation and average annual potential evapotranspiration of the first watershed during the second period (which can be determined according to Formula 2), both in mm / year. This represents the characteristic parameters of the third underlying surface.
[0119] The seventh standard deviation of runoff can be determined using Formula 11 below:
[0120]
[0121] In the formula, This indicates the biased runoff standard deviation determined based on meteorological data from the first basin during the second period. The unit is mm / year (which can be calculated by referring to the explanations of formulas 4 and 5); It is the correction factor for the standard deviation of the third runoff.
[0122] By correcting the biased runoff standard deviation using the three runoff standard deviation correction coefficients, a seventh runoff standard deviation that is close to the actual runoff standard deviation of the first basin in the second period can be obtained.
[0123] The runoff variation coefficient can be determined according to Formula 12 below:
[0124]
[0125] In the formula, This represents the runoff variation coefficient for the first watershed. This represents the corrected standard deviation of runoff in the first watershed (the seventh standard deviation of runoff), in mm / year. This represents the average runoff of the first watershed in the second period, expressed in mm / year.
[0126] In some embodiments, the runoff skewness coefficient of the first watershed is often taken as twice the runoff variation coefficient, as shown in the following formula:
[0127]
[0128] In other embodiments, relevant departments will compile hydrological manuals for different regions, and the runoff skewness coefficient of the first watershed can also be determined based on the ratio of the runoff skewness coefficient to the coefficient of variation given in the hydrological manual for each region.
[0129] In this embodiment, the third runoff standard deviation correction coefficient, the third underlying surface characteristic parameter, and long-series meteorological data of the first watershed are used simultaneously to determine the runoff frequency curve of the first watershed. Then, the hydrological design value of runoff at the characteristic frequency is determined based on the runoff frequency curve, which can reduce the error of the hydrological design value of runoff.
[0130] The following explains how to determine the runoff frequency curve of the first basin.
[0131] The runoff frequency distribution function is expressed as:
[0132]
[0133] In the formula, Γ(α) is the gamma function of α; α, β, and a0 are three parameters of the runoff frequency curve, representing the shape, scale, and location parameters of the curve, respectively, α > 0, β > 0; x p Hydrological design values are used to characterize runoff.
[0134] The distributions of α, β, and a0 mentioned above can be determined according to the following formula:
[0135]
[0136]
[0137]
[0138] In this embodiment of the application, the runoff skewness coefficient is... Runoff Variation Coefficient Average runoff By inputting formulas 15, 16, and 17 respectively, the three parameter values of the runoff frequency distribution function of the design watershed can be obtained, and the runoff frequency curve of the design watershed can be determined.
[0139] The hydrological design value at a specific design frequency is determined using the transformed distribution function. Let t = β(x - a0), Equation 14 can be transformed into the standard gamma distribution function:
[0140]
[0141] In the formula, t p Let t be the value of the transformed random variable t at a given design frequency.
[0142] Define the deviation coefficient Combined with t p =β(x p -a0) can obtain Φ p With t p The relationship between them is:
[0143]
[0144] Furthermore, the hydrological design value x p According to t p Derived Φ p Sure:
[0145]
[0146] In this embodiment, based on the given design frequency p and the shape parameter α in the runoff frequency distribution curve of the obtained design watershed (first watershed), the function value t in Formula 18 can be easily obtained using the gaminv function provided by MATLAB software. p After obtaining the deviation coefficient value according to Formula 19, inputting this value and the runoff statistics parameters into Formula 20 will yield the hydrological design value x for the design watershed. p .
[0147] In this embodiment, the hydrological design values for watersheds with scarce data can be estimated based on the above steps, thus developing a hydrological analysis and calculation method for watersheds without data. Compared with the hydrological analogy method commonly used in hydrological analysis and calculation of watersheds without data, the method provided in this embodiment is also based on the idea of hydrological similarity. For example, the method provided in this embodiment utilizes the hydrothermal coupling equilibrium parameters and standard deviation correction coefficients of the reference watershed (second watershed). However, the method provided in this embodiment is more theoretically significant. The method provided in this embodiment can also serve as a supplement to the hydrological analysis and calculation of watersheds without data, greatly reducing the uncertainty in estimating hydrological design values for watersheds without data.
[0148] See Figure 2 , Figure 2 A structural diagram of a hydrological frequency curve determination device provided in an embodiment of this application is shown below. Figure 2 As shown, the device 200 includes:
[0149] The first determining module 201 is used to determine the first target characteristics of the first watershed in the first period, and the multiple second target characteristics of multiple second watersheds in the first period, wherein the second watershed is a watershed with a long series of hydrological data.
[0150] The second determining module 202 is used to determine, based on the feature similarity between the first target feature and the plurality of second target features, a target watershed whose feature similarity with the first watershed meets a preset condition from the plurality of second watersheds;
[0151] The third determining module 203 is used to determine the third target characteristics of the target watershed in the second period; wherein the duration of the second period is longer than the duration of the first period, and the first period is located within the second period.
[0152] The fourth determining module 204 is used to determine the hydrological frequency curve of the first watershed based on the third target characteristics and the meteorological data of the first watershed in the second period.
[0153] Optionally, the first target feature includes a first underlying surface parameter, the plurality of second target features include a plurality of second underlying surface parameters, and the first determining module 201 includes:
[0154] The first acquisition unit is used to acquire first hydrological data and first meteorological data of the first watershed in the first period, and to acquire multiple second hydrological data and multiple second meteorological data of the multiple second watersheds in the first period.
[0155] The first determining unit determines the first underlying surface parameters based on the first hydrological data, the first meteorological data, and the pre-determined hydrothermal coupling balance equation.
[0156] The second determining unit determines the multiple second underlying surface parameters based on the multiple second hydrological data, the multiple second meteorological data, and the hydrothermal coupling balance equation.
[0157] Optionally, the third target feature includes a third underlying surface parameter, and the third determining module 203 includes:
[0158] The second acquisition unit is used to acquire the third hydrological data and the third meteorological data of the target watershed in the second period;
[0159] The third determining unit is used to determine the third underlying surface parameters based on the third hydrological data, the third meteorological data, and the hydrothermal coupling balance equation.
[0160] Optionally, the hydrological frequency curve is a runoff frequency curve, the third target feature includes a third runoff standard deviation correction coefficient, and the third determining module 203 further includes:
[0161] The fourth determining unit is used to determine the first runoff standard deviation of the target watershed in the second period based on the third meteorological data of the target watershed in the second period;
[0162] The fifth determining unit is used to determine the second runoff standard deviation of the target watershed in the second period based on the third hydrological data of the target watershed in the second period;
[0163] The sixth determining unit is used to determine the third runoff standard deviation correction coefficient based on the first runoff standard deviation and the second runoff standard deviation.
[0164] Optionally, the first target feature includes a first runoff standard deviation correction coefficient, the plurality of second target features include a plurality of second runoff standard deviation correction coefficients, and the first determining module 201 includes:
[0165] The seventh determining unit is used to determine the third runoff standard deviation of the first watershed in the first period and the multiple fourth runoff standard deviations of the multiple second watersheds in the first period based on the first meteorological data of the first watershed in the first period and the second meteorological data of the multiple second watersheds in the first period.
[0166] The eighth determining unit is used to determine the fifth runoff standard deviation of the first watershed in the first period and the multiple sixth runoff standard deviations of the multiple second watersheds in the first period based on the first hydrological data of the first watershed in the first period and the second hydrological data of the multiple second watersheds in the first period.
[0167] The ninth determining unit is used to determine the correction coefficient for the first runoff standard deviation based on the third runoff standard deviation and the fifth runoff standard deviation;
[0168] The tenth determining unit is used to determine the correction coefficients of the plurality of second runoff standard deviations based on the plurality of fourth runoff standard deviations and the plurality of sixth runoff standard deviations.
[0169] Optionally, the device further includes a fifth determining module, used for:
[0170] When the first target feature includes a first underlying surface parameter and a first runoff standard deviation correction coefficient, and the plurality of second target features include a plurality of second underlying surface parameters and a plurality of second runoff standard deviation correction coefficients:
[0171] Based on the parameter similarity between the first underlying surface parameters and the plurality of second underlying surface parameters, a plurality of first portability coefficients for the plurality of second watersheds are determined respectively.
[0172] Based on the coefficient similarity between the first runoff standard deviation correction coefficient and the plurality of second runoff standard deviation correction coefficients, a plurality of second transplantation coefficients for the plurality of second watersheds are determined respectively.
[0173] Based on the plurality of first portability coefficients and the plurality of second portability coefficients, the feature similarity between the first target feature and the plurality of second target features is determined respectively.
[0174] Optionally, when the third target feature includes a third underlying surface feature parameter and a third runoff standard deviation correction coefficient, the fourth determining module 204 is specifically used for:
[0175] Based on the third underlying surface characteristic parameters and the meteorological data of the first watershed in the second period, the average runoff of the first watershed in the second period is determined;
[0176] Based on the third runoff standard deviation correction coefficient and the meteorological data of the first watershed in the second period, the seventh runoff standard deviation of the first watershed is determined;
[0177] Based on the average runoff and the seventh runoff standard deviation, determine the runoff variation coefficient of the first watershed in the second period;
[0178] Based on the runoff variation coefficient, determine the runoff skewness coefficient of the first watershed in the second period;
[0179] The runoff frequency curve of the first watershed is determined based on the average runoff, the runoff variation coefficient, and the runoff skewness coefficient.
[0180] It should be noted that the hydrological frequency curve determination device of this application embodiment can realize all the processes of the above-described hydrological frequency curve determination method embodiment and achieve the same technical effect. To avoid repetition, it will not be described again here.
[0181] This application also provides an electronic device 300, see [link to previous document]. Figure 3 It includes at least one processor 301, a memory 302, and a computer program stored in the memory 302 and executable on the processor 301. The computer program is executed by at least one processor 301 to implement the various processes of the above-described hydrological frequency curve determination method embodiment and can achieve the same technical effect. To avoid repetition, it will not be described again here.
[0182] This application also provides a computer-readable storage medium storing a computer program. This computer program is executed by a processor 301 to implement the various processes of the above-described hydrological frequency curve determination method embodiment, achieving the same technical effects. To avoid repetition, it will not be described again here. The computer-readable storage medium includes read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks, etc.
[0183] It should be noted that, in this document, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element. Furthermore, it should be noted that the scope of the methods and apparatuses in the embodiments of this application is not limited to performing functions in the order shown or discussed, but may also include performing functions substantially simultaneously or in the reverse order, depending on the functions involved. For example, the described methods may be performed in a different order than described, and various steps may be added, omitted, or combined. Additionally, features described with reference to certain examples may be combined in other examples.
[0184] The embodiments of this application have been described above with reference to the accompanying drawings. However, this application is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make many other forms under the guidance of this application without departing from the spirit and scope of the claims, and all of these forms are within the protection scope of this application.
Claims
1. A hydrologic frequency curve determination method characterized by, The method includes: The first target characteristics of the first watershed in the first period are determined, as well as the second target characteristics of multiple second watersheds in the first period, wherein the second watersheds are watersheds with long series of hydrological data; Based on the feature similarity between the first target feature and the plurality of second target features, a target watershed that has a feature similarity to the first watershed is determined from the plurality of second watersheds; A third target characteristic of the target watershed in the second period is determined; wherein the duration of the second period is longer than the duration of the first period, and the first period is located within the second period; Based on the third target characteristics and the meteorological data of the first watershed in the second period, the hydrological frequency curve of the first watershed is determined. The third target feature includes the third underlying surface parameter and the third runoff standard deviation correction coefficient; The step of determining the hydrological frequency curve of the first watershed based on the third target characteristics and the meteorological data of the first watershed in the second period includes: Based on the third underlying surface characteristic parameters and the meteorological data of the first watershed in the second period, the average runoff of the first watershed in the second period is determined; Based on the third runoff standard deviation correction coefficient and the meteorological data of the first watershed in the second period, the seventh runoff standard deviation of the first watershed is determined; Based on the average runoff and the seventh runoff standard deviation, determine the runoff variation coefficient of the first watershed in the second period; Based on the runoff variation coefficient, determine the runoff skewness coefficient of the first watershed in the second period; The runoff frequency curve of the first watershed is determined based on the average runoff, the runoff variation coefficient, and the runoff skewness coefficient.
2. The method of claim 1, wherein, The first target feature includes a first underlying surface parameter, and the plurality of second target features include a plurality of second underlying surface parameters. Determining the first target feature of the first watershed in a first period, and the plurality of second target features of the plurality of second watersheds in the first period, includes: Acquire first hydrological data and first meteorological data of the first watershed during the first period, and acquire multiple second hydrological data and multiple second meteorological data of the multiple second watersheds during the first period; The parameters of the first underlying surface are determined based on the first hydrological data, the first meteorological data, and the predetermined hydrothermal coupling balance equation. Based on the multiple second hydrological data, the multiple second meteorological data, and the hydrothermal coupling balance equation, the multiple second underlying surface parameters are determined respectively.
3. The method of claim 2, wherein, Determining the third target characteristic of the target watershed in the second period includes: Acquire the third hydrological data and third meteorological data of the target watershed during the second period; The third underlying surface parameters are determined based on the third hydrological data, the third meteorological data, and the hydrothermal coupling balance equation.
4. The method according to claim 1 or 3, characterized in that, The hydrological frequency curve is the runoff frequency curve, and determining the third target characteristic of the target watershed in the second period includes: Based on the third meteorological data of the target watershed in the second period, determine the first runoff standard deviation of the target watershed in the second period; Based on the third hydrological data of the target watershed in the second period, determine the second runoff standard deviation of the target watershed in the second period; The correction factor for the third runoff standard deviation is determined based on the first runoff standard deviation and the second runoff standard deviation.
5. The method of claim 4, wherein, The first target feature includes a first runoff standard deviation correction coefficient, and the plurality of second target features include a plurality of second runoff standard deviation correction coefficients. Determining the first target feature of the first watershed in a first period, and the plurality of second target features of the plurality of second watersheds in the first period, includes: Based on the first meteorological data of the first watershed in the first period and the second meteorological data of the plurality of second watersheds in the first period, the third runoff standard deviation of the first watershed in the first period and the plurality of fourth runoff standard deviations of the plurality of second watersheds in the first period are determined. Based on the first hydrological data of the first watershed in the first period and the second hydrological data of the plurality of second watersheds in the first period, the fifth runoff standard deviation of the first watershed in the first period and the plurality of sixth runoff standard deviations of the plurality of second watersheds in the first period are determined. The correction factor for the first runoff standard deviation is determined based on the third runoff standard deviation and the fifth runoff standard deviation; Based on the plurality of fourth runoff standard deviations and the plurality of sixth runoff standard deviations, the correction coefficients for the plurality of second runoff standard deviations are determined respectively.
6. The method of claim 5, wherein, In the case where the first target feature includes a first underlying surface parameter and a first runoff standard deviation correction coefficient, and the plurality of second target features include a plurality of second underlying surface parameters and a plurality of second runoff standard deviation correction coefficients, before determining the target watershed whose feature similarity to the first watershed meets a preset condition based on the feature similarity between the first target feature and the plurality of second target features, the method further includes: Based on the parameter similarity between the first underlying surface parameters and the plurality of second underlying surface parameters, a plurality of first portability coefficients are determined for the plurality of second watersheds; Based on the coefficient similarity between the first runoff standard deviation correction coefficient and the plurality of second runoff standard deviation correction coefficients, a plurality of second transplantation coefficients for the plurality of second watersheds are determined respectively. Based on the plurality of first portability coefficients and the plurality of second portability coefficients, the feature similarity between the first target feature and the plurality of second target features is determined respectively.
7. A hydrograph frequency curve determination apparatus characterized by comprising: include: The first determining module is used to determine the first target characteristics of the first watershed in the first period, and the second target characteristics of multiple second watersheds in the first period, wherein the second watersheds are watersheds with long series of hydrological data; The second determining module is used to determine, based on the feature similarity between the first target feature and the plurality of second target features, a target watershed whose feature similarity to the first watershed meets a preset condition from the plurality of second watersheds; The third determining module is used to determine the third target characteristic of the target watershed in the second period; wherein the duration of the second period is longer than the duration of the first period, and the first period is located within the second period. The fourth determining module is used to determine the hydrological frequency curve of the first watershed based on the third target characteristics and the meteorological data of the first watershed in the second period. The third target feature includes the third underlying surface parameter and the third runoff standard deviation correction coefficient; The fourth determination module is specifically used for: The step of determining the hydrological frequency curve of the first watershed based on the third target characteristics and the meteorological data of the first watershed in the second period includes: Based on the third underlying surface characteristic parameters and the meteorological data of the first watershed in the second period, the average runoff of the first watershed in the second period is determined; Based on the third runoff standard deviation correction coefficient and the meteorological data of the first watershed in the second period, the seventh runoff standard deviation of the first watershed is determined; Based on the average runoff and the seventh runoff standard deviation, determine the runoff variation coefficient of the first watershed in the second period; Based on the runoff variation coefficient, determine the runoff skewness coefficient of the first watershed in the second period; The runoff frequency curve of the first watershed is determined based on the average runoff, the runoff variation coefficient, and the runoff skewness coefficient.
8. An electronic device, comprising: It includes a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the computer program, when executed by the processor, implements the steps of the hydrological frequency curve determination method as described in any one of claims 1 to 6.
9. A readable storage medium, characterized by, The readable storage medium stores a program or instructions that, when executed by a processor, implement the steps of the hydrological frequency curve determination method as described in any one of claims 1 to 6.
Citation Information
Patent Citations
Method and system for estimating surface water resource quantity of watershed in area without data
CN112800636A
Drainage basin hydrological model parameter estimation method for data-free area
CN116861298A