Vacuum roll coating equipment
By designing a vacuum roll-to-roll coating equipment and combining plasma source cleaning with magnetron sputtering target, the problem of insufficient efficiency and precision in coating equipment for HTL and TCO layers in perovskite solar cells was solved, achieving efficient and low-cost coating results.
Patent Information
- Application Number
- CN202311711780.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-12-13
AI Technical Summary
There is room for improvement in the efficiency, precision, and cost of existing coating equipment for HTL and TCO layers in perovskite solar cells.
A vacuum roll coating equipment was designed, including a moving vehicle, a winding device, a vacuum chamber, a coating device, a plasma source device, and a temperature measuring device. The plasma source device is used to clean the strip before coating, and the coating is carried out in combination with a magnetron sputtering target. A heater is used to improve the coating quality and ensure that the coating surface does not contact the roller surface to avoid scratches and contamination.
It improves coating efficiency, ensures coating surface quality, has a simple and compact structure, low cost, and flexible use.
Smart Images

Figure CN117702072B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of perovskite battery technology, and more particularly to vacuum roll coating equipment. Background Technology
[0002] Perovskite solar cells are solar cells that use perovskite-type organometal halide semiconductors as light-absorbing materials. They belong to the third generation of solar cells and are also known as new concept solar cells.
[0003] As a novel type of photovoltaic cell, perovskite solar cells are currently in the experimental stage in terms of all their processes and equipment. In particular, conventional coating equipment is mostly used for coating the HTL and TCO layers in perovskite solar cells, and there is still room for improvement in coating efficiency, precision, and cost. Summary of the Invention
[0004] In view of this, the purpose of this application is to provide a vacuum roll-to-roll coating apparatus to solve the technical problem that the coating efficiency, accuracy and cost of HTL and TCO layers in existing perovskite solar cells need to be further improved.
[0005] To achieve the above-mentioned technical objectives, this application provides a vacuum roll coating equipment, including a mobile vehicle, a winding device, a vacuum chamber, a coating device, a plasma source device, and a temperature measuring device; The vacuum chamber has an opening on one side for the winding device to enter and exit. The winding device includes a first fixing plate, a second fixing plate, a feeding assembly, a coating guiding assembly, a receiving assembly, and a heating assembly; The material feeding assembly is installed between the first fixing plate and the second fixing plate, and is used to release the strip after the film is torn off; The receiving assembly is installed between the first fixing plate and the second fixing plate, and is used to wind up the coated strip and apply a film. The coating guide assembly is installed between the first fixing plate and the second fixing plate and is in contact with the non-coated surface of the strip, and is used to guide the strip released by the feeding assembly to the receiving assembly; The first fixing plate is connected to the mobile vehicle and is also used to close the opening; The coating apparatus is installed in the vacuum chamber and includes multiple magnetron sputtering targets that are evenly spaced and used to coat the strip material passing through the coating guide assembly. The plasma source device is installed in the vacuum chamber and is used to perform pre-coating plasma cleaning on the coating surface of the strip passing through the coating guide assembly. The heating assembly is installed between the first fixed plate and the second fixed plate, and includes a cleaning heater and multiple coating heaters. The cleaning heater is configured correspondingly to the plasma source device and is used to heat the non-coated surface of the strip; Multiple coating heaters are arranged in a one-to-one correspondence with multiple magnetron sputtering targets to heat the non-coated surface of the strip; The temperature measuring device is used to detect the temperature of the strip inside the vacuum chamber.
[0006] Furthermore, the feeding assembly includes a feeding roll, a first feeding guide roll, a second feeding guide roll, and a film-tearing take-up roll; The first feeding guide roller is used to guide the strip released by the feeding roll to the coating feeding assembly; The second feed guide roller is used to guide the film material to be torn on the strip released by the feed roll roller to the film tearing take-up roller.
[0007] Furthermore, the feeding assembly also includes a first feeding tension measuring roller and a second feeding tension measuring roller; The first feeding tension measuring roller is arranged adjacent to the first feeding guide roller; The second feeding tension measuring roller is disposed between the first feeding guide roller and the coating guide assembly.
[0008] Furthermore, the take-up assembly includes a take-up roll, a first take-up guide roll, a second take-up guide roll, a first cooling roll, a pressure roll, and a film-coated unwind roll; The pressure roller is arranged adjacent to the first cooling roller, and a coating gap is formed between them for covering the film to be coated onto the coated strip by the film unwinding roller. The first take-up guide roller is disposed between the pressure roller and the film unwinding roller, and is used to guide the film material to the film-coating gap; The second take-up guide roller is disposed between the first cooling roller and the take-up roll roller, and is used to guide the coated strip to the take-up roll roller.
[0009] Furthermore, the receiving assembly also includes a second cooling roller; The second cooling roller is disposed between the first cooling roller and the coating guide assembly, and is used to guide the coated strip to the coating gap; The diameter of the second cooling roller is larger than the diameter of the first cooling roller.
[0010] Furthermore, the receiving assembly also includes a first receiving tension measuring roller and a second receiving tension measuring roller; The first receiving tension measuring roller is disposed between the first receiving guide roller and the pressure roller; The second receiving tension measuring roller is disposed between the second receiving guide roller and the first cooling roller.
[0011] Furthermore, the receiving assembly also includes a roller pressing drive mechanism; The roller pressing drive mechanism is connected to the pressure roller and is used to drive the pressure roller to move closer to or away from the first cooling roller.
[0012] Furthermore, the coating guide assembly includes multiple coating guide rollers; Multiple coating guide rollers are arranged sequentially at intervals; Each of the aforementioned coating guide rollers is rotatably mounted via an insulated bearing; The cleaning heater and the coating heater are arranged alternately with the coating guide roller.
[0013] Furthermore, the heating assembly also includes several preheaters; Several of the aforementioned preheaters are used to preheat the strip before coating.
[0014] Furthermore, there are at least three temperature measuring devices; At least one of the temperature measuring devices is used to detect the temperature of the strip before coating; At least one of the temperature measuring devices is used to detect the temperature of the strip after coating; At least one of the temperature measuring devices is used to detect the temperature of the cooled strip; The temperature measuring device is a laser temperature detector.
[0015] As can be seen from the above technical solutions, the vacuum roll coating equipment designed in this application has the following beneficial effects: 1. The strip released by the feeding assembly is guided to the coating guide assembly of the receiving assembly. It only contacts the non-coated surface of the strip, so that the coated surface of the strip will not come into contact with the roller surface before and after coating, ensuring that the coated surface will not be scratched or contaminated.
[0016] 2. Using a plasma source device to clean the coating surface of the strip before coating, and combining it with multiple magnetron sputtering targets to achieve coating, can greatly improve the coating efficiency.
[0017] 3. A cleaning heater is installed at the position corresponding to the plasma source device, and a coating heater is installed at the position corresponding to the magnetron sputtering target. Heating can improve the coating quality.
[0018] 4. The overall structure is simple, compact, and low-cost, and the combination of the mobile vehicle and the vacuum chamber makes it more flexible to use. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0020] Figure 1 This is a cross-sectional view of the vacuum roll coating equipment provided in this application; Figure 2 This is a schematic diagram of the structure of the winding device of the vacuum winding coating equipment provided in this application when it is removed from the vacuum chamber; In the diagram: 01, Vacuum chamber; 02, Second fixed plate; 031, Coating heater; 032, Cleaning heater; 033, Preheater; 04, Temperature measuring device; 05, Plasma source device; 06, Magnetron sputtering target; 07, First fixed plate; 08, Moving vehicle; 09, Fixed base frame; 1. Feeding roll; 21. First feeding guide roll; 22. Second feeding guide roll; 23. First take-up guide roll; 24. Second take-up guide roll; 31. First feeding tension measuring roll; 32. Second feeding tension measuring roll; 33. First take-up tension measuring roll; 34. Second take-up tension measuring roll; 4. Film to be peeled; 5. Peeling and take-up roll; 6. Second cooling roll; 7. First cooling roll; 8. Pressure roll; 9. Film to be coated; 10. Coating unwind roll; 11. Take-up roll; 12. Strip material. Detailed Implementation
[0021] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the embodiments of this application.
[0022] In the description of the embodiments of this application, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing the embodiments of this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the embodiments of this application. In addition, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0023] In the description of the embodiments of this application, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a replaceable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in the embodiments of this application based on the specific circumstances.
[0024] This application discloses a vacuum roll coating apparatus.
[0025] Please see Figure 1 as well as Figure 2 One embodiment of the vacuum roll coating equipment provided in this application includes: The system includes a mobile carriage 08, a winding device, a vacuum chamber 01, a coating device, a plasma source device 05, and a temperature measuring device 04. The mobile carriage 08 serves to move the winding device. Its specific structure may include a chassis with wheels and a fixed frame on the chassis. The design can be varied according to actual needs and is not limited. A fixed frame 09 can also be designed to support the mobile carriage 08 and the vacuum chamber 01. The cooperation between the mobile carriage 08 and the vacuum chamber 01 allows for more flexible use. Guide rails can be installed on the fixed frame 09 to better restrict the movement of the mobile carriage 08.
[0026] The vacuum chamber 01 has an opening on one side for the winding device to enter and exit.
[0027] The winding device includes a first fixing plate 07, a second fixing plate 02, a feeding assembly, a coating guide assembly, a receiving assembly, and a heating assembly. The first fixing plate 07 and the second fixing plate 02 serve to fix the material. The first fixing plate 07 is connected to the moving vehicle 08 and is also used to close the opening.
[0028] The feeding assembly is installed between the first fixed plate 07 and the second fixed plate 02 to release the strip 12 after the film is torn off.
[0029] The take-up assembly is installed between the first fixing plate 07 and the second fixing plate 02 to take up the coated strip 12 and apply a film.
[0030] The coating guide assembly is installed between the first fixed plate 07 and the second fixed plate 02 and is in contact with the non-coated surface of the strip 12. It is used to guide the strip 12 released by the feeding assembly to the receiving assembly. This ensures that the coated surface of the strip 12 will not come into contact with the roller surface before or after coating, thus preventing the coated surface from being scratched or contaminated.
[0031] The coating apparatus is installed in the vacuum chamber 01, including multiple magnetron sputtering targets 06 evenly spaced and used to coat the strip 12 passing through the coating guide assembly. The plasma source device 05 is installed in the vacuum chamber 01 and is used to perform pre-coating plasma cleaning on the coating surface of the strip 12 passing through the coating guide assembly. Using the plasma source device 05 to clean the coating surface of the strip 12 before coating, and combining it with multiple magnetron sputtering targets 06 to achieve coating, can greatly improve the coating efficiency. In this design, the magnetron sputtering targets 06 are planar magnetron sputtering targets, and the number can be four, with no specific limitation.
[0032] The heating assembly is installed between the first fixed plate 07 and the second fixed plate 02, including a cleaning heater 032 and multiple coating heaters 031. The cleaning heater 032 is correspondingly arranged with the plasma source device 05 and is used to heat the non-coated surface of the strip 12. The multiple coating heaters 031 are correspondingly arranged with multiple magnetron sputtering targets 06 and are used to heat the non-coated surface of the strip 12. Heating can improve the coating quality. The coating heaters 031 and the cleaning heaters 032 can be infrared heaters, and there are no specific restrictions.
[0033] Temperature measuring device 04 is used to detect the temperature of strip 12 inside vacuum chamber 01 in order to achieve more precise temperature control.
[0034] For ease of observation, several observation windows can be installed on the side wall of vacuum chamber 01.
[0035] The vacuum roll coating equipment designed in this application has a simple, compact overall structure and low cost.
[0036] The above is Embodiment 1 of the vacuum roll-to-roll coating equipment provided in this application. The following is Embodiment 2 of the vacuum roll-to-roll coating equipment provided in this application. Please refer to the following for details. Figures 1 to 2 .
[0037] Based on the solution of Embodiment 1 above: Furthermore, such as Figure 1 As shown, the material feeding assembly design includes a material feeding roll 1, a first material feeding guide roll 21, a second material feeding guide roll 22, and a film tearing and winding roll 5.
[0038] The first feeding guide roller 21 is used to guide the strip 12 released by the feeding roll 1 to the coating guide assembly, and the second feeding guide roller 22 is used to guide the film material 4 to be peeled on the strip 12 released by the feeding roll 1 to the film peeling take-up roller 5.
[0039] The feeding roller 1 is also equipped with a deviation correction system for adjusting deviation during the winding process of the strip 12.
[0040] Furthermore, in order to more accurately control the conveying of the strip 12, a first unloading tension measuring roller 31 and a second unloading tension measuring roller 32 are also included.
[0041] The first feeding tension measuring roller 31 is arranged adjacent to the first feeding guide roller 21. This design can detect the tension of the film material 4 to be torn, and prevent the film from breaking during the tearing process.
[0042] The second feeding tension measuring roller 32 is disposed between the first feeding guide roller 21 and the coating guide assembly. By distributing the second feeding tension measuring roller 32 near the first feeding guide roller 21, the tension of the metal strip 12 can be detected.
[0043] Furthermore, such as Figure 1 As shown, the take-up assembly includes a take-up roll 11, a first take-up guide roll 23, a second take-up guide roll 24, a first cooling roll 7, a pressure roll 8, and a film-coated unwind roll 10.
[0044] The pressure roller 8 is arranged adjacent to the first cooling roller 7, and a coating gap is formed between them for covering the film material 9 released by the coating unwinding roller 10 onto the coated strip 12.
[0045] The first take-up guide roller 23 is disposed between the pressure roller 8 and the film unwinding roller 10, and is used to guide the film material to the film coating gap. The second take-up guide roller 24 is disposed between the first cooling roller 7 and the take-up winding roller 11, and is used to guide the film-coated strip 12 to the take-up winding roller 11.
[0046] The first cooling roller 7 can improve winding efficiency.
[0047] Furthermore, the receiving assembly also includes a second cooling roller 6.
[0048] The second cooling roller 6 is positioned between the first cooling roller 7 and the coating guide assembly to guide the coated strip 12 to the coating gap. The diameter of the second cooling roller 6 is larger than that of the first cooling roller 7. By using a larger cooling roller, the cooling effect is improved, further enhancing the winding efficiency.
[0049] Both the first cooling roller 7 and the second cooling roller 6 are water-cooled rollers with an internal sandwich structure. Cooling medium flows through the sandwich to cool the strip 12.
[0050] Furthermore, the receiving assembly also includes a first receiving tension measuring roller 33 and a second receiving tension measuring roller 34.
[0051] The first receiving tension measuring roller 33 is set between the first receiving guide roller 23 and the pressure roller 8 to detect the tension of the material to be coated 9.
[0052] The second take-up tension measuring roller 34 is positioned between the second take-up guide roller 24 and the first cooling roller 7 to detect the tension of the strip 12.
[0053] Furthermore, the receiving assembly also includes a roller pressing drive mechanism, which is connected to the pressure roller 8 and is used to drive the pressure roller 8 to move closer to or away from the first cooling roller 7. Taking the pressure roller 8 as being positioned above the first cooling roller 7 as an example, this means that the pressure roller 8 can move up and down, thereby allowing for adjustment as needed and improving its applicability. The pressure roller 8 can be a rubber pressure roller 8, which compresses the material to be coated 9 to make it adhere to the strip 12, protecting the coating already plated on the strip 12.
[0054] This application enables automatic and precise tension control by setting a tension measuring roller, ensuring stable tension of the strip 12 and the film material.
[0055] Furthermore, such as Figure 1 As shown, the design of the coating guide assembly includes multiple coating guide rollers.
[0056] Multiple coating guide rollers are arranged sequentially at intervals, each rotating via an insulated bearing and featuring a heat-insulating structure. Each magnetron sputtering target 06 has a corresponding coating guide roller positioned on both sides, enabling suspended coating of the strip 12.
[0057] The cleaning heater 032 and the coating heater 031 are arranged alternately with the coating guide rollers. It can be understood that the cleaning heater 032 and the coating heater 031 are positioned between two adjacent coating guide rollers.
[0058] Furthermore, the heating assembly also includes several preheaters 033, which are used to preheat the strip 12 before coating. The preheaters 033 can also be infrared heaters, and there can be two of them, used to heat at least one side of the strip 12 before coating, preferably both sides of the strip 12, to further improve coating efficiency and quality.
[0059] Furthermore, there are at least three temperature measuring devices 04. At least one temperature measuring device 04 is used to detect the temperature of the strip 12 before coating, at least one temperature measuring device 04 is used to detect the temperature of the strip 12 after coating, and at least one temperature measuring device 04 is used to detect the temperature of the strip 12 after cooling.
[0060] Temperature measuring device 04 is a laser temperature detector.
[0061] The vacuum roll coating equipment provided in this application has been described in detail above. For those skilled in the art, there will be changes in the specific implementation methods and application scope based on the ideas of the embodiments of this application. Therefore, the content of this specification should not be construed as a limitation of this application.
Claims
1. A vacuum roll-to-roll coating equipment, characterized in that, It includes a mobile vehicle (08), a winding device, a vacuum chamber (01), a coating device, a plasma source device (05), and a temperature measuring device (04). The vacuum chamber (01) has an opening on one side for the winding device to enter and exit; The winding device includes a first fixing plate (07), a second fixing plate (02), a feeding assembly, a coating guiding assembly, a receiving assembly, and a heating assembly; The material feeding assembly is installed between the first fixing plate (07) and the second fixing plate (02) for releasing the strip (12) after the film is torn off. The receiving assembly is installed between the first fixing plate (07) and the second fixing plate (02) for winding up the coated strip (12) and applying a film. The coating guide assembly is installed between the first fixing plate (07) and the second fixing plate (02) and is in contact with the non-coated surface of the strip (12) to guide the strip (12) released by the feeding assembly to the receiving assembly; The first fixing plate (07) is connected to the mobile vehicle (08) and is also used to close the opening; The coating apparatus is installed in the vacuum chamber (01) and includes a plurality of magnetron sputtering targets (06) that are evenly spaced and used to coat the strip (12) passing through the coating guide assembly. The plasma source device (05) is installed in the vacuum chamber (01) and is used to perform pre-coating plasma cleaning on the coating surface of the strip (12) passing through the coating guide assembly. The heating assembly is installed between the first fixing plate (07) and the second fixing plate (02), and includes a cleaning heater (032) and a plurality of coating heaters (031). The cleaning heater (032) is configured in correspondence with the plasma source device (05) and is used to heat the non-coated surface of the strip (12); Multiple coating heaters (031) are arranged one-to-one with multiple magnetron sputtering targets (06) to heat the non-coated surface of the strip (12); The temperature measuring device (04) is used to detect the temperature of the strip (12) inside the vacuum chamber (01); The coating guide assembly includes multiple coating guide rollers; Multiple coating guide rollers are arranged sequentially at intervals; Each of the aforementioned coating guide rollers is rotatably mounted via an insulated bearing; Each of the magnetron sputtering targets (06) has a coating guide roller on both sides to achieve the suspension coating of the strip (12); The cleaning heater (032) and the coating heater (031) are arranged alternately with the coating guide roller.
2. The vacuum roll coating equipment according to claim 1, characterized in that, The feeding assembly includes a feeding roll (1), a first feeding guide roll (21), a second feeding guide roll (22), and a film-tearing and take-up roll (5). The first feeding guide roller (21) is used to guide the strip (12) released by the feeding roll (1) to the coating guide assembly; The second feed guide roller (22) is used to guide the film material (4) to be torn on the strip (12) released by the feed roll (1) to the film tearing take-up roller (5).
3. The vacuum roll coating equipment according to claim 2, characterized in that, The feeding assembly also includes a first feeding tension measuring roller (31) and a second feeding tension measuring roller (32); The first feeding tension measuring roller (31) is arranged adjacent to the first feeding guide roller (21); The second feeding tension measuring roller (32) is disposed between the first feeding guide roller (21) and the coating guide assembly.
4. The vacuum roll coating equipment according to claim 1, characterized in that, The take-up assembly includes a take-up roll (11), a first take-up guide roll (23), a second take-up guide roll (24), a first cooling roll (7), a pressure roll (8), and a film-coated unwind roll (10). The pressure roller (8) is arranged adjacent to the first cooling roller (7), and a coating gap is formed between them for covering the film material (9) released by the coating unwinding roller (10) onto the coated strip (12). The first take-up guide roller (23) is disposed between the pressure roller (8) and the film unwinding roller (10) to guide the film material to the film-coating gap; The second take-up guide roller (24) is disposed between the first cooling roller (7) and the take-up roll roller (11) to guide the coated strip (12) to the take-up roll roller (11).
5. The vacuum roll coating equipment according to claim 4, characterized in that, The receiving assembly also includes a second cooling roller (6). The second cooling roller (6) is disposed between the first cooling roller (7) and the coating guide assembly, for guiding the coated strip (12) to the coating gap; The diameter of the second cooling roller (6) is larger than the diameter of the first cooling roller (7).
6. The vacuum roll-to-roll coating equipment according to claim 4, characterized in that, The receiving assembly also includes a first receiving tension measuring roller (33) and a second receiving tension measuring roller (34). The first receiving tension measuring roller (33) is disposed between the first receiving guide roller (23) and the pressure roller (8); The second receiving tension measuring roller (34) is disposed between the second receiving guide roller (24) and the first cooling roller (7).
7. The vacuum roll coating equipment according to claim 4, characterized in that, The receiving assembly also includes a roller pressing drive mechanism; The roller pressing drive mechanism is connected to the pressure roller (8) and is used to drive the pressure roller (8) to move closer to or away from the first cooling roller (7).
8. The vacuum roll coating equipment according to claim 1, characterized in that, The heating assembly also includes several preheaters (033); Several of the preheaters (033) are used to preheat the strip (12) before coating.
9. The vacuum roll-to-roll coating equipment according to claim 1, characterized in that, The temperature measuring device (04) is at least three; At least one of the temperature measuring devices (04) is used to detect the temperature of the strip (12) before coating; At least one of the temperature measuring devices (04) is used to detect the temperature of the coated strip (12); At least one of the temperature measuring devices (04) is used to detect the temperature of the cooled strip (12); The temperature measuring device (04) is a laser temperature detector.
Citation Information
Patent Citations
Vertical type vacuum coating production line for flexible thin films
CN107794510A
Vacuum winding coating equipment with film tearing and coating device and coating method
CN114525492A