Method for determining safe distance of secondary lining construction of first hole in small-spacing tunnel blasting excavation
By using on-site vibration monitoring and Sadovsky's formula calculations, the safe distance for the secondary lining of the pilot tunnel during blasting excavation of tunnels with small clearance was determined. This solved the problem of the impact of blasting vibration of the subsequent tunnel on the secondary lining of the pilot tunnel, ensuring the safety and service life of the tunnel structure.
Patent Information
- Application Number
- CN202311737491.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2026-06-12
- Estimated Expiration
- 2043-12-18
AI Technical Summary
During the blasting excavation of tunnels with small clearance, the impact of blasting vibrations from the subsequent tunnel on the secondary lining of the preceding tunnel has not been fully considered, which may lead to cracking and spalling of the secondary lining, affecting its service life and safety.
By conducting orthogonal tests to monitor vibration velocity on-site, the safe allowable distance was determined. The conservative safe allowable distance was then calculated using the Sadovsky formula to ensure the safe distance for the secondary lining of the tunnel and reduce the vibration impact caused by blasting excavation of the subsequent tunnel.
The safe distance for the construction of the secondary lining of the pilot tunnel was precisely determined, which reduced the vibration impact of the subsequent blasting excavation on the secondary lining of the pilot tunnel, ensuring structural safety and service life.