Monorail track fast installation method
By assembling the monorail track on the ground and utilizing eyelets and track adjustment devices, the problems of high labor intensity and poor safety in monorail track installation have been solved, achieving an efficient and safe installation process.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- HUAINAN MINING IND GRP
- Filing Date
- 2023-12-26
- Publication Date
- 2026-06-05
Smart Images

Figure CN117755969B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of coal mine tunnel engineering technology, and in particular to a method for rapid installation of a monorail track. Background Technology
[0002] With the rapid popularization of monorail continuous transportation in coal mines, underground mining area transportation has gradually shifted from ground rail transportation to diesel engine monorail transportation. During the installation and dismantling of fully mechanized mining faces, the transportation of large equipment has also gradually shifted to monorail transportation. Therefore, the quality and speed of monorail track installation are becoming increasingly important, directly affecting the transportation efficiency of mining areas and working faces.
[0003] In the past, the installation of monorail tracks was carried out by high-altitude assembly. For example, the patent document with publication number CN113602963A disclosed a monorail installation method in which the monorail track beam is suspended from the top of the tunnel by a circular chain connected to the suspension lug. The existing monorail track installation method has the following defects: (1) When installing the monorail track beam, two people need to stand on two scaffolds respectively to lift the two adjacent monorail track beams to the installation height and then connect them end to end and suspend them to the top of the tunnel by a circular chain. After the connection is completed, the two people will lift the two scaffolds to the next connection position to install the two adjacent monorail track beams. The labor intensity is high, the work efficiency is low, and the safety is low; (2) When installing the monorail track beam, the existing lifting point positioning tools are not professional and the positioning error is large. It is easy to cause rework due to unsuitable lifting points. Summary of the Invention
[0004] The technical problem to be solved by this invention is how to reduce the labor intensity of monorail installation and improve work efficiency and safety.
[0005] This invention solves the above-mentioned technical problems through the following technical means: a method for rapid installation of a monorail track, comprising the following steps:
[0006] Step 1: Install the hanging anchor bolts;
[0007] Step 2: Install the suspension chain on each suspension anchor rod;
[0008] Step 3: Assemble multiple monorail tracks together on the ground and install the hanging components;
[0009] Step four: Use a lifting device to lift the assembled monorail tracks together.
[0010] Step 5: Adjust the monorail track to the required height and connect the suspension components to the corresponding suspension chains.
[0011] This invention changes the assembly method of monorail tracks from high-altitude assembly to ground assembly. After multiple monorail tracks are assembled on the ground, they are lifted together by a lifting device. Manual work at height only requires connecting the hanging parts and the hanging chain, which reduces the labor intensity of monorail track installation and improves work efficiency and safety.
[0012] As an optimized technical solution, in step one, holes are made in the top plate using a hole-making device, and then hanging anchor rods are installed at each hole location.
[0013] The dotting device includes a paint sprayer, a positioning mechanism, a paint outlet tube, a pressing rod, a plumb line, and a steel tape measure. The paint sprayer removes the original nozzle. The positioning mechanism is fixedly connected to the paint sprayer and is fitted over the outside of the paint sprayer nozzle. The paint outlet tube can be inserted into the positioning mechanism, and one end inserted into the positioning mechanism can contact the end of the paint sprayer nozzle. One end of the pressing rod and one end of the plumb line are both fixedly connected to the paint sprayer.
[0014] The method for applying dots to the ceiling using a dotting device is as follows: First, straighten and lay a steel tape measure flat on the base plate and fix it in place, determining the corresponding measurement value for each dotting position. Then, insert the paint tube into the positioning mechanism, attach a weight to the end of the plumb line away from the paint spraying end, and hold the pressing rod to bring the paint tube into contact with the ceiling plate, aligning the plumb line with the steel tape measurement value corresponding to the first dotting position. Then, use the pressing rod to press the paint upwards, at which point the paint tube presses down the paint nozzle, and the paint is sprayed through the paint tube onto the ceiling plate, completing the dotting of the first dotting position. Repeat this method to dot each dotting position in sequence.
[0015] The eye-dotting device can achieve precise eye-dotting, eliminating the error of the lifting point positioning and avoiding rework caused by unsuitable lifting points.
[0016] As an optimized technical solution, the positioning mechanism includes a fixing ring, a connecting rod, and a positioning tube. The fixing ring is sleeved around the outer periphery of the paint sprayer and fixedly connected to it. The positioning tube is coaxially disposed inside the fixing ring and fixedly connected to it via the connecting rod. The positioning tube is sleeved around the outside of the paint sprayer nozzle. This positioning mechanism protects the nozzle, preventing damage during the application process and enabling the application of the paint in one operation.
[0017] As an optimized technical solution, the eye-dotting device also includes a drain rod, which can be inserted into the paint outlet tube. After eye-dotting is completed, the drain rod can be used to clean the paint outlet tube for easy next use.
[0018] As an optimized technical solution, the dotting device includes multiple paint outlet tubes of different lengths. The appropriate length of paint outlet tube can be selected based on the condition of the ceiling.
[0019] As an optimized technical solution, in step five, the installer uses a track adjustment device on the ground to adjust the monorail to the required height, while another installer climbs up to connect the hanging component to the corresponding hanging chain.
[0020] The track adjustment device includes a lifting mechanism, a length adjustment mechanism, and a snap-fit component. One end of the length adjustment mechanism is fixedly connected to the lifting end of the lifting mechanism, and the other end of the length adjustment mechanism is fixedly connected to the snap-fit component.
[0021] The method for adjusting the monorail to the required height using the track adjustment device is as follows: First, adjust the length of the length adjustment mechanism according to the required height of the track installation and the height of the lifting end of the lifting mechanism at the highest position. After adjustment, maintain the length of the length adjustment mechanism. Adjust the position of the lifting end of the lifting mechanism to make the locking piece lock the lower part of the monorail. Then, adjust the lifting end of the lifting mechanism to the highest position to raise the monorail to the required height.
[0022] The track adjustment device can quickly adjust the track height on the ground, keeping the monorail track straight, further reducing the labor intensity of manual climbing operations and improving work efficiency and safety.
[0023] As an optimized technical solution, the length adjustment mechanism includes a first adjustment tube, a second adjustment tube, and a connecting pin. Both the first adjustment tube and the second adjustment tube have a connecting hole at regular intervals along the length direction. The second adjustment tube is inserted into the first adjustment tube and is fixedly connected to the first adjustment tube by the connecting pin passing through two corresponding connecting holes on the first adjustment tube and the second adjustment tube.
[0024] As an optimized technical solution, the specific method for installing the suspension chain in step two is as follows: first, remove the nut of the suspension anchor rod, then install the U-shaped lifting ring on the suspension anchor rod, and then install the suspension chain on the U-shaped lifting ring.
[0025] As an optimized technical solution, in step three, the specific method for assembling the monorail tracks on the ground is as follows: First, connect the lower parts of the first monorail track and the second monorail track through the lower connector. Then, connect the upper parts of the first monorail track and the second monorail track through the upper connector. Then, install the hanging parts on the upper connector. Assemble each monorail track in sequence according to this method.
[0026] As an optimized technical solution, the lifting device uses two hand-operated hoists, which are respectively installed on the lifting rings on the top plate. The chains of the two hand-operated hoists are respectively connected to two hanging parts at both ends of the length direction on multiple monorail tracks assembled together.
[0027] The advantages of this invention are:
[0028] 1. This invention changes the assembly method of monorail tracks from high-altitude assembly to ground assembly. Multiple monorail tracks are assembled on the ground and then lifted together for hanging. Manual work at height only requires connecting the hanging parts and the hanging chain, which reduces the labor intensity of monorail track installation and improves work efficiency and safety.
[0029] 2. The dotting device can achieve precise dotting, eliminate the positioning error of the lifting point, and avoid rework caused by unsuitable lifting points; the positioning mechanism can protect the nozzle and prevent the nozzle from being damaged during the dotting process, so as to complete the dotting operation in one go.
[0030] 3. The track adjustment device can quickly adjust the track height on the ground, keeping the monorail track straight, further reducing the labor intensity of manual climbing operations and improving work efficiency and safety. Attached Figure Description
[0031] Figure 1 This is a schematic diagram of the structure of the eye-drip device according to an embodiment of the present invention.
[0032] Figure 2 This is a schematic diagram of the state in which multiple monorail tracks are lifted together in an embodiment of the present invention.
[0033] Figure 3 This is a schematic diagram of the track adjustment device according to an embodiment of the present invention. Detailed Implementation
[0034] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present invention.
[0035] like Figures 1 to 3 As shown in the figure, an embodiment of the present invention discloses a method for rapid installation of a monorail track, including the following steps:
[0036] Step 1: Use the dotting device to make holes in the top plate, and then install hanging anchors at each dotting location.
[0037] See Figure 2The dotting device includes a spray gun 1, a positioning mechanism 2, a paint outlet tube 3, a pressing rod (not shown), a unclogging rod (not shown), a plumb line (not shown), and a steel tape measure (not shown). The spray gun 1 uses a commercially available red hand-cranked automatic spray gun with the original nozzle removed. The positioning mechanism 2 includes a fixing ring 21, a connecting rod 22, and a positioning tube 23. The fixing ring 21 is fitted around the outer circumference of the spray gun 1 and welded to its inner surface. The positioning tube 23 is coaxially arranged inside the fixing ring 21 and fixedly connected to it via multiple connecting rods 22. The connecting rods 22 are welded to both the fixing ring 21 and the positioning tube 23. The positioning tube 23 is fitted around the nozzle of the spray gun 1. The fixing ring 21 is made of DN40 steel pipe, the connecting rod 22 is made of φ5mm round steel, and the positioning tube 23 is made of DN8 steel pipe. The positioning mechanism 2 can ensure... The nozzle is protected to prevent damage during the dotting process, enabling the dotting operation to be completed in one go. The paint outlet tube 3 can be inserted into the positioning tube 23, and one end inserted into the positioning tube 23 can contact the end of the nozzle of the paint spraying 1. The paint outlet tube 3 is made of DN6 steel pipe. The dotting device includes multiple paint outlet tubes 3 of different lengths, and the appropriate length of paint outlet tube 3 can be selected according to the top plate conditions. The unblocking rod can be inserted into the paint outlet tube 3. The unblocking rod is made of φ2mm round steel. After the dotting is completed, the unblocking rod can be used to clean the paint outlet tube 3 for easy use next time. One end of the pressing rod and one end of the plumb line are fixedly connected to the bottom of the paint spraying 1. The steel tape measure is used to determine the dotting position on the base plate. The steel tape measure is made of 50m steel tape measure, which can realize continuous dotting without correction and eliminate dotting errors.
[0038] The method for dotting the ceiling using the dotting device is as follows: First, straighten the steel tape measure and lay it flat on the base plate, pressing and fixing both ends to determine the steel tape measure values corresponding to each dotting position and print them out; then, select a paint outlet tube 3 of appropriate length and insert it into the positioning tube 23. Attach a weight to the end of the plumb line away from the spray paint 1, and hold the pressing rod to make the paint outlet tube 3 contact the ceiling plate and align the plumb line with the steel tape measure value corresponding to the first dotting position; then, use the pressing rod to press the spray paint 1 upwards. At this time, the paint outlet tube 3 presses down the nozzle of the spray paint 1, and the paint is sprayed onto the ceiling plate through the paint outlet tube 3, completing the precise dotting of the first dotting position; repeat this method to dot each dotting position in sequence; after dotting, use a drain cleaner to clean the paint outlet tube 3.
[0039] Step 2: Install the suspension chains on each suspension anchor rod.
[0040] The specific method for installing the suspension chain is as follows: First, remove the nut from the suspension anchor rod, then install the U-shaped lifting ring on the suspension anchor rod, and then install the suspension chain on the U-shaped lifting ring. The suspension chain uses... Chain.
[0041] Step 3: Assemble multiple monorail tracks 4 together on the ground and install the hanging parts 5. The number of monorail tracks 4 assembled on the ground can be adjusted according to the actual situation. In this embodiment, five monorail tracks 4 are assembled together on the ground.
[0042] The specific method for assembling the monorail track 4 on the ground is as follows: First, connect the lower parts of the first monorail track 4 and the second monorail track 4 through the lower connector. Then, connect the upper parts of the first monorail track 4 and the second monorail track 4 through the upper connector. Then, install the hanging parts 5 on the upper connector. Assemble each monorail track 4 in this way. In this embodiment, the lower connector uses a male and female plug connector, and the upper connector uses a tongue plate, figure-eight ring, connecting pin and triangular hanging plate, which are all existing monorail track connection methods.
[0043] Step four: Use the lifting device 6 to lift the assembled monorail tracks 4 together. In this embodiment, the lifting device 6 uses two 1t hand chain hoists. The two hand chain hoists are respectively installed on the lifting rings of two different crossbeams on the top plate. The chains of the two hand chain hoists are respectively connected to two hanging parts 5 at both ends of the length direction of the assembled monorail tracks 4. By pulling the chains of the two hand chain hoists, the assembled monorail tracks 4 can be lifted together.
[0044] Step 5: On the ground, installers use the track adjustment device to adjust the monorail track 4 to the required height. Another installer uses a ladder to climb up and connect the hanging part 5 to the corresponding hanging chain to keep the monorail track 4 straight. After hoisting, disconnect the connection between the hanging part 5 and the chain of the hand hoist.
[0045] See Figure 3 The track adjustment device includes a lifting mechanism 7, a length adjustment mechanism 8, and a locking component 9. One end of the length adjustment mechanism 8 is welded to the lifting end of the lifting mechanism 7, and the other end of the length adjustment mechanism 8 is welded to the locking component 9. The lifting mechanism 7 is a hand-cranked 3t track lifter, and the locking component 9 is made of 8# channel steel. The length adjustment mechanism 8 includes a first adjusting pipe 81, a second adjusting pipe 82, and a connecting pin 83. Both the first adjusting pipe 81 and the second adjusting pipe 82 have a φ10mm connecting hole every 100mm along the length direction. The second adjusting pipe 82 is inserted into the first adjusting pipe 81 and is fixedly connected to the first adjusting pipe 81 by the connecting pin 83 passing through two corresponding connecting holes on the first adjusting pipe 81 and the second adjusting pipe 82. The first adjusting pipe 81 is made of DN50 steel pipe, and the second adjusting pipe 82 is made of DN40 steel pipe.
[0046] The method for adjusting the monorail track 4 to the required height using the track adjustment device is as follows: First, adjust the length of the length adjustment mechanism 8 according to the required height of the track installation and the height of the lifting end of the lifting mechanism 7 at the highest position. After adjustment, keep the length of the length adjustment mechanism 8. Adjust the height of the lifting end of the lifting mechanism 7 to make the locking piece 9 lock the lower part of the monorail track 4. Then, adjust the lifting end of the lifting mechanism 7 to the highest position to raise the monorail track 4 to the required height.
[0047] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for rapid installation of a monorail track, characterized in that: Includes the following steps: Step 1: Install the hanging anchor bolts; Step 2: Install the suspension chain on each suspension anchor rod; Step 3: Assemble multiple monorail tracks together on the ground and install the hanging components; Step four: Use a lifting device to lift the assembled monorail tracks together. Step 5: Adjust the monorail track to the required height and connect the suspension components to the corresponding suspension chains; In step one, holes are made in the top plate using a hole-making device, and then hanging anchors are installed at each hole location; The dotting device includes a paint sprayer, a positioning mechanism, a paint outlet tube, a pressing rod, a plumb line, and a steel tape measure. The paint sprayer removes the original nozzle. The positioning mechanism is fixedly connected to the paint sprayer and is fitted over the outside of the paint sprayer nozzle. The paint outlet tube can be inserted into the positioning mechanism, and one end inserted into the positioning mechanism can contact the end of the paint sprayer nozzle. One end of the pressing rod and one end of the plumb line are both fixedly connected to the paint sprayer. The method for applying dots to the ceiling using a dotting device is as follows: First, straighten and lay a steel tape measure flat on the base plate and fix it in place, determining the measurement value corresponding to each dotting position. Then, insert the paint tube into the positioning mechanism, attach a weight to the end of the plumb line away from the paint spraying end, and hold the pressing rod to bring the paint tube into contact with the ceiling plate, aligning the plumb line with the measurement value corresponding to the first dotting position. Then, use the pressing rod to press the paint upwards, at which point the paint tube presses down the paint nozzle, and the paint is sprayed through the paint tube onto the ceiling plate, completing the dotting of the first dotting position. Repeat this method to dot each dotting position sequentially. The positioning mechanism includes a fixing ring, a connecting rod, and a positioning tube. The fixing ring is sleeved around the outer periphery of the spray gun and fixedly connected to the spray gun. The positioning tube is coaxially disposed inside the fixing ring and fixedly connected to the fixing ring through the connecting rod. The positioning tube is sleeved outside the nozzle of the spray gun. In step five, the installers use the track adjustment device on the ground to adjust the monorail to the required height, while another installer climbs up to connect the hanging parts to the corresponding hanging chains.
2. The method for rapid installation of a monorail track according to claim 1, characterized in that: The eye-drilling device also includes a draining rod, which can be inserted into the paint outlet tube.
3. The method for rapid installation of a monorail track according to claim 1, characterized in that: The eye-dotting device includes multiple paint-dispensing tubes of different lengths.
4. The method for rapid installation of a monorail track according to claim 1, characterized in that: The track adjustment device includes a lifting mechanism, a length adjustment mechanism, and a snap-fit component. One end of the length adjustment mechanism is fixedly connected to the lifting end of the lifting mechanism, and the other end of the length adjustment mechanism is fixedly connected to the snap-fit component. The method for adjusting the monorail to the required height using the track adjustment device is as follows: First, adjust the length of the length adjustment mechanism according to the required height of the track installation and the height of the lifting end of the lifting mechanism at the highest position. After adjustment, maintain the length of the length adjustment mechanism. Adjust the position of the lifting end of the lifting mechanism to make the locking piece lock the lower part of the monorail. Then, adjust the lifting end of the lifting mechanism to the highest position to raise the monorail to the required height.
5. The method for rapid installation of a monorail track according to claim 4, characterized in that: The length adjustment mechanism includes a first adjustment tube, a second adjustment tube, and a connecting pin. Both the first and second adjustment tubes have a connecting hole at regular intervals along the length direction. The second adjustment tube is inserted into the first adjustment tube and is fixedly connected to the first adjustment tube by the connecting pin passing through two corresponding connecting holes on the first and second adjustment tubes.
6. The method for rapid installation of a monorail track according to claim 1, characterized in that: In step two, the specific method for installing the suspension chain is as follows: first, remove the nut from the suspension anchor rod, then install the U-shaped lifting ring on the suspension anchor rod, and then install the suspension chain on the U-shaped lifting ring.
7. The method for rapid installation of a monorail track according to claim 1, characterized in that: In step three, the specific method for assembling the monorail tracks on the ground is as follows: First, connect the lower parts of the first and second monorail tracks through the lower connectors. Then, connect the upper parts of the first and second monorail tracks through the upper connectors. Finally, install the hanging parts on the upper connectors. Assemble each monorail track in this way.
8. The method for rapid installation of a monorail track according to claim 1, characterized in that: The lifting device uses two hand-operated hoists, which are respectively installed on the lifting rings on the top plate. The chains of the two hand-operated hoists are respectively connected to two hanging parts at both ends of the length direction on multiple monorail tracks assembled together.