A capital data management system and method

Through the resource management menu and dashboard of the capital data management system, the problems of automated management and intuitive display in the capital management process are solved, the process management and risk control of capital data are realized, and the operating efficiency is improved.

CN117830002BActive Publication Date: 2024-10-15MINMETALS CAPITAL HLDG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311861492.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-15
Estimated Expiration
2043-12-29

AI Technical Summary

Technical Problem

The existing technology lacks a unified automated management method, resulting in a complex and inefficient capital management process, as well as a lack of intuitive display of scenario data and automated configuration capabilities.

Method used

Provide a capital data management system, including resource management menus and dashboards, displaying each institution and its scenario directory through image links, using indicators to represent capital scenarios and related scenarios, supporting automated configuration and intuitive display, and realizing process flow and risk control of capital management. .

Benefits of technology

It realizes the intuitive display of capital data, reduces the complexity of the management process and labor costs, improves processing efficiency, and timely discovers and responds to business risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117830002B_ABST
    Figure CN117830002B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention provides a capital data management system and method, which relates to the field of capital operation and management. The capital data management system includes: a resource management menu, which is used to display various institutions in the form of image links, and to display the scene directory under each institution, wherein the scenes include: capital scenes and capital-related scenes that represent capital through indicators; a dashboard, which is used to display the currently activated scene according to the set page layout; if the currently activated scene is any capital scene, the indicators of the currently activated scene are displayed according to the set page layout. Through the resource management menu of the capital data management system, it is possible to automatically assist in the management of capital scenes, and use the dashboard to display the currently activated scene, or the indicators of the currently activated scene, to achieve an intuitive display of capital data, streamline capital management, reduce the complexity and disorder of the management process, and at the same time reduce labor costs and improve processing efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of financial holding company operation and management, and in particular to a capital data management system and method. Background Art

[0002] Currently, enterprises need to manage the company's internal business conditions, or the operating conditions of subsidiaries, or both.

[0003] In the existing technology, paper documents are usually used for recording, communication or review. Even if electronic documents are used, manual operation and management are required. There is no unified automated management method to assist management. At the same time, there is a lack of intuitive display supported by scene data. The management process is complicated, the labor cost is high, and the efficiency is low. Summary of the invention

[0004] The embodiments of the present invention provide a capital data management system and method, which can solve the technical problems in the prior art of capital management during business operations, such as the lack of the most intuitive scenario support, the lack of scenario accumulation and automatic configuration capabilities, and the lack of intuitive display of different business scenarios.

[0005] To achieve the above objectives, on the one hand, an embodiment of the present invention provides a capital data management system, including:

[0006] The resource management menu is used to display each institution in the form of image links, and to display the scenario directory under each institution. The scenarios include: capital scenarios and capital-related scenarios that represent capital through indicators; the institutions are in a parallel relationship or other institutions are subordinate to one of the main institutions, and the types of indicators include at least one of the following: investment, income and profit; each type of indicator value includes at least one of the following: current value, target value and completed value;

[0007] The dashboard is used to display the current activation scenario according to the set page layout; if the current activation scenario is any capital scenario, the indicators of the current activation scenario are displayed according to the set page layout; among them, there is at least one current activation scenario, and the current activation scenario belongs to at least one institution.

[0008] In another aspect, an embodiment of the present invention provides a capital data management method, including:

[0009] Through the resource management menu, each institution is displayed in the form of an image link, and the scenario directory under each institution is displayed. The scenarios include: capital scenarios and capital-related scenarios that represent capital through indicators; the institutions are in a parallel relationship or other institutions are affiliated to one of the main institutions, and the types of indicators include at least one of the following: investment, income and profit; each type of indicator value includes at least one of the following: current value, target value and completed value;

[0010] The current activation scenario is displayed through the dashboard according to the set page layout; if the current activation scenario is any capital scenario, the indicators of the current activation scenario are displayed according to the set page layout; among them, there is at least one current activation scenario, and the current activation scenario belongs to at least one institution.

[0011] The above technical solution has the following beneficial effects: through the resource management menu of the capital data management system, it can automatically assist in the management of capital scenarios, use a dashboard to display the currently activated scenario, or the indicators of the currently activated scenario, to achieve an intuitive display of capital data, streamline capital management, reduce the complexity and disorder of the management process, while reducing labor costs and improving processing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0013] Figure 1 is a logical structure diagram of a first capital data management system according to an embodiment of the present invention;

[0014] Figure 2 is a logical structure diagram of a second capital data management system according to an embodiment of the present invention;

[0015] Figure 3 is a logical structure diagram of a third capital data management system according to an embodiment of the present invention;

[0016] Figure 4 is a logical structure diagram of a fourth capital data management system according to an embodiment of the present invention;

[0017] Figure 5 is a flow chart of a capital data management method according to an embodiment of the present invention;

[0018] Figure 6 is a schematic diagram of setting the directory hierarchy of each kanban board according to an embodiment of the present invention;

[0019] Figure 7 is a schematic diagram of a kanban configuration operation according to an embodiment of the present invention;

[0020] Figure 8 This is a summary display diagram of reviewing the dashboard in an embodiment of the present invention;

[0021] Fig. 9 This is a summary display diagram of the dashboard in an embodiment of the present invention;

[0022] Fig.10 is a schematic diagram of an interface of a dashboard according to an embodiment of the present invention;

[0023] Fig.11 It is a display diagram of early warning indicators at various levels according to an embodiment of the present invention. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] like Figure 1 As shown, in combination with an embodiment of the present invention, a capital data management system is provided, comprising:

[0026] Resource management menu 11 is used to display each institution in the form of image links, and to display the scenario directory under each institution. The scenarios include: capital scenarios and capital-related scenarios that represent capital through indicators; where the institutions are in a parallel relationship or other institutions are subordinate to one of the main institutions, and the types of indicators include at least one of the following: investment, income and profit; each type of indicator value includes at least one of the following: current value, target value and completed value; such as Figure 6 As shown, the institutions displayed on the left include: the first institution, the second institution, the third institution, the fourth institution and the fifth institution, among which the second institution, the third institution, the fourth institution and the fifth institution are subordinate to the first institution.

[0027] Dashboard 12 is used to display the current activation scene according to the set page layout; if the current activation scene is any capital scene, the indicators of the current activation scene are displayed according to the set page layout; wherein, there is at least one current activation scene, and the current activation scene belongs to at least one institution.

[0028] Through the resource management menu of the capital data management system, it can automatically assist in the management of capital scenarios, use dashboards to display the currently activated scenarios, or the indicators of the currently activated scenarios, to achieve an intuitive display of capital data, streamline capital management, reduce the complexity and disorder of the management process, while reducing labor costs and improving processing efficiency.

[0029] Preferably, if Figure 2 As shown, the capital data management system also includes an autonomous analysis menu 13, wherein:

[0030] The resource management menu 11 is also used for setting the organization and the scene directory of the organization through the directory editing interface after the authorized user enters the corresponding directory editing interface by clicking on the resource management menu; Figure 6 As shown, a scene directory is set under the organization displayed in the resource management menu 11, so as to set a dashboard for the scene corresponding to the scene directory, and display the scene through the dashboard.

[0031] The autonomous analysis menu 13 is used to respond to a click operation of the authorized user on the autonomous analysis menu, enter the dashboard setting interface, create a corresponding dashboard for each scene in the dashboard setting interface, and configure operation functions for the created dashboard; the operation functions include: view, edit, update and delete;

[0032] In the dashboard setting interface, set the core indicators, related indicators of the core indicators and sub-indicators of the core indicators for the scenarios to be displayed for the created dashboard, and set component styles and display colors for the core indicators, related indicators and sub-indicators respectively; component styles include indicator cards, indicator ring charts, indicator bar charts and / or indicator bar-line mixed chart tables; wherein the same indicator can be a core indicator or a related indicator in different scenarios, and the same scenario includes at least one core indicator;

[0033] In the dashboard setting interface, you can set the width and height of components by dragging, and determine the position of each component on the dashboard by dragging the components of core indicators, related indicators, and sub-indicators to build the page layout of the dashboard. The components of the dashboard can be designed according to the needs to select the corresponding indicators and component styles. The component styles include indicator cards, donut charts, bar charts, bar-line mixed charts, tables, etc.

[0034] In the dashboard setting interface, set the dynamic display mode of the indicators on the dashboard. The dynamic display mode means that when you click the core indicator main control key, the corresponding core indicator, related indicators or sub-indicators are updated and displayed through page jumps and / or pop-up boxes. That is, when you click the core indicator main control key, the corresponding core indicator is updated and displayed through page jumps and / or pop-up boxes, and the related indicators of the core indicator are updated and displayed in a linked manner through page jumps and / or pop-up boxes, and the sub-indicators of the core indicator are updated and displayed in a linked manner through page jumps and / or pop-up boxes.

[0035] Simple and direct automatic editing capabilities are achieved through the resource management menu and the autonomous analysis menu. The ability to associate display components with various capital data is achieved through the dashboard setting interface, achieving simple and intuitive display of capital.

[0036] The self-analysis menu 13 and the dashboard setting interface therein are as follows Figure 7 As shown in the figure, authorized users click to enter the self-analysis menu and configure the dashboard according to capital (i.e. finance-related) indicators in each scenario. Figure 7 The capital scenario catalog displayed in the report includes risk management and financial performance. Among them, the first institution, the second institution, the third institution, the fourth institution and the fifth institution are all financial institutions. The essence of financial institutions is risk management; risk management refers to the risk situation of each financial institution at the capital data statistical level (i.e., consolidated level), such as credit risk, capital market risk and capital liquidity risk. Financial performance refers to the financial status of each financial institution at the capital data statistical level (i.e., consolidated level), such as operating income, cost budget execution, cost expenditure, profitability analysis and asset-liability situation.

[0037] The relevant scenes of capital consolidation are shown in the catalog: Overview, Business Analysis, Customer Management, and Service Business; Overview is an overview of the core data of business analysis, customer management, and service business; the introduction of business analysis, customer management, and service business is shown in Table 1. You can also set up an overview dashboard, financial performance dashboard, business analysis dashboard, customer management dashboard, risk management dashboard, and service business dashboard for each institution. The content displayed on the dashboard can be formed according to the data corresponding to the structure in Table 1.

[0038] On the operation page of the autonomous analysis menu 13, each organization is displayed on the left, and each organization has a kanban directory; a reusable kanban component directory is also displayed on the left, which stores reusable kanban components. Clicking on each organization can display the kanban saved under the corresponding organization.

[0039] Table 1 Structure of capital data management system

[0040]

[0041]

[0042]

[0043] Preferably, the kanban is also used to respond to a click operation of an authorized user on an edit function on the kanban to be adjusted, and enter an edit page of the kanban to be adjusted; the edit function can be implemented through a button, and a function supporting editing has been set in the background;

[0044] On the editing page of the dashboard to be adjusted, add indicators to the scene, set the component style and display color for the added indicators, set the width and height of the components corresponding to the added indicators by dragging, set the position of the components corresponding to the added indicators on the dashboard to be adjusted by dragging; and link the added indicators to the core indicator main control key;

[0045] and / or,

[0046] On the edit page of the dashboard to be adjusted, add, delete and / or modify the component style for the existing indicator, set the width and height of the component of the existing indicator by dragging, and set the position of the component of the existing indicator on the dashboard to be adjusted by dragging. The changes of the components of the dashboard are based on the design requirements to select the corresponding indicators and component styles.

[0047] The dashboard corresponding to the scenario is automatically and flexibly configured and adjusted according to needs, which improves the ability to adjust and respond to changes in the capital scenario of the operation in real time due to business development, macroeconomic policy adjustments, etc. during the operation process.

[0048] Preferably, if Figure 3 As shown, the capital data management system further includes an early warning module 14, wherein:

[0049] Early warning module 14 is used to trigger the early warning of the first level indicator when the core indicator of the scenario is a first-class indicator and the assessment completion of the first-class indicator is not up to standard; if the core indicator of the scenario is a second-class indicator, when the completion of the second-class indicator is not as expected or the second-class indicator has a negative fluctuation, the early warning of the second level indicator is triggered; if the core indicator of the scenario is a third-class indicator, when the third-class indicator has a negative fluctuation or the negative fluctuation exceeds the fluctuation threshold, the early warning of the third level indicator is triggered; among them, the first-class indicator refers to the assessment indicator, and the assessment indicator corresponds to the risk scenario, such as profit. The second-class indicator refers to the non-assessment business plan indicator, and the third-class indicator refers to the structural indicator and / or attribution indicator related to non-capital business;

[0050] The dashboard 12 is also used to display a first indicator light at the assessment indicator corresponding to the dashboard corresponding to the scene when the first level indicator warning is triggered and the indicator value of the first type of indicator triggers the warning value. The first indicator light is represented by an orange triangle and an exclamation mark placed in the triangle;

[0051] When the indicator value of the assessment indicator triggers the limit value, the second indicator light is displayed at the first indicator corresponding to the dashboard corresponding to the scene, and the second indicator light is red. Fig.10 There is a display with an indicator light on.

[0052] When the second-level indicator warning is triggered, the third indicator light is displayed at the second-type indicator corresponding to the dashboard corresponding to the scene, and the third indicator light is yellow;

[0053] When the third-level indicator warning is triggered, the fourth indicator light is displayed at the third indicator corresponding to the dashboard corresponding to the scene, and the fourth indicator light is blue;

[0054] By setting different levels of warnings for different categories of core indicators, the system can detect potential risks in a timely manner and respond quickly through the warning mechanism, thereby improving the efficiency of capital data management and the timeliness of risk control. The system can identify different levels of risks based on the completion and fluctuation of the first, second and third indicators, so that managers can take corresponding measures according to the warning level, thereby managing and controlling risks more effectively. By using different indicator lights to display different levels of warnings on the dashboard, managers can intuitively understand the current risk status, which helps to quickly grasp the overall risk situation and facilitate decision-making and action. By setting different warning levels, the system can distinguish risks of different severity, allowing managers to take corresponding risk response measures according to the level of warning, thereby achieving hierarchical risk handling and optimizing resource allocation. In addition, through the early warning module, timely warnings are issued, and the dashboard displays warnings simultaneously, avoiding the investment of a large amount of manpower and material resources for layer-by-layer approval, which can indirectly improve management efficiency.

[0055] The capital data management system also includes:

[0056] The early warning query interface 15 is used to respectively display the first early warning summary chart corresponding to the first-level indicator early warning, the second early warning summary chart corresponding to the second-level indicator early warning, and the third early warning summary chart corresponding to the third-level indicator early warning; the first early warning summary chart, the second early warning summary chart, and the third early warning summary chart all include: the date when the early warning was generated, the indicator, the affiliated organization, the early warning rules, and the current processing result query; among them, the early warning rule for the first-level indicator early warning is: the indicator value of the first category indicator triggers the early warning value, the early warning rule for the second-level indicator early warning is: the completion degree of the second category indicator is lower than expected or the second category indicator has a negative fluctuation, and the early warning rule for the second-level indicator early warning is: the third category indicator has a negative fluctuation or the negative fluctuation exceeds the fluctuation threshold.

[0057] In addition, the detailed process information of the warning of the core indicators in this table can be viewed through the query button of the detailed information set at the first warning summary chart, the detailed process information of the warning of the core indicators in this table can be viewed through the query button of the detailed information set at the second warning summary chart (such as the "more" button), and the detailed process information of the warning of the core indicators in this table can be viewed through the query button of the detailed information at the third warning summary chart; the first warning summary chart, the second warning summary chart and the third warning summary chart are as shown Fig.11 shown.

[0058] Among them, the warning rules for the first-level indicator warning are: the indicator value of the assessment indicator triggers the warning value; the warning rules for the second-level indicator warning are: the completion degree of non-assessment business plan indicators is lower than expected or the non-assessment business plan indicators experience negative fluctuations; the warning rules for the third-level indicator warning are: structural indicators and / or attribution indicators related to non-capital businesses experience negative fluctuations or the negative fluctuations exceed the fluctuation threshold.

[0059] The early warning summary chart plays a role in summarizing and generalizing, and can centrally manage the early warning statistical information of indicators at all levels within the preset time period.

[0060] As shown in Table 2, there is an introduction to early warning indicators at each level.

[0061] Table 2 Introduction to early warning indicators at each level

[0062]

[0063]

[0064] Preferably, if Figure 4 As shown, the capital data management system also includes a closed-loop early warning and disposal module, wherein:

[0065] The closed-loop early warning and disposal module 16 is used to close the first-level indicator early warning after it is reviewed and determined by the first review agency (indicator management department) as a non-first-class to-do item; after it is reviewed and determined by the first review agency as a first-class to-do item, a first-class reminder sheet is sent to the responsible agency corresponding to the core indicator, and the responsible agency is triggered to handle the to-do items through the first-class reminder sheet; wherein, the first review agency is one of the agencies or a subsidiary of the main agency, and the responsible agency is a parallel structure of the first review agency or an agency parallel to the main agency.

[0066] After the second review agency receives the explanation of the causes of the first category of to-do items and the set response plan and reviews and passes the review, the process of the first-level indicator warning ends; after the second review agency receives the explanation of the causes of the first category of to-do items and the set response plan and reviews and fails to pass the review, the second review agency will review the explanation of the causes of the first category of to-do items and the set response plan for the responsible agency structure again until it is passed by the second review agency, and the first-level indicator warning is closed; the second review agency is one of the agencies or a subsidiary of the main agency;

[0067] For the second-level indicator warning, after being reviewed and determined as the second-class pending items by the first review agency, a second-class reminder sheet is sent to the responsible agency corresponding to the core indicator, and the second-class reminder sheet triggers the responsible agency to explain the reasons for the second-class pending items. After the second review agency receives the explanation of the reasons for the second-class pending items, the second-level indicator warning is closed;

[0068] For the third-level indicator warning, after being reviewed and determined by the first review agency as the third-level to-do items, a third-level reminder sheet will be sent to the responsible agency corresponding to the core indicator, and the third-level reminder sheet will be used to trigger the responsible agency to pay attention to the changes in the core indicators, so as to remind the responsible agency to pay attention to the changes in the core indicators, and at the same time close the third-level indicator warning;

[0069] Preferably, the dashboard 12 is used for warning the first-level indicator. After the first review agency reviews and determines that the to-do item is not the first-class to-do item, the first indicator light or the second indicator light at the assessment indicator on the corresponding dashboard is turned off; or, after the second review agency receives and reviews the explanation of the cause of the to-do item and the set response plan, the first indicator light or the second indicator light at the assessment indicator on the corresponding dashboard is turned off;

[0070] For the second-level indicator warning, after being reviewed and determined by the first review agency as a non-second-class to-do item, the third indicator light at the non-assessment type business plan indicator on the corresponding dashboard is turned off; or, after the second review agency receives the explanation of the reasons for the second-class to-do item, the third indicator light at the non-assessment type business plan indicator on the corresponding dashboard is turned off;

[0071] For the third-level indicator warning, after being reviewed and determined by the first review agency as a non-third-category to-do item, the fourth indicator light at the structural indicators and / or attribution indicators related to non-capital business on the corresponding dashboard shall be turned off; or, after reminding the responsible agency to pay attention to changes in core indicators through the third-category reminder sheet, the fourth indicator light on the corresponding dashboard shall be turned off.

[0072] Preferably, users with warning initiation authority and warning review authority can see the corresponding parts of the warning module 14, the warning query interface 15 and the closed-loop warning disposal module 16 under the first institution. After clicking to enter the review management menu, users of the first institution can review the update and disclosure of the dashboard and authorize the dashboard viewing authority, such as Figure 8 and Fig. 9 shown.

[0073] like Figure 5 As shown, in combination with an embodiment of the present invention, a capital data management method is provided, comprising:

[0074] S201: Display each institution in the form of an image link through the resource management menu, and display the scenario directory under each institution, the scenarios include: capital scenarios and capital-related scenarios that represent capital through indicators; the institutions are in a parallel relationship or other institutions are affiliated to one of the main institutions, the types of indicators include at least one of the following: investment, income and profit; each type of indicator value includes at least one of the following: current value, target value and completed value; such as Figure 6 As shown, the institutions displayed on the left include: the first institution, the second institution, the third institution, the fourth institution and the fifth institution, among which the second institution, the third institution, the fourth institution and the fifth institution are subordinate to the first institution.

[0075] S202: Display the current activation scenario through the dashboard according to the set page layout; if the current activation scenario is any capital scenario, display the indicators of the current activation scenario according to the set page layout; wherein, there is at least one current activation scenario, and the current activation scenario belongs to at least one institution.

[0076] Through the automated management method of capital data management, we assist in managing capital scenarios, use dashboards to display the currently activated scenarios, or the indicators of the currently activated scenarios, to achieve an intuitive display of capital data, streamline capital management, reduce the complexity and disorder of the management process, reduce labor costs, and improve processing efficiency.

[0077] Preferably, the capital data management method further includes:

[0078] S203: After the authorized user clicks the resource management menu to enter the corresponding directory editing interface, the organization and the scene directory of the organization are set through the directory editing interface; Figure 6 As shown, a scene directory is set under the organization displayed in the resource management menu 11, so as to set a dashboard for the scene corresponding to the scene directory, and display the scene through the dashboard.

[0079] S204: in response to the authorized user clicking the autonomous analysis menu to enter the dashboard setting interface, create a corresponding dashboard for each scenario through the dashboard setting interface, and configure operation functions for the created dashboard, the operation functions including: viewing, editing, updating and deleting; and

[0080] S205: setting the core indicators, related indicators of the core indicators and sub-indicators of the core indicators for the scenarios to be displayed on the created dashboard in the dashboard setting interface, and setting component styles and display colors for the core indicators, related indicators and sub-indicators respectively; the component styles include indicator cards, indicator ring charts, indicator bar charts and / or indicator bar-line mixed chart tables; wherein the same indicator may be a core indicator or a related indicator in different scenarios, and the same scenario includes at least one core indicator;

[0081] S206: In the dashboard setting interface, the width and height of the components are set by dragging, and the positions of the components on the dashboard are determined by dragging the components of the core indicators, related indicators and sub-indicators, so as to construct a page layout of the dashboard; the components of the dashboard can be designed according to the requirements to select the corresponding indicators and component styles, and the component styles include indicator cards, doughnut charts, bar charts, mixed bar and line charts, tables, etc.

[0082] S207: Set the dynamic display mode of the indicators on the dashboard in the dashboard setting interface. The dynamic display mode refers to clicking the core indicator main control key, and the corresponding core indicator, related indicators or sub-indicators are updated and displayed through page jumps and / or pop-up boxes. That is, the corresponding core indicator is updated and displayed through page jumps and / or pop-up boxes, and the related indicators of the core indicator are updated and displayed in a linked manner through page jumps and / or pop-up boxes, and the sub-indicators of the core indicator are updated and displayed in a linked manner through page jumps and / or pop-up boxes.

[0083] Simple and direct automatic editing capabilities are achieved through the resource management menu and the autonomous analysis menu. The ability to associate display components with various capital data is achieved through the dashboard setting interface, achieving simple and intuitive display of capital.

[0084] The self-analysis menu 13 and the dashboard setting interface therein are as follows Figure 7 As shown in the figure, authorized users click to enter the self-analysis menu and configure the dashboard according to capital (i.e. finance-related) indicators in each scenario. Figure 7 The capital scenario catalog displayed in the table includes risk management and financial performance, etc.; the capital-related scenario catalog displayed includes: overview, business analysis, customer management, and service main business; you can also set up an overview dashboard, financial performance dashboard, business analysis dashboard, customer management dashboard, risk management dashboard, and service main business dashboard for each institution. The content displayed on the dashboard can be formed according to the data corresponding to the structure in Table 1.

[0085] On the operation page of the autonomous analysis menu 13, each organization is displayed on the left, and each organization has a kanban directory; a reusable kanban component directory is also displayed on the left, which stores reusable kanban components. Clicking on each organization can display the kanban saved under the corresponding organization.

[0086] Preferably, the capital data management method further includes:

[0087] S208: In response to a click operation of the authorized user on the edit function on the kanban board to be adjusted, entering the edit page of the kanban board to be adjusted; the edit function can be implemented through a button, and a function supporting editing has been set in the background;

[0088] S209: adding an indicator to the scene on the editing page of the dashboard to be adjusted, setting the component style and display color for the added indicator, setting the width and height of the component corresponding to the added indicator by dragging, setting the position of the component corresponding to the added indicator on the dashboard to be adjusted by dragging; and linking the added indicator to the core indicator main control key;

[0089] and / or,

[0090] S210: Add, delete and / or modify the component style for the existing indicator on the edit page of the dashboard to be adjusted, set the width and height of the existing component by dragging, and set the position of the component of the existing indicator on the dashboard to be adjusted by dragging. The change of the components of the dashboard is to select the corresponding indicators and component styles according to the design requirements.

[0091] The dashboard corresponding to the scenario is automatically and flexibly configured and adjusted according to needs, which improves the ability to adjust and respond to changes in the capital scenario of the operation in real time due to business development, macroeconomic policy adjustments, etc. during the operation process.

[0092] Preferably, the capital data management method further includes:

[0093] S211: If the core indicator of the scenario is an assessment indicator, when the assessment completion of the assessment indicator does not meet the standard, the first-level indicator warning is triggered; and when the indicator value of the assessment indicator triggers the warning value, the first indicator light is displayed at the first indicator corresponding to the dashboard corresponding to the scenario, and the first indicator light is represented by an orange triangle and an exclamation mark placed in the triangle; when the indicator value of the first indicator triggers the limit value, the second indicator light is displayed at the first indicator corresponding to the dashboard corresponding to the scenario, and the second indicator light is a red light; Fig.10 There is a display with indicator lights on; among them, the first type of indicators refers to assessment indicators, and the assessment indicators all correspond to risk scenarios, such as profits.

[0094] S212: If the core indicator of the scenario is a second-category indicator, which refers to a non-assessment business plan indicator, when the completion of the second-category indicator is lower than expected or the second-category indicator has a negative fluctuation, a second-level indicator warning is triggered; at the same time, a third indicator light is displayed at the second-category indicator corresponding to the dashboard corresponding to the scenario, and the third indicator light is a yellow light;

[0095] S213: If the core indicator of the scenario is a third-category indicator, the third-category indicator refers to structural indicators and / or attribution indicators related to non-capital business; when the third-category indicator shows negative fluctuations or the negative fluctuations exceed the fluctuation threshold, the third-level indicator warning is triggered; at the same time, the fourth indicator light is displayed at the third-category indicator corresponding to the dashboard corresponding to the scenario, and the fourth indicator light is blue.

[0096] Through the above-mentioned indicator warning method, warnings can be issued in a timely manner and displayed on the dashboard simultaneously, avoiding the investment of a large amount of manpower and material resources in layer-by-layer approval, which can indirectly improve management efficiency.

[0097] The capital data management method further includes:

[0098] S214: The first warning summary chart corresponding to the first-level indicator warning, the second warning summary chart corresponding to the second-level indicator warning, and the third warning summary chart corresponding to the third-level indicator warning are respectively displayed through the warning query interface; the first warning summary chart, the second warning summary chart, and the third warning summary chart all include: the date when the warning was generated, the indicator, the affiliated organization, the warning rule summary, and the current processing result query; among them, the warning rule for the first-level indicator warning is: the indicator value of the first category indicator triggers the warning value, the warning rule for the second-level indicator warning is: the completion degree of the second category indicator is lower than expected or the second category indicator has a negative fluctuation, and the warning rule for the second-level indicator warning is: the third category indicator has a negative fluctuation or the negative fluctuation exceeds the fluctuation threshold.

[0099] The detailed information of the early warning process of the core indicators in this table can be viewed through the detailed information query button (such as the "More" button) set at the first early warning summary chart, the detailed information of the early warning process of the core indicators in this table can be viewed through the detailed information query button set at the second early warning summary chart, and the detailed information of the early warning process of the core indicators in this table can be viewed through the detailed information query button at the third early warning summary chart. Fig.11 As shown, the early warning summary chart plays a role in summarizing and generalizing, and can uniformly manage the early warning statistical information of indicators at all levels within the preset time period.

[0100] Preferably, the capital data management method further includes:

[0101] S215: For the first-level indicator warning, after being reviewed and determined by the first review agency (indicator management department) as a non-first-class to-do item, the first-level indicator warning will be closed; after being reviewed and determined by the first review agency as a first-class to-do item, a first-class reminder sheet will be sent to the responsible agency corresponding to the core indicator, and the responsible agency will be triggered to handle the to-do items through the first-class reminder sheet; among them, the first review agency is one of the agencies or a subsidiary of the main agency, and the responsible agency is a parallel structure of the first review agency or an agency parallel to the main agency.

[0102] S216: After the second review agency receives the explanation of the causes of the first type of to-do items and the set response plan and reviews and passes the review, the process of the first level indicator warning ends; after the second review agency receives the explanation of the causes of the first type of to-do items and the set response plan and reviews and fails to pass the review, the second review agency will review the explanation of the causes of the first type of to-do items and the set response plan for the responsible agency structure again until it is passed by the second review agency, and the first level indicator warning is closed; at the same time, the first indicator light or the second indicator light on the corresponding dashboard is closed; wherein the second review agency is one of the agencies or a subsidiary of the main agency;

[0103] S217: For the second-level indicator warning, after being reviewed and determined by the first review agency as a second-class to-do item, a second-class reminder sheet is sent to the responsible agency corresponding to the core indicator, and the responsible agency is triggered by the second-class reminder sheet to explain the reasons for the second-class to-do item. After the second review agency receives the explanation of the reasons for the second-class hair washing to-do item, the second-level indicator warning is closed, and the third indicator light on the corresponding dashboard is closed at the same time; or, after being reviewed and determined by the first review agency as a non-second-class to-do item, the second-level indicator warning is closed, and the third indicator light on the corresponding dashboard is closed at the same time;

[0104] S218: For the third-level indicator warning, after being reviewed and determined by the first review agency as a third-category to-do item, a third-category reminder sheet is sent to the responsible agency corresponding to the core indicator, and the third-category reminder sheet is used to trigger the responsible agency to pay attention to changes in core indicators, close the third-level indicator warning, and at the same time close the fourth indicator light on the corresponding dashboard; or, after being reviewed and determined by the first review agency as a non-third-category to-do item, the third-level indicator warning is closed and the fourth indicator light on the corresponding dashboard is closed.

[0105] Preferably, users with warning initiation authority and warning review authority can see the corresponding parts of the warning module 14, the warning query interface 15 and the closed-loop warning disposal module 16 under the first institution. After clicking to enter the review management menu, users of the first institution can review the update and disclosure of the dashboard and authorize the dashboard viewing authority, such as Figure 8 and Fig. 9 shown.

[0106] The beneficial effects achieved by the embodiments of the present invention are as follows:

[0107] 1. The capital data management system of the embodiment of the present invention is used to control capital and capital risks in the process of product operation. Through the capital data management system, automated assisted management can be used to timely discover problems in the operation and management process of the company, subsidiaries or branches. For example, if it is used for a financial holding company, it can discover problems in the operation and management process of the financial holding company and its subsidiaries or branches, and promptly promote the handling of the problems to ensure the smooth achievement of the company's business goals.

[0108] 2. It has the ability to accumulate scenarios and automate management. It can display capital scenarios and capital-related scenarios through dashboards, realize visual management scenarios of various scenarios, associate capital with business data, and conduct data digitization and data visualization, helping the main institution, such as the head office, to achieve digital dynamic management and control, and also to achieve cross-industry financial operation management and control. It is especially suitable for financial holding companies, which can coordinate the capital management of their own and subsidiary operations.

[0109] 3. Automatically and flexibly configure and adjust the corresponding dashboards according to needs, improving the ability to adjust and respond to changes in the capital scenario of operations during business development, macroeconomic policy adjustments, etc.

[0110] Simple and direct automatic editing capabilities are achieved through the resource management menu and the autonomous analysis menu. The ability to associate display components with various capital data is achieved through the dashboard setting interface, achieving simple and intuitive display of capital.

[0111] 4. Through the early warning module, early warning query interface and closed-loop early warning disposal module, early warnings can be issued in a timely manner, solving the problems of discovery, supervision and disposal tracking of problems such as failure to meet assessment indicators and abnormal operations during the operation process, making the management of capital in the operation process more effective.

[0112] It should be understood that the specific order or hierarchy of steps in the disclosed process is an example of an exemplary method. Based on design preferences, it should be understood that the specific order or hierarchy of steps in the process can be rearranged without departing from the scope of protection of the present disclosure. The attached method claims present the elements of the various steps in an exemplary order and are not intended to be limited to the specific order or hierarchy described.

[0113] In the above detailed description, various features are grouped together in a single embodiment to simplify the disclosure. This method of disclosure should not be interpreted as reflecting an intention that the embodiments of the claimed subject matter require more features than are clearly stated in each claim. On the contrary, as reflected in the appended claims, the invention is in a state of having less than all the features of the disclosed individual embodiments. Therefore, the appended claims are hereby expressly incorporated into the detailed description, with each claim standing on its own as a separate preferred embodiment of the invention.

[0114] The disclosed embodiments are described above to enable any person skilled in the art to implement or use the present invention. Various modifications of these embodiments are obvious to those skilled in the art, and the general principles defined herein may also be applied to other embodiments without departing from the spirit and scope of the present disclosure. Therefore, the present disclosure is not limited to the embodiments given herein, but is consistent with the broadest scope of the principles and novel features disclosed in this application.

[0115] The above description includes examples of one or more embodiments. Of course, it is impossible to describe all possible combinations of components or methods for the purpose of describing the above embodiments, but it should be recognized by those skilled in the art that the various embodiments may be further combined and arranged. Therefore, the embodiments described herein are intended to cover all such changes, modifications and variations that fall within the scope of protection of the appended claims. In addition, with respect to the term "comprising" used in the specification or claims, the word is covered in a manner similar to the term "including", just as "including," is explained as a transitional word in the claims. In addition, any term "or" used in the specification of the claims is intended to mean "non-exclusive or".

[0116] Those skilled in the art may also understand that the various illustrative logical blocks, units, and steps listed in the embodiments of the present invention may be implemented by electronic hardware, computer software, or a combination of the two. In order to clearly demonstrate the interchangeability of hardware and software, the various illustrative components, units, and steps described above have generally described their functions. Whether such functions are implemented by hardware or software depends on the specific application and the design requirements of the entire system. Those skilled in the art may use various methods to implement the described functions for each specific application, but such implementation should not be understood as exceeding the scope of protection of the embodiments of the present invention.

[0117] The various illustrative logic blocks or units described in the embodiments of the present invention can be implemented or operated by a general-purpose processor, a digital signal processor, an application-specific integrated circuit (ASIC), a field programmable gate array or other programmable logic device, a discrete gate or transistor logic, a discrete hardware component, or any combination of the above. The general-purpose processor can be a microprocessor, and optionally, the general-purpose processor can also be any conventional processor, controller, microcontroller or state machine. The processor can also be implemented by a combination of computing devices, such as a digital signal processor and a microprocessor, a plurality of microprocessors, one or more microprocessors combined with a digital signal processor core, or any other similar configuration.

[0118] The steps of the method or algorithm described in the embodiments of the present invention can be directly embedded in hardware, a software module executed by a processor, or a combination of the two. The software module can be stored in a RAM memory, a flash memory, a ROM memory, an EPROM memory, an EEPROM memory, a register, a hard disk, a removable disk, a CD-ROM, or other storage media of any form in the art. Exemplarily, the storage medium can be connected to the processor so that the processor can read information from the storage medium and can write information to the storage medium. Optionally, the storage medium can also be integrated into the processor. The processor and the storage medium can be arranged in an ASIC, and the ASIC can be arranged in a user terminal. Optionally, the processor and the storage medium can also be arranged in different components in the user terminal.

[0119] In one or more exemplary designs, the above functions described in the embodiments of the present invention can be implemented in hardware, software, firmware or any combination of the three. If implemented in software, these functions can be stored on a computer-readable medium, or transmitted in the form of one or more instructions or codes on a computer-readable medium. Computer-readable media include computer storage media and communication media that facilitate the transfer of computer programs from one place to another. The storage medium can be any available medium that can be accessed by any general or special computer. For example, such computer-readable media can include but are not limited to RAM, ROM, EEPROM, CD-ROM or other optical disk storage, disk storage or other magnetic storage devices, or any other medium that can be used to carry or store program codes in the form of instructions or data structures and other forms that can be read by general or special computers, or general or special processors. In addition, any connection can be appropriately defined as a computer-readable medium, for example, if the software is transmitted from a website site, server or other remote resource through a coaxial cable, fiber optic cable, twisted pair, digital subscriber line (DSL) or wirelessly, such as infrared, wireless and microwave, it is also included in the defined computer-readable medium. The disk and disc include compact disk, laser disk, optical disk, DVD, floppy disk and blue-ray disk. Disks usually copy data magnetically, while discs usually copy data optically with lasers. The above combination can also be included in computer readable media.

[0120] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A capital data management system, It is characterized in that include: The resource management menu is used to display each institution in the form of an image link, and to display the scenario directory under each institution, wherein the scenarios include: capital scenarios and capital-related scenarios that represent capital through indicators; wherein the institutions are in a parallel relationship or other institutions are subordinate to one of the main institutions, and the types of indicators include at least one of the following: investment, income and profit; and each type of indicator value includes at least one of the following: current value, target value and completed value; A dashboard is used to display the current activation scenario according to the set page layout; if the current activation scenario is any capital scenario, the indicators of the current activation scenario are displayed according to the set page layout; wherein, there is at least one current activation scenario, and the current activation scenario belongs to at least one institution; The capital data management system further includes an autonomous analysis menu, wherein: The resource management menu is also used to set the organization and the scene directory of the organization through the directory editing interface; The autonomous analysis menu is used to respond to a click operation of the autonomous analysis menu by an authorized user, enter a dashboard setting interface, create a corresponding dashboard for each scene in the dashboard setting interface, and configure operation functions for the created dashboard; In the dashboard setting interface, set the core indicators, related indicators of the core indicators, and sub-indicators of the core indicators for the scenario to be displayed for the created dashboard, and set component styles and display colors for the core indicators, related indicators, and sub-indicators, respectively; In the dashboard setting interface, the width and height of the components are set by dragging, and the positions of the components on the dashboard are determined by dragging the components of the core indicators, related indicators, and sub-indicators, so as to construct a page layout of the dashboard; In the dashboard setting interface, a dynamic display mode of indicators on the dashboard is set. The dynamic display mode refers to clicking the core indicator main control key, and the corresponding core indicator, related indicator or sub-indicator is updated and displayed in the form of page jump and / or pop-up box; The capital data management system further includes an early warning module, wherein: The early warning module is used to trigger a first-level indicator early warning if the core indicator of the scenario is a first-class indicator and the assessment completion degree of the first-class indicator is not up to standard; if the core indicator of the scenario is a second-class indicator, trigger a second-level indicator early warning if the completion degree of the second-class indicator is not as expected or the second-class indicator has a negative fluctuation; if the core indicator of the scenario is a third-class indicator, trigger a third-level indicator early warning if the third-class indicator has a negative fluctuation or the negative fluctuation exceeds the fluctuation threshold; The kanban is also used for: When the first-level indicator warning is triggered, and the indicator value of the first-type indicator triggers the warning value, the first indicator light is displayed at the assessment indicator corresponding to the dashboard corresponding to the scene; When the indicator value of the first type of indicator triggers the limit value, a second indicator light is displayed at the first type of indicator corresponding to the dashboard corresponding to the scene; When the second-level indicator warning is triggered, a third indicator light is displayed at the second-type indicator corresponding to the dashboard corresponding to the scene; When the third level indicator warning is triggered, a fourth indicator light is displayed at the third type of indicator corresponding to the signboard corresponding to the scene; The capital data management system further includes a closed-loop early warning and disposal module, wherein the closed-loop early warning and disposal module is used to: For the first-level indicator warning, after being reviewed and determined by the first review agency as a non-first-class to-do item, the first-level indicator warning is closed; after being reviewed and determined by the first review agency as a first-class to-do item, a first-class reminder sheet is sent to the responsible agency corresponding to the core indicator, and the responsible agency is triggered to handle the to-do item through the first-class reminder sheet; wherein, the first review agency is one of the agencies or a subsidiary of the main agency, and the responsible agency is a parallel agency of the first review agency or an agency parallel to the main agency; After the second review agency receives the explanation of the cause of the first type of to-do items and the set response plan and reviews and passes the review, the process of the first level indicator warning ends; For the second-level indicator warning, after being reviewed and determined by the first review agency as the second-type to-do items, a second-type reminder sheet is sent to the responsible agency corresponding to the core indicator, and the second-type reminder sheet triggers the responsible agency to explain the reasons for the second-type to-do items. After the second review agency receives the reasons for the second-type to-do items, the second-level indicator warning is closed; For the third-level indicator warning, after being reviewed and determined by the first review agency as the third type of to-do items, a third-type reminder sheet will be sent to the responsible agency corresponding to the core indicator, and the third-level indicator warning will be closed at the same time.

2. The capital data management system according to claim 1, It is characterized in that The kanban is further used to respond to a click operation of an edit function on the kanban to be adjusted by an authorized user, and enter an edit page of the kanban to be adjusted; On the editing page of the dashboard to be adjusted, add indicators to the scene, set the component style and display color for the added indicators, set the width and height of the components corresponding to the added indicators by dragging, set the position of the components corresponding to the added indicators on the dashboard to be adjusted by dragging; and link the added indicators to the core indicator main control key; and / or, On the edit page of the dashboard to be adjusted, add, delete and / or modify the component style for the existing indicator, set the width and height of the component of the existing indicator by dragging, and set the position of the component of the existing indicator on the dashboard to be adjusted by dragging.

3. The capital data management system according to claim 1, further comprising: include: The early warning query interface is used to display the first early warning summary chart corresponding to the first-level indicator early warning, the second early warning summary chart corresponding to the second-level indicator early warning, and the third early warning summary chart corresponding to the third-level indicator early warning; The first warning summary chart, the second warning summary chart and the third warning summary chart all include: the date when the warning was generated, the indicator, the affiliated organization, the warning rules and the current processing result query; among them, the warning rules for the first-level indicator warning are: the indicator value of the first category of indicators triggers the warning value, the warning rules for the second-level indicator warning are: the completion degree of the second category of indicators is lower than expected or the second category of indicators experience negative fluctuations, and the warning rules for the second-level indicator warning are: the third category of indicators experience negative fluctuations or the negative fluctuations that occur exceed the fluctuation threshold.

4. The capital data management system according to claim 3, It is characterized in that The kanban is also used for: For the first-level indicator warning, after being reviewed and determined by the first review agency as a non-first-class to-do item, the first indicator light or the second indicator light at the assessment indicator on the corresponding dashboard is turned off; or, after the second review agency receives and reviews the explanation of the cause of the to-do item and the set response plan, the first indicator light or the second indicator light at the assessment indicator on the corresponding dashboard is turned off; For the second-level indicator warning, after being reviewed and determined by the first review agency as a non-second-level to-do item, the third indicator light at the non-assessment type business plan indicator on the corresponding dashboard will be turned off; Alternatively, after the second review agency receives the explanation of the reasons for the second type of to-do items, the third indicator light at the non-assessment type business plan indicator on the corresponding dashboard is turned off; For the third-level indicator warning, after being reviewed and determined by the first review agency as a non-third-category to-do item, the fourth indicator light at the structural indicators and / or attribution indicators related to non-capital business on the corresponding dashboard shall be turned off; or, after the responsible agency is reminded to pay attention to changes in core indicators through the third-category reminder sheet, the fourth indicator light on the corresponding dashboard shall be turned off.

5. A method for managing capital data, It is characterized in that include: Through the resource management menu, each institution is displayed in the form of an image link, and the scenario directory under each institution is displayed, wherein the scenario includes: a capital scenario and a capital-related scenario in which capital is represented by indicators; wherein the institutions are in a parallel relationship or other institutions are subordinate to one of the main institutions, and the types of indicators include at least one of the following: investment, income and profit; and each type of indicator value includes at least one of the following: current value, target value and completed value; The current activation scenario is displayed through the dashboard according to the set page layout; if the current activation scenario is any capital scenario, the indicators of the current activation scenario are displayed according to the set page layout; wherein the current activation scenario is at least one, and the current activation scenario belongs to at least one institution; The capital data management method further includes: Setting the organization and its scene directory through the directory editing interface of the resource management menu; In response to a click operation of an authorized user on an autonomous analysis menu, entering a dashboard setting interface, creating corresponding dashboards for each scenario through the dashboard setting interface, and configuring operation functions for the created dashboards; and On the dashboard setting interface, core indicators, related indicators of the core indicators, and sub-indicators of the core indicators are set for the created dashboard for displaying the scene, and component styles and display colors are set for the core indicators, related indicators, and sub-indicators, respectively; In the dashboard setting interface, the width and height of the components are set by dragging, and the positions of the components on the dashboard are determined by dragging the components of the core indicators, related indicators, and sub-indicators, so as to construct a page layout of the dashboard; In the dashboard setting interface, a dynamic display mode of indicators on the dashboard is set. The dynamic display mode refers to clicking the core indicator main control key, and the corresponding core indicator, related indicator or sub-indicator is updated and displayed in the form of page jump and / or pop-up box; The capital data management method further includes: If the core indicator of the scenario is a first-class indicator, when the assessment completion of the first-class indicator does not meet the standard, the first-level indicator warning is triggered; and when the indicator value of the first-class indicator triggers the warning value, the first indicator light is displayed at the first-class indicator corresponding to the dashboard corresponding to the scenario; when the indicator value of the first-class indicator triggers the limit value, the second indicator light is displayed at the first-class indicator corresponding to the dashboard corresponding to the scenario; If the core indicator of the scenario is a second-level indicator, when the completion of the second-level indicator is lower than expected or the second-level indicator fluctuates negatively, the second-level indicator warning is triggered; the third indicator light is displayed at the second-level indicator corresponding to the dashboard corresponding to the scenario; If the third-level indicator of the core indicator of the scenario shows negative fluctuations or the negative fluctuations exceed the fluctuation threshold, the third-level indicator warning is triggered; the fourth indicator light is displayed at the third-level indicator corresponding to the dashboard corresponding to the scenario; The capital data management method further includes: For the first-level indicator warning, after being reviewed and determined by the first review agency as a non-first-class to-do item, the first-level indicator warning is closed; after being reviewed and determined by the first review agency as a first-class to-do item, a first-class reminder sheet is sent to the responsible agency corresponding to the core indicator, and the first-class reminder sheet is used to trigger the responsible agency to handle the to-do item; wherein, the first review agency is one of the agencies or a subsidiary of the main agency, and the responsible agency is a parallel agency of the first review agency or an agency parallel to the main agency; After the second review agency receives the explanation of the cause of the first type of to-do items and the set response plan and reviews and passes the review, the process of the first level indicator warning ends; For the second-level indicator warning, after being reviewed and determined as the second-class to-do items by the first review agency, a second-class reminder sheet is sent to the responsible agency corresponding to the core indicator, and the second-class reminder sheet triggers the responsible agency to explain the reasons for the second-class to-do items. After the second review agency receives the explanation of the reasons for the second-class hair washing to-do items, the second-level indicator warning is closed; For the third-level indicator warning, after being reviewed and determined by the first review agency as the third type of to-do items, a third-type reminder sheet will be sent to the responsible agency corresponding to the core indicator, and the third-level indicator warning will be closed at the same time.

6. The capital data management method according to claim 5, It is characterized in that Also includes: In response to a click operation of an edit function on a kanban board to be adjusted by an authorized user, entering an edit page of the kanban board to be adjusted; On the editing page of the dashboard to be adjusted, add indicators to the scene, set the component style and display color for the added indicators, set the width and height of the components corresponding to the added indicators by dragging, set the position of the components corresponding to the added indicators on the dashboard to be adjusted by dragging; and link the added indicators to the core indicator main control key; and / or, On the edit page of the dashboard to be adjusted, add, delete and / or modify the component style for the existing indicator, set the width and height of the existing component by dragging, and set the position of the component of the existing indicator on the dashboard to be adjusted by dragging.