A groundwater reuse system and method for dewatering wells in foundation pits

By calculating and controlling the amount of groundwater pumped out and the amount of water used, and adjusting the construction process, the reuse of groundwater in the dewatering well pipes of the foundation pit was realized, which solved the problem of water waste during construction and reduced the consumption of municipal water purification network pipes.

CN117853099BActive Publication Date: 2026-11-10CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410044657.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-12
Publication Date
2026-11-10
Estimated Expiration
2044-01-12

AI Technical Summary

Technical Problem

In existing foundation pit construction, the direct discharge of groundwater extracted from dewatering wells leads to a waste of water resources and increases the consumption of municipal water purification networks.

Method used

By calculating the drainage and water consumption in the foundation pit dewatering well pipes, adjusting the construction process, and using controllers to control electric valves and flow meters, the reuse of groundwater and the discharge of excess water can be achieved, reducing the consumption of municipal water purification network pipes.

Benefits of technology

This enabled the reuse of groundwater during construction, reduced water consumption in the municipal water purification network, and ensured a normal supply of water for construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117853099B_ABST
    Figure CN117853099B_ABST
Patent Text Reader

Abstract

A groundwater reuse system and method for foundation pit dewatering wells, relating to the field of foundation pit dewatering recycling technology, includes a dewatering well pumping volume calculation module, a water usage point identification module, a water usage calculation module, a construction process analysis module, a construction project adjustment module, and a difference calculation module. This invention collects parameters from all dewatering wells and calculates the pumping volume per unit time of the daily working cycle during construction. Simultaneously, it calculates the water usage per unit time of the daily working cycle during construction and calculates the difference. When the difference is positive, the corresponding difference is replenished from the municipal water supply network; when the difference is negative, the difference is discharged into the municipal sewage network. This not only ensures normal water use during construction but also automatically discharges excess groundwater into the municipal sewage network, achieving groundwater reuse within the foundation pit dewatering wells and reducing the consumption of water resources in the municipal water supply network.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of foundation pit dewatering recycling technology, specifically to a groundwater reuse system and method within a foundation pit dewatering well pipe. Background Technology

[0002] During foundation pit construction, groundwater continuously seeps into the pit because the aquifer is cut off. To promptly drain the water or lower the groundwater level, current practices typically involve installing dewatering wells. These wells are then pumped out and discharged into the municipal sewage network, thus lowering the groundwater level, keeping the pit bottom dry, and increasing the stability of the slopes and base. However, the existing dewatering wells directly discharge the extracted groundwater as wastewater, wasting water resources. Furthermore, construction on the site consumes a significant amount of water from the municipal water supply network. Therefore, finding a solution to reuse the groundwater from the foundation pit dewatering wells to reduce the use of municipal water resources is a problem that needs to be addressed. Summary of the Invention

[0003] This invention provides a groundwater reuse system and method for dewatering wells in foundation pits. By calculating the pumping volume per unit time in the dewatering wells and the water consumption during construction, the pumped water can be processed and used during construction, thereby reducing the consumption of water resources in the municipal water purification network.

[0004] A groundwater reuse system within a dewatering well in a foundation pit includes: a dewatering well pumping volume calculation module, a water usage point identification module, a water usage calculation module, a construction process analysis module, a construction project adjustment module, and a quantity difference calculation module.

[0005] The dewatering volume calculation module for dewatering wells is suitable for calculating the dewatering volume per unit time of the daily working cycle of dewatering wells in real time.

[0006] The water usage point identification module is suitable for identifying and classifying water usage points in the construction process;

[0007] The water consumption calculation module is suitable for calculating water consumption data based on the identified water consumption points.

[0008] The construction process analysis module is suitable for analyzing the construction process in conjunction with water consumption data to obtain items in the entire construction process whose sequence can be adjusted.

[0009] The construction project adjustment module is suitable for adjusting the construction sequence of construction projects that can be adjusted in the construction process, so that the water consumption per unit time in the daily work cycle of the construction process is infinitely close to the average water consumption per unit time in a single work cycle in the total water consumption of the entire work cycle.

[0010] The difference calculation module is suitable for calculating the difference between the water consumption per unit time of the daily work cycle and the drainage volume of the dewatering well per unit time of the daily work cycle, based on the adjusted construction process.

[0011] Furthermore, when the difference calculated by the difference calculation module is positive, the corresponding difference is supplemented from the municipal water purification network according to the difference; when the difference calculated by the difference calculation module is negative, the difference is discharged into the municipal sewage network.

[0012] Furthermore, the dewatering well pumping volume calculation module includes a dewatering well management unit and a pumping volume estimation unit;

[0013] The dewatering well management unit is used to collect parameters of all dewatering wells, and is suitable for managing dewatering wells that can be pumped out, forming a database of available dewatering wells. When a dewatering well is closed, it is deleted from the database of available dewatering wells. After the dewatering well is excavated and groundwater is pumped out, the dewatering well is added to the database of available dewatering wells.

[0014] The drainage volume estimation unit is adapted to calculate the drainage volume of groundwater from all dewatering wells based on the parameters of the dewatering wells in the available dewatering well database, and obtain an estimated value of the drainage volume of groundwater per unit time in the daily working cycle of the dewatering wells.

[0015] Furthermore, the water usage point identification module includes a constant water usage point identification unit and a floating water usage point identification unit;

[0016] The constant water usage point identification unit is suitable for analyzing the construction process and obtaining the constant water usage points in the construction process.

[0017] The floating water point identification unit is suitable for analyzing the construction process and obtaining the floating water points in the construction process.

[0018] Furthermore, the water consumption calculation module includes a constant water consumption calculation unit and a floating water consumption calculation unit;

[0019] The constant water consumption calculation unit is adapted to calculate the water consumption per unit time of the constant water consumption point in the daily work cycle based on the constant water consumption point obtained in the construction process.

[0020] The floating water consumption calculation unit is adapted to calculate the water consumption of the floating water consumption points per unit time in the daily work cycle based on the floating water consumption points obtained in the construction process.

[0021] Furthermore, the calculation process for water consumption per unit time during the daily work cycle of floating water points includes:

[0022] Obtain water consumption data for all working cycles of historical floating water points;

[0023] Analyze water consumption data to obtain the average water consumption per unit time of the daily working cycle at the floating water consumption points;

[0024] The average value is taken as the water consumption per unit time of the floating water point in the daily work cycle.

[0025] Secondly, embodiments of the present invention provide a method for reusing groundwater within a foundation pit dewatering well pipe, comprising the following steps:

[0026] S1, calculates the amount of groundwater pumped out per unit time during the daily working cycle of all precipitation wells;

[0027] S2, based on the daily work cycle unit time groundwater pumping volume, set up a three-stage sedimentation storage tank for storing pumped water, and use pipelines to connect the water pump in the dewatering well to the inlet of the three-stage sedimentation storage tank, and use pipelines to connect the outlet of the three-stage sedimentation storage tank to the water storage tank at the construction site.

[0028] S3, by adjusting the order of construction projects in the construction process, makes the water consumption per unit time in the daily work cycle infinitely close to the average water consumption per unit time in a single work cycle in the total water consumption of the entire work cycle.

[0029] S4, add an electric valve a and a flow meter a at the water supply pipe connecting the water storage tank and the municipal water purification network at the construction site;

[0030] S5, add a flow meter b at the water supply pipe connecting the water storage tank and the three-stage sedimentation water storage tank at the construction site;

[0031] S6, Install a level gauge in the water storage tank at the construction site, and install an electric valve b at the connection between the water storage tank and the municipal sewage network at the construction site;

[0032] S7, the controller is configured to communicate with the electric valve a, the electric valve b, the flow meter a, the flow meter b, and the level gauge respectively;

[0033] S8, the controller calculates the difference between the average water consumption per unit time and the drainage volume per unit time, as well as the signal from the level gauge, and controls the electric valve a and the electric valve b respectively according to the difference.

[0034] Furthermore, the signal output terminal of the controller is communicatively connected to the signal input terminals of electric valve a and electric valve b, respectively, and the signal input terminal of the controller is communicatively connected to the signal output terminals of flow meter a, flow meter b and level gauge, respectively.

[0035] Furthermore, the control process of the controller for the electric valve a and the electric valve b includes:

[0036] S81a, when the difference is positive, the controller opens the electric valve a according to the difference, and the controller replenishes the corresponding difference from the municipal water purification network according to the data collected by the flow meter a;

[0037] S81b, when the difference is negative, the controller opens the electric valve b according to the difference, and discharges the difference into the municipal sewage network.

[0038] Furthermore, the control process of the controller over the electric valve a and the electric valve b also includes:

[0039] S82a, two liquid level monitoring points, one high and one low, are set up for the water storage tank at the construction site;

[0040] S82b, when the level gauge detects that the water level is high, the controller opens the electric valve b to discharge water into the municipal sewage network, so that the water level is in the range between the high level monitoring point and the low level monitoring point;

[0041] S82c, when the level gauge detects that the water level is low, the controller opens the electric valve a to replenish the water in the water storage tank at the construction site using the municipal water purification network, so that the water level is in the range between the high level monitoring point and the low level monitoring point.

[0042] The beneficial effects of the above-described technical solutions provided in the embodiments of the present invention include at least the following:

[0043] This invention collects and calculates the daily drainage volume per unit time of the dewatering wells during construction by collecting parameters from all dewatering wells. Simultaneously, it calculates the daily water consumption per unit time during construction and determines the difference. When the difference is positive, the corresponding difference is replenished from the municipal water supply network; when the difference is negative, the difference is discharged into the municipal sewage network. This not only ensures normal water use during construction but also automatically discharges excess groundwater into the municipal sewage network, achieving groundwater reuse within the dewatering wells and reducing water consumption in the municipal water supply network.

[0044] Other features and advantages of the invention will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the invention. The objects and other advantages of the invention may be realized and obtained by means of the structures particularly pointed out in the written description, claims, and drawings.

[0045] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0046] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings:

[0047] Figure 1 This is a schematic diagram of the groundwater reuse system inside the dewatering well pipe of the foundation pit disclosed in an embodiment of the present invention;

[0048] Figure 2 This is a schematic flowchart of the groundwater reuse method in the well pipe of the foundation pit dewatering disclosed in an embodiment of the present invention;

[0049] Figure 3 This is a flowchart illustrating steps S81a to S81b disclosed in an embodiment of the present invention;

[0050] Figure 4 This is a flowchart illustrating steps S82a to S82c as disclosed in an embodiment of the present invention;

[0051] Figure 5 This is a communication block diagram of the controller and electric valve a, electric valve b, flow meter a, flow meter b and level gauge disclosed in an embodiment of the present invention.

[0052] Figure label:

[0053] 1. Calculation module for dewatering well pumping volume; 101. Dewatering well management unit; 102. Pumping volume estimation unit; 2. Water usage point identification module; 201. Constant water usage point identification unit; 202. Floating water usage point identification unit; 3. Water usage calculation module; 301. Constant water usage calculation unit; 302. Floating water usage calculation unit; 4. Construction process analysis module; 5. Construction project adjustment module; 6. Quantity difference calculation module; 7. Electric valve a; 8. Electric valve b; 9. Flow meter a; 10. Flow meter b; 11. Level gauge; 12. Controller. Detailed Implementation

[0054] Exemplary embodiments of the present disclosure will now be described in more detail with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.

[0055] like Figure 1 As shown, this embodiment of the invention provides a groundwater reuse system within a dewatering well pipe in a foundation pit, comprising: a dewatering well pumping volume calculation module 1, a water usage point identification module 2, a water usage calculation module 3, a construction process analysis module 4, a construction project adjustment module 5, and a quantity difference calculation module 6;

[0056] The system calculates the drainage volume per unit time in the dewatering well pipe of the foundation pit through the dewatering well drainage volume calculation module 1. After the water consumption calculation module 3 calculates the water consumption data during the construction process, the construction process analysis module 4 obtains the projects that can be adjusted in sequence during the entire construction process. The construction project adjustment module 5 adjusts the construction sequence of the construction projects that can be adjusted in the construction process, so that the water consumption per unit time in the daily work cycle of the construction process is infinitely close to the average water consumption per unit time in a single work cycle of the entire work cycle. During the construction process, the quantity difference calculation module 6 calculates the difference between the water consumption per unit time in the daily work cycle of the construction process and the drainage volume per unit time in the daily work cycle of the dewatering well, thereby controlling the use of water resources in the municipal water purification network and achieving the effect of reducing the consumption of water resources in the municipal water purification network.

[0057] like Figure 1 As shown, the dewatering well pumping volume calculation module 1 is suitable for calculating the pumping volume of the dewatering well per unit time of the daily working cycle in real time.

[0058] The dewatering well pumping volume calculation module 1 includes a dewatering well management unit 101 and a pumping volume estimation unit 102.

[0059] Specifically, the precipitation well management unit 101 is used to collect parameters of all precipitation wells, which is suitable for managing precipitation wells that can be pumped out, forming a database of available precipitation wells. When a precipitation well is closed, it is deleted from the database of available precipitation wells. After the groundwater is pumped out after the excavation of the precipitation well is completed, the precipitation well is added to the database of available precipitation wells.

[0060] Specifically, the drainage volume estimation unit 102 is adapted to calculate the drainage volume of groundwater from all dewatering wells based on the parameters of the dewatering wells in the available dewatering well database, and obtain an estimated value of the drainage volume of groundwater per unit time of the daily working cycle of the dewatering wells.

[0061] like Figure 1 As shown, the water point identification module 2 is suitable for identifying and classifying water points in the construction process;

[0062] The water usage point identification module 2 includes a constant water usage point identification unit 201 and a floating water usage point identification unit 202.

[0063] Specifically, the constant water usage point identification unit 201 is suitable for analyzing the construction process to obtain the constant water usage points in the construction process.

[0064] It should be noted that the constant quantity refers to a fixed amount of water used, which is determined based on the items requiring fixed water usage during the construction process.

[0065] Specifically, the floating water point identification unit 202 is suitable for analyzing the construction process and obtaining the floating water points in the construction process.

[0066] It should be noted that the floating amount refers to water usage within a certain range of activity, and is determined based on the projects during the construction process, such as water used for cleaning equipment and dust suppression.

[0067] like Figure 1 As shown, the water consumption calculation module 3 is adapted to calculate water consumption data based on the identified water consumption points;

[0068] The water consumption calculation module 3 includes a constant water consumption calculation unit 301 and a floating water consumption calculation unit 302.

[0069] Specifically, the constant water consumption calculation unit 301 is suitable for calculating the water consumption per unit time of the constant water consumption point in the daily work cycle based on the constant water consumption point obtained in the construction process.

[0070] Specifically, the floating water consumption calculation unit 302 is suitable for calculating the water consumption of the floating water consumption points per unit time in the daily work cycle based on the floating water consumption points obtained in the construction process.

[0071] In one embodiment, the calculation process for the water consumption per unit time during the daily work cycle of a floating water point includes:

[0072] Obtain water consumption data for all working cycles of historical floating water points;

[0073] Analyze water consumption data to obtain the average water consumption per unit time of the daily working cycle at the floating water consumption points;

[0074] The average value is taken as the water consumption per unit time of the floating water point in the daily work cycle.

[0075] like Figure 1 As shown, the construction process analysis module 4 is suitable for analyzing the construction process in conjunction with water consumption data to obtain the items in the entire construction process whose sequence can be adjusted.

[0076] like Figure 1 As shown, the construction project adjustment module 5 is suitable for adjusting the construction sequence of construction projects that can be adjusted in the construction process, so that the water consumption per unit time in the daily work cycle in the construction process is infinitely close to the average water consumption per unit time in a single work cycle in the total work cycle.

[0077] like Figure 1 As shown, the difference calculation module 6 is suitable for calculating the difference between the water consumption per unit time of the daily work cycle and the drainage volume of the dewatering well per unit time of the daily work cycle during the construction process, based on the adjusted construction process.

[0078] Specifically, when the difference calculated by the difference calculation module 6 is positive, the amount of water pumped per unit time is less than the amount of water used per unit time. Based on the difference, the corresponding difference is supplemented from the municipal water purification network. When the difference calculated by the difference calculation module 6 is negative, the amount of water pumped per unit time is greater than the amount of water used per unit time. The difference is discharged into the municipal sewage network.

[0079] like Figures 2-5 As shown in the figure, this invention also discloses a method for reusing groundwater within a foundation pit dewatering well pipe, comprising the following steps:

[0080] S1, calculates the amount of groundwater pumped out per unit time during the daily working cycle of all precipitation wells;

[0081] S2, based on the daily work cycle unit time groundwater pumping volume, set up a three-stage sedimentation storage tank for storing pumped water, and use pipelines to connect the water pump in the dewatering well to the inlet of the three-stage sedimentation storage tank, and use pipelines to connect the outlet of the three-stage sedimentation storage tank to the water storage tank at the construction site.

[0082] S3, by adjusting the order of construction projects in the construction process, makes the water consumption per unit time in the daily work cycle infinitely close to the average water consumption per unit time in a single work cycle in the total water consumption of the entire work cycle.

[0083] S4. Add an electric valve a7 and a flow meter a9 to the water supply pipe connecting the water storage tank and the municipal water purification system at the construction site.

[0084] S5, add a flow meter b10 at the water supply pipe connecting the water storage tank and the three-stage sedimentation water storage tank at the construction site;

[0085] S6, a level gauge 11 is installed in the water storage tank at the construction site, and an electric valve b8 is installed at the connection between the water storage tank at the construction site and the municipal sewage network.

[0086] S7, the controller 12 is configured to communicate with electric valve a7, electric valve b8, flow meter a9, flow meter b10, and level gauge 11 respectively;

[0087] S8, based on the average water consumption per unit time and the drainage volume per unit time, calculate the difference and the signal from the level gauge 11, and the controller 12 controls the electric valve a7 and the electric valve b8 respectively according to the difference.

[0088] In one example, the control process of controller 12 for electric valves a7 and b8 includes:

[0089] S81a, when the difference is positive, the controller 12 opens the electric valve a7 according to the difference, and the controller 12 replenishes the corresponding difference from the municipal water purification network according to the data collected by the flow meter a9.

[0090] S81b, when the difference is negative, the controller 12 opens the electric valve b8 according to the difference, and discharges the difference into the municipal sewage network.

[0091] In another example, the control process of controller 12 for electric valves a7 and b8 also includes:

[0092] S82a, two liquid level monitoring points, one high and one low, are set up for the water storage tank at the construction site;

[0093] S82b, when the level gauge 11 detects that the water level is high, the controller 12 opens the electric valve b8 to discharge water into the municipal sewage network, so that the water level is in the range between the high level monitoring point and the low level monitoring point.

[0094] S82c, when the level gauge 11 detects that the water level is low, the controller 12 opens the electric valve a7 to replenish the water in the water storage tank at the construction site using the municipal water purification network, so that the water level is in the range between the high level monitoring point and the low level monitoring point.

[0095] It should be noted that the signal output terminal of controller 12 is connected to the signal input terminals of electric valve a7 and electric valve b8 respectively, and the signal input terminal of controller 12 is connected to the signal output terminals of flow meter a9, flow meter b10 and level gauge 11 respectively.

[0096] This invention collects and calculates the daily drainage volume per unit time of the dewatering wells during construction by collecting parameters from all dewatering wells. Simultaneously, it calculates the daily water consumption per unit time during construction and determines the difference. When the difference is positive, the corresponding difference is replenished from the municipal water supply network; when the difference is negative, the difference is discharged into the municipal sewage network. This not only ensures normal water use during construction but also automatically discharges excess groundwater into the municipal sewage network, achieving groundwater reuse within the dewatering wells and reducing water consumption in the municipal water supply network.

[0097] It should be noted that the specific models and specifications of electric valve a7, electric valve b8, flow meter a9, flow meter b10, level gauge 11, and controller 12 need to be selected and determined according to the actual specifications of the device. The specific selection calculation method adopts the existing technology in this field, so it will not be described in detail.

[0098] The power supply and operating principle of electric valves a7, b8, flow meter a9, b10, level gauge 11, and controller 12 are clear to those skilled in the art and will not be described in detail here.

[0099] It should be understood that the specific order or hierarchy of steps in the disclosed process is an example of an exemplary method. Based on design preferences, it should be understood that the specific order or hierarchy of steps in the process may be rearranged without departing from the scope of this disclosure. The appended method claims provide elements of various steps in an exemplary order and are not intended to limit the scope to the specific order or hierarchy described.

[0100] In the detailed description above, various features are combined together in a single embodiment to simplify this disclosure. This approach to disclosure should not be construed as reflecting an intention that embodiments of the claimed subject matter require more features than are explicitly stated in each claim. Rather, as reflected in the appended claims, the invention is presented with fewer features than all of the features in a single disclosed embodiment. Therefore, the appended claims are hereby explicitly incorporated into the detailed description, with each claim representing a separate preferred embodiment of the invention.

[0101] Those skilled in the art will also understand that the various illustrative logic blocks, modules, circuits, and algorithm steps described in conjunction with the embodiments herein can be implemented as electronic hardware, computer software, or a combination thereof. To clearly illustrate the interchangeability between hardware and software, the various illustrative components, blocks, modules, circuits, and steps described above are generally described in terms of their functionality. Whether such functionality is implemented as hardware or software depends on the specific application and the design constraints imposed on the overall system. Those skilled in the art can implement the described functionality in alternative ways for each specific application; however, such implementation decisions should not be construed as departing from the scope of this disclosure.

[0102] The steps of the methods or algorithms described in conjunction with the embodiments herein can be directly embodied in hardware, software modules executed by a processor, or a combination thereof. The software modules can reside in RAM memory, flash memory, ROM memory, EPROM memory, EEPROM memory, registers, hard disks, removable disks, CD-ROMs, or any other form of storage medium well known in the art. An exemplary storage medium is connected to the processor, enabling the processor to read information from and write information to the storage medium. Of course, the storage medium can also be a component of the processor. The processor and storage medium can reside in an ASIC. The ASIC can reside in a user terminal. Alternatively, the processor and storage medium can exist as discrete components in the user terminal.

[0103] For software implementation, the techniques described in this application can be implemented using modules (e.g., procedures, functions, etc.) that perform the functions described in this application. This software code can be stored in memory units and executed by a processor. The memory units can be implemented within the processor or outside the processor; in the latter case, they are communicatively coupled to the processor via various means, as is well known in the art.

[0104] The foregoing description includes examples of one or more embodiments. It is certainly impossible to describe all possible combinations of components or methods in order to describe the above embodiments, but those skilled in the art will recognize that further combinations and arrangements of the various embodiments are possible. Therefore, the embodiments described herein are intended to cover all such changes, modifications, and variations that fall within the scope of the appended claims. Furthermore, the term "comprising" as used in the specification or claims is interpreted in a manner similar to the term "including," as interpreted when used as a conjunction in the claims. Additionally, the use of any term "or" in the specification of the claims is intended to mean "non-exclusive or."

Claims

1. A groundwater reuse system within a foundation pit dewatering well pipe, characterized in that, include: The dewatering volume calculation module for dewatering wells is suitable for calculating the dewatering volume per unit time of the daily working cycle of dewatering wells in real time. The water usage point identification module is suitable for identifying and classifying water usage points in the construction process; The water consumption calculation module is suitable for calculating water consumption data based on the identified water consumption points. The construction process analysis module is suitable for analyzing the construction process in conjunction with water consumption data to obtain items in the entire construction process whose sequence can be adjusted. The construction project adjustment module is suitable for adjusting the construction sequence of construction projects that can be adjusted in the construction process, so that the water consumption per unit time in the daily work cycle of the construction process is infinitely close to the average water consumption per unit time in a single work cycle in the total water consumption of the entire work cycle. The difference calculation module is suitable for calculating the difference between the water consumption per unit time of the daily work cycle and the drainage volume of the dewatering well per unit time of the daily work cycle, based on the adjusted construction process. When the difference calculated by the difference calculation module is positive, the corresponding difference is replenished from the municipal water purification network. When the difference calculated by the difference calculation module is negative, the difference is discharged into the municipal sewage network.

2. The groundwater reuse system within the well pipe of a foundation pit dewatering system as described in claim 1, characterized in that, The dewatering well pumping volume calculation module includes a dewatering well management unit and a pumping volume estimation unit; The dewatering well management unit is used to collect parameters of all dewatering wells, and is suitable for managing dewatering wells that can be pumped out, forming a database of available dewatering wells. When a dewatering well is closed, it is deleted from the database of available dewatering wells. After the dewatering well is excavated and groundwater is pumped out, the dewatering well is added to the database of available dewatering wells. The drainage volume estimation unit is adapted to calculate the drainage volume of groundwater from all dewatering wells based on the parameters of the dewatering wells in the available dewatering well database, and obtain an estimated value of the drainage volume of groundwater per unit time in the daily working cycle of the dewatering wells.

3. The groundwater reuse system within the well pipe of a foundation pit dewatering system as described in claim 1, characterized in that, The water usage point identification module includes a constant water usage point identification unit and a floating water usage point identification unit; The constant water usage point identification unit is suitable for analyzing the construction process and obtaining the constant water usage points in the construction process. The floating water point identification unit is suitable for analyzing the construction process and obtaining the floating water points in the construction process.

4. A groundwater reuse system within a foundation pit dewatering well pipe as described in claim 3, characterized in that, The water consumption calculation module includes a constant water consumption calculation unit and a floating water consumption calculation unit; The constant water consumption calculation unit is adapted to calculate the water consumption per unit time of the constant water consumption point in the daily work cycle based on the constant water consumption point obtained in the construction process. The floating water consumption calculation unit is adapted to calculate the water consumption of the floating water consumption points per unit time in the daily work cycle based on the floating water consumption points obtained in the construction process.

5. A groundwater reuse system within a foundation pit dewatering well pipe as described in claim 4, characterized in that, The calculation process for water consumption per unit time during the daily work cycle of floating water points includes: Obtain water consumption data for all working cycles of historical floating water points; Analyze water consumption data to obtain the average water consumption per unit time of the daily working cycle at floating water points; The average value is taken as the water consumption per unit time of the floating water point in the daily work cycle.

6. A method for reusing groundwater within a foundation pit dewatering well pipe, using the foundation pit dewatering well pipe groundwater reuse system as described in any one of claims 1 to 5, characterized in that, Includes the following steps: Calculate the amount of groundwater pumped out per unit time during the daily working cycle of all dewatering wells; Based on the daily work cycle and the amount of groundwater pumped out per unit time, a three-stage sedimentation tank is set up to store the pumped water. Pipes are used to connect the water pump in the dewatering well to the inlet of the three-stage sedimentation tank, and pipes are used to connect the outlet of the three-stage sedimentation tank to the water storage tank at the construction site. After adjusting the sequence of construction projects in the construction process, the water consumption per unit time in the daily work cycle is made infinitely close to the average water consumption per unit time in a single work cycle in the total water consumption of the entire work cycle. An electric valve a and a flow meter a are added at the water supply pipe connecting the water storage tank and the municipal water purification system at the construction site. Add a flow meter b at the water inlet pipe connecting the water storage tank and the three-stage sedimentation tank at the construction site; A level gauge is installed in the water storage tank at the construction site, and an electric valve b is installed at the connection between the water storage tank and the municipal sewage network at the construction site. The controller is configured to communicate with the electric valve a, the electric valve b, the flow meter a, the flow meter b, and the level gauge respectively. The controller calculates the difference between the average water consumption per unit time and the drainage volume per unit time, and uses the signal from the level gauge to control the electric valve a and the electric valve b according to the difference.

7. A method for reusing groundwater within a foundation pit dewatering well pipe as described in claim 6, characterized in that, The signal output terminal of the controller is communicatively connected to the signal input terminals of electric valve a and electric valve b, respectively, and the signal input terminal of the controller is communicatively connected to the signal output terminals of flow meter a, flow meter b and level gauge, respectively.

8. A method for reusing groundwater within a foundation pit dewatering well pipe as described in claim 6, characterized in that, The control process of the controller over the electric valve a and the electric valve b includes: When the difference is positive, the controller opens the electric valve a according to the difference, and the controller replenishes the corresponding difference from the municipal water purification network according to the data collected by the flow meter a. When the difference is negative, the controller opens the electric valve b according to the difference, and discharges the difference into the municipal sewage network.

9. A method for reusing groundwater within a foundation pit dewatering well pipe as described in claim 6, characterized in that, The control process of the controller over the electric valve a and the electric valve b also includes: Two monitoring points, one high and one low, were set up in the water storage tank at the construction site; When the level gauge detects that the water level is high, the controller opens the electric valve b to discharge water into the municipal sewage network, so that the water level is in the range between the high level monitoring point and the low level monitoring point. When the level gauge detects that the water level is low, the controller opens the electric valve a to replenish the water in the water storage tank at the construction site using the municipal water purification network, so that the water level is between the high level monitoring point and the low level monitoring point.

Citation Information

Patent Citations

  • Deep foundation pit rainwater recycling device based on BIM and using method thereof

    CN107587517A

  • Optimal design method of foundation pit dewatering based on genetic algorithm and groundwater model

    CN109117517A