Cross-domain risk assessment method, device, equipment and medium for power dispatching communication service
By calculating the minimum attack cost and prior probability, combining DC optimal current and Bayesian network, the cross-domain risk of network attacks in power scheduling services is solved, and the problem of difficulty in cross-domain risk assessment in power systems is improved. reliability.
Patent Information
- Application Number
- CN202311688944.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-09
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2043-12-09
AI Technical Summary
Quantitative assessment of cross-domain risks in power scheduling services is too difficult. The existing technology mainly starts from physical systems and fails to effectively evaluate the threats of network security vulnerabilities in the information system to the power system.
By obtaining the topological data of the scheduling automation system, calculating the minimum attack cost and prior probability, combining DC optimal current algorithm and Bayesian network, evaluating the probability and physical consequences of the network attack combination, and calculating the network attack in the power scheduling communication service cross-domain risks.
It reduces the difficulty of cross-domain risk quantitative assessment, deeply explores the fragile links of the system, improves the reliability of the scheduling automation system, and accurately evaluates the cross-domain risk value transmitted by the information system to the physical system.
Smart Images

Figure CN117857107B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of electric power communication technology, and specifically relates to a method, device, equipment and medium for cross-domain risk assessment of electric power dispatching communication services. Background Art
[0002] With the deep integration of Internet communication technology and automatic control technology with power systems, the digitalization and informatization of power systems are constantly improving. Especially in dispatching automation systems, power dispatching services are highly dependent on communication networks, and the successful execution of dispatching commands is inseparable from the carrying role of communication networks. In dispatching automation systems, intelligent electronic devices (IEDs) and complex communication equipment are widely distributed. The network security protection level of these devices is low, and there are many system vulnerabilities. Attackers can use their basic knowledge of power systems and network attack methods to launch network attacks on equipment security vulnerabilities, thereby achieving the purpose of tampering with the measurement data of the power system. If the vulnerabilities of the information system are attacked, it will threaten the safe and stable operation of the power system and cause unnecessary economic losses to the power system.
[0003] Traditional power system risk assessment starts from the physical system and mainly evaluates the risks caused by a single equipment failure to the power system. As the number of IED devices with low security protection levels continues to grow, network security vulnerabilities in information systems that can be used as attack entrances by attackers are also increasing, making cross-domain risk quantitative assessment too difficult. Summary of the invention
[0004] The purpose of the present invention is to provide a method, device, equipment and medium for cross-domain risk assessment of electric power dispatching communication services, so as to solve the problem that cross-domain risk quantitative assessment in electric power information-physical systems is too difficult.
[0005] In order to achieve the above object, the present invention adopts the following technical solution:
[0006] In a first aspect, the present invention provides a method for cross-domain risk assessment of electric power dispatching communication services, comprising:
[0007] Obtaining dispatching automation system topology data; based on the dispatching automation system topology data, calculating the minimum attack cost under the constraints of node injected active power residual, node active power tampering range and node injected total power balance; wherein the minimum attack cost is the cost of the tampered measurement data;
[0008] Obtain the prior probability that the measurement data has been successfully tampered by an attacker;
[0009] Calculate the probability of occurrence of network attack combinations based on the minimum attack cost and prior probability;
[0010] Based on the tampered measurement data, the DC optimal power flow algorithm is used to calculate the physical consequences of the cyber attack;
[0011] According to the probability of occurrence and physical consequences of cyber attack combinations, the cross-domain risks caused by cyber attacks in power dispatching communication services are calculated.
[0012] Furthermore, based on the dispatching automation system topology data, the minimum attack cost considering the node injected active power residual constraint, the node active power tampering range constraint and the node injected total power balance constraint is calculated, including:
[0013] Building a cost minimization attack model:
[0014]
[0015] The constraints are:
[0016] stC1:ΔP F =-AΔP d
[0017] C2:-αP d ≤ΔP d ≤αP d
[0018] C3:b T ΔP d =0
[0019]
[0020]
[0021]
[0022] Where A is the branch-node association admittance matrix, ΔP d is the non-zero attack vector injected by the attacker into the original measurement vector, ΔP F is the branch power flow change vector; α is a constant; ΔP d,i The attack injection power of node i, b T is a column vector whose elements are all 1; v i is a 0-1 variable, v i =1 indicates that the node measurement data has been tampered with, otherwise it has not been tampered with; F ij is the active power value of branch ij, is the maximum active power that branch ij can carry, is the change of branch ij power flow, θ i is the phase angle of node i; θ j is the phase angle of node j; x ijis the branch reactance, and N is the number of nodes.
[0023] Furthermore, the prior probability of obtaining the measurement data being successfully tampered by an attacker includes:
[0024] Obtain the dispatching automation system structure and vulnerability distribution, and obtain a dispatching automation system vulnerability distribution map;
[0025] Obtain vulnerability node information of different devices in the dispatch automation system through CVSS to determine the probability of successful exploitation of the dispatch automation system vulnerability;
[0026] The Bayesian attack graph is constructed from the Bayesian network and the vulnerability distribution graph of the scheduling automation system to obtain the local conditional probability;
[0027] The prior probability of each node is calculated based on the probability of successful vulnerability exploitation and the local conditional probability.
[0028] Furthermore, CVSS is used to obtain vulnerability node information of different devices in the scheduling automation system, and the metric level and its value are obtained according to the vulnerability node information of different devices. The probability of the vulnerability being successfully exploited is calculated by the metric level and its value of the vulnerability:
[0029] P vi =2.1×AV×AC×PR×UI
[0030] Where P vi is the probability of the vulnerability being successfully exploited, AV is the access vector metric of the vulnerability; AC is the attack complexity metric of the vulnerability; PR is the permission requirement metric of the vulnerability; UI is the user interaction metric of the vulnerability;
[0031] Construct a Bayesian attack graph from the Bayesian network, determine the attribute nodes, directed edges and logical relationships of the Bayesian network, and obtain local conditional probabilities;
[0032] The attribute node is defined as:
[0033]
[0034] In the formula, is an attribute node, G represents the type of attribute node; n is the total number of attribute nodes in the Bayesian network;
[0035] A directed edge is defined as:
[0036] E={e ij |i=1,2,…,n,j=1,2,…,b}
[0037] In the formula, E represents the Bayesian network as a set of directed edges, e ij Indicates that the attribute node is derived from the parent To child attribute node Transfer, attribute node The parent attribute node set of
[0038] The logical relationship is: the relationship between parent attribute nodes can be divided into two types: AND or OR;
[0039] When the logical relationship of the parent attribute node is AND, its local conditional probability is:
[0040]
[0041] In the formula, is the local conditional probability, P vi , the probability that the vulnerability is successfully exploited;
[0042] When the logical relationship of the parent attribute node is OR, its local conditional probability is:
[0043]
[0044] express It is successfully exploited by the attacker, otherwise it is not exploited;
[0045] The prior probability of each attribute node is calculated based on the probability of successful vulnerability exploitation and the local conditional probability:
[0046]
[0047]
[0048] In the formula, Represents an attribute node The prior probability of being mastered by the attacker.
[0049] Furthermore, the calculation formula for the probability of occurrence of the network attack combination is:
[0050]
[0051] Where P e represents the probability of occurrence of network attack combination e, v i It is a 0-1 variable, which determines whether the measurement data of node i has been tampered with.
[0052] Furthermore, the physical consequences of network attacks calculated based on the DC optimal power flow algorithm are specifically:
[0053]
[0054]
[0055] -P Gi ≤ΔP Gi ≤(P Gimax -P Gi )
[0056] 0≤ΔP Di ≤P Di
[0057] -F lmax ≤F l ≤F lmax
[0058] In the formula, C e is the minimum active load reduction caused by the network attack combination e, N p is the number of power nodes, P Di is the active power value of node i after false data injection, F l is the branch active power value after false data injection, F lmax is the maximum active power of the branch after the false data is injected, P Gi is the output active power of generator node i, ΔP Di is the active load reduction of node i, ΔP Gi is the active output adjustment of the generator at node i, P Gimax is the upper limit of the active output of the generator at node i.
[0059] Furthermore, the cross-domain risk caused by the network attack in the power dispatching communication business is calculated based on the calculated probability of occurrence of the network attack combination and the physical consequences of the network attack, specifically:
[0060] R=P e C e
[0061] Where R represents the cross-domain risk generated when the network attack combination e occurs; P e represents the probability of occurrence of network attack combination e; C e It represents the minimum active load reduction caused by the network attack combination e.
[0062] In a second aspect of the present invention, a device for cross-domain risk assessment of electric power dispatching communication services is provided, comprising:
[0063] A minimum attack cost calculation module is used to obtain the dispatching automation system topology data; based on the dispatching automation system topology data, calculate the minimum attack cost under the constraints of node injected active power residual, node active power tampering range and node injected total power balance; wherein the minimum attack cost is the cost of the tampered measurement data;
[0064] A priori probability acquisition module is used to obtain the priori probability that the measurement data has been successfully tampered by an attacker;
[0065] A network attack combination occurrence probability calculation module is used to calculate the network attack combination occurrence probability based on the minimum attack cost and prior probability;
[0066] The physical consequence calculation module of the network attack is used to calculate the physical consequence of the network attack based on the tampered measurement data and using the DC optimal power flow algorithm;
[0067] The risk calculation module is used to calculate the cross-domain risks caused by network attacks in the power dispatching communication business based on the probability of occurrence of network attack combinations and physical consequences.
[0068] According to a third aspect of the present invention, an electronic device is provided, comprising a processor and a memory, wherein the processor is configured to execute a computer program stored in the memory to implement a cross-domain risk assessment method for electric power dispatching communication services as described in any one of the above.
[0069] According to a fourth aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores at least one instruction, and when the at least one instruction is executed by a processor, a method for cross-domain risk assessment of electric power dispatching communication services as described in any one of the above is implemented.
[0070] The beneficial effects of the present invention are as follows:
[0071] 1. The present invention obtains the topological data of the dispatching automation system, calculates the minimum attack cost, and obtains the prior probability that the measurement data is successfully tampered by the attacker; calculates the probability of a combination of network attacks based on the minimum attack cost and the prior probability; uses the DC optimal power flow algorithm to calculate the physical consequences of the network attack based on the tampered measurement data; calculates the cross-domain risk caused by the network attack in the power dispatching communication service based on the probability of a combination of network attacks and the physical consequences; reduces the difficulty of quantitative assessment of cross-domain risks in the dispatching automation system, deeply explores the vulnerable links of the system, and provides a reference for improving system reliability.
[0072] 2. The present invention constructs a specific attack scenario, establishes a Bayesian attack graph based on the Bayesian network, analyzes the probability and physical consequences of successful exploitation of the vulnerability, and uses the cost minimization attack model to minimize the attack cost as the optimization goal, taking into account the attacker's resource constraints and system flow constraints, so that the attacker can successfully tamper with the system measurement data, and then accurately quantify and evaluate the cross-domain risk value transmitted from the information system to the physical system in the scheduling business, thereby improving the reliability of the scheduling automation system. BRIEF DESCRIPTION OF THE DRAWINGS
[0073] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0074] Figure 1 This is a flow chart of a method for cross-domain risk assessment of electric power dispatching communication services according to the present invention;
[0075] Figure 2 To provide a distribution map of vulnerabilities in the dispatching automation system;
[0076] Figure 3 Bayesian attack graph for line / node measurement data;
[0077] Figure 4 Compare the attack cost evaluation results;
[0078] Figure 5 Compare the assessment results for attack risk;
[0079] Figure 6 This is a structural block diagram of a cross-domain risk assessment device for electric power dispatching communication services according to an embodiment of the present invention;
[0080] Figure 7 The present invention is a structural block diagram of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0081] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.
[0082] The following detailed description is an exemplary description, which is intended to provide further detailed description of the present invention. Unless otherwise specified, all technical terms used in the present invention have the same meaning as those generally understood by those skilled in the art to which the present application belongs. The terms used in the present invention are only for describing specific embodiments, and are not intended to limit exemplary embodiments according to the present invention.
[0083] Example 1
[0084] like Figure 1 As shown, a cross-domain risk assessment method for power dispatching communication services includes:
[0085] S1: Obtain dispatching automation system topology data; based on the dispatching automation system topology data, calculate the minimum attack cost under the constraints of node injected active power residual, node active power tampering range and node injected total power balance; wherein the minimum attack cost is the cost of tampering with measurement data;
[0086] Specifically, the dispatching automation system topology data in this solution includes:
[0087] Matrix A, branch reactance x ij , the phase angle θ between nodes i and j i ,θ j
[0088] Specifically, the cost minimization attack model in this scheme is based on the residual constraint of node injected active power, the tampering range constraint of node active power, and the balance constraint of node injected total power;
[0089] The cost minimization attack model is established as:
[0090]
[0091] The constraints of the cost minimization attack model are:
[0092] stC1:ΔP F =-AΔP d
[0093] C2:-αP d ≤ΔP d ≤αP d
[0094] C3:b T ΔP d =0
[0095]
[0096]
[0097]
[0098] Where A is the branch-node association admittance matrix, ΔP d is the non-zero attack vector injected by the attacker into the original measurement vector, ΔP F is the branch flow change vector; α is a constant used to limit the measurement size that can be modified at each node; ΔP d,i The attack injection power of node i, b T is a column vector whose elements are all 1; v i is a 0-1 variable used to determine whether the measurement data of node i has been tampered with. i =1 indicates that the node measurement data has been tampered with, otherwise it has not been tampered with; F ij is the active power value of branch ij, is the maximum active power that branch ij can carry, is the change of branch ij power flow, θ i is the phase angle of node i; θ j is the phase angle of node j; xij is the branch reactance, and N is the number of nodes.
[0099] S2: Obtain the prior probability that the measurement data is successfully tampered by the attacker, specifically:
[0100] P1-3: System structure permissions on prime movers, routers, and servers, t probability of successful attack;
[0101] S21: Figure 2 As shown, the scheduling automation system structure and vulnerability distribution are obtained, and a scheduling automation system vulnerability distribution map is obtained;
[0102] The dispatching automation system includes the SCADA server V4 and dispatching data router V3 in the cloud, the remote motors V1 and V2 and switches at the station control layer, multiple measurement and control devices at the bay layer, and multiple switches, multiple line merging units and bus merging units at the process layer; each device in the dispatching automation system may have vulnerabilities;
[0103] S22: Obtain vulnerability node information of different devices in the scheduling automation system through CVSS (Common Vulnerability Scoring System), as shown in Table 1 below;
[0104] Table 1 System vulnerability information table
[0105]
[0106] The values of various basic metrics of vulnerabilities obtained based on the vulnerability node information of different devices are shown in Table 2 below.
[0107] Table 2 Vulnerability metric value quantification level table
[0108]
[0109]
[0110] The metric level and value of the vulnerability are obtained from Table 1 and Table 2, and the value is substituted into the following formula to calculate the probability of the vulnerability being successfully exploited:
[0111] P vi =2.1×AV×AC×PR×UI
[0112] Where P vi is the probability of the vulnerability being successfully exploited, AV is the access vector metric of the vulnerability; AC is the attack complexity metric of the vulnerability; PR is the permission requirement metric of the vulnerability; UI is the user interaction metric of the vulnerability;
[0113] S23: Construct a Bayesian attack graph from the Bayesian network and the vulnerability distribution map of the dispatching automation system, determine the attribute nodes, directed edges and logical relationships of the Bayesian network, and obtain local conditional probabilities;
[0114] The attribute node is defined as:
[0115]
[0116] In the formula, is an attribute node, G represents the type of attribute node, which can be PRI, VUL or TAR; n is the total number of attribute nodes in the Bayesian network;
[0117] The value is 0 or 1. When , it means that the attribute is not controlled by the attacker; when , it means that the attribute is controlled by the attacker.
[0118] A directed edge is defined as:
[0119] E={e ij |i=1,2,…,n,j=1,2,…,n}
[0120] In the formula, E represents the Bayesian network as a set of directed edges, e ij Indicates that the attribute node is derived from the parent To child attribute node Transfer, attribute node The parent attribute node set of
[0121] The logical relationship is: R represents the relationship between the parent attribute nodes of the attribute node. The relationship between the parent attribute nodes can be divided into two types: AND or OR;
[0122] When the logical relationship of the parent attribute node is AND, its local conditional probability is:
[0123]
[0124] In the formula, is the local conditional probability, That is P vi , the probability that the vulnerability is successfully exploited;
[0125] When the logical relationship of the parent attribute node is OR, its local conditional probability is:
[0126]
[0127] S24: After the Bayesian network is established, the prior probability of each node is calculated based on the probability of successful vulnerability exploitation and the local conditional probability. The prior probability of each attribute node is equal to the product of the conditional probability of the current attribute node and its parent attribute node:
[0128]
[0129]
[0130] In the formula, Represents an attribute node The prior probability of being mastered by the attacker.
[0131] S3: Calculate the probability of occurrence of network attack combinations based on the calculated minimum attack cost and prior probability;
[0132] The calculation formula for the probability of a combination of network attacks is:
[0133]
[0134] Where P e represents the probability of occurrence of network attack combination e, v i It is a 0-1 variable, which determines whether the measurement data of node i has been tampered with.
[0135] S4: Based on the tampered measurement data, the DC optimal power flow algorithm is used to calculate the physical consequences of the cyber attack;
[0136] The specific method for calculating the physical consequences of a cyber attack is:
[0137]
[0138]
[0139] -P Gi ≤ΔP Gi ≤(P Gimax -P Gi )
[0140] 0≤ΔP Di ≤P Di
[0141] -F lmax ≤F l ≤-F lmax
[0142] In the formula, C e is the optimization target, N represents the minimum active load reduction caused by the network attack combination e, p is the number of power nodes, P Di is the active power value of node i after false data injection, Fl is the branch active power value after false data injection, F lmax is the maximum active power of the branch after the false data is injected, P Gi is the output active power of generator node i, ΔP Di is the active load reduction of node i, ΔP Gi is the active output adjustment of the generator at node i, P Gimax is the upper limit of the active output of the generator at node i.
[0143] S5: Based on the probability of occurrence of cyber attack combinations and the physical consequences of cyber attacks, the cross-domain risks caused by cyber attacks in the power dispatching communication business are calculated.
[0144] The specific method is:
[0145] R=P e C e
[0146] Where R represents the cross-domain risk generated when the network attack combination e occurs; P e represents the probability of occurrence of network attack combination e; C e It represents the minimum active load reduction caused by the network attack combination e.
[0147] S6: Output cross-domain risk assessment results of power dispatching communication services.
[0148] In order to verify the performance of the cross-domain risk assessment method proposed in the embodiment of the present invention, taking the IEEE14-node system as an example, under the same network topology parameters, the cross-domain risk assessment method in the present invention and the cross-domain risk assessment method based on random attack are simulated and compared, wherein the random attack specifically refers to an attack method in which the attacker causes a certain line to cross the limit without considering the minimization of the attack cost. The specific simulation process is as follows:
[0149] First, the grid topology parameters are input, the DC power flow is calculated, and the initial power flow is obtained. Then, the CPLEX solver is used to solve the cost minimization attack model to calculate the minimum attack cost. Then, the probability of the vulnerability being successfully exploited is calculated based on Table 1 and Table 2. Figure 2 and Figure 3 The Bayesian attack graph is obtained, the probability of occurrence of network attack combinations is calculated, and then the physical consequences of network attacks are obtained by the DC power flow optimization model. The network attack risk value is calculated by the probability of occurrence of network attack combinations and the physical consequences of network attacks.
[0150] Matlab is used as the simulation tool, and the system simulation environment parameters are set as follows:
[0151] 1. Use the IEEE14 node data in MATPOWER as the system input data and set the line capacity to 1.5 times the normal flow;
[0152] 2. Assume that the range of node measurement data that the attacker can tamper with is (-0.2P d , 0.2P d ), that is, parameter α = 0.2;
[0153] The simulation results are as follows Figure 4 and Figure 5 As shown, from Figure 4 It can be seen from the figure that the attack cost of the cost minimization attack model in the method of the present invention is less than that of the random attack. Figure 5 It can be seen that compared with random attacks, the attack model proposed by the method of the present invention can cause greater risks to the system.
[0154] It can be seen from the above simulation results that the cost minimization attack model proposed by the present invention takes the minimization of attack cost as the optimization goal, takes into account the attacker's resource constraints and system flow constraints, so that the attacker can successfully tamper with the system measurement data. Compared with the comparison method, the method of the present invention enables the attacker to successfully forge the target line overload fault with the minimum attack cost, thereby causing greater cross-domain risks to the system. Therefore, the method of the present invention reduces the difficulty of quantitative assessment of cross-domain risks in the dispatching automation system, deeply explores the vulnerable links of the system, and provides a reference for improving system reliability.
[0155] Example 2
[0156] like Figure 6 As shown, based on the same inventive concept as the above embodiment, the present invention also provides a cross-domain risk assessment device for power dispatching communication services, comprising:
[0157] A minimum attack cost calculation module is used to obtain the dispatching automation system topology data; based on the dispatching automation system topology data, calculate the minimum attack cost under the constraints of node injected active power residual, node active power tampering range and node injected total power balance; wherein the minimum attack cost is the cost of the tampered measurement data;
[0158] A priori probability acquisition module is used to obtain the priori probability that the measurement data has been successfully tampered by an attacker;
[0159] A network attack combination occurrence probability calculation module is used to calculate the network attack combination occurrence probability based on the minimum attack cost and prior probability;
[0160] The physical consequence calculation module of the network attack is used to calculate the physical consequence of the network attack based on the tampered measurement data and using the DC optimal power flow algorithm;
[0161] The risk calculation module is used to calculate the cross-domain risks caused by network attacks in the power dispatching communication business based on the probability of occurrence of network attack combinations and physical consequences.
[0162] Example 3
[0163] like Figure 7 As shown, the present invention also provides an electronic device 100 for implementing a cross-domain risk assessment method for electric power dispatching communication services;
[0164] The electronic device 100 includes a memory 101 , at least one processor 102 , a computer program 103 stored in the memory 101 and executable on the at least one processor 102 , and at least one communication bus 104 .
[0165] The memory 101 can be used to store a computer program 103. The processor 102 implements the steps of a method for cross-domain risk assessment of electric power dispatching communication services in Example 1 by running or executing the computer program stored in the memory 101 and calling the data stored in the memory 101.
[0166] The memory 101 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data (such as audio data) created according to the use of the electronic device 100, etc. In addition, the memory 101 may include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices.
[0167] At least one processor 102 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The processor 102 may be a microprocessor or any conventional processor, etc. The processor 102 is the control center of the electronic device 100, and uses various interfaces and lines to connect various parts of the entire electronic device 100.
[0168] The memory 101 in the electronic device 100 stores a plurality of instructions to implement a method for cross-domain risk assessment of electric power dispatching communication services, and the processor 102 can execute the plurality of instructions to implement:
[0169] Obtaining dispatching automation system topology data; based on the dispatching automation system topology data, calculating the minimum attack cost under the constraints of node injected active power residual, node active power tampering range and node injected total power balance; wherein the minimum attack cost is the cost of the tampered measurement data;
[0170] Obtain the prior probability that the measurement data has been successfully tampered by an attacker;
[0171] Calculate the probability of occurrence of network attack combinations based on the minimum attack cost and prior probability;
[0172] Based on the tampered measurement data, the DC optimal power flow algorithm is used to calculate the physical consequences of the cyber attack;
[0173] According to the probability of occurrence and physical consequences of cyber attack combinations, the cross-domain risks caused by cyber attacks in power dispatching communication services are calculated.
[0174] Example 4
[0175] If the module / unit integrated in the electronic device 100 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. Computer-readable media may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory and read-only memory (ROM, Read-Only Memory).
[0176] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0177] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0178] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0179] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0180] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0181] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A cross-domain risk assessment method for power dispatching communication services, characterized in that: include: Obtain dispatch automation system topology data; Based on the dispatching automation system topology data, the minimum attack cost considering the node injected active power residual constraint, the node active power tampering range constraint and the node injected total power balance constraint is calculated; wherein the minimum attack cost is the cost of the tampered measurement data; Obtain the prior probability that the measurement data has been successfully tampered by an attacker; Calculate the probability of occurrence of network attack combinations based on the minimum attack cost and prior probability; Based on the tampered measurement data, the DC optimal power flow algorithm is used to calculate the physical consequences of the cyber attack; Based on the probability of occurrence and physical consequences of cyber attack combinations, the cross-domain risks caused by cyber attacks in power dispatching communication services are calculated; Based on the dispatching automation system topology data, the minimum attack cost considering the node injected active power residual constraint, the node active power tampering range constraint and the node injected total power balance constraint is calculated, including: Building a cost minimization attack model: The constraints are: s.t.C1:ΔP F =-AΔP d C2:-αP d ≤ΔP d ≤αP d C3:b T ΔP d =0 Where A is the branch-node association admittance matrix, ΔP d is the non-zero attack vector injected by the attacker into the original measurement vector, ΔP F is the branch power flow change vector; α is a constant; ΔP d,i The attack injection power of node i, b T is a column vector whose elements are all 1; v i is a 0-1 variable, v i =1 indicates that the node measurement data has been tampered with, otherwise it has not been tampered with; F ij is the active power value of branch ij, is the maximum active power that branch ij can carry, is the change of branch ij power flow, θ i is the phase angle of node i; θ j is the phase angle of node j; x ij is the branch reactance, N is the number of nodes; The prior probability of obtaining the measurement data being successfully tampered by an attacker includes: Obtain the dispatching automation system structure and vulnerability distribution, and obtain a dispatching automation system vulnerability distribution map; The vulnerability node information of different devices in the dispatching automation system is obtained through CVSS to determine the probability of successful exploitation of the dispatching automation system vulnerability. The specific steps include: The vulnerability node information of different devices in the scheduling automation system is obtained through CVSS. The metric level and its value are obtained according to the vulnerability node information of different devices. The probability of the vulnerability being successfully exploited is calculated through the metric level and its value of the vulnerability: P vi =2.1×AV×AC×PR×UI Where P vi is the probability of the vulnerability being successfully exploited, AV is the access vector metric of the vulnerability; AC is the attack complexity metric of the vulnerability; PR is the permission requirement metric of the vulnerability; UI is the user interaction metric of the vulnerability; The Bayesian attack graph is constructed from the Bayesian network and the vulnerability distribution graph of the scheduling automation system to obtain the local conditional probability, which specifically includes the following steps: Construct a Bayesian attack graph from the Bayesian network, determine the attribute nodes, directed edges and logical relationships of the Bayesian network, and obtain local conditional probabilities; The attribute node is defined as: In the formula, is an attribute node, G represents the type of attribute node; n is the total number of attribute nodes in the Bayesian network; A directed edge is defined as: E={e ij |i=1,2,…,n,j=1,2,…,n} In the formula, E represents the Bayesian network as a set of directed edges, e ij Indicates that the attribute node is derived from the parent To child attribute node Transfer, attribute node The parent attribute node set of The logical relationship is: the relationship between parent attribute nodes is divided into two types: AND or OR; When the logical relationship of the parent attribute node is AND, its local conditional probability is: In the formula, is the local conditional probability, P vi , the probability that the vulnerability is successfully exploited; When the logical relationship of the parent attribute node is OR, its local conditional probability is: express It is successfully exploited by the attacker, otherwise it is not exploited; The prior probability of each node is calculated based on the probability of successful vulnerability exploitation and the local conditional probability, including: The prior probability of each attribute node is calculated based on the probability of successful vulnerability exploitation and the local conditional probability: In the formula, Represents an attribute node The prior probability of being mastered by the attacker; The physical consequences of network attacks calculated using the DC optimal power flow algorithm are specifically: -P Gi ≤ΔP Gi ≤(P Gimax -P Gi ) 0≤ΔPD i ≤PD i -F lmax ≤F l ≤F lmax In the formula, C e is the minimum active load reduction caused by the network attack combination e, N p is the number of power nodes, P Di is the active power value of node i after false data injection, F l is the branch active power value after false data injection, F lmax is the maximum active power of the branch after the false data is injected, P Gi is the active power output of the generator at node i, ΔP Di is the active load reduction of node i, ΔP Gi is the active output adjustment of the generator at node i, P Gimax is the upper limit of the active output of the generator at node i.
2. According to claim 1, a method for cross-domain risk assessment of electric power dispatching communication services is characterized in that: The calculation formula for the occurrence probability of the network attack combination is: Where P e represents the probability of occurrence of network attack combination e, v i It is a 0-1 variable, which determines whether the measurement data of node i has been tampered with.
3. According to claim 1, a method for cross-domain risk assessment of electric power dispatching communication services is characterized in that: According to the probability of occurrence of the network attack combination and the physical consequences, the cross-domain risk caused by the network attack in the power dispatching communication business is calculated, which is specifically: R=P e C e Where R represents the cross-domain risk generated when the network attack combination e occurs; P e represents the probability of occurrence of network attack combination e; C e It represents the minimum active load reduction caused by the network attack combination e.
4. A cross-domain risk assessment device for power dispatching communication services, characterized in that: include: Minimum attack cost calculation module, used to obtain the topology data of the dispatching automation system; Based on the dispatching automation system topology data, the minimum attack cost considering the node injected active power residual constraint, the node active power tampering range constraint and the node injected total power balance constraint is calculated; wherein the minimum attack cost is the cost of the tampered measurement data; A priori probability acquisition module is used to obtain the priori probability that the measurement data has been successfully tampered by an attacker; A network attack combination occurrence probability calculation module is used to calculate the network attack combination occurrence probability based on the minimum attack cost and prior probability; The physical consequence calculation module of the network attack is used to calculate the physical consequence of the network attack based on the tampered measurement data and using the DC optimal power flow algorithm; The risk calculation module is used to calculate the cross-domain risk caused by network attacks in the power dispatching communication business based on the probability of occurrence of network attacks and physical consequences; Based on the dispatching automation system topology data, the minimum attack cost considering the node injected active power residual constraint, the node active power tampering range constraint and the node injected total power balance constraint is calculated, including: Building a cost minimization attack model: The constraints are: s.t.C1:ΔP F =-AΔP d C2:-αP d ≤ΔP d ≤αP d C3:b T ΔP d =0 Where A is the branch-node association admittance matrix, ΔP d is the non-zero attack vector injected by the attacker into the original measurement vector, ΔP F is the branch power flow change vector; α is a constant; ΔP d,i The attack injection power of node i, b T is a column vector whose elements are all 1; v i is a 0-1 variable, v i =1 indicates that the node measurement data has been tampered with, otherwise it has not been tampered with; F ij is the active power value of branch ij, is the maximum active power that branch ij can carry, is the change of branch ij power flow, θ i is the phase angle of node i; θ j is the phase angle of node j; x ij is the branch reactance, N is the number of nodes; The prior probability of obtaining the measurement data being successfully tampered by an attacker includes: Obtain the dispatching automation system structure and vulnerability distribution, and obtain a dispatching automation system vulnerability distribution map; The vulnerability node information of different devices in the dispatching automation system is obtained through CVSS to determine the probability of successful exploitation of the dispatching automation system vulnerability. The specific steps include: The vulnerability node information of different devices in the scheduling automation system is obtained through CVSS. The metric level and its value are obtained according to the vulnerability node information of different devices. The probability of the vulnerability being successfully exploited is calculated through the metric level and its value of the vulnerability: P vi =2.1×AV×AC×PR×UI Where P vi is the probability of the vulnerability being successfully exploited, AV is the access vector metric of the vulnerability; AC is the attack complexity metric of the vulnerability; PR is the permission requirement metric of the vulnerability; UI is the user interaction metric of the vulnerability; The Bayesian attack graph is constructed from the Bayesian network and the vulnerability distribution graph of the scheduling automation system to obtain the local conditional probability, which specifically includes the following steps: Construct a Bayesian attack graph from the Bayesian network, determine the attribute nodes, directed edges and logical relationships of the Bayesian network, and obtain local conditional probabilities; The attribute node is defined as: In the formula, is an attribute node, G represents the type of attribute node; n is the total number of attribute nodes in the Bayesian network; A directed edge is defined as: E={e ij |i=1,2,…,n,j=1,2,…,n} In the formula, E represents the Bayesian network as a set of directed edges, e ij Indicates that the attribute node is derived from the parent To child attribute node Transfer, attribute node The parent attribute node set of The logical relationship is: the relationship between parent attribute nodes is divided into two types: AND or OR; When the logical relationship of the parent attribute node is AND, its local conditional probability is: In the formula, is the local conditional probability, P vi , the probability that the vulnerability is successfully exploited; When the logical relationship of the parent attribute node is OR, its local conditional probability is: express It is successfully exploited by the attacker, otherwise it is not exploited; The prior probability of each node is calculated based on the probability of successful vulnerability exploitation and the local conditional probability, including: The prior probability of each attribute node is calculated based on the probability of successful vulnerability exploitation and the local conditional probability: In the formula, Represents an attribute node The prior probability of being mastered by the attacker; The physical consequences of network attacks calculated using the DC optimal power flow algorithm are specifically: -P Gi ≤ΔP Gi ≤(P Gimax -P Gi ) 0≤ΔPD i ≤PD i -F lmax ≤F l ≤F lmax In the formula, C e is the minimum active load reduction caused by the network attack combination e, N p is the number of power nodes, PD i is the active power value of node i after false data injection, F l is the branch active power value after false data injection, F lmax is the maximum active power of the branch after the false data is injected, P Gi is the active power output of the generator at node i, ΔP Di is the active load reduction of node i, ΔP Gi is the active output adjustment of the generator at node i, P Gimax is the upper limit of the active output of the generator at node i.
5. An electronic device, characterized in that: It comprises a processor and a memory, wherein the processor is used to execute a computer program stored in the memory to implement a cross-domain risk assessment method for electric power dispatching communication services as described in any one of claims 1 to 3.
6. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores at least one instruction, and when the at least one instruction is executed by the processor, it implements the cross-domain risk assessment method for power dispatching communication services as described in any one of claims 1 to 3.