A method and device for testing frequency adaptability on the secondary side of equipment
By conducting frequency adaptability tests on the secondary side of the equipment, using simulated power grid devices to simulate frequency disturbances, and testing the frequency adaptability of new energy units and electrochemical energy storage systems, the frequency change adaptability test is solved when new energy accounts for a high proportion in the power grid. problems to ensure the safe and stable operation of the power system.
Patent Information
- Application Number
- CN202410170222.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-06
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-02-06
AI Technical Summary
How to test the adaptability of new energy units to frequency changes in the power grid to ensure the safe and stable operation of the power grid without increasing the impact on the power grid, especially as the proportion of new energy sources is getting higher and higher.
Frequency adaptability testing is performed on the secondary side of the equipment. The voltage and current signals at the grid-connected point of the new energy unit are converted into secondary side signals through the transformer, and simulated grid devices are used to simulate frequency disturbances to test wind turbines and photovoltaic power generation modes. and the continuous operation capability of electrochemical energy storage systems in different frequency ranges.
Through this method, the frequency adaptability of new energy units and electrochemical energy storage systems can be tested under national standard requirements, ensuring safe and stable operation of power systems under high-penetration new energy sources, and avoiding off-grid problems caused by frequency changes.
Smart Images

Figure CN117872022B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power systems, and more specifically, to a method and device for performing frequency adaptability testing on the secondary side of equipment. Background Art
[0002] Due to the recent proposal to build a clean, low-carbon, safe and efficient energy system, wind power and photovoltaic power generation have developed rapidly in recent years, and the installed capacity of wind power and photovoltaic power generation ranks first in the world. It is foreseeable that in the near future, the proportion of new energy in some local power grids may reach 80% or even higher, and the ultra-high proportion of new energy grid-connected operation will become an important feature of the future power structure.
[0003] However, as the proportion of renewable energy in the power grid increases, its impact on the power grid is gradually expanding from local areas. In order to prevent large-scale grid disconnection of renewable energy, it is important to evaluate the grid frequency after the access of renewable energy, as well as the ability of power electronic equipment to continue to operate without disconnection at a frequency that meets national standards, to ensure the safe and stable operation of the power grid.
[0004] Therefore, how to test the adaptability of new energy units to changes in grid frequency while taking into account the accuracy of the test and not increasing the impact on the grid is an issue that needs to be solved urgently. Summary of the invention
[0005] The technical solution of the present invention provides a method and a device for performing a frequency adaptability test on the secondary side of a device, so as to solve the problem of how to perform a frequency adaptability test experiment on the secondary side of a power electronic device.
[0006] In order to solve the above problem, the present invention provides a method for performing frequency adaptability testing on the secondary side of a device, the method comprising:
[0007] The voltage signal U output by the grid-connected point of the new energy unit T , current signal I T After passing through the corresponding transformer, they are converted into secondary side voltage signals U T2 And the secondary current signal I T2 ;
[0008] Determining the operation mode of the simulated power grid device according to the type of equipment for the frequency adaptability test, wherein the operation mode includes a wind turbine mode, a photovoltaic power generation mode, and an electrochemical energy storage system mode;
[0009] The secondary side voltage signal U T2 And the secondary side current signal I T2 Input a simulated grid device connected in series with the transformer, and based on the grid connection point frequency, send frequency disturbance through the simulated grid device to simulate the change of grid connection point frequency;
[0010] The secondary side voltage signal U' after disturbance adjustment T2 And the secondary side current signal I' T2 Input converter control system;
[0011] When the operation mode of the simulated power grid device is a wind turbine mode, a continuous operation capability test of the wind turbine is performed within multiple frequency ranges; when the operation mode of the simulated power grid device is a photovoltaic power generation mode, a continuous operation capability test of the photovoltaic inverter is performed within multiple frequency ranges; when the operation mode of the simulated power grid device is an electrochemical energy storage system mode, a continuous operation capability test of the electrochemical energy storage system is performed within multiple frequency ranges.
[0012] Preferably, when the operation mode of the simulated power grid device is a wind turbine generator mode, a continuous operation capability test of the wind turbine generator within multiple frequency ranges is performed, including:
[0013] The grid-connected point frequency of the wind turbine generator set received by the converter control system is adjusted to the frequency limit value of each preset range by the simulated grid device, and the continuous operation state of the wind turbine generator set and the corresponding protection action time t are recorded;
[0014] When the recorded protection action time t is less than the preset time threshold, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0015] The simulated power grid device is reset, the wind turbine grid connection point frequency received by the converter control system is adjusted to an initial value, and the test is terminated.
[0016] Preferably, it includes:
[0017] When the frequency limit value is 46.5 Hz and the protection action time t is less than 5 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable voltage deviation range;
[0018] When the frequency limit value is 47 Hz and the protection action time t is less than 20 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable voltage deviation range;
[0019] When the frequency limit value is 47.5 Hz and the protection action time t is less than 60 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable voltage deviation range;
[0020] When the frequency limit value is 48 Hz and the protection action time t is less than 30 min, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0021] When the frequency limit value is 48.5 Hz, the wind turbine cannot operate continuously, and it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0022] When the frequency limit value is 50.5 Hz and the protection action time t is less than 3 min, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0023] When the frequency limit value is 51 Hz and the protection action time t is less than 30 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation.
[0024] Preferably, when the operation mode of the simulated power grid device is the photovoltaic power generation mode, the continuous operation capability test of the photovoltaic inverter within multiple frequency ranges is performed, including:
[0025] The grid-connected point frequency of the photovoltaic inverter received by the converter control system is adjusted to the frequency limit value of each preset range by the simulated grid device, and the continuous operation state of the photovoltaic inverter and the corresponding protection action time t are recorded;
[0026] When the recorded protection action time t is less than the preset time threshold, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0027] The simulated power grid device is reset, the photovoltaic inverter grid connection point frequency received by the converter control system is adjusted to an initial value, and the test is terminated.
[0028] Preferably, when the frequency limit value is 48 Hz and the protection action time t is less than 10 min, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0029] When the frequency limit value is 49.5 Hz, the photovoltaic inverter cannot operate continuously, and it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0030] When the frequency limit value is 50.2 Hz and the protection action time t is less than 2 min, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable voltage deviation range;
[0031] When the frequency limit value is 51.5 Hz, the protection does not take effect immediately, and it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation.
[0032] Preferably, when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, a continuous operation capability test of the electrochemical energy storage system within multiple frequency ranges is performed, including:
[0033] The grid-connection point frequency of the electrochemical energy storage system received by the converter control system is adjusted to 49.5 Hz or 52 Hz by the simulated grid device;
[0034] When the protection is activated, it is determined that the electrochemical energy storage system does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0035] The simulated power grid device is reset, the frequency of the electrochemical energy storage system grid connection point received by the electrochemical energy storage system is adjusted to an initial value, and the test is terminated.
[0036] Preferably, when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, a continuous operation capability test of the electrochemical energy storage system within multiple frequency ranges is performed, including:
[0037] The grid-connected point frequency of the electrochemical energy storage system received by the converter control system is adjusted to less than 49.5 Hz through the simulated grid device. When the electrochemical energy storage system is in a charging state, it is determined that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0038] Preferably, when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, a continuous operation capability test of the electrochemical energy storage system within multiple frequency ranges is performed, including:
[0039] The grid-connected point frequency of the electrochemical energy storage system received by the converter control system is adjusted to be greater than 52 Hz through the simulated grid device. When the electrochemical energy storage system is in a discharging state, it is determined that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0040] According to another aspect of the present invention, the present invention provides a device for performing a frequency adaptability test on a secondary side of a device, the device comprising:
[0041] The conversion unit is used to convert the voltage signal U output by the grid-connected point of the new energy unit T , current signal I T After passing through the corresponding transformer, they are converted into secondary side voltage signals U T2 And the secondary current signal I T2 ;
[0042] The execution unit is used to determine the operation mode of the simulated power grid device according to the device type of the frequency adaptability test, and the operation mode includes a wind turbine mode, a photovoltaic power generation mode and an electrochemical energy storage system mode; the secondary side voltage signal U T2 And the secondary side current signal I T2Input a simulated grid device connected in series with the transformer, based on the grid connection point frequency, send frequency disturbance through the simulated grid device to simulate the change of grid connection point frequency; adjust the secondary side voltage signal U' after the disturbance T2 And the secondary side current signal I' T2 Input converter control system;
[0043] The result unit is used to perform continuous operation capability tests of wind turbines within multiple frequency ranges when the operation mode of the simulated power grid device is a wind turbine mode; to perform continuous operation capability tests of photovoltaic inverters within multiple frequency ranges when the operation mode of the simulated power grid device is a photovoltaic power generation mode; and to perform continuous operation capability tests of electrochemical energy storage systems within multiple frequency ranges when the operation mode of the simulated power grid device is an electrochemical energy storage system mode.
[0044] Preferably, the result unit is used to perform a continuous operation capability test of the wind turbines within multiple frequency ranges when the operation mode of the simulated power grid device is a wind turbine mode, and is also used to:
[0045] The grid-connected point frequency of the wind turbine generator set received by the converter control system is adjusted to the frequency limit value of each preset range by the simulated grid device, and the continuous operation state of the wind turbine generator set and the corresponding protection action time t are recorded;
[0046] When the recorded protection action time t is less than the preset time threshold, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0047] The simulated power grid device is reset, the wind turbine grid connection point frequency received by the converter control system is adjusted to an initial value, and the test is terminated.
[0048] Preferably, it includes:
[0049] When the frequency limit value is 46.5 Hz and the protection action time t is less than 5 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable voltage deviation range;
[0050] When the frequency limit value is 47 Hz and the protection action time t is less than 20 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable voltage deviation range;
[0051] When the frequency limit value is 47.5 Hz and the protection action time t is less than 60 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable voltage deviation range;
[0052] When the frequency limit value is 48 Hz and the protection action time t is less than 30 min, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0053] When the frequency limit value is 48.5 Hz, the wind turbine cannot operate continuously, and it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0054] When the frequency limit value is 50.5 Hz and the protection action time t is less than 3 min, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0055] When the frequency limit value is 51 Hz and the protection action time t is less than 30 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation.
[0056] Preferably, the result unit is used to perform a continuous operation capability test of the photovoltaic inverter within multiple frequency ranges when the operation mode of the simulated power grid device is the photovoltaic power generation mode, and is also used to:
[0057] The grid-connected point frequency of the photovoltaic inverter received by the converter control system is adjusted to the frequency limit value of each preset range by the simulated grid device, and the continuous operation state of the photovoltaic inverter and the corresponding protection action time t are recorded;
[0058] When the recorded protection action time t is less than the preset time threshold, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0059] The simulated power grid device is reset, the photovoltaic inverter grid connection point frequency received by the converter control system is adjusted to an initial value, and the test is terminated.
[0060] Preferably, when the frequency limit value is 48 Hz and the protection action time t is less than 10 min, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0061] When the frequency limit value is 49.5 Hz, the photovoltaic inverter cannot operate continuously, and it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0062] When the frequency limit value is 50.2 Hz and the protection action time t is less than 2 min, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable voltage deviation range;
[0063] When the frequency limit value is 51.5 Hz, the protection does not take effect immediately, and it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation.
[0064] Preferably, the result unit is used to perform a continuous operation capability test of the photovoltaic inverter within multiple frequency ranges when the operation mode of the simulated power grid device is an electrochemical energy storage system mode, and is also used to:
[0065] The grid-connection point frequency of the electrochemical energy storage system received by the converter control system is adjusted to 49.5 Hz or 52 Hz by the simulated grid device;
[0066] When the protection is activated, it is determined that the electrochemical energy storage system does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0067] The simulated power grid device is reset, the wind turbine grid connection point frequency received by the electrochemical energy storage system is adjusted to an initial value, and the test is terminated.
[0068] Preferably, the result unit is used to perform a continuous operation capability test of the electrochemical energy storage system within multiple frequency ranges when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, and is also used to:
[0069] The grid-connected point frequency of the electrochemical energy storage system received by the converter control system is adjusted to less than 49.5 Hz through the simulated grid device. When the electrochemical energy storage system is in a charging state, it is determined that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0070] Preferably, the result unit is used to perform a continuous operation capability test of the electrochemical energy storage system within multiple frequency ranges when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, including:
[0071] The grid-connected point frequency of the electrochemical energy storage system received by the converter control system is adjusted to be greater than 52 Hz through the simulated grid device. When the electrochemical energy storage system is in a discharging state, it is determined that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0072] The technical solution of the present invention provides a method and device for testing the frequency adaptability on the secondary side of the equipment, wherein the method comprises: T , current signal I T After passing through the corresponding transformer, they are converted into secondary side voltage signals U T2 And the secondary current signal I T2; Determine the operation mode of the simulated power grid device according to the type of equipment for frequency adaptability test, the operation modes include wind turbine mode, photovoltaic power generation mode and electrochemical energy storage system mode; convert the voltage signal U output from the grid connection point of the new energy unit T , current signal I T After passing through the corresponding transformer, they are converted into secondary side voltage signals U T2 And the secondary current signal I T2 ; The secondary voltage signal U T2 And the secondary current signal I T2 Input the simulated grid device connected in series with the transformer. Based on the grid connection point frequency, the simulated grid device sends out frequency disturbance to simulate the grid connection point frequency change. The secondary side voltage signal U' after disturbance adjustment is T2 And the secondary current signal I' T2 Input converter control system; when the operation mode of the simulated power grid device is the wind turbine mode, the continuous operation capability test of the wind turbine in multiple frequency ranges is performed; when the operation mode of the simulated power grid device is the photovoltaic power generation mode, the continuous operation capability test of the photovoltaic inverter in multiple frequency ranges is performed; when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, the continuous operation capability test of the electrochemical energy storage system in multiple frequency ranges is performed. The technical solution of the present invention provides a method and device for frequency adaptability testing on the secondary side of power electronic equipment, by collecting the grid frequency at the new energy converter, and adding a simulated power grid device in series with the collection and measurement unit, to perform the continuous operation capability test of the new energy unit or energy storage system under the different frequency range limits of the new energy unit and the electrochemical energy storage system required by the national standard, so as to ensure the safe and stable operation of the power system under high penetration of new energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0073] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:
[0074] Figure 1 A flow chart of a method for performing frequency adaptability testing on the secondary side of a device according to a preferred embodiment of the present invention;
[0075] Figure 2 A schematic diagram of a method for performing a frequency adaptability test on a secondary side of a power electronic device according to a preferred embodiment of the present invention; and
[0076] Figure 3 The figure is a structural diagram of a device for performing frequency adaptability test on the secondary side of a device according to a preferred embodiment of the present invention. DETAILED DESCRIPTION
[0077] Now, exemplary embodiments of the present invention are described with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms used in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.
[0078] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.
[0079] Figure 1 The present invention is a flowchart of a method for performing frequency adaptability testing on the secondary side of a device according to a preferred embodiment of the present invention.
[0080] The present invention provides a method for performing frequency adaptability testing on the secondary side of a power electronic device. The present invention collects the grid frequency at a new energy converter and adds a simulated grid device in series with a collection and measurement unit to perform a continuous operation capability test of a new energy unit or an energy storage system under different frequency range limits of the new energy unit and the electrochemical energy storage system required by national standards, thereby ensuring the safe and stable operation of the power system under high-penetration new energy.
[0081] like Figure 1 As shown, the present invention provides a method for performing frequency adaptability testing on the secondary side of a device, the method comprising:
[0082] Step 101: The voltage signal U outputted by the grid-connected point of the new energy unit T , current signal I T After passing through the corresponding transformer, they are converted into secondary side voltage signals U T2 And the secondary current signal I T2 ;
[0083] Step 102: determining an operation mode of the simulated power grid device according to the type of equipment to be tested for frequency adaptability, the operation modes including a wind turbine mode, a photovoltaic power generation mode, and an electrochemical energy storage system mode;
[0084] Step 103: Convert the secondary voltage signal U T2 And the secondary current signal I T2 Input a simulated grid device connected in series with the transformer, and based on the grid connection point frequency, send frequency disturbances through the simulated grid device to simulate the change of grid connection point frequency;
[0085] Step 104: Adjust the secondary voltage signal U' after disturbance adjustment T2 And the secondary current signal I' T2 Input converter control system;
[0086] Step 105: When the operation mode of the simulated power grid device is the wind turbine mode, the continuous operation capability test of the wind turbine is performed within multiple frequency ranges; when the operation mode of the simulated power grid device is the photovoltaic power generation mode, the continuous operation capability test of the photovoltaic inverter is performed within multiple frequency ranges; when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, the continuous operation capability test of the electrochemical energy storage system is performed within multiple frequency ranges.
[0087] Preferably, when the operation mode of the simulated power grid device is a wind turbine generator mode, a continuous operation capability test of the wind turbine generator within multiple frequency ranges is performed, including:
[0088] By simulating the grid device, the frequency of the wind turbine grid connection point received by the converter control system is adjusted to the frequency limit value of each preset range, and the continuous operation status of the wind turbine and the corresponding protection action time t are recorded;
[0089] When the recorded protection action time t is less than the preset time threshold, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0090] Reset the simulated grid device, adjust the wind turbine grid connection point frequency received by the converter control system to the initial value, and end the test.
[0091] Preferably, it includes:
[0092] When the frequency limit value is 46.5Hz and the protection action time t is less than 5s, it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0093] When the frequency limit value is 47Hz and the protection action time t is less than 20s, it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0094] When the frequency limit value is 47.5Hz and the protection action time t is less than 60s, it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0095] When the frequency limit value is 48Hz and the protection action time t is less than 30min, it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0096] When the frequency limit value is 48.5Hz, the wind turbine cannot operate continuously, and it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0097] When the frequency limit value is 50.5Hz and the protection action time t is less than 3min, it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0098] When the frequency limit value is 51 Hz and the protection action time t is less than 30 s, it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0099] Preferably, when the operation mode of the simulated power grid device is the photovoltaic power generation mode, a continuous operation capability test of the photovoltaic inverter within multiple frequency ranges is performed, including:
[0100] By simulating the grid device, the frequency of the photovoltaic inverter grid connection point received by the converter control system is adjusted to the frequency limit value of each preset range, and the continuous operation state of the photovoltaic inverter and the corresponding protection action time t are recorded;
[0101] When the recorded protection action time t is less than the preset time threshold, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0102] Reset the simulated grid device, adjust the PV inverter grid connection point frequency received by the converter control system to the initial value, and end the test.
[0103] Preferably, when the frequency limit value is 48 Hz and the protection action time t is less than 10 min, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0104] When the frequency limit value is 49.5Hz, the photovoltaic inverter cannot operate continuously, and it is determined that the photovoltaic inverter does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0105] When the frequency limit value is 50.2Hz and the protection action time t is less than 2min, it is determined that the photovoltaic inverter does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0106] When the frequency limit value is 51.5Hz, the protection does not act immediately, which determines that the PV inverter does not meet the continuous operation requirements within the allowable voltage deviation range.
[0107] Preferably, when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, a continuous operation capability test of the electrochemical energy storage system within multiple frequency ranges is performed, including:
[0108] The grid connection point frequency of the electrochemical energy storage system received by the converter control system is adjusted to 49.5 Hz or 52 Hz by simulating a grid device;
[0109] When the protection is activated, it is determined that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0110] Reset the simulated power grid device, adjust the frequency of the electrochemical energy storage system grid connection point received by the electrochemical energy storage system to the initial value, and end the test.
[0111] Preferably, when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, a continuous operation capability test of the electrochemical energy storage system within multiple frequency ranges is performed, including:
[0112] By simulating the grid device, the grid-connected frequency of the electrochemical energy storage system received by the converter control system is adjusted to less than 49.5 Hz. When the electrochemical energy storage system is in a charging state, it is determined that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0113] Preferably, when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, a continuous operation capability test of the electrochemical energy storage system within multiple frequency ranges is performed, including:
[0114] By simulating the grid device, the grid connection point frequency of the electrochemical energy storage system received by the converter control system is adjusted to be greater than 52Hz. When the electrochemical energy storage system is in a discharging state, it is determined that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0115] The method provided by the present invention comprises the following steps:
[0116] Step (1): Set the voltage U of the point of interconnection (POI) of the new energy unit or energy storage device to T , current I T After the voltage and current transformers are used to measure and collect the secondary voltage signal, the grid connection point frequency is measured, and a simulated grid device is connected in series and then connected to the converter controller. The simulated grid device can send out frequency disturbances to simulate the frequency changes at the grid connection point. When connected to the converter control system, the simulated grid device does not send out disturbances initially. Figure 2 Check the communication status between the simulated grid device and the converter. If the communication status is good, proceed to step (2). Otherwise, return to step (1).
[0117] Step (2): Select the simulated grid device operation mode according to the type of equipment that needs frequency adaptability test. Mode 0 is a wind turbine, mode 1 is photovoltaic power generation, and mode 2 is an electrochemical energy storage system. If it is running in mode 0, go to step (3); if it is running in mode 1, go to step (5); if it is running in mode 2, go to step (7).
[0118] Step (3): For wind turbines, test the continuous operation capability of wind turbines in seven frequency ranges. The specific requirements are as shown in Appendix 1. Adjust the simulated grid device to set the frequency to the limit value in each range, and record the operation status of the wind turbine and the corresponding protection action time. For example: Control the simulated grid device to adjust the wind turbine grid connection point frequency received by the converter to 46.5Hz. If the protection action time t<5s, record it as the converter does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0119] Appendix 1 Operation regulations for wind farms within different power system frequency ranges
[0120] Power system frequency range Require 46.5Hz<f<47Hz The wind farm should run for at least 5 seconds. 47Hz≦f<47.5Hz The wind farm runs for at least 20 seconds 47.5Hz≦f<48Hz The wind farm must be in operation for at least 60 seconds. 48Hz≦f<48.5Hz The wind farm must operate for at least 30 minutes 48.5Hz≦f<50.5Hz Continuous operation 50.5Hz≦f<51Hz The wind farm must operate for at least 3 minutes 51Hz≦f<51.5Hz The wind farm must be in operation for at least 30 seconds.
[0121] Step (4): Reset the grid simulation device, adjust the grid connection point frequency collected by the converter control system to restore it to the initial value, and go to step (11).
[0122] Step (5): For the photovoltaic power generation unit, test the continuous operation capability of the photovoltaic inverter within four frequency ranges. The specific requirements are as shown in Appendix 2. Adjust the simulated grid device to set the frequency to the limit value within each range, and record the operation status of the photovoltaic inverter and the corresponding protection action time. For example: Control the simulated grid device to adjust the photovoltaic inverter grid connection point frequency received by the converter to 48Hz. If the protection action time t<10min, record it as the photovoltaic inverter does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0123] (1) Appendix 2: Operation regulations of photovoltaic power stations within different power system frequency ranges
[0124]
[0125]
[0126] Step (6): Reset the grid simulation device, adjust the grid connection point frequency collected by the inverter control system to restore it to the initial value, and go to step (11).
[0127] Step (7): For the electrochemical energy storage system, the operating status of the electrochemical energy storage system is tested within three frequency ranges: the simulated grid device is controlled to adjust the grid connection point frequency of the electrochemical energy storage system received by the converter to 49.5 Hz and 52 Hz respectively. If the protection is activated, it is recorded that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0128] Step (8): Control the simulated grid device to adjust the frequency of the electrochemical energy storage system grid connection point received by the converter to f < 49.5 Hz. If the energy storage system is in a charging state, it is recorded as the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0129] Step (9): Control the simulated grid device to adjust the grid-connected point frequency of the electrochemical energy storage system received by the converter to f>52 Hz. If the energy storage system is in a discharging state, it is recorded that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0130] Step (10): Reset the grid simulation device, adjust the grid connection point frequency collected by the electrochemical energy storage system to restore it to the initial value, and go to step (11).
[0131] Step (11): After the test is completed, exit the simulated power grid device.
[0132] The present invention can simulate the frequency disturbance sent by the simulated grid device at the end of the new energy unit, and connect to the converter control system to perform frequency adaptability test. The ability of the new energy unit or energy storage system to continuously operate without disconnecting from the grid under different grid connection point frequency conditions can be tested to ensure the safe and stable operation of the power system under high penetration of new energy.
[0133] Figure 3 The figure is a structural diagram of a device for performing frequency adaptability test on the secondary side of a device according to a preferred embodiment of the present invention.
[0134] like Figure 3 As shown, the present invention provides a device for performing frequency adaptability testing on the secondary side of a device, the device comprising:
[0135] The conversion unit 301 is used to convert the voltage signal U outputted by the grid-connected point of the new energy unit T , current signal I T After passing through the corresponding transformer, they are converted into secondary side voltage signals U T2 And the secondary current signal I T2 ;
[0136] The execution unit 302 is used to convert the secondary side voltage signal U T2 And the secondary current signal I T2 Input the simulated grid device connected in series with the transformer. Based on the grid connection point frequency, the simulated grid device sends out frequency disturbance to simulate the grid connection point frequency change. The secondary side voltage signal U' after disturbance adjustment is T2 And the secondary current signal I' T2 Input converter control system;
[0137] The result unit 303 is used to determine the operation mode of the simulated power grid device according to the equipment type of the frequency adaptability test, and the operation modes include wind turbine mode, photovoltaic power generation mode and electrochemical energy storage system mode; when the operation mode of the simulated power grid device is wind turbine mode, the continuous operation capability test of the wind turbine is performed within multiple frequency ranges; when the operation mode of the simulated power grid device is photovoltaic power generation mode, the continuous operation capability test of the photovoltaic inverter is performed within multiple frequency ranges; when the operation mode of the simulated power grid device is electrochemical energy storage system mode, the continuous operation capability test of the electrochemical energy storage system is performed within multiple frequency ranges.
[0138] Preferably, the result unit 303 is used to perform a continuous operation capability test of the wind turbines within multiple frequency ranges when the operation mode of the simulated power grid device is the wind turbine mode, and is also used to:
[0139] By simulating the grid device, the frequency of the wind turbine grid connection point received by the converter control system is adjusted to the frequency limit value of each preset range, and the continuous operation status of the wind turbine and the corresponding protection action time t are recorded;
[0140] When the recorded protection action time t is less than the preset time threshold, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0141] Reset the simulated grid device, adjust the wind turbine grid connection point frequency received by the converter control system to the initial value, and end the test.
[0142] Preferably, it includes:
[0143] When the frequency limit value is 46.5Hz and the protection action time t is less than 5s, it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0144] When the frequency limit value is 47Hz and the protection action time t is less than 20s, it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0145] When the frequency limit value is 47.5Hz and the protection action time t is less than 60s, it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0146] When the frequency limit value is 48Hz and the protection action time t is less than 30min, it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0147] When the frequency limit value is 48.5Hz, the wind turbine cannot operate continuously, and it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0148] When the frequency limit value is 50.5Hz and the protection action time t is less than 3min, it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0149] When the frequency limit value is 51 Hz and the protection action time t is less than 30 s, it is determined that the converter control system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0150] Preferably, the result unit 303 is used to perform a continuous operation capability test of the photovoltaic inverter within multiple frequency ranges when the operation mode of the simulated power grid device is the photovoltaic power generation mode, and is also used to:
[0151] By simulating the grid device, the frequency of the photovoltaic inverter grid connection point received by the converter control system is adjusted to the frequency limit value of each preset range, and the continuous operation state of the photovoltaic inverter and the corresponding protection action time t are recorded;
[0152] When the recorded protection action time t is less than the preset time threshold, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation;
[0153] Reset the simulated grid device, adjust the wind turbine grid connection point frequency received by the converter control system to the initial value, and end the test.
[0154] Preferably,
[0155] When the frequency limit value is 48Hz and the protection action time t is less than 10min, it is determined that the photovoltaic inverter does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0156] When the frequency limit value is 49.5Hz, the photovoltaic inverter cannot operate continuously, and it is determined that the photovoltaic inverter does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0157] When the frequency limit value is 50.2Hz and the protection action time t is less than 2min, it is determined that the photovoltaic inverter does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0158] When the frequency limit value is 51.5Hz, the protection does not act immediately, which determines that the PV inverter does not meet the continuous operation requirements within the allowable voltage deviation range.
[0159] Preferably, the result unit 303 is used to test the continuous operation capability of the electrochemical energy storage system within multiple frequency ranges when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, and is also used to
[0160] The grid connection point frequency of the electrochemical energy storage system received by the converter control system is adjusted to 49.5 Hz or 52 Hz by simulating a grid device;
[0161] When the protection is activated, it is determined that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation;
[0162] Reset the simulated power grid device, adjust the frequency of the electrochemical energy storage system grid connection point received by the electrochemical energy storage system to the initial value, and end the test.
[0163] Preferably, the result unit 303 is used to perform a continuous operation capability test of the electrochemical energy storage system within multiple frequency ranges when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, and is also used to:
[0164] By simulating the grid device, the grid-connected frequency of the electrochemical energy storage system received by the converter control system is adjusted to less than 49.5 Hz. When the electrochemical energy storage system is in a charging state, it is determined that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0165] Preferably, the result unit 303 is used to perform a continuous operation capability test of the electrochemical energy storage system within multiple frequency ranges when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, including:
[0166] By simulating the grid device, the grid connection point frequency of the electrochemical energy storage system received by the converter control system is adjusted to be greater than 52Hz. When the electrochemical energy storage system is in a discharging state, it is determined that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation.
[0167] An apparatus for performing a frequency adaptability test on the secondary side of a device in a preferred embodiment of the present invention corresponds to a method for performing a frequency adaptability test on the secondary side of a device in another preferred embodiment of the present invention, and will not be described in detail herein.
[0168] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes. The schemes in the embodiments of the present invention may be implemented in various computer languages, for example, object-oriented programming language Java and literal scripting language JavaScript, etc.
[0169] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0170] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0171] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0172] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0173] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
[0174] The invention has been described above with reference to a few embodiments. However, it is readily apparent to a person skilled in the art that other embodiments than the ones disclosed above are equally within the scope of the invention, as defined by the appended patent claims.
[0175] Generally, all terms used in the claims are to be interpreted according to their ordinary meaning in the technical field, unless explicitly defined otherwise herein. All references to "a / / the [means, component, etc.]" are to be openly interpreted as at least one instance of a means, component, etc., unless explicitly stated otherwise. The steps of any method disclosed herein do not necessarily have to be performed in the exact order disclosed, unless explicitly stated otherwise.
Claims
1. A method for performing a frequency adaptability test on the secondary side of a device, the method being used to connect a converter control system to perform a frequency adaptability test when a simulated frequency disturbance is emitted by a simulated power grid device at the end of a new energy unit, the method comprising: The voltage signal output by the new energy unit grid connection point U T , current signal After passing through the corresponding transformer, they are converted into secondary side voltage signals U T2 And the secondary current signal I T2 ; Determine the operation mode of the simulated power grid device according to the type of equipment for the frequency adaptability test, the operation mode including a wind turbine mode, a photovoltaic power generation mode and an electrochemical energy storage system mode; The secondary side voltage signal U T2 And the secondary side current signal I T2 Input a simulated grid device connected in series with the transformer, and based on the grid connection point frequency, send frequency disturbance through the simulated grid device to simulate the change of grid connection point frequency; The secondary side voltage signal after disturbance adjustment And the secondary current signal after disturbance adjustment Input converter control system; When the operation mode of the simulated power grid device is a wind turbine mode, a continuous operation capability test of the wind turbine is performed within multiple frequency ranges; when the operation mode of the simulated power grid device is a photovoltaic power generation mode, a continuous operation capability test of the photovoltaic inverter is performed within multiple frequency ranges; when the operation mode of the simulated power grid device is an electrochemical energy storage system mode, a continuous operation status test of the electrochemical energy storage system is performed within multiple frequency ranges; When the operation mode of the simulated power grid device is the electrochemical energy storage system mode, a continuous operation state test of the electrochemical energy storage system within multiple frequency ranges is performed, including: The grid-connection point frequency of the electrochemical energy storage system received by the converter control system is adjusted to 49.5 Hz or 52 Hz by the simulated grid device, and the protection action of the electrochemical energy storage system is recorded; When the protection is activated, it is determined that the electrochemical energy storage system does not meet the continuous operation requirement within the allowable range of voltage deviation; Resetting the simulated power grid device, adjusting the frequency of the electrochemical energy storage system grid connection point received by the electrochemical energy storage system to an initial value, and ending the test; When the operation mode of the simulated power grid device is the electrochemical energy storage system mode, a continuous operation state test of the electrochemical energy storage system within multiple frequency ranges is performed, including: The grid-connected point frequency of the electrochemical energy storage system received by the converter control system is adjusted to be less than 49.5 Hz by the simulated grid device, and when the electrochemical energy storage system is in a charging state, it is determined that the electrochemical energy storage system does not meet the operating requirements within the allowable range of voltage deviation; The grid-connected point frequency of the electrochemical energy storage system received by the converter control system is adjusted to be greater than 52 Hz through the simulated grid device. When the electrochemical energy storage system is in a discharging state, it is determined that the electrochemical energy storage system does not meet the operating requirements within the allowable range of voltage deviation.
2. The method according to claim 1, when the operation mode of the simulated power grid device is a wind turbine generator mode, performing a continuous operation capability test of the wind turbine generator within multiple frequency ranges comprises: The grid-connected point frequency of the wind turbine generator set received by the converter control system is adjusted to the frequency limit value of each preset range by the simulated grid device, and the continuous operation state of the wind turbine generator set and the corresponding protection action time t are recorded; When the recorded protection action time t is less than the preset time threshold, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; The simulated power grid device is reset, the wind turbine grid connection point frequency received by the converter control system is adjusted to an initial value, and the test is terminated.
3. The method according to claim 2, comprising: When the frequency limit value is 46.5 Hz and the protection action time t is less than 5 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 47 Hz and the protection action time t is less than 20 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 47.5 Hz and the protection action time t is less than 60s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 48 Hz and the protection action time t is less than 30 min, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 48.5 Hz, the wind turbine cannot operate continuously, and it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 50.5 Hz and the protection action time t is less than 3 minutes, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 51 Hz and the protection action time t is less than 30 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation.
4. The method according to claim 1, when the operation mode of the simulated power grid device is a photovoltaic power generation mode, performing a continuous operation capability test of the photovoltaic inverter within multiple frequency ranges comprises: The grid-connected point frequency of the photovoltaic inverter received by the converter control system is adjusted to the frequency limit value of each preset range by the simulated grid device, and the continuous operation state of the photovoltaic inverter and the corresponding protection action time t are recorded; When the recorded protection action time t is less than the preset time threshold, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation; The simulated power grid device is reset, the photovoltaic inverter grid connection point frequency received by the converter control system is adjusted to an initial value, and the test is terminated.
5. The method according to claim 4, When the frequency limit value is 48 Hz and the protection action time t is less than 10 minutes, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 49.5 Hz, the photovoltaic inverter cannot operate continuously, and it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 50.2 Hz and the protection action time t is less than 2 minutes, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 51.5 Hz, the protection does not immediately act, and it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation.
6. A device for performing frequency adaptability test on the secondary side of the equipment, the device is used to connect to the converter control system to perform frequency adaptability test when the new energy unit sends out simulated frequency disturbance through the simulated power grid device, the device comprises: Conversion unit, used to convert the voltage signal output by the grid-connected point of the new energy unit U T , current signal After passing through the corresponding transformer, they are converted into secondary side voltage signals U T2 And the secondary current signal I T2 ; The execution unit is used to determine the operation mode of the simulated power grid device according to the equipment type of the frequency adaptability test, and the operation mode includes a wind turbine mode, a photovoltaic power generation mode and an electrochemical energy storage system mode; the secondary side voltage signal U T2 And the secondary side current signal I T2 Input a simulated grid device connected in series with the transformer, based on the grid connection point frequency, send frequency disturbance through the simulated grid device to simulate the change of grid connection point frequency; adjust the secondary side voltage signal after disturbance And the secondary current signal after disturbance adjustment Input converter control system; A result unit is used to perform continuous operation capability tests of wind turbines within multiple frequency ranges when the operation mode of the simulated power grid device is a wind turbine mode; to perform continuous operation capability tests of photovoltaic inverters within multiple frequency ranges when the operation mode of the simulated power grid device is a photovoltaic power generation mode; and to perform continuous operation status tests of electrochemical energy storage systems within multiple frequency ranges when the operation mode of the simulated power grid device is an electrochemical energy storage system mode. The result unit is used to perform a continuous operation state test of the electrochemical energy storage system within multiple frequency ranges when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, and is also used to: Adjusting the grid connection point frequency of the electrochemical energy storage system received by the converter control system to 49.5 Hz or 52 Hz through the simulated grid device; When the protection is activated, it is determined that the electrochemical energy storage system does not meet the continuous operation requirement within the allowable range of voltage deviation; Resetting the simulated power grid device, adjusting the frequency of the electrochemical energy storage system grid connection point received by the electrochemical energy storage system to an initial value, and ending the test; The result unit is used to perform a continuous operation state test of the electrochemical energy storage system within multiple frequency ranges when the operation mode of the simulated power grid device is the electrochemical energy storage system mode, and is also used to: The grid-connected point frequency of the electrochemical energy storage system received by the converter control system is adjusted to be less than 49.5 Hz by the simulated grid device, and when the electrochemical energy storage system is in a charging state, it is determined that the electrochemical energy storage system does not meet the continuous operation requirement within the allowable range of voltage deviation; The grid-connected point frequency of the electrochemical energy storage system received by the converter control system is adjusted to be greater than 52 Hz through the simulated grid device. When the electrochemical energy storage system is in a discharging state, it is determined that the electrochemical energy storage system does not meet the continuous operation requirements within the allowable range of voltage deviation.
7. The device according to claim 6, wherein the result unit is used to perform a continuous operation capability test of the wind turbines within multiple frequency ranges when the operation mode of the simulated power grid device is a wind turbine mode, and is also used to: The grid-connected point frequency of the wind turbine generator set received by the converter control system is adjusted to the frequency limit value of each preset range by the simulated grid device, and the continuous operation state of the wind turbine generator set and the corresponding protection action time t are recorded; When the recorded protection action time t is less than the preset time threshold, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; The simulated power grid device is reset, the wind turbine grid connection point frequency received by the converter control system is adjusted to an initial value, and the test is terminated.
8. The device according to claim 7, comprising: When the frequency limit value is 46.5 Hz and the protection action time t is less than 5 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 47 Hz and the protection action time t is less than 20 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 47.5 Hz and the protection action time t is less than 60s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 48 Hz and the protection action time t is less than 30 min, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 48.5 Hz, the wind turbine cannot operate continuously, and it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 50.5 Hz and the protection action time t is less than 3 minutes, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 51 Hz and the protection action time t is less than 30 s, it is determined that the converter control system does not meet the continuous operation requirement within the allowable range of voltage deviation.
9. The device according to claim 6, wherein the result unit is used to test the continuous operation capability of the photovoltaic inverter within multiple frequency ranges when the operation mode of the simulated power grid device is the photovoltaic power generation mode, and is also used to: The grid-connected point frequency of the photovoltaic inverter received by the converter control system is adjusted to the frequency limit value of each preset range by the simulated grid device, and the continuous operation state of the photovoltaic inverter and the corresponding protection action time t are recorded; When the recorded protection action time t is less than the preset time threshold, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation; The simulated power grid device is reset, the photovoltaic inverter grid connection point frequency received by the converter control system is adjusted to an initial value, and the test is terminated.
10. The device according to claim 9, comprising: When the frequency limit value is 48 Hz and the protection action time t is less than 10 minutes, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 49.5 Hz, the photovoltaic inverter cannot operate continuously, and it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 50.2 Hz and the protection action time t is less than 2 minutes, it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation; When the frequency limit value is 51.5 Hz, the protection does not immediately act, and it is determined that the photovoltaic inverter does not meet the continuous operation requirement within the allowable range of voltage deviation.