Industrial Park Management System Driven by Cloud Computing

The industrial park management system driven by cloud computing uses advanced algorithms and technical means to solve the problems of resource scheduling, inventory management and network optimization in traditional systems, improve resource utilization and system performance, reduce operating costs, and enhance competition. force.

CN117891606BActive Publication Date: 2024-10-18JIANGXI ZHIHONG DIGITAL TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410080961.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-19
Publication Date
2024-10-18
Estimated Expiration
2044-01-19

AI Technical Summary

Technical Problem

Traditional industrial park management systems have deficiencies in resource scheduling, inventory management, network optimization and performance monitoring, resulting in uneven resource allocation, low utilization, energy waste, low data transmission efficiency, increased operating costs, and reduced competitiveness.

Method used

The industrial park management system driven by cloud computing includes intelligent resource scheduling module, microservice architecture module, inventory management module, resource optimization module, network structure optimization module, resource allocation and optimization module, data-driven strategy module and system performance monitoring module. Utilize technologies such as graph neural networks, reinforcement learning algorithms, Docker containerization technology, Kubernetes orchestration, topological data analysis, and evolutionary algorithms to achieve dependency modeling between resources and tasks, dynamic inventory adjustment, resource usage pattern optimization, and network structure optimization. and system performance evaluation.

Benefits of technology

It improves resource utilization, system responsiveness and processing efficiency, realizes intelligent inventory management, efficient optimization of resource use and stability of network communication, reduces operating costs, and improves system flexibility and competitiveness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117891606B_ABST
    Figure CN117891606B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of cloud infrastructure management technology, specifically to an industrial park management system driven by cloud computing, the system includes a resource intelligent scheduling module, a microservice architecture module, an inventory management module, a resource optimization module, a network structure optimization module, a resource allocation and optimization module, a data-driven strategy module, and a system performance monitoring module. In the present invention, resource scheduling is optimized by a graph neural network algorithm to achieve modeling and allocation between resources and tasks, microservice architecture and Docker containerization technology bring flexibility and scalability to service deployment and management, Kubernetes service orchestration and automatic expansion optimize dynamic load balancing, improve responsiveness and processing efficiency, enhance learning algorithms to adapt to changes in market demand in real time, reduce inventory backlogs and shortages, SOM networks optimize resource usage patterns, reduce resource waste, topological data analysis methods optimize network structures, and evolutionary algorithms optimize resource allocation to maintain operation in the face of environmental changes and demand fluctuations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of cloud infrastructure management, and in particular to an industrial park management system driven by cloud computing. Background Art

[0002] Cloud infrastructure management is a field that covers a wide range of technologies and services aimed at effectively managing and optimizing data center resources through cloud computing solutions. In the context of industrial park management systems, it involves integrating various physical and virtual resources of the industrial park into a unified cloud platform. Such integration enables more efficient resource allocation, better data analysis and processing, and more flexible operation and maintenance modes. Cloud infrastructure management in this environment not only deals with traditional IT resources, but also involves Industrial Internet of Things (IoT) devices and other technologies specific to industrial environments.

[0003] Among them, the industrial park management system is a comprehensive solution for coordinating and optimizing various operational activities within the industrial park. The purpose of these systems is to improve efficiency and reduce costs while ensuring the safety and sustainable operation of the industrial park. By centrally managing energy use, equipment maintenance, safety monitoring and other key operations, the industrial park management system can help companies better control and monitor their production environment and improve the transparency and responsiveness of operations.

[0004] Traditional industrial park management systems have deficiencies in many aspects. Traditional systems usually adopt relatively fixed and single resource scheduling strategies, which are difficult to adapt to complex and changing industrial needs, resulting in uneven resource allocation and low utilization. The lack of flexible service architecture and automatic expansion capabilities makes the system respond slowly when faced with high concurrent requests, affecting production efficiency. Inventory management relies on preset rules and experience judgments, which is prone to oversupply or shortage and cannot respond to market changes in a timely manner. Insufficient optimization of resource usage patterns and network structures leads to energy waste and low data transmission efficiency. In addition, traditional systems often lack effective performance monitoring and optimization mechanisms, making it difficult to accurately identify and promptly resolve system bottlenecks and problems, further affecting operational efficiency and stability. These deficiencies ultimately lead to increased operating costs and reduced competitiveness for the entire industrial park. Summary of the invention

[0005] The purpose of the present invention is to solve the shortcomings of the prior art and propose a cloud computing driven industrial park management system.

[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solutions: the cloud computing-driven industrial park management system includes a resource intelligent scheduling module, a microservice architecture module, an inventory management module, a resource optimization module, a network structure optimization module, a resource allocation and optimization module, a data-driven strategy module, and a system performance monitoring module;

[0007] The resource intelligent scheduling module is based on the resources and task requirements of the industrial park, uses a graph neural network algorithm to analyze the relationship between resources, establishes a dependency graph model between resources and tasks through node feature extraction and edge relationship learning, implements a scheduling strategy based on node classification and resource allocation optimization, and generates an optimized resource allocation map;

[0008] The microservice architecture module designs a microservice splitting strategy based on the optimized resource allocation map, uses Docker containerization technology to achieve independent deployment and management of services, uses Kubernetes for service orchestration and automatic expansion, performs dynamic load balancing and resource scheduling of services, and generates microservice configuration strategies;

[0009] The inventory management module is based on the microservice configuration strategy, uses the reinforcement learning algorithm to dynamically analyze the inventory data, adjusts the inventory level through the reward mechanism, responds to market demand changes in real time, makes adaptive adjustments to the inventory strategy, and generates an intelligent inventory strategy;

[0010] The resource optimization module is based on the intelligent inventory strategy, designs the SOM network to identify the resource usage pattern, adjusts the mapping weights through competitive learning and adaptive neighborhood functions, performs dimension reduction and pattern recognition of resource usage data, and then optimizes the resource allocation strategy and generates a resource optimization plan;

[0011] The network structure optimization module uses the topological data analysis method to identify key nodes and connections of the network structure based on the resource optimization solution, calculates and compares the geometric and topological characteristics of the data to adjust the network configuration, and generates a network optimization graph;

[0012] The resource allocation and optimization module implements evolutionary algorithms to optimize resource allocation based on the network optimization graph, dynamically adjusts resource allocation strategies through simulation of selection, inheritance and mutation processes, matches environmental changes and demand fluctuations, and generates allocation optimization results;

[0013] The data-driven strategy module optimizes the strategy based on the deployment optimization results, uses time series data analysis and prediction models to optimize the strategy, formulates strategy adjustments by analyzing historical data and identifying trend changes, and generates a strategy optimization guide;

[0014] The system performance monitoring module is based on the strategy optimization guide and uses performance monitoring technology to conduct a comprehensive evaluation of the system. By collecting and analyzing multiple performance indicator data, it identifies potential bottlenecks and problems, implements optimization measures, and generates performance monitoring results.

[0015] As a further solution of the present invention, the optimized resource allocation map includes resource node optimization status, task allocation matrix and resource utilization index, the microservice configuration strategy includes service partition list, container configuration parameters and automatic expansion rules, the intelligent inventory strategy includes dynamic replenishment threshold, inventory turnover rate target and emergency response strategy, the resource optimization plan includes adjusted resource allocation table, optimized resource utilization path and predicted resource savings, the network optimization map includes optimized node layout, data transmission route and network delay index, the deployment optimization results include new resource combination strategy, improved resource allocation efficiency and resource deployment schedule, the strategy optimization guide includes optimized decision-making process, key decision nodes and prediction effect index, and the performance monitoring results include comprehensive performance score, key performance indicators and recommended improvement measures.

[0016] As a further solution of the present invention, the resource intelligent scheduling module includes a dependency graph model submodule, a dynamic scheduling submodule, and a performance optimization submodule;

[0017] The dependency graph model submodule uses a graph neural network algorithm to perform structured modeling of resources based on the resources and task requirements of the industrial park, analyzes the attributes of each resource and the relationship between tasks, dynamically expresses the dependencies between resources through node updates and edge weighting, and generates a dependency graph;

[0018] The dynamic scheduling submodule uses constraint programming and heuristic search strategies to perform dynamic scheduling based on the dependency graph, and refers to the real-time status and task requirements of multiple resources, optimizes the search path and adjusts the resource allocation to match resources for each task and generate a scheduling strategy graph;

[0019] The performance optimization submodule is based on the scheduling strategy map and adopts a multi-objective optimization method to improve system performance. It comprehensively refers to performance indicators including resource utilization rate and task completion time, adjusts resource allocation strategy and optimizes task scheduling sequence, continuously iterates and solves, and generates an optimized resource allocation map.

[0020] As a further solution of the present invention, the microservice architecture module includes a service splitting strategy submodule, an automated deployment submodule, and a load balancing submodule;

[0021] The service splitting strategy submodule performs logical and physical segmentation of services based on the optimized resource allocation map, uses domain-driven design to identify and divide service boundaries, and establishes the autonomy and granularity of services by analyzing business domains, inter-service dependencies and communication patterns, and formulates a service splitting plan;

[0022] The automated deployment submodule uses Docker to containerize services based on the service splitting solution, and cooperates with Kubernetes to automatically deploy and manage containers, perform service deployment and elastic scaling, set and optimize service configuration, network connection, and storage management, and generate automated deployment scripts;

[0023] The load balancing submodule uses a load balancing strategy to intelligently distribute service requests based on an automated deployment script, monitors service load and resource status in real time, dynamically adjusts resource allocation and the number of service replicas, and generates a microservice configuration strategy.

[0024] As a further solution of the present invention, the inventory management module includes a demand forecasting submodule, a real-time monitoring submodule, and a decision support submodule;

[0025] The demand forecasting submodule uses time series analysis to identify patterns and trends through historical sales data based on microservice configuration strategies, and uses random forests to analyze the relationship between trends and multiple factors to predict future demand and match market changes to generate demand forecast results;

[0026] The real-time monitoring submodule uses real-time data stream processing and monitoring technology to monitor inventory status in real time based on demand forecast results, implements Apache Kafka to process multi-channel inventory data, and updates inventory status and market change information in real time through continuous data analysis and processing, generating a real-time inventory dynamic view;

[0027] The decision support submodule optimizes inventory strategies based on real-time dynamic inventory views using optimization algorithms and decision models, wherein linear programming is used to analyze inventory costs and service levels, and decision models are used to evaluate the effects of multiple strategies, and intelligent inventory strategies are formulated based on costs and service levels.

[0028] As a further solution of the present invention, the resource optimization module includes a SOM network design submodule, a pattern recognition submodule, and a strategy adjustment submodule;

[0029] The SOM network design submodule is based on the intelligent inventory strategy, uses the self-organizing map network to reduce the dimension and recognize the pattern of resource usage data, receives multi-dimensional resource data through the input layer, uses the neurons in the competition layer to win the competition and update the weights, forms a feature map of resource usage, and generates a resource pattern map;

[0030] The pattern recognition submodule uses clustering and pattern recognition technology to analyze based on resource pattern mapping, classifies and marks resource usage patterns according to the output of SOM, identifies high-frequency usage patterns, inefficient patterns or abnormal patterns, and generates resource usage pattern recognition results;

[0031] The strategy adjustment submodule uses a decision model and a resource adjustment strategy to perform optimization and adjustment based on the resource usage pattern recognition results. By analyzing the recognition results and combining the current business needs and resource status, the resource allocation strategy is adjusted, including increasing or decreasing resource input, adjusting resource configuration, and generating a resource optimization plan.

[0032] As a further solution of the present invention, the network structure optimization module includes a key node identification submodule, a network adjustment submodule, and an efficiency improvement submodule;

[0033] The key node identification submodule is based on the resource optimization scheme and adopts the topological data analysis method to analyze the structure of the network, identify the key nodes and connections in the network, calculate the topological characteristics of the network, including the connectivity and centrality of the nodes, and the stability and efficiency of the connections, reveal the key components of the network structure, and generate key nodes and connection maps;

[0034] The network adjustment submodule uses graph editing technology and minimum spanning tree algorithm based on key nodes and connection graphs to adjust the network structure, including adding or deleting nodes and connections, adjusting the network topology, and generating an adjusted network structure graph;

[0035] The efficiency improvement submodule uses network flow analysis and path optimization based on the adjusted network structure diagram to evaluate and improve the performance of the network, including calculating the network's transmission efficiency, delay and load indicators, optimizing path selection and resource allocation, and generating a network optimization diagram.

[0036] As a further solution of the present invention, the resource allocation and optimization module includes an evolutionary algorithm implementation submodule, a dynamic strategy adjustment submodule, and an effect evaluation submodule;

[0037] The evolutionary algorithm implementation submodule executes the evolutionary algorithm to optimize resource allocation based on the network optimization graph. By simulating selection, inheritance and mutation mechanisms, the resource allocation strategy is continuously updated iteratively to match the environment and demand. The resource allocation strategy is guided by the matching degree, gradually optimized and adjusted to form a resource allocation strategy.

[0038] The dynamic policy adjustment submodule dynamically adjusts the resource allocation strategy to respond to real-time business needs and resource conditions, adjusts according to real-time data, increases or decreases resources, and generates a dynamic resource adjustment strategy;

[0039] The effect evaluation submodule performs effect evaluation based on the dynamic adjustment of resource strategy, conducts a comprehensive evaluation on the results after the strategy adjustment, including resource utilization, service level and cost-effectiveness, and generates an optimized resource allocation result.

[0040] As a further solution of the present invention, the data-driven strategy module includes a data analysis submodule, a machine learning submodule, and a strategy solution submodule;

[0041] The data analysis submodule uses the autoregressive moving average model based on the deployment optimization results to analyze the time series characteristics of historical data, predicts future data by calculating autoregressive terms and moving average terms, and combines trend analysis and seasonal decomposition to locate data patterns, conduct environmental analysis and preliminary trend forecasting, and generate strategic environmental analysis results;

[0042] The machine learning submodule applies the random forest algorithm based on the results of the policy environment analysis, improves the prediction accuracy and stability by constructing multiple decision trees and aggregating their prediction results, and performs deep learning operations at the same time, applying convolutional neural networks and recursive neural networks to mine the deep features and time series relationships of the data to generate a policy prediction model;

[0043] The strategy solution submodule is based on the strategy prediction model and adopts the particle swarm optimization algorithm. The individuals in the particle swarm search for the optimal solution in the solution space. Each particle iteratively updates its position based on its own experience and the experience of the group to capture the global optimal solution. It combines real-time data and model recommendations to generate a strategy optimization guide.

[0044] As a further solution of the present invention, the system performance monitoring module includes an efficiency monitoring submodule, a response time monitoring submodule, and a stability monitoring submodule;

[0045] The efficiency monitoring submodule uses resource utilization analysis methods based on the strategy optimization guide to evaluate system efficiency, including real-time monitoring of CPU, memory, and I / O resources. By sampling and counting resource usage, it identifies hot spots and bottleneck areas of resource utilization, proposes resource adjustment and optimization strategies, and generates efficiency evaluation results.

[0046] The response time monitoring submodule measures the response time based on the efficiency evaluation results, adopts delay tracking and time analysis methods, tracks the life cycle of each request through fine-grained timestamp records, identifies and records the key links that cause response delays, analyzes and optimizes the response time, and formulates the response time analysis results;

[0047] The stability monitoring submodule performs stability monitoring based on the response time analysis results and adopts the failure mode and effect analysis method, including continuous operation status monitoring of the system and failure record analysis. Through in-depth analysis of the system operation log, it identifies frequent failure modes and potential system weaknesses, conducts risk assessment and prediction, and generates stability monitoring results.

[0048] Compared with the prior art, the advantages and positive effects of the present invention are:

[0049] In the present invention, resource scheduling is optimized through a graph neural network algorithm to achieve accurate modeling and efficient allocation of dependencies between resources and tasks, thereby improving resource utilization. Microservice architecture and Docker containerization technology bring flexibility and scalability to service deployment and management. Kubernetes' service orchestration and automatic expansion optimize dynamic load balancing, improving system responsiveness and processing efficiency. Reinforcement learning algorithms make inventory management more intelligent, adapt to changes in market demand in real time, and reduce inventory backlogs and shortages. The SOM network optimizes resource usage patterns and effectively reduces resource waste. Topological data analysis methods optimize network structures to ensure data communication efficiency and stability. Evolutionary algorithms further refine resource allocation, allowing the system to maintain efficient operation in the face of environmental changes and demand fluctuations. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 is a system flow chart of the present invention;

[0051] Figure 2 It is a schematic diagram of the system framework of the present invention;

[0052] Figure 3 This is a flow chart of the resource intelligent scheduling module of the present invention;

[0053] Figure 4 This is a flow chart of the microservice architecture module of the present invention;

[0054] Figure 5 It is a flow chart of the inventory management module of the present invention;

[0055] Figure 6 It is a flow chart of the resource optimization module of the present invention;

[0056] Figure 7 It is a flow chart of the network structure optimization module of the present invention;

[0057] Figure 8 It is a flow chart of the resource allocation and optimization module of the present invention;

[0058] Fig. 9 It is a flow chart of the data-driven strategy module of the present invention;

[0059] Fig.10 This is a flow chart of the system performance monitoring module of the present invention. DETAILED DESCRIPTION

[0060] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0061] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.

[0062] Embodiment 1

[0063] See also Figure 1 to Figure 2 ,The cloud computing driven industrial park management system includes resource intelligent scheduling module, microservice architecture module, inventory management module, resource optimization module, network structure optimization module, resource allocation and optimization module, data driven strategy module, and system performance monitoring module;

[0064] The resource intelligent scheduling module is based on the resources and task requirements of the industrial park. It uses the graph neural network algorithm to analyze the relationship between resources, establishes a dependency graph model between resources and tasks through node feature extraction and edge relationship learning, implements a scheduling strategy based on node classification and resource allocation optimization, and generates an optimized resource allocation map.

[0065] The microservice architecture module designs microservice splitting strategies based on the optimized resource allocation map, uses Docker containerization technology to achieve independent deployment and management of services, uses Kubernetes for service orchestration and automatic expansion, performs dynamic load balancing and resource scheduling of services, and generates microservice configuration strategies;

[0066] The inventory management module is based on microservice configuration strategies and uses reinforcement learning algorithms to dynamically analyze inventory data. It adjusts inventory levels through reward mechanisms, responds to changes in market demand in real time, makes adaptive adjustments to inventory strategies, and generates intelligent inventory strategies.

[0067] The resource optimization module is based on the intelligent inventory strategy and designs a SOM network to identify resource usage patterns. It adjusts mapping weights through competitive learning and adaptive neighborhood functions, performs dimensionality reduction and pattern recognition on resource usage data, and then optimizes resource allocation strategies and generates resource optimization solutions.

[0068] The network structure optimization module uses the topological data analysis method to identify the key nodes and connections of the network structure based on the resource optimization solution, calculates and compares the geometric and topological characteristics of the data to adjust the network configuration, and generates a network optimization diagram;

[0069] The resource allocation and optimization module uses evolutionary algorithms to optimize resource allocation based on the network optimization graph. It dynamically adjusts resource allocation strategies through simulation of selection, inheritance, and mutation processes to match environmental changes and demand fluctuations, and generates allocation optimization results.

[0070] The data-driven strategy module optimizes the strategy based on the deployment optimization results, uses time series data analysis and forecasting models to make strategy adjustments by analyzing historical data and identifying trend changes, and generates a strategy optimization guide.

[0071] The system performance monitoring module is based on the strategy optimization guide and uses performance monitoring technology to conduct a comprehensive evaluation of the system. By collecting and analyzing multiple performance indicator data, it identifies potential bottlenecks and problems, implements optimization measures, and generates performance monitoring results.

[0072] The optimized resource allocation map includes the optimization status of resource nodes, task allocation matrix and resource utilization indicators. The microservice configuration strategy includes the service partition list, container configuration parameters and automatic expansion rules. The intelligent inventory strategy includes dynamic replenishment thresholds, inventory turnover targets and emergency response strategies. The resource optimization plan includes the adjusted resource allocation table, optimized resource utilization path and predicted resource savings. The network optimization map includes the optimized node layout, data transmission route and network delay indicators. The deployment optimization results include new resource combination strategies, improved resource allocation efficiency and resource deployment schedule. The strategy optimization guide includes the optimized decision-making process, key decision nodes and predicted effect indicators. The performance monitoring results include comprehensive performance scores, key performance indicators and recommended improvement measures.

[0073] In the resource intelligent scheduling module, the system imports the resource and task demand data of the industrial park, which usually exists in a structured format (such as CSV or database table). The system applies a graph neural network algorithm. The specific operations include initializing the node feature vector and representing the resources and tasks as nodes and edges of the graph. Through iterative learning, the algorithm updates the feature representation of the nodes to capture the complex dependencies between resources. Node classification is achieved through supervised learning, where resource and task types are used as category labels. Resource allocation optimization uses a graph convolutional network to optimize resource allocation by learning the strength of the relationship between resources. This module outputs an optimized resource allocation map, which shows in detail how resources are most effectively allocated to each task.

[0074] In the microservice architecture module, the system designs a microservice splitting strategy based on the optimized resource allocation map. The system performs a microscopic analysis of the services to determine which services can be deployed independently. Using Docker containerization technology, each service is packaged into an independent container, containing all the required code, runtime environment, and libraries. Kubernetes is used for service orchestration and automatic expansion. The system automatically analyzes the service load and dynamically adjusts the number of service instances according to preset rules to achieve dynamic load balancing. The microservice configuration strategy generated by this module includes a service partition list, container configuration parameters, and automatic expansion rules, ensuring efficient operation of services and optimized use of resources.

[0075] The inventory management module uses a reinforcement learning algorithm to dynamically analyze inventory data based on microservice configuration strategies. The system imports inventory data, including inventory volume, inventory turnover, and market demand. The reinforcement learning model is trained in a simulated environment and adjusts inventory strategies through interactive learning with the environment. The model receives feedback on inventory levels and demand changes and optimizes decisions through a reward mechanism. The system generates intelligent inventory strategies, including dynamic replenishment thresholds, inventory turnover targets, and emergency response strategies. These strategies make inventory management more flexible and responsive to market changes.

[0076] The resource optimization module uses the SOM network to identify and optimize resource usage patterns. The system imports resource usage data, which usually includes resource consumption, usage frequency, and cost. The SOM network automatically identifies patterns and trends in resource usage through unsupervised learning. The system adjusts mapping weights through competitive learning and adaptive neighborhood functions to reduce the dimension and identify patterns of resource usage data. In this process, the resource allocation strategy is optimized, and the system generates a resource optimization plan including an adjusted resource allocation table, an optimized resource utilization path, and predicted resource savings.

[0077] The network structure optimization module uses topological data analysis methods to analyze the key nodes and connections of the network structure. The system imports network structure data, including node information, connection relationships, and data flow. By calculating and comparing the geometric and topological characteristics of the data, the system identifies key nodes and weak connections in the network. Adjust the network configuration, optimize the data transmission route, and reduce network latency. The generated network optimization diagram shows the optimized node layout, data transmission route, and network latency indicators, providing significant optimization for the network structure.

[0078] In the resource allocation and optimization module, the system implements evolutionary algorithms to optimize resource allocation. After importing resource and task data, the algorithm simulates natural selection, inheritance, and mutation processes. By simulating multiple generations of resource allocation strategies, the algorithm finds the resource configuration that best suits the current environment. During this process, the resource combination strategy is continuously iterated and updated to match environmental changes and demand fluctuations. The system generates allocation optimization results, including new resource combination strategies, improved resource allocation efficiency, and resource allocation schedules.

[0079] In the data-driven strategy module, the system uses time series data analysis and forecasting models to optimize strategies. The system analyzes historical data, identifies trends and patterns, and applies forecasting models to predict future changes. These models include regression analysis, time series analysis, and machine learning algorithms. Through these analyses and forecasts, the system generates a strategy optimization guide, including optimized decision-making processes, key decision nodes, and forecasting effect indicators.

[0080] The system performance monitoring module uses performance monitoring technology to conduct a comprehensive evaluation of the system. The system collects data on a variety of performance indicators, such as response time, throughput, and resource utilization. Through data analysis, the system identifies potential bottlenecks and problems in the system. Targeted optimization measures are implemented, such as code optimization, resource reallocation, or hardware upgrades. The system generates performance monitoring results, including comprehensive performance scores, key performance indicators, and recommended improvement measures.

[0081] See also Figure 3 ,The resource intelligent scheduling module includes the dependency graph model sub-module, the dynamic scheduling sub-module, and the performance optimization sub-module;

[0082] The dependency graph model submodule uses the graph neural network algorithm to structure resource modeling based on the resource and task requirements of the industrial park, analyzes the attributes of each resource and the relationship between tasks, dynamically expresses the dependencies between resources through node updates and edge weighting, and generates a dependency graph.

[0083] The dynamic scheduling submodule uses constraint programming and heuristic search strategies to perform dynamic scheduling based on the dependency graph. It matches resources for each task and generates a scheduling strategy graph by optimizing the search path and adjusting resource allocation, referring to the real-time status of multiple resources and task requirements.

[0084] The performance optimization submodule is based on the scheduling strategy map and adopts a multi-objective optimization method to improve system performance. It comprehensively refers to performance indicators including resource utilization rate and task completion time, adjusts the resource allocation strategy and optimizes the task scheduling sequence, continuously iterates and solves, and generates an optimized resource allocation map.

[0085] In the dependency graph model submodule, the system is based on the resource and task demand data of the industrial park, which usually exists in a structured form, such as a table or database. After importing the data, the graph neural network (GNN) algorithm is used to perform structured modeling of resources. Specifically, each resource and task is regarded as a node in the graph, and the relationship between them is represented as an edge. The GNN algorithm first initializes the node features, which are based on the attributes of the resource (such as type, capacity, location) and the requirements of the task (such as the required resource type, quantity, and time limit). Subsequently, the algorithm performs a node update operation, which includes aggregating the information of neighboring nodes to update the features of the current node to reflect the dependencies and interactions between resources. Edge weighting is performed by learning the strength of the relationship between different resources and tasks, which is determined by factors such as the frequency of interaction between resources and the suitability of resources for tasks. Through these steps, the GNN algorithm dynamically expresses the dependencies between resources and generates a dependency graph. This graph shows the interdependence and synergy between resources in detail, providing a decision-making basis for subsequent resource scheduling.

[0086] The dynamic scheduling submodule uses constraint programming and heuristic search strategies for dynamic scheduling based on the dependency graph. Constraint programming is used to define and manage the resource requirements and constraints of tasks, such as a task must use a specific type of resource or the use of resources cannot exceed a certain time. Heuristic search strategies are used to find the optimal resource allocation solution under these constraints. Specifically, the search strategy evaluates different resource allocation combinations and adjusts them according to the real-time status of resources (such as availability, current load) and task requirements (such as urgency, priority). The system continuously optimizes the search path and finds the most suitable match by simulating and predicting the effects of different resource allocation schemes. Finally, a scheduling strategy map is generated, which details the resources matched for each task, as well as the schedule and order of resource allocation. This dynamic scheduling method improves the efficiency of resource utilization and ensures that tasks are completed on time, while also being flexible to respond to emergencies and changes.

[0087] The performance optimization submodule uses a multi-objective optimization method to improve system performance based on the scheduling strategy map. Multi-objective optimization focuses on optimizing multiple performance indicators at the same time, such as resource utilization, task completion time, cost-effectiveness, etc. The system first analyzes the current resource allocation and task scheduling status according to the scheduling strategy map to identify existing performance bottlenecks or inefficient use. Next, performance is improved by adjusting the resource allocation strategy and optimizing the task scheduling order. This involves a series of iterative solution processes, in which the system continuously experiments with different resource configurations and scheduling plans to evaluate the impact on performance indicators. In this way, the system is able to find solutions that maximize or minimize the selected performance indicators while satisfying all constraints. The resulting resource allocation map shows the optimized resource allocation plan, including resource allocation and scheduling order. This optimization process improves overall system efficiency, shortens task completion time, and also reduces resource waste.

[0088] Assume that the industrial park has three resources (A, B, C) and two tasks (X, Y). The attributes of resources A, B, and C include type (such as machine, manpower, material), capacity (such as daily processing volume), and location (such as factory area). The requirements of tasks X and Y include the required resource type, quantity, and completion time. For example, task X requires two machine-type resources and three human resources to be completed within two days.

[0089] In the dependency graph model submodule, data is input in a structured format, such as:

[0090] resource type capacity Location A machine 100 1 B Human Resources 50 2 C materials 200 1

[0091]

[0092] The GNN algorithm converts this data into a graph structure, where nodes represent resources and tasks, and edges represent the relationships between them. The algorithm analyzes resource attributes and task requirements, updates node features and edge weights, and generates a dependency graph.

[0093] In the dynamic scheduling submodule, constraint programming defines resource and task constraints. For example, task X must use machine type resource A and human resource B. Heuristic search evaluates the effect of different resource combinations, such as assigning resources A and B to task X and resource C to task Y. The system optimizes the search path and generates a scheduling strategy map.

[0094] In the performance optimization submodule, the multi-objective optimization method analyzes the scheduling strategy map. The system tries different resource allocation schemes, such as swapping the resource allocation of tasks X and Y, and evaluates the impact on performance indicators. The resulting resource allocation map shows the optimized scheme, such as task X using resources B and C, and task Y using resource A.

[0095] See also Figure 4 ,The microservice architecture module includes the service splitting strategy submodule, the ,automatic deployment submodule, and the load balancing submodule;

[0096] The service splitting strategy submodule performs logical and physical segmentation of services based on the optimized resource allocation map, uses domain-driven design to identify and divide service boundaries, and establishes the autonomy and granularity of services by analyzing business domains, inter-service dependencies, and communication patterns, and formulates a service splitting plan.

[0097] The automated deployment submodule uses Docker to containerize services based on the service splitting solution, and cooperates with Kubernetes to automatically deploy and manage containers, perform service deployment and elastic scaling, set and optimize service configuration, network connection, and storage management, and generate automated deployment scripts;

[0098] The load balancing submodule is based on automated deployment scripts and uses load balancing strategies to intelligently distribute service requests. It monitors service load and resource status in real time, dynamically adjusts resource allocation and the number of service replicas, and generates microservice configuration strategies.

[0099] In the microservice architecture module, the service splitting strategy submodule realizes the effective splitting of services by comprehensively applying domain-driven design (DDD) and optimized resource allocation maps. Specifically, this submodule first uses the resource allocation map, which is an algorithmically generated data structure that details the resource requirements and dependencies between different services. Through the map, it is possible to identify which services require more resources and which services can share resources. Then, the domain-driven design method is used to define the service boundaries. Domain-driven design focuses on business logic and divides the entire system into different domains, each corresponding to a microservice. This process involves complex business analysis and forms a domain model by identifying business entities, value objects, aggregate roots, repositories, and services.

[0100] The service splitting strategy submodule also deeply analyzes the dependencies and communication patterns between services, using graph theory algorithms and network analysis techniques. For example, the shortest path algorithm (such as the Dijkstra algorithm) can be used to determine the optimal communication path between services to ensure data transmission efficiency. In the service splitting process, the algorithm carefully considers the autonomy and granularity of the service to ensure that each service is self-sufficient while being able to interact with other services efficiently. This process ultimately generates a specific service splitting plan that describes in detail the responsibilities, interfaces, and resource requirements of each microservice, ensuring the scalability and maintainability of the system.

[0101] In the automated deployment submodule, based on the service splitting solution, Docker and Kubernetes are used to implement containerization and automated deployment of services. Docker containerization technology allows each service to run in an isolated environment, ensuring environmental consistency and lightweight deployment of services. During this process, the Docker file defines the operating system, dependency libraries, and environment variables required for the service to run. Then, Kubernetes, as a container orchestration tool, is responsible for the automatic deployment, scaling, and management of containers. Using Kubernetes' declarative configuration and automated deployment capabilities, resource allocation and the number of service instances can be dynamically adjusted according to service requirements. Kubernetes' load balancer and service discovery mechanism ensure efficient communication between services.

[0102] In the load balancing submodule, an intelligent load balancing strategy is adopted to dynamically adjust resource allocation by real-time monitoring of service load and resource status. In this process, load balancing algorithms (such as polling, least connections, and shortest response time) are used to distribute inbound requests to ensure load balancing of each service and avoid single-point overload. At the same time, through real-time performance monitoring, such as data analysis of CPU usage, memory consumption, and network latency, the system can automatically adjust the number of service replicas to adapt to changing load requirements. This adaptive resource management strategy significantly improves the reliability and availability of the system.

[0103] In the service splitting strategy submodule, assume that there is an e-commerce system that includes services such as user management, order processing, and payment processing. Through resource allocation graph analysis, it is found that the order processing service depends on the data of the user management service. Using domain-driven design, the e-commerce system is divided into different domains, such as user domain, order domain, and payment domain. Each domain is deployed independently as a microservice. Use graph theory algorithms to analyze the dependencies between services, optimize communication paths, and ensure efficient data exchange. Finally, generate a detailed service splitting plan, including the responsibilities, interfaces, and resource requirements of each microservice.

[0104] In the automated deployment submodule, a Docker file is written for the order processing service of the e-commerce system, defining the required operating system, Java runtime environment, and database connection configuration. Kubernetes is used for container orchestration, defining the deployment strategy, number of replicas, and resource limits of the service. Kubernetes automatically handles the deployment, scaling, and load balancing of the service to ensure high availability of the service.

[0105] In the load balancing submodule, a load balancing strategy is implemented for the order processing service of the e-commerce system. By real-time monitoring of the CPU and memory usage of the order processing service, the number of service replicas is dynamically adjusted to cope with the peak order volume. The least connection strategy is adopted to evenly distribute user requests to different service replicas, ensuring load balancing of each replica and improving the overall performance of the system.

[0106] See also Figure 5 ,The inventory management module includes demand forecasting submodule, real-time monitoring submodule, and decision support submodule;

[0107] The demand forecasting submodule is based on the microservice configuration strategy, uses time series analysis to identify patterns and trends through historical sales data, and uses random forests to analyze the relationship between trends and multiple factors, predicts future demand, and matches market changes to generate demand forecast results;

[0108] The real-time monitoring submodule uses real-time data stream processing and monitoring technology to monitor inventory status in real time based on demand forecast results. It implements Apache Kafka to process inventory data from multiple channels. Through continuous data analysis and processing, it updates inventory status and market change information in real time and generates a real-time inventory dynamic view.

[0109] The decision support submodule optimizes inventory strategies based on real-time dynamic inventory views using optimization algorithms and decision models. It analyzes inventory costs and service levels through linear programming, evaluates the effects of multiple strategies using decision models, and develops intelligent inventory strategies based on costs and service levels.

[0110] In the demand forecasting submodule, the data format is usually historical sales records through microservice configuration strategies. These data contain key information such as timestamps, sales volume, and product types. Based on these data, time series analysis is first performed. The core of time series analysis is to identify patterns and trends in the data. For example, the autoregressive moving average (ARMA) model is used, which identifies trends by calculating the autocorrelation between data points. In specific operations, model parameters are set, such as the number of lag terms and the window size of the moving average. These parameters are adjusted according to the periodicity and volatility of the data.

[0111] Subsequently, the random forest algorithm is used to analyze the relationship between trends and multiple factors. Random forest is an ensemble learning method that builds multiple decision trees and averages or majority votes on the prediction results to improve the accuracy of the prediction. In operation, the number of trees, the depth of the tree, and the number of features used are set, and these settings are adjusted according to the complexity of the data and the computing power. This method can identify key factors that affect demand from multidimensional data, such as seasonality, promotions, market trends, etc.

[0112] Finally, combined with market changes, demand forecast results are generated. This process uses algorithms to combine historical data and current market conditions to predict future demand trends. The generated forecast results are a series of demand estimates for future time points, which can be used for subsequent inventory management and supply chain planning.

[0113] The real-time monitoring submodule uses real-time data stream processing and monitoring technology to monitor inventory status in real time based on demand forecast results. Here, the data format is usually a record of real-time in and out inventory, including product ID, quantity, timestamp, etc. Apache Kafka is used to process these multi-channel inventory data. As a distributed stream processing platform, Kafka can efficiently process large amounts of data streams from different sources.

[0114] Specifically for operations, topics in Kafka are configured to receive real-time data from the warehouse system. By setting partitions and replicas, high availability and fault tolerance of data can be guaranteed. Subsequently, these data streams are sent to the real-time analysis system, using tools such as Spark Streaming for data processing and analysis. At this stage, data cleaning, conversion, and basic statistical calculations, such as the accumulation and reduction of inventory, are performed.

[0115] Finally, a real-time dynamic inventory view is generated. This view is a real-time snapshot of the inventory status, including the current inventory quantity of various products, recent change trends, etc. This dynamic view is crucial for inventory management because it provides real-time and detailed inventory conditions, helping managers make quick replenishment or adjustment decisions.

[0116] In the decision support submodule, based on the real-time inventory dynamic view, optimization algorithms and decision models are used to optimize inventory strategies. The key operation here is to use linear programming to analyze inventory costs and service levels. Linear programming is a mathematical method used to optimize the objective function under given constraints. In inventory management, the objective function is to minimize the total cost, including storage costs, out-of-stock costs, etc., while the constraints include warehouse capacity, supply time, etc.

[0117] First, define the objective function and constraints. The objective function is a cost function, such as total cost = storage cost + out-of-stock cost + ordering cost. Constraints include inventory capacity, safety stock level, etc. Then, use a linear programming solver, such as the Simplex method, to solve this problem and find the inventory level that minimizes cost.

[0118] In addition, the decision-making model is combined to evaluate the effectiveness of multiple strategies. This involves simulating and comparing different replenishment strategies (such as regular replenishment, demand-driven replenishment, etc.) to evaluate performance under different circumstances. Finally, based on cost and service level, intelligent inventory strategies are formulated. These strategies will guide future inventory management operations to ensure that inventory levels can both meet customer demand and control costs.

[0119] Assume that a retail company uses the above submodules to manage its inventory. In the demand forecasting submodule, historical sales data shows that the weekly sales of a product in the past three months were 100, 120, 130, 150, 160, 140, 130, 125, 145, 155, 165, 170 units respectively. Using the ARMA model, setting the lag term to 2 and the moving average window to 3, the demand for the next four weeks is predicted to be 175, 180, 185, 190 units respectively. The random forest model identifies promotional activities as a key factor in the increase in demand.

[0120] In the real-time monitoring submodule, real-time data shows that the current inventory is 200 units, but based on demand forecasts and market changes, demand is expected to reach 175 units next week. With Kafka processing the data stream in real time, the dynamic view of inventory updates to show that if it is not replenished, the inventory will drop to a critical level within two weeks.

[0121] In the decision support submodule, the linear programming model analysis shows that maintaining 300 units of inventory can minimize total costs while meeting customer service levels. Therefore, the company decides to replenish 100 units in the following week to maintain the ideal inventory level.

[0122] See also Figure 6 ,The resource optimization module includes the SOM network design submodule, the pattern recognition submodule, and the ,strategy adjustment submodule;

[0123] The SOM network design submodule is based on the intelligent inventory strategy and uses a self-organizing map network to reduce the dimension and recognize patterns of resource usage data. It receives multi-dimensional resource data through the input layer, uses the neurons in the competition layer to win the competition and update the weights, forms a feature map of resource usage, and generates a resource pattern map.

[0124] The pattern recognition submodule uses clustering and pattern recognition technology to analyze resource pattern mapping, classifies and marks resource usage patterns according to the output of SOM, identifies high-frequency usage patterns, inefficient patterns or abnormal patterns, and generates resource usage pattern recognition results;

[0125] The policy adjustment submodule uses decision-making models and resource adjustment strategies to optimize and adjust based on the results of resource usage pattern recognition. By analyzing the recognition results and combining current business needs and resource status, it adjusts the resource allocation strategy, including increasing or decreasing resource input, adjusting resource configuration, and generating resource optimization plans.

[0126] The SOM network design submodule uses a self-organizing map network to perform dimensionality reduction and pattern recognition on resource usage data.

[0127] Example code (using Python's MiniSom library):

[0128] from minisom import MiniSomimport numpy as np

[0129] #Assume that the data dimension is 10 and the network size is 5x5

[0130] data_dimension=10

[0131] som_width=5

[0132] som_height=5

[0133] som=MiniSom(som_width, som_height, data_dimension, sigma=0.5, learning_rate=0.5)

[0134] # Randomly initialize weights

[0135] data = np.random.rand(100,data_dimension) #Assume there are 100 samples

[0136] som.random_weights_init(data)

[0137] #Train the network

[0138] num_iteration=10000

[0139] som.train_random(data,num_iteration)

[0140] #After network training is completed, it can be used for mapping and recognition

[0141] mapped = som.win_map(data)

[0142] The pattern recognition submodule uses clustering and pattern recognition techniques to analyze the data output by the SOM network.

[0143] Example code (using scikit-learn's KMeans):

[0144] from sklearn.cluster import KMeans

[0145] #Suppose you want to divide the data into 3 categories

[0146] n_clusters=3

[0147] kmeans=KMeans(n_clusters=n_clusters)

[0148] #Assume that som_activation is the activation map of the data obtained from the SOM network

[0149] som_activation=np.array([som.quantization(data[i])for iin range(len(data))])

[0150] # Apply KMeans for clustering

[0151] kmeans.fit(som_activation)

[0152] #Get clustering results

[0153] labels = kmeans.labels_

[0154] The strategy adjustment submodule uses decision-making models and resource adjustment strategies to perform optimization adjustments based on pattern recognition results.

[0155] Example code (using linear programming):

[0156] from scipy.optimize import linprog

[0157] #Define the objective function coefficient (cost or benefit) of linear programming

[0158] c=[-1,4,3]#Example objective function coefficient

[0159] #Define linear inequality constraints

[0160] A=[[-2,1,1],[1,3,1]]

[0161] b=[20,30]

[0162] #Define the bounds of the variable

[0163] x0_bounds=(0,None)

[0164] x1_bounds = (0, None)

[0165] x2_bounds = (0, None)

[0166] #Execute linear programming

[0167] result=linprog(c,A_ub=A,b_ub=b,bounds=[x0_bounds,x1_bounds,x2_bounds],method='highs')

[0168] #Output optimization results print("Optimal value:",result.fun,"\nX:",result.x)

[0169] See also Figure 7 ,The network structure optimization module includes key node identification submodule, network adjustment submodule, and efficiency improvement submodule;

[0170] The key node identification submodule uses the topological data analysis method to analyze the structure of the network based on the resource optimization solution, identify the key nodes and connections in the network, calculate the topological characteristics of the network, including the connectivity and centrality of the nodes, as well as the stability and efficiency of the connections, reveal the key components of the network structure, and generate key nodes and connection maps;

[0171] The network adjustment submodule uses graph editing technology and minimum spanning tree algorithm based on key nodes and connection graphs to adjust the network structure, including adding or deleting nodes and connections, adjusting the network topology, and generating an adjusted network structure graph;

[0172] The efficiency improvement submodule uses network flow analysis and path optimization based on the adjusted network structure diagram to evaluate and improve the performance of the network, including calculating the network's transmission efficiency, delay and load indicators, optimizing path selection and resource allocation, and generating a network optimization diagram.

[0173] In the key node identification submodule, the network structure is deeply analyzed through the topological data analysis method adopted by the resource optimization solution. The process involves the application of multiple data formats and algorithms. First, the submodule receives the topological data of the network, which is usually represented in the form of a graph, including information about nodes and edges. This data is stored in the form of a matrix or adjacency list, where each node represents an element in the network and each edge represents a connection between nodes.

[0174] The analysis process begins by calculating the topological properties of the network, including the connectivity and centrality of nodes, as well as the stability and efficiency of connections. Connectivity analysis relies on graph traversal algorithms such as depth-first search (DFS) or breadth-first search (BFS), which are effective in identifying connected components in the network. Centrality analysis mainly uses algorithms such as betweenness centrality or closeness centrality, which identify key nodes by calculating the "importance" of each node in the network. For example, the betweenness centrality algorithm evaluates the importance of a node by calculating how often it appears in all shortest paths.

[0175] The stability and efficiency analysis of connections involves edge stability and network flow algorithms in network theory. Edge stability analysis evaluates the redundancy of edges, that is, the degree of change in network connectivity after removing an edge. Efficiency analysis uses network flow algorithms, such as the Ford-Fulkerson algorithm, to determine the maximum transmission capacity of the network through the maximum flow minimum cut theorem.

[0176] The final output of this submodule is a map of key nodes and connections, which is a detailed graphical representation of the most important elements and connections in the network. This map not only reveals the core components of the network structure, but also provides basic data for the subsequent network adjustment submodule.

[0177] In the network adjustment submodule, the network structure is fine-tuned based on key nodes and connection graphs through graph editing technology and minimum spanning tree algorithm. Graph editing technology here refers to the operation of adding, deleting or modifying nodes and edges in the network graph. For example, if the analysis finds that the connectivity of some nodes is insufficient, additional connections or nodes will be added to enhance the overall connectivity of the network.

[0178] The minimum spanning tree (MST) algorithm plays a key role in the process, especially in optimizing the network topology. Using algorithms such as Prim or Kruskal, a tree covering all nodes with the minimum total edge weight can be generated from a given network graph. This helps remove unnecessary connections in the network, thereby reducing complexity and improving efficiency.

[0179] During the adjustment process, the algorithm continuously evaluates the performance of the modified network structure to ensure that any changes are made in the direction of improving the overall network efficiency. After the modification is completed, the submodule generates the adjusted network structure graph, which is a new graphical representation showing the optimized network topology.

[0180] In the efficiency improvement submodule, network flow analysis and path optimization methods are used to improve network performance based on the adjusted network structure diagram. First, network flow analysis evaluates network performance by calculating the network's transmission efficiency, delay, and load indicators. This usually involves complex network traffic models and simulations, such as using shortest path algorithms (such as the Dijkstra algorithm) and network traffic distribution algorithms (such as the Bellman-Ford algorithm) to simulate and optimize the flow of data in the network.

[0181] Path optimization focuses on determining the best path for data to travel through the network. This includes not only finding the shortest path, but also taking into account load balancing to avoid certain paths being too crowded and causing overall efficiency to decrease. Here, multipath routing algorithms, such as Yen's K shortest path algorithm, are used to identify multiple efficient paths.

[0182] The final output of the submodule is a network optimization graph, which is a graphical representation of the new structure of the network after performance optimization. This graph not only shows the optimized network topology, but also includes performance indicators such as the expected transmission rate and delay time of each path, providing important insights for further use and analysis of the network.

[0183] Assume that there is a network consisting of 100 nodes, and the connections between nodes are represented in the form of an adjacency matrix. In the key node identification submodule, 10 isolated nodes were found by the DFS algorithm, and the betweenness centrality analysis revealed 5 high centrality nodes. The edge stability analysis showed that 15 edges were key connections.

[0184] In the network adjustment submodule, edges connected to isolated nodes are added through graph editing technology, a minimum spanning tree containing all key nodes is generated using Prim's algorithm, and some unnecessary edges are removed.

[0185] The efficiency improvement submodule uses the Dijkstra algorithm and the Bellman-Ford algorithm to find several bottleneck areas in the network and provides multi-path routing solutions for these areas through the Yen's K shortest path algorithm. The resulting network optimization graph shows the improved network structure and performance indicators, such as the transmission efficiency of each node and the average delay time of the path.

[0186] See also Figure 8 ,The resource allocation and optimization module includes the evolutionary algorithm implementation submodule, the dynamic ,strategy adjustment submodule, and the effect evaluation submodule;

[0187] The evolutionary algorithm implementation submodule is based on the network optimization graph and executes the evolutionary algorithm to optimize resource allocation. By simulating selection, inheritance and mutation mechanisms, the resource allocation strategy is continuously updated iteratively to match the environment and demand. The resource allocation strategy is guided by the matching degree and gradually optimized and adjusted to form a resource allocation strategy.

[0188] The dynamic strategy adjustment submodule is based on the resource allocation strategy, dynamically adjusts to respond to real-time business needs and resource conditions, adjusts according to real-time data, increases or decreases resources, and generates dynamic resource adjustment strategies;

[0189] The effect evaluation submodule performs effect evaluation based on dynamically adjusting resource strategies, conducts a comprehensive evaluation of the results after the strategy adjustment, including resource utilization, service level and cost-effectiveness, and generates optimized resource allocation results.

[0190] In the evolutionary algorithm implementation submodule, the resource allocation is further optimized through the evolutionary algorithm executed based on the network optimization graph. The data format is mainly the node and connection information of the network, including the resource requirements and available resources of each node, as well as the bandwidth and delay of the connection. These data are usually stored in a matrix or graph structure to facilitate algorithm processing.

[0191] The implementation process of an evolutionary algorithm involves three main phases: simulated selection, inheritance, and mutation. First, in the simulated selection phase, the algorithm starts with a set of initial resource allocation strategies, which can be randomly generated or based on previous experience. Each strategy is considered an "individual" and is evaluated based on its performance in the resource allocation task. Evaluation criteria include resource utilization, ability to meet demand, etc., forming a "fitness" score.

[0192] Next, in the genetic phase, the algorithm generates a new generation of strategies through crossover and selection operations. The crossover operation allows two strategies with high fitness to "mate" and combine their characteristics to produce a new strategy. The selection operation ensures that only strategies with high fitness can be retained and enter the next generation.

[0193] Finally, in the mutation phase, the strategy is randomly adjusted to introduce new variations and increase the diversity of the strategy. Mutation involves changing the resource allocation of certain nodes, or adjusting the priority of connections, etc.

[0194] After multiple iterations, the strategy is gradually optimized to form the final resource allocation strategy. This strategy is guided by matching degree and effectively matches the resource demand and environmental changes in the network. The generated resource allocation strategy file records the resource allocation of each node in detail, providing important decision support for network operation and maintenance.

[0195] In the dynamic policy adjustment submodule, dynamic adjustments are made based on the resource allocation strategy in response to real-time business needs and resource conditions. The data format includes real-time business demand data and resource usage data, which are usually time series data and updated in real time.

[0196] The dynamic adjustment process mainly relies on real-time data analysis and prediction models. By analyzing real-time data, such as through time series analysis techniques, the submodule can identify trends and patterns in resource demand. For example, machine learning models such as the Autoregressive Moving Average (ARMA) model or the Long Short-Term Memory Network (LSTM) are used to predict future resource demand.

[0197] Based on these analyses and predictions, the dynamic policy adjustment submodule adjusts resource allocation. Adjustment operations include increasing resource allocation to high-demand nodes or reclaiming resources from low-demand nodes. These adjustments are implemented based on detailed rules and algorithms, such as using linear programming or greedy algorithms to optimize resource allocation.

[0198] The generated dynamic resource adjustment policy file records in detail the content of each adjustment, including which nodes' resources are increased or decreased, as well as the reasons for the adjustment and the expected effects. This provides strong support for the flexible operation and maintenance of the network, ensuring that the network can maintain the optimal state in a constantly changing environment.

[0199] In the effect evaluation submodule, based on the dynamic adjustment of resource strategies, the results of the strategy adjustment are evaluated. The data format includes indicator data such as resource utilization, service level and cost-effectiveness, which are comparative data before and after the strategy adjustment.

[0200] In the process of effect evaluation, we first evaluate resource utilization through data analysis technology, such as calculating the average and peak utilization of resources, as well as resource waste. This is achieved by comparing the data before and after the adjustment, and using data statistics and visualization techniques such as box plots or heat maps to present the results.

[0201] Next, evaluate the service level, which includes indicators such as service response time and reliability. Evaluate the effectiveness of the policy adjustment by analyzing the changes in the adjusted data, such as the reduction in response time or the reduction in the number of service interruptions.

[0202] Finally, the cost-effectiveness is assessed. This involves calculating the economic benefits of adjusting the resource allocation strategy, such as the cost of resource savings and the benefits of improved efficiency. Use cost-effectiveness analysis methods such as net present value (NPV) calculations or rate of return analysis.

[0203] The final output of the effect evaluation submodule is the optimized resource allocation result report, which shows the effect of the strategy adjustment in detail, including the improvement of resource utilization, the improvement of service level and the improvement of cost-effectiveness. This report is crucial to understand the effect of resource allocation strategy and provides a valuable reference for future strategy adjustment.

[0204] Assume that there are 50 nodes in a network environment, and the resource demand and usage of each node are recorded in real time. In the evolutionary algorithm implementation submodule, the initial strategy generates an allocation scheme with an average resource utilization of 70%. After 50 iterations, the resource utilization rate is increased to 90%, reducing resource waste.

[0205] In the dynamic strategy adjustment submodule, real-time data showed that the demand for a certain node increased sharply. The LSTM model was used to predict the subsequent demand trend, and resource allocation was adjusted accordingly, increasing the resources of the node by 10%.

[0206] The effect evaluation submodule shows that the adjusted strategy keeps the overall resource utilization at a high level, while the response time is reduced from an average of 3 seconds to 2 seconds. The cost-benefit analysis shows that the adjusted strategy has brought a 5% improvement in economic benefits. The final report records these changes in detail, providing empirical evidence for subsequent resource allocation.

[0207] See also Fig. 9 ,The data-driven strategy module includes a data analysis submodule, a machine learning submodule, and a strategy solution submodule;

[0208] The data analysis submodule uses the autoregressive moving average model to analyze the time series characteristics of historical data based on the deployment optimization results, and predicts future data by calculating the autoregressive term and the moving average term. At the same time, it combines trend analysis and seasonal decomposition to locate data patterns, conduct environmental analysis and preliminary trend forecasts, and generate strategic environmental analysis results;

[0209] The machine learning submodule applies the random forest algorithm based on the results of the policy environment analysis, improves the prediction accuracy and stability by building multiple decision trees and aggregating their prediction results, and performs deep learning operations at the same time, using convolutional neural networks and recursive neural networks to mine the deep features and time series relationships of the data to generate a policy prediction model;

[0210] The strategy solution submodule is based on the strategy prediction model and adopts the particle swarm optimization algorithm. It searches for the optimal solution in the solution space through individuals in the particle swarm. Each particle iteratively updates its position based on its own experience and the experience of the group to capture the global optimal solution. It combines real-time data and model recommendations to generate a strategy optimization guide.

[0211] In the data analysis submodule, the autoregressive moving average (ARMA) model is used to accurately analyze the time series characteristics of historical data and predict future data. The data format is usually time series data, which records past events or observations, such as sales volume, temperature readings, or stock market indices, and each data point has a timestamp.

[0212] The implementation of the ARMA model begins with determining the model parameters, namely the order p of the autoregressive (AR) term and the order q of the moving average (MA) term. This is done by identifying the autocorrelation function (ACF) and partial autocorrelation function (PACF) of the data. The ACF and PACF charts help determine the number of lags for the autoregressive and moving average terms, based on the cyclical and trending changes exhibited by the data.

[0213] After the parameters are determined, the model estimates the coefficients of the AR and MA terms by fitting historical data. The AR term represents the relationship between the current value and its historical value, while the MA term represents the relationship between the current value and the historical forecast error. The model uses maximum likelihood estimation or least squares to calculate these coefficients to maximize the model's fit to the historical data.

[0214] In addition to the ARMA model, the submodule also incorporates trend analysis and seasonal decomposition to locate data patterns. Trend analysis involves identifying long-term changes in data over time using linear or nonlinear regression techniques, while seasonal decomposition extracts cyclical patterns in data through algorithms such as STL (Seasonal and Trend Decomposition).

[0215] Through these refinement operations, the generated strategic environment analysis results show in detail the time series characteristics, trends, periodicity and future forecasts of the data. These results are crucial to understanding the patterns behind the data and provide a scientific basis for strategy formulation.

[0216] In the machine learning submodule, based on the results of the policy environment analysis, the random forest algorithm and deep learning technology are applied to accurately build a policy prediction model. The data format is also time series data, but at this stage, the data has undergone preliminary analysis and feature extraction.

[0217] The random forest algorithm improves prediction accuracy and stability by building multiple decision trees and aggregating their predictions. Each decision tree is built on a random subset of the data and makes an independent prediction of the output. The final prediction is the average or majority vote of all decision tree predictions. This approach reduces the risk of overfitting and improves the model's generalization ability when faced with unknown data.

[0218] In the deep learning part, the submodule uses convolutional neural networks (CNN) and recurrent neural networks (RNN) to mine the deep features and temporal relationships of data. CNN can effectively extract local features when processing time series data, while RNN is particularly suitable for processing data with time dependencies. In particular, the long short-term memory network (LSTM), a variant of RNN, can learn long-term dependencies in time series data.

[0219] By combining the advantages of random forest, CNN and LSTM, the policy prediction model can capture and predict complex data patterns more comprehensively and accurately. The generated policy prediction model file records the model structure, training process and prediction performance in detail, providing a powerful tool for formulating more accurate strategies.

[0220] In the strategy solution submodule, based on the strategy prediction model, the particle swarm optimization (PSO) algorithm is used to accurately formulate the strategy optimization guide. PSO is an optimization technology based on swarm intelligence that simulates the foraging behavior of bird flocks. The data format includes various parameters in the multidimensional solution space, such as price, demand or resource allocation.

[0221] During the execution of PSO, each particle represents a possible solution in the solution space. Particles iteratively update their positions based on their own experience and the experience of the group, that is, adjust the parameters of the solution. Each particle has a speed, indicating the direction and distance it moves in the solution space. The speed update depends on the historical best position of the particle itself and the historical best position of the entire group.

[0222] The particle swarm searches in the solution space and continuously updates its position until it finds the global optimal solution or reaches a preset number of iterations. This process involves complex mathematical operations, such as the update formulas for speed and position, and the objective function for evaluating the current position of the particle.

[0223] Through the PSO algorithm, the generated strategy optimization guide describes in detail the optimal strategy selection, such as the optimal solution for resource allocation or the best strategy for market behavior. These guides combine real-time data and model recommendations to provide decision makers with efficient and accurate strategy guidance, effectively improving the quality and efficiency of decision-making.

[0224] For example, in a retail industry scenario, the data analysis submodule uses daily sales data from the past year for time series analysis. Through the ARMA model, it is determined that the AR term is 2, the MA term is 2, and weekend peaks and holiday patterns in the sales data are discovered.

[0225] The machine learning submodule uses random forests to analyze the relationship between sales and weather and holidays, and builds a model containing 50 decision trees. At the same time, the LSTM network is applied to analyze the long-term dependency of sales volume and capture the sales trend of specific product categories.

[0226] The strategy submodule uses the PSO algorithm to optimize inventory management and promotion strategies for the upcoming holiday season. The PSO algorithm iterates 100 times to find the best inventory level and promotion intensity to maximize sales and profits.

[0227] Ultimately, the resulting strategy optimization guide detailed the optimal inventory levels and promotion strategies for each category of merchandise, providing data-driven decision support and helping retailers achieve significant sales growth during the holiday season.

[0228] See also Fig.10 ,The system performance monitoring module includes an efficiency monitoring submodule, a response time monitoring submodule, and a stability monitoring submodule;

[0229] The efficiency monitoring submodule uses resource utilization analysis methods based on the policy optimization guide to evaluate system efficiency, including real-time monitoring of CPU, memory, and I / O resources. By sampling and counting resource usage, it identifies hot spots and bottleneck areas of resource utilization, proposes resource adjustment and optimization strategies, and generates efficiency evaluation results.

[0230] The response time monitoring submodule measures the response time based on the efficiency evaluation results, using delay tracking and time analysis methods. It tracks the life cycle of each request through fine-grained timestamp records, identifies and records the key links that cause response delays, analyzes and optimizes the response time, and formulates the response time analysis results.

[0231] The stability monitoring submodule uses the failure mode and effect analysis method based on the response time analysis results to perform stability monitoring, including continuous operation status monitoring of the system and fault record analysis. Through in-depth analysis of the system operation log, it identifies frequent failure modes and potential system weaknesses, conducts risk assessment and prediction, and generates stability monitoring results.

[0232] In the efficiency monitoring submodule, the module conducts in-depth system efficiency evaluation through resource utilization analysis methods. Specifically, real-time monitoring data of CPU, memory, and I / O resources are collected. These data are usually in the form of time series, recording the details of resource usage at every moment. In order to effectively process these data, a resource utilization algorithm is used. This algorithm first defines the baseline usage of resources, and then accurately identifies the peak and trough periods of resource usage by comparing real-time data with the baseline. On this basis, statistical analysis techniques such as moving average or exponential smoothing are further used to smooth data fluctuations and make trends more obvious. Next, bottleneck identification algorithms such as queue theory models are used to conduct in-depth analysis of resource usage and identify hot spots and bottleneck areas of resource usage. These algorithms are refined into specific steps such as resource occupancy calculation and queue length estimation during the processing process. Finally, combined with the policy optimization guide, resource adjustment and optimization strategies are proposed, and efficiency evaluation reports are generated. These reports not only record resource usage in detail, but also include targeted optimization suggestions and potential improvement measures.

[0233] In the response time monitoring submodule, the module uses delay tracking and time analysis methods to measure the response time based on the efficiency evaluation results. Through fine-grained timestamp recording, the module tracks the life cycle of each request. In this process, time series analysis methods such as autoregressive moving average model (ARMA) or adaptive filtering technology are mainly used to capture and analyze time dependencies. For each request, each link from initiation to completion is recorded in detail, including the initiation time, processing time, waiting time, etc. of the request. Through these data, the key links that cause response delays can be accurately identified and recorded. When analyzing the response time, the normal response time is distinguished from the abnormal response time through methods such as cluster analysis and outlier detection. The analysis results are used to formulate response time optimization strategies to improve the response efficiency of the system. The response time analysis report finally generated describes the processing process of each request in detail, providing strong data support for system performance optimization.

[0234] The stability monitoring submodule uses the failure mode and effect analysis method to perform stability monitoring based on the response time analysis results. The submodule focuses on the continuous operation status monitoring and fault record analysis of the system. Through in-depth analysis of the system operation log, the module uses log mining techniques, such as association rule mining and sequence pattern mining, to identify frequent failure modes and potential system weaknesses. The log data, including key information such as fault code, timestamp, execution path, etc., is used to build a failure mode database. In the process of failure mode identification, the failure modes are classified and predicted by applying machine learning algorithms such as decision trees and random forests. In addition, the stability monitoring module also applies risk assessment models, such as Bayesian networks and fault tree analysis, to predict and quantify potential system risks. The final stability monitoring report not only includes a detailed failure mode analysis, but also provides risk assessment results and improvement suggestions to help improve the overall stability of the system.

[0235] Suppose there is a set of time series data of CPU usage, with values ​​of [60%, 65%, 70%, 80%, 75%, 70%, 65%, 60%]. After smoothing by moving average method, the data becomes [62.5%, 67.5%, 75%, 75%, 72.5%, 67.5%. Then through queue theory model analysis, it is identified that the peak period of CPU usage is 75%, and it is recommended to increase processing capacity or optimize task allocation to reduce bottlenecks. The generated efficiency evaluation report records the process in detail and puts forward specific optimization suggestions.

[0236] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A cloud computing driven industrial park management system, characterized by: The system includes a resource intelligent scheduling module, a microservice architecture module, an inventory management module, a resource optimization module, a network structure optimization module, a resource allocation and optimization module, a data-driven strategy module, and a system performance monitoring module; The resource intelligent scheduling module is based on the resources and task requirements of the industrial park, uses a graph neural network algorithm to analyze the relationship between resources, establishes a dependency graph model between resources and tasks through node feature extraction and edge relationship learning, implements a scheduling strategy based on node classification and resource allocation optimization, and generates an optimized resource allocation map; The resource intelligent scheduling module includes a dependency graph model submodule, a dynamic scheduling submodule, and a performance optimization submodule; The dependency graph model submodule uses a graph neural network algorithm to perform structured modeling of resources based on the resources and task requirements of the industrial park, analyzes the attributes of each resource and the relationship between tasks, dynamically expresses the dependencies between resources through node updates and edge weighting, and generates a dependency graph; The dynamic scheduling submodule uses constraint programming and heuristic search strategies to perform dynamic scheduling based on the dependency graph, and refers to the real-time status and task requirements of multiple resources, optimizes the search path and adjusts the resource allocation to match resources for each task and generate a scheduling strategy graph; The performance optimization submodule uses a multi-objective optimization method to improve system performance based on the scheduling strategy map, comprehensively refers to performance indicators including resource utilization rate and task completion time, adjusts resource allocation strategy and optimizes task scheduling sequence, continuously iterates and solves, and generates an optimized resource allocation map; The microservice architecture module designs a microservice splitting strategy based on the optimized resource allocation map, uses Docker containerization technology to achieve independent deployment and management of services, uses Kubernetes for service orchestration and automatic expansion, performs dynamic load balancing and resource scheduling of services, and generates microservice configuration strategies; The inventory management module is based on the microservice configuration strategy, uses the reinforcement learning algorithm to dynamically analyze the inventory data, adjusts the inventory level through the reward mechanism, responds to market demand changes in real time, makes adaptive adjustments to the inventory strategy, and generates an intelligent inventory strategy; The resource optimization module is based on the intelligent inventory strategy, designs the SOM network to identify the resource usage pattern, adjusts the mapping weights through competitive learning and adaptive neighborhood functions, performs dimension reduction and pattern recognition of resource usage data, and then optimizes the resource allocation strategy and generates a resource optimization plan; The network structure optimization module uses the topological data analysis method to identify key nodes and connections of the network structure based on the resource optimization solution, calculates and compares the geometric and topological characteristics of the data to adjust the network configuration, and generates a network optimization graph; The network structure optimization module includes a key node identification submodule, a network adjustment submodule, and an efficiency improvement submodule; The key node identification submodule is based on the resource optimization scheme and adopts the topological data analysis method to analyze the structure of the network, identify the key nodes and connections in the network, calculate the topological characteristics of the network, including the connectivity and centrality of the nodes, and the stability and efficiency of the connections, reveal the key components of the network structure, and generate key nodes and connection maps; The network adjustment submodule uses graph editing technology and minimum spanning tree algorithm based on key nodes and connection graphs to adjust the network structure, including adding or deleting nodes and connections, adjusting the network topology, and generating an adjusted network structure graph; The efficiency improvement submodule uses network flow analysis and path optimization based on the adjusted network structure diagram to evaluate and improve the performance of the network, including calculating the transmission efficiency, delay and load indicators of the network, optimizing path selection and resource allocation, and generating a network optimization diagram; The resource allocation and optimization module implements evolutionary algorithms to optimize resource allocation based on the network optimization graph, dynamically adjusts resource allocation strategies through simulation of selection, inheritance and mutation processes, matches environmental changes and demand fluctuations, and generates allocation optimization results; The data-driven strategy module optimizes the strategy based on the deployment optimization results, uses time series data analysis and prediction models to optimize the strategy, formulates strategy adjustments by analyzing historical data and identifying trend changes, and generates a strategy optimization guide; The system performance monitoring module is based on the strategy optimization guide and uses performance monitoring technology to conduct a comprehensive evaluation of the system. By collecting and analyzing multiple performance indicator data, it identifies potential bottlenecks and problems, implements optimization measures, and generates performance monitoring results.

2. The cloud computing driven industrial park management system according to claim 1, characterized in that: The optimized resource allocation map includes the optimization status of resource nodes, the task allocation matrix and the resource utilization index; the microservice configuration strategy includes the service partition list, the container configuration parameters and the automatic expansion rules; the intelligent inventory strategy includes the dynamic replenishment threshold, the inventory turnover rate target and the emergency response strategy; the resource optimization plan includes the adjusted resource allocation table, the optimized resource utilization path and the predicted resource savings; the network optimization map includes the optimized node layout, the data transmission route and the network delay index; the deployment optimization results include the new resource combination strategy, the improved resource allocation efficiency and the resource deployment schedule; the strategy optimization guide includes the optimized decision-making process, the key decision nodes and the prediction effect index; the performance monitoring results include the comprehensive performance score, the key performance index and the recommended improvement measures.

3. The cloud computing driven industrial park management system according to claim 1, characterized in that: The microservice architecture module includes a service splitting strategy submodule, an automated deployment submodule, and a load balancing submodule; The service splitting strategy submodule performs logical and physical segmentation of services based on the optimized resource allocation map, uses domain-driven design to identify and divide service boundaries, and establishes the autonomy and granularity of services by analyzing business domains, inter-service dependencies and communication patterns, and formulates a service splitting plan; The automated deployment submodule uses Docker to containerize services based on the service splitting solution, and cooperates with Kubernetes to automatically deploy and manage containers, perform service deployment and elastic scaling, set and optimize service configuration, network connection, and storage management, and generate automated deployment scripts; The load balancing submodule uses a load balancing strategy to intelligently distribute service requests based on an automated deployment script, monitors service load and resource status in real time, dynamically adjusts resource allocation and the number of service replicas, and generates a microservice configuration strategy.

4. The cloud computing driven industrial park management system according to claim 1, characterized in that: The inventory management module includes a demand forecasting submodule, a real-time monitoring submodule, and a decision support submodule; The demand forecasting submodule uses time series analysis to identify patterns and trends through historical sales data based on microservice configuration strategies, and uses random forests to analyze the relationship between trends and multiple factors to predict future demand and match market changes to generate demand forecast results; The real-time monitoring submodule uses real-time data stream processing and monitoring technology to monitor inventory status in real time based on demand forecast results, implements Apache Kafka to process multi-channel inventory data, and updates inventory status and market change information in real time through continuous data analysis and processing, generating a real-time inventory dynamic view; The decision support submodule optimizes inventory strategies based on real-time dynamic inventory views using optimization algorithms and decision models, wherein linear programming is used to analyze inventory costs and service levels, and decision models are used to evaluate the effects of multiple strategies, and intelligent inventory strategies are formulated based on costs and service levels.

5. The cloud computing driven industrial park management system according to claim 1, characterized in that: The resource optimization module includes a SOM network design submodule, a pattern recognition submodule, and a strategy adjustment submodule; The SOM network design submodule is based on the intelligent inventory strategy, uses the self-organizing map network to reduce the dimension and recognize the pattern of resource usage data, receives multi-dimensional resource data through the input layer, uses the neurons in the competition layer to win the competition and update the weights, forms a feature map of resource usage, and generates a resource pattern map; The pattern recognition submodule uses clustering and pattern recognition technology to analyze based on resource pattern mapping, classifies and marks resource usage patterns according to the output of SOM, identifies high-frequency usage patterns, inefficient patterns or abnormal patterns, and generates resource usage pattern recognition results; The strategy adjustment submodule uses a decision model and a resource adjustment strategy to perform optimization and adjustment based on the resource usage pattern recognition results. By analyzing the recognition results and combining the current business needs and resource status, the resource allocation strategy is adjusted, including increasing or decreasing resource input, adjusting resource configuration, and generating a resource optimization plan.

6. The cloud computing driven industrial park management system according to claim 1, characterized in that: The resource allocation and optimization module includes an evolutionary algorithm implementation submodule, a dynamic strategy adjustment submodule, and an effect evaluation submodule; The evolutionary algorithm implementation submodule executes the evolutionary algorithm to optimize resource allocation based on the network optimization graph. By simulating selection, inheritance and mutation mechanisms, the resource allocation strategy is continuously updated iteratively to match the environment and demand. The resource allocation strategy is guided by the matching degree, gradually optimized and adjusted to form a resource allocation strategy. The dynamic policy adjustment submodule dynamically adjusts the resource allocation strategy to respond to real-time business needs and resource conditions, adjusts according to real-time data, increases or decreases resources, and generates a dynamic resource adjustment strategy; The effect evaluation submodule performs effect evaluation based on the dynamic adjustment of resource strategy, conducts a comprehensive evaluation on the results after the strategy adjustment, including resource utilization, service level and cost-effectiveness, and generates an optimized resource allocation result.

7. The cloud computing driven industrial park management system according to claim 1, characterized in that: The data-driven strategy module includes a data analysis submodule, a machine learning submodule, and a strategy solution submodule; The data analysis submodule uses the autoregressive moving average model based on the deployment optimization results to analyze the time series characteristics of historical data, predicts future data by calculating autoregressive terms and moving average terms, and combines trend analysis and seasonal decomposition to locate data patterns, conduct environmental analysis and preliminary trend forecasting, and generate strategic environmental analysis results; The machine learning submodule applies the random forest algorithm based on the results of the policy environment analysis, improves the prediction accuracy and stability by constructing multiple decision trees and aggregating their prediction results, and performs deep learning operations at the same time, applying convolutional neural networks and recursive neural networks to mine the deep features and time series relationships of the data to generate a policy prediction model; The strategy solution submodule is based on the strategy prediction model and adopts the particle swarm optimization algorithm. The individuals in the particle swarm search for the optimal solution in the solution space. Each particle iteratively updates its position based on its own experience and the experience of the group to capture the global optimal solution. It combines real-time data and model recommendations to generate a strategy optimization guide.

8. The cloud computing driven industrial park management system according to claim 1, characterized in that: The system performance monitoring module includes an efficiency monitoring submodule, a response time monitoring submodule, and a stability monitoring submodule; The efficiency monitoring submodule uses resource utilization analysis methods based on the strategy optimization guide to evaluate system efficiency, including real-time monitoring of CPU, memory, and I / O resources. By sampling and counting resource usage, it identifies hot spots and bottleneck areas of resource utilization, proposes resource adjustment and optimization strategies, and generates efficiency evaluation results. The response time monitoring submodule measures the response time based on the efficiency evaluation results, adopts delay tracking and time analysis methods, tracks the life cycle of each request through fine-grained timestamp records, identifies and records the key links that cause response delays, analyzes and optimizes the response time, and formulates the response time analysis results; The stability monitoring submodule performs stability monitoring based on the response time analysis results and adopts the failure mode and effect analysis method, including continuous operation status monitoring of the system and failure record analysis. Through in-depth analysis of the system operation log, it identifies frequent failure modes and potential system weaknesses, conducts risk assessment and prediction, and generates stability monitoring results.

Citation Information

Patent Citations

  • Heterogeneous wireless network bearing power service resource scheduling method

    CN117412334A