A green wave period coordination control method based on intersection groups
By calculating the suitable green wave coordination period at the intersection and combining the similarity of traffic flow and traffic status, the green wave coordination method is determined, which solves the problem of low traffic efficiency caused by inappropriate green wave coordination control period in the existing technology, and improves the traffic at associated intersections. efficiency and overall transport service levels.
Patent Information
- Application Number
- CN202410003214.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-02
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-01-02
AI Technical Summary
Existing green wave coordinated control methods fail to effectively consider the time period suitable for green wave coordinated control, resulting in coordinated control at inappropriate time periods affecting traffic efficiency, especially for traffic in non-green wave directions.
By calculating the alternative time periods suitable for green wave coordination control at each intersection, and combining the intersection flow and traffic status similarities, the initial green wave coordination time period and coordination method are determined, and the final effective green wave coordination time period and method are screened out through rationality judgment. , to reduce the impact on non-green wave directions.
It improves the traffic efficiency of associated intersections, reduces the impact of traffic efficiency in non-green wave directions, optimizes the time period and method of green wave coordinated control, and improves the overall traffic service level.
Smart Images

Figure CN117912271B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of road traffic, and in particular to a green wave period coordination control method based on an intersection group. Background Art
[0002] In modern society, the density of urban road networks continues to increase, resulting in a sharp increase in the number of intersections. At the same time, urban traffic demand is also expanding, which directly affects the overall traffic service level of the city and the increasingly serious queuing and congestion. Therefore, strengthening the correlation between intersections is an inevitable result of coordinated control of urban trunk roads, which is of great significance to the improvement of urban trunk road traffic efficiency and overall traffic service level. Morgan and Little are the earliest scholars in the world to study coordinated control and proposed the theory of green wave coordinated control. Green wave coordinated control is to connect multiple intersection lights on the trunk road so that these lights can coordinate with each other, so that when the moving vehicles arrive at the intersections of the front trunk road in turn, they will avoid the red light and meet the green light. However, in the current research on green wave coordinated control, only the content of how to improve traffic efficiency by green wave control is usually considered, but the time period suitable for green wave control and the time period when green wave control is not needed are not considered. The use of filter coordinated control in unsuitable time periods can easily lead to excessive green lights in one direction although the vehicles are unblocked, while the green light time in another direction is compressed, resulting in low traffic efficiency.
[0003] The "bidirectional green wave coordinated control method, device, electronic device and storage medium" disclosed in the Chinese patent literature has a publication number of CN115240443A and a publication date of 2022-10-25, including: dividing the forward green wave bandwidth parameter into multiple forward green wave sub-bandwidth parameters, dividing the reverse green wave bandwidth parameter into multiple reverse green wave sub-bandwidth parameters, and weighting the multiple forward green wave sub-bandwidth parameters and the reverse green wave sub-bandwidth parameters; determining the objective function based on multiple forward green wave sub-bandwidth parameters, multiple reverse green wave sub-bandwidth parameters and corresponding weights; solving the objective function based on modeling parameters to obtain control parameters, and performing green wave coordinated control based on the control parameters, and the modeling parameters include road parameters and signal light parameters. This technology only discloses the technical content of how to perform green wave coordinated control to solve the problem of unbalanced two-way traffic capacity, and also does not consider how to calculate the time period suitable for green wave coordinated control at each intersection, which is likely to lead to the problem of surplus green lights in the green wave passage direction and low traffic efficiency due to too short green light time in the non-green wave passage direction. Summary of the invention
[0004] The present invention aims to overcome the problem that most of the prior arts only consider optimizing specific green wave coordination control methods, but do not consider calculating the time period suitable for green wave coordination control, so that green wave coordination control in inappropriate time periods is likely to affect traffic efficiency. A green wave time period coordination control method based on intersection groups is provided. On the basis of analyzing and calculating the alternative time periods suitable for green wave coordination control at each intersection, the initial green wave coordination time period and coordination method are obtained by combining the intersection flow and the similarity of the traffic conditions at the intersection, and the final effective green wave coordination time period is obtained based on further rationality judgment, and the appropriate time is selected for green wave coordination control to reduce the impact on the traffic efficiency in the non-green wave direction.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A green wave period coordination control method based on intersection groups, comprising:
[0007] Calculate the candidate time period suitable for green wave coordinated control at any intersection;
[0008] Select adjacent intersections A and B suitable for green wave coordinated control, and obtain a set of candidate time periods for green wave control at adjacent intersections based on the candidate time periods of each intersection;
[0009] Based on the candidate green wave control period set, the initial green wave coordination period and corresponding coordination mode of adjacent intersections are calculated in combination with the similarity of flow and traffic status;
[0010] The rationality of the initial green wave coordination period is judged to obtain the effective green wave coordination period and coordination method.
[0011] The purpose of the green wave coordinated control in the present invention is to improve the traffic efficiency of some related intersections. The premise is that the coordinated control will be carried out only when the traffic conditions of some intersections need to be improved. On this basis, the alternative time periods that are more suitable for green wave coordinated control at each intersection can be analyzed; and because the green wave coordinated control is the coordination of related intersections, not just the control of one intersection, it is necessary to analyze the adjacent related intersections together to obtain the alternative time periods suitable for green wave coordinated control; then, according to the actual traffic flow conditions of the intersections within the alternative time period and the similarity of the traffic conditions between the intersections, the initial green wave coordinated time period and the corresponding coordination method are preliminarily obtained, so that the green wave coordinated control can be carried out on the intersections at the appropriate time; further, the rationality is judged according to the road flow results according to the initial green wave coordinated time period and the coordination method within a certain test period, and the effective green wave coordinated time period and coordination method that better meet the actual intersection needs are screened out.
[0012] Preferably, the process of selecting adjacent intersections A and B suitable for green wave coordinated control includes: screening adjacent intersections whose adjacent intersection distance influence coefficient F is greater than or equal to a set coefficient threshold;
[0013] F=(a+bL) / b, where a is the first distance threshold, b is the second distance threshold and is greater than a, and L is the distance between adjacent intersections.
[0014] In the present invention, the adjacent intersection distance influence coefficient is used to indicate the correlation between adjacent intersections. The larger the coefficient is, the stronger the correlation between adjacent intersections is, the stronger the continuity and stability of traffic flow are, and the more suitable it is for green wave coordinated control. If the influence coefficient is too small, it means that it is not suitable for green wave coordinated control.
[0015] Preferably, the green wave control candidate time period set is obtained by taking the union of the candidate time period of intersection A and the candidate time period of intersection B;
[0016] Based on the set of candidate time periods for green wave control, the green wave coordination time period and the corresponding coordination method are determined according to the mainstream direction of the traffic flow at the intersection; the time period suitable for green wave coordination is calculated according to the similarity of traffic conditions at adjacent intersections, and the initial green wave coordination time period and the corresponding coordination method are obtained by taking the intersection with the green wave coordination time period based on traffic flow.
[0017] In the present invention, due to the correlation between adjacent intersections, the union of the alternative time periods of the two intersections is used as the alternative time period of the common green wave coordinated control time period. On the basis of the alternative time period, a more accurate time period suitable for green wave coordinated control and the coordination method for each time period are further determined according to the intersection flow conditions and the similarity of traffic conditions at adjacent intersections.
[0018] Preferably, the process of determining the green wave coordination period and the corresponding coordination mode includes:
[0019] Count the flow of each direction at the intersection at each time step; take the flow direction corresponding to the maximum flow value as the main flow direction of the intersection;
[0020] Determine whether the main direction and adjacent relationship of intersection A and intersection B are north-south or east-west:
[0021] If the main flow directions of the two intersections are the same and parallel to the adjacent relationship, it is the period of one-way green wave coordinated control in the direction of the main flow direction; if the main flow directions of the two intersections are opposite and parallel to the adjacent relationship, it is the period of two-way green wave coordinated control in the direction of the adjacent relationship; if the main flow directions of the two intersections are perpendicular, it is the period of one-way green wave coordinated control in the direction of the main flow direction parallel to the adjacent relationship.
[0022] In the present invention, the coordination mode can be determined while determining the green wave coordinated control time period according to the flow relationship at the intersection; there are multiple different flow directions at an intersection. Since the purpose of green wave coordinated control is to improve traffic efficiency, the flow direction with the largest flow is selected as the mainstream direction for green wave coordinated control. In this case, the green wave coordinated control mode can be determined according to the relationship between the mainstream directions of the two adjacent intersections and the adjacent positional relationship of the two intersections, and the time period corresponding to the green wave coordinated control can be determined according to the time period corresponding to the mainstream direction.
[0023] Preferably, the process of determining the green wave coordination period and the corresponding coordination mode further includes:
[0024] Obtain the traffic data within a test cycle to obtain the coordination method corresponding to each time period of each day;
[0025] When more than half of the working days and all non-working days in a certain period have the same coordination mode within a test cycle, the green wave coordination period and the corresponding coordination mode are output.
[0026] In the present invention, since the flow data is fluctuating and unstable, even the main flow direction of the same time period may be different on different days, it is necessary to select and correct the flow-based green wave coordination time period. Taking the flow data collected in a test cycle as an example, when more than half of the working days and all non-working days in the same time period have the same coordination method, it means that the time period is very suitable for corresponding green wave coordination control in most cases, thereby determining this coordination method and coordination period; in other cases, due to the large differences in the coordination methods in the same time period, not performing green wave coordination control is more in line with actual traffic requirements.
[0027] Preferably, the process of calculating the time period suitable for green wave coordination according to the similarity of traffic states at adjacent intersections includes: obtaining the total flow of adjacent intersections A and intersection B at each time step, and converting the total flow data into a total flow array of a time series;
[0028] The dynamic time warping method is used to calculate the similarity between the total flow array of intersection A and the total flow array of intersection B. The time period when the similarity is less than the set similarity threshold is suitable for green wave coordination.
[0029] In the present invention, the total flow of two intersections is converted into a total flow array of time series and the similarity between the two is calculated. The smaller the similarity, the higher the spatial similarity between the two adjacent intersections, the stronger the correlation, and the easier it is to achieve green wave coordinated control. Therefore, a similarity threshold is set, and the time period with a similarity less than the similarity threshold is identified as a time period suitable for green wave coordination.
[0030] Preferably, the process of determining the rationality of the initial green wave coordination period includes:
[0031] Obtain the total flow and main directional flow at each time step of intersection A and intersection B during the initial green wave coordination period;
[0032] Calculate the proportion of the main directional flow at intersection A in its total flow, and calculate the proportion of the main directional flow at intersection B in its total flow;
[0033] The time periods in the initial green wave coordination period whose proportion data meets the requirements for rationality judgment are screened out as effective green wave coordination periods.
[0034] The green wave coordinated control in the present invention is mainly the coordinated control of the main flow direction of the associated intersections. However, in addition to the main flow direction with the largest flow at an intersection, there are other directions with a certain flow. Therefore, the proportion of the flow of the main flow in the initial green wave coordinated control in the total flow is judged by rationality. The larger the proportion, the more the flow in the main flow direction exceeds that of other directions. The flow in other directions basically does not affect the green wave coordinated control of the main flow direction, and the corresponding time period is suitable for green wave coordinated control.
[0035] Preferably, the process of calculating the candidate time period suitable for green wave coordinated control at any intersection includes:
[0036] When overflow results are detected on more than half of the working days and all non-working days in a certain time period of the intersection during a test cycle, the time period is output and added to the first candidate time period based on intersection overflow;
[0037] A second candidate time period based on the intersection flow is calculated, and the second candidate time period is combined with the first candidate time period to obtain a candidate time period suitable for green wave coordinated control.
[0038] The calculation of the candidate time period suitable for green wave coordinated control at any intersection in the present invention includes a combination of two results: intersection overflow analysis and intersection flow analysis. Overflow refers to the long queue of vehicles at the downstream intersection that overflows to the current intersection, affecting the traffic of vehicles at the current intersection. In this case, green wave coordinated control can be performed to improve the traffic efficiency of the corresponding flow direction. When overflow is detected in the same time period on most days within a test cycle, it means that the poor traffic conditions in this time period are not random and can be improved through green wave coordinated control.
[0039] Preferably, the process of calculating the second candidate time period based on the intersection flow includes:
[0040] Determine the off-peak and peak time periods of the target intersection and set the corresponding lane flow thresholds;
[0041] Calculate the traffic data corresponding to the lane with the largest traffic in each direction of the intersection, and use it to calculate the hourly average lane traffic in that direction; add the time period when the hourly average lane traffic is greater than the corresponding lane traffic threshold to the second alternative time period.
[0042] The analysis based on intersection flow in the present invention can be divided into two different situations: off-peak hours and peak hours. When the intersection flow is far less than the lane flow threshold, the use of green wave coordinated control has basically no improvement effect on the traffic efficiency of the mainstream direction, but will affect the traffic efficiency of the non-mainstream direction. Therefore, it is not suitable for green wave coordinated control. When the intersection flow exceeds the lane flow threshold, the use of green wave coordinated control will affect the traffic conditions of the non-mainstream direction to a certain extent, but it can greatly improve the traffic efficiency of the mainstream direction. In general, it can improve the overall traffic status of the intersection.
[0043] Preferably, for the green wave period coordination control method between N intersections in the same driving direction, any two adjacent intersections are taken as a group to obtain N-1 groups of adjacent intersections, and the effective green wave coordination period and coordination method of each adjacent intersection group are calculated and summarized to obtain the filtering coordination period and coordination method of multiple intersections.
[0044] In the present invention, the multiple intersections that actually perform green wave coordinated control are basically in the same driving direction, that is, no turning is performed at the intersection; in this case, the green wave coordinated control of the straight flow direction is mainly considered; for multiple associated intersections, adjacent intersections can be combined in pairs according to the order of driving direction, and the effective green wave coordination period and coordination method of each group are integrated according to the order of intersections to obtain the green wave coordination period and coordination method of multiple intersections.
[0045] The present invention has the following beneficial effects: on the basis of analyzing and calculating the alternative time periods suitable for green wave coordinated control at each intersection, the initial green wave coordinated time period and coordination method are obtained by combining the intersection flow and the similarity of the traffic conditions at the intersection, and the final effective green wave coordinated time period is obtained based on further rationality judgment, and the appropriate time is selected for green wave coordinated control to reduce the impact on the traffic efficiency in the non-green wave direction. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 It is a flow chart of the green wave period coordination control method based on the intersection group in the present invention;
[0047] Figure 2 is a flow chart of calculating an alternative time period suitable for green wave coordinated control at an intersection in an embodiment of the present invention;
[0048] Figure 3 It is a flow chart of obtaining the effective green wave coordination period in an embodiment of the present invention. DETAILED DESCRIPTION
[0049] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0050] like Figure 1 As shown, a green wave period coordination control method based on an intersection group includes:
[0051] Calculate the alternative time period suitable for green wave coordinated control at any intersection.
[0052] When overflow results are detected on more than half of the working days and all non-working days in a certain time period of the intersection during a test cycle, the time period is output and added to the first candidate time period based on intersection overflow;
[0053] A second candidate time period based on the intersection flow is calculated, and the second candidate time period is combined with the first candidate time period to obtain a candidate time period suitable for green wave coordinated control.
[0054] The process of calculating the second alternative time period based on the intersection flow includes:
[0055] Determine the off-peak and peak time periods of the target intersection and set the corresponding lane flow thresholds;
[0056] Calculate the traffic data corresponding to the lane with the largest traffic in each direction of the intersection, and use it to calculate the hourly average lane traffic in that direction; add the time period when the hourly average lane traffic is greater than the corresponding lane traffic threshold to the second alternative time period.
[0057] Adjacent intersections A and B suitable for green wave coordinated control are selected, and a set of candidate time periods for green wave control of adjacent intersections is obtained according to the candidate time periods of each intersection.
[0058] The process of selecting adjacent intersections A and B suitable for green wave coordinated control includes:
[0059] Filter out adjacent intersections whose adjacent intersection distance influence coefficient F is greater than or equal to a set coefficient threshold;
[0060] F=(a+bL) / b, where a is the first distance threshold, b is the second distance threshold and is greater than a, and L is the distance between adjacent intersections.
[0061] The green wave control candidate time period set is obtained by finding the union of the candidate time periods of intersection A and intersection B.
[0062] Based on the set of candidate green wave control periods, the initial green wave coordination periods and corresponding coordination methods of adjacent intersections are calculated in combination with the similarity of flow and traffic status.
[0063] Based on the set of candidate time periods for green wave control, the green wave coordination time period and the corresponding coordination method are determined according to the mainstream direction of the traffic flow at the intersection; the time period suitable for green wave coordination is calculated according to the similarity of traffic conditions at adjacent intersections, and the initial green wave coordination time period and the corresponding coordination method are obtained by taking the intersection with the green wave coordination time period based on traffic flow.
[0064] The process of determining the green wave coordination period and the corresponding coordination method includes:
[0065] Count the flow of each direction at the intersection at each time step; take the flow direction corresponding to the maximum flow value as the main flow direction of the intersection;
[0066] Determine whether the main direction and adjacent relationship of intersection A and intersection B are north-south or east-west:
[0067] If the main flow directions of the two intersections are the same and parallel to the adjacent relationship, it is the period of one-way green wave coordinated control in the direction of the main flow direction; if the main flow directions of the two intersections are opposite and parallel to the adjacent relationship, it is the period of two-way green wave coordinated control in the direction of the adjacent relationship; if the main flow directions of the two intersections are perpendicular, it is the period of one-way green wave coordinated control in the direction of the main flow direction parallel to the adjacent relationship.
[0068] The process of determining the green wave coordination period and the corresponding coordination method also includes:
[0069] Obtain the traffic data within a test cycle to obtain the coordination method corresponding to each time period of each day;
[0070] When more than half of the working days and all non-working days in a certain period have the same coordination mode within a test cycle, the green wave coordination period and the corresponding coordination mode are output.
[0071] The process of calculating the time period suitable for green wave coordination based on the similarity of traffic states at adjacent intersections includes:
[0072] Get the total flow of adjacent intersections A and B at each time step, and convert the total flow data into a total flow array of a time series;
[0073] The dynamic time warping method is used to calculate the similarity between the total flow array of intersection A and the total flow array of intersection B. The time period when the similarity is less than the set similarity threshold is suitable for green wave coordination.
[0074] The rationality of the initial green wave coordination period is judged to obtain the effective green wave coordination period and coordination method.
[0075] The process of determining the rationality of the initial green wave coordination period includes:
[0076] Obtain the total flow and main directional flow at each time step of intersection A and intersection B during the initial green wave coordination period;
[0077] Calculate the proportion of the main directional flow at intersection A in its total flow, and calculate the proportion of the main directional flow at intersection B in its total flow;
[0078] The time periods in the initial green wave coordination period whose proportion data meets the requirements for rationality judgment are screened out as effective green wave coordination periods.
[0079] For the green wave period coordination control method between N intersections in the same driving direction, any two adjacent intersections are taken as a group to obtain N-1 groups of adjacent intersections. The effective green wave coordination period and coordination method of each adjacent intersection group are calculated and summarized to obtain the filtering coordination period and coordination method of multiple intersections.
[0080] The purpose of the green wave coordinated control in the present invention is to improve the traffic efficiency of some related intersections. The premise is that the coordinated control will be carried out only when the traffic conditions of some intersections need to be improved. On this basis, the alternative time periods that are more suitable for green wave coordinated control at each intersection can be analyzed; and because the green wave coordinated control is the coordination of related intersections, not just the control of one intersection, it is necessary to analyze the adjacent related intersections together to obtain the alternative time periods suitable for green wave coordinated control; then, according to the actual traffic flow conditions of the intersections within the alternative time period and the similarity of the traffic conditions between the intersections, the initial green wave coordinated time period and the corresponding coordination method are preliminarily obtained, so that the green wave coordinated control can be carried out on the intersections at the appropriate time; further, the rationality is judged according to the road flow results according to the initial green wave coordinated time period and the coordination method within a certain test period, and the effective green wave coordinated time period and coordination method that better meet the actual intersection needs are screened out.
[0081] In the present invention, the adjacent intersection distance influence coefficient is used to indicate the correlation between adjacent intersections. The larger the coefficient is, the stronger the correlation between adjacent intersections is, the stronger the continuity and stability of traffic flow are, and the more suitable it is for green wave coordinated control. If the influence coefficient is too small, it means that it is not suitable for green wave coordinated control.
[0082] In the present invention, due to the correlation between adjacent intersections, the union of the alternative time periods of the two intersections is used as the alternative time period of the common green wave coordinated control time period. On the basis of the alternative time period, a more accurate time period suitable for green wave coordinated control and the coordination method for each time period are further determined according to the intersection flow conditions and the similarity of traffic conditions at adjacent intersections.
[0083] In the present invention, the coordination mode can be determined while determining the green wave coordinated control time period according to the flow relationship at the intersection; there are multiple different flow directions at an intersection. Since the purpose of green wave coordinated control is to improve traffic efficiency, the flow direction with the largest flow is selected as the mainstream direction for green wave coordinated control. In this case, the green wave coordinated control mode can be determined according to the relationship between the mainstream directions of the two adjacent intersections and the adjacent positional relationship of the two intersections, and the time period corresponding to the green wave coordinated control can be determined according to the time period corresponding to the mainstream direction.
[0084] In the present invention, since the flow data is fluctuating and unstable, even the main flow direction of the same time period may be different on different days, it is necessary to select and correct the flow-based green wave coordination time period. Taking the flow data collected in a test cycle as an example, when more than half of the working days and all non-working days in the same time period have the same coordination method, it means that the time period is very suitable for corresponding green wave coordination control in most cases, thereby determining this coordination method and coordination period; in other cases, due to the large differences in the coordination methods in the same time period, not performing green wave coordination control is more in line with actual traffic requirements.
[0085] In the present invention, the total flow of two intersections is converted into a total flow array of time series and the similarity between the two is calculated. The smaller the similarity, the higher the spatial similarity between the two adjacent intersections, the stronger the correlation, and the easier it is to achieve green wave coordinated control. Therefore, a similarity threshold is set, and the time period with a similarity less than the similarity threshold is identified as a time period suitable for green wave coordination.
[0086] The green wave coordinated control in the present invention is mainly the coordinated control of the main flow direction of the associated intersections. However, in addition to the main flow direction with the largest flow at an intersection, there are other directions with a certain flow. Therefore, the proportion of the flow of the main flow in the initial green wave coordinated control in the total flow is judged by rationality. If the proportion is larger, it means that the flow in the main flow direction far exceeds that of other directions, and the flow in other directions will basically not affect the green wave coordinated control of the main flow direction, which means that the corresponding time period is indeed suitable for green wave coordinated control.
[0087] The calculation of the candidate time period suitable for green wave coordinated control at any intersection in the present invention includes a combination of two results: intersection overflow analysis and intersection flow analysis. Overflow refers to the long queue of vehicles at the downstream intersection that overflows to the current intersection, affecting the traffic of vehicles at the current intersection. In this case, green wave coordinated control can be performed to improve the traffic efficiency of the corresponding flow direction. When overflow is detected in the same time period on most days within a test cycle, it means that the poor traffic conditions in this time period are not random and can be improved through green wave coordinated control.
[0088] The analysis based on intersection flow in the present invention can be divided into two different situations: off-peak hours and peak hours. When the intersection flow is far less than the lane flow threshold, the use of green wave coordinated control has basically no improvement effect on the traffic efficiency of the mainstream direction, but will affect the traffic efficiency of the non-mainstream direction. Therefore, it is not suitable for green wave coordinated control. When the intersection flow exceeds the lane flow threshold, the use of green wave coordinated control will affect the traffic conditions of the non-mainstream direction to a certain extent, but it can greatly improve the traffic efficiency of the mainstream direction. In general, it can improve the overall traffic status of the intersection.
[0089] In the present invention, the multiple intersections that actually perform green wave coordinated control are basically in the same driving direction, that is, no turning is performed at the intersection; in this case, the green wave coordinated control of the straight flow direction is mainly considered; for multiple associated intersections, adjacent intersections can be combined in pairs according to the order of driving direction, and the effective green wave coordination period and coordination method of each group are integrated according to the order of intersections to obtain the green wave coordination period and coordination method of multiple intersections.
[0090] In an embodiment of the present invention, the process of calculating the first candidate time period based on intersection overflow includes:
[0091] The detection data of the intersection is obtained with one week as a test cycle, and one week includes five working days and two non-working days; and the overflow results of each flow direction of intersection A and the overflow results of each flow direction of intersection B are counted on a daily basis.
[0092] Take ten minutes as a time step and traverse all the data. If an overflow result is detected within ten minutes, the ten minutes will be recorded as a continuous period [t i ,t i+1 ]; if the previous continuous period [t i-1 ,t i ] and the end time of the next continuous period [t i ,t i+1 ] is less than or equal to one time step, then these two periods are merged into one period, that is, in the period [t i-1 ,t i+1 ] all overflow; for the merged time periods, delete the time periods whose duration is less than the duration threshold (set to twenty minutes).
[0093] For the time period corresponding to each time step, if there are more than or equal to three working days and the overflow state is detected on all non-working days, the corresponding flow direction and time period are output, and the time period is added to the first candidate time period.
[0094] The process of calculating the second alternative time period based on the intersection flow includes:
[0095] Take one week as a test cycle to obtain traffic data at the intersection. A week includes five working days and two non-working days. Count the traffic results of each direction of intersection A and intersection B in each time step (ten minutes) on a daily basis, and take out the traffic data of the lane with the largest traffic in each direction. Determine the flat and peak times of the target intersection (congestion and oversaturation are recorded as peaks, and empty and non-congested are recorded as flat peaks), take the mainstream direction with the largest traffic as the object, and calculate the hourly average lane traffic of the mainstream direction (multiply the traffic data of the lane with the largest traffic in each direction by six).
[0096] If the hourly average lane flow is greater than the corresponding lane flow threshold (the lane flow threshold during peak hours can be set to 500 vehicles per hour, and the lane flow threshold during off-peak hours can be set to 300 vehicles per hour), the corresponding flow direction and time period are recorded. After sorting these time periods, if the end time of the previous time period and the start time of the next time period are less than one time step, the two time periods are merged into one continuous time period; for the merged time periods, the time periods with a duration less than the time threshold (set to 20 minutes) are deleted. The remaining time periods are added to the second candidate time period.
[0097] The candidate time period suitable for green wave coordinated control at the intersection is obtained by finding the union of the first candidate time period and the second candidate time period. The coordination time period and coordination mode are further determined based on the obtained candidate time period.
[0098] The above content is the determination of the alternative time periods suitable for green wave coordinated control at each intersection. However, green wave coordinated control is carried out based on the correlation between adjacent intersections. Therefore, it is necessary to select adjacent intersections suitable for green wave coordinated control and exclude unsuitable adjacent intersections. For adjacent intersections suitable for green wave coordinated control, the time period suitable for green wave coordinated control between the two intersections is the union of the alternative time periods of each intersection, which serves as the candidate time period set for green wave control.
[0099] First, calculate the influence coefficient of the distance between adjacent intersections to determine whether it is suitable for green wave coordinated control:
[0100] The distance L between adjacent intersections is obtained. If L is less than or equal to the first distance threshold a (set to 200 meters in this embodiment and adjusted according to actual conditions), the adjacent intersection distance influence coefficient F is 1; if L is greater than or equal to the second distance threshold b (which can be set to 800 meters), the adjacent intersection distance influence coefficient F is 0. For the remaining distances L, F = (a + bL) / b.
[0101] The influence coefficient F of the distance between adjacent intersections is analyzed. The larger the F is, the stronger the correlation between adjacent intersections is, and the greater the continuity and stability of the traffic flow is. If F is greater than or equal to the set coefficient threshold (which can be set to 0.25), it indicates that the intersection is suitable for green wave coordinated control and no coordinated control is performed.
[0102] Then, at the intersections where green wave coordinated control can be performed, the initial green wave coordination period and the corresponding coordination method are obtained based on the intersection flow and traffic state similarity.
[0103] The green wave coordination period and coordination method of the intersection are determined according to the traffic volume (if intersection A and intersection B are adjacent east-west intersections, then A is the west intersection; if intersection A and intersection B are adjacent north-south intersections, then A is the north intersection).
[0104] The flow data of the intersection is obtained in a test cycle of one week, which includes five working days and two non-working days. The flow results of each direction of intersection A and intersection B in each time step (ten minutes) are counted in units of days, and the flow direction corresponding to the maximum flow in a time step at the intersection is found as the mainstream direction of the intersection in the current time step; thus, the mainstream directions of the adjacent intersections A and B are obtained.
[0105] Classification discussion based on the adjacent position relationship between adjacent intersections A and B:
[0106] When intersection A and intersection B are adjacent east-west intersections, if the mainstream directions of intersection A and intersection B are both east straight, east-to-west one-way green wave coordination will be carried out;
[0107] If the mainstream direction of intersection A and intersection B is both westward and straight, a one-way green wave coordination from west to east will be carried out;
[0108] If the main flow direction of intersection A and intersection B is one east straight and the other west straight, the east-west two-way green wave coordinated control is carried out;
[0109] If the main direction of intersection A and intersection B is east / west, and the other is south / north, then if the adjacent relationship is east-west, east-to-west / west-to-east one-way green wave coordination is performed;
[0110] If the main flow directions at intersection A and intersection B are both southbound / northbound, green wave coordinated control will not be performed in the east-west direction.
[0111] When intersection A and intersection B are adjacent intersections in the north and south, if the mainstream directions of intersection A and intersection B are both south-straight, a one-way green wave coordination from south to north will be carried out;
[0112] If the mainstream direction of intersection A and intersection B is both north and straight, a one-way green wave coordination from north to south will be carried out;
[0113] If the main flow direction of intersection A and intersection B is one southbound and the other northbound, two-way green wave coordinated control in the north-south direction is carried out;
[0114] If the main direction of intersection A and intersection B is south-to-north or east-to-west, then if the adjacent relationship is north-south, south-to-north or north-to-south one-way green wave coordination will be carried out;
[0115] If the mainstream directions at intersection A and intersection B are both east-straight / west-straight, green wave coordinated control will not be performed in the north-south direction.
[0116] The time period suitable for green wave coordination at an intersection is determined based on the similarity of traffic conditions at adjacent intersections.
[0117] Taking one week as a test cycle, the total flow data of intersection A and intersection B at each time step (ten minutes) is obtained. A week includes five working days and two non-working days; and the total flow data of intersection A and intersection B is converted into a total flow array of time series.
[0118] The dynamic time warping method is used to calculate the similarity of two time series: the input time series is distorted by extending and shortening the sequence so that the two sequences can be aligned on the time axis, and then a time warping function that meets certain conditions is used to describe the time correspondence between the test template and the reference template, and the minimum cumulative distance when the two sequences match is solved:
[0119] 1. Define two time series: Q = q1, q2, ..., q n 、C=c1,c2,…,c m (flow rate every 10 minutes);
[0120] 2. Calculate the distance d(q i ,c j ), and create an m*n matrix;
[0121] 3. Use the formula γ(i,j)=d(q i ,c j )+min{γ(i-1,j-1),γ(i-1,j),γ(i,j+1)} finds the cumulative minimum distance between Q and C. The smaller the distance, the stronger the similarity between the sequences.
[0122] The calculated minimum distance is used as the result of similarity. The smaller the similarity, the more similar the traffic conditions of adjacent intersections are. The higher the spatial similarity of the two intersections, the stronger the correlation, and the easier it is to achieve green wave coordinated control. Take 60 minutes as a group (6 groups of data), calculate the minimum distance once, and if the similarity is less than S (the default is 50), the corresponding time period is considered to be suitable for green wave coordinated control.
[0123] The initial green wave coordination period and coordination method suitable for green wave coordinated control are obtained by taking the intersection of the green wave coordination period based on flow and the time period based on traffic state similarity.
[0124] The rationality of the initial green wave coordination period is judged, and whether it is suitable for green wave coordination control is determined based on the proportion of the main directional flow at the intersection in the total flow:
[0125] Taking one day as a unit, the total flow and main flow at each time step of intersection A and intersection B during the initial green wave coordination period are taken.
[0126] For intersections A and B, which are adjacent east-west, the proportion of the main directional flow of the intersections in the total flow is calculated: if the coordination mode is two-way green wave coordination, the proportion of the main directional flow of intersection A in the total flow of intersection A, and the proportion of the main directional flow of intersection B in the total flow of intersection B are calculated, whether they are both greater than the proportion threshold (set to 30%);
[0127] If the coordination method is east-to-west one-way green wave coordination, calculate the proportion of the straight flow of the west entrance of intersection A in the total flow of intersection A, and the proportion of the straight flow of the west entrance of intersection B in the total flow of intersection B, and whether it is greater than the proportion threshold (set to 30%); if the coordination method is west-to-east one-way green wave coordination, calculate the proportion of the straight flow of the east entrance of intersection A in the total flow of intersection A, and the proportion of the straight flow of the east entrance of intersection B in the total flow of intersection B, and whether it is greater than the proportion threshold (set to 30%).
[0128] For intersections A and B that are adjacent to each other in the north-south direction, calculate the proportion of the main directional flow of the intersections in the total flow: if the coordination mode is two-way green wave coordination, calculate the proportion of the main directional flow of intersection A in the total flow of intersection A, and the proportion of the main directional flow of intersection B in the total flow of intersection B, whether they are both greater than the proportion threshold (set to 30%);
[0129] If the coordination mode is one-way green wave coordination from north to south, calculate the proportion of the straight flow of the south entrance of intersection A in the total flow of intersection A, and the proportion of the straight flow of the south entrance of intersection B in the total flow of intersection B, and whether it is greater than the proportion threshold (set to 30%); if the coordination mode is one-way green wave coordination from south to north, calculate the proportion of the straight flow of the north entrance of intersection A in the total flow of intersection A, and the proportion of the straight flow of the north entrance of intersection B in the total flow of intersection B, and whether it is greater than the proportion threshold (set to 30%)
[0130] Repeat the above steps, expand the data to one week, and verify the rationality of the judgment time (if the working days are greater than or equal to three days and the proportion of all non-working days is more than 30%, the period is judged to be suitable for green wave coordination control). Obtain the effective green wave coordination period and the corresponding coordination method after the rationality judgment of the initial green wave coordination period.
[0131] The above embodiments are further elaborations and illustrations of the present invention for ease of understanding, and are not limitations of the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A green wave period coordination control method based on intersection groups, It is characterized in that include: Calculate the candidate time period suitable for green wave coordinated control at any intersection; Select adjacent intersections A and B suitable for green wave coordinated control, and obtain a set of candidate time periods for green wave control at adjacent intersections based on the candidate time periods of each intersection; Based on the candidate green wave control period set, the initial green wave coordination period and corresponding coordination mode of adjacent intersections are calculated in combination with the similarity of flow and traffic status; Count the flow of each direction at the intersection at each time step; take the flow direction corresponding to the maximum flow value as the main flow direction of the intersection; Determine the rationality of the initial green wave coordination period. Obtain the total flow and main directional flow at each time step of intersection A and intersection B during the initial green wave coordination period; Calculate the proportion of the main directional flow at intersection A in its total flow, and calculate the proportion of the main directional flow at intersection B in its total flow; The time periods in the initial green wave coordination time periods whose proportion data meet the requirements for rationality judgment are screened out as effective green wave coordination time periods; the effective green wave coordination time periods and coordination methods are obtained.
2. According to the green wave period coordination control method based on intersection group according to claim 1, It is characterized in that The process of selecting adjacent intersections A and B suitable for green wave coordinated control includes: Filter out adjacent intersections whose adjacent intersection distance influence coefficient F is greater than or equal to a set coefficient threshold; F=(a+bL) / b, where a is the first distance threshold, b is the second distance threshold and is greater than a, and L is the distance between adjacent intersections.
3. A green wave period coordination control method based on intersection groups according to claim 1 or 2, It is characterized in that The green wave control candidate time period set is obtained by finding the union of the candidate time period of intersection A and the candidate time period of intersection B; Based on the green wave control candidate time period set, the green wave coordination time period and the corresponding coordination method are determined according to the main flow direction of the intersection traffic; The time period suitable for green wave coordination is calculated according to the similarity of traffic conditions at adjacent intersections, and the intersection with the green wave coordination period based on flow is taken to obtain the initial green wave coordination period and the corresponding coordination method.
4. According to the green wave period coordination control method based on intersection group according to claim 3, It is characterized in that The process of determining the green wave coordination period and the corresponding coordination method includes: Determine whether the main direction and adjacent relationship of intersection A and intersection B are north-south or east-west: If the main flow directions of the two intersections are the same and parallel to the adjacent relationship, it is the period of one-way green wave coordinated control in the direction of the main flow direction; If the main flow directions of the two intersections are opposite and parallel to the adjacent direction, it is the period of two-way green wave coordinated control in the adjacent direction; If the main flow directions of the two intersections are perpendicular, it is the period of one-way green wave coordinated control in the direction of the main flow direction parallel to the adjacent relationship.
5. According to the green wave period coordination control method based on intersection group according to claim 4, It is characterized in that The process of determining the green wave coordination period and the corresponding coordination method also includes: Obtain the traffic data within a test cycle to obtain the coordination method corresponding to each time period of each day; When more than half of the working days and all non-working days in a certain period have the same coordination mode within a test cycle, the green wave coordination period and the corresponding coordination mode are output.
6. A green wave period coordination control method based on intersection groups according to claim 3, It is characterized in that The process of calculating the time period suitable for green wave coordination according to the similarity of traffic states at adjacent intersections includes: Get the total flow of adjacent intersections A and B at each time step, and convert the total flow data into a total flow array of a time series; The dynamic time warping method is used to calculate the similarity between the total flow array of intersection A and the total flow array of intersection B. The time period when the similarity is less than the set similarity threshold is suitable for green wave coordination.
7. A green wave period coordination control method based on intersection groups according to claim 1 or 2 or 4 or 5 or 6, It is characterized in that The process of calculating the candidate time period suitable for green wave coordinated control at any intersection includes: When overflow results are detected on more than half of the working days and all non-working days in a certain time period of the intersection during a test cycle, the time period is output and added to the first candidate time period based on intersection overflow; A second candidate time period based on the intersection flow is calculated, and the second candidate time period is combined with the first candidate time period to obtain a candidate time period suitable for green wave coordinated control.
8. A green wave period coordination control method based on intersection groups according to claim 7, It is characterized in that The process of calculating the second candidate time period based on the intersection flow includes: Determine the off-peak and peak time periods of the target intersection and set the corresponding lane flow thresholds; Calculate the traffic data corresponding to the lane with the largest traffic in each direction of the intersection, and use it to calculate the hourly average lane traffic in that direction; add the time period when the hourly average lane traffic is greater than the corresponding lane traffic threshold to the second alternative time period.
9. A green wave period coordination control method based on intersection groups according to claim 1 or 2 or 4 or 5 or 6, It is characterized in that For the green wave period coordination control method between N intersections in the same driving direction, any two adjacent intersections are taken as a group to obtain N-1 groups of adjacent intersections. The effective green wave coordination period and coordination method of each adjacent intersection group are calculated and summarized to obtain the filtering coordination period and coordination method of multiple intersections.
Citation Information
Patent Citations
Bidirectional green wave coordination control method and device, electronic equipment and storage medium
CN115240443A
Trunk road section classification method under green-wave coordinated control
CN106297334A
City trunk road segmented green wave coordination control method, device and system
CN113034937A