Road operation management method, device, equipment and storage medium
Through multi-modal fusion processing and predictive analysis of road operation data, the operation management plan is implemented in advance, which solves the problem of low traffic efficiency during traffic congestion, achieves effective diversion of traffic flow and increases traffic speed.
Patent Information
- Application Number
- CN202410030735.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-01-09
AI Technical Summary
In the existing technology, the effect of improving traffic efficiency is poor when traffic is congested, making it difficult to quickly divert traffic and increase vehicle speed.
By acquiring road operation data, data analysis is performed based on multi-modal fusion processing and a preset road congestion prediction model to predict road congestion and implement operation management plans in advance to alleviate traffic congestion.
Executing the operation management plan in advance before traffic congestion improves road traffic efficiency, slows down traffic congestion, and increases vehicle speed.
Smart Images

Figure CN117935548B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of computer technology, and in particular to a road operation management method, device, equipment and storage medium. Background Art
[0002] At present, with the increase in the number of motor vehicles and the growing demand for travel services, urban roads or highways often experience heavy traffic and low vehicle traffic efficiency. Therefore, how to quickly ease traffic and improve traffic efficiency is an issue that needs to be urgently addressed.
[0003] In the related art, when traffic congestion occurs, the traffic control center or traffic commanders usually restrict the traffic flow to ensure the rapid passage of vehicles on the road. However, when traffic congestion occurs, the current road vehicle traffic efficiency is very low, and traffic control can only alleviate the traffic congestion, but the effect of improving traffic efficiency is poor. Summary of the invention
[0004] The main purpose of the present invention is to provide a road operation management method, device, equipment and storage medium, aiming to solve the technical problem of poor improvement effect of traffic efficiency in the prior art.
[0005] To achieve the above objectives, the present invention provides a road operation management method, the road operation management method comprising:
[0006] Obtain road operation data;
[0007] Determining a congestion prediction result of a current road based on the road operation data;
[0008] Determine an operation management plan corresponding to the congestion prediction result, and execute the operation management plan.
[0009] Optionally, the step of determining a congestion prediction result of a current road based on the road operation data includes:
[0010] Based on the road operation data, a multimodal fusion process is performed through a preset information fusion model to obtain road congestion data, wherein the road operation data is multi-dimensional data information about the currently monitored road;
[0011] Based on the road congestion data, a preset road congestion prediction model is used to perform predictive analysis and calculation on the data to obtain a congestion prediction result of the current road, wherein the road congestion prediction model is obtained by iteratively training a preset first model to be trained based on road congestion data samples and congestion prediction result labels of the road congestion data samples.
[0012] Optionally, before the step of performing a prediction analysis and calculation of the data based on the road congestion data by a preset road congestion prediction model to obtain a congestion prediction result of the current road, the method includes:
[0013] Obtaining a road congestion data sample and a congestion prediction result label of the road congestion data sample;
[0014] Based on the road congestion data samples and the congestion prediction result labels of the road congestion data samples, the preset first model to be trained is iteratively trained to obtain a road congestion prediction model.
[0015] Optionally, the step of iteratively training a preset first to-be-trained model based on the road congestion data sample and the congestion prediction result label of the road congestion data sample to obtain a road congestion prediction model includes:
[0016] Acquiring event information of the road congestion data sample;
[0017] Based on the event information, determining the event weight of the road congestion data sample, wherein the event weight refers to the weight of the event processing time, and the event processing time refers to the time from the occurrence of the event to the completion of the event processing;
[0018] Based on the road congestion data samples, the event weights of the road congestion data samples and the congestion prediction result labels of the road congestion data samples, the preset first model to be trained is iteratively trained to obtain a road congestion prediction model.
[0019] Optionally, the step of iteratively training a preset first to-be-trained model based on the road congestion data samples, the event weights of the road congestion data samples, and the congestion prediction result labels of the road congestion data samples to obtain a road congestion prediction model includes:
[0020] Based on the road congestion data samples and the event weights of the road congestion data samples, a prediction analysis calculation of the data is performed through a preset first to-be-trained model to obtain a predicted congestion result;
[0021] Calculate the difference between the predicted congestion result and the congestion prediction result label of the road congestion data sample to obtain an error result;
[0022] Based on the error result, determining whether the error result meets an error standard indicated by a preset error threshold range;
[0023] If the error result does not meet the error standard indicated by the preset error threshold range, return the road congestion data sample and the event weight of the road congestion data sample, perform predictive analysis and calculation on the data through the preset first model to be trained, and obtain the step of predicting congestion results, until the error result meets the error standard indicated by the preset error threshold range, stop training, and obtain a road congestion prediction model.
[0024] Optionally, before the step of performing multimodal fusion processing based on the road operation data through a preset information fusion model to obtain road congestion data, the method includes:
[0025] Obtaining a multi-dimensional road operation data sample and a congestion prediction result label of the multi-dimensional road operation data sample;
[0026] Based on the multi-dimensional road operation data samples and the congestion prediction result labels of the multi-dimensional road operation data samples, a preset second model to be trained and a preset first model to be trained are jointly trained to obtain an information fusion model and a road congestion prediction model, wherein the second model to be trained is the initial model to be trained of the information fusion model, and the first model to be trained is the initial model to be trained of the road congestion prediction model.
[0027] Optionally, the step of jointly training a preset second model to be trained and a preset first model to be trained based on the multi-dimensional road operation data samples and the congestion prediction result labels of the multi-dimensional road operation data samples to obtain an information fusion model and a road congestion prediction model includes:
[0028] Based on the multi-dimensional road operation data samples, multimodal fusion processing is performed through a preset second model to be trained to obtain predicted road congestion data, wherein the second model to be trained is an initial model to be trained of the information fusion model;
[0029] Based on the predicted road congestion data, a prediction analysis and calculation of the data is performed through a preset first model to be trained to obtain a predicted congestion result, wherein the first model to be trained is an initial model to be trained of the road congestion prediction model;
[0030] Calculate the difference between the predicted congestion result and the congestion prediction result label of the road congestion data sample to obtain an error result;
[0031] Based on the error result, determining whether the error result meets an error standard indicated by a preset error threshold range;
[0032] If the error result does not meet the error standard indicated by the preset error threshold range, return to the step of performing multimodal fusion processing based on the multi-dimensional road operation data sample through a preset second model to be trained to obtain predicted road congestion data, and stop training until the error result meets the error standard indicated by the preset error threshold range to obtain a jointly trained information fusion model and a road congestion prediction model.
[0033] Optionally, the step of acquiring road operation data includes:
[0034] Collect road information;
[0035] The road information is integrated and analyzed to obtain road operation data, and the road operation data is displayed to a user's mobile terminal so that the user can perform road management based on the road operation data.
[0036] The present invention also provides a road operation management device, the road operation management device comprising:
[0037] An acquisition module, used to acquire road operation data;
[0038] A determination module, used to determine a congestion prediction result of a current road based on the road operation data;
[0039] An execution module is used to determine an operation management plan corresponding to the congestion prediction result and execute the operation management plan.
[0040] The present invention also provides a road operation management device, the road operation management device comprising: a memory, a processor, and a program stored in the memory for implementing the road operation management method.
[0041] The memory is used to store a program for implementing the road operation management method;
[0042] The processor is used to execute a program for implementing the road operation management method to implement the steps of the road operation management method.
[0043] The present invention also provides a storage medium, on which is stored a program for implementing the road operation management method, and the program for implementing the road operation management method is executed by a processor to implement the steps of the road operation management method.
[0044] The present invention monitors road operation data related to the road, predicts whether the current road will be congested within a period of time, and based on the congestion prediction result, executes the operation management plan corresponding to the congestion prediction result for the road in advance, that is, before traffic congestion occurs, executes the operation management plan of congestion control in advance, so as to further alleviate traffic congestion and improve traffic efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] The drawings herein are incorporated into and constitute a part of the specification, illustrate embodiments consistent with the present invention, and together with the specification are used to explain the principles of the present invention. In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art description will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor.
[0046] Figure 1 A schematic diagram of a flow chart of a first embodiment of a road operation management method of the present invention;
[0047] Figure 2 A schematic diagram of traffic flow statistics of the road operation management method of the present invention;
[0048] Figure 3 A schematic diagram of the road congestion prediction model structure of the road operation management method of the present invention;
[0049] Figure 4 A schematic diagram of a flow chart of a second embodiment of a road operation management method of the present invention;
[0050] Figure 5 A schematic diagram of a flow chart of a third embodiment of a road operation management method of the present invention;
[0051] Figure 6 It is a module schematic diagram of the road operation management device of the present invention;
[0052] Figure 7 It is a schematic diagram of the device structure of the hardware operating environment involved in the embodiment of the present invention.
[0053] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0054] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0055] Reference Figure 1 , Figure 1 It is a flowchart of the first embodiment of the road operation management method of the present invention.
[0056] In a first embodiment, the road operation management method comprises the following steps:
[0057] Step S100, obtaining road operation data;
[0058] It should be noted that the executor of the road operation management method is a road operation management device. Preferably, the road operation management device is a software client, or other terminals with data transmission and data processing functions, which are not specifically limited here.
[0059] It is understood that the road in the present invention refers to a part of the road that is operated and managed, including but not limited to expressways, urban roads or township roads. The road operation data refers to the operation data of a part of the monitored road section, and the road operation data includes but is not limited to traffic flow statistics information, accident information, road construction information and traffic control information, wherein the traffic flow statistics information refers to the number of vehicles passing through the road, and the specific reference is Figure 2 , also includes traffic flow statistics for various types of vehicles; the accident information refers to the number of accidents on the road, the cause of the accident, the location of the accident and other information, where the accident location also includes the accident location, the distance data between the accident and the traffic flow, etc.; the road construction information refers to the information about the construction on the road, such as construction section information, construction start time information, construction end time information, construction location information, etc.; the traffic control information refers to the relevant information of traffic control on the road, such as traffic control section information, traffic control start time information, traffic control end time information, etc.
[0060] In a specific implementation, the device obtains road operation data in a manner that includes receiving road operation data after a cloud platform integrates and analyzes road data information from road sensors, where the road sensors include but are not limited to road cameras.
[0061] In a specific implementation, the method for the device to obtain road operation data also includes the following steps:
[0062] The device collects road information; integrates and analyzes the road information to obtain road operation data, and displays the road operation data to the user's mobile terminal so that the user can manage the road based on the road operation data.
[0063] In the specific implementation, the device monitors the business operation status in real time, including monitoring road slowdowns, accidents, slowdowns at toll stations, controls and other information, and calculates the business operation coefficient in real time based on the roads, toll stations, service areas, construction and control conditions, as well as displays information such as split account income, traffic flow statistics, special construction, accident statistics, slowdown statistics and so on.
[0064] It is understandable that the device integrates and analyzes the road information to obtain road operation data. This function is mainly to analyze the operation data, optimize the toll data, and rely on the intelligent analysis function of vehicle traffic flow to upgrade the toll stations, toll lanes, and toll gantry data sources and calculation methods, so that the toll data can be displayed in a T-1 cycle. It can also be displayed by time period and provide data analysis of vehicle flow, toll amount, ETC vehicles, overloaded vehicles, gantry status, and green pass vehicles.
[0065] It should be noted that in addition to the functions mentioned above, the device also includes but is not limited to the following functions: (1) Basic information: Based on the fusion of multiple data, the company's data asset directory is visualized in multiple levels and dimensions according to scenarios, fields, and departments, including company profile, data profile, etc.; (2) Address book: The address book of the company's main leaders, leaders in charge, operation department, information sub-center, road management sub-center, maintenance sub-center, toll station and other relevant personnel is displayed separately, so that users can make calls directly; (3) Data window: Supports detailed search of data such as account splitting, vehicle flow, lane toll amount, green pass vehicles, overloaded vehicles, basic information, driving records, etc.; (4) Regular reports: Generate operation reports regularly on a daily, monthly, and annual basis, including revenue situation, vehicle flow analysis, asset quality analysis, congestion, control and case analysis, user portrait and marketing analysis, etc. (5) Connect the company's 26 business systems, including toll collection, road management, electromechanical, travel services, and OA, to integrate, manage, and analyze data, so as to achieve data sharing and service, and improve data horizontal coordination and vertical integration; (6) Fully tap into the massive data of highways, use big data analysis technology, and build user portraits. Visualize the multi-dimensional portraits of vehicles, toll stations, lanes, toll sections, payment methods, vehicle models, ETC, etc., accurately depict user travel needs, road network operation conditions, and display the company's precise marketing and operation results; (7) Intelligently generate operation reports, analyze revenue, traffic flow, asset quality, congestion control, user portraits, and marketing conditions, intelligently generate operation reports and push them to relevant departments, and provide decision support for the company's management; (8) The present invention proposes a method for calculating the popularity of content, which can automatically recommend relevant data to the user end. Users can add functions and data of interest according to their preferences, which is convenient for users to quickly locate and realize the function of thousands of faces.
[0066] In the specific implementation, the present invention proposes an operation mode type of handheld operation. Through the company's intelligent data window, the data of multiple systems are integrated in a diversified way, and the operation data of each system can be easily viewed, thereby improving the information collaboration capabilities of various business systems, improving the company's operation and management efficiency, reducing operation and maintenance labor costs, and realizing the core operation data to be carried on-hand, providing timely and accurate data support for daily operations and decision-making.
[0067] Step S200, determining a congestion prediction result of a current road based on the road operation data;
[0068] It should be noted that the congestion prediction result refers to the result of the congestion prediction of the operating and management road in the future and / or current preset time, where the future preset time can be 10 minutes or 30 minutes, and can be adjusted according to demand. The congestion prediction result can be graded according to the congestion situation, no congestion can be level 0, slight congestion can be level 1, medium congestion can be level 2, and severe congestion can be level 3. The classification of the congestion situation is set according to demand, and the present invention proposes that the device executes different operation management plans according to different congestion situations and / or congestion intensities.
[0069] It can be understood that the present invention predicts and analyzes road operation data to obtain the predicted congestion situation of the current road in the future. For example, two small passenger cars have a rear-end collision on the Y section of the monitored road X, and there are Z number of passenger cars traveling behind the accident site. The device analyzes the congestion prediction result that the accident will cause congestion of the rear traffic flow at level 2 based on data such as the average vehicle speed and the accident distance. The device sends the congestion prediction result and the corresponding operation management plan to the traffic command center, so as to realize early command and unblocking of road traffic before traffic congestion occurs, so as to improve traffic efficiency.
[0070] In a specific implementation, the method for determining the congestion prediction result of the current road based on the road operation data further includes the following steps:
[0071] The device performs multimodal fusion processing based on the road operation data through a preset information fusion model to obtain road congestion data, wherein the road operation data is multi-dimensional data information about the currently monitored road; based on the road congestion data, the device performs data prediction analysis and calculation through a preset road congestion prediction model to obtain a congestion prediction result of the current road, wherein the road congestion prediction model is obtained by iteratively training a preset first model to be trained based on road congestion data samples and congestion prediction result labels of the road congestion data samples.
[0072] It should be noted that the information fusion model can be trained by using a deep neural network learning method of reinforcement learning, or can also be trained by using supervised and unsupervised deep neural network learning methods. The information fusion model is trained based on multi-dimensional road operation data samples, using reinforcement learning, or supervised or unsupervised methods for separate training; it can also be trained based on multi-dimensional road operation data samples and jointly with a road congestion prediction model. Specifically, the training material of the information fusion model (multi-dimensional road operation data samples) comes from the operation data of the road in historical time.
[0073] It can be understood that the road congestion prediction model is obtained by iteratively training a preset first model to be trained based on road congestion data samples and congestion prediction result labels of the road congestion data samples, that is, the road congestion prediction model is obtained through deep learning training of a neural network, wherein the road congestion data samples also include multi-dimensional data information about the currently monitored road.
[0074] In a specific implementation, the present invention selects multiple parameters closely related to traffic flow to reflect the characteristics of highway traffic flow. Specifically, the parameters include flow q, density k and speed v. The above three parameters intuitively reflect the traffic system load, driving freedom within the traffic flow, and traffic system service level. The relationship between the three is as follows:
[0075]
[0076] in, Indicates the traffic volume of the road section. represents the vehicle density of the road section, and v represents the vehicle speed of the road section.
[0077] Specifically, the parameter definition content and calculation method are as follows:
[0078] 1. Traffic , where the traffic volume reflects the number of vehicles traveling on a certain road section per unit time. For example, in a detection period of T time, a total of n vehicles traveled, and the traffic flow is:
[0079]
[0080] in, Indicates the traffic volume of the road section. represents the total number of vehicles, and T represents the detection time period.
[0081] 2. Density k, where density reflects the number of existing vehicles within a unit distance of a road section. Since this parameter is an instantaneous value and is greatly affected by distance and time, the present invention replaces it with a time occupancy ratio and space occupancy The occupancy parameters are composed of time occupancy Reflects the traffic flow status and space occupancy Reflects the traffic density, and the calculation formula is as follows:
[0082]
[0083]
[0084] in, represents the total number of vehicles, Indicates the detection distance of the highway, represents the measuring distance of the detection device, i represents one of the vehicles, Indicates the time occupancy rate, Indicates the space occupancy.
[0085] 3. Speed v, where speed reflects the distance traveled per unit time. Specifically, it is determined by the average speed of the section. Average speed during the period The two types of speed means refer to the traffic flow in a fixed road section and a fixed detection location respectively, and the calculation formula is as follows:
[0086]
[0087]
[0088] in, represents the total number of vehicles, Indicates the detection distance of the highway, represents the vehicle speed when the vehicle passes the detection position, i represents one of the vehicles, represents the average speed of vehicles in the interval, Indicates the average speed of vehicles during a time period.
[0089] Based on the above parameter calculation, the present invention classifies the congestion situation into levels: no congestion can be level 0, slight congestion can be level 1, medium congestion can be level 2, and severe congestion can be level 3. Specifically, the present application adopts a back propagation neural network to improve the genetic algorithm to construct a road congestion prediction model, referring to Figure 3 The road congestion prediction model structure diagram is shown in FIG. The prediction process of the road congestion prediction model is as follows:
[0090] 1) Based on the input road congestion data samples, normalization training is performed to set the output result value range to [0, 1];
[0091] 2) Specify the number of network layers and their nodes. For example, the input layer has p nodes and the hidden layer has nodes, and the output layer has h nodes, then the number of nodes in the hidden layer can be determined by the following relationship:
[0092]
[0093] Where a represents the preset variable factor, and the value range of the variable factor a is [1, 10]. represents the number of nodes in the hidden layer, p represents the number of nodes in the input layer, and h represents the number of nodes in the output layer;
[0094] 3) Select a smaller value from [0, 1] and assign the initial network weight and threshold;
[0095] 4) Input the initial weight and threshold into the genetic algorithm to obtain the optimal solution;
[0096] 5) Output the results and continuously train the network through the error function until the optimal weight and threshold are obtained, and terminate the training when the preset conditions are met;
[0097] 6) Based on the trained road congestion prediction model, the test sample data is input into the model to output the final road congestion prediction result.
[0098] Step S300, determining an operation management plan corresponding to the congestion prediction result, and executing the operation management plan.
[0099] It should be noted that the congestion prediction results of different levels are pre-set with corresponding operation management plans, and the operation management plans are executed accordingly. The specific scenario can be that at time point T1, the traffic volume is small, and no accidents or construction have occurred, the congestion prediction result is no congestion, the congestion level is 0, and the operation management plan does not need to be adjusted; until time point T2, it is monitored that the current road traffic volume is large, but no accidents or construction have occurred, the congestion prediction result is slight congestion, the congestion level is 1, and the operation management plan is to turn on the flow limiting indicator lights at some road intersections to avoid a large number of vehicles on the road at the same time. If congestion has not been predicted, the operation management plan at time point T1 is always implemented, that is, no adjustment is required, until the device predicts that the congestion prediction result has changed, the operation management plan is adjusted; until time point T3, it is monitored that the current road traffic volume is large, and accidents and construction have occurred, the congestion prediction result is intermediate congestion, the congestion level is 2, and the operation management plan is to turn on the flow limiting indicator lights at some road intersections.
[0100] The present invention monitors road operation data related to the road, predicts whether the current road will be congested within a period of time, and based on the congestion prediction result, executes the operation management plan corresponding to the congestion prediction result for the road in advance, that is, before traffic congestion occurs, executes the operation management plan of congestion control in advance, so as to further alleviate traffic congestion and improve traffic efficiency.
[0101] Based on the above first embodiment, the present invention also provides another embodiment, referring to Figure 4 , the road operation management method comprises:
[0102] Before the device performs a predictive analysis and calculation of the data based on the road congestion data by a preset road congestion prediction model to obtain a congestion prediction result of the current road, the method includes the following steps A100-A200:
[0103] Step A100, obtaining a road congestion data sample and a congestion prediction result label of the road congestion data sample;
[0104] It should be noted that the road congestion data sample includes multi-dimensional data information about the currently monitored road, and is a relevant data sample used for model training. It is preferably a historical data sample containing road congestion conditions collected by a data acquisition sensor (such as a camera) installed at a toll booth; the congestion prediction result label of the road congestion data sample is the congestion prediction result corresponding to the manually labeled road congestion data sample.
[0105] Step A200: Based on the road congestion data samples and the congestion prediction result labels of the road congestion data samples, iterative training is performed on a preset first model to be trained to obtain a road congestion prediction model.
[0106] It can be understood that the road congestion prediction model of the present invention is obtained by performing deep learning training of a neural network based on the road congestion data samples and the congestion prediction result labels of the road congestion data samples. Through the deep learning training of the neural network, it is possible to make an accurate prediction of the congestion situation of the current road based on the road congestion data samples, so as to implement an operational management plan for congestion control in advance before traffic congestion occurs, thereby further alleviating traffic congestion and improving traffic efficiency.
[0107] In a specific implementation, the device iteratively trains a preset first to-be-trained model based on the road congestion data sample and the congestion prediction result label of the road congestion data sample, and the method for obtaining the road congestion prediction model further includes the following steps:
[0108] The device obtains event information of the road congestion data sample; based on the event information, determines the event weight of the road congestion data sample, wherein the event weight refers to the weight regarding the event processing time, and the event processing time refers to the length of time from the occurrence of the event to the completion of the event processing; based on the road congestion data sample, the event weight of the road congestion data sample and the congestion prediction result label of the road congestion data sample, iteratively trains a preset first model to be trained to obtain a road congestion prediction model.
[0109] In a specific implementation, the event information refers to the relevant information of the events monitored in the road congestion data sample. If there are no events such as vehicle breakdowns, traffic accidents, road construction, etc., then the event information does not contain any events, and the corresponding event weight is 0; if any one or more events such as vehicle breakdowns, traffic accidents, road construction, etc. occur, the device will assign different event weights according to the relevant information of different events, where the event weight is the weight about the event processing time, and the event processing time refers to the length of time from the occurrence of the event to the completion of the event processing. Event information includes the type and / or nature of the event, the location and start time of the event, etc. The event processing time is usually given by technicians in this field based on different event information and experiments in a specified event scenario, and the event weights are generally different for different event information, and the present invention does not limit this.
[0110] It is understandable that the present invention takes into account that in many cases, traffic congestion is often caused by events occurring on the road. Therefore, when training the road congestion prediction model, event information and event weights corresponding to the event information are added. The lighter the event situation, the shorter the event processing time, and the smaller the event weight, the congestion prediction result is more inclined to a mild degree of congestion; and the more serious the event situation, the longer the event processing time, and the larger the event weight, the congestion prediction result is more inclined to a severe degree of congestion.
[0111] For example, the event information of road congestion data sample A is that a bus broke down on section B, 3 kilometers away from the traffic flow, and stopped in the emergency lane waiting for rescue. The event processing time of this event is short, so the event weight corresponding to the event is small, specifically 0.2; the event information of road congestion data sample C is that a chain rear-end traffic accident occurred on section D, 3 kilometers away from the traffic flow. The event processing time of this event is long, so the event weight corresponding to the event is large, specifically 0.8. Therefore, under the same other conditions, the road congestion prediction result of road congestion data sample C has a higher congestion prediction level than the road congestion prediction result of road congestion data sample A. Specifically, the road congestion prediction result of road congestion data sample C is level 3 severe congestion, and the road congestion prediction result of road congestion data sample A is level 1 mild congestion.
[0112] In a specific implementation, the device iteratively trains a preset first to-be-trained model based on the road congestion data sample, the event weight of the road congestion data sample, and the congestion prediction result label of the road congestion data sample, and the method for obtaining the road congestion prediction model also includes the following steps:
[0113] The device performs predictive analysis and calculation of the data based on the road congestion data sample and the event weight of the road congestion data sample through a preset first model to be trained to obtain a predicted congestion result; performs difference calculation on the predicted congestion result and the congestion prediction result label of the road congestion data sample to obtain an error result; based on the error result, determines whether the error result meets the error standard indicated by a preset error threshold range; if the error result does not meet the error standard indicated by the preset error threshold range, returns to the step of performing predictive analysis and calculation of the data based on the road congestion data sample and the event weight of the road congestion data sample through a preset first model to be trained to obtain a predicted congestion result, and stops training until the error result meets the error standard indicated by the preset error threshold range to obtain a road congestion prediction model.
[0114] It should be noted that, first, the device performs predictive analysis and calculation of the data based on the road congestion data samples and the event weights of the road congestion data samples through a preset first model to be trained to obtain a predicted congestion result, wherein the first model to be trained is a preset initial model with the function of predicting and analyzing the road congestion data samples and outputting congestion prediction results, and the predicted congestion result is the predicted congestion result generated by the first model to be trained performing predictive analysis and calculation on the road congestion data samples and the event weights of the road congestion data samples.
[0115] It is understandable that the device then calculates the difference between the predicted congestion result and the congestion prediction result label of the road congestion data sample to obtain an error result, that is, verifies whether the result obtained by the model in training is consistent with the known result, and calculates the difference between the results to obtain an error result.
[0116] It should be noted that the device determines whether the error result meets the error standard indicated by the preset error threshold range based on the error result. Specifically, since there is an error between the result after model training and the actual result, the error result is allowed to be within the preset error threshold range, so as to further determine whether the error result meets the error standard indicated by the preset error threshold range.
[0117] It is understandable that if the error result does not meet the error standard indicated by the preset error threshold range, it means that the error of the model is too large in this training. The device returns the event weight based on the road congestion data sample and the road congestion data sample, and performs predictive analysis and calculation of the data through the preset first model to be trained to obtain the step of predicting the congestion result, that is, performing iterative training until the error result meets the error standard indicated by the preset error threshold range and then stops training to obtain the road congestion prediction model, thereby improving the accuracy of the road congestion prediction model.
[0118] In another embodiment, before the step A200 in which the device iteratively trains a preset first to-be-trained model based on the road congestion data sample and the congestion prediction result label of the road congestion data sample to obtain a road congestion prediction model, the method further includes:
[0119] Performing random dimensional information erasing processing on the multi-dimensional information under the road congestion data sample to obtain the erased road congestion data sample and the erased information, wherein the erased information refers to the erased dimensional information, and the erased road congestion data sample refers to the road congestion data sample retained after the erasure; obtaining an influence value between the erased information and the erased road congestion data sample; and determining a target weight corresponding to the erased information based on the influence value;
[0120] The step of iteratively training a preset first to-be-trained model based on the road congestion data sample and the congestion prediction result label of the road congestion data sample to obtain a road congestion prediction model comprises:
[0121] Based on the erased road congestion data samples, the target weights and the congestion prediction result labels of the road congestion data samples, the preset first model to be trained is iteratively trained to obtain a road congestion prediction model.
[0122] In a specific implementation, since it is possible that one or more dimensional information cannot be obtained or is obtained incorrectly when collecting road congestion data, in order to avoid the situation where the road congestion prediction model cannot output corresponding recognition results when one or more dimensional information is missing, the present invention proposes to perform random dimensional information erasing processing on the multi-dimensional information under the road congestion data sample during the training process of the road congestion prediction model to obtain an erased road congestion data sample, wherein the erased road congestion data sample includes part of the road congestion data of the road congestion data sample, or the erased road congestion data sample includes all of the road congestion data of the road congestion data sample.
[0123] It is understandable that there are influence values between the multi-dimensional information under the road congestion data samples, wherein the influence values can be given by technicians in this field based on experiments under specified conditions according to different road congestion scenarios or other specific requirements.
[0124] For example, multi-dimensional road congestion data includes the predicted time information of the current road, traffic flow statistics, accident information, road construction information and traffic control information. Among them, the erased information is the road construction information. The current predicted time information is 12 noon. The probability of road construction in this time period in the historical information is small, so the impact value is small, that is, the impact on the road congestion prediction is small, and the corresponding target weight is also small, such as 0.1. When predicting congestion, it is more inclined to the situation where there is no construction causing congestion.
[0125] It can be understood that the present invention proposes to perform random dimensional information erasure processing on the multi-dimensional information under the road congestion data sample, and iteratively train the preset first model to be trained with the erased road congestion data sample, the target weight and the congestion prediction result label of the road congestion data sample to obtain a road congestion prediction model, so that the trained road congestion prediction model can still output corresponding prediction results when there is no information in one or more dimensions.
[0126] Based on the above-mentioned first and second embodiments, the present invention also provides another embodiment, referring to Figure 5 , the road operation management method comprises:
[0127] Before the step of performing multimodal fusion processing based on the road operation data through a preset information fusion model to obtain road congestion data, the method includes the following steps B100-B200:
[0128] Step B100, obtaining a multi-dimensional road operation data sample and a congestion prediction result label of the multi-dimensional road operation data sample;
[0129] Step B200, based on the multi-dimensional road operation data samples and the congestion prediction result labels of the multi-dimensional road operation data samples, jointly train the preset second model to be trained and the preset first model to be trained to obtain an information fusion model and a road congestion prediction model, wherein the second model to be trained is the initial model to be trained of the information fusion model, and the first model to be trained is the initial model to be trained of the road congestion prediction model.
[0130] In the specific implementation, the present invention also proposes joint training of the information fusion model and the road congestion prediction model. The multi-dimensional road operation data samples fused by the information fusion model after the joint training are more in line with the computing and analysis environment of the road congestion prediction model, thereby further improving the prediction accuracy of the road congestion prediction model.
[0131] In a specific implementation, the device jointly trains a preset second model to be trained and a preset first model to be trained based on the multi-dimensional road operation data sample and the congestion prediction result label of the multi-dimensional road operation data sample to obtain an information fusion model and a road congestion prediction model. The method also includes the following steps:
[0132] Based on the multi-dimensional road operation data sample, multimodal fusion processing is performed through a preset second model to be trained to obtain predicted road congestion data, wherein the second model to be trained is the initial model to be trained of the information fusion model; based on the predicted road congestion data, recognition processing is performed through a preset first model to be trained to obtain a predicted congestion result, wherein the first model to be trained is the initial model to be trained of the road congestion prediction model; the predicted congestion result and the congestion prediction result label of the road congestion data sample are calculated to obtain an error result; based on the error result, it is determined whether the error result meets the error standard indicated by a preset error threshold range; if the error result does not meet the error standard indicated by the preset error threshold range, the step of performing multimodal fusion processing based on the multi-dimensional road operation data sample through the preset second model to be trained to obtain predicted road congestion data is returned, and the training is stopped until the error result meets the error standard indicated by the preset error threshold range, so as to obtain the information fusion model and road congestion prediction model after joint training.
[0133] The present invention also provides a road operation management device, referring to Figure 6 , the road operation management device comprises:
[0134] An acquisition module 10 is used to acquire road operation data;
[0135] A determination module 20, configured to determine a congestion prediction result of a current road based on the road operation data;
[0136] The execution module 30 is used to determine the operation management plan corresponding to the congestion prediction result and execute the operation management plan.
[0137] Optionally, the determining module 20 includes:
[0138] A fusion module, configured to perform multimodal fusion processing based on the road operation data through a preset information fusion model to obtain road congestion data, wherein the road operation data is multi-dimensional data information about the currently monitored road;
[0139] The prediction module is used to perform predictive analysis and calculation of the data based on the road congestion data through a preset road congestion prediction model to obtain a congestion prediction result of the current road, wherein the road congestion prediction model is obtained by iteratively training a preset first model to be trained based on road congestion data samples and congestion prediction result labels of the road congestion data samples.
[0140] Optionally, the road operation management device further includes:
[0141] A first sample acquisition module, used to acquire a road congestion data sample and a congestion prediction result label of the road congestion data sample;
[0142] The training module is used to iteratively train a preset first model to be trained based on the road congestion data samples and the congestion prediction result labels of the road congestion data samples to obtain a road congestion prediction model.
[0143] Optionally, the training module includes:
[0144] An event information acquisition module, used to acquire event information of the road congestion data sample;
[0145] An event weight determination module, used to determine the event weight of the road congestion data sample based on the event information, wherein the event weight refers to the weight of the event processing time, and the event processing time refers to the time from the occurrence of the event to the completion of the event processing;
[0146] The model training module is used to iteratively train a preset first model to be trained based on the road congestion data samples, the event weights of the road congestion data samples and the congestion prediction result labels of the road congestion data samples to obtain a road congestion prediction model.
[0147] Optionally, the model training module includes:
[0148] A first prediction module is used to perform prediction analysis and calculation of data based on the road congestion data sample and the event weight of the road congestion data sample through a preset first to-be-trained model to obtain a predicted congestion result;
[0149] A first difference calculation module, used for performing difference calculation between the predicted congestion result and the congestion prediction result label of the road congestion data sample to obtain an error result;
[0150] A first judgment module, configured to judge, based on the error result, whether the error result satisfies an error standard indicated by a preset error threshold range;
[0151] The first iterative training module is used to return the road congestion data sample and the event weight based on the road congestion data sample if the error result does not meet the error standard indicated by the preset error threshold range, and perform predictive analysis and calculation of the data through a preset first model to be trained to obtain a predicted congestion result. The training is stopped until the error result meets the error standard indicated by the preset error threshold range to obtain a road congestion prediction model.
[0152] Optionally, the road operation management device further includes:
[0153] A second sample acquisition module, used to acquire multi-dimensional road operation data samples and congestion prediction result labels of the multi-dimensional road operation data samples;
[0154] A joint training module is used to jointly train a preset second model to be trained and a preset first model to be trained based on the multi-dimensional road operation data samples and the congestion prediction result labels of the multi-dimensional road operation data samples to obtain an information fusion model and a road congestion prediction model, wherein the second model to be trained is an initial model to be trained of the information fusion model, and the first model to be trained is an initial model to be trained of the road congestion prediction model.
[0155] Optionally, the joint training module includes:
[0156] A multimodal fusion module, configured to perform multimodal fusion processing based on the multi-dimensional road operation data sample through a preset second model to be trained to obtain predicted road congestion data, wherein the second model to be trained is an initial model to be trained of the information fusion model;
[0157] A second prediction module, based on the predicted road congestion data, performs prediction analysis and calculation of the data through a preset first to-be-trained model to obtain a predicted congestion result, wherein the first to-be-trained model is an initial to-be-trained model of the road congestion prediction model;
[0158] A second difference calculation module is used to perform difference calculation between the predicted congestion result and the congestion prediction result label of the road congestion data sample to obtain an error result;
[0159] A second judgment module, configured to judge, based on the error result, whether the error result satisfies an error standard indicated by a preset error threshold range;
[0160] The second iterative training module is used to return to the multi-dimensional road operation data sample and perform multimodal fusion processing through a preset second model to be trained to obtain predicted road congestion data if the error result does not meet the error standard indicated by the preset error threshold range, and stop training until the error result meets the error standard indicated by the preset error threshold range, so as to obtain the information fusion model and road congestion prediction model after joint training.
[0161] Optionally, the acquisition module 10 includes:
[0162] A collection module, used for collecting road information;
[0163] The fusion analysis module is used to fuse and analyze the road information to obtain road operation data, and display the road operation data to the user's mobile terminal so that the user can manage the road based on the road operation data.
[0164] The specific implementation of the road operation management device of the present invention is basically the same as the various embodiments of the above-mentioned road operation management method, and will not be repeated here.
[0165] Reference Figure 7 , Figure 7 It is a schematic diagram of the terminal structure of the hardware operating environment involved in the embodiment of the present invention.
[0166] like Figure 7 As shown, the terminal may include: a processor 1001, such as a CPU, a network interface 1004, a user interface 1003, a memory 1005, and a communication bus 1002. Among them, the communication bus 1002 is used to realize the connection and communication between these components. The user interface 1003 may include a display screen (Display), an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a WI-FI interface). The memory 1005 may be a high-speed RAM memory, or a stable memory (non-volatile memory), such as a disk memory. The memory 1005 may also be a storage device independent of the aforementioned processor 1001.
[0167] Optionally, the road operation management device may also include a rectangular user interface, a network interface, a camera, an RF (Radio Frequency) circuit, a sensor, an audio circuit, a WiFi module, etc. The rectangular user interface may include a display screen (Display), an input submodule such as a keyboard (Keyboard), and the optional rectangular user interface may also include a standard wired interface and a wireless interface. The network interface may optionally include a standard wired interface and a wireless interface (such as a WI-FI interface).
[0168] Those skilled in the art will understand that Figure 6 The road operation management equipment structure shown in the figure does not constitute a limitation of the road operation management equipment, and may include more or less components than shown in the figure, or combine certain components, or arrange the components differently.
[0169] like Figure 7 As shown, the memory 1005 as a storage medium may include an operating system, a network communication module and a road operation management program. The operating system is a program that manages and controls the hardware and software resources of the road operation management equipment, and supports the operation of the road operation management program and other software and / or programs. The network communication module is used to realize the communication between the components inside the memory 1005, and the communication with other hardware and software in the road operation management system.
[0170] exist Figure 7 In the road operation management device shown, the processor 1001 is used to execute the road operation management program stored in the memory 1005 to implement the steps of any of the road operation management methods described above.
[0171] The specific implementation of the road operation management equipment of the present invention is basically the same as the various embodiments of the above-mentioned road operation management method, and will not be repeated here.
[0172] The present invention also provides a storage medium, on which is stored a program for implementing the road operation management method, and the program for implementing the road operation management method is executed by a processor to implement the road operation management method as described below:
[0173] Obtain road operation data;
[0174] Determining a congestion prediction result of a current road based on the road operation data;
[0175] Determine an operation management plan corresponding to the congestion prediction result, and execute the operation management plan.
[0176] Optionally, the step of determining a congestion prediction result of a current road based on the road operation data includes:
[0177] Based on the road operation data, a multimodal fusion process is performed through a preset information fusion model to obtain road congestion data, wherein the road operation data is multi-dimensional data information about the currently monitored road;
[0178] Based on the road congestion data, a preset road congestion prediction model is used to perform predictive analysis and calculation on the data to obtain a congestion prediction result of the current road, wherein the road congestion prediction model is obtained by iteratively training a preset first model to be trained based on road congestion data samples and congestion prediction result labels of the road congestion data samples.
[0179] Optionally, before the step of performing a prediction analysis and calculation of the data based on the road congestion data by a preset road congestion prediction model to obtain a congestion prediction result of the current road, the method includes:
[0180] Obtaining a road congestion data sample and a congestion prediction result label of the road congestion data sample;
[0181] Based on the road congestion data samples and the congestion prediction result labels of the road congestion data samples, the preset first model to be trained is iteratively trained to obtain a road congestion prediction model.
[0182] Optionally, the step of iteratively training a preset first to-be-trained model based on the road congestion data sample and the congestion prediction result label of the road congestion data sample to obtain a road congestion prediction model includes:
[0183] Acquiring event information of the road congestion data sample;
[0184] Based on the event information, determining the event weight of the road congestion data sample, wherein the event weight refers to the weight of the event processing time, and the event processing time refers to the time from the occurrence of the event to the completion of the event processing;
[0185] Based on the road congestion data samples, the event weights of the road congestion data samples and the congestion prediction result labels of the road congestion data samples, the preset first model to be trained is iteratively trained to obtain a road congestion prediction model.
[0186] Optionally, the step of iteratively training a preset first to-be-trained model based on the road congestion data samples, the event weights of the road congestion data samples, and the congestion prediction result labels of the road congestion data samples to obtain a road congestion prediction model includes:
[0187] Based on the road congestion data samples and the event weights of the road congestion data samples, a prediction analysis calculation of the data is performed through a preset first to-be-trained model to obtain a predicted congestion result;
[0188] Calculate the difference between the predicted congestion result and the congestion prediction result label of the road congestion data sample to obtain an error result;
[0189] Based on the error result, determining whether the error result meets an error standard indicated by a preset error threshold range;
[0190] If the error result does not meet the error standard indicated by the preset error threshold range, return the road congestion data sample and the event weight of the road congestion data sample, perform predictive analysis and calculation on the data through the preset first model to be trained, and obtain the step of predicting congestion results, until the error result meets the error standard indicated by the preset error threshold range, stop training, and obtain a road congestion prediction model.
[0191] Optionally, before the step of performing multimodal fusion processing based on the road operation data through a preset information fusion model to obtain road congestion data, the method includes:
[0192] Obtaining a multi-dimensional road operation data sample and a congestion prediction result label of the multi-dimensional road operation data sample;
[0193] Based on the multi-dimensional road operation data samples and the congestion prediction result labels of the multi-dimensional road operation data samples, a preset second model to be trained and a preset first model to be trained are jointly trained to obtain an information fusion model and a road congestion prediction model, wherein the second model to be trained is the initial model to be trained of the information fusion model, and the first model to be trained is the initial model to be trained of the road congestion prediction model.
[0194] Optionally, the step of jointly training a preset second model to be trained and a preset first model to be trained based on the multi-dimensional road operation data samples and the congestion prediction result labels of the multi-dimensional road operation data samples to obtain an information fusion model and a road congestion prediction model includes:
[0195] Based on the multi-dimensional road operation data samples, multimodal fusion processing is performed through a preset second model to be trained to obtain predicted road congestion data, wherein the second model to be trained is an initial model to be trained of the information fusion model;
[0196] Based on the predicted road congestion data, a prediction analysis and calculation of the data is performed through a preset first model to be trained to obtain a predicted congestion result, wherein the first model to be trained is an initial model to be trained of the road congestion prediction model;
[0197] Calculate the difference between the predicted congestion result and the congestion prediction result label of the road congestion data sample to obtain an error result;
[0198] Based on the error result, determining whether the error result meets an error standard indicated by a preset error threshold range;
[0199] If the error result does not meet the error standard indicated by the preset error threshold range, return to the step of performing multimodal fusion processing based on the multi-dimensional road operation data sample through a preset second model to be trained to obtain predicted road congestion data, and stop training until the error result meets the error standard indicated by the preset error threshold range to obtain a jointly trained information fusion model and a road congestion prediction model.
[0200] Optionally, the step of acquiring road operation data includes:
[0201] Collect road information;
[0202] The road information is integrated and analyzed to obtain road operation data, and the road operation data is displayed to a user's mobile terminal so that the user can perform road management based on the road operation data.
[0203] The specific implementation of the storage medium of the present invention is basically the same as the various embodiments of the above-mentioned road operation management method, and will not be repeated here.
[0204] The present invention also provides a computer program product, including a computer program, which implements the steps of the above-mentioned road operation management method when executed by a processor.
[0205] The specific implementation of the computer program product of the present invention is basically the same as the various embodiments of the above-mentioned road operation management method, and will not be repeated here.
[0206] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0207] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0208] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk) as described above, and includes a number of instructions for a terminal device (which can be a mobile phone, computer, server, air conditioner, or network device, etc.) to execute the methods described in each embodiment of the present invention.
[0209] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A road operation management method, characterized in that: The road operation management method comprises: Obtaining a road congestion data sample and a congestion prediction result label of the road congestion data sample; Based on the road congestion data samples and the congestion prediction result labels of the road congestion data samples, iteratively training a preset first to-be-trained model to obtain a road congestion prediction model; The step of iteratively training a preset first to-be-trained model based on the road congestion data sample and the congestion prediction result label of the road congestion data sample to obtain a road congestion prediction model includes: Acquiring event information of the road congestion data sample; Based on the event information, determine the event weight of the road congestion data sample, wherein the event weight refers to the weight of the event processing time, the event processing time refers to the time from the occurrence of the event to the completion of the event processing, and the event information refers to the relevant information of the event monitored in the road congestion data sample; Based on the road congestion data samples, the event weights of the road congestion data samples, and the congestion prediction result labels of the road congestion data samples, iteratively training a preset first to-be-trained model to obtain a road congestion prediction model; Obtain road operation data; Determining a congestion prediction result of a current road based on the road operation data; The step of determining the congestion prediction result of the current road based on the road operation data includes: Based on the road operation data, a multimodal fusion process is performed through a preset information fusion model to obtain road congestion data, wherein the road operation data is multi-dimensional data information about the currently monitored road; Based on the road congestion data, a prediction analysis and calculation of the data is performed through a preset road congestion prediction model to obtain a congestion prediction result of the current road, wherein the road congestion prediction model is obtained by iteratively training a preset first to-be-trained model based on a road congestion data sample and a congestion prediction result label of the road congestion data sample; Determine an operation management plan corresponding to the congestion prediction result, and execute the operation management plan.
2. The road operation management method according to claim 1, characterized in that: The step of iteratively training a preset first to-be-trained model based on the road congestion data samples, the event weights of the road congestion data samples, and the congestion prediction result labels of the road congestion data samples to obtain a road congestion prediction model comprises: Based on the road congestion data samples and the event weights of the road congestion data samples, a prediction analysis calculation of the data is performed through a preset first to-be-trained model to obtain a predicted congestion result; Calculate the difference between the predicted congestion result and the congestion prediction result label of the road congestion data sample to obtain an error result; Based on the error result, determining whether the error result meets an error standard indicated by a preset error threshold range; If the error result does not meet the error standard indicated by the preset error threshold range, return the road congestion data sample and the event weight of the road congestion data sample, perform predictive analysis and calculation on the data through the preset first model to be trained, and obtain the step of predicting congestion results, until the error result meets the error standard indicated by the preset error threshold range, stop training, and obtain a road congestion prediction model.
3. The road operation management method according to claim 1, characterized in that: Before the step of performing multimodal fusion processing based on the road operation data through a preset information fusion model to obtain road congestion data, the method includes: Obtaining a multi-dimensional road operation data sample and a congestion prediction result label of the multi-dimensional road operation data sample; Based on the multi-dimensional road operation data samples and the congestion prediction result labels of the multi-dimensional road operation data samples, a preset second model to be trained and a preset first model to be trained are jointly trained to obtain an information fusion model and a road congestion prediction model, wherein the second model to be trained is the initial model to be trained of the information fusion model, and the first model to be trained is the initial model to be trained of the road congestion prediction model.
4. The road operation management method according to claim 1, characterized in that: The step of obtaining road operation data includes: Collect road information; The road information is integrated and analyzed to obtain road operation data, and the road operation data is displayed to a user's mobile terminal so that the user can perform road management based on the road operation data.
5. A road operation management device, characterized in that: The road operation management device comprises: A first sample acquisition module, used to acquire a road congestion data sample and a congestion prediction result label of the road congestion data sample; A training module, configured to iteratively train a preset first to-be-trained model based on the road congestion data samples and the congestion prediction result labels of the road congestion data samples to obtain a road congestion prediction model; The training module comprises: An event information acquisition module, used to acquire event information of the road congestion data sample; An event weight determination module, configured to determine the event weight of the road congestion data sample based on the event information, wherein the event weight refers to the weight of the event processing time, the event processing time refers to the time from the occurrence of the event to the completion of the event processing, and the event information refers to the relevant information of the event monitored in the road congestion data sample; A model training module, configured to iteratively train a preset first to-be-trained model based on the road congestion data samples, event weights of the road congestion data samples, and congestion prediction result labels of the road congestion data samples to obtain a road congestion prediction model; An acquisition module, used to acquire road operation data; A determination module, used to determine a congestion prediction result of a current road based on the road operation data; The determining module comprises: A fusion module, configured to perform multimodal fusion processing based on the road operation data through a preset information fusion model to obtain road congestion data, wherein the road operation data is multi-dimensional data information about the currently monitored road; A prediction module, configured to perform prediction analysis and calculation of the data based on the road congestion data by using a preset road congestion prediction model to obtain a congestion prediction result of the current road, wherein the road congestion prediction model is obtained by iteratively training a preset first to-be-trained model based on a road congestion data sample and a congestion prediction result label of the road congestion data sample; An execution module is used to determine an operation management plan corresponding to the congestion prediction result and execute the operation management plan.
6. A road operation management device, characterized in that: The road operation management device includes: a memory, a processor, and a program stored in the memory for implementing the road operation management method. The memory is used to store a program for implementing the road operation management method; The processor is used to execute a program for implementing the road operation management method to implement the steps of the road operation management method according to any one of claims 1 to 4.
7. A storage medium, characterized in that: The storage medium stores a program for implementing the road operation management method, and the program for implementing the road operation management method is executed by a processor to implement the steps of the road operation management method according to any one of claims 1 to 4.
Citation Information
Patent Citations
Prediction method and visualization method of traffic jam
CN104157139A
Method and system for predicting road congestion state
CN115457766A
Expressway traffic flow prediction method based on ETC portal frame data
CN116504076A
Smart city data analysis method and system based on data distribution value
CN116935654A
Traffic jam prediction system and traffic jam prediction method
JP2004272408A
