Equipment management system for ultra-high altitude photovoltaic demonstration base based on KKS coding

Through the equipment management system based on KKS coding, the problems of difficult equipment management and complex material management of ultra-high-altitude photovoltaic power stations are solved, and the full life cycle content management and digitalization level of equipment management are realized.

CN117974058BActive Publication Date: 2024-10-18POWERCHINA BEIJING ENG CORP +1
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202410151365.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-02
Publication Date
2024-10-18
Estimated Expiration
2044-02-02

AI Technical Summary

Technical Problem

Ultra-high-altitude photovoltaic power station equipment management is difficult. Traditional equipment and material management information is complex, diverse, and frequently transferred, which affects the construction progress.

Method used

Adopt an equipment management system based on KKS coding, including basic information management module, digital twin 3D engine, equipment procurement planning module, procurement management module, equipment management module, data communication middle platform module and mobile terminal to realize equipment coding management and BIM model creation With rendering, procurement plan management, equipment acceptance and warehouse management, data integration and push.

Benefits of technology

It realizes full life cycle content management of equipment management, improves the efficiency of on-site equipment installation, reduces unnecessary equipment transfer, and improves equipment management efficiency and digitalization level.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117974058B_ABST
    Figure CN117974058B_ABST
Patent Text Reader

Abstract

The present invention provides an equipment management system for an ultra-high altitude photovoltaic demonstration base based on KKS coding, comprising: a basic information management module, a digital twin 3D engine, an equipment procurement plan module, a procurement management module, an equipment management module, a data communication middle platform module and a mobile terminal. The equipment management system for an ultra-high altitude photovoltaic demonstration base based on KKS coding provided by the present invention seamlessly integrates the refined BIM model of engineering equipment with equipment production scheduling data, procurement data, logistics data, warehousing and inventory data, and realizes the visual display of engineering equipment, and realizes the content management of the entire life cycle from equipment procurement to installation, effectively improving the efficiency of equipment management on the engineering site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of equipment management, and in particular relates to an equipment management system of an ultra-high altitude photovoltaic demonstration base based on KKS coding. Background Art

[0002] Photovoltaic power stations are usually located in sparsely populated areas such as the Gobi Desert, mountains, and grasslands. The environment is relatively harsh and precision instruments frequently fail. Ultra-high-altitude photovoltaic power stations are also characterized by high altitudes and difficult transportation, which makes equipment management more difficult. In addition, there are a large number of photovoltaic equipment and their volume is huge. Traditionally, equipment and materials during the construction period are often managed by manual statistics. The phenomenon of equipment suppliers being out of touch with on-site construction often occurs. At the same time, the information and data of equipment and material management are complex, of many types, and frequently circulated, resulting in a huge workload for engineering equipment management, which has a great impact on the progress of engineering construction. Summary of the invention

[0003] In view of the defects of the prior art, the present invention provides an equipment management system for an ultra-high altitude photovoltaic demonstration base based on KKS coding, which can effectively solve the above problems.

[0004] The technical solution adopted by the present invention is as follows:

[0005] The present invention provides an equipment management system for an ultra-high altitude photovoltaic demonstration base based on KKS coding, comprising: a basic information management module, a digital twin 3D engine, an equipment procurement plan module, a procurement management module, an equipment management module, a data communication middle platform module and a mobile terminal;

[0006] The basic information management module is used to encode the equipment, building structures and locations related to the construction site according to the coding rules to generate unique corresponding equipment codes, building structure codes and location codes; then, based on the coding, the basic information of the equipment, building structures and locations is managed in layers and levels;

[0007] The digital twin 3D engine is linked with the basic information management module to create a BIM model of the construction site, and according to the update operation of the basic information management module on the equipment and building structures, the BIM model is updated accordingly to obtain the latest BIM model; at the same time, the BIM model is driven and rendered to obtain a visualization scene of the construction site;

[0008] The equipment procurement plan module is used to generate an equipment entry plan and an equipment production scheduling plan, and publish them to the basic information management module and the procurement management module, and monitor whether the procurement management module completes the equipment entry plan before the monitoring deadline. If not, an alarm message is sent to the mobile terminal;

[0009] The procurement management module is used to formulate a list of contract equipment to be purchased upon receiving the equipment entry plan issued by the equipment procurement plan module, and search the basic information management module according to the contract equipment list to obtain suppliers corresponding to the equipment to be purchased, thereby generating an order list for placing orders with the supplier; then, according to the order list, query and monitor the logistics, and when the equipment is purchased, send the basic information of the purchased equipment to the equipment management module;

[0010] The equipment management module is used to generate an equipment acceptance form when receiving the basic information of the purchased equipment sent by the procurement management module; and verify whether the equipment acceptance form is qualified. If qualified, generate an equipment report of the purchased equipment, send the equipment report to the basic information management module, and the basic information management module manages and stores the equipment information according to the equipment report;

[0011] The data communication middle platform module is used to summarize, integrate and clean the data exchanged between the basic information management module, the equipment procurement plan module, the procurement management module and the equipment management module, and format the data into standard data with a standardized format for calling by other modules;

[0012] The mobile terminal is respectively connected to the basic information management module, the equipment procurement plan module, the procurement management module, the equipment management module and the data communication middle platform module to perform data entry, data display, information query and message push operations.

[0013] Preferably, the basic information management module is specifically used for:

[0014] Step A1, hierarchically divide the equipment, building structures and locations related to the construction site according to the KKS coding rules to obtain a construction site architecture diagram;

[0015] Step A2, each node in the engineering construction site architecture diagram is associated with basic information of corresponding equipment, building structure or location; wherein the equipment basic information, building structure basic information and location basic information are respectively converted into standard data for unified management, with data batch import and editing functions; wherein the equipment basic information includes equipment type, equipment location identification, equipment installation point identification and equipment process identification;

[0016] Step A3, using a coding method to encode the equipment, building structure or location, and managing the basic information of the equipment, building structure and location in layers and levels based on the coding;

[0017] The encoding method is:

[0018] Step A3.1, digitally encode the equipment location identification, equipment installation point identification, equipment process identification and their associated classification codes;

[0019] Step A3.2, analyzing each device in the engineering construction site architecture diagram, summarizing all device types as a whole, and encoding each device type to obtain a device type code;

[0020] Step A3.3, summarize all supplier information in the project according to the bidding section, and code each supplier to obtain the supplier code;

[0021] Step A3.4, summarize all warehouse information and warehouse locations according to the section to which they belong, and use GIS map technology to mark the specific location of each warehouse, and encode the warehouse to obtain the warehouse code to uniformly manage equipment storage.

[0022] Preferably, the digital twin 3D engine is specifically used for:

[0023] Step B1, create a BIM model of the construction site, and divide the BIM model into seven levels from the outer layer to the inner layer according to the data source, model characteristics and scene refinement, combined with the KKS coding characteristics, namely: level 1 building BIM model, level 2 partition BIM model, level 3 installation point BIM model, level 4 installation space BIM model, level 5 system BIM model, level 6 equipment BIM model and level 7 component BIM model; wherein: each level of the BIM model is a multi-level pyramid structure;

[0024] Step B2, collecting original spatial scene data K1 according to the construction site information and equipment distribution range, wherein the original spatial scene data K1 includes a digital elevation model DEM, a digital surface model DSM and a digital orthophoto DOM; setting the pyramid level to n;

[0025] According to the original spatial scene data K1 and the set pyramid level n, the digital twin 3D engine multi-level shell extraction algorithm and cross-section filling algorithm are used to construct a multi-level pyramid structure of the spatial scene for the original spatial scene data K1, and n-1 levels of spatial scene data are generated, which are respectively: the second-level spatial scene data K2, the third-level spatial scene data K3, ..., the n-th-level spatial scene data Kn in the direction from small to large in area. Therefore, the obtained n-level pyramid structure of the spatial scene is: the original spatial scene data K1, the second-level spatial scene data K2, the third-level spatial scene data K3, ..., the n-th-level spatial scene data Kn;

[0026] Step B3, according to the generated n-level pyramid structure of the spatial scene, the BIM models of the corresponding levels are integrated according to the level correspondence, and merged into a BIM model file corresponding to each level, and the X and Y coordinates of each BIM model are recorded at the same time;

[0027] Lightweight the BIM model files at each level to obtain lightweight BIM model files;

[0028] Step B4, based on the lightweight BIM model file, automatically encode each BIM model to obtain a BIM model code;

[0029] Render the shadow effects, dynamic effects, and weather effects of the BIM model to obtain a rendered BIM model;

[0030] Step B5, renders the spatial scene data of each level, and uses asynchronous loading technology to complete the data association and mounting of the rendered BIM model and the spatial scene data of each level according to the BIM model encoding, and at the same time adds model hiding, model isolation, model sectioning and first-person roaming interactive functions to the rendered BIM model.

[0031] Preferably, it also includes:

[0032] Step B6, using the digital twin 3D engine to achieve construction site visualization:

[0033] The n-level pyramid structure of the spatial scene is based on the rendered BIM model of the corresponding level, and the whole is called the BIM scene equipment model;

[0034] If the digital twin 3D engine receives an operation request to rotate the BIM scene equipment model to a specified angle and magnify it n times at the same time, the digital twin 3D engine rotates the BIM scene equipment model to the specified angle and obtains the corresponding level of spatial scene and rendered BIM model according to the instruction to magnify it n times, and displays them; at the same time, according to the collision point between the viewing angle and the BIM scene equipment model, the collision area is obtained, the shape of the collision area is painted, and the surrounding material map is filled to display a clear scene and equipment.

[0035] Preferably, the equipment procurement planning module is specifically used for:

[0036] Step C1, based on the construction progress and the basic information management module, manage the equipment production schedule, calculate the process progress and overall progress according to the process planned completion time and actual completion time, and significantly mark the progress status;

[0037] Step C2: Manage the equipment entry plan according to the construction progress, maintain the entry plan regularly, mark the plan at the time node, and automatically push reminder messages to the mobile terminal.

[0038] Preferably, the procurement management module is specifically used for:

[0039] Step D1: manage the contract equipment list in a unified manner according to the affiliated units and bidding sections, including supplier information and contract information, equipment information included in the contract and quotation, and upload the attachment information related to the contract to the system for backup storage;

[0040] Step D2: According to the project construction requirements and schedule, regularly sort out the contract equipment list and equipment entry plan, compile the equipment order list, and support information export of the order list after approval;

[0041] Step D3, the packaged equipment is distributed to various project locations according to the project installation requirements, and the equipment code and QR code are automatically generated after the distribution is completed. The equipment is transported and installed at a fixed point according to the information of the QR code;

[0042] Step D4: During on-site acceptance, quickly obtain equipment information and equipment quantity by scanning the QR code. After the equipment is installed, view the equipment supervision information, on-site time, and on-site acceptance status by scanning the QR code.

[0043] Preferably, the device management module is specifically used for:

[0044] Step E1: Perform operation inspection and preparatory tests on the incoming equipment according to the acceptance standards, fill in the acceptance record and submit it to the management personnel for review, return the unqualified equipment and arrange for the qualified equipment to be put into storage;

[0045] Step E2: Centrally manage the incoming equipment and materials, record the information of the incoming equipment and materials on the project site in detail by filling out electronic forms, automatically form records and ledgers, and display important information in a differentiated manner;

[0046] Step E3: fill in the application form according to the outbound process and conduct online approval. After approval, the outbound equipment information and quantity are recorded in real time, and the inventory data is updated;

[0047] Step E4: Carry out regular inventory of equipment and materials according to warehouse management requirements and plans, and write off the material differences found during the inventory with one click to ensure the consistency between the material account quantity and the actual quantity;

[0048] Step E5, after the entry and exit of materials and equipment and inventory verification, the ledger information is automatically generated, providing automatic statistics, summary and export report functions, and supporting the query and export of equipment historical information.

[0049] Preferably, the data communication platform module is specifically used for:

[0050] Step F1, obtaining the data generated by each module in the system, and classifying the business data into structured data and unstructured data. The structured data includes equipment name, installation location, and logistics information, and the unstructured data includes equipment technical report, test inspection report, and acceptance video;

[0051] Clean structured data, filter invalid and dirty data, verify erroneous data, and generate a standard format through data serialization services for digital business application calls and integration;

[0052] Judge the unstructured data, record the unique ID for small data, slice the large data, record the number of slices, slice ID, slice size, and finally store it according to the module and data type to which the data belongs;

[0053] Step F2, obtain the intra-station communication data in the system, classify them according to pending messages, approval messages, and alarm messages, and sort them according to the severity and occurrence time of the messages, and use PUSH technology to push them to the relevant mobile terminals for viewing and processing;

[0054] The PUSH push technology: the management system uses the TCP full-duplex communication protocol as the underlying communication protocol, and uses WebSocket monitoring to complete message push; the mobile end integrates the SDK of each device manufacturer and completes the message push according to APP_KEY+UserId;

[0055] Integrate the management system and mobile push interfaces, monitor the push content generated by the management system and mobile terminals in real time, splice the message type and content according to the message classification, call the integrated message push interface, and complete the delivery of communication data.

[0056] Preferably, the mobile terminal is specifically used for:

[0057] Integrate the main functions of the management system, cooperate with the management system to complete process approval, data collection, data display, information query, and message push operations, and provide a convenient operation terminal.

[0058] The equipment management system of the ultra-high altitude photovoltaic demonstration base based on KKS coding provided by the present invention has the following advantages:

[0059] The equipment management system of the ultra-high altitude photovoltaic demonstration base based on KKS coding provided by the present invention seamlessly integrates the refined BIM model of engineering equipment with equipment production scheduling data, procurement data, logistics data, warehousing and inventory data, etc., while realizing the visual display of engineering equipment, realizing content management of the entire life cycle from equipment procurement to installation, and effectively improving the efficiency of equipment management on the engineering site. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] Figure 1 This is a schematic diagram of the structure of the equipment management system of the ultra-high altitude photovoltaic demonstration base based on KKS coding provided by the present invention. DETAILED DESCRIPTION

[0061] In order to make the technical problems, technical solutions and beneficial effects solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0062] The equipment management system of the ultra-high altitude photovoltaic demonstration base based on KKS coding provided by the present invention solves the problems of untimely material demand planning, complicated equipment entry and exit procedures, and delayed inventory behavior in engineering projects by establishing a complete management system for equipment information. In addition, the equipment code is implicitly included in the QR code in combination with the mobile APP, and a directional association between manufacturer information, transportation status, equipment information, and installation location is established, thereby improving equipment installation efficiency, reducing unnecessary equipment transportation, and realizing content management of the entire life cycle from equipment procurement to installation.

[0063] The present invention provides an equipment management system for an ultra-high altitude photovoltaic demonstration base based on KKS coding, referring to Figure 1 , including basic information management module, digital twin 3D engine, equipment procurement plan module, procurement management module, equipment management module, data communication middle platform module and mobile terminal.

[0064] The basic information management module provides a supporting environment for the entire equipment management system. Other digital applications in the system are integrated and extended on this platform to achieve centralized and unified management of engineering equipment data.

[0065] Digital twin 3D engine, BIM modeling, based on prerequisites such as the distribution and installation location of engineering equipment, through intelligent algorithms, seamlessly integrates the refined BIM model of engineering equipment with equipment scheduling data, procurement data, logistics data, warehousing and inventory data, and realizes the visualization of engineering equipment at the same time; the digital twin 3D engine integrates the new generation of GIS+BIM / 3D technology based on WebGL, and uses multi-level shell extraction algorithm and section filling algorithm to automatically construct a multi-level pyramid structure of large-volume BIM models, realizing intelligent dynamic BIM model download, dynamic content management, dynamic rendering and fast lightweighting of large-volume GIS / BIM / 3D models;

[0066] The data communication platform has the ability to uniformly calculate, store and push information for heterogeneous data, allowing scattered and chaotic data to be centrally managed in a standardized manner, breaking through business data barriers, linking data islands, and completing asset integration of engineering equipment data;

[0067] Based on the characteristics of engineering equipment management, the digital business management platform completes the research and development of functional modules such as logistics management and KKS coding association, and realizes the refined management of engineering equipment data; the mobile terminal supplements the functions of the PC system to improve the convenience of equipment management, and at the same time realizes functions such as business data reporting, process approval, PUSH push and information query, thereby improving the efficiency of engineering equipment management.

[0068] The research and development of the system has improved the efficiency of equipment installation at the project site, reduced unnecessary equipment transfer, and realized content management of the equipment throughout its life cycle from preliminary planning to installation completion. It has also promoted the digital development of digital twin technology in the engineering industry and provided an innovative driving force for improving the equipment management level of the ultra-high altitude photovoltaic demonstration base.

[0069] The following is a detailed introduction to each module:

[0070] (I) Basic information management module

[0071] The basic information management module is used to encode the equipment, building structures and locations related to the construction site according to the coding rules to generate unique corresponding equipment codes, building structure codes and location codes; then, based on the coding, the basic information of the equipment, building structures and locations is managed in layers and levels;

[0072] The basic information management module is specifically used for:

[0073] Step A1, hierarchically divide the equipment, building structures and locations related to the construction site according to the KKS coding rules to obtain a construction site architecture diagram;

[0074] Step A2, each node in the engineering construction site architecture diagram is associated with basic information of corresponding equipment, building structure or location; in the present invention, the basic information of equipment, basic information of building structure and basic information of location are respectively converted into standard data for unified management, and have the function of batch import and editing of data; wherein, the basic information of equipment includes equipment type, equipment location identification, equipment installation point identification and equipment process identification;

[0075] Step A3, using a coding method to encode the equipment, building structure or location, and managing the basic information of the equipment, building structure and location in layers and levels based on the coding;

[0076] The encoding method is:

[0077] Step A3.1, digitally encode the equipment location identification, equipment installation point identification, equipment process identification and their associated classification codes;

[0078] Step A3.2, analyzing each device in the engineering construction site architecture diagram, summarizing all device types as a whole, and encoding each device type to obtain a device type code;

[0079] Step A3.3, summarize all supplier information in the project according to the bidding section, and code each supplier to obtain the supplier code;

[0080] Step A3.4, summarize all warehouse information and warehouse locations according to the section to which they belong, and use GIS map technology to mark the specific location of each warehouse, and encode the warehouse to obtain the warehouse code to uniformly manage equipment storage.

[0081] 2. Digital Twin 3D Engine

[0082] The digital twin 3D engine is linked with the basic information management module to create a BIM model of the construction site, and according to the update operation of the basic information management module on the equipment and building structures, the BIM model is updated accordingly to obtain the latest BIM model; at the same time, the BIM model is driven and rendered to obtain a visualization scene of the construction site;

[0083] The digital twin 3D engine is specifically used for:

[0084] Step B1, create a BIM model of the construction site, and divide the BIM model into seven levels from the outer layer to the inner layer according to the data source, model characteristics and scene refinement, combined with the KKS coding characteristics, namely: level 1 building BIM model, level 2 partition BIM model, level 3 installation point BIM model, level 4 installation space BIM model, level 5 system BIM model, level 6 equipment BIM model and level 7 component BIM model; wherein: each level of the BIM model is a multi-level pyramid structure;

[0085] Step B2, collecting original spatial scene data K1 according to the construction site information and equipment distribution range, wherein the original spatial scene data K1 includes a digital elevation model DEM, a digital surface model DSM and a digital orthophoto DOM; setting the pyramid level to n;

[0086] According to the original spatial scene data K1 and the set pyramid level n, the digital twin 3D engine multi-level shell extraction algorithm and cross-section filling algorithm are used to construct a multi-level pyramid structure of the spatial scene for the original spatial scene data K1, and n-1 levels of spatial scene data are generated, which are respectively: the second-level spatial scene data K2, the third-level spatial scene data K3, ..., the n-th-level spatial scene data Kn in the direction from small to large in area. Therefore, the obtained n-level pyramid structure of the spatial scene is: the original spatial scene data K1, the second-level spatial scene data K2, the third-level spatial scene data K3, ..., the n-th-level spatial scene data Kn;

[0087] Step B3, according to the generated n-level pyramid structure of the spatial scene, the BIM models of the corresponding levels are integrated according to the level correspondence, and merged into a BIM model file corresponding to each level, and the X and Y coordinates of each BIM model are recorded at the same time;

[0088] Lightweight the BIM model files at each level to obtain lightweight BIM model files;

[0089] Step B4, based on the lightweight BIM model file, automatically encode each BIM model to obtain a BIM model code;

[0090] Render the shadow effects, dynamic effects, and weather effects of the BIM model to obtain a rendered BIM model;

[0091] Step B5, renders the spatial scene data of each level, and uses asynchronous loading technology to complete the data association and mounting of the rendered BIM model and the spatial scene data of each level according to the BIM model encoding, and at the same time adds model hiding, model isolation, model sectioning and first-person roaming interactive functions to the rendered BIM model.

[0092] Also includes:

[0093] Step B6, using the digital twin 3D engine to achieve construction site visualization:

[0094] The n-level pyramid structure of the spatial scene is based on the rendered BIM model of the corresponding level, and the whole is called the BIM scene equipment model;

[0095] If the digital twin 3D engine receives an operation request to rotate the BIM scene equipment model to a specified angle and magnify it n times at the same time, the digital twin 3D engine rotates the BIM scene equipment model to the specified angle and obtains the corresponding level of spatial scene and rendered BIM model according to the instruction to magnify it n times, and displays them; at the same time, according to the collision point between the viewing angle and the BIM scene equipment model, the collision area is obtained, the shape of the collision area is painted, and the surrounding material map is filled to display a clear scene and equipment.

[0096] The design innovations of this step are:

[0097] 1. According to the actual situation of the project and the distribution and coding of the on-site equipment, the present invention creates a special BIM model, which contains a large number of sub-models, large scenes, and disordered arrangements. To facilitate the use of the project, the model is divided from large to small into 1-level building model, 2-level partition model, 3-level installation point model, 4-level installation space model, 5-level system model, 6-level equipment model, and 7-level component model;

[0098] 2. By summarizing various basic data of the project site, a BIM model created with basic data (such as parameters such as length, width and height) is set as the original model K1;

[0099] 3. Since the model will lose precision when it is enlarged or reduced, a series of problems such as deformation and blurring will occur;

[0100] In addition, when the user views the model at a certain angle, zooming in and out of the model will produce a black block scene that blocks the view;

[0101] In the present invention, the collision point between the viewing angle and the model is determined through the algorithm at the bottom of the engine, the black block area is dynamically calculated, and the shape is drawn and the surrounding material is filled to ensure that there is no black block area when viewing, thereby improving the user-friendliness of viewing;

[0102] In the present invention, when the user needs to view multiple year-on-year magnification scenes of the model at the same time, the magnification benchmark (L) and the specific number (n) can be set. The system automatically generates multiple models, K2, K3, Kn, etc. based on the original model K1 combined with the algorithm; the formula is K2 = K1*L*1, K3 = K1*L1*2...; Kn = K1*L1*n, n is the number of models to be generated;

[0103] If L is a positive number, the generated model K2 is larger than the original K1 model, and K3 is larger than K2. If we understand it according to the pyramid, the innermost layer is K1, the next is K2, and the outermost layer is Kn.

[0104] The generated K2, K3...Kn models will have distorted textures due to the existence of enlarged pictures. Therefore, the present invention performs algorithm recognition on the enlarged texture and the original texture, and the system fills the distorted part with material after enlargement to ensure that no matter how many times it is enlarged, it can be displayed through a normal texture.

[0105] (III) Equipment procurement plan module

[0106] The equipment procurement plan module is used to generate an equipment entry plan and an equipment production scheduling plan, and publish them to the basic information management module and the procurement management module, and monitor whether the procurement management module completes the equipment entry plan before the monitoring deadline. If not, an alarm message is sent to the mobile terminal;

[0107] The equipment procurement plan module is specifically used for:

[0108] Step C1, based on the construction progress and the basic information management module, manage the equipment production schedule, calculate the process progress and overall progress according to the process planned completion time and actual completion time, and significantly mark the progress status;

[0109] Step C2: Manage the equipment entry plan according to the construction progress, maintain the entry plan regularly, mark the plan at the time node, and automatically push reminder messages to the mobile terminal.

[0110] (IV) Procurement Management Module

[0111] The procurement management module is used to formulate a list of contract equipment to be purchased upon receiving the equipment entry plan issued by the equipment procurement plan module, and search the basic information management module according to the contract equipment list to obtain suppliers corresponding to the equipment to be purchased, thereby generating an order list for placing orders with the supplier; then, according to the order list, query and monitor the logistics, and when the equipment is purchased, send the basic information of the purchased equipment to the equipment management module;

[0112] The procurement management module is specifically used for:

[0113] Step D1: manage the contract equipment list in a unified manner according to the affiliated units and bidding sections, including supplier information and contract information, equipment information included in the contract and quotation, and upload the attachment information related to the contract to the system for backup storage;

[0114] Step D2: According to the project construction requirements and schedule, regularly sort out the contract equipment list and equipment entry plan, compile the equipment order list, and support information export of the order list after approval;

[0115] Step D3, the packaged equipment is distributed to various project locations according to the project installation requirements, and the equipment code and QR code are automatically generated after the distribution is completed. The equipment is transported and installed at a fixed point according to the information of the QR code;

[0116] Step D4: During on-site acceptance, quickly obtain equipment information and equipment quantity by scanning the QR code. After the equipment is installed, view the equipment supervision information, on-site time, and on-site acceptance status by scanning the QR code.

[0117] (V) Equipment Management Module

[0118] The equipment management module is used to generate an equipment acceptance form when receiving the basic information of the purchased equipment sent by the procurement management module; and verify whether the equipment acceptance form is qualified. If qualified, generate an equipment report of the purchased equipment, send the equipment report to the basic information management module, and the basic information management module manages and stores the equipment information according to the equipment report;

[0119] The device management module is specifically used for:

[0120] Step E1: Perform operation inspection and preparatory tests on the incoming equipment according to the acceptance standards, fill in the acceptance record and submit it to the management personnel for review, return the unqualified equipment and arrange for the qualified equipment to be put into storage;

[0121] Step E2: Centrally manage the incoming equipment and materials, record the information of the incoming equipment and materials on the project site in detail by filling out electronic forms, automatically form records and ledgers, and display important information in a differentiated manner;

[0122] Step E3: fill in the application form according to the outbound process and conduct online approval. After approval, the outbound equipment information and quantity are recorded in real time, and the inventory data is updated;

[0123] Step E4: Carry out regular inventory of equipment and materials according to warehouse management requirements and plans, and write off the material differences found during the inventory with one click to ensure the consistency between the material account quantity and the actual quantity;

[0124] Step E5, after the entry and exit of materials and equipment and inventory verification, the ledger information is automatically generated, providing automatic statistics, summary and export report functions, and supporting the query and export of equipment historical information.

[0125] (VI) Data communication platform module

[0126] The data communication middle platform module is used to summarize, integrate and clean the data exchanged between the basic information management module, the equipment procurement plan module, the procurement management module and the equipment management module, and format the data into standard data with a standardized format for calling by other modules;

[0127] The data communication platform module is specifically used for:

[0128] Step F1, obtaining the data generated by each module in the system, and classifying the business data into structured data and unstructured data. The structured data includes equipment name, installation location, and logistics information, and the unstructured data includes equipment technical report, test inspection report, and acceptance video;

[0129] Clean structured data, filter invalid and dirty data, verify erroneous data, and generate a standard format through data serialization services for digital business application calls and integration;

[0130] Judge the unstructured data, record the unique ID for small data, slice the large data, record the number of slices, slice ID, slice size, and finally store it according to the module and data type to which the data belongs;

[0131] Step F2, obtain the intra-station communication data in the system, classify them according to pending messages, approval messages, and alarm messages, and sort them according to the severity and occurrence time of the messages, and use PUSH technology to push them to the relevant mobile terminals for viewing and processing;

[0132] The PUSH push technology: the management system uses the TCP full-duplex communication protocol as the underlying communication protocol, and uses WebSocket monitoring to complete message push; the mobile end integrates the SDK of each device manufacturer and completes the message push according to APP_KEY+UserId;

[0133] Integrate the management system and mobile push interfaces, monitor the push content generated by the management system and mobile terminals in real time, splice the message type and content according to the message classification, call the integrated message push interface, and complete the delivery of communication data.

[0134] (VII) Mobile

[0135] The mobile terminal is respectively connected to the basic information management module, the equipment procurement plan module, the procurement management module, the equipment management module and the data communication middle platform module to perform data entry, data display, information query and message push operations.

[0136] The mobile terminal is specifically used for:

[0137] Integrate the main functions of the management system, cooperate with the management system to complete process approval, data collection, data display, information query, and message push operations, and provide a convenient operation terminal.

[0138] An embodiment is described below:

[0139] An equipment management system based on KKS coding for ultra-high altitude photovoltaic demonstration base, including: basic information management module, digital twin 3D engine, equipment procurement plan module, procurement management module, equipment management module, data communication middle platform module and mobile terminal;

[0140] Digital twin 3D engine: used to link equipment and its space with design goals and related data, manage BIM models from a data-driven perspective, and support lightweight processing of BIM models in multiple formats, such as FBX, 3dxml, and OBJ, and output the formats supported by the engine, greatly reducing the size of model files, thereby improving the rendering speed of the model and ensuring that the scene special effects are not distorted;

[0141] The specific contents executed by the digital twin 3D engine are as follows:

[0142] A1. Based on the data source, model characteristics and scene refinement, combined with KKS coding features, the BIM model is divided into seven levels. Each level has the characteristics and capabilities of smooth rendering, realistic scenes, enhanced key elements, and the ability to achieve three-dimensional video fusion and panoramic linkage;

[0143] The seven levels of the BIM model are: level 1 building model, level 2 partition model, level 3 installation point model, level 4 installation space model, level 5 system model, level 6 equipment model, and level 7 component model;

[0144] Models at each level follow the multi-level pyramid structure of the BIM model, have high resolution and fineness, can be used by the engine for shell extraction, and are located at the last level of the pyramid structure;

[0145] A2. Collect the original data of digital elevation model (DEM), digital surface model (DSM), and digital orthophoto (DOM) according to the construction site information and equipment distribution range. The original data is set as K1, and the pyramid level is set as n to provide basic data for the digital twin 3D engine.

[0146] According to the original data K1 and the set pyramid level n, the DEM, DSM, and DOM original data are automatically constructed using the digital twin 3D engine's multi-level shell extraction algorithm and section filling algorithm to automatically construct a multi-level pyramid structure of a large-volume BIM model and generate n-1 levels of DEM, DSM, and DOM data;

[0147] Therefore, the original terrain DEM, DSM, DOM data, the second-level terrain DEM, DSM, DOM data, the third-level terrain DEM, DSM, DOM data, ..., the n-1-level terrain DEM, DSM, DOM data, the n-level terrain DEM, DSM, DOM data, and the terrain DEM, DSM, DOM data of each level correspond to each other;

[0148] A3, according to the generated DEM, DSM, and DOM data, corresponding integration is carried out according to the level, and merged into the corresponding BIM model file, and the X and Y coordinates of each model are recorded at the same time;

[0149] The terrain data (level 1 and 2 BIM models), installation point data (level 3 and 4 BIM models) and equipment data (level 5, 6 and 7 models) are lightweighted through the digital twin 3D engine, and the model files are stored based on seven levels and pyramid levels;

[0150] A4. Based on the lightweight model data, each model is automatically encoded and the uniqueness of the encoding is guaranteed. At the same time, the model's shadow effect, dynamic effect, and weather effect are processed as a whole to provide basic support for model embedding and data association.

[0151] Integrate lightweight models according to the pyramid level to enable BIM models to support multi-level loading and dynamic rendering technology of WEB pages;

[0152] A5. Render terrain data, installation point data, and equipment data as a whole, and use asynchronous loading technology to complete model data association and mounting based on the model's unique code. At the same time, add interactive functions such as model hiding, model isolation, model sectioning, and first-person roaming to the model.

[0153] Basic information management module: used to uniformly manage the process and content of equipment and material management at the project site, realize dynamic management of basic information data, reduce repetitive data entry work, and improve on-site digital management capabilities and work efficiency;

[0154] The specific contents executed by the basic information management module are as follows:

[0155] B1. According to the KKS coding specification of photovoltaic power stations, the location identification, installation point identification and process identification are extracted as standard data for unified management, the corresponding classification codes and levels are set according to the specifications, and batch import and editing of data are supported;

[0156] B2. Refer to KKS coding specifications to divide and code the power plant units and public systems, equipment or buildings (structures) in the project, and support batch import and editing of data;

[0157] B3. Manage the location information, installation point information and process identification information of the project site equipment and their associated classification codes and digital codes, and support batch association and editing of data;

[0158] B4. Analyze the equipment and material management content at the project site, summarize all equipment types at the project site, and encode each equipment type to manage them uniformly;

[0159] B5. Summarize the information of all suppliers in the project according to the bidding section, and code each supplier to manage them in a unified manner;

[0160] B6. All warehouse information and warehouse locations are summarized according to the bidding section, and the specific location of each warehouse is marked with GIS map technology to uniformly manage equipment storage.

[0161] Equipment procurement planning module: used to plan the equipment production and entry date of the project site, monitor the equipment production and entry status before the deadline, push alarm reminders for delayed entry plans, and improve the equipment and material management and control capabilities of the project construction site;

[0162] The specific contents of the equipment procurement plan module are as follows:

[0163] C1. Manage the equipment production schedule based on the construction progress. According to the planned completion time and actual completion time of the process, the system automatically calculates whether the process progress and the overall progress are normal, and significantly marks the progress status;

[0164] C2. Manage and regularly maintain the equipment entry plan according to the construction progress. The plan that reaches the time node will be specially marked, and reminder messages will be automatically pushed to the management personnel;

[0165] Procurement management module: used for overall management of equipment procurement, distribution and allocation at the project site, and generates a unique QR code for each device according to pre-defined rules, realizes information integration of equipment procurement, connects data between equipment production, supervision and installation, and effectively improves management efficiency;

[0166] The specific contents executed by the procurement management module are as follows:

[0167] D1. Manage the contract equipment list in a unified manner according to the affiliated units and bidding sections, including supplier information and contract information, equipment information included in the contract and quotation, and upload the contract-related attachments to the system for backup storage;

[0168] D2. According to the project construction requirements and progress plan, regularly sort out the contract equipment list and equipment entry plan, compile the equipment order list, and support information export of the order list after approval;

[0169] D3. Allocate the packaged equipment to various project locations according to the project installation requirements. After the allocation is completed, the equipment code and QR code are automatically generated. The equipment is transported and installed at designated locations based on the information on the QR code.

[0170] D4. During on-site acceptance, you can quickly obtain equipment information and equipment quantity by scanning the QR code. After the equipment is installed, you can view the equipment supervision information, on-site time, on-site acceptance status, etc. by scanning the QR code;

[0171] Equipment management module: used for overall management of equipment acceptance, warehousing and inventory, and real-time recording of equipment ledgers, automatic generation of equipment reports, ensuring the consistency between the material account quantity and the actual quantity, improving the efficiency and quality of material control, and improving the progress management capabilities of the project site;

[0172] The specific contents executed by the device management module are as follows:

[0173] E1. Carry out operation inspection and preparatory tests on the equipment according to the acceptance standards, fill in the acceptance records and submit them to the management personnel for review, return the unqualified equipment and arrange for the qualified equipment to be put into storage;

[0174] E2. Manage the incoming equipment and materials in a unified manner. Fill out electronic forms to record the information of the equipment and materials entering the warehouse on the project site in detail, automatically form records and ledgers, and display important information in a differentiated manner;

[0175] E3. Fill out the application form according to the outbound process and conduct online approval. After approval, record the outbound equipment information and quantity in real time and update the inventory data;

[0176] E4. Carry out regular inventory of equipment and materials according to warehouse management requirements and plans. The material differences found during the inventory can be written off with one click to ensure the consistency between the material account quantity and the actual quantity;

[0177] E5. Automatically generate ledger information after materials and equipment are in and out of the warehouse and counted and written off. It provides automatic statistics, summary and export report functions and supports the query and export of equipment historical information.

[0178] Data communication middle platform module: used to summarize, integrate and clean the exchanged data in the system, format the data into a standardized format to facilitate the call of other modules, and manage all approval messages and alarm reminders of the equipment management system as a whole, and provide quick operations to assist on-site managers to quickly grasp the on-site situation, reduce abnormal impacts, and improve work efficiency;

[0179] The specific contents executed by the data communication platform module are as follows:

[0180] F1. Obtain the data generated by each module in the system and classify the business data into structured data and unstructured data. The structured data includes equipment name, installation location, logistics information, etc. The unstructured data includes equipment technical report, test inspection report, acceptance video, etc.;

[0181] Clean structured data, filter invalid and dirty data, verify erroneous data, and generate a standard format through data serialization services for digital business application calls and integration;

[0182] Judge the unstructured data, record the unique ID for small data, slice the large data, record the number of slices, slice ID, slice size, and finally store it according to the module to which the data belongs (such as equipment storage) + data type (such as video, picture);

[0183] F2. Obtain the intra-station communication data in the system, classify them according to pending messages, approval messages, and alarm messages, and sort them according to the severity and occurrence time of the messages. At the same time, use PUSH technology to push them to relevant personnel for viewing and processing;

[0184] The PUSH push technology uses the TCP full-duplex communication protocol as the underlying communication protocol on the PC side and uses WebSocket monitoring to complete message push; the mobile side integrates the SDK of each device manufacturer and completes message push according to APP_KEY+UserId;

[0185] Integrate the push interface of PC and mobile terminals, monitor the push content generated by the client and server in real time, splice the message type and content according to the message classification, call the integrated message push interface, and complete the distribution and approval of communication data;

[0186] Mobile APP: used to link with Web data, cooperate to complete process approval, data entry, data display, information query, message push and other operations, achieve multi-terminal integration, multi-dimensional engineering digitalization, intelligent management and control goals, and improve the efficiency and convenience of engineering project management.

[0187] The specific contents executed by the mobile terminal module are as follows:

[0188] G1. Integrate the main functions of the Web, cooperate with the Web side to complete process approval, data collection, data display, information query, message push and other operations, and provide a convenient operation terminal.

[0189] By adopting the above technical solution disclosed in the present invention, the following beneficial effects are obtained:

[0190] 1. This system builds a device management system through Windows+Nginx+MySQL+PHP+Java;

[0191] 2. This system integrates GIS+BIM / 3D technology based on WebGL, and uses multi-level shell extraction algorithm and section filling algorithm to automatically construct a multi-level pyramid structure of large-volume BIM models, realizing intelligent dynamic BIM model download, dynamic content management, dynamic rendering and fast lightweighting of large-volume GIS / BIM / 3D models, greatly improving model rendering efficiency;

[0192] 3. This system uses DDoS and other protection technologies to ensure data transmission security, and uses MVC architecture + RESTful style to ensure concise code;

[0193] 4. This system uses internal messaging and PUSH push technology for approval circulation and reminders, realizing full-duplex communication between the platform system client and server, so that data can be transmitted quickly in both directions, improving the real-time and convenience of users in receiving and processing messages or tasks;

[0194] 5. This system uses multi-threading technology and establishes an intelligent algorithm to generate device QR codes, making the QR code generation efficient and ensuring the uniqueness of the code, thereby significantly reducing waiting time;

[0195] 6. This system is based on the "GB / T 35691-2017 Photovoltaic Power Plant Identification System Coding Guidelines" and combined with the actual use of the project to establish an equipment and material information system, so that the equipment and material information of the power plant can be in the best configuration from the beginning of design to operation and maintenance, laying the foundation for realizing the construction requirements of the "digital power plant";

[0196] 7. This system introduces kkFileView technology, combined with the online approval platform, simplifies the equipment in and out of the warehouse and inventory process, realizes report preview, plan reminder and form approval, and plays a significant role in the standardization and standardization of engineering equipment management;

[0197] 8. This system solves the problems of untimely material demand planning, complicated equipment warehousing and warehousing procedures, and delayed inventory activities in engineering projects, and realizes structured and standardized management of equipment. The series of results formed can provide reference value for the digital and intelligent applications of projects under construction or already built.

[0198] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be considered as the scope of protection of the present invention.

Claims

1. An equipment management system for an ultra-high altitude photovoltaic demonstration base based on KKS coding, characterized in that: include: Basic information management module, digital twin 3D engine, equipment procurement planning module, procurement management module, equipment management module, data communication middle platform module and mobile terminal; The basic information management module is used to encode the equipment, building structures and locations related to the construction site according to the coding rules to generate unique corresponding equipment codes, building structure codes and location codes; then, based on the coding, the basic information of the equipment, building structures and locations is managed in layers and levels; The basic information management module is specifically used for: Step A2, each node in the engineering construction site architecture diagram is associated with basic information of corresponding equipment, building structure or location; wherein the equipment basic information, building structure basic information and location basic information are respectively converted into standard data for unified management, with data batch import and editing functions; wherein the equipment basic information includes equipment type, equipment location identification, equipment installation point identification and equipment process identification; Step A3, using a coding method to encode the equipment, building structure or location, and managing the basic information of the equipment, building structure and location in layers and levels based on the coding; The encoding method is: Step A3.1, digitally encode the equipment location identification, equipment installation point identification, equipment process identification and their associated classification codes; Step A3.2, analyzing each device in the engineering construction site architecture diagram, summarizing all device types as a whole, and encoding each device type to obtain a device type code; Step A3.3, summarize all supplier information in the project according to the bidding section, and code each supplier to obtain the supplier code; Step A3.4, summarize all warehouse information and warehouse locations according to the bidding section, and use GIS map technology to mark the specific location of each warehouse, and encode the warehouse to obtain the warehouse code, so as to manage the equipment storage in a unified manner; The digital twin 3D engine is linked with the basic information management module to create a BIM model of the construction site, and according to the update operation of the basic information management module on the equipment and building structures, the BIM model is updated accordingly to obtain the latest BIM model; at the same time, the BIM model is driven and rendered to obtain a visualization scene of the construction site; The digital twin 3D engine is specifically used for: Step B1, create a BIM model of the construction site, and divide the BIM model into seven levels from the outer layer to the inner layer according to the data source, model characteristics and scene refinement, combined with the KKS coding characteristics, namely: level 1 building BIM model, level 2 partition BIM model, level 3 installation point BIM model, level 4 installation space BIM model, level 5 system BIM model, level 6 equipment BIM model and level 7 component BIM model; wherein: each level of the BIM model is a multi-level pyramid structure; Step B2, collecting original spatial scene data K1 according to the construction site information and equipment distribution range, wherein the original spatial scene data K1 includes a digital elevation model DEM, a digital surface model DSM and a digital orthophoto DOM; setting the pyramid level to n; According to the original spatial scene data K1 and the set pyramid level n, the digital twin 3D engine multi-level shell extraction algorithm and cross-section filling algorithm are used to construct a multi-level pyramid structure of the spatial scene for the original spatial scene data K1, and n-1 levels of spatial scene data are generated, which are respectively: the second-level spatial scene data K2, the third-level spatial scene data K3, ..., the n-th-level spatial scene data Kn in the direction from small to large in area. Therefore, the obtained n-level pyramid structure of the spatial scene is: the original spatial scene data K1, the second-level spatial scene data K2, the third-level spatial scene data K3, ..., the n-th-level spatial scene data Kn; Step B3, according to the generated n-level pyramid structure of the spatial scene, the BIM models of the corresponding levels are integrated according to the level correspondence, and merged into a BIM model file corresponding to each level, and the X and Y coordinates of each BIM model are recorded at the same time; Lightweight the BIM model files at each level to obtain lightweight BIM model files; Step B4, based on the lightweight BIM model file, automatically encode each BIM model to obtain a BIM model code; Render the shadow effects, dynamic effects, and weather effects of the BIM model to obtain a rendered BIM model; Step B5, rendering the spatial scene data of each level, and completing the data association and mounting of the rendered BIM model and the spatial scene data of each level using asynchronous loading technology according to the BIM model coding, and adding interactive functions such as model hiding, model isolation, model cutting, and first-person roaming to the rendered BIM model; Also includes: Step B6, using the digital twin 3D engine to achieve construction site visualization: The n-level pyramid structure of the spatial scene is based on the rendered BIM model of the corresponding level, and the whole is called the BIM scene equipment model; If the digital twin 3D engine receives an operation request to rotate the BIM scene equipment model to a specified angle and magnify it by n times at the same time, the digital twin 3D engine rotates the BIM scene equipment model to the specified angle and obtains the corresponding level of space scene and rendered BIM model according to the instruction to magnify it by n times, and displays them; at the same time, according to the collision point between the viewing angle and the BIM scene equipment model, the collision area is obtained, the shape of the collision area is painted, and the surrounding material map is filled to display a clear scene and equipment; The equipment procurement plan module is used to generate an equipment entry plan and an equipment production scheduling plan, and publish them to the basic information management module and the procurement management module, and monitor whether the procurement management module completes the equipment entry plan before the monitoring deadline. If not, an alarm message is sent to the mobile terminal; The procurement management module is used to formulate a list of contract equipment to be purchased upon receiving the equipment entry plan issued by the equipment procurement plan module, and search the basic information management module according to the contract equipment list to obtain suppliers corresponding to the equipment to be purchased, thereby generating an order list for placing orders with the supplier; then, according to the order list, query and monitor the logistics, and when the equipment is purchased, send the basic information of the purchased equipment to the equipment management module; The equipment management module is used to generate an equipment acceptance form when receiving the basic information of the purchased equipment sent by the procurement management module; and verify whether the equipment acceptance form is qualified. If qualified, generate an equipment report of the purchased equipment, send the equipment report to the basic information management module, and the basic information management module manages and stores the equipment information according to the equipment report; The data communication middle platform module is used to summarize, integrate and clean the data exchanged between the basic information management module, the equipment procurement plan module, the procurement management module and the equipment management module, and format the data into standard data with a standardized format for calling by other modules; The mobile terminal is respectively connected to the basic information management module, the equipment procurement plan module, the procurement management module, the equipment management module and the data communication middle platform module to perform data entry, data display, information query and message push operations.

2. The equipment management system of the ultra-high altitude photovoltaic demonstration base based on KKS coding according to claim 1 is characterized in that: The equipment procurement plan module is specifically used for: Step C1, based on the construction progress and the basic information management module, manage the equipment production schedule, calculate the process progress and whether the overall progress is normal according to the process plan completion time and the actual completion time, and significantly mark the progress status; Step C2: Manage the equipment entry plan according to the construction progress, maintain the entry plan regularly, mark the plan at the time node, and automatically push reminder messages to the mobile terminal.

3. The equipment management system of the ultra-high altitude photovoltaic demonstration base based on KKS coding according to claim 1 is characterized in that: The procurement management module is specifically used for: Step D1: manage the contract equipment list in a unified manner according to the affiliated units and bidding sections, including supplier information and contract information, equipment information included in the contract and quotation, and upload the attachment information related to the contract to the system for backup storage; Step D2: According to the project construction requirements and progress plan, regularly sort out the contract equipment list and equipment entry plan, compile the equipment order list, and support information export of the order list after approval; Step D3, the packaged equipment is distributed to various project locations according to the project installation requirements, and the equipment code and QR code are automatically generated after the distribution is completed. The equipment is transported and installed at a fixed point according to the information of the QR code; Step D4: During on-site acceptance, quickly obtain equipment information and equipment quantity by scanning the QR code. After the equipment is installed, view the equipment supervision information, on-site time, and on-site acceptance status by scanning the QR code.

4. The equipment management system of the ultra-high altitude photovoltaic demonstration base based on KKS coding according to claim 1 is characterized in that: The device management module is specifically used for: Step E1: Perform operation inspection and preparatory tests on the incoming equipment according to the acceptance standards, fill in the acceptance record and submit it to the management personnel for review, return the unqualified equipment and arrange for the qualified equipment to be put into storage; Step E2: Centrally manage the incoming equipment and materials, record the information of the incoming equipment and materials on the project site in detail by filling out electronic forms, automatically form records and ledgers, and display important information in a differentiated manner; Step E3: fill in the application form according to the outbound process and conduct online approval. After approval, the outbound equipment information and quantity are recorded in real time, and the inventory data is updated; Step E4: Carry out regular inventory of equipment and materials according to warehouse management requirements and plans, and write off the material differences found during the inventory with one click to ensure the consistency between the material account quantity and the actual quantity; Step E5, after the entry and exit of materials and equipment and inventory verification, the ledger information is automatically generated, providing automatic statistics, summary and export report functions, and supporting the query and export of equipment historical information.

5. The equipment management system of the ultra-high altitude photovoltaic demonstration base based on KKS coding according to claim 1 is characterized in that: The data communication platform module is specifically used for: Step F1, obtaining the data generated by each module in the system, and classifying the business data into structured data and unstructured data. The structured data includes equipment name, installation location, and logistics information, and the unstructured data includes equipment technical report, test inspection report, and acceptance video; Clean structured data, filter invalid and dirty data, verify erroneous data, and generate a standard format through data serialization services for digital business application calls and integration; Judge the unstructured data, record the unique ID for small data, slice the large data, record the number of slices, slice ID, slice size, and finally store it according to the module and data type to which the data belongs; Step F2, obtain the intra-station communication data in the system, classify them according to pending messages, approval messages, and alarm messages, and sort them according to the severity and occurrence time of the messages, and use PUSH technology to push them to the relevant mobile terminals for viewing and processing; The PUSH push technology: the management system uses the TCP full-duplex communication protocol as the underlying communication protocol, and uses WebSocket monitoring to complete message push; the mobile end integrates the SDK of each device manufacturer and completes the message push according to APP_KEY+UserId; Integrate the management system and mobile push interfaces, monitor the push content generated by the management system and mobile terminals in real time, splice the message type and content according to the message classification, call the integrated message push interface, and complete the delivery of communication data.

6. The equipment management system of the ultra-high altitude photovoltaic demonstration base based on KKS coding according to claim 1 is characterized in that: The mobile terminal is specifically used for: Integrate the main functions of the management system, cooperate with the management system to complete process approval, data collection, data display, information query, and message push operations, and provide a convenient operation terminal.

Citation Information

Patent Citations

  • Electric power engineering project investment management system

    CN109784681A

  • Bridge prefabricated part BIM informatization management system

    CN111210199A

  • Digital twin architecture, model evaluation system and model operation method

    CN115051926A

  • BIM-based informatization management production management system and server

    CN115660619A

  • Intelligent platform of BIM reverse modeling technology for engineering construction period management

    CN116011064A