Methods to prevent slag charging at blast furnace tuyeres

By monitoring the blast furnace hot blast main pipe and furnace top pressure in real time, the furnace top large venting solenoid valve is automatically opened to release pressure, solving the problem of slag filling in the tuyeres caused by a sudden drop or stop in the blast furnace hot blast pressure, and ensuring safe production.

CN118006853BActive Publication Date: 2026-11-17LIUZHOU IRON & STEEL
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410164988.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2026-11-17
Estimated Expiration
2044-02-05

AI Technical Summary

Technical Problem

When the blast furnace hot blast pressure drops suddenly or stops abruptly, existing technology cannot release the pressure in time, leading to slag filling at the tuyere, which poses an explosion risk and economic losses.

Method used

The pressure of the blast furnace hot blast main pipe and the furnace top is monitored in real time. Two detection points are set up. When the pressure reaches a specific condition, the furnace top large venting solenoid valve is automatically opened to release pressure, ensuring that the hot blast pressure and the furnace top pressure are within a safe range.

Benefits of technology

It effectively prevents slag from entering the vent, reduces the risk of explosion, minimizes economic losses, improves system safety and reliability, and avoids misjudgment and misoperation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118006853B_ABST
    Figure CN118006853B_ABST
Patent Text Reader

Abstract

This invention discloses a pressure relief method to prevent slag buildup at blast furnace tuyeres, relating to the field of blast furnace production technology. The method involves real-time monitoring of the pressure at two hot blast pressure detection points at the blast furnace hot blast main. When the pressure at both detection points is less than 60 kPa, the first condition for automatically opening the top vent is met. The second condition for automatically opening the top vent is also met: real-time monitoring of the pressure at two top pressure detection points. When the pressure at both top pressure points is greater than 30 kPa, the second condition for automatically opening the top vent is met. When both conditions are met simultaneously, the PLC issues an automatic pressure relief command. The top vent solenoid valve receives the command signal, energizes the solenoid valve, starts the hydraulic pump in the top system, and opens the solenoid valve, completing the pressure relief. This invention solves the problem of slag buildup at blast furnace tuyeres caused by the inability to promptly relieve pressure during sudden drops or stops of hot blast pressure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of blast furnace production technology, and in particular to a method for preventing slag charging at the blast furnace tuyeres. Background Technology

[0002] The blast furnace top vent is a critical device responsible for releasing pressure at the blast furnace top. Currently, technologies such as automatic pressure relief at excessively high blast furnace top pressure and automatic pressure control have been implemented. However, even under low pressure conditions below 30 kPa at the blast furnace top, manual activation of the top vent is still necessary. When the blast furnace experiences repeated abnormalities such as the absence of a blast system, blower tripping, malfunctioning blast system, venting system failure, or electrical short circuits in the venting valve causing a sudden drop and shutdown of the lower hot blast pressure, failure to activate the top vent in time will result in excessively high top pressure. The lower blast pressure will be insufficient to maintain the upward force of the furnace charge, causing the charge to drop rapidly. This will raise the molten slag and iron level in the hearth to the tuyeres, leading to backflow of furnace gas into the tuyeres, posing an explosion risk. Simultaneously, it can cause a severe slag-filling accident at the tuyeres, resulting in significant economic losses and substantial production safety risks for the enterprise. Summary of the Invention

[0003] The purpose of this invention is to provide a pressure relief method to prevent slag filling at the blast furnace tuyere. This method can solve the problem of slag filling at the blast furnace tuyere when the hot blast pressure drops suddenly or stops abruptly.

[0004] To solve the above problems, the technical solution adopted by this invention is as follows: This method for preventing slag charging at the blast furnace tuyeres involves real-time monitoring of the pressure at two hot blast pressure detection points at the blast furnace hot blast main pipe. When the pressure at both hot blast pressure detection points is less than 60 kPa, the first condition for automatically opening the furnace top venting is met. Real-time monitoring of the pressure at two furnace top pressure detection points is also conducted. When both furnace top pressure detection points are greater than 30 kPa, the second condition for automatically opening the furnace top venting is met. When both the first and second conditions are met simultaneously, the PLC issues an automatic pressure relief command. The furnace top venting solenoid valve receives the command signal, energizes the venting solenoid valve, starts the furnace top hydraulic system oil pump, opens the venting solenoid valve, and completes the pressure relief.

[0005] In the above-mentioned method for preventing slag charging at the blast furnace tuyeres, a more specific technical solution could be: two hot blast pressure detection points are set within 5 to 8 meters of the hot blast main pipe on the side closest to the blast furnace hot blast casing.

[0006] Furthermore, the pressure detection point at the top of the furnace is installed inside the blast furnace gas riser pipe.

[0007] Furthermore, the pressure detection points at the top of the furnace are set inside the two blast furnace gas riser pipes, and the two pressure detection points at the same height are set up.

[0008] Furthermore, the pressure detection point at the top of the furnace is located 1 meter above the furnace shell.

[0009] Furthermore, after depressurizing the furnace, before closing the large venting solenoid valve, ensure that the hot air pressure does not exceed 100 kPa and the furnace top pressure does not exceed 50 kPa.

[0010] By adopting the above technical solution, the present invention has the following advantages compared with the prior art: 1. By monitoring the hot blast pressure at the blast furnace hot blast main and the furnace top pressure in real time, when the blast furnace hot blast pressure drops suddenly or stops abruptly, if the detected hot blast pressure is less than 60 kPa and the furnace top pressure is greater than 30 kPa, the furnace top vent will automatically open to release pressure. This effectively prevents blast furnace tuyere slag-filling accidents or greatly reduces the risk of tuyere slag-filling, avoiding the risk of gas backflow into the air supply pipeline caused by sudden blast shutdown. The two pressure relief conditions ensure the safety of the blast furnace tuyere from slag-filling, while also taking into account environmental protection and reducing smoke emission. At the same time, it can also avoid misjudgment and reduce the risk of tuyere slag-filling. Two detection points are set for both hot blast pressure and furnace top pressure, which can avoid misjudgment, increase the safety and reliability of the system, and reduce the risk of misoperation.

[0011] 2. The hot blast pressure detection points are all located 5 to 8 meters from the hot blast main pipe on the side of the blast furnace hot blast casing. This can reduce the interference of other factors on the pressure measurement, thereby measuring the hot blast pressure more accurately.

[0012] 3. Set up furnace top pressure detection points in the two gas riser pipes respectively. This allows for direct measurement of the furnace top pressure, reducing interference from external factors. It is also convenient for installation and daily maintenance, and the measurement results are highly accurate and reliable.

[0013] 4. After depressurization is completed, before closing the large vent valve, ensure that the hot air pressure and furnace top pressure are within a certain range. This can prevent excessive pressure from causing the furnace top large vent valve to be difficult to close, or even damaged or deformed, resulting in the subsequent furnace top large vent valve not being able to close tightly. Attached Figure Description

[0014] Figure 1 This is a schematic diagram of the blast furnace tuyeres slag charging and pressure relief system. Detailed Implementation

[0015] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments: like Figure 1As shown, the lower part of the blast furnace 6 is provided with multiple blast furnace tuyeres 4. Above the blast furnace tuyeres 4, a blast furnace hot blast duct 5 is arranged around the blast furnace 6. The blast furnace hot blast duct 5 is connected to the blast furnace 6 through the blast furnace tuyeres 4. A blast furnace hot blast main pipe 2 is connected between the blast furnace hot blast duct 5 and the hot blast stove 1. Two hot blast pressure detection points 3 are set in the blast furnace hot blast main pipe 2. The two hot blast pressure detection points 3 can be adjacent to each other. They are set within 5 to 8 meters on the side of the blast furnace hot blast main pipe 2 closest to the blast furnace hot blast duct 5. In actual production, the pressure values ​​of the two hot blast pressure detection points 3 are almost equal. The upper part of the blast furnace 6 is provided with two gas riser pipes 8 connected to the furnace top large vent solenoid valve 9. Each gas riser pipe 8 is provided with a furnace top pressure detection point 9. The two furnace top pressure detection points 9 are at approximately the same height, set at a position of about 1 meter above the furnace shell. Under normal circumstances, the pressure values ​​of the two furnace tops are almost equal. During normal operation, cold air enters the hot blast stove 1 through a blower and is heated to 1200℃. The hot air then flows through the blast furnace hot blast main duct 2 to the blast furnace hot blast surround duct 5, and through the blast furnace tuyeres 4 to the hearth of the blast furnace 6, generating coal gas. The coal gas flows through the gas riser 8 to the gas treatment system. A large vent valve 9 is installed at the top of the riser duct for releasing coal gas or depressurizing. In this embodiment, the pressure transmitters used for the hot blast pressure detection points and the furnace top pressure detection points are model EJA430A-EAS5A-92DJ, with a range of 0~500KPa, a power supply of 24VDC, and a two-wire 4~20mA output signal with HART communication protocol, A-diaphragm, and digital display. The hot blast pressure and furnace top pressure are instrument data. The instrument data is converted into electrical data using a DGP-3100 power distribution unit with one input and two outputs, an input of 4~20mA and an output of 4~20mA, powered by 24VDC. To ensure the normal operation of pressure level gauges and solenoid valves, an uninterruptible power supply (UPS) can be connected to the power input of the equipment to provide a stable and uninterrupted power supply. In the event of a large-scale power outage, it can also automatically activate the furnace top venting protection.

[0016] The pressure relief method for preventing slag charging at the blast furnace tuyeres is as follows: Real-time monitoring of the pressure at two hot blast pressure detection points at the blast furnace hot blast main pipe and two pressure detection points at the blast furnace top. In cases where the blast furnace experiences a sudden drop or stop in hot blast pressure due to factors such as the absence of a blast system, blower tripping and blast system malfunction, blast pipe rupture, or electrical fault / short circuit in the venting valve causing abnormal venting, the pressure inside the blast furnace increases. When the pressure at both hot blast pressure detection points is less than 60 kPa, the first condition for automatically opening the blast furnace top venting is met. When the pressure at both blast furnace top pressure detection points is greater than 30 kPa, the second condition for automatically opening the blast furnace top venting is met. When both the first and second conditions are met simultaneously, the PLC issues an automatic pressure relief command. The blast furnace top venting solenoid valve receives the command signal, energizes the solenoid valve, starts the hydraulic pump in the blast furnace top system, opens the venting solenoid valve, and completes the pressure relief. After depressurizing the furnace, before closing the large venting solenoid valve, ensure that the hot air pressure does not exceed 100 kPa and the furnace top pressure does not exceed 50 kPa.

[0017] It is worth mentioning that, in states such as shutdown and suspended material operation, automatic pressure relief can be deactivated, and normal air reduction can be implemented. This reduction in air volume will simultaneously lower the top pressure, preventing premature automatic opening of the furnace top vent valve and the resulting smoke and environmental problems. Furthermore, audible, visual, and text alarms can be added to alert personnel to take timely action after the automatic pressure relief valve opens and completes the furnace depressurization. Both the fully open and fully closed positions of the furnace top vent valve are indicated by signals. Manual or semi-automatic remote valve closure is preferred when closing the furnace top vent valve during production. A delay is required when closing the furnace top vent valve during production to ensure it is tightly closed and prevent gas leakage from affecting blast furnace production.

[0018] This invention sets two pressure relief conditions: the hot blast pressure before blast furnace entry and the furnace top pressure. In the event of a sudden drop or stop in the hot blast pressure, the furnace top vent automatically opens to release pressure, effectively preventing slag buildup at the tuyeres. In practical applications, this pressure relief method, by directly opening the furnace top vent to prevent slag buildup, is more effective than automatically reducing the top pressure to prevent slag buildup at the tuyeres. This method can open the furnace top vent within 5 seconds, and this rapid opening helps prevent slag buildup at the tuyeres. One of the pressure relief conditions is set at a furnace top pressure of 30 kPa, which is considered high pressure. This pressure relief condition is mainly used to identify sudden drops or stops in airflow due to abnormal conditions such as blower tripping or air supply system malfunctions. Although there are currently automatic furnace top pressure reduction systems, in abnormal situations, the rate of pressure reduction cannot keep up with the rate of hot blast pressure decrease. If the top pressure is greater than or close to the hot blast pressure, it can easily lead to gas backflow accidents, causing slag buildup at the tuyeres and gas explosions. Adding another pressure relief condition—the hot blast pressure—prevents misjudgments.

Claims

1. A pressure relief method for preventing a blast furnace tuyere from being clogged with slag, characterized by: The pressure at two hot blast pressure detection points at the blast furnace hot blast main is monitored in real time. When the pressure at both detection points is less than 60 kPa, the first condition for automatically opening the top vent is met. The pressure at two top pressure detection points at the blast furnace top is monitored in real time. When the pressure at both detection points is greater than 30 kPa, the second condition for automatically opening the top vent is met. When both conditions are met, the PLC issues an automatic pressure relief command. The top vent solenoid valve receives the command signal, energizes the solenoid valve, starts the hydraulic pump in the top system, and opens the solenoid valve to complete the pressure relief. The two hot blast pressure detection points are located within 5-8 meters of the hot blast main on the side closest to the blast furnace hot blast duct. The top pressure detection points are located inside the two blast furnace gas risers, and the two top pressure detection points are at the same height. After the pressure relief is completed, before closing the top vent solenoid valve, ensure that the hot blast pressure does not exceed 100 kPa and the top pressure does not exceed 50 kPa.

2. The pressure relief method for preventing the blow tank of a blast furnace from being filled with slag according to claim 1, characterized by: The pressure detection point at the top of the furnace is 1 meter above the furnace shell.

Citation Information

Patent Citations

  • Automatic safety top pressure reduction control method for preventing slag from going into blast furnace

    CN106987667A

  • Comprehensive protection method for overpressure of blast furnace

    CN116179777A