Through the combination of a clean energy power supply module and an 800-volt DC charging pile, real-time power and peak power consumption intervals are detected, and the power supply strategy is adjusted, which solves the problem of unstable power supply in new energy, and realizes continuous, stable power supply and efficient charging of energy storage batteries. .
Patent Information
- Application Number
- CN202410409790.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-07
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-04-07
AI Technical Summary
In the prior art, new energy such as wind energy and solar energy are difficult to achieve continuous and stable power supply under different environmental conditions, resulting in unstable battery power supply and affecting power supply.
By combining the clean energy power supply module and the 800-volt DC charging pile, it provides a variety of power supply methods for energy storage batteries, detect real-time power and peak power consumption intervals, adjust the power supply strategy according to the actual power consumption speed, and ensure the stability and efficiency of battery power supply. .
It realizes continuous and stable power supply of energy storage batteries, reduces energy waste and costs, improves charging efficiency, adapts to different power needs, and enhances the flexibility and reliability of the system.
Smart Images

Figure CN118117713B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of battery charging, and in particular relates to a battery charging method, an electronic device and a storage medium. Background Art
[0002] With the rapid economic development at this stage, the living standards of urban and rural residents have also been greatly improved. Various household appliances are widely used in thousands of households, and the comfort and convenience brought by electricity to urban and rural residents are constantly rising. In recent years, household electricity consumption has increased year by year, accounting for a high proportion of the total electricity consumption in society. With the increasing demand for electricity in the three major industries and urban and rural residents, it is easy to cause a shortage of electricity supply.
[0003] During peak electricity consumption, in order to ensure the safe and stable operation of the power grid, although the peak electricity consumption has brought benefits to urban and rural residents, it will still cause insufficient power supply in the case of severe electricity shortage (such as the hot summer in the south), thus affecting people's normal production and life. Solar energy, hydropower, and wind power have become the main means of utilizing new energy with their clean, efficient, and renewable advantages. The comprehensive and complementary utilization of these energy sources can overcome the noise pollution and exhaust pollution problems of traditional diesel generators. However, the comprehensive utilization of solutions relying solely on wind or solar energy is low, and it is difficult to achieve continuous operation under different environmental conditions. Therefore, in the utilization of most new energy sources, there is a problem that a stable amount of electricity cannot be supplied to the battery continuously. Summary of the invention
[0004] The present application aims to solve at least one of the technical problems existing in the prior art, and to provide a battery charging method, an electronic device and a storage medium, which can realize continuous and stable power supply to the battery in a variety of ways.
[0005] In a first aspect, the present application provides a battery charging method, which is applied to an energy storage system, wherein the energy storage system includes a clean energy power supply module, an energy storage battery, and an 800V DC charging pile, and the method includes:
[0006] The energy storage battery is powered by the clean energy power supply module, and the real-time power level of the energy storage battery is detected and the detection time corresponding to the real-time power level is recorded;
[0007] Determine the peak power consumption interval of the energy storage battery used by the user according to the real-time power consumption and the detection time;
[0008] During the peak power consumption period, when the power level of the energy storage battery is lower than the preset power level, the actual power consumption rate of the energy storage battery is determined according to the real-time power level and the detection time;
[0009] When the actual power consumption rate is greater than the standard power consumption rate during the peak power consumption period, the energy storage battery is powered by the clean energy power supply module and the 800V DC charging pile.
[0010] According to the battery charging method provided in the embodiment of the present application, there are at least the following beneficial effects: first, the energy storage battery is powered by a clean energy power supply module, thereby avoiding energy waste, reducing energy costs, saving electricity expenditures, and detecting the real-time power of the energy storage battery and recording the detection time corresponding to the real-time power, thereby realizing real-time detection and recording of the power of the energy storage battery, which is convenient for subsequent control of the battery charging process, and then determining the peak power consumption interval of the user using the energy storage battery according to the real-time power and the detection time, which is convenient for the subsequent use of different power supply means in different power consumption intervals. In the peak power consumption interval, when the power of the energy storage battery is lower than the preset power, it means that the current power of the energy storage battery is too low, and it is necessary to determine the actual power consumption speed of the energy storage battery according to the real-time power and the detection time, thereby improving the flexibility of power supply. When the actual power consumption speed is greater than the standard power consumption speed in the peak power consumption interval, it means that the current power consumption speed is large, and it is necessary to power the energy storage battery through a clean energy module and an 800V DC charging pile, so that the energy storage battery can be powered continuously and stably to ensure the stability of battery power supply. This embodiment compares the actual power consumption rate with the standard power consumption rate during the peak power consumption period. When the actual power consumption rate is greater than the standard power consumption rate, the energy storage battery is powered by the clean energy power supply module and the 800-volt DC charging pile to ensure the stability of the battery power supply and improve the battery charging efficiency while saving energy costs.
[0011] According to some embodiments of the present application, the clean energy power supply module includes a photovoltaic string; and supplying power to the energy storage battery through the clean energy power supply module includes:
[0012] The energy storage battery is powered by the photovoltaic string, and a current change value, a voltage change value, and a temperature change value of the photovoltaic string over a preset time period are detected;
[0013] When the current change value, the voltage change value and the temperature change value meet preset change conditions, the energy storage battery is powered by the photovoltaic string.
[0014] According to some embodiments of the present application, after the photovoltaic string supplies power to the energy storage battery, the method further includes:
[0015] When the current change value, the voltage change value, and the temperature change value do not meet a preset change condition, it is determined that the photovoltaic string is in a fault state or a shielding state.
[0016] According to some embodiments of the present application, the powering the energy storage battery by the clean energy power supply module and the 800V DC charging pile includes:
[0017] Obtaining the power consumption of the 800V DC charging pile and detecting the working state of the 800V DC charging pile;
[0018] When it is determined that the 800V DC charging pile is connected to the electric vehicle for charging, detecting the electric power of the electric vehicle;
[0019] When the electric power of the electric vehicle reaches a preset power threshold, a first power and a second power are set according to the electric power consumption, the energy storage battery is powered by the first power and the clean energy power supply module, and the electric vehicle is powered by the second power, wherein the first power is greater than the second power.
[0020] or,
[0021] When the power of the electric vehicle does not reach a preset power threshold, the third power and the fourth power are set according to the power consumption, the electric vehicle is powered by the third power, and the energy storage battery is powered by the fourth power and the clean energy power supply module, wherein the third power is greater than the fourth power.
[0022] According to some embodiments of the present application, the powering the energy storage battery by the clean energy power supply module and the 800V DC charging pile includes:
[0023] Powering the energy storage battery through the clean energy power supply module and determining the real-time power quantity;
[0024] When the real-time power level is in a preset first power level interval, controlling the 800V DC charging pile to supply power to the energy storage battery at a fifth power;
[0025] When the real-time power level is in a preset second power level interval, controlling the 800V DC charging pile to supply power to the energy storage battery at a sixth power level in a preset cycle;
[0026] When the real-time power level is in a preset third power level interval, stopping supplying power to the energy storage battery;
[0027] The power levels of the first power interval, the second power interval, and the third power interval increase in sequence, and the fifth power is less than the sixth power.
[0028] According to some embodiments of the present application, determining that the photovoltaic string is in a fault state or a shielding state includes:
[0029] Draw a current-voltage curve according to the current change value and the voltage change value, and determine the slope of the current-voltage curve;
[0030] Detecting an initial current-voltage curve of the photovoltaic string after being powered on for the first time, and determining an initial slope of the initial current-voltage curve;
[0031] Compare the current change value and the voltage change value with a preset first standard value, and compare the temperature change value with a preset second standard value, wherein the first standard value is used to characterize the current value and voltage value of the photovoltaic string under normal operating conditions, and the second standard value is used to characterize the temperature value of the photovoltaic string under normal operating conditions;
[0032] When the current change value or the voltage change value is less than the first standard value, the temperature change value is greater than the second standard value, and the slope of the curve is greater than the initial slope, it is determined that the photovoltaic string is in a fault state;
[0033] When the current change value and the voltage change value are less than the first standard value, the temperature change value is greater than the second standard value, and the slope of the curve is less than the initial slope, it is determined that the photovoltaic string is in a shielding state.
[0034] According to some embodiments of the present application, determining the peak power consumption interval of the energy storage battery used by the user according to the real-time power and the detection time includes:
[0035] Collecting the discharge amount of the energy storage battery in a preset monitoring period;
[0036] Performing data analysis on the discharge amount, the real-time power amount and the detection time to obtain a power consumption line graph of the energy storage battery;
[0037] Perform image recognition on the electricity consumption line graph to determine peak intervals and flat intervals;
[0038] The peak time period and the flat time period of the user's electricity consumption are determined according to the peak time period and the flat time period, and the peak time period is used as the peak time period of electricity consumption of the energy storage battery.
[0039] According to some embodiments of the present application, the data analysis of the discharge amount, the real-time power amount and the detection time to obtain the power consumption line graph of the energy storage battery includes:
[0040] Performing data cleaning on the discharge amount, the real-time power amount and the detection time;
[0041] Determine the power consumption parameters of the energy storage battery according to the discharge amount and real-time power after data cleaning;
[0042] Drawing an electricity usage template based on a preset data visualization tool, and sorting the electricity usage parameters according to the detection time after data cleaning to obtain multiple sets of electricity usage coordinates;
[0043] The power consumption template is drawn according to the power consumption coordinates to obtain a power consumption line graph of the energy storage battery.
[0044] In a second aspect, the present application provides an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the battery control method as described in the first aspect when executing the computer program.
[0045] In a third aspect, the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer-executable instructions, and the computer-executable instructions are used to execute the battery charging method described in the first aspect.
[0046] Other features and advantages of the present application will be described in the following description, and partly become apparent from the description, or understood by practicing the present application. The purpose and other advantages of the present application can be realized and obtained through the structures particularly pointed out in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] The accompanying drawings are used to provide further understanding of the technical solution of the present application and constitute a part of the specification. Together with the embodiments of the present application, they are used to explain the technical solution of the present application and do not constitute a limitation on the technical solution of the present application.
[0048] Figure 1 is a system schematic diagram of an energy storage system provided by an embodiment of the present application;
[0049] Figure 2 is a flow chart of a battery charging method provided by an embodiment of the present application;
[0050] Figure 3 yes Figure 2 Specific method flow chart of step S101 in FIG.
[0051] Figure 4 is a flow chart of a battery charging method provided by another embodiment of the present application;
[0052] Figure 5 yes Figure 2 Specific method flow chart of step S104 in;
[0053] Figure 6 yes Figure 2 Another specific method flow chart of step S104 in FIG.
[0054] Figure 7 yes Figure 3 Specific method flow chart of step S202 in FIG.
[0055] Figure 8 yes Figure 2 Specific method flow chart of step S102 in FIG.
[0056] Fig. 9 yes Figure 8 Specific method flow chart of step S702 in FIG.
[0057] Fig.10 It is a schematic diagram of the hardware structure of the electronic device provided in the embodiment of the present application. DETAILED DESCRIPTION
[0058] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0059] It should be noted that although a logical order is shown in the flowchart, in some cases, the steps shown or described may be performed in a different order than that in the flowchart. The terms "first", "second", etc. in the specification, claims and the above drawings are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence.
[0060] With the rapid economic development at this stage, the living standards of urban and rural residents have also been greatly improved. Various household appliances are widely used in thousands of households, and the comfort and convenience brought by electricity to urban and rural residents are constantly rising. In recent years, household electricity consumption has increased year by year, accounting for a high proportion of the total electricity consumption in society. With the increasing demand for electricity in the three major industries and urban and rural residents, it is easy to cause a shortage of electricity supply.
[0061] During peak electricity consumption, in order to ensure the safe and stable operation of the power grid, although the peak electricity consumption has brought benefits to urban and rural residents, it will still cause insufficient power supply in the case of severe electricity shortage (such as the hot summer in the south), thus affecting people's normal production and life. Solar energy, hydropower, and wind power have become the main means of utilizing new energy with their clean, efficient, and renewable advantages. The comprehensive and complementary utilization of these energy sources can overcome the noise pollution and exhaust pollution problems of traditional diesel generators. However, the comprehensive utilization of solutions relying solely on wind or solar energy is low, and it is difficult to achieve continuous operation under different environmental conditions. Therefore, in the utilization of most new energy sources, there is a problem that a stable amount of electricity cannot be supplied to the battery continuously.
[0062] To solve the above problems, the present embodiment provides a battery charging method. First, the energy storage battery is powered by a clean energy power supply module, thereby avoiding energy waste, reducing energy costs, and saving electricity expenditures. The real-time power of the energy storage battery is detected and the detection time corresponding to the real-time power is recorded, thereby realizing real-time detection and recording of the power of the energy storage battery, which is convenient for subsequent control of the battery charging process. Then, the peak power consumption interval of the user using the energy storage battery is determined according to the real-time power and the detection time, which is convenient for the subsequent use of different power supply means in different power consumption intervals. In the peak power consumption interval, when the power of the energy storage battery is lower than the preset power, it means that the current power of the energy storage battery is too low. It is necessary to determine the actual power consumption speed of the energy storage battery according to the real-time power and the detection time, thereby improving the flexibility of power supply. When the actual power consumption speed is greater than the standard power consumption speed in the peak power consumption interval, it means that the current power consumption speed is large, and it is necessary to power the energy storage battery through a clean energy module and an 800V DC charging pile, so that the energy storage battery can be powered continuously and stably to ensure the stability of battery power supply. This embodiment compares the actual power consumption rate with the standard power consumption rate during the peak power consumption period. When the actual power consumption rate is greater than the standard power consumption rate, the energy storage battery is powered by the clean energy power supply module and the 800-volt DC charging pile to ensure the stability of the battery power supply and improve the battery charging efficiency while saving energy costs.
[0063] The embodiments of the present application are further described below in conjunction with the accompanying drawings.
[0064] refer to Figure 1 , Figure 1 It is a system schematic diagram of an energy storage system provided in one embodiment of the present application.
[0065] In some embodiments, the energy storage system includes a clean energy power supply module 100 , an energy storage battery 200 , and an 800V DC charging pile 300 , wherein the clean energy power supply module 100 includes a photovoltaic string 110 and a wind turbine 120 .
[0066] It should be noted that the energy storage battery 200 is respectively connected to the clean energy power supply module 100 and the 800V DC charging pile 300. The energy storage system supplies power to the energy storage battery 200 through the cooperation between the clean energy power supply module 100 and the 800V DC charging pile 300, thereby ensuring the stability of the battery power supply, and the energy storage battery 200 can be quickly charged through the 800V DC charging pile 300, further improving the charging efficiency of the battery.
[0067] It is understandable that with the continuous development of automobile electrification, electric vehicles are already in a period of rapid development, and the market is constantly improving and maturing. The current vehicle power battery voltage is maintained below 750V to adapt to the charging environment of the market charging pile with a maximum voltage of 750V. In order to solve the charging anxiety, various models are developing a whole vehicle 800V boost charging system. The 800V boost charging system can achieve when the maximum voltage of the vehicle power battery is greater than 750V, and the voltage of the DC charging pile input to the vehicle end is increased to above 750V, so that the vehicle power battery is charged to 100%. However, the existing 800V boost charging pile is only used for electric vehicle charging and cannot meet the power needs of users. Therefore, the energy storage system of this embodiment adds an 800-volt DC charging pile 300 to supply power on the basis of the power supply of the clean energy power supply module 100, so that the energy storage battery 200 can be powered by a variety of power supply methods, avoiding slow power supply or insufficient power supply during peak periods. The power supply stability of the energy storage battery 200 is improved by the mutual cooperation of a variety of power supply methods, and the 800-volt DC charging pile 300 can quickly supply power to the energy storage battery 200, further shortening the power supply speed of the energy storage battery 200 and improving the power supply efficiency of the energy storage battery 200.
[0068] In some embodiments, the photovoltaic string 110 includes a charging controller and a photovoltaic inverter. The charging controller is used to monitor the output voltage and current of the photovoltaic string 110, and then transmit appropriate electrical energy to the energy storage battery 200 to ensure that the battery is safely fully charged and prevent overcharging. Specifically, when solar light irradiates the photovoltaic string 110, the photovoltaic string 110 converts the light energy into direct current electrical energy through the photovoltaic inverter. The charging controller monitors the voltage and current output by the photovoltaic string 110 and adjusts it according to the state of the battery. After adjustment by the charging controller, the electrical energy generated by the photovoltaic string 110 will be transmitted to the battery for charging.
[0069] The wind turbine 120 captures wind energy by rotating its blades. The rotor inside the generator generates current when the blades rotate, converting mechanical energy into electrical energy. Afterwards, the charging controller monitors the voltage and current output by the wind turbine 120 and adjusts it according to the battery status to ensure safe charging.
[0070] The 800V DC charging station 300 includes a rectifier. During the charging process, the rectifier converts AC power into DC power, which can charge the energy storage battery 200 and the electric vehicle at the same time.
[0071] It can be understood that the energy storage system in this embodiment can be used to power solar lamps, refrigerators, air conditioners and other electrical equipment. Taking the energy storage system powering solar lamps as an example, solar lamps usually rely on solar power generation, and at night or in rainy weather when there is insufficient sunlight, the energy storage system can store the solar energy collected during the day and release it when needed to ensure continuous power supply to the solar lamps, avoid power fluctuations caused by weather changes, and ensure the brightness of the lamps during peak power consumption periods.
[0072] Based on the above energy storage system, a battery charging method according to an embodiment of the present application is proposed below.
[0073] refer to Figure 2 , Figure 2 This is a flowchart of a battery charging method provided by an embodiment of the present application, which is applicable but not limited to Figure 1 In the energy storage system, the battery charging method includes but is not limited to steps S101 to S104.
[0074] Step S101: supplying power to the energy storage battery 200 through the clean energy power supply module 100, detecting the real-time power level of the energy storage battery 200 and recording the detection time corresponding to the real-time power level;
[0075] In some embodiments, the clean energy power supply module 100 is used to power the energy storage battery 200 to improve energy utilization efficiency and avoid energy waste. The real-time power level of the energy storage battery 200 is detected and the detection time corresponding to the real-time power level is recorded, so that the real-time variable changes of the energy storage battery 200 can be obtained, which is convenient for the subsequent selection of different methods to power the energy storage battery 200.
[0076] It can be understood that the clean energy power supply module 100 in this embodiment is a renewable energy source such as solar energy and wind energy. Using clean energy to power the energy storage battery 200 can reduce dependence on traditional fossil fuels, reduce greenhouse gas emissions, and is beneficial to environmental protection and sustainable development.
[0077] Step S102: determining the peak power consumption interval of the energy storage battery 200 used by the user according to the real-time power consumption and the detection time;
[0078] In some embodiments, the peak power consumption period of the user using the energy storage battery 200 is determined based on the real-time power consumption and the detection time, so as to facilitate the subsequent planning of power consumption in the peak power consumption period and improve power consumption efficiency.
[0079] Step S103: during the peak power consumption period, when the power level of the energy storage battery 200 is lower than the preset power level, the actual power consumption rate of the energy storage battery 200 is determined according to the real-time power level and the detection time;
[0080] In some embodiments, during the peak power consumption period, when the power level of the energy storage battery 200 is lower than the preset power level, it means that the current power level of the energy storage battery 200 is too low. This embodiment determines the actual power consumption rate of the energy storage battery 200 based on the real-time power level and the detection time, so as to determine whether an 800V DC charging pile 300 is still needed to supply power on the basis of the clean energy power supply module 100.
[0081] Step S104: When the actual power consumption rate is greater than the standard power consumption rate during the peak power consumption period, the energy storage battery 200 is powered by the clean energy power supply module 100 and the 800V DC charging pile 300.
[0082] In some embodiments, when the actual power consumption rate is greater than the standard power consumption rate during the peak power consumption period, it means that the current power consumption rate of the energy storage battery 200 is relatively fast, and the power supply of the clean energy power supply module 100 can no longer meet the user's power demand. It is necessary to power the energy storage battery 200 through the clean energy power supply module 100 and the 800V DC charging pile 300 to achieve stable power supply to the energy storage battery 200, improve the performance of the energy storage system, extend battery life, and increase system reliability.
[0083] It should be noted that when the actual power consumption rate is less than or equal to the standard power consumption rate during the peak power consumption period, the energy storage battery 200 can be powered directly by the clean energy power supply module 100, thereby achieving efficient use of energy, improving energy utilization, and promoting sustainable energy development.
[0084] Reference Figure 3 , Figure 3 yes Figure 2 The specific method flow chart of step S101 in FIG. 1 , step S101 includes but is not limited to steps S201 to S202.
[0085] It should be noted that the clean energy power supply module 100 includes a photovoltaic string 110 and a wind turbine 120 .
[0086] Step S201: Powering the energy storage battery 200 through the photovoltaic string 110, detecting the current change value, voltage change value and temperature change value of the photovoltaic string 110 within a preset time period;
[0087] In some embodiments, in the process of supplying power to the energy storage battery 200 through the clean energy power supply module 100, the photovoltaic string 110 is preferentially used to supply power to the energy storage battery 200, that is, the photovoltaic string 110 is used to supply power to the energy storage battery 200, and the current change value, voltage change value and temperature change value of the photovoltaic string 110 within a preset time are detected, so that the parameter changes of the photovoltaic string 110 during the power supply process can be determined, which is convenient for the subsequent determination of whether the photovoltaic string 110 has abnormal conditions such as failure or obstruction, and can also maximize the use of solar energy resources and reduce dependence on traditional energy.
[0088] It is understandable that solar energy, as a clean energy, has great potential. At the same time, solar energy can be used for charging as long as the weather is clear. However, solar radiation is discontinuous and intermittent, and the investment and cost of pure solar lighting systems are currently high, and some technologies are not mature enough. Solar lighting systems often fail to light up the load due to insufficient battery voltage or the photovoltaic panels are blocked during consecutive rainy days. Therefore, this embodiment needs to detect the current change value, voltage change value and temperature change value of the photovoltaic string 110 to avoid abnormal situations such as failure to supply power due to bad weather, photovoltaic string 110 being blocked or photovoltaic string 110 failure.
[0089] Step S202: When the current change value, the voltage change value and the temperature change value meet the preset change conditions, the energy storage battery is powered by the photovoltaic string.
[0090] In some embodiments, various change values of the photovoltaic string within a preset time period are judged to determine whether the photovoltaic string can supply power normally at this time. When the current change value, voltage change value and temperature change value meet the preset change conditions, it indicates that the photovoltaic string functions normally, and the energy storage battery can be powered directly through the photovoltaic string to realize power supply to the energy storage battery.
[0091] Reference Figure 4 , Figure 4 It is a flowchart of a battery charging method provided by another embodiment of the present application. The battery charging method includes but is not limited to step S301.
[0092] Step S301: When the current change value, the voltage change value and the temperature change value do not meet the preset change conditions, it is determined that the photovoltaic string 110 is in a fault state or a shielding state.
[0093] In some embodiments, when the current change value, the voltage change value, and the temperature change value do not meet the preset change conditions, it indicates that the photovoltaic string 110 is abnormal, and it is determined that the photovoltaic string 110 is in a fault state or a shielding state.
[0094] In some embodiments, after determining that the photovoltaic string 110 is in a fault state or a shielding state, the working state of the wind turbine 120 is detected to avoid insufficient power supply and improve the stability of the power supply process.
[0095] It should be noted that the change condition is used to characterize the parameter change value of the photovoltaic string 110 under normal working conditions, including but not limited to current value, voltage value, temperature value, power value, impedance value, etc. In this embodiment, if any of the current change value, voltage change value and temperature change value does not meet the change condition, it means that the photovoltaic string 110 is abnormal and a specific status judgment is required to determine whether the photovoltaic string 110 is blocked or a fault occurs.
[0096] In some embodiments, when the photovoltaic string 110 is in a shielded state, the first charging amount of the photovoltaic string 110 for the energy storage battery 200 within a preset time period is detected to determine whether the photovoltaic string 110 in the shielded state can continue to charge the energy storage battery 200, thereby maximizing the use of solar energy resources and reducing energy waste.
[0097] It is understandable that when a part of the photovoltaic string 110 is blocked, the photovoltaic string 110 can continue to supply power to the energy storage battery 200, thereby fully utilizing the solar energy resources; when the photovoltaic string 110 is completely blocked, the photovoltaic string 110 cannot continue to supply power to the energy storage battery 200, and other power supply modules need to be started to supply power to the energy storage battery 200, thereby achieving stable power supply to the energy storage battery 200.
[0098] In some embodiments, when the wind turbine 120 operates normally and the first charge amount is lower than the preset stage charge threshold, it means that the power supply power of the photovoltaic string 110 is relatively small at this time, and the energy storage battery 200 needs to be powered by the wind turbine 120 and the photovoltaic string 110 together, thereby improving the reliability of energy supply, improving the flexibility of the energy system, and being able to better adapt to changes in energy demand, making the energy supply more flexible and controllable.
[0099] It should be noted that when there is wind in the environment where the wind turbine 120 is located, the wind turbine 120 operates normally; when there is no wind in the environment where the wind turbine 120 is located during the off-season, the wind turbine 120 stops operating. The stage charging threshold in this embodiment is calculated based on the charging amount of the battery when the photovoltaic string 110 is working normally, and this embodiment does not make specific restrictions.
[0100] In some embodiments, when the wind turbine 120 operates normally and the first charge amount is higher than the preset stage charge threshold, it means that the power supply power of the photovoltaic string 110 is relatively high at this time, and only a small part of the shading may occur. At this time, the energy storage battery 200 can be powered only by the photovoltaic string 110, or the energy storage battery 200 can be powered by the photovoltaic string 110 and the wind turbine 120, thereby improving the power supply efficiency of the energy storage battery 200 and shortening the power supply time.
[0101] In some embodiments, after detecting the first charging amount of the energy storage battery 200 by the photovoltaic string 110 within a preset time period, there may be no wind in the environment where the wind turbine 120 is located, and the following steps S301 to S302 are performed at this time.
[0102] Step S301: When the wind turbine 120 stops running and the first charge amount is lower than the stage charge threshold, the energy storage battery 200 is powered by the 800V DC charging pile 300;
[0103] Step S302: when the first charging amount is higher than the stage charging threshold, the energy storage battery 200 is powered by the photovoltaic string 110 .
[0104] In some embodiments, in steps S301 to S302, when the wind turbine 120 stops running and the first charge amount is lower than the stage charge threshold, it means that there is no wind in the environment where the wind turbine 120 is located, and the photovoltaic string 110 is blocked over a large area. At this time, the wind turbine 120 and the photovoltaic string 110 cannot stably and continuously provide power to the energy storage battery 200, and it is necessary to power the energy storage battery 200 through the 800V DC charging pile 300, so as to achieve stable power supply to the energy storage battery 200 and improve charging efficiency; or, when the first charge amount is higher than the stage charge threshold, it means that the power supply power of the photovoltaic string 110 is relatively high at this time, and only a small area of blocking may occur. At this time, the energy storage battery 200 can be powered only by the photovoltaic string 110, so as to maximize the use of solar energy resources, reduce energy waste, and reduce energy costs.
[0105] It should be noted that, in non-peak power consumption conditions, the power supply priorities of the photovoltaic string 110, the wind turbine 120 and the 800-volt DC charging pile 300 decrease in sequence, that is, the photovoltaic string 110 is used for power supply first, then the wind turbine 120, and finally the 800-volt DC charging pile 300 is used for power supply. This can reduce energy costs, make full use of natural resources, reduce dependence on traditional energy, and thus save costs. In addition, the combined use of wind power, solar energy and the 800-volt DC charging pile 300 can improve the flexibility of the energy system, better adapt to changes in energy demand, and make energy supply more flexible and controllable.
[0106] Reference Figure 5 , Figure 5 yes Figure 2 The specific method flow chart of step S104 in FIG. 1 , step S104 includes but is not limited to steps S401 to S404.
[0107] Step S401: obtaining the power consumption of the 800V DC charging pile 300 and detecting the working state of the 800V DC charging pile 300;
[0108] Step S402: When it is determined that the 800V DC charging pile 300 is connected to the electric vehicle for charging, the electric power of the electric vehicle is detected;
[0109] Step S403: When the electric power of the electric vehicle reaches a preset power threshold, the first power and the second power are set according to the power consumption, the energy storage battery 200 is powered by the first power and the clean energy power supply module 100, and the electric vehicle is powered by the second power;
[0110] In steps S401 to S403 of some embodiments, in the process of supplying power to the energy storage battery 200 through the clean energy power supply module 100 and the 800V DC charging pile 300, first, the power consumption of the 800V DC charging pile 300 is obtained, and the working status of the 800V DC charging pile 300 is detected to determine whether there is an electrical appliance currently being charged by the 800V DC charging pile 300, so as to facilitate the subsequent allocation of power consumption. When it is determined that the 800V DC charging pile 300 is connected to the electric vehicle for charging, it means that the 800V DC charging pile 300 is charging the electric vehicle at this time, and it is necessary to detect the electric vehicle power of the electric vehicle. When the electric vehicle power reaches the preset power threshold, it means that the battery power of the electric vehicle is high at this time, and the 800V DC charging pile 300 is not needed. 00 for high-power charging, the charging power can be reduced. Therefore, in this embodiment, the first power and the second power are set according to the power consumption, and the first power is greater than the second power. The energy storage battery 200 is powered by the first power and the clean energy power supply module 100, and the electric vehicle is powered by the second power, that is, more power is allocated to power the energy storage battery 200, and less power is allocated to power the electric vehicle, so as to achieve reasonable distribution of power consumption, improve the charging efficiency of the energy storage battery 200, and provide the energy storage battery 200 with continuous and stable power during the peak power consumption period. Moreover, by allocating more power in the 800V DC charging pile 300 to charge the energy storage battery 200, the energy storage battery 200 can be charged in a shorter time, thereby improving the charging efficiency.
[0111] Step S404: When the electric vehicle power does not reach the preset power threshold, the third power and the fourth power are set according to the power consumption, the electric vehicle is powered by the third power, and the energy storage battery 200 is powered by the fourth power and the clean energy power supply module 100.
[0112] It should be noted that the third power is greater than the fourth power.
[0113] In some embodiments, when the electric vehicle power does not reach the preset power threshold, it means that the battery power of the electric vehicle is low and still needs high-power charging. At this time, this embodiment sets the third power and the fourth power according to the power consumption, and the third power is greater than the fourth power. The electric vehicle is powered by the third power, and the energy storage battery 200 is powered by the fourth power and the clean energy power supply module 100, that is, more power is allocated to power the electric vehicle, and less power is allocated to power the energy storage battery 200, thereby realizing a reasonable arrangement of the power consumption of the 800-volt DC charging pile 300, and being able to provide stable power supply to multiple electrical devices at the same time to avoid insufficient power supply.
[0114] It should be noted that the power threshold can be set according to the battery capacity of the electric vehicle, for example, to 90%, 80%, 70% of the capacitance, etc., and this embodiment does not impose any specific limitation.
[0115] Reference Figure 6 , Figure 6 yes Figure 2 Another specific method flow chart of step S104 in , step S104 includes but is not limited to steps S501 to S504.
[0116] Step S501: supplying power to the energy storage battery 200 through the clean energy power supply module 100, and determining the real-time power level;
[0117] Step S502: When the real-time power level is in the preset first power level interval, the 800V DC charging pile 300 is controlled to supply power to the energy storage battery 200 at the fifth power;
[0118] Step S503: when the real-time power level is in the preset second power level interval, the 800V DC charging pile 300 is controlled to supply power to the energy storage battery 200 at the sixth power level in a preset cycle;
[0119] Step S504: when the real-time power level is within the preset third power level range, stop supplying power to the energy storage battery 200.
[0120] It should be noted that the power levels in the first power range, the second power range and the third power range increase in sequence, and the fifth power is less than the sixth power.
[0121] In steps S501 to S504 of some embodiments, in the process of supplying power to the energy storage battery 200 through the clean energy power supply module 100 and the 800V DC charging pile 300, first, the clean energy power supply module 100 supplies power to the energy storage battery 200, and determines the real-time power of the energy storage battery 200, so as to facilitate the subsequent use of different powers for power supply according to the power status of the energy storage battery 200. When the real-time power is in the preset first power interval, it means that the current power of the energy storage battery 200 is low, and the 800V DC charging pile 300 is controlled to supply power to the energy storage battery 200 at the fifth power. The energy storage battery 200 is powered by high power. When the real-time power is in the preset second power interval, it means that the current power of the energy storage battery 200 is medium. The 800V DC charging pile 300 can be controlled to power the energy storage battery 200 with the sixth power according to the preset cycle. When the real-time power is in the preset third power interval, it means that the current power of the energy storage battery 200 is high and no power supply is needed, then the energy storage battery 200 is stopped from being powered. Thus, different power supply parameters can be selected according to different situations of the energy storage battery 200, which can better protect the battery, reduce the loss of the battery during the charge and discharge cycle, and thus extend the service life of the battery. And by reasonably setting different power supply powers, a more economical power consumption strategy can be selected during the charging period, thereby reducing the power consumption cost.
[0122] It should be noted that, in the process of controlling the 800V DC charging pile 300 to power the energy storage battery 200 with a preset cycle, the energy storage battery 200 may be powered at the sixth power every five minutes, the energy storage battery 200 may be powered at the sixth power every hour, and the energy storage battery 200 may be powered at the sixth power every two hours. The second power interval may also be divided into a plurality of sub-intervals, each sub-interval is set with a different interval period, and then the interval period is set by determining in which sub-interval the real-time power is located. For example, the second power interval includes a first sub-interval, a second sub-interval, and a third sub-interval, wherein, The power levels of the first sub-interval, the second sub-interval and the third sub-interval increase in sequence. At this time, the interval period of each sub-interval is gradually extended. When the real-time power level is in the first sub-interval, the energy storage battery 200 is powered every five minutes; when the real-time power level is in the second sub-interval, the energy storage battery 200 is powered every ten minutes; when the real-time power level is in the third sub-interval, the energy storage battery 200 is powered every twenty minutes. This allows the charging interval to be adjusted according to the specific power level of the energy storage battery 200, thereby achieving intelligent optimal utilization of energy, improving the charging efficiency of the energy storage battery 200 and avoiding energy waste.
[0123] Reference Figure 7 , Figure 7 yes Figure 3 Specific method flow chart of step S202 in the embodiment, step S202 includes but is not limited to steps S601 to S605.
[0124] Step S601: drawing a current-voltage curve according to the current change value and the voltage change value, and determining the slope of the current-voltage curve;
[0125] Step S602: Detecting an initial current-voltage curve of the photovoltaic string 110 after being powered on for the first time, and determining an initial slope of the initial current-voltage curve;
[0126] Step S603: comparing the current change value and the voltage change value with a preset first standard value, and comparing the temperature change value with a preset second standard value;
[0127] It should be noted that the first standard value is used to characterize the current value and voltage value of the photovoltaic string 110 under normal operating conditions, and the second standard value is used to characterize the temperature change value of the photovoltaic string 110 under normal operating conditions.
[0128] Step S604: when the current change value or the voltage change value is less than the first standard value, the temperature change value is greater than the second standard value, and the slope of the curve is greater than the initial slope, it is determined that the photovoltaic string 110 is in a fault state;
[0129] Step S605: when the current change value and the voltage change value are less than the first standard value, the temperature change value is greater than the second standard value, and the slope of the curve is less than the initial slope, it is determined that the photovoltaic string 110 is in a shielding state.
[0130] In steps S601 to S605 of some embodiments, in the process of determining whether the photovoltaic string 110 is in a fault state or a shielding state, firstly, a current-voltage curve is drawn according to the current change value and the voltage change value, and the slope of the current-voltage curve is determined, so that various parameters of the photovoltaic string 110 in the current-voltage curve can be obtained. The detailed working characteristics of the photovoltaic string 110 can be obtained through the current-voltage curve, and whether the photovoltaic string 110 has a fault can be intuitively identified. Then, the initial current-voltage curve of the photovoltaic string 110 after the first power-on is detected, and the initial slope of the initial current-voltage curve is determined, so as to facilitate the subsequent diagnosis of whether the photovoltaic string 110 has a fault. After that, the current change value and the voltage change value are compared with the preset first standard value, and the temperature change value is compared with the preset second standard value, so as to determine whether the current value, voltage value and temperature value of the photovoltaic string 110 have changed abnormally, thereby improving the accuracy of the state judgment of the photovoltaic string 110 and avoiding misjudgment. In the event of misjudgment, when the current change value or the voltage change value is less than the first standard value, the temperature change value is greater than the second standard value, and the slope of the curve is greater than the initial slope, it means that the voltage or current of the photovoltaic string 110 fluctuates, and the temperature changes greatly, and the slope of the current-voltage curve differs greatly from that of the initial current-voltage curve, then the photovoltaic string 110 is determined to be in a fault state; when the current change value and the voltage change value are greater than the first standard value, and the temperature change value is greater than the second standard value, it means that the voltage and current of the photovoltaic string 110 fluctuate greatly and the temperature is high, and the slope of the curve is less than the initial slope, and the slope of the current-voltage curve differs little from that of the initial current-voltage curve, then the photovoltaic string 110 is determined to be in a shielding state, and the current state of the photovoltaic string 110 can be quickly judged, thereby realizing the judgment of the fault state and shielding state of the photovoltaic string 110. Accurately judging that the photovoltaic string 110 is faulty or blocked can help maintenance personnel quickly locate the problem and perform timely repairs, thereby improving the reliability and stability of the system.
[0131] It should be noted that when the photovoltaic string 110 is blocked, the light will be weakened, the output voltage of the photovoltaic string 110 will drop, and the output current of the string will also be affected by the blocking and drop, that is, the output current and output voltage of the photovoltaic string 110 will both drop, and due to the blocking, the photovoltaic string 110 does not have enough space for heat dissipation, resulting in abnormal temperature rise of some strings. Therefore, the slope of the current-voltage curve when the photovoltaic string 110 is blocked is relatively gentle and has no obvious inflection point, that is, the curve when the photovoltaic string 110 is blocked is close to the standard curve; when the photovoltaic string 110 fails, it may cause a sudden voltage drop or fluctuation of the photovoltaic string 110, and the current may also fluctuate abnormally, that is, when the photovoltaic string 110 is abnormal, it may cause abnormal fluctuations in voltage or current, and the temperature will rise abnormally. Therefore, the slope of the current-voltage curve when the photovoltaic string 110 fails is relatively steep or flat, and multiple inflection points may appear, that is, the curve when the photovoltaic string 110 fails will deviate from the standard curve.
[0132] Reference Figure 8 , Figure 8 yes Figure 2 Specific method flow chart of step S102 in the embodiment, step S102 includes but is not limited to steps S701 to S704.
[0133] Step S701: collecting the discharge amount of the energy storage battery 200 in a preset monitoring period;
[0134] Step S702: Analyze the discharge amount, real-time power and detection time to obtain a power consumption line graph of the energy storage battery 200;
[0135] Step S703: Perform image recognition on the power consumption line graph to determine the peak interval and the flat interval;
[0136] Step S704: Determine the peak time period and the gentle time period of the user's electricity consumption according to the peak period and the gentle period, and use the peak time period as the peak electricity consumption period of the energy storage battery 200 .
[0137] In steps S701 to S704 of some embodiments, in the process of determining the peak power consumption interval of the energy storage battery 200 used by the user, first, the discharge amount of the energy storage battery 200 in the preset monitoring period is collected, and then the discharge amount, real-time power and detection time are analyzed to obtain a power consumption line graph of the energy storage battery 200, so that the data of power consumption can be presented in an intuitive manner, and the power consumption of the energy storage battery 200 can be analyzed more comprehensively, and strong support can be provided for the formulation of subsequent strategies and plans. Then, image recognition is performed on the power consumption line graph to determine the peak interval and the gentle interval, so as to facilitate subsequent energy-saving optimization measures for the peak interval, reduce the power consumption cost, and formulate a more reasonable power consumption plan according to the distribution of the peak interval and the gentle interval to improve the power consumption efficiency. Finally, the peak time period and the gentle time period of the user's power consumption are determined according to the peak interval and the gentle interval, and the peak time period is used as the peak power consumption interval of the energy storage battery 200, so as to facilitate the subsequent planning of the power consumption in the peak power consumption interval and improve the power consumption efficiency.
[0138] It is worth noting that in the process of image recognition of the electricity consumption line graph, first, the electricity consumption line graph is processed, including but not limited to denoising, grayscale, binarization and other operations for subsequent image analysis, and then the curve contour in the line graph is found through the edge detection algorithm for subsequent regional analysis, and the curve data in the electricity consumption line graph is identified and extracted. Finally, the peak interval in the electricity consumption line graph is identified using data processing algorithms or pattern recognition technology, that is, the time period when the electricity consumption suddenly increases. According to the peak detection results, the electricity consumption line graph is divided into peak intervals and flat intervals. Thresholds or rules can be set according to specific needs for interval division to determine peak intervals and flat intervals, thereby reflecting the user's electricity consumption, facilitating the subsequent optimization of electricity consumption strategies, and improving energy utilization efficiency.
[0139] It should be noted that the monitoring period can be adjusted according to the needs of the user. For example, the monitoring period can be one day, three days, five days, etc., and this embodiment does not impose any specific limitation.
[0140] Reference Fig. 9 , Fig. 9 yes Figure 8 The specific method flow chart of step S702 in FIG. 1 , step S702 includes but is not limited to steps S801 to S804.
[0141] Step S801: Clean the data of the discharge amount, real-time power and detection time;
[0142] Step S802: determining the power consumption parameters of the energy storage battery 200 according to the discharge amount and real-time power after data cleaning;
[0143] Step S803: Draw a power consumption template based on a preset data visualization tool, and sort the power consumption parameters according to the detection time after data cleaning to obtain multiple groups of power consumption coordinates;
[0144] Step S804: Draw the power consumption template according to the power consumption coordinates to obtain a power consumption line graph of the energy storage battery 200.
[0145] In steps S801 to S804 of some embodiments, in the process of obtaining the power consumption line graph of the energy storage battery 200, first, the discharge amount, real-time power and detection time are cleaned, wherein the data cleaning includes but is not limited to removing duplicate data, processing missing values, correcting erroneous data, etc., so as to ensure the accuracy and completeness of the data, and then the power consumption parameters of the energy storage battery 200 are determined according to the discharge amount and real-time power after data cleaning, so as to obtain the real-time power and discharge amount changes of the energy storage battery 200 at different detection times, and then, based on the preset data visualization tool The tool draws an electricity usage template, wherein the electricity usage template uses the detection time after data cleaning as the horizontal coordinate and the electricity usage parameter as the vertical coordinate, and the electricity usage parameters are sorted according to the detection time after data cleaning to obtain multiple groups of electricity usage coordinates, so as to obtain the user's electricity usage habits in different time periods. Finally, the electricity usage template is drawn according to the electricity usage coordinates to obtain a power consumption line graph of the energy storage battery 200, so that the data on power usage can be presented in an intuitive manner, which can more comprehensively analyze the power usage of the energy storage battery 200 and provide strong support for the formulation of subsequent strategies and plans.
[0146] It should be noted that the data visualization tool may be Tableau, Power BI, Google Data Studio, etc., and this embodiment does not impose any specific limitation.
[0147] See also Fig.10 , Fig.10 The hardware structure of an electronic device of an embodiment is shown, and the electronic device includes:
[0148] The processor 1001 may be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present application;
[0149] The memory 1002 can be implemented in the form of a read-only memory (ROM), a static storage device, a dynamic storage device, or a random access memory (RAM). The memory 1002 can store an operating system and other application programs. When the technical solution provided in the embodiment of this specification is implemented by software or firmware, the relevant program code is stored in the memory 1002, and the processor 1001 calls and executes the battery charging method of the embodiment of this application;
[0150] Input / output interface 1003, used to implement information input and output;
[0151] The communication interface 1004 is used to realize the communication interaction between the device and other devices. The communication can be realized through a wired manner (such as USB, network cable, etc.) or a wireless manner (such as mobile network, WI FI, Bluetooth, etc.);
[0152] A bus 1005 , which transmits information between various components of the device (e.g., the processor 1001 , the memory 1002 , the input / output interface 1003 , and the communication interface 1004 );
[0153] The processor 1001 , the memory 1002 , the input / output interface 1003 and the communication interface 1004 are connected to each other in communication within the device via the bus 1005 .
[0154] In addition, an embodiment of the present application also provides a computer-readable storage medium, which stores computer-executable instructions, and the computer-executable instructions are executed by a processor or controller, for example, by a processor in the above-mentioned system embodiment, so that the above-mentioned processor can execute the battery charging method in the above-mentioned embodiment.
[0155] The embodiments described in the embodiments of the present application are intended to more clearly illustrate the technical solutions of the embodiments of the present application and do not constitute a limitation on the technical solutions provided in the embodiments of the present application. Those skilled in the art will appreciate that with the evolution of technology and the emergence of new application scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.
[0156] It can be understood by those skilled in the art that Figure 1-6 The technical solutions shown in the figure do not constitute a limitation on the embodiments of the present application, and may include more or fewer steps than those shown in the figure, or a combination of certain steps, or different steps.
[0157] The device embodiments described above are merely illustrative, and the units described as separate components may or may not be physically separated, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0158] Those skilled in the art will appreciate that all or some of the steps in the methods disclosed above, and the functional modules / units in the systems and devices may be implemented as software, firmware, hardware, or a suitable combination thereof.
[0159] The terms "first", "second", "third", "fourth", etc. (if any) in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0160] It should be understood that in the present application, "at least one (item)" means one or more, and "plurality" means two or more. "And / or" is used to describe the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" can mean: only A exists, only B exists, and A and B exist at the same time, where A and B can be singular or plural. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b or c can mean: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", where a, b, c can be single or multiple.
[0161] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the above units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0162] In addition, each functional unit in each embodiment of the present application can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of a software functional unit. If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including multiple instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method of each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, referred to as ROM), random access memory (RandomAccess Memory, referred to as RAM), disk or optical disk and other media that can store programs.
[0163] The preferred embodiments of the present invention are described above with reference to the accompanying drawings, but the scope of the rights of the present invention is not limited thereto. Any modification, equivalent substitution and improvement made by a person skilled in the art without departing from the scope and essence of the present invention should be within the scope of the rights of the present invention.
Claims
1. A battery charging method, characterized in that: Applied to an energy storage system, the energy storage system includes a clean energy power supply module, an energy storage battery and an 800V DC charging pile, the clean energy power supply module includes a photovoltaic string; the method includes: The energy storage battery is powered by the clean energy power supply module, and the real-time power level of the energy storage battery is detected and the detection time corresponding to the real-time power level is recorded; Determine the peak power consumption interval of the energy storage battery used by the user according to the real-time power consumption and the detection time; During the peak power consumption period, when the power level of the energy storage battery is lower than the preset power level, the actual power consumption rate of the energy storage battery is determined according to the real-time power level and the detection time; When the actual power consumption rate is greater than the standard power consumption rate during the peak power consumption period, the energy storage battery is powered by the clean energy power supply module and the 800V DC charging pile; Wherein, supplying power to the energy storage battery through the clean energy power supply module includes: The energy storage battery is powered by the photovoltaic string, and a current change value, a voltage change value, and a temperature change value of the photovoltaic string over a preset time period are detected; When the current change value, the voltage change value and the temperature change value meet preset change conditions, the energy storage battery is powered by the photovoltaic string; After the energy storage battery is powered by the photovoltaic string, the method further includes: When the current change value, the voltage change value, and the temperature change value do not meet a preset change condition, determining that the photovoltaic string is in a fault state or a shielding state; The detecting the real-time power of the energy storage battery and recording the detection time corresponding to the real-time power includes: Wherein, determining the peak power consumption interval of the energy storage battery used by the user according to the real-time power and the detection time includes: Collecting the discharge amount of the energy storage battery in a preset monitoring period; Performing data cleaning on the discharge amount, the real-time power amount and the detection time; Determine the power consumption parameters of the energy storage battery according to the discharge amount and real-time power after data cleaning; Drawing an electricity usage template based on a preset data visualization tool, and sorting the electricity usage parameters according to the detection time after data cleaning to obtain multiple groups of electricity usage coordinates; The power consumption template is drawn according to the power consumption coordinates to obtain a power consumption line graph of the energy storage battery; Perform image recognition on the electricity consumption line graph to determine peak intervals and flat intervals; Determine the peak time period and the flat time period of the user's electricity consumption according to the peak time period and the flat time period, and use the peak time period as the peak power consumption period of the energy storage battery; Wherein, determining that the photovoltaic string is in a fault state or a shielding state includes: Draw a current-voltage curve according to the current change value and the voltage change value, and determine the slope of the current-voltage curve; Detecting an initial current-voltage curve of the photovoltaic string after being powered on for the first time, and determining an initial slope of the initial current-voltage curve; Compare the current change value and the voltage change value with a preset first standard value, and compare the temperature change value with a preset second standard value, wherein the first standard value is used to characterize the current value and voltage value of the photovoltaic string under normal operating conditions, and the second standard value is used to characterize the temperature value of the photovoltaic string under normal operating conditions; When the current change value or the voltage change value is less than the first standard value, the temperature change value is greater than the second standard value, and the slope of the curve is greater than the initial slope, it is determined that the photovoltaic string is in a fault state; When the current change value and the voltage change value are less than the first standard value, the temperature change value is greater than the second standard value, and the slope of the curve is less than the initial slope, it is determined that the photovoltaic string is in a shielding state.
2. The battery charging method according to claim 1, characterized in that: The method of supplying power to the energy storage battery through the clean energy power supply module and the 800V DC charging pile includes: Obtaining the power consumption of the 800V DC charging pile and detecting the working state of the 800V DC charging pile; When it is determined that the 800V DC charging pile is connected to the electric vehicle for charging, detecting the electric power of the electric vehicle; When the electric power of the electric vehicle reaches a preset power threshold, a first power and a second power are set according to the electric power consumption, the energy storage battery is powered by the first power and the clean energy power supply module, and the electric vehicle is powered by the second power, wherein the first power is greater than the second power. or, When the power of the electric vehicle does not reach a preset power threshold, the third power and the fourth power are set according to the power consumption, the electric vehicle is powered by the third power, and the energy storage battery is powered by the fourth power and the clean energy power supply module, wherein the third power is greater than the fourth power.
3. The battery charging method according to claim 1, characterized in that: The method of supplying power to the energy storage battery through the clean energy power supply module and the 800V DC charging pile includes: Powering the energy storage battery through the clean energy power supply module and determining the real-time power quantity; When the real-time power level is in a preset first power level interval, controlling the 800V DC charging pile to supply power to the energy storage battery at a fifth power; When the real-time power level is in a preset second power level interval, controlling the 800V DC charging pile to supply power to the energy storage battery at a sixth power level in a preset cycle; When the real-time power level is in a preset third power level interval, stopping supplying power to the energy storage battery; The power levels of the first power interval, the second power interval, and the third power interval increase in sequence, and the fifth power is less than the sixth power.
4. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the battery charging method according to any one of claims 1 to 3 when executing the computer program.
5. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, and the computer-executable instructions are used to execute the battery charging method according to any one of claims 1 to 3.
Citation Information
Patent Citations
Commercial-power, wind-energy and solar-energy complementary air heater
CN104113095A
Intelligent household standby energy storage system
CN106849322A
Energy management method and device, computer equipment and computer readable storage medium
CN114331757A
Intelligent electrical storage device and non-stop electronic toll collection equipment
CN214707295U
Parameter configuration method and terminal for photovoltaic storage and charging system
WO2023029335A1