A method for folding and coiling slewing main cable strands and a method for erecting main cable strands.
By using a folding and coiling method and a single-line reciprocating traction system, the problems of long traction paths and torsional deformation of the slewing cable strands were solved, achieving efficient cable strand erection and installation, and improving construction efficiency and quality.
Patent Information
- Application Number
- CN202410191952.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-21
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2044-02-21
AI Technical Summary
In existing technologies, the traction path of the slewing cable strands is long and the number of anchor head changes is high, which leads to problems such as strand twisting, deformation, loose strands, and skipped strands. In addition, the conventional vertical cable laying method is not suitable for the horizontal or slightly inclined slewing saddle of the slewing cable, resulting in low installation efficiency of the cable strands.
The single strand of cable is coiled using a folding and coiling method. Through the design of the folded strand ring and the shaping bracket, it is ensured that the head and tail of the strand are on the outside of the cable reel, and it is laterally bent and shaped between the cable frame. The single-line reciprocating traction system is used to achieve efficient traction and saddle insertion of the strand, reducing the number of anchor head conversions.
It improves the efficiency of cable strand erection, avoids cable strand twisting and fraying, ensures the quality of cable strand installation, shortens the cable release path, and improves cable strand traction efficiency and installation quality.
Smart Images

Figure CN118145433B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the technical field of suspension bridge slewing main cable erection, specifically relating to a method for folding and coiling slewing main cable strands and a method for erecting main cable strands. Background Technology
[0002] When constructing a suspension bridge, the first step is to establish a traction system for the initial setup of the catenary and the main cable. Due to the large weight of the main cable, it needs to be divided into several main cable strands for traction during construction. This project (the Yellow River Three Gorges Bridge project) uses a single main cable slewing cable. The slewing cable strand traction method used abroad involves first coiling a single main cable strand, then using a longitudinal traction system to pull an anchor head to the opposite bank, then using a horizontal traction system to pull the anchor head horizontally to the other side, and finally using a longitudinal traction system to pull the anchor head back. However, this method results in a long traction path, numerous anchor head transfers, and low strand traction efficiency.
[0003] Furthermore, conventional bridge main cables are laid vertically, while the slewing end saddles and slewing saddles of slewing cables are horizontal or slightly inclined. This means that the strands must be reversed after being laid before they can be put into the saddle, which may cause problems such as strand twisting, deformation, loose strands, skipped strands, and tangled strands.
[0004] Therefore, there is a need to provide an improved technical solution that addresses the shortcomings of the existing technology. Summary of the Invention
[0005] The purpose of this invention is to overcome the shortcomings of the prior art and provide a method for folding and coiling the main cable strands and a method for erecting the main cable strands.
[0006] To achieve the above objectives, the present invention provides the following technical solution:
[0007] A method for folding and coiling slewing main cable strands involves coiling a single strand using a folding and coiling method; the final coiled strand has both the head and tail ends on the outside of the coil; the method includes the following steps:
[0008] S0.1. Wire is fed from the wire feeding spool to make strands. The strands are coiled individually with the head inside and the tail outside, using cable frame A for coiling. When the first horizontal cable saddle position is reached, the first lateral bending is performed to form the strand.
[0009] S0.2, When the main cable is made to the horizontal saddle position, a second lateral bending is performed;
[0010] S0.3 Place a cable frame B in front of cable frame A. Locate the midpoint of the cable strand according to the cable strand making marks. Use a clamp to hold the midpoint of the cable strand and pull it. Pull the cable strand past cable frame B. After pulling it to a distance of 20 to 30 times the diameter of the cable strand at the edge of cable frame B, wrap it around the side of the cable reel on cable frame B with a diameter of not less than 25 times the diameter of the cable strand to form a folded cable strand loop.
[0011] S0.4. A triangular support with dimensions matching 20 to 30 times the diameter of the strand is used to form a rigid support inside the folded strand ring.
[0012] S0.5 The shaping bracket and the cable reel on cable frame B are temporarily fixed with special tooling to ensure that the folded cable strands will not slide relative to the cable reel on cable frame B; then, while releasing the cable with cable frame A, the remaining cable strands are made, and all cable strands are wound onto the cable reel on cable frame B.
[0013] S0.6 After winding is completed, remove the shaping bracket from the cable reel on cable frame B, and temporarily fix the root of the folded strand ring to the cable reel on cable frame B to form the starting end of the folded strand coil; unwind the coiled double-headed strand from cable frame B and pack it.
[0014] Furthermore, in step S0.6, during the process of coiling the cable strands on cable frame B, a third lateral bending is performed when the cable strands are made to the second horizontal saddle position.
[0015] Furthermore, the contact area between the shaping bracket and the strand is machined with square or trapezoidal grooves that match the shape of the strand.
[0016] This invention also proposes a method for erecting main cable strands, which utilizes the aforementioned method of folding and coiling main cable strands to produce a single strand coil, comprising the following steps:
[0017] S0. Construction Preparation:
[0018] Two independent single-line reciprocating traction systems are erected, located between the south and north anchorages on both banks of the river, to handle the traction of the main cable strands. A circular channel is provided within the north anchorage, with horizontal main cable saddles and two horizontal swivel saddles installed on its walls. The swivel main cable rotates along the circular channel. A cable release area corresponding to the midpoint of the swivel main cable is provided within the north anchorage, containing a horizontal cable release machine for horizontal cable release. The traction area is located on the top surface of the south anchorage.
[0019] The coil of a single strand produced by the aforementioned method of folding and coiling the main cable strands is hoisted to the cable release area;
[0020] S1, Cable Traction:
[0021] During cable laying, manual labor and a crane simultaneously pull out two anchor heads of the same cable strand from the cable reel in the cable laying area and move them to the upstream and downstream horizontal cable saddles. They are then connected to the pullers of two sets of single-line reciprocating traction systems. The two sets of single-line reciprocating traction systems are used to simultaneously pull both ends of the cable strand to the south anchorage and reach the platform above the front anchorage chamber. The connection between the two anchor heads and the pullers is then released, and the tower crane, in conjunction with a winch, slowly lowers the front anchor head into the front anchorage chamber of the south anchorage for temporary anchoring.
[0022] When there are 1-3 turns of cable strand remaining in the cable release frame, the traction winch on the south bank stops traction operation; the cable strand is temporarily fixed and tightened using the cable gripper; then, the remaining cable strand in the cable release frame is slowly released by manual labor and the tower crane in coordination with the chain hoist until there are no cable strands on the cable reel of the cable release frame.
[0023] S2, Stock Lift, Lateral Movement:
[0024] The completed cable strands are placed on the catwalk rollers, and the cable strands are lifted and moved laterally using the tower, anchor gantry winch, gantry A, and gantry B in conjunction with the cable gripper.
[0025] S3, Thigh Shaping:
[0026] The cable strands of the horizontal main cable saddle and horizontal cable turn saddle sections of the north anchorage adopt pre-forming technology, and have already undergone lateral bending pre-forming construction in the factory. Only when loose or twisted strands occur in these horizontal cable strand sections during construction are they manually shaped on-site using quadrilateral shaping tools. The cable strands of the horizontal main cable saddle at the top of the bridge tower and the loose cable saddle section of the south anchorage adopt on-site manual shaping technology.
[0027] S4, Inserting the Thigh into the Saddle:
[0028] After all the cable strands at the main cable saddle, the loose cable saddle, and the turning cable saddle have been shaped, the cable strands are placed into the corresponding saddle grooves of the cable saddle in sequence; the horizontal main cable saddle and the horizontal turning cable saddle of the north anchorage are both horizontal cable saddles;
[0029] The order of cable strand insertion into the saddle is as follows: first the horizontal main cable saddle → then the horizontal rotating cable saddle → then the bridge tower main cable saddle → finally the loose cable saddle; among which, the horizontal main cable saddle of the north anchorage is inserted into the saddle groove in the order from the middle to both sides, and the horizontal rotating cable saddle is inserted into the saddle groove in the order from the side span to the middle span, then the main cable saddle of the tower top is inserted into the saddle from the middle span to the side span, and the loose cable saddle of the side span pier top is inserted into the saddle from the side span to the anchorage span.
[0030] S5, anchoring the strands.
[0031] Furthermore, in step S1, when the cable is released until there are no strands on the cable release frame reel, there is a folded strand ring fixed on the cable reel;
[0032] In step S2, manual assistance is used to connect the folded strand ring to the chain hoist on gantry A.
[0033] Furthermore, in step S2, during the cable lifting stage, within the annular channel area, the cable strands between the horizontal main cable saddle and the horizontal rotating cable saddle are lifted using chain hoists on gantry A and gantry B within a 2.5m range on both sides. A lifting point is set at the midpoint of the cable strands between the saddles, and the cable strands are lifted using chain hoists on gantry B to ensure that the cable strands in the horizontal cable saddle area are basically in a stress-free state. With manual assistance, the temporary fixation at the root of the folded cable strand ring is released and connected to the chain hoist on gantry A. The chain hoist lifts the cable strands to a certain height, completely separating the cable strands from the vertical and horizontal limiting rollers.
[0034] During the cable strand lateral movement stage, the cable strand is laterally moved into the annular channel using the lateral movement systems on gantry A and gantry B. Then, the cable strand is supported by the support system of the operating platform in the annular channel. The elevation of the support system is controlled to be at the same level as the elevation of the steel diaphragm surface corresponding to the cable strand entering the saddle.
[0035] Furthermore, in step S4, firstly, the anti-pull chain hoists used for horizontal entry of the cable strands into the horizontal main cable saddle and the horizontal turning cable saddle are installed and tightened; several anti-pull chain hoists are installed 2m before and after the horizontal main cable saddle and the horizontal turning cable saddle, and one is installed on each side edge of the horizontal main cable saddle and the horizontal turning cable saddle, the purpose of which is to keep the cable strands relatively horizontal within the range of the horizontal main cable saddle and the horizontal turning cable saddle; start the winch of the north bank catwalk gantry to loosen and the winch of the south bridge tower to tighten, so that the tension of the cable strands towards the mid-span side gradually increases, and at the same time, the anti-pull chain hoists at the horizontal cable saddle are slowly loosened;
[0036] When the cable is being installed in the saddle, manual assistance is used to assist in the reverse chain hoisting construction. When the middle reverse chain hoist reaches the partition at the groove, the middle reverse chain hoisting is removed. At this time, the cable strand has gradually entered the saddle groove. As the reverse chain hoisting is removed from the middle to both sides, the cable strand continues to move into the saddle groove until the cable strand reaches the root of the saddle groove. After confirming that the cable strand has no bulging or twisting, wooden wedges are inserted into the saddle groove to temporarily tighten the cable strand.
[0037] Furthermore, a single-line reciprocating traction system mainly includes two traction winches, one traction cable, one puller, tower anchor gantry and guide wheel assembly, catwalk gantry and guide wheel assembly, and various support rollers; the two traction winches are respectively arranged on the south anchorage and the north anchorage, one for releasing the traction cable and the other for winding the traction cable, and the two traction winches are linked to make the traction cable move back and forth; the puller is fixed on the traction cable.
[0038] Furthermore, the north anchorage is equipped with cable strand supports and cable strand limiting rollers; the horizontal cable release machine is located in the cable release area and is used to horizontally release the coiled single cable strands; the cable strand supports are arranged along the direction from the cable release area to the horizontal cable saddle, and the cable strand limiting rollers are installed on the cable strand supports, and the cable strands are supported and limited by the cable strand supports and the cable strand limiting rollers when the cable strands are pulled.
[0039] The gantry A is positioned on the north anchorage at the position corresponding to the horizontal main cable saddle, and several gantry Bs are arranged along the annular channel; the gantry A and gantry B are equipped with chain hoists and lateral movement systems, and the chain hoists can move laterally along the lateral movement system.
[0040] Furthermore, an anchor head slide is provided on the top surface of the cable support, on which a track trolley for transporting the anchor head can travel.
[0041] The beneficial effects of this invention are:
[0042] The method of folding and coiling the main cable strands of the present invention changes the conventional production and winding of cable strands. The pre-bending of the horizontal main cable saddle and the horizontal slewing cable saddle, as well as the folding and coiling of the cable strands, are completed during the production of the steel wire raw materials and the first coiling process. The entire folding and coiling process only uses two cable frames, A and B, and only requires transferring the cable strands from cable frame A to cable frame B once, which can efficiently produce folded cable strand coils.
[0043] The main cable strand erection method of the present invention utilizes a strand coil made by a folding and coiling method, which can realize the simultaneous horizontal release of the strand head and tail and the horizontal insertion into the saddle, shortening the release path; and each anchor head of the folding coil only needs to change the operating vehicle once, improving the strand erection efficiency.
[0044] Meanwhile, by adopting the method of horizontal cable release and horizontal insertion of cable strands into the saddle, if there are no loose or twisted strands in the pre-bent section of the cable strand after it is released, it can be directly inserted into the saddle. This can minimize the twisting and loosening of the cable strand wires, prevent the cable strand from being damaged by twisting during installation, and ensure the installation quality of the cable strand. Attached Figure Description
[0045] The accompanying drawings, which form part of this application, are used to provide a further understanding of the invention. The illustrative embodiments of the invention and their descriptions are used to explain the invention and do not constitute an undue limitation of the invention. Wherein:
[0046] Figure 1 This is a schematic diagram of the cable strand traction plane according to an embodiment of the present invention.
[0047] Figure 2 This is a schematic diagram of the arrangement of the north anchorage in an embodiment of the present invention.
[0048] Figure 3 This is a schematic diagram of the arrangement of the anchor head slide in an embodiment of the present invention.
[0049] Figure 4 This is a construction process flow diagram according to an embodiment of the present invention.
[0050] Figure 5 This is an elevation view of the cable-stayed traction construction steps according to an embodiment of the present invention.
[0051] Figure 6 This is an elevation view of the cable lifting and lateral movement construction steps according to an embodiment of the present invention.
[0052] Figure 7 This is an elevation view of the construction steps of the cable strand entering the horizontal main cable saddle according to an embodiment of the present invention.
[0053] Figure 8 This is a plan view of the construction steps of the cable strand entering the horizontal main cable saddle according to an embodiment of the present invention.
[0054] Figure 9 This is a plan view of the construction steps for the cable strand entering the horizontal cable saddle according to an embodiment of the present invention.
[0055] Figure 10 This is a schematic diagram of the second lateral bending forming of the strand in an embodiment of the present invention.
[0056] Figure 11 This is a schematic diagram showing the positions of cable frame A and cable frame B in an embodiment of the present invention.
[0057] Figure 12 This is a schematic diagram of the third lateral bending forming of the strand in an embodiment of the present invention.
[0058] In the diagram: 1- Cable release frame, 2- Anchor head slide, 3- Track trolley, 4- Cable strand limiting roller, 5- Cable strand support, 6- Reverse pull chain hoist, 7- Cable release disc, 8- Shaping bracket, 9- Cable frame A, 10- Cable frame B, 11- First pre-bending section, 12- Second pre-bending section, 13- Pre-bending section production line, 14- Third pre-bending section, 15- Traction winch, 16- Traction cable, 17- Puller, 18- Guide wheel A, 19- Rotary bracket, 20- Gantry A, 21- Gantry B. Detailed Implementation
[0059] The technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art are within the scope of protection of the present invention.
[0060] In the description of this invention, the terms "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," and "bottom," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing the invention and do not require the invention to be constructed and operated in a specific orientation; therefore, they should not be construed as limitations on the invention. The terms "connected" and "linked" used in this invention should be interpreted broadly. For example, they can refer to a fixed connection or a detachable connection; they can refer to a direct connection or an indirect connection through intermediate components. Those skilled in the art can understand the specific meaning of the above terms according to the specific circumstances.
[0061] The present invention will now be described in detail with reference to the accompanying drawings and embodiments. It should be noted that, unless otherwise specified, the embodiments and features described herein can be combined with each other.
[0062] A method for folding and coiling slewing main cable strands involves coiling a single strand using a folding and coiling method; the final coiled strand has both the head and tail ends on the outside of the coil, and includes the following steps:
[0063] S0.1. Wire is fed from the wire feeding plate 7 to make strands. The strands are coiled individually with the head inside and the tail outside. The coiling is done using the cable frame A9. When the first horizontal cable saddle position is reached, the first lateral bending is performed.
[0064] The term "manufacturing" here refers to the process of releasing high-strength galvanized steel wire from the wire release spool 7, shaping, marking, wrapping, and securing it with tape; that is, the process of making strands from high-strength galvanized steel wire. Figures 10-12 The cables in the diagram are all in the production process;
[0065] S0.2, when the cable reaches the horizontal main cable saddle position, perform a second lateral bending shaping; such as Figure 10 The image shows the first pre-bent section 11 formed by the first lateral bending and the second pre-bent section 12 formed by the second lateral bending. At this time, the first pre-bent section 11 has been coiled on the cable frame A9, and the second pre-bent section 12 is being fixed and formed on the pre-bent section production line 13. During the production of the pre-bent section, ingot-shaped pre-forming clamps are first used at both ends of each formed cable strand, and then ordinary pre-forming clamps are used at intervals in the middle to fix the cable strands into shape.
[0066] S0.3, Place a cable frame B10 in front of cable frame A9, as follows: Figure 11As shown, locate the midpoint of the cable strand according to the cable strand making marks (corresponding to the center point of the horizontal main cable saddle of the north anchorage), use a clamp to hold the midpoint of the cable strand and pull it to pull the cable strand over cable frame B10; after pulling the distance to a distance of 20 to 30 times the diameter of the cable strand at the edge of cable frame B10, wrap it around the side of the cable reel on cable frame B10 with a diameter of not less than 25 times the diameter of the cable strand to form a folded cable strand loop;
[0067] S0.4, such as Figure 11 As shown, a triangular shaping bracket 8 with an outer dimension matching 20 to 30 times the diameter of the cable strand is used to form a rigid support inside the folded cable strand ring, ensuring that the folded cable strand ring does not collapse and preventing damage to the folded part of the slewing main cable strand; the contact part between the shaping bracket 8 and the cable strand is machined with a square or trapezoidal groove that matches the shape of the cable strand to prevent damage to the steel wire of the cable strand. Preferably, the groove is trapezoidal to facilitate the loading and unloading of the cable strand, and the groove has a vertical groove wall that contacts the inner side of the cable strand;
[0068] S0.5, such as Figure 12 As shown, the shaping bracket 8 and the cable reel on the cable frame B10 are temporarily fixedly connected using a special tool to ensure that the folded cable strands do not slide relative to the cable reel on the cable frame B10; then, while releasing the cable using the cable frame A9, the remaining cable strands are made, and all the cable strands are wound onto the cable reel on the cable frame B10.
[0069] S0.6 After winding is completed, remove the shaping bracket 8 from the cable reel of cable frame B10, and temporarily fix the root of the folded strand ring to the cable reel on cable frame B10 to form the starting end of the folded strand coil; unwind the coiled double-headed strand from cable frame B10 and pack it; when packing, be careful to leave a certain space at the ring of the strand, do not pack too tightly, and be careful to prevent the folded strand ring from being deformed by the packaging; the shaping bracket 8 can be made of common materials such as wood or steel. In this invention, the shaping bracket 8 is removed before the finished strand coil is packed, and the shaping bracket 8 can be reused in the subsequent strand coil production process;
[0070] Note that a third lateral bending should be performed when the second horizontal cable saddle position is reached, such as... Figure 12 The diagram shows a plan view of the folding and coiling process. At this time, the first pre-bent section 11 is coiled on the cable frame A9, the second pre-bent section 12 is fixed by the shaping bracket 8, and the third pre-bent section 14, which is formed by the third lateral bending, is being fixed and formed on the pre-bent section production line 13. The weight of a single full-length cable strand after coiling is about 37t. Considering that the cable strand is folded in half and exposed on the coil, the size is 3.6m × 6.0m.
[0071] After the S0.7 cable strands are folded and coiled, the anchor head of the cable strands is filled with cement. The process is as follows: melt alloy → separate wires and clean → assemble anchor → preheat anchor → fill with cement → press up; note that the two ends of the cable strands are exposed when coiling; the anchor head can be constructed before or after the removal of the shaping bracket 8.
[0072] This embodiment changes the conventional manufacturing and winding of cable strands. During the initial winding process from the production of the steel wire raw material, the lateral bending and forming of the cable strands at three points—the horizontal main cable saddle and the horizontal transfer cable saddle—are completed, allowing for efficient production of cable strand folded coils. Furthermore, during the manufacturing process, only one cable frame A9 is needed as a transfer cable frame, and one cable frame B10 is needed as a winding cable frame. The folding and winding of the cable strands can be achieved with the assistance of the shaping bracket 8. After the cable strands on cable frame A9 are wound onto cable frame B10, cable frame A9 can be used again in the manufacturing process of the next cable strand.
[0073] The main cable strand erection construction process of this invention is roughly as follows:
[0074] The main cable of the present invention is erected by prefabricated parallel wire strand (PPWS). In the factory, 127 steel wires are combined into a parallel wire bundle with a regular hexagonal cross section, wrapped and shaped with fiber strength tape to form a parallel wire strand, and then folded and coiled according to the aforementioned folding and coiling method. Anchor heads are installed at both ends, and then the coil is uncoiled, packaged and transported to the construction site.
[0075] The cable reel is transported from the manufacturing base to a designated cable storage yard near the north anchorage using a heavy-duty trailer. A 100t crawler crane is used for in-yard transfer. At the north anchorage, the crawler crane lifts the cable reel onto the cable laying frame 1 of the horizontal cable laying machine. The anchor heads at both ends of the cable strands are simultaneously pulled out and connected to the traction system puller 17. Through the single-line reciprocating traction system, the cable strands are pulled along the rollers on the catwalk from the north anchorage to the south anchorage. After the anchor heads are pulled into place, they are temporarily anchored and connected, completing the construction of the reference cable frame. Then, the winch returns the single-line reciprocating traction system puller 17 and repeats the above steps to continue pulling the general cable strands into place and temporarily anchoring them (the general cable strands are the main cable strands other than the reference cable strands).
[0076] After the cable strand is pulled into place, it is lifted and moved laterally, shaped and inserted into the saddle, and the cable strand anchor head is connected to the front anchor chamber connector through a Ф85mm tie rod; and the cable strand alignment is measured and adjusted and the anchor span tension is adjusted when the temperature is stable at night.
[0077] The following example illustrates a suspension bridge construction project, in which the main cable consists of two spans, as follows: Figure 1 , Figure 2As shown, the north bank uses a surface-mounted gravity anchor, and the south bank uses a rock-embedded gravity anchor. From north to south, the spans are: north anchor span, main span, south side span, and anchor span. When the bridge is completed, the span combination is 540 + 185 = 725m. The theoretical intersection point of the main cable at the top of the tower is 489.000m, the midpoint of the main cable span is 401.250m, the rise is 87.75m, and the rise-to-span ratio is 1 / 16. There is one slewing main cable arranged upstream and downstream, with a center distance of 37.4m. The length of the single main cable strand is 1612.330 to 1614.846m. It adopts prefabricated parallel wire bundle strands (PPWS). Each main cable consists of 121 strands, each strand is composed of 121 Φ5.3mm 1960MPa high-strength galvanized steel wires, and the total weight of the strand is about 37t.
[0078] Due to space constraints, the anchorage on the north bank requires the use of the top surface of the anchor body as a construction platform. This platform houses a material storage area and a crane operation area. In addition to storing various materials used for cable hoisting, the north bank anchorage also includes a horizontal cable-laying machine for releasing the main cable strands, tugboats and limit rollers supporting the main cable, gantry A20 / Gantry B21, an operating platform within the circular passage, as well as winches, steering wheels, and steering supports. Storage areas are set up at the bridge tower's major and minor mileage points to store materials such as cable clamps and slings, as well as materials for subsequent use, including wire winding machines, S-shaped steel wires, cable sleeves, and maintenance walkways. At the south anchorage, in addition to storing various materials used for cable hoisting, steering wheels and winches are installed on the top surface of the anchorage during the main cable erection phase. A truck crane operation platform, cable clamps, and cable sleeve storage area are set up on the approach bridge deck.
[0079] This embodiment of a main cable strand erection method mainly includes the following procedures: construction preparation, strand traction, strand lifting, lateral movement, strand shaping, strand insertion into the saddle, strand insertion into the anchor, sag adjustment, and cable tension adjustment; including the following steps:
[0080] S0. Construction Preparation:
[0081] Two independent single-line reciprocating traction systems are erected, located between the south and north anchorages on both banks of the river, to handle the traction of the main cable strands. A circular channel is provided within the north anchorage, with horizontal main cable saddles and two horizontal swivel saddles installed on its walls. The swivel main cable rotates along the circular channel. A cable release area corresponding to the midpoint of the swivel main cable is provided within the north anchorage, containing a horizontal cable release machine for horizontal cable release. The traction area is located on the top surface of the south anchorage.
[0082] The coil of a single strand, made using the aforementioned method of folding and coiling the main cable strands, is hoisted to the cable release area; the cable reel is released horizontally (the cable reel rotates horizontally);
[0083] S1, cable traction, specifically includes:
[0084] S1.1 The crane in the cable laying area, in conjunction with special lifting equipment, lifts and rotates the boom to hoist the cable strand reel to be erected onto the horizontal cable laying machine and fixes it to the cable support reel;
[0085] S1.2, with manual assistance, two tower cranes simultaneously pull out the upstream and downstream anchor heads respectively. The anchor heads and cable strands are hoisted to the upstream and downstream horizontal cable saddles via the cable strand vertical roller and horizontal limiting roller (collectively referred to as cable strand limiting roller 4), and connected to the pullers 17 of the upstream and downstream single-line reciprocating traction systems respectively; Figure 2 , Figure 5 The image shows the cable strands connected to the puller.
[0086] If the construction of the main cable, wind cable, etc., overlaps with the main cable erection in the later stages, and the workers cannot easily pass due to the space constraints of the main cable, then an anchor head slide 2 will be installed on the top surface of the cable strand support 5. The upstream and downstream anchor heads will be pulled out simultaneously by manual labor and two tower cranes, and then the anchor heads will be placed on the track trolley 3 and fixed. The track trolley 3 will be placed on the anchor head slide 2. The track trolley 3 will be pushed and pulled by a horizontal chain hoist at the end of the traveling track, moving the anchor head and cable strand laterally to the horizontal cable saddle via the vertical and horizontal limit rollers. Then, a crane will be used to lift and move the anchor head to connect it to the pullers 17 on the upstream and downstream traction systems. Figure 3 , Figure 5 The image shows the track trolley 3 transporting the anchor head;
[0087] S1.3. Start the 30t winch on the south anchorage side, and begin pulling the cable strand from the horizontal cable saddle → to the support frame on the construction channel within the circular passage → until it successfully passes through the guide wheel assembly of the north anchorage catwalk; this completes the pulling of the cable strand from the cable release area to exiting the north anchorage; Figure 5 As shown, the cable anchor head has already moved out of the north anchorage;
[0088] S1.4 Continue to pull 16 cables, passing the north anchorage, the mid-span catwalk bracket, and the south anchorage side tower, to reach the south anchorage. This completes the pulling of the cable strands from the north anchorage to the south anchorage.
[0089] Throughout the traction process, a dedicated person must monitor the cable strands, observing for any twisting, broken or damaged strapping, bulging, or other issues, and promptly correct or address them. Cable strand traction must ensure matching traction and release speeds, with both winches maintaining consistent retraction and release speeds. Simultaneously, upstream and downstream winches should be kept basically synchronized. During traction, care should be taken to prevent cable strand twisting and protect the galvanized layer of the cable strands from damage. When tractioning the first few cable strands, key observation and adjustments should be made to the front anchor head, catwalk rollers, tower anchor gantry guide wheel assembly, catwalk gantry guide wheel assembly, cable saddle rollers, horizontal cable release machine, and steering wheel support. After the system is properly debugged, the traction speed should be appropriately increased, generally controlled at 20–25 m / min. However, when passing through the catwalk gantry and top tower gantry guide wheel assembly, the traction speed should be appropriately reduced to 4 m / min to prevent the puller 17 from jumping out of its groove.
[0090] S1.5. When the cable strand anchor head enters the gantry frame of the south anchorage, reduce the traction speed. The cable strand passes through the guide wheel group of the gantry frame and reaches the platform above the front anchorage. The connection with the puller 17 is then released. The tower crane, in conjunction with the 10t winch of the anchorage, slowly lowers the front anchor head into the front anchorage of the south anchorage for temporary anchoring.
[0091] S1.6 When about two turns of the folded cable strand remain in the cable release frame 1, the south bank traction winch 15 shall suspend traction operation.
[0092] On the south side of the 16 bogie of the south bank traction cable, a temporary chain hoist (or a 10t winch + wire rope pulling device) is set up to temporarily fix and tighten the cable strands with a cable gripper; then, in coordination with the tower crane, the remaining cable strands in the cable release frame 1 are slowly released out with the chain hoist until there are no cable strands on the cable reel of the cable release frame 1, and only the folded part of the cable strands (folded cable strand rings) are fixed on the cable reel of the cable release frame 1;
[0093] S1.7 After the cable strand is pulled, number the points 1m to the left and right of the mid-span marking point of each span of the cable strand (at least 3 sides), and wrap them with transparent tape to prevent rainwater from eroding the markings, so as to facilitate the adjustment of the cable strand sag at night.
[0094] S2, Stock Lifting and Lateral Movement; specifically includes:
[0095] S2.1 Installation of cable grippers and grooved limit fasteners: Install cable grippers on the cable strands at both sides of the horizontal main cable saddle on the bridge tower, both sides of the loose cable saddle on the south bank, and about 20m from the mid-span side of the catwalk gantry on the north bank; connect the 10t winch wire rope on the tower and anchor gantry through the fixed pulley on the catwalk gantry to the moving pulley; connect the 50t moving pulley to the cable grippers to form the lifting system for each span;
[0096] like Figure 6As shown, within the ring channel, within a 2.5m range on both sides of the horizontal main cable saddle and the horizontal rotating cable saddle, the groove-type limit fasteners are installed on the cable strands with the grooves facing upwards, and the connecting pins are connected to the chain hoist hooks on the gantry A20 and gantry B21 to form a lifting system;
[0097] S2.2, Strand Lifting: Before lifting, check and correct the twisting of the strands to ensure that each wire of the strand is in a completely parallel state, thus ensuring uniform stress after cabling.
[0098] After the lifting system is installed, start the winch at the same time to lift the entire cable strand away from the cat track roller, so that the cable strand between the two grippers is in a slack state.
[0099] The cable strand lifting sequence is first the main span and then the side spans; in this embodiment, a single slewing cable is used, and the winches at the upstream and downstream catwalk gantry of the north anchorage lift the cable strands simultaneously to prevent them from deviating too much in one direction;
[0100] Within the circular passage area, the cable strands between the horizontal main cable saddle and the horizontal rotating cable saddle are lifted using chain hoists on gantry A20 and gantry B21 within a 2.5m range on both sides. A lifting point is set at the midpoint of the cable strands between the cable saddles, and the cable strands are lifted using chain hoists on gantry B21 to make the cable strands in the horizontal cable saddle area basically stress-free and connected to the chain hoists on gantry A20. The chain hoists lift the cable strands to a certain height, and the cable strands are completely separated from the vertical and horizontal limiting rollers.
[0101] S2.3, Lateral shift of the cord:
[0102] Before the cable strands are moved laterally, confirm that all cable strands across the entire span have left the catwalk support roller.
[0103] While the cable strands are being lifted, the lateral movement device connects to the cable strands in the middle of the cable saddle. The cable strands at the piers and main towers are lifted and laterally moved to the top of the corresponding saddle groove (a certain distance from the saddle body, pre-raised 30-40cm, so that the cable strands between the two grippers are in a relaxed state). The main span and the side spans are laterally moved at the same time to maintain balance and prevent the cable strand marking line from leaving the tower top marking point.
[0104] Within the annular channel, the cable strands are moved laterally using the lateral movement system on gantry A20 and gantry B21. The cable strands are then moved laterally into the annular channel and supported by the support system of the operating platform in the annular channel (spacing 2.0m / channel). The elevation of the support system is controlled to be equal to the elevation of the steel diaphragm surface corresponding to the cable strands entering the saddle, so that the cable strands can be moved horizontally directly after shaping and then entered the saddle. Figure 6 The arrows in the diagram indicate the direction of cable movement;
[0105] S3, Thigh Shaping:
[0106] After the entire cable strand is lifted and moved laterally, the cable strand between the two grippers is in a relaxed state, and cable strand shaping and saddle insertion can be carried out in this state.
[0107] The cable strands of the horizontal main cable saddle and horizontal turning cable saddle sections of the north anchorage are pre-formed using pre-forming technology. They are shaped into squares according to the design within the manufacturing unit and then fixed using quadrilateral clamps. Specifically, the process involves segmental forming in the order of horizontal turning cable saddle, horizontal main cable saddle, and horizontal turning cable saddle. Ingot-shaped pre-forming clamps are used at both ends of each formed cable strand, while ordinary pre-forming clamps are used at intervals in the middle to fix the cable strands in place. Figure 10 , Figure 12 As shown, at the entry points of the horizontal main cable saddle and the upstream and downstream horizontal cable saddles, the cable strands have been prefabricated into quadrilaterals, so they can be directly inserted into the saddle without the need for shaping, saving on-site construction time.
[0108] If loose or twisted strands occur in the horizontal cable strand section during construction, the horizontal cable strand section will be manually shaped on-site using a quadrilateral shaping tool.
[0109] Except for the three horizontal cable saddles at the north anchorage and the horizontal turning cable saddle, the cable strands at the other cable saddles, namely the horizontal main cable saddle at the top of the bridge tower and the cable strands at the south anchorage, are manually shaped on-site using a quadrilateral shaper to shape the 127-wire 68.9×60.4mm hexagon into a 58.3×56.1mm rectangle.
[0110] Before manual shaping, determine the position of the colored wires and correct any twists immediately. Install hexagonal clamps approximately 3 meters before and after the cable saddle, then remove the cable strand wrapping tape between the two clamps. Begin shaping 1 meter from the hexagonal clamps on the side closest to the cable saddle. During shaping, manually tap the cable strands with a wooden hammer and use a steel comb to straighten the cross-section, changing the hexagonal shape to a quadrilateral shape. After straightening to a regular cross-section, check if the cable strand cross-section shape and the position of the colored wires are correct. Then clamp with a special quadrilateral clamp and bind with wrapping tape (except at the cable saddle) to ensure the cable strands can smoothly enter the saddle groove with minimal voids. During cable strand shaping, keep the steel wires smooth, prevent crossing or twisting, and do not damage the steel wires.
[0111] S4, Inserting the Thigh into the Saddle:
[0112] After all the cable strands at the main, branch, and turning cable saddles have been shaped, the cable strands are placed into the corresponding saddle slots of the cable saddles in sequence. The order of cable strands entering the saddles is as follows: first the horizontal main cable saddle → then the horizontal turning cable saddle → then the bridge tower main cable saddle → finally the branch cable saddle. Among them, the horizontal main cable saddle of the north anchorage is placed into the saddle slots from the middle to both sides, and the horizontal turning cable saddle is placed into the saddle slots from the side span side to the main span side. Then the horizontal main cable saddle at the top of the tower is placed into the saddle from the main span side to the side span side, and the branch cable saddle at the top of the pier of the side span is placed into the saddle from the side span side to the anchorage side.
[0113] The specific construction steps for inserting the cable strands into the saddle at the main tower and anchor saddle are as follows:
[0114] S4.1 Saddle Insertion Preparation: When inserting the cable into the saddle, strictly control the position of the colored wires in the saddle groove to prevent the cable from twisting; before inserting the cable into the saddle, check the condition of the cable and drive any bulging or loose wires to the main span or side span; to prevent the lateral force of the cable already inserted into the saddle from deforming the diaphragm, fill the adjacent saddle groove of the cable with wooden wedges.
[0115] S4.2 Cable saddle insertion: In this invention, the main cable rotates on the north bank, and both the horizontal main cable saddle and the horizontal rotating cable saddle at the north anchorage are horizontal cable saddles; the saddle insertion is carried out in the order of first inserting the horizontal main cable saddle and then the horizontal rotating cable saddle, with the horizontal main cable saddle being inserted from the middle to both sides, and the horizontal rotating cable saddle being inserted from the side span to the middle span; for example... Figure 7 , Figure 8 As shown, first install and tighten the anti-pull chain hoists 6 for horizontal cable strand entry into the saddle at the horizontal main cable saddle and the horizontal turning cable saddle. Several anti-pull chain hoists 6 are installed 2m before and after the horizontal main cable saddle and the horizontal turning cable saddle, and one is installed on each side edge of the horizontal main cable saddle and the horizontal turning cable saddle. The purpose is to keep the cable strands relatively horizontal within the range of the horizontal main cable saddle and the horizontal turning cable saddle. Start the winch of the north bank catwalk gantry to loosen and the winch of the south bridge tower to tighten, so that the tension of the cable strands towards the mid-span side gradually increases, and at the same time, slowly loosen the anti-pull chain hoists 6 at the horizontal cable saddle.
[0116] During the process of the cable strand approaching the horizontal main cable saddle, the position of the cable strand centerline and the horizontal main cable saddle centerline are strictly observed and adjusted left and right. When the cable strand reaches the horizontal main cable saddle partition, the cable strand centerline and the horizontal main cable saddle centerline (the cable saddle marking centerline) are basically coincident (within 5mm of deviation). When entering the saddle, manual assistance is provided for the construction of the reverse pull chain hoist 6. When the middle reverse pull chain hoist 6 reaches the partition at the groove, the middle reverse pull chain hoist 6 is removed. At this time, the cable strand has gradually entered the saddle groove. As the reverse pull chain hoist 6 is removed from the middle to both sides, the cable strand continues to move into the saddle groove until the cable strand reaches the root of the saddle groove. After confirming that the cable strand has no bulging or twisting, wooden wedges are inserted into the saddle groove to temporarily tighten the cable strand.
[0117] After the horizontal main cable saddle is put into place, the horizontal toggle cable saddles on both sides are then put into place in the same way from the side span to the middle span, and wooden wedges are used to temporarily tighten them.
[0118] After the cable strands are fully inserted into the horizontal saddle, install cable grippers on the strands. Using the tensioning device (50t pulley block) on the mid-span side of the horizontal saddle, pull on both ends of the inserted cable strands (the wooden wedges can be loosened appropriately). Control the pulling force until the cable strands between the horizontal main saddle and the horizontal saddle are horizontal (the cable strands are straight), ensuring uniform force on the cable strands at the horizontal saddle, and that the cable strand wires in the channel are taut, without slippage or unraveling. After confirming that the deviation between the saddle centerline and the horizontal main saddle centerline meets design requirements, fill the diaphragm channel with wooden wedges to tighten the cable strands and prevent slippage. Figure 9 In the middle, the horizontal main cable saddle and horizontal swivel cable saddle on the north bank have been installed and the cable grips have also been installed;
[0119] After the horizontal cable saddle on the north bank is installed, the main cable saddle on the south bank will be installed. After installation, the position of the main cable saddle mark on the bridge tower will be pre-deflected by raising it 30-40cm at the mid-span of the main span (the specific pre-deflection value is subject to the monitoring instructions) so that the cable strand at the mid-span of the main span is higher than the final position of the cable strand sag.
[0120] Next, the cable saddle is inserted. After insertion, the position of the cable saddle mark point is controlled by pre-lifting 10-20cm at the mid-span of the side span (the specific pre-lifting value is subject to the monitoring instructions) so that the cable strand at the mid-span of the side span is higher than the final position of the cable strand sag.
[0121] After the main cable saddle and anchor cable saddle of the bridge tower are put into the saddle, they are fixed in the saddle groove with wooden wedges at each saddle position;
[0122] Finally, draw parallel lines on the cable strands at the saddle slot outlet for main cable slip monitoring.
[0123] S5, Anchoring the strands:
[0124] After the cable strands are saddled, the anchor heads are lowered to the front anchor face operating platform using a 10t winch on the anchor gantry. The winch is then used to pull back the cable strand anchor heads, and with the help of a tower crane or truck crane, the anchor heads at both ends of the cable strand are pulled to the corresponding positions on the front anchor face. Then, with the help of a 5t hand-operated hoist, the anchor heads are connected to the anchoring system at the corresponding position of the cable strand using tie rods. Hollow jacks are installed (procured according to the cable shape and tension issued by the monitoring instructions). After the cable strands are shaped and saddled, the jacks are used to tension the cable strands, initially adjust the elevation of each span, and pre-raise the cable.
[0125] Furthermore, since the bridge site is located in a canyon area with frequent strong winds, V-shaped retainers need to be installed at the mid-span of the side span, the mid-span of the main span, and at the 1 / 4 and 3 / 4 spans when the cable strands are erected to the 4th layer (the 74# cable strand is erected).
[0126] When cable strand erection encounters strong winds, steel wire ropes are used to bind the erected cable strands and connect them to the catwalk for temporary fixation. This allows the catwalk and the erected cable strands to shift together under the influence of wind, preventing the catwalk from swaying and colliding with the erected cable strands, thus ensuring the safety of cable strand erection. In case of severe weather such as heavy rain, fog, or strong winds, cable strand erection is suspended, and if necessary, the catwalk and main cable are temporarily fixed.
[0127] This project involves a single slewing main cable. The strand alignment adjustment is achieved by fixing the center of the strand at the horizontal main cable saddle of the north anchorage as a fixed reference point. This allows the upstream and downstream strands to be converted into independent adjustable systems without interference. The simplified method of slewing cable strand alignment adjustment is basically the same as the conventional method.
[0128] Each main cable has an independent single-line reciprocating traction system upstream and downstream. The traction winch 15 and the cable release system are located on both banks, which reduces mutual interference and facilitates centralized control of the winch system, thus improving work efficiency. The single-line reciprocating traction system utilizes the traction system from the catwalk erection phase and is modified by changing the diameter of the catwalk traction cable 16 wire rope from φ22mm to φ32mm. Based on the terrain features and transportation conditions, the traction winch 15 is positioned on the top surface of the anchor body of the north and south anchorages, respectively. The cable release system is positioned on the anchor body at the low mileage position of the horizontal main cable saddle in the north anchorage ring channel. Two traction winches 15 are configured upstream and downstream, and the traction cable 16 runs from the north anchorage side through the gantry guide wheel group on one side of the catwalk to the south anchorage side.
[0129] like Figure 1 , Figure 2 As shown, a single-line reciprocating traction system mainly includes: two 30t traction winches 15, one traction cable 16, one puller 17, tower anchor gantry and guide wheel assembly, catwalk gantry and guide wheel assembly, guide wheel A18, slewing support 19, tower top winch, anchor gantry top winch, and various support rollers (including catwalk support rollers, cable saddle support rollers, and nylon rollers that cooperate with the cable saddle). The two traction winches 15 are respectively arranged on the south anchor and the north anchor. One is used to release the traction cable 16, and the other is used to reel in the traction cable 16. The two traction winches 15 are linked to make the traction cable 16 move back and forth. The puller 17 is fixed on the traction cable 16. The cable strand starts from the cable release area of the north anchor, passes through the guide frame, catwalk, north anchor gantry, tower top gantry, and south anchor gantry, and reaches the anchor chamber in front of the south anchor.
[0130] The traction winches are positioned 15 units upstream and downstream on the top surface of the north anchorage, as follows: Figure 1As shown, the traction cable 16 passes through a guide wheel A18 and a slewing bracket 19 pre-embedded in the foundation of the north anchorage to the anchorage gantry, and then is placed into the guide wheel assembly of the main traction system. The position of the traction cable 16 is 1.0m outside the centerline of each main cable. The center positions of the tower anchorage guide wheel assembly, the catwalk gantry guide wheel assembly, the catwalk support roller, the saddle support roller, etc. are consistent with the position of the traction cable 16, and are all on the same vertical plane. On the south anchorage side, the traction cable 16 passes through the guide wheel assembly and rotates out from the vertical and horizontal steering wheel brackets into the winch, so that the entire traction system forms a single-line reciprocating traction system.
[0131] Three 10t winches are installed on the top of the catwalk anchorage gantry at the north anchorage, the top of the gantry at the south bank tower, and the top of the gantry at the south anchorage. These 10t winches are arranged symmetrically upstream and downstream and are installed using tower cranes or truck cranes. They are mainly used as power equipment for cable strand lifting and lateral movement, saddle entry, anchor entry, subsequent cable tensioning machine movement, catwalk gantry and lateral passage dismantling, cable clamp and sling installation, and wire winding machine movement.
[0132] In the arrangement of tugs in various parts, the tower and anchor guide wheel group are arranged in accordance with the conventional method. However, in this embodiment, since the horizontal main cable saddle and the horizontal turning cable saddle of the north anchor are both horizontal cable saddles, it is not possible to set the towing rollers using the tie rod holes on the cable saddles. Therefore, the towing rollers need to be set separately on the operating platform near the cable saddle or on the steel plate pre-embedded in the side wall of the annular passage.
[0133] During the cable strand laying and erection process, uneven traction speed and unsatisfactory reverse tension effect of the rear cable strands can easily lead to problems such as cable breakage, wire bulging, and hoop-like defects when the traction is temporarily stopped, especially when the rotational inertia of the cable reel in ultra-long main cables is very large and the braking performance is poor. These problems can seriously affect the synchronization and uniformity of the steel wire stress and severely impact the quality of the main cable erection. Therefore, the performance of the main cable strand laying system plays a crucial role in the erection of the main cable strands. The laying system includes a horizontal laying machine and a guiding mechanism. The horizontal laying machine can adopt the ultra-long main cable strand laying machine for suspension bridges disclosed in patent CN110735402A. This laying machine simplifies the structure by using a slewing bearing that can withstand axial and radial forces, and has both damping brake and emergency braking functions. Under the dual action of the damping brake and the emergency brake, smooth and rapid braking can be achieved, which can greatly improve construction efficiency.
[0134] The north anchorage is equipped with a cable strand support 5 and a cable strand limiting roller 4; the horizontal cable release machine is set in the cable release area and is used to release the cable strands horizontally; the cable strand support 5 is arranged along the direction from the cable release area to the horizontal cable saddle, and the cable strand limiting roller is set on the cable strand support 5. When the cable strand is pulled, it is supported and limited by the cable strand support 5 and the cable strand limiting roller;
[0135] The gantry A20 is positioned on the north anchorage corresponding to the horizontal main cable saddle, and several gantry B21s are arranged along the annular channel; the gantry A20 and gantry B21 are equipped with chain hoists and lateral movement systems, and the chain hoists can move laterally along the lateral movement system.
[0136] This invention changes the conventional manufacturing and winding of cable strands. During the initial winding process from the production of the steel wire raw materials, the pre-bending at the horizontal main cable saddle and the horizontal turning cable saddle, as well as the folding and winding of the cable strands, are completed simultaneously, allowing for efficient production of folded cable strand coils. This invention utilizes the folding and winding method for winding single cable strands, enabling simultaneous cable release from both anchor heads of a single cable strand to the opposite bank from the cable release area, shortening the cable release path and improving cable strand erection efficiency. Furthermore, during horizontal cable release and horizontal saddle insertion, it minimizes the twisting and fraying of the cable strand wires, preventing damage to the cable strands during installation and ensuring the quality of cable strand installation.
[0137] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention shall be within the scope of protection of the pending claims of the present invention.
Claims
1. A method for folding and coiling a main cable strand, wherein a single strand is coiled using a folding and coiling method; the final coiled strand has both the head and tail ends on the outside of the coil; characterized in that, Includes the following steps: S0.
1. Threads are made from the thread feeding plate (7). The threads are coiled one by one with the head inside and the tail outside. The coiling is done using the cable frame A (9). When the first horizontal cable saddle position is reached, the first lateral bending is performed. S0.2, When the main cable is made to the horizontal saddle position, a second lateral bending is performed; S0.3 Place a cable frame B (10) in front of cable frame A (9), find the midpoint of the cable strand according to the cable strand making mark, use a clamp to clamp the midpoint of the cable strand and pull it, pull the cable strand past cable frame B (10), after pulling the distance to the edge of cable frame B (10) by 20 to 30 times the diameter of the cable strand, wrap it around the side of the cable reel on cable frame B (10) with a diameter of not less than 25 times the diameter of the cable strand to form a folded cable strand ring; S0.
4. A triangular support (8) with an outer dimension matching 20 to 30 times the diameter of the strand is used to form a rigid support inside the folded strand ring; S0.5 The shaping bracket (8) and the cable reel on cable frame B (10) are temporarily fixed with special tooling to ensure that the folded cable strands will not slide relative to the cable reel on cable frame B (10); then, while releasing the cable with cable frame A (9), the remaining cable strands are made and all the cable strands are wound onto the cable reel on cable frame B (10); during the process of winding the cable strands onto cable frame B (10), when the cable strands are made to the second horizontal cable saddle position, the third lateral bending is performed; S0.6 After winding is completed, remove the shaping bracket (8) from the cable reel of cable frame B (10) and temporarily fix the root of the folded strand ring to the cable reel on cable frame B (10) to form the starting end of the folded strand coil. Remove the coiled double-headed cable strands from cable rack B (10) and pack them up.
2. The method for folding and coiling the main cable strands of the slewing main cable according to claim 1, characterized in that, The contact area between the shaping bracket (8) and the strand is machined with a square or trapezoidal groove that matches the shape of the strand.
3. A method for erecting a main cable strand, comprising a coil of a single strand produced using the folding and coiling method for the slewing main cable strand as described in any one of claims 1 to 2, characterized in that, Includes the following steps: S0. Construction Preparation: Two independent single-line reciprocating traction systems are erected, located between the south and north anchorages on both banks of the river, to handle the traction of the main cable strands. A circular channel is provided within the north anchorage, with horizontal main cable saddles and two horizontal swivel saddles installed on its walls. The swivel main cable rotates along the circular channel. A cable release area corresponding to the midpoint of the swivel main cable is provided within the north anchorage, containing a horizontal cable release machine for horizontal cable release. The traction area is located on the top surface of the south anchorage. The coil of a single strand made by the above-mentioned method of folding and coiling the main cable strand is hoisted onto the cable release frame (1) of the horizontal cable release machine in the cable release area; A single-line reciprocating traction system mainly includes two traction winches (15), one traction cable (16), one puller (17), tower anchor gantry and guide wheel assembly, catwalk gantry and guide wheel assembly, and support rollers in various parts; the two traction winches (15) are respectively arranged on the south anchor and the north anchor, one for releasing the traction cable (16) and the other for winding the traction cable (16). The two traction winches (15) are linked together to make the traction cable (16) move back and forth; the puller (17) is fixed on the traction cable (16); S1, Cable Traction: During cable laying, a crane is used to simultaneously pull out two anchor heads of the same cable strand from the cable reel in the cable laying area and move them to the upstream and downstream horizontal cable saddles. They are then connected to the pullers (17) of two single-line reciprocating traction systems. The two single-line reciprocating traction systems are used to simultaneously pull both ends of the cable strand to the south anchorage and reach the platform above the front anchorage. The connection between the two anchor heads and the pullers (17) is then released, and the front anchor head is slowly lowered into the front anchorage of the south anchorage for temporary anchoring using a tower crane and winch. When there are 1-3 turns of cable strand remaining in the cable release frame (1), the traction winch (15) on the south bank stops traction operation; the cable strand is temporarily fixed and tightened using the cable gripper; then, the remaining cable strand in the cable release frame (1) is slowly released by manual labor and tower crane in coordination with the chain hoist until there are no cable strands on the cable reel of the cable release frame (1); S2, Stock Lift, Lateral Movement: The completed cable strands are placed on the catwalk rollers, and the cable strands are lifted and moved laterally using the tower, anchor gantry winch, gantry A (20), and gantry B (21) in conjunction with the cable gripper. S3, Thigh Shaping: The cable strands of the horizontal main cable saddle and horizontal turning cable saddle sections of the north anchorage adopt pre-forming technology, and have already undergone lateral bending pre-forming construction in the factory. Only when the cable strands of the horizontal main cable saddle and horizontal turning cable saddle sections of the north anchorage exhibit loose or twisted strands during construction will the cable strands of the horizontal main cable saddle and horizontal turning cable saddle sections of the north anchorage be manually shaped on-site using a quadrilateral shaping device. The cable strands of the horizontal main cable saddle at the top of the bridge tower and the loose cable saddle section of the south anchorage adopt on-site manual shaping technology. S4, Inserting the Thigh into the Saddle: After all the cable strands at the main cable saddle, the loose cable saddle, and the turning cable saddle have been shaped, the cable strands are placed into the corresponding saddle grooves of the cable saddle in sequence; the horizontal main cable saddle and the horizontal turning cable saddle of the north anchorage are both horizontal cable saddles; The order of cable strand insertion into the saddle is as follows: first the horizontal main cable saddle, then the horizontal rotating cable saddle, then the bridge tower main cable saddle, and finally the loose cable saddle; among them, the horizontal main cable saddle of the north anchorage is inserted into the saddle groove in the order from the middle to both sides, and the horizontal rotating cable saddle is inserted into the saddle groove in the order from the side span to the middle span, then the main cable saddle of the tower top is inserted into the saddle from the middle span to the side span, and the loose cable saddle of the side span pier top is inserted into the saddle from the side span to the anchorage span. S5, anchoring the strands.
4. The method for erecting main cable strands according to claim 3, characterized in that, In step S1, when the cable is released to the point where there are no strands on the cable tray of the cable release frame (1), there are still folded strand rings fixed on the cable tray; In step S2, manual assistance is used to connect the folded strand ring to the chain hoist on gantry A (20).
5. The method for erecting main cable strands according to claim 4, characterized in that: In step S2, during the cable lifting stage, within the annular channel, the cable strands between the horizontal main cable saddle and the horizontal rotating cable saddle are lifted using chain hoists on gantry A (20) and gantry B (21) within a 2.5m range on both sides of the horizontal main cable saddle and the horizontal rotating cable saddle. A lifting point is set at the midpoint of the cable strands between the cable saddles, and the cable strands are lifted using chain hoists on gantry B (21) to make the cable strands in the horizontal cable saddle area basically stress-free. The temporary fixation at the root of the folded cable strand ring is released with manual assistance and connected to the chain hoist on gantry A (20). The chain hoist lifts the cable strands to a certain height, and the cable strands are completely separated from the vertical and horizontal limiting rollers. During the lateral movement of the cable strand, the lateral movement system on gantry A (20) and gantry B (21) is used to move the cable strand laterally into the annular channel. Then, the cable strand is supported by the support system of the operating platform in the annular channel. The elevation of the support system is equal to the elevation of the steel partition surface corresponding to the cable strand entering the saddle.
6. The method for erecting main cable strands according to claim 3, characterized in that: In step S4, first install the anti-pull chain hoist (6) for horizontal cable strand entry into the saddle at the horizontal main cable saddle and the horizontal turning cable saddle, and tighten it; several anti-pull chains (6) are set 2m in front of and behind the horizontal main cable saddle and the horizontal turning cable saddle, and one is set on each side edge of the horizontal main cable saddle and the horizontal turning cable saddle, in order to keep the cable strands relatively horizontal within the range of the horizontal main cable saddle and the horizontal turning cable saddle; start the winch of the north bank catwalk gantry to loosen and the winch of the south bridge tower to tighten, so that the tension of the cable strands towards the mid-span side gradually increases, and at the same time, slowly loosen the anti-pull chain hoist (6) at the horizontal cable saddle; When the cable is being installed, manual assistance is provided to the reverse chain hoist (6). When the middle reverse chain hoist (6) reaches the partition at the groove, the middle reverse chain hoist (6) is removed. At this time, the cable strand has gradually entered the saddle groove. As the reverse chain hoist (6) is removed from the middle to both sides, the cable strand continues to move into the saddle groove until the cable strand reaches the root of the saddle groove. After confirming that the cable strand has no bulging or twisting, wooden wedges are temporarily inserted into the saddle groove to tighten the cable strand.
7. The method for erecting main cable strands according to claim 3, characterized in that: The north anchorage is equipped with a cable support (5) and a cable limit roller (4); the cable support (5) is arranged along the direction from the cable release area to the horizontal cable saddle, and the cable limit roller (4) is set on the cable support (5). When the cable is pulled, it is supported and limited by the cable support (5) and the cable limit roller (4); The gantry A (20) is set on the north anchorage at the position corresponding to the horizontal main cable saddle, and several gantry B (21) are arranged along the annular channel; the gantry A (20) and gantry B (21) are equipped with chain hoists and lateral movement systems, and the chain hoists can move laterally along the lateral movement system.
8. The method for erecting main cable strands according to claim 7, characterized in that: An anchor head slide (2) is provided on the top surface of the cable support (5), and a track trolley (3) for transporting the anchor head can travel on the anchor head slide (2).
Citation Information
Patent Citations
Reciprocating traction system and main cable strand erecting method
CN117026821A
Cable strand pre-bending forming method for simulating rotary cable saddle
CN117139508A
Cable strand folding and coiling method
CN117142248A