A method for calculating the loss of life of people submerged in a barrier lake based on process mechanism
By using a method based on process mechanisms, key parameters are selected to establish a life loss assessment model for barrier lake inundation risks, which solves the problems of large data demand and parameter quantification in the existing technology, and improves the speed and accuracy of calculation of human losses in barrier lake inundation areas of rivers. .
Patent Information
- Application Number
- CN202311356733.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-18
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2043-10-18
AI Technical Summary
Existing methods for calculating life loss in river barrier lakes require a large amount of data and cannot effectively quantify qualitative and quantitative parameters, resulting in inaccurate and low-precision calculation results.
A method based on process mechanism was used to conduct weight analysis on 15 influencing factors through the analytic hierarchy process, and six parameters including alarm time, total risk population, submerged water depth, risk population density, emergency plan and understanding level were selected to establish the barrier lake inundation risk. Life loss assessment model, calculates emergency evacuation probability and fatality rate, and streamlines the model structure to reduce data dependence.
It improves the calculation speed and accuracy, reduces the evaluation parameters, can be used normally in the case of missing data, and provides a fast and accurate assessment of the loss of human life in the submerged area caused by river dams.
Smart Images

Figure CN118152695B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of dam safety and risk management, and in particular to a method for calculating the loss of life of people submerged in a barrier lake based on a process mechanism. Background Art
[0002] A barrier lake is a natural disaster caused by landslides caused by earthquakes, rainfall and other factors, which results in the damming of rivers. The damming of rivers will lead to waterlogging in the upper reaches of the river, forming a barrier lake, which poses a serious threat to the lives and property safety of people in the upper reaches. It is of theoretical significance and practical value to reasonably predict the loss of life that may be caused by flooding the upstream areas after the damming of the river, improve the emergency management system of the barrier lake disaster, and protect the lives and property safety of people in the river damming areas.
[0003] Existing literature: Hu Liang et al. Research on calculation method of life loss caused by river damming [J]. Journal of Water Resources and Hydropower Engineering, 2021(5):58-66. 15 life loss influencing factors such as alarm time and lake water level elevation were selected to construct life loss evaluation indicators, and a river life loss evaluation model was constructed based on the Bayesian network. The research results are of great significance for the evaluation of life loss caused by river damming. However, the above methods have problems such as too many evaluation indicators, large data requirements, and high data quality requirements. They are not user-friendly, and there is no unified quantification process between quantitative parameters and qualitative parameters in the method, and the relationship between the factors cannot be quantified. For example: it is difficult to quickly obtain relevant information such as inflow flow, catchment area, upstream terrain, lake flow rate, etc.; qualitative factors such as weather, understanding, and emergency plans are also difficult to express quantitatively; these problems affect the accuracy of the loss assessment model. Summary of the invention
[0004] The purpose of the present invention is to solve the problem that it is difficult to effectively collect all the data required by the existing literature methods and the accuracy of the data cannot be guaranteed in the risk management of river dams, which will cause the evaluation results of the calculation methods to be inaccurate or unable to operate effectively, and to provide a calculation method for the loss of life of people submerged in a dammed lake based on a process mechanism.
[0005] The technical solution adopted by the present invention is:
[0006] A method for calculating the loss of life of people submerged in a barrier lake based on a process mechanism includes the following steps:
[0007] Step 1: According to the water conditions of the barrier lake, obtain the six indicator values of alarm time, total number of risk population, flood depth, risk population density, emergency plan and the understanding of flood risk by risk population;
[0008] Step 2: Combine the indicators in step 1 to establish an emergency evacuation module for the risk population and calculate the probability of successful emergency evacuation of the risk population;
[0009] Step 3: Combine the indicators in step 1 to establish a flood depth module, and calculate the mortality rate of the water depth in the flooded area to the risk population based on the stability of the risk population in the lake water;
[0010] Step 4: Combine the calculation results of step 2 and step 3 to establish a life loss assessment module to calculate the life loss of the population at risk in the flooded area.
[0011] The present invention uses the analytic hierarchy process to perform weight analysis on 15 factors affecting life loss (the parameters are from the literature: Research on the calculation method of life loss caused by river damming), and the formation time of the damming body, the elevation of the risk population, the speed of lake water rise, the height of the damming body, the inflow, the weather, the catchment area, the terrain conditions, the lake flow rate, the emergency plan, the degree of understanding, the total population, the population density, the flooding depth and the alarm time parameters are recorded as A1 to A15 in sequence. The index of each parameter is shown in Table 1, and the weight of the influencing factors is shown in Table 2.
[0012] Table 1 Index
[0013] parameter A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A1 1 1 1 / 2 1 / 2 1 / 2 1 / 2 1 / 3 1 / 4 1 / 5 1 / 3 1 / 6 1 / 7 1 / 7 1 / 8 1 / 9 A2 1 1 1 / 2 1 / 2 1 / 2 1 / 2 1 / 3 1 / 4 1 / 5 1 / 6 1 / 6 1 / 7 1 / 7 1 / 8 1 / 9 A3 2 2 1 1 1 1 1 / 2 1 / 3 1 / 4 1 / 5 0.2 1 / 6 1 / 6 1 / 7 1 / 8 A4 2 2 1 1 1 1 1 / 2 1 / 2 1 / 3 1 / 4 1 / 4 1 / 5 1 / 5 1 / 6 1 / 8 A5 2 2 1 1 1 1 1 / 2 1 / 2 1 / 3 1 / 4 1 / 4 1 / 5 1 / 5 1 / 6 1 / 8 A6 2 2 1 1 1 1 1 / 2 1 / 2 1 / 3 1 / 4 1 / 4 1 / 5 1 / 5 1 / 6 1 / 8 A7 3 3 2 2 2 2 1 1 / 2 1 / 2 1 / 3 1 / 3 1 / 4 1 / 4 1 / 5 1 / 7 A8 4 4 3 2 2 2 2 1 1 / 2 1 / 3 1 / 3 1 / 4 1 / 4 1 / 5 1 / 7 A9 5 5 4 3 3 3 2 2 1 1 / 2 1 / 2 1 / 3 1 / 3 1 / 4 1 / 6 A10 6 6 5 4 4 4 3 3 2 1 1 1 / 2 1 / 2 1 / 3 1 / 5 A11 6 6 5 4 4 4 3 3 2 1 1 1 / 2 1 / 2 1 / 3 1 / 5 A12 7 7 6 5 5 5 4 4 3 2 2 1 1 1 / 2 1 / 4 A13 7 7 6 5 5 5 4 4 3 2 2 1 1 1 / 2 1 / 3 A14 8 8 7 6 6 6 5 5 4 3 3 2 2 1 1 / 2 A15 9 9 8 8 8 8 7 7 6 5 5 4 3 2 1
[0014] Table 2 Weights of influencing factors
[0015]
[0016]
[0017] According to the results of the weight analysis of 15 parameters, six parameters with the highest weights and independent of each other were selected to establish the life loss assessment model for the flooding risk of barrier lakes. The selected parameters were six influencing factors, namely, alarm time, total number of risk population, flooding depth, risk population density, emergency plan, and the understanding of risk population on flooding risk.
[0018] Step 1 specifically includes the following steps:
[0019] Step 1.1 The risk population is the only disaster-prone body for life loss. The total number of risk population is the basic condition for calculating life loss, expressed as P AR .
[0020] Step 1.2 calculates the alarm time. The alarm time is a key factor in whether the population at risk can evacuate safely. The alarm time value is:
[0021] W T =dV i / dQ(t)
[0022] Among them, W T is the alarm time; V iis the reservoir capacity of the lake area corresponding to the elevation of the risk population, which can be calculated from the water level-reservoir capacity curve; Q(t) is the time-related flow rate of the upstream river. In the absence of drastic weather changes, the average flow rate of the corresponding period can be taken based on local hydrological data.
[0023] Step 1.3 Determine the risk population density. The risk population density refers to the ratio of the total risk population to the area of the flooded area. The risk population density affects the implementation of emergency evacuation and rescue operations. The greater the risk population density, the more unfavorable it is for the implementation of emergency evacuation.
[0024] D P =P AR / S
[0025] In the formula, S is the area of the risk population gathering area of upstream flooding. The impact of population density on the loss of life of the risk population is graded according to the level, see Table 3:
[0026] Table 3 Classification of the influence of population density factors
[0027] Impact high middle Low <![CDATA[Population density (persons / km 2 )]]> >2500 1500~2500 <1500
[0028] Step 1.4 determines the flood depth at the risk population, which refers to the difference between the water level elevation and the elevation of the risk area where the risk population is located, and is the main cause of loss of life due to river damming.
[0029]
[0030] Where H represents the flooding depth, H i Indicates water level elevation, H 0 It represents the elevation of the risk area where the risk population is located, t represents time, and takes the value of 2.1m when the flood depth is greater than 2.1m. Q(t) represents the time-related upstream river flow. In the absence of drastic weather changes, the average flow rate of the corresponding period is generally taken based on local hydrological data. f'(h) is the first-order derivative of the reservoir capacity-water level curve to the water depth.
[0031] Step 1.5 The degree of understanding of the flooding risk by the at-risk population largely affects the magnitude of life loss. The degree of understanding of the at-risk population mainly includes trust in disaster alerts, awareness of the necessity of escape, refuge measures, evacuation routes, and understanding of the possible scope of lake flooding. The degree of influence is divided according to the degree of public awareness of the risk, and the results are shown in Table 4.
[0032] Table 4 Classification of the influence of understanding factors
[0033] Impact high middle Low Understanding Fuzzy understanding General understanding Clear understanding
[0034] Step 1.6 The completeness of the emergency plan determines whether the at-risk population can evacuate the risk area quickly and effectively. The degree of impact can be divided into three levels, see Table 5.
[0035] Table 5 Classification of the impact of emergency plan factors
[0036] Impact high middle Low Emergency Plan Incomplete Generally complete complete
[0037] According to the importance of factors affecting life loss, the method for calculating the risk population loss caused by the dammed lake is divided into three modules, namely, the emergency evacuation module for calculating the evacuation rate, the flood depth module for calculating the flood mortality rate, and the life loss module for calculating the number of deaths. Step 2 specifically includes the following steps:
[0038] Step 2.1 The emergency evacuation module mainly calculates the probability of evacuation of risk population under the influence of alarm time, population density, completeness of emergency plan, and the degree of understanding of risk personnel on the danger of lake water congestion. The following formula is used to calculate the evacuation probability under different alarm times during daytime and nighttime conditions:
[0039]
[0040] Where P(W T ) represents the probability of evacuation of risk population under different alarm times.
[0041] Step 2.2 Population density, completeness of emergency plans, and degree of understanding of the risk population about the danger of lake water rise affect the efficiency of the alarm time in evacuating the risk population. The degree to which each factor affects the efficiency of the alarm time is shown in Table 6.
[0042] Table 6 Alarm efficiency influence coefficient
[0043] Influencing factors <![CDATA[Population density β 1 > <![CDATA[Emergency plan β 2 > <![CDATA[Degree of understanding β 3 > high 0.80 0.90 0.85 middle 0.90 0.95 0.96 Low 1.00 1.00 1.00
[0044] In the table, high, medium and low correspond to high density, medium density and low density of risk population; incomplete, generally complete and complete emergency plans; and vague understanding, general understanding and clear understanding of the degree of understanding.
[0045] Step 2.3 calculates the probability of evacuation of the risk population based on the alarm time, risk population density, completeness of the emergency plan, and the degree of understanding of the risk personnel on the danger of lake water congestion through the calculations of steps 2.1 and 2.2.
[0046] P(E eva )=P(W T )×β 1 ×β 2 ×β 3
[0047] Where P(E eva) represents the probability of successful emergency evacuation of the risk population, P(W T ) represents the alarm time rate, β 1 , β 2 , β 3 They respectively represent the influence of risk population density, emergency plan and understanding on emergency evacuation of risk population.
[0048] Compared with the existing literature, in step 2, this method not only quantifies the relationship between the alarm time and the evacuation probability of the risk population, but also clarifies the relationship between the three influencing factors of risk population density, understanding level and emergency plan and the evacuation probability of the risk population; the flooding depth module is streamlined. After the river channel is blocked and water is stored, it is difficult to determine the accurate distribution of all the population in the risk area and the terrain conditions such as the slope of their location. Therefore, in this method, the stability analysis of people in the lake water is reduced, and the behavior of self-refuge of risk personnel is attributed to the evacuation rate in step 2.
[0049] Step 3 specifically includes:
[0050] The lake area flood is the direct factor leading to the death of the risk population. Compared with the flow rate of the dam burst flood, the two-dimensional flow rate of the lake area water flow caused by the river dam is smaller. Under different water depth conditions, the mortality rate of the lake area flood to the risk population can be regarded as a normal function distribution:
[0051]
[0052] In the formula, F D (h) refers to the risk population mortality rate when the water depth in the disaster area is H; Φ refers to the standard normal distribution function; μ D , σ D They are 7.159 and 2.59 respectively, which are obtained by solving the normal distribution of the data on deaths caused by low-flow flood disasters at home and abroad.
[0053] Step 4 specifically includes the following steps:
[0054] Step 4.1 Calculate the loss rate of the population at risk. In the case of river damming risk, the population at risk is either successfully transferred or stranded in the risk area facing the danger of rising lake water. Therefore, the mortality rate assessment formula for the population at risk of river damming is:
[0055] f=F D (h)×(1-P9E eva ))
[0056] Where f represents the mortality rate of the risk population.
[0057] Step 4.2 Calculate the number of deaths of the risk population caused by the flooding of the barrier lake by using the risk population mortality rate calculated in step 4.1 and the total number of risk population obtained in step 1.3. The calculation formula is as follows:
[0058] L OL =P AR ×f=P AR ×F D (h)×(1-P(E eva ))
[0059] Where, L OL Indicates the number of deaths.
[0060] The beneficial effects of the present invention are:
[0061] The present invention unifies the quantification process of qualitative parameters and quantitative parameters, making the calculation model less dependent on data quality. Compared with existing literature methods, this method not only uses fewer evaluation parameters, increases the loss calculation speed, but also improves the calculation accuracy.
[0062] The present invention establishes a modular evaluation model by selecting main action parameters. Even if there is data missing, it can still be used normally. The refined evaluation model and modular characteristics facilitate users to quickly and accurately calculate the loss of life in the upstream flooded area caused by river blockage. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] Figure 1 is a flow chart of the method;
[0064] Figure 2 is the definition of the alarm time. DETAILED DESCRIPTION
[0065] Example 1
[0066] This embodiment takes the Hongshiyan barrier lake in Zhaotong City, Yunnan Province as an example to evaluate the risk population loss rate of the upstream flooded area after the Niulan River is blocked. The specific steps are as follows: Figure 1 As shown, including:
[0067] Step 1: The relevant parameters of Hongshiyan barrier lake are shown in Table 7, and other parameters for life loss assessment are shown in Table 8.
[0068] Table 7 Parameters of barrier lake
[0069]
[0070] Table 8 Parameters affecting loss of life
[0071] parameter Numeric Quantification Alarm time >72h - Total population at risk 1015 - Flooding depth 2.1m - Population density at risk Low <![CDATA[β 1 =1]]> Emergency Plan complete <![CDATA[β 2 =1]]> Understanding Clear understanding <![CDATA[β 3 =1]]>
[0072] Step 2: Emergency evacuation module, calculate the probability of successful evacuation of the risk population. Since the barrier lake occurs during the day, the alarm rate is calculated as follows:
[0073]
[0074] At the same time, the impact of emergency plans, understanding level and population density on the evacuation rate is considered (the values of the three parameters are shown in Table 9):
[0075] P(E eva )=P(W T )×β1 1 ×β 2 ×β 3
[0076] =0.99×1.0=0.99
[0077] Because the warning time was sufficient, 99% of the at-risk population was able to evacuate, while those who failed to evacuate in time would face the danger of rising lake water. Compared with the existing literature methods, this method expresses the relationship between warning time and evacuation rate as a function, and expresses the impact of emergency plans, understanding level and population density independently and continuously.
[0078] Step 3: Submerge water depth module:
[0079]
[0080] The fatality rate of the flooded water depth for the risk personnel who failed to evacuate was 0.0072. To improve the calculation efficiency, the stability analysis of the risk individuals in the lake water was cancelled.
[0081] In existing literature, it is necessary to first determine the stability of the risk population in the water, and then calculate the mortality rate of the lake water to the risk population in an unstable state. However, it is found in the calculation that calculating stability not only requires a lot of data (including personnel distribution, terrain conditions, lake water flow rate, etc., the calculation itself is generalized, it is impossible to consider the stability of everyone, it is time-consuming and laborious, and the calculation results are not very useful), but also in actual cases, almost all the risk population that has not been transferred is in an unstable state in the lake water, so the stability of the risk population is not considered in this method, and it is assumed to be in an unstable state, so it only needs to calculate the mortality rate of lake water flooding, so in the embodiment, the calculation results are the same.
[0082] Step 4: Loss of Life Module:
[0083] L OL =P AR ×f=P AR ×F D (h)×(1-P(E eva ))
[0084] =1015×0.0072×(1-0.99)
[0085] =0.07
[0086] In this disaster event, due to timely emergency warning, sufficient alarm time, and timely evacuation of personnel by the local government and emergency management departments, no casualties were caused. The calculation results of this method are consistent with the actual situation.
[0087] Example 2
[0088] This embodiment takes the Tangjiashan barrier lake in Sichuan Province as an example to calculate the risk population loss rate of the upstream flooding area of the Tangjiashan barrier lake, specifically including:
[0089] Step 1: The relevant parameters of the impact of life loss in the barrier lake are shown in Table 9, and the life loss parameters according to this method are shown in Table 10.
[0090] Table 9 Parameters affecting loss of life
[0091]
[0092] Table 10 Life loss parameters
[0093]
[0094]
[0095] Among them, the alarm time calculation model is as follows Figure 2 As shown, in order to facilitate the acquisition of alarm time parameters, the time from the issuance of the alarm to the arrival of the lake water level at the location of the risk population is defined as the alarm time, that is, Definition 1 in the figure.
[0096] Step 2: Emergency evacuation module, calculate the probability of successful evacuation of the risk population:
[0097] P(E eva )=P(W T )×β 1 ×β 2 ×β 3
[0098] =0.99×1.0
[0099] =0.99
[0100] Since the warning was given in sufficient time, most of the people at risk were able to be evacuated, while those who failed to be evacuated in time would face the danger of rising lake water.
[0101] Step 3: Submerge water depth module:
[0102]
[0103] Step 4: Loss of Life Module:
[0104] L OL =P AR ×f=P AR ×F D (h)×(1-P(E eva ))
[0105] =9411×0.0072×(1-0.99)
[0106] =0.68
[0107] In fact, the loss of life caused by the flooding of the upper reaches of the Tangjiashan barrier lake was zero. In this disaster, due to the timely emergency warning, sufficient alarm time, and timely evacuation of personnel by the local government and emergency management departments, no casualties were caused. The calculation results of this method are consistent with the actual situation.
[0108] Example 3
[0109] This embodiment takes the Hongshiyan barrier lake as an example to compare the life loss assessment model in the existing literature with this method. The method steps of calculating the life loss assessment model in the existing literature include:
[0110] Step 1: Determine the parameters required for the loss assessment model. See Table 11 for specific parameter information.
[0111] Table 11 Parameters affecting loss of life
[0112]
[0113]
[0114] Note: “-” indicates that the parameter has not been quantified, and “ / ” indicates that there is no relevant parameter information; the methods proposed in the existing literature do not quantify the qualitative parameters (congestion time, weather, terrain conditions, emergency plans, and degree of understanding) (quantitative parameters may not be quantified).
[0115] Due to the discreteness of the spatial distribution of the risk population, it is difficult to obtain accurate elevation information for each risk population. This parameter mainly affects the calculation of the alarm time and the value of the flood depth, and does not directly and independently affect the mortality rate of the risk population. The lake water rise rate parameter is affected by factors such as weather, catchment area and season, so it is difficult to accurately and quickly obtain the lake water rise parameter. The terrain conditions are difficult to describe qualitatively and quantitatively. In the existing literature, they are characterized by slope, but obtaining slope information at different risk populations is undoubtedly a huge task, which seriously hinders the efficiency of loss assessment. In the existing literature, when there is no terrain information, it is assumed that the terrain is slopeless.
[0116] Step 2: Emergency Evacuation Module:
[0117] P(E eva )=P(W T =W)×P(U n =U)
[0118] =1.0×0.95=0.95
[0119] Compared with this method, the existing literature methods mainly consider the alarm time parameters and the non-alarm time joint parameters (emergency plan, risk population density and understanding level) in the emergency evacuation network. The calculation methods of the alarm time parameters and the non-alarm time joint parameters are all graphical methods. The alarm time parameters are checked in the graph (i.e., Figure 3 of the existing literature). Although the parameter values are continuous, the accuracy is not enough. The non-alarm time parameters are mainly obtained by looking up the table (i.e., Table 1 of the existing literature), which makes the parameter calculation values discontinuous and affects the accuracy of the calculation results.
[0120] Step 3: Submerge water depth module:
[0121] F v -F 摩 =0.5ρC D BH 2 -μ(mg-2ρgHBd)
[0122] =0.5×1000×1.1×0.4×2.1×0.49
[0123] -0.4×(75×9.8-2×1000×9.8×2.1×0.4×0.1)
[0124] =455.28kN>0
[0125]
[0126] Because F v -F 摩 >0, M>0, the risk population in the lake area has completely lost stability. Therefore, the mortality rate of the population exposed to the danger of lake water is:
[0127]
[0128] Compared with this method, the existing literature methods need to determine the stability of risk individuals in the lake water, but this requires determining the terrain conditions of each risk individual and calculating the impact of the terrain conditions of each risk individual on the stability of the risk individual. Generally speaking, in order to avoid a huge workload, a representative individual is selected for calculation, but the problem is that the selection of representative individuals is very subjective. In this method, by determining the definition of the alarm time, the emergency evacuation results of the risk population are comprehensively considered. For the risk population that failed to evacuate successfully, the stability of the risk individual is no longer considered. For individuals who failed to evacuate in time, they face the danger of being submerged in the lake water, and then the mortality rate of the lake water to the submerged risk population is calculated by step 3.
[0129] Step 4: Loss of Life Network:
[0130] L OL =P AR ×f=P AR =F D (h)×(1-P eva )
[0131] =1015×0.0072×(1-0.95)
[0132] =0.37
[0133] The calculation result of the existing literature method is 0.37, which is greater than the calculation result of this method of 0.07. The calculation result of this method is closer to the actual situation, so the calculation accuracy of this method is higher.
[0134] Example 4
[0135] This embodiment takes the Tangjiashan barrier lake in Sichuan Province as an example to compare the life loss assessment model calculated in the existing literature with this method. The method for calculating the life loss assessment model in the existing literature includes:
[0136] Step 1: Determine the parameters required for the loss assessment model. See Table 12 for specific parameter information.
[0137] Table 12 Parameters affecting loss of life
[0138]
[0139]
[0140] Note: “-” indicates that the parameter has not been quantified, and “ / ” indicates that there is no relevant parameter information; the method proposed in the literature does not quantify the qualitative parameters (quantitative parameters may not be quantified).
[0141] Step 2: Emergency evacuation module, calculate the probability of successful evacuation of the risk population:
[0142] P(E eva )=P(W T =W)×P(U n =U)
[0143] =1.0×0.95=0.95
[0144] Since the warning was given in sufficient time, most of the people at risk were able to be evacuated, while those who failed to be evacuated in time would face the danger of rising lake water.
[0145] Step 3: Submerge water depth module:
[0146] F v -F 摩 =0.5ρC D BH 2 -μ(mg-2ρgHBd)
[0147] =0.5×1000×1.1×0.4×2.1×0.25
[0148] -0.4×(75×9.8-2×1000×9.8×2.1×0.4×0.1)
[0149] =480.06kN>0
[0150]
[0151] Because F v -F 摩 >0, M>0, the risk population in the lake area has completely lost stability. Therefore, the mortality rate of the population exposed to the danger of lake water is:
[0152]
[0153] Step 4: Loss of Life Module:
[0154] L OL =P AR ×f=P AR ×F D (h)×(1-P(E eva ))
[0155] =9411×0.0072×(1-0.95)
[0156] =3.39
[0157] The calculation result of the method proposed in the existing literature is 3.39, which is greater than 0.68 calculated by this method. The calculation result of this method is closer to the actual situation, indicating that the calculation accuracy of this method is higher.
Claims
1. A method for calculating the loss of life of people submerged in a barrier lake based on process mechanism, characterized in that: The specific steps include: Step 1: According to the water conditions of the barrier lake, obtain the six indicator values of alarm time, total number of risk population, flood depth, risk population density, emergency plan and the understanding of flood risk by risk population; Step 2, combining the indicators in step 1, establish an emergency evacuation module for the risk population, and calculate the probability of successful emergency evacuation of the risk population; step 2 specifically includes the following steps: Step 2.1 The emergency evacuation module mainly calculates the probability of evacuation of the risk population under the influence of the alarm time, risk population density, completeness of the emergency plan, and the degree of understanding of the risk population on the flooding risk. The following formula is used to calculate the evacuation probability affected by different alarm times under daytime and nighttime conditions: Where P(W T ) represents the evacuation probability of risk population under different alarm times; W T Indicates the alarm time; Step 2.2 Calculate the impact of the density of the population at risk, the completeness of the emergency plan, and the degree of understanding of the flood risk by the population at risk on the evacuation efficiency of the population at risk. The degree to which each factor affects the efficiency of the alarm time is shown in the following table: Alarm efficiency impact coefficient In the table, high, medium and low correspond to high density, medium density and low density of risk population respectively; incompleteness, general completeness and completeness of emergency plans; vague understanding, general understanding and clear understanding of the degree of understanding; β1, β2 and β3 respectively represent the influence of risk population density, completeness of emergency plans and the degree of understanding of flooding risk by risk population on emergency evacuation of risk population; Step 2.3: Based on the calculations in Step 2.1 and Step 2.2, calculate the probability of evacuation of the risk population under the influence of the alarm time, risk population density, completeness of the emergency plan, and the degree of understanding of the risk population about the flooding risk: P(E eva )=P(W T )×β1×β2×β3 Where P(E eva ) represents the probability of successful emergency evacuation of the risk population; Step 3, combining the indicators in step 1, establish a flood depth module, and calculate the mortality rate of the water depth in the flooded area to the risk population based on the stability of the risk population in the lake water; Step 3 specifically includes: The mortality rate of Yongshui in the lake area to the risk population satisfies the normal function distribution: In the formula, F D (h) refers to the risk population mortality rate when the water depth in the disaster area is H; Φ refers to the standard normal distribution function; μ D , σ D They are 7.159 and 2.59 respectively; Step 4, combining the calculation results of step 2 and step 3, establishing a life loss assessment module to calculate the life loss of the population at risk in the flooded area; step 4 specifically includes the following steps: Step 4.1 Calculate the risk population loss rate and the mortality rate assessment formula of the dam risk population: f=F D (h)×(1-P(E eva )) In the formula, f represents the risk population loss rate; Step 4.2 Calculate the number of deaths of the risk population caused by the flooding of the barrier lake by using the risk population loss rate calculated in step 4.1 and the total number of risk population obtained in step 1.
3. The calculation formula is as follows: L OL =P AR ×f=P AR ×F D (h)×(1-P(E eva )) Where, L OL Indicates the number of deaths; P AR represents the total population at risk.
2. The method for calculating the loss of life of people submerged in a barrier lake based on a process mechanism according to claim 1 is characterized in that: The six indicators described in step 1 are the weight analysis of 15 factors affecting life loss using the hierarchical analysis method, and the six parameters with the highest weights and independent of each other are selected. The 15 factors affecting life loss are the formation time of the dam body, the elevation of the risk population, the speed of the lake water rise, the height of the dam body, the inflow, the weather, the catchment area, the terrain conditions, the lake water flow rate, the emergency plan, the understanding of the risk of flooding by the risk population, the total number of risk population, the density of risk population, the flooding depth and the alarm time parameter.