A construction engineering data integration management system based on BIM5D technology

The construction engineering data integration management system using BIM5D technology solves the problem of visual organization and processing in data management, realizes effective classification and management of data, improves the integrity and reliability of data, and enhances the progress and cost of construction projects. and model management efficiency.

CN118193649BActive Publication Date: 2024-10-11JIANGSU LONGWEI ZHONGKE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410331692.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-10-11
Estimated Expiration
2044-03-22

AI Technical Summary

Technical Problem

In the existing technology, construction engineering data management lacks effective visual organization and data processing, resulting in data that cannot be accurately analyzed, safety performance is reduced, and is too messy to be effectively managed.

Method used

Adopt a construction engineering data integration management system based on BIM5D technology to ensure the integrity, accuracy and consistency of data through data classification, unique coding, pre-processing, visual organization and other means, and select appropriate analysis methods and tools according to the data type , to achieve effective classification and management of data.

Benefits of technology

Improves the accuracy and reliability of construction engineering data management, ensures that data is stored in memory with sufficient space, enhances the efficiency of schedule management, cost management and model management, reduces data ambiguity and misunderstanding, and improves data availability and reliability sex.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118193649B_ABST
    Figure CN118193649B_ABST
Patent Text Reader

Abstract

The present invention discloses a construction engineering data integration management system based on BIM5D technology, relates to the technical field of digital management of construction engineering, and is intended to solve the problem of inconvenient construction engineering data management. The present invention divides the processing engineering data into graphic data, curve data and model data, which is helpful to realize the effective classification and management of data. Different data types usually require different analysis methods and tools. The progress management, cost management and model management of the entire construction engineering BIM5D are improved according to the visualization arrangement of graphic data, curve data and model data. The integrity, accuracy and consistency of the data are ensured through data cleaning, thereby improving the reliability of subsequent analysis. By comparing the data inventory of the target engineering data with the remaining capacity of the memory, it can be ensured that the data is stored in a memory with sufficient space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of digital management of construction projects, and in particular to a construction project data integration management system based on BIM5D technology. Background Art

[0002] Construction project management is a comprehensive process that involves organizing, planning, directing, coordinating, controlling and evaluating all aspects of the life cycle of a construction project, from planning, design, construction to maintenance.

[0003] Chinese patent with publication number CN115186348A discloses a BIM and project data structured management method for construction projects. It simplifies the process of borrowing BIM model information and project data for construction projects by setting corresponding BIM and project data structured management methods, significantly improves the efficiency of BIM and project data sharing for construction projects, and improves the reliability of reference adjustment of construction projects through construction project information data. Although the above patent solves the problem of construction project data management, the following problems still exist in actual operation:

[0004] 1. The actual effects of the construction project and the planned operations are not effectively visualized, resulting in an inability to conduct accurate analysis.

[0005] 2. The data is not processed and stored effectively, resulting in reduced data security.

[0006] 3. There is no further effective data organization for the collected data, resulting in the data being too messy and difficult to manage. Summary of the invention

[0007] The purpose of the present invention is to provide a construction engineering data integration management system based on BIM5D technology, which divides the processed engineering data into graphic data, curve data and model data, which is helpful to realize the effective classification and management of data. Different data types usually require different analysis methods and tools. The progress management, cost management and model management of the entire construction engineering BIM5D are improved according to the visual organization of graphic data, curve data and model data. The integrity, accuracy and consistency of the data are ensured through data cleaning, thereby improving the reliability of subsequent analysis. By comparing the data inventory of the target engineering data with the remaining capacity of the memory, it can be ensured that the data is stored in a memory with sufficient space, which can solve the problems in the prior art.

[0008] To achieve the above object, the present invention provides the following technical solutions:

[0009] A construction engineering data integration management system based on BIM5D technology, including:

[0010] Construction engineering data acquisition unit, used for:

[0011] Retrieving the construction engineering data from the database, and uniquely coding the retrieved construction engineering data according to the data type, and marking the uniquely coded data as target engineering data;

[0012] Acquisition data processing and storage unit, used for:

[0013] The target engineering data is preprocessed, and after the data preprocessing is completed, the preprocessed data is classified and stored according to the data type, and the classified and stored data is marked as processing engineering data;

[0014] Storage data analysis and collation unit, used for:

[0015] The processed engineering data will be analyzed according to the data type, and the different data will be visualized according to the analysis results. The visualized data will be marked as standard engineering data and presented.

[0016] Preferably, the construction engineering data acquisition unit comprises:

[0017] Construction engineering data classification module, used for:

[0018] Retrieving the construction engineering data from the database, and classifying the data according to the data type after the construction engineering data is retrieved;

[0019] Among them, the data types of construction engineering data include building basic data, building design data, building construction data, building progress data and building cost data.

[0020] Preferably, the construction engineering data classification module is also used for:

[0021] Basic building data refers to the basic data of building projects, including project name, location, scale, construction unit, design unit, and construction unit;

[0022] Architectural design data include topographic maps, geological survey data, building plans, elevations, sections, and construction drawings of construction projects;

[0023] Construction data refers to data generated during the construction process, including construction logs, material usage records, equipment usage records, and quality inspection records;

[0024] Construction progress data refers to the progress of construction projects at different stages, including planned progress and actual progress;

[0025] Construction cost data refers to the investment cost in construction projects, including land cost, construction material cost and labor cost.

[0026] Preferably, the construction engineering data acquisition unit further includes:

[0027] Construction engineering data collation module, used for:

[0028] After the construction engineering data is classified according to data type, different types of construction engineering data are uniquely coded and labeled;

[0029] The construction engineering data is uniquely coded and labeled to import the construction engineering data after type classification into the coding library for timestamp and random number coding;

[0030] Among them, the timestamp and random number code are the import time of the construction project data and the randomly generated number as the unique code;

[0031] The construction project data is uniquely coded and labeled to obtain the target project data.

[0032] Preferably, the construction engineering data sorting module includes:

[0033] A type coding module is used to obtain the construction engineering category data after the construction engineering data is classified according to the data type, and assign a data type coding rule to each type of construction engineering category data based on the data type;

[0034] An information encoding module is used to obtain data information of the construction engineering category data, and determine the data information encoding rules for the construction engineering category data based on the difference characteristics between the data information;

[0035] A random number encoding module, used to determine a random number encoding rule for the construction engineering category data based on the data volume of the construction engineering category data;

[0036] A rule determination module, configured to determine a first rule based on the number of bits of the coding identification digits of the data type coding rule, determine a second rule based on the number of bits of the coding identification digits of the data information coding rule, determine a third rule based on the coding sequence and coding connection of the data type coding and the data information coding, and determine a timestamp coding rule based on the first rule, the second rule and the third rule;

[0037] A coding library design module, used to design coding rules for the coding library based on the timestamp coding rule and the random number coding rule, so as to obtain a coding library for construction engineering data;

[0038] A verification module is used to use the coding library of the construction engineering data to perform time stamp and random number coding on the construction engineering data respectively, obtain the initial coding, and verify the uniqueness of the initial coding;

[0039] If the verification is successful, the initial code will be used as the only code;

[0040] Otherwise, determine the random number encoding rules, and perform time stamping and random number encoding on the construction project data until the determined code is unique.

[0041] Preferably, the collected data processing and storage unit comprises:

[0042] Target data preprocessing module, used for:

[0043] Retrieve the target engineering data, and clean the data after the target engineering data is retrieved;

[0044] Data cleaning is to fill missing values, delete outliers and duplicate values ​​of the target engineering data in sequence;

[0045] After data cleaning is completed, the cleaned target engineering data will be converted;

[0046] Data transformation involves feature scaling, feature encoding, feature selection, and dimensionality reduction of data;

[0047] After the data conversion is completed, the converted target engineering data will be standardized;

[0048] After data standardization is completed, the target engineering data that has been preprocessed is obtained.

[0049] Preferably, the collected data processing and storage unit further includes:

[0050] Processing data storage module for:

[0051] Confirm the data inventory of the target engineering data that has been preprocessed;

[0052] Divide the target engineering data into several data segments of equal length;

[0053] Confirm the data storage of the target engineering data according to the number of data segments;

[0054] Acquire the remaining capacity data of the memory, wherein the number of the memory is not less than five;

[0055] Confirm the memory location according to the data storage of the target project data;

[0056] Wherein, the data storage amount of the target engineering data is less than the remaining capacity of the memory;

[0057] The stored target engineering data is marked as processed engineering data.

[0058] Preferably, the storage data analysis and collation unit comprises:

[0059] Data type analysis module for:

[0060] Perform data analysis on the processing engineering data in the memory;

[0061] Among them, data analysis is to divide the processed engineering data into graphic data, curve data and model data;

[0062] The data types of the processed engineering data are consistent with those of the construction engineering data, namely, basic building data, building design data, building construction data, building progress data and building cost data;

[0063] Among them, graphic data include building basic data and building progress data; curve data include building cost data; model data include building design data and building construction data.

[0064] Preferably, the storage data analysis and sorting unit further includes:

[0065] Analytical data visualization and organization module, used for:

[0066] Visualize the progress chart of the graphic data, obtain the actual progress chart and the planned progress chart of the construction project after the arrangement, and compare the time dimension of the actual progress of the construction project with the time dimension of the planned progress, and judge whether the actual progress is within the standard planned progress range after comparison;

[0067] The curve data is visualized as a cost curve. After the visualization is completed, the actual cost curve and the planned cost curve of the construction project are obtained, and the actual cost curve and the planned cost curve are overlapped. After the curves overlap, it is determined whether the actual cost is within the planned cost range based on the non-overlapping area;

[0068] The model data is organized into a three-dimensional model visualization, and the actual three-dimensional model and the planned three-dimensional model of the construction project are obtained after the organization, and the actual three-dimensional model and the planned three-dimensional model are compared, and it is determined whether the actual three-dimensional model is different from the planned three-dimensional model according to the model comparison result;

[0069] Among them, the actual progress chart where the actual progress is not within the standard planned progress, the actual cost curve where the actual cost is not within the planned cost, and the actual 3D model where the actual 3D model is different from the planned 3D model are specially marked;

[0070] After the graphic data, curve data and model data are visualized and collated, standard engineering data can be obtained;

[0071] And transmit standard engineering data to the display terminal for presentation.

[0072] The storage data analysis and collation unit also includes: a data deviation determination module for determining the overall data deviation of the standard engineering data;

[0073] Preferably, the data deviation determination module includes:

[0074] The content feature determination module is used to determine the data content feature value K of the standard engineering data based on the engineering planning constraint relationship of the standard engineering data and according to the following formula;

[0075]

[0076] Among them, P1 represents the planning constraint relationship value between time and cost in standard engineering data, and its value range is (0, 10); P2 represents the planning constraint relationship value between time and model in standard engineering data, and its value range is (0, 10); P3 represents the planning constraint relationship value between cost and model in standard engineering data, and its value range is (0, 10); e represents a natural constant, and its weight is 2.72;

[0077] A weight determination module, for matching the time difference allowable weight, the cost difference allowable weight and the model difference allowable weight of the standard engineering data based on the data content feature value of the standard engineering data;

[0078] The deviation value determination module is used to determine the overall data deviation value D of the standard engineering data based on the time difference allowable weight, cost difference allowable weight and model difference allowable weight of the standard engineering data, combined with the actual progress, actual cost and actual three-dimensional model, and according to the following formula v ;

[0079]

[0080] Among them, σ a Indicates the time difference allowed weight, the value range is (0.5, 1), σ b represents the allowable weight of cost difference, with a value range of (0.5, 1), σ c The model difference allows weights, with a value range of (0.5, 1), H a Indicates the difference between the actual progress and the standard planned progress range, H b Indicates the difference between the actual cost and the planned cost range, H c Indicates the difference between the actual 3D model and the planned 3D model;

[0081] The deviation marking module is used to mark the overall deviation of the standard engineering data based on the overall data deviation value.

[0082] Compared with the prior art, the present invention has the following beneficial effects:

[0083] 1. The present invention provides a construction engineering data integration management system based on BIM5D technology, which can ensure that each data type follows a consistent format and standard through category classification, help reduce data ambiguity and misunderstanding, improve data availability and reliability, and combine timestamps and random number generated coding to ensure that each construction engineering data has a unique identifier.

[0084] 2. The present invention provides a construction engineering data integration management system based on BIM5D technology, which ensures the integrity, accuracy and consistency of data through data cleaning, thereby improving the reliability of subsequent analysis. By comparing the data inventory of the target engineering data with the remaining capacity of the memory, it can ensure that the data is stored in a memory with sufficient space.

[0085] 3. The present invention provides a construction project data integration management system based on BIM5D technology, which divides the processed engineering data into graphic data, curve data and model data, which helps to achieve effective classification and management of data. Different data types usually require different analysis methods and tools. The visual organization of graphic data, curve data and model data improves the progress management, cost management and model management of the entire construction project BIM5D. BRIEF DESCRIPTION OF THE DRAWINGS

[0086] Figure 1 It is an overall schematic diagram of the construction project management of the present invention;

[0087] Figure 2 It is a schematic diagram of the construction project management method of the present invention;

[0088] Figure 3 The present invention is a schematic diagram of the construction engineering visualization process. DETAILED DESCRIPTION

[0089] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0090] In order to solve the problem in the prior art that after the original construction project data is collected, there is no further effective data sorting for the collected data, which leads to the data being too messy and difficult to manage, please refer to Figure 1 and Figure 2 , this embodiment provides the following technical solutions:

[0091] A construction engineering data integration management system based on BIM5D technology, including:

[0092] Construction engineering data acquisition unit, used for:

[0093] Retrieving the construction engineering data from the database, and uniquely coding the retrieved construction engineering data according to the data type, and marking the uniquely coded data as target engineering data;

[0094] Acquisition data processing and storage unit, used for:

[0095] The target engineering data is preprocessed, and after the data preprocessing is completed, the preprocessed data is classified and stored according to the data type, and the classified and stored data is marked as processing engineering data;

[0096] Storage data analysis and collation unit, used for:

[0097] The processed engineering data will be analyzed according to the data type, and the different data will be visualized according to the analysis results. The visualized data will be marked as standard engineering data and presented.

[0098] Specifically, the accuracy of data management is improved through the construction project data acquisition unit. The timestamp, as a part of the code, ensures the orderliness of the code, that is, the data is arranged in the chronological order of data import. The data acquisition processing storage unit can ensure that the data is stored in a memory with sufficient space, ensuring the integrity, accuracy and consistency of the data. The data is visualized and organized through the storage data analysis and organization unit, thereby improving the progress management, cost management and model management of the entire construction project BIM5D.

[0099] Construction engineering data acquisition unit, including:

[0100] Construction engineering data classification module, used for:

[0101] Retrieving the construction engineering data from the database, and classifying the data according to the data type after the construction engineering data is retrieved;

[0102] Among them, the data types of construction engineering data include building basic data, building design data, building construction data, building progress data and building cost data;

[0103] Basic building data refers to the basic data of building projects, including project name, location, scale, construction unit, design unit, and construction unit;

[0104] Architectural design data include topographic maps, geological survey data, building plans, elevations, sections, and construction drawings of construction projects;

[0105] Construction data refers to data generated during the construction process, including construction logs, material usage records, equipment usage records, and quality inspection records;

[0106] Construction progress data refers to the progress of construction projects at different stages, including planned progress and actual progress;

[0107] Construction cost data refers to the investment cost in construction projects, including land cost, construction material cost and labor cost.

[0108] Construction engineering data collation module, used for:

[0109] After the construction engineering data is classified according to data type, different types of construction engineering data are uniquely coded and labeled;

[0110] The construction engineering data is uniquely coded and labeled to import the construction engineering data after type classification into the coding library for timestamp and random number coding;

[0111] Among them, the timestamp and random number code are the import time of the construction project data and the randomly generated number as the unique code;

[0112] The construction project data is uniquely coded and labeled to obtain the target project data.

[0113] Specifically, after the construction project data is retrieved from the database, the construction project data is classified by the construction project data classification module. Classification can ensure that each data type follows a consistent format and standard, which helps reduce data ambiguity and misunderstanding, and improves the availability and reliability of the data. The classified construction project data is then uniquely coded and labeled by the construction project data sorting module. By combining the timestamp and the random number generated code, it can be ensured that each construction project data has a unique identifier. This helps to avoid data duplication and confusion and improve the accuracy of data management. The timestamp, as part of the code, ensures the orderliness of the code, that is, it is arranged in the chronological order of data import. This makes data processing and retrieval more efficient, and it is also convenient to track the source and changes of data. By generating a unique code for the construction project data, the identification and matching operations in the data processing process can be simplified. This helps to speed up data processing and improve the overall efficiency of data management.

[0114] The present invention provides an embodiment, wherein the construction engineering data sorting module comprises:

[0115] A type coding module is used to obtain the construction engineering category data after the construction engineering data is classified according to the data type, and assign a data type coding rule to each type of construction engineering category data based on the data type;

[0116] An information encoding module is used to obtain data information of the construction engineering category data, and determine the data information encoding rules for the construction engineering category data based on the difference characteristics between the data information;

[0117] A random number encoding module, used to determine a random number encoding rule for the construction engineering category data based on the data volume of the construction engineering category data;

[0118] A rule determination module, configured to determine a first rule based on the number of bits of the coding identification digits of the data type coding rule, determine a second rule based on the number of bits of the coding identification digits of the data information coding rule, determine a third rule based on the coding sequence and coding connection of the data type coding and the data information coding, and determine a timestamp coding rule based on the first rule, the second rule and the third rule;

[0119] A coding library design module, used to design coding rules for the coding library based on the timestamp coding rule and the random number coding rule, so as to obtain a coding library for construction engineering data;

[0120] A verification module is used to use the coding library of the construction engineering data to perform time stamp and random number coding on the construction engineering data respectively, obtain the initial coding, and verify the uniqueness of the initial coding;

[0121] If the verification is successful, the initial code will be used as the only code;

[0122] Otherwise, determine the random number encoding rules, and perform time stamping and random number encoding on the construction project data until the determined code is unique.

[0123] In this embodiment, the larger the amount of construction engineering category data is, the larger the number of random digits determined by the corresponding random number encoding rule is.

[0124] The beneficial effects of the above design scheme are: by designing coding rules according to the data type of construction engineering data, the data information of the construction engineering category data and the data volume of the construction engineering category data, the construction engineering data can be timestamped and encoded with random numbers to ensure the close correlation between the initial code obtained and the data, and the uniqueness of the initial code can be verified to ensure the uniqueness of the unique code obtained, which makes data processing and retrieval more efficient, and facilitates tracking the source and changes of data. By generating a unique code for the construction engineering data, the identification and matching operations in the data processing process can be simplified. This helps to speed up data processing and improve the overall efficiency of data management.

[0125] In order to solve the problem that the data security performance is reduced due to the lack of effective data processing and storage in the prior art, please refer to Figure 1 and Figure 2, this embodiment provides the following technical solutions:

[0126] The acquisition data processing and storage unit includes:

[0127] Target data preprocessing module, used for:

[0128] Retrieve the target engineering data, and clean the data after the target engineering data is retrieved;

[0129] Data cleaning is to fill missing values, delete outliers and duplicate values ​​of the target engineering data in sequence;

[0130] After data cleaning is completed, the cleaned target engineering data will be converted;

[0131] Data transformation involves feature scaling, feature encoding, feature selection, and dimensionality reduction of data;

[0132] After the data conversion is completed, the converted target engineering data will be standardized;

[0133] After data standardization is completed, the target engineering data that has been preprocessed is obtained.

[0134] Processing data storage module for:

[0135] Confirm the data inventory of the target engineering data that has been preprocessed;

[0136] Divide the target engineering data into several data segments of equal length;

[0137] Confirm the data storage of the target engineering data according to the number of data segments;

[0138] Acquire the remaining capacity data of the memory, wherein the number of the memory is not less than five;

[0139] Confirm the memory location according to the data storage of the target project data;

[0140] Wherein, the data storage amount of the target engineering data is less than the remaining capacity of the memory;

[0141] The stored target engineering data is marked as processed engineering data.

[0142] Specifically, the target engineering data is preprocessed by collecting data, processing and storing units, and data integrity, accuracy and consistency are ensured through data cleaning, thereby improving the reliability of subsequent analysis. Data conversion, especially feature scaling and encoding, makes the data more suitable for the input requirements of the machine learning model, thereby improving the prediction performance and accuracy of the model. Through feature selection and dimensionality reduction, unnecessary computing burden is reduced, and the training and analysis process of the model is accelerated. Data standardization ensures that data from different sources or different features have the same scale, which helps to fairly evaluate the importance of each feature in the model. The preprocessed data is easier to manage and maintain, which facilitates subsequent data analysis and modeling. After the data preprocessing is completed, the preprocessed data is stored through the processing data storage module. By confirming the data inventory of the target engineering data after preprocessing, the scale and quantity of the data can be understood. Subsequently, the data is divided into data segments of equal length, which helps to organize and manage the data, making data processing, transmission and storage more flexible and efficient. By comparing the data inventory of the target project data with the remaining capacity of the memory, it can be ensured that the data is stored in a memory with sufficient space. According to the data inventory of the target project data, the location of the memory is dynamically confirmed, realizing the effective use of storage resources. Through reasonable data segmentation and memory management, the efficiency of data storage can be improved.

[0143] In order to solve the problem that the actual effect and planned operation of the construction project are not effectively visualized in the existing technology, which leads to the inability to accurately analyze, please refer to Figure 1-Figure 3 , this embodiment provides the following technical solutions:

[0144] Data type analysis module for:

[0145] Perform data analysis on the processing engineering data in the memory;

[0146] Among them, data analysis is to divide the processed engineering data into graphic data, curve data and model data;

[0147] The data types of the processed engineering data are consistent with those of the construction engineering data, namely, basic building data, building design data, building construction data, building progress data and building cost data;

[0148] Among them, graphic data include building basic data and building progress data; curve data include building cost data; model data include building design data and building construction data.

[0149] Analytical data visualization and organization module, used for:

[0150] Visualize the progress chart of the graphic data, obtain the actual progress chart and the planned progress chart of the construction project after the arrangement, and compare the time dimension of the actual progress of the construction project with the time dimension of the planned progress, and judge whether the actual progress is within the standard planned progress range after comparison;

[0151] The curve data is visualized as a cost curve. After the visualization is completed, the actual cost curve and the planned cost curve of the construction project are obtained, and the actual cost curve and the planned cost curve are overlapped. After the curves overlap, it is determined whether the actual cost is within the planned cost range based on the non-overlapping area;

[0152] The model data is organized into a three-dimensional model visualization, and the actual three-dimensional model and the planned three-dimensional model of the construction project are obtained after the organization, and the actual three-dimensional model and the planned three-dimensional model are compared, and it is determined whether the actual three-dimensional model is different from the planned three-dimensional model according to the model comparison result;

[0153] Among them, the actual progress chart where the actual progress is not within the standard planned progress, the actual cost curve where the actual cost is not within the planned cost, and the actual 3D model where the actual 3D model is different from the planned 3D model are specially marked;

[0154] After the graphic data, curve data and model data are visualized and collated, standard engineering data can be obtained;

[0155] And transmit standard engineering data to the display terminal for presentation.

[0156] The present invention provides an embodiment, the storage data analysis and arrangement unit further comprises: a data deviation determination module, which is used to determine the overall data deviation of the standard engineering data;

[0157] The data deviation determination module comprises:

[0158] The content feature determination module is used to determine the data content feature value K of the standard engineering data based on the engineering planning constraint relationship of the standard engineering data and according to the following formula;

[0159]

[0160] Among them, P1 represents the planning constraint relationship value between time and cost in standard engineering data, and its value range is (0, 10); P2 represents the planning constraint relationship value between time and model in standard engineering data, and its value range is (0, 10); P3 represents the planning constraint relationship value between cost and model in standard engineering data, and its value range is (0, 10); e represents a natural constant, and its weight is 2.72;

[0161] A weight determination module, for matching the time difference allowable weight, the cost difference allowable weight and the model difference allowable weight of the standard engineering data based on the data content feature value of the standard engineering data;

[0162] The deviation value determination module is used to determine the overall data deviation value D of the standard engineering data based on the time difference allowable weight, cost difference allowable weight and model difference allowable weight of the standard engineering data, combined with the actual progress, actual cost and actual three-dimensional model, and according to the following formula v ;

[0163]

[0164] Among them, σ a Indicates the time difference allowed weight, the value range is (0.5, 1), σ b represents the allowable weight of cost difference, with a value range of (0.5, 1), σ c The model difference allows weights, with a value range of (0.5, 1), H a Indicates the difference between the actual progress and the standard planned progress range, H b Indicates the difference between the actual cost and the planned cost range, H c Indicates the difference between the actual 3D model and the planned 3D model;

[0165] The deviation marking module is used to mark the overall deviation of the standard engineering data based on the overall data deviation value.

[0166] In this embodiment, the data content feature values ​​of the standard engineering data are different, the corresponding allowable weights are different, and the matching relationship is pre-designed.

[0167] In this embodiment, the planning constraint relationship value is used to determine the relative relationship between the two.

[0168] The beneficial effects of the above design scheme are: through the engineering planning constraint relationship based on the standard engineering data, and according to the following formula to determine the data content characteristic value of the standard engineering data, based on the data content characteristic value of the standard engineering data, matching the time difference allowable weight, cost difference allowable weight and model difference allowable weight of the standard engineering data, ensuring the accuracy of the obtained allowable weights, and providing an accurate data basis for the calculation of the overall data deviation value of the standard engineering data, and then, based on the time difference allowable weight, cost difference allowable weight and model difference allowable weight of the standard engineering data, combined with the actual progress, actual cost and actual three-dimensional model, determine the overall data deviation value of the standard engineering data, based on the overall data deviation value, perform overall deviation annotation on the standard engineering data, realize intuitive overall display of the standard engineering data, and improve data utilization efficiency and value.

[0169] Specifically, by performing data analysis on processed engineering data through the data type analysis module, we can understand the characteristics and structure of each data type more clearly. Dividing the processed engineering data into graphic data, curve data and model data will help to achieve effective classification and management of data. Different data types (such as building foundation data, building design data, building construction data, building progress data and building cost data) usually require different analysis methods and tools. Through data analysis, we can choose the most appropriate analysis method for each data type, thereby improving the accuracy and effectiveness of the analysis. By analyzing the data of the processed engineering, we can extract information useful for decision-making more quickly, and then visualize the analyzed data through the analysis data visualization and organization module. Through the visualization of the progress chart, the actual progress of the construction project can be intuitively displayed compared with the planned progress, so that project managers and relevant stakeholders can quickly understand the progress status of the project and make timely decisions and adjustments. Through the overlap of curves, the difference between the two can be clearly seen, which helps to identify cost overruns or savings and provide early warnings for project managers to take appropriate measures. The visualization of the three-dimensional model helps to compare the differences between the actual building model and the planned model in detail. This comparison can provide key information about building quality, structural accuracy, etc., so as to ensure that the project is carried out according to the design standards. Special annotations are made for the parts where the actual progress, cost and model are significantly different from the plan, which helps to highlight key issues. By integrating different types of data (pictures, curves, models) and visualizing them, the scheme forms a standardized engineering data representation. This standardized data not only facilitates internal communication and exchange, but also helps to connect with other systems or platforms to improve the efficiency and value of data use. At the same time, the visual organization of graphic data, curve data and model data improves the progress management, cost management and model management of the entire construction project BIM5D.

[0170] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0171] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction engineering data integration management system based on BIM5D technology, characterized in that: include: Construction engineering data acquisition unit, used for: Retrieving the construction engineering data from the database, and uniquely coding the retrieved construction engineering data according to the data type, and marking the uniquely coded data as target engineering data; Acquisition data processing and storage unit, used for: The target engineering data is preprocessed, and after the data preprocessing is completed, the preprocessed data is classified and stored according to the data type, and the classified and stored data is marked as processing engineering data; Storage data analysis and collation unit, used for: Perform data analysis on the processed engineering data according to the data type, organize the different data visually according to the analysis results, mark the visualized data as standard engineering data, and present the standard engineering data; The storage data analysis and sorting unit comprises: Data type analysis module for: Perform data analysis on the processing engineering data in the memory; Among them, data analysis is to divide the processed engineering data into graphic data, curve data and model data; The data types of the processed engineering data are consistent with those of the construction engineering data, namely, basic building data, building design data, building construction data, building progress data and building cost data; Among them, graphic data includes building basic data and building progress data; curve data includes building cost data; model data includes building design data and building construction data; Analytical data visualization module for: Visualize the progress chart of the graphic data, obtain the actual progress chart and the planned progress chart of the construction project after the arrangement, and compare the time dimension of the actual progress of the construction project with the time dimension of the planned progress, and judge whether the actual progress is within the standard planned progress range after comparison; The curve data is visualized as a cost curve. After the visualization is completed, the actual cost curve and the planned cost curve of the construction project are obtained, and the actual cost curve and the planned cost curve are overlapped. After the curves overlap, it is determined whether the actual cost is within the planned cost range based on the non-overlapping area; The model data is organized into a three-dimensional model visualization, and the actual three-dimensional model and the planned three-dimensional model of the construction project are obtained after the organization, and the actual three-dimensional model and the planned three-dimensional model are compared, and it is determined whether the actual three-dimensional model is different from the planned three-dimensional model according to the model comparison result; Among them, the actual progress chart where the actual progress is not within the standard planned progress, the actual cost curve where the actual cost is not within the planned cost, and the actual 3D model where the actual 3D model is different from the planned 3D model are specially marked; After the graphic data, curve data and model data are visualized and collated, standard engineering data can be obtained; And transmit standard engineering data to the display terminal for presentation; A data deviation determination module, used to determine the overall data deviation of standard engineering data; The data deviation determination module comprises: The content feature determination module is used to determine the data content feature value K of the standard engineering data based on the engineering planning constraint relationship of the standard engineering data according to the following formula; ; Among them, P1 represents the planning constraint relationship value between time and cost in the standard engineering data, and its value range is (0, 10); P2 represents the planning constraint relationship value between time and model in the standard engineering data, and its value range is (0, 10); P3 represents the planning constraint relationship value between cost and model in the standard engineering data, and its value range is (0, 10); e represents a natural constant, and its weight is 2.72; A weight determination module, for matching the time difference allowable weight, the cost difference allowable weight and the model difference allowable weight of the standard engineering data based on the data content feature value of the standard engineering data; The deviation value determination module is used to determine the overall data deviation value D of the standard engineering data based on the time difference allowable weight, cost difference allowable weight and model difference allowable weight of the standard engineering data, combined with the actual progress, actual cost and actual three-dimensional model, and according to the following formula v ; ; Among them, σ a Indicates the time difference allowed weight, the value range is (0.5, 1), σ b represents the allowable weight of cost difference, with a value range of (0.5, 1), σ c The model difference allows weights, with a value range of (0.5, 1), H a Indicates the difference between the actual progress and the standard planned progress range, H b Indicates the difference between the actual cost and the planned cost range, H c Indicates the difference between the actual 3D model and the planned 3D model; The deviation marking module is used to mark the overall deviation of the standard engineering data based on the overall data deviation value.

2. The construction engineering data integration management system based on BIM5D technology according to claim 1 is characterized by: The construction engineering data acquisition unit comprises: Construction engineering data classification module, used for: Retrieving the construction engineering data from the database, and classifying the data according to the data type after the construction engineering data is retrieved; Among them, the data types of construction engineering data include building basic data, building design data, building construction data, building progress data and building cost data.

3. The construction engineering data integration management system based on BIM5D technology according to claim 2 is characterized by: The construction engineering data classification module is also used for: Basic building data refers to the basic data of building projects, including project name, location, scale, construction unit, design unit, and construction unit; Architectural design data include topographic maps, geological survey data, building plans, elevations, sections, and construction drawings of construction projects; Construction data refers to data generated during the construction process, including construction logs, material usage records, equipment usage records, and quality inspection records; Construction progress data refers to the progress of construction projects at different stages, including planned progress and actual progress; Construction cost data refers to the investment cost in construction projects, including land cost, construction material cost and labor cost.

4. The construction engineering data integration management system based on BIM5D technology according to claim 3 is characterized by: The construction engineering data acquisition unit further includes: Construction engineering data collation module, used for: After the construction engineering data is classified according to data type, different types of construction engineering data are uniquely coded and labeled; The construction engineering data is uniquely coded and labeled to import the construction engineering data after type classification into the coding library for timestamp and random number coding; Among them, the timestamp and random number code are the import time of the construction project data and the randomly generated number as the unique code; The construction project data is uniquely coded and labeled to obtain the target project data.

5. A construction engineering data integration management system based on BIM5D technology according to claim 4, characterized in that: The construction engineering data sorting module comprises: A type coding module is used to obtain the construction engineering category data after the construction engineering data is classified according to the data type, and assign a data type coding rule to each type of construction engineering category data based on the data type; An information encoding module is used to obtain data information of the construction engineering category data, and determine the data information encoding rules for the construction engineering category data based on the difference characteristics between the data information; A random number encoding module, used to determine a random number encoding rule for the construction engineering category data based on the data volume of the construction engineering category data; A rule determination module, configured to determine a first rule based on the number of bits of the coding identification digits of the data type coding rule, determine a second rule based on the number of bits of the coding identification digits of the data information coding rule, determine a third rule based on the coding sequence and coding connection of the data type coding and the data information coding, and determine a timestamp coding rule based on the first rule, the second rule and the third rule; A coding library design module, used to design coding rules for the coding library based on the timestamp coding rule and the random number coding rule, so as to obtain a coding library for construction engineering data; A verification module is used to use the coding library of the construction engineering data to perform time stamp and random number coding on the construction engineering data respectively, obtain the initial coding, and verify the uniqueness of the initial coding; If the verification is successful, the initial code will be used as the only code; Otherwise, determine the random number encoding rules, and perform time stamping and random number encoding on the construction project data until the determined code is unique.

6. The construction engineering data integration management system based on BIM5D technology according to claim 4 is characterized by: The collected data processing and storage unit comprises: Target data preprocessing module, used for: Retrieve the target engineering data, and clean the data after the target engineering data is retrieved; Data cleaning is to fill missing values, delete outliers and duplicate values ​​of the target engineering data in sequence; After data cleaning is completed, the cleaned target engineering data will be converted; Data transformation involves feature scaling, feature encoding, feature selection, and dimensionality reduction of data; After the data conversion is completed, the converted target engineering data will be standardized; After data standardization is completed, the target engineering data that has been preprocessed is obtained.

7. The construction engineering data integration management system based on BIM5D technology according to claim 6 is characterized by: The collected data processing and storage unit also includes: Processing data storage module for: Confirm the data inventory of the target engineering data that has been preprocessed; Divide the target engineering data into several data segments of equal length; Confirm the data storage of the target engineering data according to the number of data segments; Acquire the remaining capacity data of the memory, wherein the number of the memory is not less than five; Confirm the memory location according to the data storage of the target project data; Wherein, the data storage amount of the target engineering data is less than the remaining capacity of the memory; The stored target engineering data is marked as processed engineering data.