A classification method for water-saving coal mining in coal seam floor aquifers
Through the measurement of hydrological parameters and hydrological numerical simulation through exploratory boreholes, the floor aquifer water-retaining coal mining types are divided, which solves the problem of incomplete evaluation in the existing technology and achieves accurate assessment of the impact of the floor aquifer on the coal mining face and coal mining. Scientific guidance on the process.
Patent Information
- Application Number
- CN202410475614.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-04-19
AI Technical Summary
The existing technology cannot comprehensively evaluate the impact of coal mining on the floor aquifer during the coal mining process, resulting in poor guidance in the evaluation results, inaccurate impact prediction, and complicated evaluation methods that require a large amount of hydrological engineering data.
Exploration boreholes are used to measure hydrological parameters and discharge parameters, and hydrological numerical simulation methods are used to predict water inflow and water level changes. The types of floor aquifer water-retaining coal mining are divided into floor water-retaining coal mining types I, II and III, and are carried out according to the types. Adjust accordingly.
It achieves a more comprehensive and accurate evaluation of the aquifer on the floor of the coal mining face, reduces the complexity and cost of hydrological engineering, shortens the evaluation cycle, and improves the accuracy of the evaluation results.
Smart Images

Figure CN118223882B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the fields of hydrogeology and mining engineering technology, and in particular to a classification method for water-preserving coal mining in aquifers at the bottom of a coal seam. Background Art
[0002] There are a large number of floor aquifers beneath the coal seams in North my country and South China. The discharge of these floor aquifers forms precious water resources, which are the main source of water for ecology, life and production in the mining areas and must be protected during the coal mining process.
[0003] Before coal mining, it is necessary to evaluate and classify the impact of coal mining on floor water resources. Traditional classification methods mainly include floor water inrush coefficient method and numerical simulation method, which have the following problems:
[0004] (1) The water inrush coefficient only evaluates whether water inrush occurs during coal mining, but cannot evaluate the impact on regional water sources, which means that the evaluation is incomplete.
[0005] (2) Traditional evaluation methods are mainly qualitative, and the evaluation results are not very instructive.
[0006] (3) The traditional evaluation method is based on the prediction of large-scale pumping wells in the coal mining face, which does not accurately predict the impact on the aquifer.
[0007] (4) Traditional evaluation requires large-area hydrological engineering data to carry out large-area numerical simulation, which is technically complex to implement. Summary of the invention
[0008] Purpose of the invention: In order to overcome the deficiencies in the prior art, the present invention provides a method for classifying water-saving coal mining in aquifers at the bottom of a coal seam.
[0009] Technical solution: To achieve the above purpose, the technical solution adopted by the present invention is:
[0010] The object of the present invention is to provide a method for classifying water-retaining coal mining in a coal seam floor aquifer, comprising the following steps:
[0011] S1. Conduct exploratory drilling on the floor aquifer at the coal mining working face to measure the hydrological parameters and discharge parameters of the planned protected aquifer, wherein the hydrological parameters include the groundwater permeability coefficient K and the water level Y before coal mining, and the discharge parameters include the total discharge flow P, the weighted average elevation Y1 of the discharge point, and the closest straight-line distance X between the discharge point and the coal mining working face;
[0012] S2, calculate the predicted floor water inflow value Q2 of the coal mining working face, where Q2 = Q-Q1, Q is the predicted total water inflow, and Q1 is the predicted roof water inflow;
[0013] S3. Divide the coal mining face into N B*B square units according to the length A and width B of the coal mining face, where N is A / B rounded up to one integer. Use the hydrological numerical simulation method to simulate and calculate the water level drop S of the unit closest to the discharge point at the closest straight-line distance X to the coal mining face.
[0014] S4, predict the post-mining water level Y2 of the coal mining face and the attenuation water inflow q at the coal mining discharge point, where:
[0015] Y2=YS
[0016]
[0017] Where M is the thickness of the bottom aquifer, that is, the total thickness of the planned protected aquifer;
[0018] S5. Based on the comparison results of the water level Y2 after mining and the weighted average elevation Y1 of the discharge point, or the comparison results of the attenuated water inflow q of the coal mining discharge point and the total discharge flow P, the bottom aquifer water conservation coal mining type is divided.
[0019] In one embodiment of the present invention, in step S1, the drilling depth of the exploratory borehole satisfies that the exposed thickness of the planned protected aquifer reaches more than 20% of the total thickness M of the planned protected aquifer.
[0020] In one embodiment of the present invention, in step S1, the total discharge flow P refers to the sum of the discharge flow of each discharge point, and the weighted average elevation Y1 of the discharge point is calculated according to the weighted number of the discharge point flow, and the formula is as follows:
[0021] Y1=(Y 11 ×P1+Y 12 ×P2...+Y 1n ×P n )÷(P1+P2...+P n )
[0022] In the formula, the flow rate of the kth discharge point is P k , whose elevation is Y 1k , there are n discharge points in total, k=1,2...n.
[0023] In one embodiment of the present invention, in step S2, the total water inflow value Q is calculated using the following formula:
[0024]
[0025] Where W is the total water inflow of the coal mining face with similar hydrogeological conditions, C Q is the predicted coal production of the coal mining face, C WThe coal production of coal mining faces with similar hydrogeological conditions;
[0026] The predicted roof water inflow Q1 is calculated using the large well method.
[0027] Furthermore, in one embodiment of the present invention, the similar hydrogeological conditions include that the water-richness coefficient and the thickness of the aquifer in the coal mining face are in the same order of magnitude.
[0028] In one embodiment of the present invention, in step S3, the method for dividing the working face includes dividing the working face into N B*B square units along the length direction of the coal mining working face.
[0029] In one embodiment of the present invention, in step S3, the hydrological numerical simulation method includes: each divided unit is equivalent to a pumping well with the same center as the square unit, and the radius of the pumping well is R = 0.71B. The diameter of the pumping well is half of the square diagonal line, which satisfies the requirement that the square is fully covered by the circular well, so the coefficient is taken as 0.71.
[0030] In one embodiment of the present invention, in step S3, the stable water pumping capacity of the pumping well is Q2 / N, and the type of the pumping well is a complete well planned to protect the aquifer.
[0031] In one embodiment of the present invention, in step S4, the thickness M of the bottom plate aquifer is obtained through a drilling histogram.
[0032] In one embodiment of the present invention, in step S5, the classification of the floor aquifer water-preserving coal mining type specifically includes:
[0033] When Y2≤Y1, it is Type I coal mining with floor water conservation;
[0034] When Y2>Y1, and q>eP, it is Type II of bottom water-retaining coal mining;
[0035] When Y2>Y1, and q≤eP, it is Type III of bottom water-retaining coal mining.
[0036] Where e=0.1~0.3.
[0037] Furthermore, in one embodiment of the present invention, e = 0.2. e represents a range in which a river flow can decay, and is usually set to e = 0.1 to 0.3. In some examples, e = 0.2.
[0038] Further, in one embodiment of the present invention, the corresponding adjustment according to the water-retaining coal mining type of the floor aquifer specifically includes:
[0039] (i) If the floor water-retaining mining is Type I, the floor water-retaining layer needs to be grout-transformed and re-evaluated after grouting until it reaches Type II and Type III. Otherwise, the thickness of the floor water-retaining layer should be continuously increased;
[0040] (ii) If it is Type II floor water-retaining coal mining, the working face shall not carry out artificial drainage of the aquifer in the floor of the coal mining working face, and the gushing water from the coal mining working face shall be purified and discharged to the original discharge point;
[0041] (iii) If the bottom water-retaining coal mining is type III, the coal mining face can be mined normally without taking any additional measures.
[0042] Beneficial effects: Compared with the prior art, the present invention has the following advantages:
[0043] 1) Simple and easy to implement, without requiring a large number of hydrological observation projects;
[0044] 2) The evaluation is more comprehensive, taking into account both water inflow and regional water level fluctuations;
[0045] 3) Lower costs and fewer large projects;
[0046] 4) The evaluation results are more accurate, using group well pumping equivalent to coal mining face disturbance;
[0047] 5) The implementation period is shorter and long-term water level observation is not required. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION
[0049] The present invention will be further described below in conjunction with the accompanying drawings and Examples. According to the following examples, the present invention can be better understood. However, it is easy for those skilled in the art to understand that the specific material ratios, process conditions and results described in the examples are only used to illustrate the present invention, and should not and will not limit the present invention described in detail in the claims.
[0050] Example
[0051] like Figure 1 As shown, a classification method for water-saving coal mining in a floor aquifer comprises the following steps:
[0052] S1. Drill holes for exploration of the floor aquifer at the coal mining face to measure the hydrological parameters and discharge parameters of the planned protected aquifer, wherein the hydrological parameters include the groundwater permeability coefficient K and the water level Y before coal mining, and the discharge parameters include the total discharge flow rate P, the weighted average elevation Y1 of the discharge point, and the closest straight-line distance X between the discharge point and the coal mining face, as follows:
[0053] Step 1: Before coal mining, exploratory drilling is carried out on the bottom aquifer at the coal mining working surface, and the groundwater permeability coefficient K of the planned protection aquifer and the water level Y before coal mining are measured in the borehole.
[0054] In some examples, the exploratory drilling reveals that the thickness of the planned protected aquifer should be greater than 20% or more of the total thickness of the planned protected aquifer.
[0055] In some examples, the permeability coefficient K is obtained by a pumping test or a draining test.
[0056] In some examples, the water level Y before coal mining is obtained by a water level meter.
[0057] Step 2: Use geological survey methods to identify the discharge points of the protective aquifer, measure the shortest straight-line distance X between the discharge point and the coal mining face, measure the flow rate of each discharge point, and calculate the total discharge flow rate P.
[0058] In some examples, determining the shortest straight-line distance X between the discharge point and the coal mining face means first determining the shortest straight-line distance between each discharge point and the coal mining face, and then finding the discharge point with the shortest straight-line distance.
[0059] In some examples, the total discharge flow rate P is the sum of the flow rates of each discharge point.
[0060] Step 3: Determine the weighted average elevation Y1 of the discharge point of the protective aquifer.
[0061] In some examples, the weighted average elevation Y1 of the discharge point is a weighted average of the elevations calculated based on the weighted number of the discharge point flow, and the formula is as follows:
[0062] Y1=(Y 11 ×P1+Y 12 ×P2...+Y 1n ×P n )÷(P1+P2...+P n )
[0063] In the formula, the flow rate of the kth discharge point is P k , whose elevation is Y 1k , there are n discharge points in total, k=1,2...n.
[0064] S2. Calculate the predicted floor water inflow value Q2 of the coal mining face, as follows:
[0065] Step 4: Predict the floor water inflow Q2 of the coal mining face.
[0066] In some examples, the prediction method uses the following formula
[0067] Q2=Q-Q1
[0068] Among them, Q is the predicted total water inflow, and Q1 is the predicted top plate water inflow.
[0069] In some examples, the predicted total water inflow Q of the coal mining face is calculated using the following formula:
[0070]
[0071] In the formula, W is the total water inflow of the coal mining face with similar hydrogeological conditions that has been mined, obtained through actual measurement, and C Q is the predicted coal production of the coal mining face, obtained through reserve calculation, C W The coal production of coal mining faces with similar hydrogeological conditions is obtained through actual measurement.
[0072] Furthermore, in some examples, coal mining faces with similar hydrogeological conditions refer to coal mining faces having water-richness coefficients and aquifer thicknesses that are in the same order of magnitude.
[0073] In some examples, the predicted roof water inflow Q1 of the coal mining face is calculated using the conventional "big well method".
[0074] S3. Based on the predicted length A and width B of the coal mining face, the face is divided into N units, where N is A / B rounded to the nearest integer. The water level drop S of the unit closest to the discharge point is calculated by using the hydrological numerical simulation method, as shown in the following steps 5 to 6:
[0075] Step 5: Based on the predicted length A and width B of the coal mining working face, divide the working face into N units, where N is A / B rounded to the nearest integer.
[0076] In some examples, a specific method of dividing the working face includes dividing the working face into N B*B square units along the length direction of the coal mining working face.
[0077] Step 6: Use the hydrological numerical simulation method to simulate the water level drop S of the unit closest to the discharge point found in step 2.
[0078] In some examples, the hydrological numerical simulation method is: each unit divided in step five is equivalent to a pumping well with the same center as the square unit, the radius of the pumping well is R=0.71B, the stable pumping volume of the pumping well is Q2 / N, the type of the pumping well is a complete well to protect the aquifer, and other parameters and simulation methods are established processes.
[0079] S4, predicting the post-mining water level Y2 of the coal mining face and the attenuated water inflow q at the coal mining discharge point, specifically as follows: Steps 7 to 8:
[0080] Step 7: Predict the water level Y2 after mining at the coal mining face, Y2=YS.
[0081] Step 8: Predict the attenuation water inflow q at the coal mining discharge point, and calculate it according to the following formula
[0082]
[0083] Where M is the thickness of the bottom aquifer.
[0084] In some examples, the thickness M of the floor aquifer is obtained from a borehole histogram.
[0085] S5. Based on the comparison result of the water level Y2 after mining and the weighted average elevation Y1 of the discharge point, or the comparison result of the attenuated water inflow q of the coal mining discharge point and the total discharge flow P, the water-retaining coal mining type of the floor aquifer is divided, as shown in the following steps nine to ten:
[0086] Step 9: Classification of bottom aquifer water-conservation mining types.
[0087] In some examples, the classification of floor aquifer water conservation coal mining types specifically includes:
[0088] When Y2≤Y1, it is Type I coal mining with floor water conservation;
[0089] When Y2>Y1, and q>e P, it is Type II bottom water-retaining coal mining, where e is 0.1~0.3;
[0090] When Y2>Y1, and q≤eP, it is Type III bottom water-retaining coal mining, where e is 0.1~0.3.
[0091] Step 10: Make corresponding adjustments according to the water-preserving coal mining type of the bottom aquifer.
[0092] In some examples, making corresponding adjustments according to the floor aquifer water-preserving coal mining type specifically includes:
[0093] (i) If it is Type I bottom plate water conservation coal mining, the water level at the discharge point is higher than the water level in the coal mining area, indicating that the discharge direction of the groundwater system has changed. Since there is no water in the original discharge area, the ecological impact is huge. Therefore, it is necessary to strengthen the waterproof layer and control the change of the discharge direction. Therefore, the design of the present invention requires grouting transformation of the bottom plate waterproof layer at this time, and re-evaluation after grouting transformation until it reaches Type II and Type III, otherwise the thickness of the bottom plate waterproof layer will continue to increase.
[0094] (ii) If it is type II coal mining with floor water conservation, although there is no change in the discharge direction, the discharge volume is reduced to the point where the ecology of the original discharge area is partially degraded. Therefore, although there is no need for large-scale engineering to reinforce the aquifer, it is necessary to artificially guide the water circulation to allow the ecology of the original discharge area to continue to be maintained. Therefore, the design of the present invention requires that the coal mining face floor aquifer should not be artificially drained at this time, and the gushing water from the coal mining face should be purified and discharged to the original discharge point.
[0095] (iii) If it is Type III bottom water-retaining mining, there is no change in the discharge direction and the discharge volume is limitedly attenuated. The coal mining face can be mined normally without taking additional measures.
[0096] The floor aquifer water-preservation coal mining classification method of the present invention mainly adopts the following principles:
[0097] First, the impact of coal mining on groundwater does not equate a single coal mining face to a large well, but rather to a group of wells. This is because the coal mining face is rectangular, and the error in equating it to a circular well is large.
[0098] Second, the water attenuation at the discharge point mainly comes from the decrease in discharge volume after the coal mining water level drops. Darcy's law is applied here. The attenuation area is smaller than the width B of the coal mining face, so the Darcy law is on the safe side, that is, the attenuation q is greater than or equal to the actual value.
[0099] Third, the prediction of water inrush from the floor of the coal mining face adopts the analogy method combined with the large well method, which is more accurate than the water inrush coefficient method.
[0100] Embodiment 1:
[0101] The ecological environment of a certain mining area is fragile. The main ecological wetlands in the area come from the karst aquifers at the bottom of the coal seam. In the past, the water inrush coefficient method was used to evaluate the impact of coal mining on ecological wetlands. It was believed that if the water inrush coefficient was greater than the critical water inrush coefficient of 0.06, the bottom mine and water supply would occur. However, it was impossible to specifically divide the mining impact level and guide the green and scientific mining of coal.
[0102] In order to make a more scientific assessment, this assessment method is adopted. The specific steps are as follows:
[0103] S1. Drill holes for exploration of the floor aquifer at the coal mining face to measure the hydrological parameters and discharge parameters of the planned protected aquifer, wherein the hydrological parameters include the groundwater permeability coefficient K and the water level Y before coal mining, and the discharge parameters include the total discharge flow rate P, the weighted average elevation Y1 of the discharge point, and the closest straight-line distance X between the discharge point and the coal mining face, as follows:
[0104] Step 1: Before coal mining, exploratory drilling is carried out on the bottom aquifer at the coal mining working surface, and the groundwater permeability coefficient K of the planned protection aquifer and the water level Y before coal mining are measured in the borehole.
[0105] The exploratory drilling revealed that the thickness of the aquifer planned to be protected is 34% of the total thickness.
[0106] The permeability coefficient is obtained by a pumping test, and the groundwater permeability coefficient K is measured to be 0.43 m / d.
[0107] The water level Y before coal mining was obtained through a water level meter, and the measured value was Y=386m.
[0108] Step 2: Use geological survey methods to identify the discharge points of the planned protected aquifer.
[0109] Specifically, in the planned protected aquifer of this embodiment, there are 6 discharge points. The straight-line distances between each discharge point and the coal mining face are measured as 1204m, 1306m, 1376m, 1410m, 1449m, and 1530m respectively. The discharge point corresponding to the nearest straight-line distance of 1204m is found and is located in the second unit.
[0110] The shortest straight-line distance between the discharge point and the coal mining face was determined to be X=1204m.
[0111] Determine the flow rate of each discharge point, and calculate the sum of the flow rates of each discharge point to get the total discharge flow rate, which is P = 46762m 3 / d.
[0112] Step 3: Determine the weighted average elevation of the discharge point of the protective aquifer, Y1=375m.
[0113] In this embodiment, the weighted average elevation of the discharge point is a weighted average of the elevations calculated based on the weighted numbers of the discharge point flow rates, and the formula is as follows:
[0114] Y1=(Y 11 ×P1+Y 12 ×P2...+Y 16 ×P6)÷(P1+P2...+P6)
[0115] In the formula, the flow rate of the kth discharge point is P k , whose elevation is Y 1k , there are n discharge points in total, k=1,2...6.
[0116] S2. Calculate the predicted floor water inflow value Q2 of the coal mining face, as follows:
[0117] Step 4: Predict the floor water inflow Q2 of the coal mining face.
[0118] In this embodiment, the prediction method of the bottom plate water inflow Q2 adopts the following formula:
[0119] Q2=Q-Q1
[0120] Among them, Q is the predicted total water inflow of the coal mining face, which is calculated using the following formula:
[0121]
[0122] In the formula, W is the total water inflow of the coal mining face with similar hydrogeological conditions that has been mined. It is W=2349m 3 / d,C W The coal production of coal mining faces with similar hydrogeological conditions is obtained through actual measurement as C W =394m 3 In this embodiment, the coal mining working face with similar hydrogeological conditions specifically refers to a coal mining working face with a water-filled aquifer with a water-richness coefficient of 0.23 liters / (second·meter) and a water-containing layer thickness of 19.2 meters, which is the same as the coal mining working face with a water-filled aquifer with a water-richness coefficient of 0.44 liters / (second·meter) and a water-containing layer thickness of 26.3 meters in this embodiment. The two sets of data are in the same order of magnitude.
[0123] C Q The coal production of the coal mining face is predicted, and the reserve calculation results in C Q =432m 3 .
[0124] Substituting the values of each parameter into the above formula for the predicted total water inflow Q of the coal mining face, we obtain:
[0125]
[0126] Furthermore, in this embodiment, the predicted roof water inflow Q1 of the coal mining face is calculated using the conventional "big well method" to be Q1 = 1430m 3 / d.
[0127] According to the predicted total water inflow Q of the above-mentioned coal mining working face and the predicted roof water inflow Q1, they are substituted into the prediction formula of Q2 to obtain:
[0128] Q2=Q-Q1=2576-1430=1146m 3 / d.
[0129] S3. Based on the predicted length A and width B of the coal mining face, the face is divided into N units, where N is A / B rounded to the nearest integer. The water level drop S of the unit closest to the discharge point is calculated by using the hydrological numerical simulation method, as shown in the following steps 5 to 6:
[0130] Step 5: Based on the length A=1164m and the width B=176m of the coal mining face, divide the face into N units, where N is A / B rounded up to the nearest integer, which is 7.
[0131] In this embodiment, the specific working face division method is: dividing the working face into 6 176m*176m square units and a final small unit along the length direction of the coal mining working face, for a total of 7 units.
[0132] Step 6: Use the hydrological numerical simulation method to simulate the water level drop S of the second unit of the cut hole that is closest to the discharge point found in step 2.
[0133] The hydrological numerical simulation method is as follows: each unit divided in step 5 is equivalent to a pumping well with the same center as the square unit, the radius of the pumping well is R = 0.71B = 311.52m, and the stable water pumping capacity of the pumping well is Q2 / N = 163.71m 3 / d, the pumping well type is a complete well to protect the aquifer, and other parameters and simulation methods are the established process. According to the conventional water level drawdown measurement method, the water level drawdown of the second unit from the opening of the cut is S = 6m.
[0134] S4, predicting the post-mining water level Y2 of the coal mining face and the attenuated water inflow q at the coal mining discharge point, specifically as follows: Steps 7 to 8:
[0135] Step 7: Predict the water level Y2 after mining at the coal mining face, Y2=YS=386-6=380m.
[0136] Step 8: Predict the attenuation water inflow q at the coal mining discharge point, and calculate it according to the following formula:
[0137]
[0138] Among them, the thickness of the bottom plate aquifer M = 113m, which is obtained through the drilling column chart.
[0139] S5. Based on the comparison result of the water level Y2 after mining and the weighted average elevation Y1 of the discharge point, or the comparison result of the attenuated water inflow q of the coal mining discharge point and the total discharge flow P, the water-retaining coal mining type of the floor aquifer is divided, as shown in the following steps nine to ten:
[0140] Step 9: Classification of bottom aquifer water-conservation mining types.
[0141] Since Y2>Y1, and q≤0.1P, it is Type III bottom water-retaining coal mining.
[0142] Step 10: The coal mining face of Type III with bottom plate water conservation can be mined normally without taking any additional measures.
[0143] This coal mining face is Type III bottom plate water-conservation mining, and no other additional measures have been taken. During the mining process of the face, the mine water inrush is limited and the ecological wetland is not affected, thus achieving green coal mining.
[0144] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A classification method for water-saving coal mining in aquifers on coal seam floors, characterized in that: The following steps are involved: S1. Conduct exploratory drilling on the floor aquifer at the coal mining working face to measure the hydrological parameters and discharge parameters of the planned protected aquifer, wherein the hydrological parameters include the groundwater permeability coefficient K and the water level Y before coal mining, and the discharge parameters include the total discharge flow P, the weighted average elevation Y1 of the discharge point, and the closest straight-line distance X between the discharge point and the coal mining working face; S2, predict the water inflow value Q2 of the bottom plate of the coal mining working face, where Q2 = Q-Q1, Q is the predicted total water inflow, Q1 is the predicted roof water inflow; the total water inflow value Q is calculated using the following formula: Where W is the total water inflow of the coal mining face with similar hydrogeological conditions, C Q is the predicted coal production of the coal mining face, C W The coal production of coal mining faces with similar hydrogeological conditions; The predicted roof water inflow Q1 is calculated using the large well method; S3. Divide the coal mining face into N B*B square units according to the length A and width B of the coal mining face, where N is A / B rounded up to one integer. Use the hydrological numerical simulation method to simulate and calculate the water level drop S of the unit closest to the discharge point at the closest straight-line distance X to the coal mining face. The hydrological numerical simulation method includes: each divided unit is equivalent to a pumping well with the same center as the square unit, the radius of the pumping well is R=0.71B, the stable pumping volume of the pumping well is Q2 / N, and the type of the pumping well is a complete well planned to protect the aquifer; S4, predict the post-mining water level Y2 of the coal mining face and the attenuation water inflow q at the coal mining discharge point, where: Y2=YS Where M is the thickness of the bottom aquifer, that is, the total thickness of the planned protected aquifer; S5. Based on the comparison results of the water level Y2 after mining and the weighted average elevation Y1 of the discharge point, or the comparison results of the attenuated water inflow q of the coal mining discharge point and the total discharge flow P, the bottom aquifer water conservation coal mining type is divided.
2. The method according to claim 1, characterized in that: In step S1, the drilling depth of the exploratory borehole satisfies that the exposed thickness of the planned protected aquifer reaches more than 20% of the total thickness M of the planned protected aquifer.
3. The method according to claim 1, characterized in that In step S1, the total discharge flow P refers to the sum of the discharge flow of each discharge point, and the weighted average elevation Y1 of the discharge point is calculated according to the weighted number of the discharge point flow, and the formula is as follows: Y1=(Y 11 ×P1+Y 12 ×P2...+Y 1n ×P n )÷(P1+P2...+P n ) In the formula, the flow rate of the kth discharge point is P k , whose elevation is Y 1k , there are n discharge points in total, k=1,2...n.
4. The method according to claim 1, characterized in that: The similarity of the hydrogeological conditions includes that the water-richness coefficient and the thickness of the aquifer filled with water at the coal mining face are at the same order of magnitude.
5. The method according to claim 1, characterized in that: In step S4, the thickness M of the bottom plate aquifer is obtained through a drilling histogram.
6. The method according to claim 1, characterized in that In step S5, the classification of the bottom aquifer water-preserving coal mining types specifically includes: When Y2≤Y1, it is Type I coal mining with floor water conservation; When Y2>Y1, and q>eP, it is Type II of bottom water-retaining coal mining; When Y2>Y1, and q≤eP, it is Type III of bottom water-retaining coal mining. Where e=0.1~0.
3.
7. The method according to claim 6, characterized in that Corresponding adjustments are made according to the water-preserving coal mining type of the floor aquifer, including: (i) If the floor water-retaining mining is Type I, the floor water-retaining layer needs to be grout-transformed and re-evaluated after grouting until it reaches Type II and Type III. Otherwise, the thickness of the floor water-retaining layer should be continuously increased; (ii) If it is Type II floor water-retaining coal mining, the working face shall not carry out artificial drainage of the aquifer in the floor of the coal mining working face, and the gushing water from the coal mining working face shall be purified and discharged to the original discharge point; (iii) If the bottom water-retaining coal mining is type III, the coal mining face can be mined normally without taking any additional measures.