Distribution network power flow control system, method and equipment based on HDT and CBs collaborative control

By adopting the collaborative control method of HDT and CBs in the distribution network to adjust the output voltage of the on-load tap changer and AC/AC module, the voltage fluctuation and feedback of the distribution network when high-penetration distributed power generation resources are connected to the grid are solved. It solves the power flow problem and achieves precise and rapid power flow control and improves the economy and reliability of the equipment.

CN118232350BActive Publication Date: 2024-10-18NORTHEAST DIANLI UNIVERSITY
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410419668.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-10-18
Estimated Expiration
2044-04-09

AI Technical Summary

Technical Problem

When high-penetration distributed power generation resources are connected to the existing distribution network, voltage fluctuations and reverse power flow may threaten the stability of the distribution network. Traditional voltage regulation methods such as OLTC and CBs have limitations in dynamic response and regulation accuracy. , and the synergy effect between HDT and traditional equipment is not good.

Method used

A distribution network power flow control method based on collaborative control of HDT and CBs is adopted. By setting up a hybrid distribution transformer at the balancing node, combined with an on-load voltage regulating transformer and an AC/AC converter, the power data of the distributed power supply is collected, and the objective function is constructed to Minimize the total operating cost of the distribution network, adjust the on-load tap changer and AC/AC module output voltage, and achieve optimal power flow control.

Benefits of technology

It achieves precise and rapid power flow control in a system with a large number of distributed power sources, reduces redundancy, and improves control accuracy and equipment economy and reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118232350B_ABST
    Figure CN118232350B_ABST
Patent Text Reader

Abstract

The present invention discloses a distribution network power flow control system, method and device based on HDT and CBs coordinated control. A hybrid distribution transformer includes an on-load tap-changing transformer and an AC / AC converter. Distributed power sources DGs and capacitor switches (CBs) are arranged in the branches of the distribution network system. The present application converts the equivalent voltage of the hybrid distribution transformer into the injection power of the branch where the HDT is located, and adopts the method of HDT coordinated with CBs to realize accurate and rapid power flow control in a system with a large number of distributed power sources connected. The active injection power and reactive injection power of the on-load tap-changing transformer OLTC and the AC / AC converter are obtained by power flow control constraints when the optimal power flow is obtained, and the voltage of the hybrid distribution transformer HDT is obtained. The output voltage of the on-load tap changer and the AC / AC module is adjusted based on the voltage of the hybrid distribution transformer HDT to realize optimal power flow control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power system equipment, and specifically relates to a distribution network power flow control system, method and equipment based on HDT and CBs coordinated control. Background Art

[0002] In the existing technology, the grid connection of distributed generation resources, especially at high penetration rates, may cause voltage fluctuations, reverse power flow, and even threaten the stability and reliability of the distribution network. In order to meet these challenges, grid operators need to adopt more flexible and efficient voltage control methods. Although traditional distribution network voltage regulation methods, such as on-load tap changer transformers (OLTC) and capacitor banks (CBs), have been the main means of voltage regulation in the past few decades, they have inherent limitations in dynamic response and regulation accuracy.

[0003] Compared with other power electronic devices such as soft openpoint (SOP), unified power flow controller (UPFC) and SEN transformer, hybrid distribution transformer (HDT) has its own advantages in voltage and power flow regulation, power quality management, equipment reliability and economy. The common goal of these devices is to improve the efficiency and reliability of the power grid, optimize the access of renewable energy, and promote the development of modern power systems to a higher level of intelligence and greenness. Although HDT has shown excellent performance in theoretical and experimental studies, its synergy with traditional voltage regulation devices (such as OLTC and CBs) and its application effect in actual power systems are relatively poor.

[0004] Although OLTC is a voltage regulating device, its voltage regulation is discrete. When distributed power sources are connected, the power grid will have power reverse transmission problems and voltage fluctuations will become more frequent. Simply installing capacitors at the end of the feeder cannot achieve a good compensation effect.

[0005] The existing technology of line-to-line power flow controller modeling and power flow optimization method (Proceedings of the CSEE) is to add the power flow controller to the power grid. The cost of the power flow controller is much higher than that of the HDT. In addition, the power passing through the AC / AC module of the HDT is not the full power of the line, which will greatly reduce the failure rate of the AC / AC module of the HDT and increase the life of the HDT. Summary of the invention

[0006] The purpose of the present invention is to solve the problems in the prior art. The present application discloses a distribution network power flow control method based on HDT and CBs collaborative control, which is characterized in that a hybrid distribution transformer is set at the balancing node m of the distribution network system, and the hybrid distribution transformer includes an on-load tap-changing transformer and an AC / AC converter; the power equipment in the distribution network system is defined as a node, and the nodes are numbered, and the number of nodes is N. N , the hybrid distribution transformer HDT is connected to the power equipment through the node o, and the distributed power source and capacitor switch are set in the branch of the distribution network system; the line between the i-th node and its adjacent node j is an adjacent branch; the on-load tap changer is set on the on-load tap changer, and the output voltage U of the on-load tap changer is adjusted by adjusting the on-load tap changer to i=1,2L N N , j = 1,2L N N .

[0007] The on-load tap changer is a voltage regulating gear switching device on the on-load tap-changing transformer. t,mo Indicates that at time t, branch U mo The value of the on-load tap-changer position.

[0008] The distribution network power flow control method based on HDT and CBs coordinated control specifically includes the following steps:

[0009] S1, collects the active power injected by the distributed power source at the node i at time t and reactive power U t,i is the voltage of node i at time t; t=1,2L N T , i=1,2L N N ;

[0010] S2, the single-phase average model of the hybrid distribution transformer is equivalent to the HDT voltage source model;

[0011] S3, establishing an injection power model for the branch where the hybrid distribution transformer is located;

[0012] S4, constructing the objective function with the goal of minimizing the total operating cost of the distribution network;

[0013] S5, through the power flow control constraints, the active injection power and reactive injection power of the on-load tap-changer and AC / AC converter are obtained when the optimal power flow is in place. The voltage of the hybrid distribution transformer and the output voltage of the AC / AC module are calculated through the injection power model, and the output voltage of the on-load tap changer and AC / AC module are adjusted to achieve optimal power flow control.

[0014] Step S2 specifically includes the following steps:

[0015] The connection point between the on-load tap-changing transformer and the AC / AC converter is the auxiliary node n. The impedance of the on-load tap-changing transformer in the single-phase average model of the hybrid distribution transformer is equivalent to Z T , the impedance of the AC / AC converter is equivalent to Z AC / AC ;

[0016] The establishment of a power injection model reduces the number of unknowns in power flow calculation and shortens the power flow calculation time.

[0017] The injection power model established for the branch where the hybrid distribution transformer is located is:

[0018]

[0019]

[0020] P t,n is the active injection power of node n at time t, Q t,n is the reactive power injected into node n at time t, U t,n is the output voltage of the on-load tap-changing transformer (the voltage of node n at time t); P t,o is the active injection power of node o at time t, Q t,o is the reactive power injected into node o at time t, U t,o is the output voltage of the hybrid distribution transformer (the voltage of node o at time t); θ t,on is the phase difference between node o and node n at time t.

[0021] The objective function constructed with the goal of minimizing the total operating cost of the distribution network is:

[0022] f min =W L (f loss +f switch )+W v C v f v (2)

[0023] Among them, f min represents the total operating cost of the distribution network, W L , W v is the weight coefficient, f loss is the power loss cost, f switch is the switch operation cost; C v is the voltage deviation f v Cost coefficient of

[0024]

[0025] r mo =r AC / AC +r T+r′ mo

[0026] Among them, r mo To balance the resistance of the branch between node m and node o, r AC / AC 、r T Z AC / AC , Z T The real part, r′ mo To balance the original line resistance between node m and node o.

[0027] f Lloss is the line loss cost of the distribution network, f Ploss is the operating cost of the hybrid distribution transformer, C loss N is the cost coefficient of the total cost of active power loss; T is the total period of the time range, N N is the total number of system nodes; Ω b is the branch set without on-load tap-changing transformer; r ij is the resistance value between adjacent nodes i and j; Δt is the unit time; is the active power flowing through the hybrid distribution transformer at time t; I t,ij is the current of adjacent nodes i and j at time t;

[0028] I t,ij The value range of is:

[0029]

[0030] in, For I t,ij current carrying capacity.

[0031] Switch operating cost switch Including the gear switching cost of the on-load tap changer on the on-load tap-changing transformer, the switching cost of the capacitor switcher and the operating cost of the hybrid distribution transformer, it is formula (5):

[0032]

[0033] Among them, Ω0 is the branch set containing the on-load tap-changing transformer; C tap , C cap , C hap Cost coefficients for on-load tap changers, capacitor switchers, and hybrid distribution transformers during operation of the gear switching operation; is the number of units operated by the capacitor switch at node i at time t; n HDT is the number of thyristors in the hybrid distribution transformer.

[0034] Voltage deviation f v The calculation formula is (6):

[0035]

[0036] Among them, U t,i is the voltage of node i at time t; is the expected voltage of the node (the expected voltage refers to the expected voltage of the node, and the expected voltage of all nodes is in the same voltage range). t,i , The voltage range is as follows:

[0037]

[0038]

[0039] in, U t,i For U t,i The upper and lower limits of U ~ for upper and lower limits.

[0040] The power flow control constraints include the operation constraints of the distributed generation, the operation constraints of the hybrid distribution transformer, the operation constraints of the on-load tap changer and the operation constraints of the capacitor switch;

[0041] The operating constraints of the distributed power source are:

[0042]

[0043]

[0044] is the active power injected into the i-th node where the distributed generation is located at time t (the power input to the grid), and the predicted value is assigned to the true value, P i is the active power injected into node i, is the active power output of the distributed generation to the grid at time t, is the active power injected into the node i where the distributed generation is located at time t, P i is the active injection power of node i, is the reactive power injected into the node i where the distributed generation is located at time t; is the power factor angle of the distributed power supply at node i; is the capacity of the distributed power source at node i at time t (the maximum output capacity of the distributed power source);

[0045] The operating constraints of the hybrid distribution transformer are:

[0046]

[0047]

[0048]

[0049]

[0050] is the active power flowing through the hybrid distribution transformer at branch mo at time t; is the reactive power flowing through the hybrid distribution transformer at branch mo at time t; and are the lower and upper limits of the active power flowing through the hybrid distribution transformer at branch mo at time t, respectively; are the lower and upper limits of the reactive power flowing through the hybrid distribution transformer at branch mo at time t;

[0051] The operating constraints of the on-load tap changer are:

[0052] U t,i =k t,ij U t,j (13)

[0053] k t,mo =k mo,0 +K t,mo Δk mo (14)

[0054]

[0055]

[0056] U t,i is the voltage of node i at time t, k t,mo is the transformation ratio of the on-load tap-changing transformer on branch mo at time t, U t,j is the voltage of node j at time t; k mo,0 is the initial transformation ratio of the branch mo where the on-load tap-changing transformer is located (the ij branch is the branch between the node i and its adjacent node j; the transformation ratio is the voltage ratio across the transformer); Δk mo is the transformation ratio step length of the on-load tap-changing transformer in the branch mo where the on-load tap-changing transformer is located; is the maximum change range of the on-load tap-changer in adjacent time periods; The upper limit of the adjustable gear of the on-load tap-changing transformer; N T is the total period of the time range;

[0057] The operating constraints of the capacitor switch are:

[0058]

[0059]

[0060]

[0061] in, is the reactive power injected by the capacitor switch at node i at time t, is the number of operating units of the capacitor switch at node i at time t; is the unit reactive capacity of the capacitor switch at node i, is the switched capacitor bank at node i at time t, is the switched capacitor bank at node i at the moment before time t, is the switched capacitor bank at node i at time t; The maximum number of switched units of capacitor switch units in adjacent time periods; is the maximum number of capacitor switch groups, and Z is a mathematical integer set. is the number of operating units of the capacitor switch at node i at time t;

[0062] The active and reactive injection powers of the on-load tap-changing transformer and AC / AC converter are obtained by the power flow control constraint at the optimal power flow, and the voltage U of the hybrid distribution transformer is calculated. t,o -U t,m , voltage regulation on-load tap-changer and AC / AC module based on hybrid distribution transformer output voltage U t,o -U t,n , realize power flow control, by adjusting the on-load tap changer (adjusting K t,ij value) to adjust the output voltage U of the on-load tap-changing transformer t,n , the output voltage U of the hybrid distribution transformer in this embodiment t,o is the voltage at node 2.

[0063] The injected power model takes the power P t,o , P t,n , Q t,o , Q t,n ,θ t,on The regulation is converted into the voltage U of the hybrid distribution transformer t,o -U t,m and the voltage U of the AC / AC module t,o -U t,n The voltage of the hybrid distribution transformer does not need to be added in the optimal power flow calculation process.

[0064] Based on the optimal power flow, P t,o , P t,n , Qt,o , Q t,n ,θ t,on , the power of the balance node P t,m , Q t,m and the equilibrium node voltage U t,m , calculate the voltage U of the hybrid distribution transformer t,o -U t,m and the voltage U of the AC / AC module t,o -U t,n ; Optimal power flow control can be achieved by adjusting the voltage of the hybrid distribution transformer (on-load tap changer) and the voltage of the AC / AC module. t,m is the voltage of the equilibrium node m, and U t,m The per-unit value is 1.

[0065] Through the above constraints, the active injection power and reactive injection power of the on-load tap-changing transformer and AC / AC converter during optimal power flow are obtained. The voltage of the hybrid distribution transformer is calculated based on the injection power model. The power flow control is achieved by adjusting the output voltage of the on-load tap changer and AC / AC module of the hybrid distribution transformer.

[0066] An electronic device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the distribution network flow control method based on the coordinated control of HDT and CBs is implemented.

[0067] A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that when the computer program is executed by a processor, the distribution network flow control method based on the coordinated control of HDT and CBs is implemented.

[0068] A computer program product, comprising a computer program, characterized in that when the computer program is executed by a processor, the distribution network power flow control method based on the coordinated control of HDT and CBs is implemented.

[0069] Compared with the prior art, the present invention has the following beneficial effects:

[0070] The present application discloses a distribution network power flow control method based on HDT and CBs collaborative control, obtains the active injection power and reactive injection power of the on-load tap-changing transformer OLTC and the AC / AC converter at the optimal power flow through power flow control constraints, obtains the voltage of the hybrid distribution transformer HDT, adjusts the output voltage of the on-load tap changer and the AC / AC module based on the voltage of the hybrid distribution transformer HDT, realizes the optimal power flow control, has little control redundancy and is accurate in control.

[0071] The equivalent voltage of the hybrid distribution transformer is converted into the injected power of the branch where the HDT is located. The HDT is used in coordination with OLTC and CBs to achieve accurate and rapid power flow control in systems with a large number of distributed power sources.

[0072] After the AC / AC module is added to the on-load voltage-changing transformer OLTC of this application, the discrete voltage adjusted by the original on-load voltage-changing transformer OLTC can be smoothed. In the process of coordinated control of the hybrid distribution transformer HDT and the capacitor switch CBs, the problem of the gear position of the on-load voltage-changing transformer OLTC and the order of the voltage adjustment of the AC / AC module need to be solved. When considering the coordinated control scheme, its cost-effectiveness also needs to be considered, which includes equipment cost, installation and maintenance costs, and the long-term economic benefits that may be brought about by improved efficiency and reliability.

[0073] The equivalent voltage of the hybrid distribution transformer is converted into the injected power of the branch where the hybrid distribution transformer HDT is located. The method of using the hybrid distribution transformer HDT to coordinate OLTC and CBs is adopted to achieve accurate and rapid power flow control in the system with a large number of distributed power sources. BRIEF DESCRIPTION OF THE DRAWINGS

[0074] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:

[0075] Figure 1 It is the IEEE33 node system diagram of the improved distribution network power flow control method based on HDT and CBs coordinated control in this application;

[0076] Figure 2 It is the single-phase average model equivalent circuit diagram of the HDT system;

[0077] Figure 3 It is the equivalent circuit diagram of HDT voltage source model;

[0078] Figure 4 is the daily load curve of DGs and loads;

[0079] Figure 5 It is an 18-node voltage diagram;

[0080] Figure 6 It is a voltage range statistical chart;

[0081] Figure 7 It is the maximum and minimum voltage comparison diagram;

[0082] Figure 8 This is the OLTC gear change diagram;

[0083] Fig. 9 This is the CBs unit switching change diagram. DETAILED DESCRIPTION

[0084] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0085] like Figure 1 In the distribution network power flow control method based on HDT and CBs collaborative control, a hybrid distribution transformer HDT is set at the balancing node m of the distribution network system, and the hybrid distribution transformer HDT includes an on-load tap-changing transformer OLTC and an AC / AC converter; the power equipment in the distribution network system is defined as a node, and the nodes are numbered, and the number of nodes is N. N , the hybrid distribution transformer HDT is connected to the power equipment through node o, the power equipment includes transformers, generators and capacitors, distributed generation DGs and capacitor switches (CBs) are set in the branches of the distribution network system; the line between the i-th node and its adjacent node j is an adjacent branch; the on-load tap changer is set on the on-load voltage regulating transformer (OLTC), and the on-load tap changer is adjusted by adjusting the on-load tap changer (adjusting K t,ij value) to adjust the output voltage U of the on-load voltage regulator transformer OLTC to , the output voltage U of the on-load voltage regulating transformer OLTC in this embodiment to is the voltage at node 2. i=1,2L N N , j = 1,2L N N The balancing node m of the distribution network system represents the bus node of the main frequency regulation power plant of the distribution network system.

[0086] Figure 1 It is an improved IEEE33 node system structure diagram with a rated voltage of 12.66kV. Figure 1 The balancing node is node 1, nodes 2-33 are power plants, the lines between two adjacent nodes of the power plant are defined as adjacent branches, and the distributed power sources DGs include photovoltaic generators PV and wind turbines WT. The improved IEEE33 node system in this embodiment demonstrates the distribution network flow control method based on the coordinated control of HDT and CBs. The IEEE33 node system is improved, DGs are connected to the system and parameters such as capacity, type, and location are set for the connected DGs. HDT is introduced into the system and simulation is performed to understand the impact of HDT on the flow of the system. This embodiment analyzes the experimental data and summarizes the role and benefits of HDT in flow control.

[0087] The adjustable voltage range of the hybrid distribution transformer HDT formed by adding an AC / AC module to a traditional transformer is smaller than that of the hybrid distribution transformer HDT formed by adding an AC / AC module to an OLTC. The hybrid distribution transformer HDT proposed by the present invention has a large adjustable voltage range and has a better effect in dealing with large voltage fluctuations. The hybrid distribution transformer HDT after adding an AC / AC converter to a traditional transformer can adjust the voltage range to -100% to 50%, the adjustable voltage range of the OLTC is -5% to 5% and the adjustable voltage of the OLTC is discrete, and the adjustable voltage range of the HDT after adding an AC / AC converter to the OLTC is -110% to 55%. Adding an AC / AC converter to the OLTC increases the adjustable voltage range of the HDT and allows the voltage to be adjusted smoothly.

[0088] The on-load tap changer is a voltage regulating gear switching device on the on-load tap changing transformer (OLTC). t,mo Indicates that at time t, branch U mo The value of the on-load tap-changer position.

[0089] The distribution network power flow control method based on HDT and CBs coordinated control specifically includes the following steps:

[0090] S1, collects the active power injected by distributed power sources DGs at the node i at time t and reactive power U t,i is the voltage of node i at time t; t=1,2L N T , i=1,2L N N ; N T Indicates the number of samples.

[0091] S2, the single-phase average model of the hybrid distribution transformer is equivalent to the HDT voltage source model;

[0092] like Figure 2 As shown, the connection point between the on-load tap-changing transformer OLTC and the AC / AC converter is the auxiliary node n, and the impedance of the on-load tap-changing transformer OLTC in the single-phase average model of the hybrid distribution transformer is equivalent to Z T , the impedance of the AC / AC converter is equivalent to Z AC / AC ; Z AC / AC The output node is node o (node ​​o is the connection node between the hybrid distribution transformer HDT and the power equipment);

[0093] The establishment of a power injection model reduces the number of unknowns in power flow calculation and shortens the power flow calculation time.

[0094] S3, establishing an injection power model for the branch where the hybrid distribution transformer HDT is located;

[0095] S4, constructing the objective function with the goal of minimizing the total operating cost of the distribution network;

[0096] S5, through the power flow control constraint, the active injection power and reactive injection power of the on-load tap changer (OLTC) and the AC / AC converter are obtained during the optimal power flow. The voltage of the hybrid distribution transformer HDT is calculated based on the injection power model. The output voltage of the on-load tap changer and the AC / AC module is adjusted based on the voltage of the HDT to achieve power flow control.

[0097] like Figure 3 As shown in the figure, the injection power model established for the branch where the hybrid distribution transformer HDT is located is:

[0098]

[0099]

[0100] Based on formula (1) through P t,o , P t,n , Q t,o , Q t,n ,θ t,on Get the output voltage U of the on-load voltage regulator transformer OLTC t,n , the output voltage U of the hybrid distribution transformer HDT t,o , calculated, the voltage U of the hybrid distribution transformer HDT t,o -U t,m ) and the voltage U of the AC / AC module t,o -U t,n That is, the optimal power flow control can be achieved by adjusting the voltage of the hybrid distribution transformer HDT (on-load tap changer) and the voltage of the AC / AC module.

[0101] P t,n is the active injection power of node n at time t, Q t,n is the reactive power injected into node n at time t, U t,n is the output voltage of the on-load tap-changing transformer OLTC (the voltage of node n at time t); P t,o is the active injection power of node o at time t, Q t,o is the reactive power injected into node o at time t, U t,o is the output voltage of the hybrid distribution transformer HDT (the voltage of node o at time t); θ t,on is the phase difference between node o and node n at time t.

[0102] The objective function constructed with the goal of minimizing the total operating cost of the distribution network is:

[0103] f min =WL (f loss +f switch )+W v C v f v (2)

[0104] Among them, f min represents the total operating cost of the distribution network, W L , W v is the weight coefficient, f loss is the power loss cost, f switch is the switch operation cost; C v is the voltage deviation f v The cost coefficient of this embodiment C v is 1$ / Ω.

[0105]

[0106] r mo =r AC / AC +r T +r′ mo

[0107] Among them, r mo To balance the resistance of the branch between node m and node o, r AC / AC 、r T Z AC / AC , Z T The real part, r′ mo To balance the original line resistance between node m and node o.

[0108] f Lloss is the line loss cost of the distribution network, f Ploss is the operating cost of the hybrid distribution transformer, C loss N is the cost coefficient of the total cost of active power loss; T is the total period of the time range, N N is the total number of system nodes; Ω b is the branch set without OLTC; r ij is the resistance value between adjacent nodes i and j; Δt is the unit time; is the active power flowing through the hybrid distribution transformer HDT at time t; I t,ij is the current of adjacent nodes i and j at time t;

[0109] I t,ij The value range of is:

[0110]

[0111] in, For It,ij current carrying capacity.

[0112] Switch operating cost switch Including the gear switching cost of the on-load tap changer on the on-load voltage regulating transformer OLTC, the switching cost of the capacitor switch CBs and the operating cost of the hybrid distribution transformer HDT, it is formula (5):

[0113]

[0114] Where, Ω0 is the set of branches containing OLTC transformers; C tap , C cap , C hap is the cost coefficient of the gear switching operation when the on-load voltage regulating transformer OLTC, the capacitor switch CBs and the hybrid distribution transformer HDT are in operation; the cost coefficient C of the gear switching operation when the on-load voltage regulating transformer OLTC, the capacitor switch CBs and the hybrid distribution transformer HDT are in operation in this embodiment tap , C cap , C hap Set to 1.4$ / time, 0.24$ / time and 0.1$ / time. K t,mo is the gear position of the on-load tap changer on branch mo at time t (there are 10 gears, and the adjustable voltage of each gear is 1%); is the number of CBs operating at node i at time t; n HDT is the number of thyristors in the hybrid distribution transformer.

[0115] The voltage deviation function adopts the voltage range control strategy to control the voltage within the desired range. v The calculation formula is (6):

[0116]

[0117] Among them, U t,i is the voltage of node i at time t; is the expected voltage of the node (the expected voltage refers to the expected voltage of the node, and the expected voltage of all nodes is in the same voltage range). t,i , The voltage range is as follows:

[0118]

[0119]

[0120] in, U t,i For U t,i The upper and lower limits of U ~ for upper and lower limits.

[0121] The power flow control constraints include the operation constraints of the distributed generation, the operation constraints of the hybrid distribution transformer, the operation constraints of the on-load tap changer and the operation constraints of the capacitor switch;

[0122] The operating constraints of the distributed power source are:

[0123]

[0124]

[0125] is the active power injected into the i-th node where the distributed generation DGs is located at time t (the power input to the grid), and the predicted value is assigned to the true value, P i is the active power injected into node i, is the active power output of DGs to the grid at time t, is the active power injected into the node i where the distributed generation DG is located at time t, P i is the active injection power of node i, is the reactive power injected into the node i where the distributed generation DGs is located at time t; is the power factor angle of DG at node i; is the capacity of the distributed power source DGs at node i at time t (the maximum output capacity of the distributed power source);

[0126] The operating constraints of the hybrid distribution transformer HDT are:

[0127]

[0128]

[0129]

[0130]

[0131] is the active power flowing through the hybrid distribution transformer HDT at branch mo at time t; is the reactive power flowing through the hybrid distribution transformer HDT at branch mo at time t; and are the lower and upper limits of the active power flowing through the HDT at branch mo at time t respectively; are the lower and upper limits of the reactive power flowing through the hybrid distribution transformer HDT at branch mo at time t;

[0132] The operating constraints of the on-load tap changer are:

[0133] U t,i =k t,ij U t,j (13)

[0134] k t,mo =k mo,0 +K t,mo Δk mo (14)

[0135]

[0136]

[0137] U t,i is the voltage of node i at time t, k t,mo is the transformation ratio of the OLTC on the branch mo where the OLTC is located at time t, U t,j is the voltage of node j at time t; k mo,0 is the initial transformation ratio of the OLTC in the branch mo where the on-load tap-changing transformer OLTC is located (the ij branch is the branch between the node i and its adjacent node j; the transformation ratio is the voltage ratio across the transformer); Δk mo is the transformation ratio step length of the on-load tap-changing transformer OLTC on the branch mo where the on-load tap-changing transformer OLTC is located; is the maximum variation of OLTC taps in adjacent time periods; N is the upper limit of the adjustable gear of the on-load tap-changing transformer OLTC; T is the total period of the time range;

[0138] The operating constraints of the capacitor switch are:

[0139]

[0140]

[0141]

[0142] in, is the reactive power injected by the capacitor switch CBs at node i at time t, is the number of operating units of the capacitor switch at node i at time t; is the unit reactive capacity of the capacitor switch at node i, is the switched capacitor bank at node i at time t, is the switched capacitor bank at node i at the moment before time t, is the switched capacitor bank at node i at time t; The maximum number of switched units of capacitor switch units in adjacent time periods; is the maximum number of capacitor switch groups, and Z is a mathematical integer set. is the number of operating units of CBs at node i at time t;

[0143] When the optimal power flow is obtained by power flow control constraints, the active and reactive injection powers of the on-load tap changer (OLTC) and the AC / AC converter are calculated by P t,o , P t,n , Q t,o , Q t,n ,θ t,on Calculate the voltage U of the hybrid distribution transformer HDT t,o -U t,m , voltage regulation on-load tap-changer and AC / AC module output voltage U based on hybrid distribution transformer HDT t,o -U t,n , realize power flow control, by adjusting the on-load tap changer (adjusting K t,ij value) to adjust the output voltage U of the on-load voltage regulator transformer OLTC t,n , the output voltage U of the hybrid distribution transformer HDT in this embodiment t,o is the voltage at node 2.

[0144] The injected power model takes the power P t,o , P t,n , Q t,o , Q t,n The regulation is converted into the voltage U of the hybrid distribution transformer HDT t,o -U t,m and the voltage U of the AC / AC module t,o -U t,n The voltage of the hybrid distribution transformer HDT does not need to be added in the optimal power flow calculation process.

[0145] Based on the optimal power flow, P t,o , P t,n , Q t,o , Q t,n ,θ t,on , the power of the balance node P t,m , Q t,m and the equilibrium node voltage U t,m , calculate the voltage U of the hybrid distribution transformer HDT t,o -U t,m and the voltage U of the AC / AC module t,o -U t,n ; Optimal power flow control can be achieved by adjusting the voltage of the hybrid distribution transformer HDT (on-load tap changer) and the voltage of the AC / AC module. t,mis the voltage of the equilibrium node m, and U t,m The per-unit value is 1.

[0146] Through the above constraints, the active and reactive injected powers of the on-load tap changer (OLTC) and AC / AC converter under optimal power flow are obtained. The voltage of the hybrid distribution transformer HDT is calculated based on the injected power model. The output voltage of the on-load tap changer and AC / AC module is adjusted based on the voltage of the HDT to realize power flow control.

[0147] An electronic device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the distribution network flow control method based on the coordinated control of HDT and CBs is implemented.

[0148] A non-transitory computer-readable storage medium stores a computer program, which, when executed by a processor, implements the distribution network power flow control method based on HDT and CBs collaborative control.

[0149] A computer program product includes a computer program, and when the computer program is executed by a processor, the distribution network power flow control method based on HDT and CBs collaborative control is implemented.

[0150] In this embodiment Figure 4 It is the daily load curve of DGs and loads in this embodiment, which is obtained by prediction with the time step of each hour in a day.

[0151] An OLTC is installed between nodes 1 and 2, with a total of 10 taps, each with an adjustable voltage of 1%. An AC / AC module is installed on the low-voltage side of the OLTC to form a HDT, such as Figure 3 As shown in the figure, the power electronic devices in the HDT do not bear the full power of the line, and the active power capacity of the HDT is 300kW. Five 150kVar switchable CBs are installed at the 33 nodes. Considering that frequent switching of OLTC gears and the number of CBs operating units will increase certain risks and reduce the service life of the equipment, it is now assumed that both OLTC and CBs are set to 4 times.

[0152] According to the analytic hierarchy process, W L , W v The values ​​of are 0.833 and 0.167 respectively. This paper assumes that the cost of purchasing electricity on the grid is 0.08$ / kWh. The cost coefficient C of the gear switching operation when OLTC and CBs are running tap , C cap Set to 1.4$ / time and 0.24$ / time. Set the upper limit of the voltage range is 1.05pu, the lower limit of voltageU t,i The upper limit of the expected voltage is 0.95 pu. is 1.03pu, and the lower limit of the expected voltage is U ~ , the expected voltage range is also the threshold margin of the voltage interval control strategy.

[0153] In order to ensure the operation efficiency of ANDs while keeping the system voltage at an ideal level when HDT, OLTC and CBs are coordinated for power flow regulation, this paper considers the following three scenarios to compare and analyze the coordinated power flow regulation characteristics of HDT.

[0154] Scenario 1. There is no power flow control device in the power system;

[0155] Scenario 2. Only OLTC and CBs control devices;

[0156] Scenario 3: After installing HDT, HDT and other control devices OLTC and CBs perform power flow control

[0157] from Figure 4 It can be seen that the load demand is larger during 8:00-10:00 and 15:00-19:00, while the abundant output is much greater than the load demand at 3:00.

[0158] Figure 5 is the voltage time series diagram between 18 nodes, from Figure 5 It can be seen that in scenario 1, voltage exceeds the limit at 3:00, 8:00, 10:00 and 17:00. For scenario 2, the power flow control equipment can adjust the voltage to the range of 0.95-1.05pu, but the voltage still cannot be adjusted to the expected voltage range of 0.97-1.03pu. After installing HDT, the voltage can be adjusted to the expected range of 0.97pu-1.03pu. Comparing the voltage levels of each node before and after the introduction of HDT, HDT can effectively increase the voltage level and maintain it within the appropriate range.

[0159] Figure 6 The voltage range statistics of the distribution network within 24 hours are shown in the figure. It can be seen that in scenario 1, there is a voltage over-limit phenomenon, the voltage over-limit rate is 4.167%, and the number of voltages within the expected voltage range accounts for 73.611% of the total. In scenario 2, 93.939% of the voltages are within the expected voltage range, and in scenario 3, the node voltages of all time periods can be controlled within the expected voltage through HDT regulation. The results show that HDT can improve the voltage stability of the power grid.

[0160] Figure 7The maximum and minimum voltage comparison diagram of scenario 1 and scenario 3 shows that in scenario 1, because nodes 13-18 and nodes 29-33 are far from the generator, the voltage of these nodes exceeds the limit. Figure 6 It can be seen that the introduction of HDT can control the voltage of all nodes in the distribution network within the expected voltage range. When the node voltage decreases, HDT can effectively increase the voltage level and enhance the voltage stability.

[0161] Figure 8 and Fig. 9 The OLTC gear change diagram and CBs unit switching diagram for scenario 2 and scenario 3 are shown in Figure 2. Figure 8 It can be seen that compared with scenario 2, the number of OLTC gear changes in scenario 3 is significantly smaller, and the absolute value of the gear change of CBs is also slightly reduced. After the introduction of HDT, the frequent actions of these traditional power flow control devices are avoided, effectively reducing the safety risks of system operation.

[0162] In summary, the present invention proposes a flexible control method for distribution network based on hybrid distribution transformer branch model to minimize operating costs and improve voltage distribution of ANDs. Considering the synergy between HDT and multiple traditional power flow control devices, a time series optimization second-order cone model of HDT-based collaborative power flow control is established, in which HDT, OLTC and switchable CBs are all controllable devices. The simulation results show that:

[0163] 1) By adopting the coordinated power flow control method based on HDT, the system voltage can effectively increase the voltage level and maintain it within an appropriate range, and the operating efficiency is significantly improved. Whether HDT can improve the voltage stability of the power grid and reduce voltage fluctuations and flickers.

[0164] 2) HDT can effectively reduce line loss and improve power flow distribution.

[0165] In the description provided herein, a large number of specific details are described. However, it is understood that embodiments of the present invention can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.

[0166] Similarly, it should be understood that in order to streamline the present disclosure and aid in understanding one or more of the various inventive aspects, in the above description of exemplary embodiments of the present invention, various features of the present invention are sometimes grouped together into a single embodiment, figure, or description thereof. However, this disclosed method should not be interpreted as reflecting the intention that the claimed invention requires more features than those expressly recited in each claim. Rather, as reflected in the claims, inventive aspects lie in less than all of the features of the individual embodiments previously disclosed. Therefore, the claims that follow the detailed description are hereby expressly incorporated into the detailed description, with each claim itself serving as a separate embodiment of the present invention.

[0167] Those skilled in the art will appreciate that the modules or units or groups of the devices in the examples disclosed herein may be arranged in the device as described in the embodiment, or alternatively may be located in one or more devices different from the devices in the example. The modules in the foregoing examples may be combined into one module or may be divided into multiple submodules.

[0168] Those skilled in the art will appreciate that the modules in the devices in the embodiments may be adaptively changed and arranged in one or more devices different from the embodiments. The modules or units or groups in the embodiments may be combined into one module or unit or group, and in addition they may be divided into a plurality of submodules or subunits or subgroups. All features disclosed in this specification (including the accompanying claims, abstracts and drawings) and all processes or units of any method or device so disclosed may be combined in any combination, except that at least some of such features and / or processes or units are mutually exclusive. Unless otherwise expressly stated, each feature disclosed in this specification (including the accompanying claims, abstracts and drawings) may be replaced by an alternative feature providing the same, equivalent or similar purpose.

[0169] In addition, those skilled in the art will appreciate that, although some embodiments described herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present invention and form different embodiments. For example, in the claims below, any one of the claimed embodiments may be used in any combination.

[0170] In addition, some of the embodiments are described herein as methods or combinations of method elements that can be implemented by a processor of a computer system or by other devices that perform the functions. Therefore, a processor with necessary instructions for implementing the method or method elements forms a device for implementing the method or method elements. In addition, the elements described herein of the device embodiments are examples of devices for implementing the functions performed by the elements for the purpose of implementing the invention.

[0171] The various techniques described herein may be implemented in combination with hardware or software, or a combination thereof. Thus, the method and apparatus of the present invention, or some aspects or portions of the method and apparatus of the present invention may be in the form of program codes (i.e., instructions) embedded in a tangible medium, such as a floppy disk, a CD-ROM, a hard disk drive, or any other machine-readable storage medium, wherein when the program is loaded into a machine such as a computer and executed by the machine, the machine becomes a device for practicing the present invention.

[0172] In the case where the program code is executed on a programmable computer, the computing device generally includes a processor, a storage medium readable by the processor (including volatile and non-volatile memory and / or storage elements), at least one input device, and at least one output device. The memory is configured to store the program code; the processor is configured to execute the method of the present invention according to the instructions in the program code stored in the memory.

[0173] By way of example and not limitation, computer readable media include computer storage media and communication media. Computer readable media include computer storage media and communication media. Computer storage media stores information such as computer readable instructions, data structures, program modules or other data. Communication media generally embodies computer readable instructions, data structures, program modules or other data in a modulated data signal such as a carrier wave or other transmission mechanism, and includes any information delivery medium. Any combination of the above is also included within the scope of computer readable media.

[0174] As used herein, unless otherwise specified, the use of ordinal numbers "first," "second," "third," etc. to describe common objects merely indicates that different instances of similar objects are involved, and is not intended to imply that the objects so described must have a given order in time, space, order, or in any other manner.

[0175] Although the present invention has been described according to a limited number of embodiments, it will be apparent to those skilled in the art, with the benefit of the above description, that other embodiments may be envisioned within the scope of the invention thus described. In addition, it should be noted that the language used in this specification is selected primarily for readability and teaching purposes, rather than for explaining or defining the subject matter of the present invention. Therefore, many modifications and variations will be apparent to those skilled in the art without departing from the scope and spirit of the appended claims. The disclosure of the present invention is illustrative, not restrictive, with respect to the scope of the present invention, which is defined by the appended claims.

Claims

1. A distribution network power flow control method based on HDT and CBs coordinated control, characterized in that: A hybrid distribution transformer is set at the balancing node m of the distribution network system, and the hybrid distribution transformer includes an on-load tap-changing transformer and an AC / AC converter; the power equipment in the distribution network system is defined as a node, and the nodes are numbered, and the number of nodes is N N , the hybrid distribution transformer HDT is connected to the power equipment through the node o, and the distributed power source and capacitor switch are set in the branch of the distribution network system; the line between the i-th node and its adjacent node j is an adjacent branch; the on-load tap changer is set on the on-load tap changer, and the output voltage U of the on-load tap changer is adjusted by adjusting the on-load tap changer to , where i = 1, 2…N N , j = 1, 2…N N ; S1, collects the active power injected by the distributed power source at the node i at time t and reactive power U t,i is the voltage of node i at time t; t=1,2…N T ; S2, the single-phase average model of the hybrid distribution transformer is equivalent to the HDT voltage source model; S3, establishing an injection power model for the branch where the hybrid distribution transformer is located; S4, constructing the objective function with the goal of minimizing the total operating cost of the distribution network; S5, obtain the active injection power and reactive injection power of the on-load tap-changer and the AC / AC converter at the optimal power flow through the power flow control constraint, obtain the voltage of the hybrid distribution transformer and the output voltage of the AC / AC module through the injection power model calculation, adjust the on-load tap changer and the output voltage of the AC / AC module, and realize the optimal power flow control; Step S2 specifically includes the following steps: The connection point between the on-load tap-changing transformer and the AC / AC converter is the auxiliary node n. The impedance of the on-load tap-changing transformer in the single-phase average model of the hybrid distribution transformer is equivalent to Z T , the impedance of the AC / AC converter is equivalent to Z AC / AC ; The injection power model established for the branch where the hybrid distribution transformer is located is: P t,n is the active injection power of node n at time t, Q t,n is the reactive power injected into node n at time t, U t,n P is the output voltage of the on-load tap-changing transformer; t,o is the active injection power of node o at time t, Q t,o is the reactive power injected into node o at time t, U t,o is the output voltage of the hybrid distribution transformer; θ t,on is the phase difference between node o and node n at time t.

2. The distribution network power flow control method based on HDT and CBs coordinated control according to claim 1 is characterized in that: The on-load tap changer is a voltage regulating gear switching device on the on-load tap-changing transformer. t,mo Indicates that at time t, branch U mo The value of the on-load tap-changer position.

3. The distribution network power flow control method based on HDT and CBs coordinated control according to claim 1 is characterized in that: The objective function constructed with the goal of minimizing the total operating cost of the distribution network is: f min =W L (f loss +f switch )+W v C v f v (2) Among them, f min represents the total operating cost of the distribution network, W L , W v is the weight coefficient, f loss is the power loss cost, f switch is the switch operation cost; C v is the voltage deviation f v Cost coefficient of r mo =r AC / AC +r T +r′ mo Among them, r mo To balance the resistance of the branch between node m and node o, r AC / AC 、r T Z AC / AC , Z T The real part, r m ' o To balance the original line resistance between node m and node o; f Lloss is the line loss cost of the distribution network, f Ploss is the operating cost of the hybrid distribution transformer, C loss N is the cost coefficient of the total cost of active power loss; T is the total period of the time range, N N is the total number of system nodes; Ω b is the branch set without on-load tap-changing transformer; r ij is the resistance value between adjacent nodes i and j; Δt is the unit time; is the active power flowing through the hybrid distribution transformer at time t; I t,ij is the current of adjacent nodes i and j at time t; I t,ij The value range of is: in, For I t,ij Current carrying capacity; Switch operating cost switch Including the gear switching cost of the on-load tap changer on the on-load tap-changing transformer, the switching cost of the capacitor switcher and the operating cost of the hybrid distribution transformer, it is formula (5): Among them, Ω0 is the branch set containing the on-load tap-changing transformer; C tap , C cap , C hap Cost coefficients for on-load tap changers, capacitor switchers, and hybrid distribution transformers during operation of the gear switching operation; is the number of units operated by the capacitor switch at node i at time t; n HDT is the number of thyristors in the hybrid distribution transformer; Voltage deviation f v The calculation formula is (6): Among them, U t,i is the voltage of node i at time t; is the expected voltage of the node; U t,i , The voltage range is as follows: in, U t,i For U t,i The upper and lower limits of U ~ for upper and lower limits.

4. The distribution network power flow control method based on HDT and CBs coordinated control according to claim 3 is characterized in that: The power flow control constraints include the operation constraints of the distributed generation, the operation constraints of the hybrid distribution transformer, the operation constraints of the on-load tap changer and the operation constraints of the capacitor switch; The operating constraints of the distributed power source are: is the active power injected into the node i where the distributed power source is located at time t, and the predicted value is assigned to the real value, P i is the active power injected into node i, is the active power output of the distributed generation to the grid at time t, is the active power injected into the node i where the distributed generation is located at time t, P i is the active injection power of node i, is the reactive power injected into the node i where the distributed generation is located at time t; is the power factor angle of the distributed power supply at node i; is the capacity of the distributed generation at node i at time t; The operating constraints of the hybrid distribution transformer are: is the active power flowing through the hybrid distribution transformer at branch mo at time t; is the reactive power flowing through the hybrid distribution transformer at branch mo at time t; and are the lower and upper limits of the active power flowing through the hybrid distribution transformer at branch mo at time t, respectively; are the lower and upper limits of the reactive power flowing through the hybrid distribution transformer at branch mo at time t; The operating constraints of the on-load tap changer are: IN t,i =k t,ij IN t,j (13) k t,mo =k mo,0 +K t,mo Δk mo (14) U t,i is the voltage of node i at time t, k t,mo is the transformation ratio of the on-load tap-changing transformer on branch mo at time t, U t,j is the voltage of node j at time t; k mo,0 is the initial transformation ratio of the branch mo where the on-load tap-changing transformer is located; Δk mo is the transformation ratio step length of the on-load tap-changing transformer in the branch mo where the on-load tap-changing transformer is located; is the maximum change range of the on-load tap-changer in adjacent time periods; The upper limit of the adjustable gear of the on-load tap-changing transformer; N T is the total period of the time range; The operating constraints of the capacitor switch are: in, is the reactive power injected by the capacitor switch at node i at time t, is the number of operating units of the capacitor switch at node i at time t; is the unit reactive capacity of the capacitor switch at node i, is the switched capacitor bank at node i at time t, is the switched capacitor bank at node i at the moment before time t, is the switched capacitor bank at node i at time t; The maximum number of switched units of capacitor switch units in adjacent time periods; is the maximum number of units of the capacitor switch, and Z is a mathematical integer set; is the number of operating units of the capacitor switch at node i at time t; The active and reactive injection powers of the on-load tap-changer and AC / AC converter during optimal power flow are obtained through power flow control constraints. The voltage of the hybrid distribution transformer is calculated through the injection power model. The optimal power flow control is achieved by adjusting the on-load tap changer and AC / AC module output voltage of the hybrid distribution transformer.

5. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the distribution network power flow control method based on HDT and CBs collaborative control as described in any one of claims 1 to 4 is implemented.

6. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by the processor, the distribution network power flow control method based on the coordinated control of HDT and CBs as described in any one of claims 1 to 4 is implemented.

7. A computer program product, comprising a computer program, characterized in that When the computer program is executed by the processor, the distribution network power flow control method based on the coordinated control of HDT and CBs as described in any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Power distribution network fault recovery method based on intelligent soft switching and energy-saving voltage reduction

    CN115296302A

  • Modeling method of direct AC / AC type hybrid distribution transformer

    CN116505534A

  • Reactive power optimization method, device and equipment for power distribution network and storage medium

    CN116599166A

  • Fast Fourier Transform provision appts. for multicarrier telephony transport - twiddle-factor look-up table coupled to N multiplier inputs with RAM storing transform points for multiplication by real and imaginary components of twiddle factor

    DE29724878U1

  • Method for calculating phase angle difference of power system, method for calculating phase angle of power system, and power system analyzer

    JP2005033848A