A method and system for emergency dispatching of water volume for multi-water source projects in a river basin
Through the emergency scheduling method of water volume in multiple water source projects in the basin, the water resource utilization and scheduling model is optimized, and the problems of excessive water abandonment and local imbalance in drought scheduling are solved, and the water resource utilization efficiency and water supply reliability are improved.
Patent Information
- Application Number
- CN202410676671.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-29
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-05-29
AI Technical Summary
The existing technology of water scheduling methods in the field of drought disaster reduction have excessive water discarding and local imbalances, making it difficult to effectively deal with drought events, resulting in the dilemma of no water availability during drought.
Using the emergency scheduling method for water volume in multiple water sources in the basin, by analyzing the water resource utilization rate and operating conditions of large water projects in the basin, selecting emergency scheduling urban areas and water supply reservoirs, determining control sections and scheduling flow, and optimizing the scheduling model to maximize water resource utilization and minimize Increase flow by recombinant compensation.
It effectively reduces the risk of drought in the river basin, improves the efficiency of water resource utilization, reduces the risk of drought caused by excessive water abandonment during the flood season, and improves the reliability and stability of water supply.
Smart Images

Figure CN118261403B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of water resources dispatching in river basins, and in particular relates to a method and system for emergency dispatching of water volume for a multi-water source project in a river basin. Background Art
[0002] With the development of the economy and society, the population and economic density of the river basin have increased, and the impact and losses caused by drought in the river basin have become more serious. On the one hand, this is due to the impact of climate change, and on the other hand, it is also due to the historical selection of human settlements in the river basin. It is an urgent and necessary task to give full play to the regulation and storage capacity of large-scale water projects in the river basin, respond to drought events under extreme climatic conditions, and minimize disaster losses and adverse effects. Therefore, it is of great significance to construct a water emergency dispatch method and system.
[0003] At present, water dispatching has a relatively mature and complete method system in the field of flood control, but there is still much room for improvement in the field of drought disaster reduction. In addition, recent research on emergency water dispatching in the field of drought also has the following problems: (1) The mandatory requirement that reservoirs do not exceed the flood limit water level during the flood season leads to excessive water abandonment in many reservoirs during the flood season and no water to store after the flood season, resulting in a dilemma of no water supply when drought occurs; (2) The plan for independent operation of single water source projects is very likely to cause local imbalances such as excessive water abandonment in some water source projects or insufficient water inflow to downstream water source projects.
[0004] In view of this, it is necessary to propose an emergency dispatch method that takes all factors into consideration and is practical and has strong drought resistance and timeliness, so as to effectively reduce the risk of drought in the basin and have sufficient conditions and capabilities to respond to drought events, which is of great significance to the research on drought emergency dispatch. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings of the above-mentioned background technology and to provide a method and system for emergency water dispatching of multi-water source projects in a river basin. Based on the analysis of the current status of water resources utilization in the river basin and the operating conditions of large-scale water projects in the river basin, the risk of small flows caused by drought in the river basin can be effectively reduced, and technical support can be provided for guiding the actual operation of emergency water dispatching caused by drought.
[0006] The technical solution adopted by the present invention is: a method for emergency water dispatching of a watershed multi-water source project, comprising the following steps:
[0007] Determine whether to execute the emergency dispatch process based on the water resource utilization rate of the basin to be dispatched;
[0008] The emergency dispatch process includes:
[0009] Select the emergency dispatching urban area of the watershed to be dispatched;
[0010] Select the corresponding water supply reservoir for each emergency dispatch urban area and determine the corresponding control section;
[0011] The following steps are cyclically performed for each control section and its corresponding water supply reservoir to obtain the emergency dispatch compensation increase flow of each control section in each emergency dispatch period:
[0012] According to the water demand flow in the previous emergency dispatch period and the current hydrological series input conditions of the water supply reservoir, the current adjustable water volume of the corresponding water supply reservoir is obtained, and then the current dispatch flow of the control section is determined; according to the current dispatch flow of the control section, the target level of protection and its corresponding water demand flow are determined, and then the current emergency dispatch compensation increase flow is calculated.
[0013] In the above technical scheme, the water resource utilization rate is the ratio of the total economic and social water consumption of the basin to be scheduled to the total water resources; if the water resource utilization rate is greater than or equal to the set value, it is determined that the emergency scheduling process needs to be executed; if the water resource utilization rate is less than the set value, the water resource utilization rate is derived, and if it is greater than or equal to 0, the water resource utilization rate is recalculated.
[0014] In the above technical solution, the process of selecting the emergency dispatch urban area includes:
[0015] If the total annual water consumption of any urban area along the river basin to be regulated exceeds the set value, and the urban area is located outside the specific range of the reservoir river section, and there is a reservoir used for emergency regulation upstream of the urban area, the urban area will be used as the emergency regulation range.
[0016] In the above technical solution, the process of selecting a corresponding water supply reservoir for any emergency dispatching urban area includes:
[0017] For all reservoirs located upstream of the urban area, the following are judged:
[0018] If the normal water level of a reservoir is lower than the elevation of the urban area, the reservoir cannot be used as a water supply reservoir for the emergency dispatch urban area;
[0019] If the normal water level of a reservoir is higher than the elevation of the urban area and lower than the urban area immediately upstream of the urban area, the reservoir will be used as a backup reservoir to supply water to the emergency dispatch urban area;
[0020] Select several reservoirs closest to the urban area from the candidate reservoirs as the water supply reservoirs for the urban area; the total regulating storage capacity of the selected water supply reservoirs exceeds the total annual water consumption of the urban area, and after removing the reservoir farthest from the urban area from the selected water supply reservoirs, the total regulating storage capacity of the remaining reservoirs does not exceed the total annual water consumption of the urban area;
[0021] In the basin to be dispatched, select the section that best represents the water supply capacity of each water supply reservoir as the corresponding control section.
[0022] In the above technical solution, the principle of determining the corresponding security target level according to the current dispatching flow of the control section is:
[0023] If the current dispatching flow of the control section is less than or equal to the natural minimum ten-day average flow of the control section, the target level of protection is determined to be level one;
[0024] If the current dispatch flow of the control section is greater than the natural minimum ten-day average flow of the control section and is less than or equal to the ecological base flow of the control section, the protection target level is determined to be level 2;
[0025] If the current dispatching flow of the control section is greater than the ecological base flow of the control section and is less than or equal to the minimum downstream flow of the control section, the target level of protection is determined to be level three.
[0026] In the above technical solution, the principle for determining the corresponding water demand flow according to the target level of each section is:
[0027] If the target level of any section is level 1, the water demand of the section is the sum of the urban water shortage, ecological water shortage and other water shortages within the unit dispatching time;
[0028] If the target level of any section is level 2, the water demand of the section is the sum of the urban water shortage and other water shortages within the unit dispatching time;
[0029] If the target protection level of any section is level three, the water demand flow of the section is the water shortage of other water uses within the unit scheduling time.
[0030] In the above technical solution, the process of calculating the current emergency dispatch compensation increase flow includes:
[0031] According to the water demand flow in the last emergency dispatch period and the current hydrological series input conditions of the water supply reservoir, the current adjustable water volume of each corresponding water supply reservoir is obtained;
[0032] By calculating the sum of the minimum adjustable water volumes of several water supply reservoirs corresponding to the control section during the emergency dispatch cycle, the minimum adjustable water volume of the control section is obtained;
[0033] Convert the minimum adjustable water volume of the control section into the compensatory dispatching flow according to the emergency dispatching duration;
[0034] The compensation dispatching flow of the control section and the minimum runoff flow in the emergency dispatching period are summed as the dispatching flow of the control section;
[0035] Determine the target level of protection and its corresponding water demand flow based on the current dispatching flow of the control section;
[0036] The difference between the required water flow rate and the dispatching flow rate of the control section is calculated as the emergency dispatching compensation to increase the flow rate.
[0037] In the above technical scheme, the current adjustable water volume of each water supply reservoir is a dynamic interval value, and the water demand flow and the dispatching flow of the control section determined based on the current adjustable water volume of the water supply reservoir are both dynamic interval values; the adjustable water volume of each water supply reservoir, the water demand flow and the dispatching flow of the control section are substituted into the optimization dispatching model; the optimization dispatching model is solved with the optimization objectives of maximizing the total adjustable water volume of the water supply reservoir, minimizing the overall emergency dispatching compensation increase flow and maximizing the total power generation of the water supply reservoir, and the emergency dispatching compensation increase flow of each control section in each emergency dispatching period is obtained; wherein,
[0038] The emergency dispatch compensation increase flow rate of each control section during the current emergency dispatch period is expressed as the difference between the water demand flow rate and the dispatch flow rate of the corresponding control section during the current emergency dispatch period;
[0039] The current adjustable water volume of the water supply reservoir is proportional to the current dispatching flow of the corresponding control section;
[0040] The current adjustable water volume of the water supply reservoir is inversely proportional to its current power generation.
[0041] In the above technical solution, the constraints of the optimization scheduling model include:
[0042] For any ten-day period within the emergency dispatch cycle, the storage capacity of the selected emergency dispatch reservoir at the end of the ten-day period is equal to the difference between the sum of the storage capacity at the beginning of the ten-day period and the sum of the water inflow of the reservoir in a certain ten-day period and the sum of the water transfer volume in the ten-day period, the water loss due to evaporation and leakage of the reservoir, and the water abandonment volume of the reservoir in a certain ten-day period;
[0043] The water level in front of the dam of the selected emergency dispatching reservoir in the t-th emergency dispatching period is greater than or equal to the minimum value of the initial upstream water level in the t-th emergency dispatching period, and less than or equal to the maximum value of the initial upstream water level in the t-th emergency dispatching period;
[0044] The storage capacity of the selected emergency dispatch reservoir is greater than or equal to 0, and less than or equal to the maximum beneficial storage capacity of the reservoir in the tth emergency dispatch period;
[0045] The discharge flow of the selected emergency dispatching reservoir in the tth emergency dispatching period is greater than or equal to the maximum discharge flow of the reservoir in the tth emergency dispatching period, and less than or equal to the minimum discharge flow of the reservoir in the tth emergency dispatching period.
[0046] The present invention also provides a water emergency dispatching system for a watershed multi-water source project, which is used for the water emergency dispatching method for a watershed multi-water source project described in the above technical solution.
[0047] The beneficial effects of the present invention are as follows: the present invention uses water resource utilization rate to determine whether emergency dispatch is needed, which can better optimize the utilization of water resources and ensure the full utilization and reasonable allocation of resources. The water resource utilization rate is an intuitive indicator that can quickly judge the current water resource utilization situation and provide a basis for emergency dispatch. The present invention uses multi-level warnings to correspond to a variety of emergency dispatch guarantee targets, which has strong pertinence and improves the efficiency of water resource utilization. The present invention uses multiple water source projects to jointly dispatch water, maximizes the efficiency of water resource utilization, reduces the possible drought risk after the flood season caused by excessive water abandonment in the reservoir during the flood season, and the drought risk faced by the water source under the condition of single reservoir operation, and improves the reliability and stability of water supply.
[0048] Furthermore, the present invention calculates the water resource utilization rate on the premise of analyzing the historical water use record data and comprehensive water use level of the river basin, and can reflect the latest trend of economic and social water use in the river basin in real time to adapt to the water demand of the river basin.
[0049] Furthermore, the process of selecting urban areas for emergency dispatch can quickly identify urban areas with potential risks and include them in the scope of emergency dispatch. Selecting urban areas whose total annual water consumption exceeds the set value can better protect water resources and avoid emergencies caused by excessive water use in urban areas.
[0050] Furthermore, the classification of security targets can achieve refined management of water resource scheduling, take corresponding scheduling measures according to the needs of different levels, better adapt to different water resource scheduling needs, and improve the flexibility and pertinence of scheduling.
[0051] Furthermore, the corresponding water demand flow is determined according to the target level of protection for each section, so that the goals are clear in the emergency dispatch process, water resources are used rationally, and factors such as urban water shortage, ecological water shortage and other water shortage are taken into account. The water demand situation of each section is comprehensively evaluated, which is conducive to the comprehensive and integrated analysis and handling of various needs and challenges in the emergency dispatch process.
[0052] Furthermore, establishing an optimization scheduling model can optimize multiple objective functions at the same time, effectively deal with multi-objective optimization problems, help find a better set of solutions, and provide decision makers with the convenience of choosing between different trade-off options. It has strong practicality and applicability.
[0053] Furthermore, constraints are set for the optimization scheduling model to ensure the rational control and realization of various indicators in the reservoir scheduling process. The constraints take into account factors such as reservoir water inflow, water transfer, evaporation and leakage losses, and abandoned water. Various influencing factors in the reservoir scheduling process are comprehensively considered, which is conducive to the comprehensive optimization of the reservoir scheduling plan. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] Figure 1 It is a schematic diagram of the method flow of the present invention. DETAILED DESCRIPTION
[0055] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments to facilitate a clear understanding of the present invention, but they do not constitute a limitation on the present invention.
[0056] like Figure 1 As shown, the present invention provides a method for emergency dispatching of water volume for a watershed multi-water source project, comprising the following steps:
[0057] Determine whether to execute the emergency dispatch process based on the water resource utilization rate of the basin to be dispatched;
[0058] The emergency dispatch process includes:
[0059] Select the emergency dispatching urban area of the watershed to be dispatched;
[0060] Select the corresponding water supply reservoir for each emergency dispatch urban area and determine the corresponding control section;
[0061] The following steps are cyclically performed for each control section and its corresponding water supply reservoir to obtain the emergency dispatch compensation increase flow of each control section in each emergency dispatch period:
[0062] According to the water demand flow in the previous emergency dispatch period and the current hydrological series input conditions of the water supply reservoir, the current adjustable water volume of the water supply reservoir is obtained, and then the current dispatch flow of the control section is determined; according to the current dispatch flow of the control section, the target level of protection and its corresponding water demand flow are determined, and then the current emergency dispatch compensation increase flow is calculated.
[0063] The principle of the present invention is further explained below with reference to specific embodiments.
[0064] The application scenario of the specific embodiment is the joint emergency dispatch of some water projects in the completed cascade projects in the main stream of the X River Basin, which is also of guiding significance for the joint emergency dispatch of multiple water source projects in other river basins. The total designed storage capacity of the completed and under-construction cascades in the main stream of the X River Basin is about 20.549 billion m 3 The total designed regulating reservoir capacity is 9.952 billion m 3 The mainstream cascade project as a whole has strong regulation capabilities.
[0065] In this specific embodiment, the water emergency dispatching method for a watershed multi-water source project specifically performs the following steps:
[0066] First, analyze the historical data of water resources in the basin and the current status of water use, and establish a water crisis assessment level.
[0067] The economic and social water use in the X River Basin mainly consists of urban water use, agricultural irrigation water and industrial water use.
[0068] W 经济社会 =W 城镇 +W 农业灌溉 +W 工业
[0069] Analyzing the historical data of economic and social water use in the X River Basin, with the advancement of urbanization, W 城镇 It will show an increasing trend. 农业灌溉 It is expected to remain at the current scale level, W 工业 Since the degree of mutual offset between future industrial technological progress, industrial structure adjustment and scale growth is not clear, its increase or decrease trend cannot be determined. Taking all the above factors into consideration, the economic and social water use in Basin X is still unclear, and further analysis of the degree of water crisis is needed based on the local status of the basin.
[0070]
[0071] in, is the total economic and social water consumption in the X basin, W 城镇 is the total urban water consumption in Basin X, W 农业灌溉 is the total amount of agricultural irrigation water in Basin X, W 工业 is the total industrial water consumption in Basin X, is the total water resources in Basin X, is the economic and social water resources utilization rate of the X basin.
[0072] The following principles are used to judge water crisis:
[0073]
[0074] In the formula, The threshold for water crisis in the basin.
[0075] Overall, the total economic and social water use in River Basin X 5.721 billion m³, accounting for about the total water resources of the X River Basin ( About 9.75% of the 56.208 billion m³, which does not reach the 20% water crisis threshold of the basin. .
[0076] If the water resource utilization rate is less than the set value, the derived water resource utilization rate is:
[0077]
[0078] In the formula, = is the degree of economic and social water crisis in the X basin. If it is greater than or equal to 0, it means that the water crisis is serious, and the water resource utilization rate is recalculated. Since the total amount of local economic and social water use and the total amount of water resources are constantly changing, the speed of approaching the critical value is faster when it is serious, and it is necessary to repeat the calculation in a short time to determine whether emergency dispatch is needed again.
[0079] The emergency dispatch process for the X basin includes:
[0080] The first step is to determine the urban area and its water supply reservoir for emergency water volume dispatch in the basin, and to determine the control section.
[0081] The process of selecting an emergency dispatch urban area includes: if the total annual water consumption of any urban area along the basin to be dispatched exceeds the set value, and the urban area is located outside the specific range of the reservoir river section, and there is a reservoir for emergency dispatch upstream of the urban area, the urban area will be used as the emergency dispatch range.
[0082] The process of selecting the corresponding water supply reservoir for any emergency dispatch urban area includes:
[0083] For all reservoirs located upstream of the urban area, the following are judged:
[0084] If the normal water level of a reservoir is lower than the elevation of the urban area, the reservoir cannot be used as a water supply reservoir for the emergency dispatch urban area;
[0085] If the normal water level of a reservoir is higher than the elevation of the urban area and lower than the urban area immediately upstream of the urban area, the reservoir will be used as a backup reservoir to supply water to the emergency dispatch urban area;
[0086] Select several reservoirs closest to the urban area from the candidate reservoirs as the water supply reservoirs for the urban area; the total regulating storage capacity of the selected water supply reservoirs exceeds the total annual water consumption of the urban area, and after removing the reservoir farthest from the urban area from the selected water supply reservoirs, the total regulating storage capacity of the remaining reservoirs does not exceed the total annual water consumption of the urban area;
[0087] In the watershed to be dispatched, the section that best represents the water supply capacity of each water supply reservoir is selected as the corresponding control section. In this specific embodiment, four sections, namely WJD, SN, YH and WL, in the main control sections in the middle and lower reaches of the X watershed are selected as emergency water dispatch control sections.
[0088] Then, the following steps are cyclically performed for each control section and its corresponding water supply reservoir to obtain the emergency dispatch compensation increase flow of each control section in each emergency dispatch period:
[0089] According to the current water demand flow and the hydrological series input conditions of the next emergency dispatch period of the water supply reservoir, the adjustable water volume of the next emergency dispatch period of the water supply reservoir is obtained;
[0090] Calculate the current dispatching flow of the control section according to the adjustable water volume of the water supply reservoir;
[0091] Determine the corresponding security target level based on the current dispatching flow of the control section;
[0092] Determine the corresponding water demand flow according to the target level of protection of the control section;
[0093] According to the difference between the corresponding water demand flow and the dispatch flow of the control section, the emergency dispatch compensation increase flow is obtained.
[0094] Specifically, the emergency dispatch guarantee target levels for the X River Basin are: urban drought resistance, ecological drought resistance, and water diversion control. Considering that each reservoir in the X River Basin has a certain regulation capacity, the ten-day scale flow index is used to respond to the urban drought resistance guarantee target. The ecological drought resistance uses the basin ecological base flow as the flow index. For the water diversion control guarantee target, the minimum downstream flow is used as the flow index according to the control index stipulated in the water allocation case of the X River Basin. That is, to meet the emergency dispatch guarantee target, the natural minimum ten-day average flow, ecological base flow, and minimum downstream flow are set as three-level warnings. According to the statistical data of the hydrological stations in the X River Basin, the control index parameters of the control section are shown in Table 1.
[0095] Table 1 Statistics of control index parameters of control section
[0096]
[0097] Determine the corresponding security target level based on the dispatching flow of the control section:
[0098]
[0099] In the formula, To control the current dispatching flow of the section, To control the natural minimum ten-day average flow of the section, To control the ecological base flow of the section, It is the minimum downstream flow rate of the control section.
[0100] Determine the corresponding water demand flow according to the target level of protection of the control section;
[0101]
[0102] In the formula, is the water demand flow corresponding to each emergency protection target, is the urban water shortage, which is calculated from the water demand and dispatching flow of the downstream water supply city. is the ecological water shortage, which can be calculated from the ecological water demand and dispatching flow of the section. is the water shortage for water use other than urban and ecological use, and t is the duration of the scheduling period.
[0103] Subsequently, you can choose method 1 or method 2 to calculate the emergency dispatch compensation increase flow of the control section.
[0104] The process of executing method 1 in this specific embodiment is as follows:
[0105] Through the long series calculation of the adjustable water volume of the reservoir in the X basin from 1959 to 2014, the HJD reservoir, DF reservoir, WJD reservoir and their corresponding WJD section of the emergency dispatch urban water supply reservoir are selected as representatives to calculate the adjustable water volume of the section. Here, the outflow of the WJD reservoir is used as the section runoff of the WJD section, and the adjustable water volume is the long series of the adjustable water volume of the three reservoirs HJD reservoir, DF reservoir and WJD reservoir in the same period.
[0106] According to the water demand flow in the previous emergency dispatch period, the current hydrological series of the water supply reservoir, and the input conditions, the current adjustable water volume W of each corresponding water supply reservoir is obtained. n .
[0107] By calculating the sum of the minimum adjustable water volumes of several water supply reservoirs corresponding to the control section during the emergency dispatch cycle, the minimum adjustable water volume of the control section is obtained;
[0108] The minimum adjustable water volume of the control section is calculated as follows:
[0109]
[0110] In the formula, Indicates the adjustable water volume of the control section, It represents the minimum adjustable water volume of the nth reservoir, and N represents the total number of reservoirs used for emergency water dispatch.
[0111] The statistics of the adjustable water volume at the end of each decade of HJD Reservoir, DF Reservoir and WJD Reservoir are listed in Tables 2, 3 and 4. The statistical table of the adjustable water volume analysis of the emergency dispatch plan of the WJD section is listed in Table 5.
[0112] Table 2 Statistics of adjustable water volume at the end of each decade at HJD reservoir
[0113]
[0114] Table 3 Statistics of adjustable water volume at the end of each decade in DF reservoir
[0115]
[0116] Table 4 Statistics of adjustable water volume at the end of each decade at WJD Reservoir
[0117]
[0118] Table 5 Analysis and statistics of adjustable water volume in emergency dispatching scheme of WJD section
[0119]
[0120] In Table 5: ∆W t Minimum Q for a long series min Corresponding adjustable water volume, ∆W min It is the minimum adjustable water volume in the long series; ∆W adjustable water volume is the adjustable water volume at the end of ten days.
[0121] The adjustable water volume of the section is converted into the compensation dispatching flow according to the emergency dispatching duration:
[0122]
[0123] In the formula, To control the flow rate of compensation in the section.
[0124] The cross-section dispatching flow calculation is based on the most unfavorable situation in each decade (minimum runoff + minimum adjustable water volume):
[0125]
[0126] In the formula, To control the dispatching flow of the section, To control the compensation flow of the section, It is the minimum control section runoff flow during the emergency dispatch cycle.
[0127] The current dispatching flow Q is calculated by the current adjustable water volume of the reservoir d Compare with the warning flow index to get the current emergency dispatch guarantee target level, and then determine the water demand Q of the control section level , calculate the difference between the water demand flow rate of the control section and the dispatch flow rate to obtain the emergency dispatch compensation increase flow rate, .
[0128] According to the current water demand flow and the hydrological series input conditions of the next emergency dispatch period of the water supply reservoir, the adjustable water volume of the next emergency dispatch period of the water supply reservoir is obtained. The above steps are executed repeatedly to form an emergency water dispatch plan according to the real-time changing water demand.
[0129] The process of executing method 2 in this specific embodiment is as follows:
[0130] Based on the construction of the optimization scheduling model, the model is finally solved and the optimal decision-making plan is selected.
[0131] The objective function of the optimization scheduling model is: the maximum adjustable water volume of the reservoir, the minimum increase in flow rate of the section emergency scheduling compensation, and the maximum power generation of the reservoir. The expression is as follows:
[0132]
[0133]
[0134] In the formula, is the total adjustable water volume of the water supply reservoir, N is the total number of participating water supply reservoirs, T is the total length of the emergency dispatch period, t is the serial number of the period, is the adjustable water volume of the nth reservoir; n=1, 2…, N; Increase traffic for emergency dispatch compensation, is the water flow required at the section corresponding to the tth period, is the dispatching flow of the control section in t time periods; is the power generation of the reservoir, is the output of the nth reservoir in the tth period, △ t The length of a certain period of time.
[0135] The current adjustable water volume of the water supply reservoir is proportional to the current dispatching flow of the corresponding control section; since the current adjustable water volume of each water supply reservoir is a dynamic interval value, based on the current adjustable water volume W of the water supply reservoir n Determined dispatch flow Q d,t is a dynamic interval value, based on the control section scheduling flow Q d,t The determined Q level,t It is a dynamic interval value. Based on the current adjustable water volume W of the water supply reservoir n Determined water supply reservoir output It is a dynamic interval value.
[0136] Considering the constraint relationship between reservoir power generation and water supply,
[0137] , k>0, when the output is greater, the smaller the adjustable water volume of the reservoir is, so the model takes the maximization of the adjustable water volume and the reservoir power generation, and the minimum increase in flow by emergency dispatch compensation as the optimization goal, seeking a balance between power generation and water supply.
[0138] The constraints that the model needs to satisfy are as follows:
[0139] Water balance constraint: V 旬末 =V 旬初 +V 来 -V 调 -V 损 -V 弃 , V 旬末 V is the reservoir capacity at the end of ten days; 旬初 W is the reservoir capacity at the beginning of the decade; 来 W is the water volume of the reservoir in a certain ten-day period; 调 W is the water volume for ten-day adjustment; 损W is the amount of water lost by evaporation and leakage in a certain decade in the reservoir; 弃 The amount of water abandoned in a certain ten-day period in the reservoir;
[0140] Water level constraints: ,in, is the water level in front of the dam used for emergency dispatching of the reservoir in time period t, are the maximum and minimum values of the upstream water level at the beginning of period t;
[0141] Reservoir capacity upper and lower boundary constraints: is the maximum beneficial storage capacity of reservoir y during period t;
[0142] The upper and lower boundary constraints of the reservoir discharge flow are: The discharge flow of the reservoir in the tth period is used for emergency dispatching. is the maximum and minimum value of the downstream flow in period t;
[0143] The NSGA-II algorithm is used to solve the water emergency optimization scheduling model, and the Pareto frontier solution set among the objectives that are non-inferior to each other is obtained, that is, the emergency scheduling compensation of the control section in each emergency scheduling period increases the flow.
[0144] This specific embodiment adopts a weight combination design method based on an improved congestion operator to optimize the scheme.
[0145] For multi-objective optimization problems, the method of directly obtaining Pareto frontier solutions is a research hotspot. Compared with converting into a single objective, its advantages are: 1. A more comprehensive set of Pareto solutions can be obtained, so that the competition and synergy between objectives can be analyzed from multiple dimensions; 2. Each objective has a clear physical meaning, which is convenient for decision makers to conduct multi-objective analysis and decision-making; 3. There is no need to set weight coefficients, and it is less affected by human factors.
[0146] Selecting the final solution from numerous Pareto solutions is the core problem. Therefore, the present invention aims at the weight combination design problem in the optimization of Pareto solution set, adopts a weight combination design method of improved congestion operator, and optimizes the Pareto solution set using the generated weight combination.
[0147] The steps of the weight combination design method for improving the congestion operator are as follows:
[0148] (1) The number of objective functions in the Pareto solution set is m, and the number of decision combinations is set to N, requiring N ≥ 5 m;
[0149] (2) Define the population of the final weighted combination;
[0150] (3) Set the optimal weight combination for a single objective. Taking the three-objective function as an example, the weight combination is (1, 0, 0), (0, 1, 0), (0, 0, 1), and put it into the population set;
[0151] (4) Define the weights set to store randomly generated weight combinations. The size of the weights set is N. 100;
[0152] (5) Randomly generate N 100 weight combinations, the sum of each weight combination is equal to 1.0, and then all random weight combinations are put into the weights collection
[0153] (6) Traverse the weights set, calculate the sum of the Euclidean distances between each weight combination and all weight combinations in the population set, select the weight combination with the largest sum of Euclidean distances and put it into the population set, and remove the weight combination from the weights set;
[0154] (7) Repeat step (5) until the number of weight combinations in the population set reaches N;
[0155] There are three objective functions in the Pareto solution set, and the number of their weight combinations should be greater than or equal to 15. Therefore, the number of weight combinations is set to 15. Finally, based on these weight combinations, the optimal decision is made from the Pareto solution set to obtain the emergency water dispatching plan for the WJD section, as shown in Table 6.
[0156]
[0157] In summary, the water dispatching operation of multiple water sources in the X River Basin has improved its water resources carrying capacity and effectively improved the current situation of drought caused by excessive water abandonment during the flood season and single reservoir operation. While meeting the comprehensive utilization needs of water supply, ecology and shipping in the management of water conservancy hub projects, it has improved the utilization efficiency of water resources and provided an important technical means for the emergency dispatching of water in multiple water source projects.
[0158] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
Claims
1. A method for emergency dispatching of water volume for a multi-water source project in a river basin, characterized by: The following steps are involved: Determine whether to execute the emergency dispatch process based on the water resource utilization rate of the basin to be dispatched; The water resource utilization rate is the ratio of the total economic and social water consumption of the basin to be dispatched to the total water resources; The emergency dispatch process includes: Select the emergency dispatching urban area of the basin to be dispatched; Select the corresponding water supply reservoir for each emergency dispatch urban area and determine the corresponding control section; The following steps are cyclically performed for each control section and its corresponding water supply reservoir to obtain the emergency dispatch compensation increase flow of each control section in each emergency dispatch period: According to the water demand flow in the last emergency dispatch period and the current hydrological series input conditions of the water supply reservoir, the current adjustable water volume of each corresponding water supply reservoir is obtained; By calculating the sum of the minimum adjustable water volumes of several water supply reservoirs corresponding to the control section during the emergency dispatch cycle, the minimum adjustable water volume of the control section is obtained; Convert the minimum adjustable water volume of the control section into the compensatory dispatching flow according to the emergency dispatching duration; The compensation dispatching flow of the control section and the minimum runoff flow in the emergency dispatching period are summed as the dispatching flow of the control section; Determine the target level of protection and its corresponding water demand flow based on the current dispatching flow of the control section; The difference between the required water flow rate and the dispatching flow rate of the control section is calculated as the emergency dispatching compensation to increase the flow rate.
2. The method according to claim 1, characterized in that: If the water resource utilization rate is greater than or equal to the set value, it is determined that the emergency dispatch process needs to be executed; if the water resource utilization rate is less than the set value, the water resource utilization rate is derived, and if it is greater than or equal to 0, the water resource utilization rate is recalculated.
3. The method according to claim 1, characterized in that: The process of selecting an emergency dispatch district includes: If the total annual water consumption of any urban area along the river basin to be regulated exceeds the set value, and the urban area is located outside the specific range of the reservoir river section, and there is a reservoir used for emergency regulation upstream of the urban area, the urban area will be used as the emergency regulation range.
4. The method according to claim 1, characterized in that: The process of selecting the corresponding water supply reservoir for any emergency dispatching urban area includes: For all reservoirs located upstream of the urban area, the following are judged: If the normal water level of a reservoir is lower than the elevation of the urban area, the reservoir cannot be used as a water supply reservoir for the emergency dispatch urban area; If the normal water level of a reservoir is higher than the elevation of the urban area and lower than the urban area immediately upstream of the urban area, the reservoir will be used as a backup reservoir to supply water to the emergency dispatch urban area; Select several reservoirs closest to the urban area from the candidate reservoirs as the water supply reservoirs for the urban area; the total regulating storage capacity of the selected water supply reservoirs exceeds the total annual water consumption of the urban area, and after removing the reservoir farthest from the urban area from the selected water supply reservoirs, the total regulating storage capacity of the remaining reservoirs does not exceed the total annual water consumption of the urban area; In the basin to be dispatched, select the section that best represents the water supply capacity of each water supply reservoir as the corresponding control section.
5. The method according to claim 1, characterized in that: The principle for determining the corresponding security target level based on the current dispatching flow of the control section is: If the current dispatching flow of the control section is less than or equal to the natural minimum ten-day average flow of the control section, the target level of protection is determined to be level one; If the current dispatch flow of the control section is greater than the natural minimum ten-day average flow of the control section and is less than or equal to the ecological base flow of the control section, the protection target level is determined to be level 2; If the current dispatching flow of the control section is greater than the ecological base flow of the control section and is less than or equal to the minimum downstream flow of the control section, the target level of protection is determined to be level three.
6. The method according to claim 1, characterized in that: The principle for determining the corresponding water demand flow according to the target level of each section is as follows: If the target level of any section is level 1, the water demand of the section is the sum of the urban water shortage, ecological water shortage and other water shortages within the unit dispatching time; If the target level of any section is level 2, the water demand of the section is the sum of the urban water shortage and other water shortages within the unit dispatching time; If the target protection level of any section is level three, the water demand flow of the section is the water shortage of other water uses within the unit scheduling time.
7. The method according to claim 1, characterized in that: The process of calculating the current emergency dispatch compensation increase flow also includes: Substitute the adjustable water volume of each water supply reservoir, the water demand flow and the dispatching flow of the control section into the optimization dispatching model; solve the optimization dispatching model with the optimization objectives of maximizing the total adjustable water volume of the water supply reservoir, minimizing the overall emergency dispatching compensation increase flow and maximizing the total power generation of the water supply reservoir, and obtain the emergency dispatching compensation increase flow of each control section in each emergency dispatching period; among which, the current adjustable water volume of each water supply reservoir is a dynamic interval value, and the water demand flow and dispatching flow of the control section determined based on the current adjustable water volume of the water supply reservoir are both dynamic interval values; The emergency dispatch compensation increase flow rate of each control section during the current emergency dispatch period is expressed as the difference between the water demand flow rate and the dispatch flow rate of the corresponding control section during the current emergency dispatch period; The current adjustable water volume of the water supply reservoir is proportional to the current dispatching flow of the corresponding control section; The current adjustable water volume of the water supply reservoir is inversely proportional to its current power generation.
8. The method according to claim 7, characterized in that: The constraints of the optimization scheduling model include: For any ten-day period within the emergency dispatch cycle, the storage capacity of the selected emergency dispatch reservoir at the end of the ten-day period is equal to the difference between the sum of the storage capacity at the beginning of the ten-day period and the sum of the ten-day water inflow of the reservoir and the sum of the ten-day water transfer volume, the ten-day evaporation and leakage loss of the reservoir, and the ten-day water abandonment of the reservoir; The water level in front of the dam of the selected emergency dispatching reservoir in the t-th emergency dispatching period is greater than or equal to the minimum value of the initial upstream water level in the t-th emergency dispatching period, and less than or equal to the maximum value of the initial upstream water level in the t-th emergency dispatching period; The storage capacity of the selected emergency dispatch reservoir is greater than or equal to 0, and less than or equal to the maximum beneficial storage capacity of the reservoir in the tth emergency dispatch period; The discharge flow of the selected emergency dispatching reservoir in the tth emergency dispatching period is less than or equal to the maximum discharge flow of the reservoir in the tth emergency dispatching period, and greater than or equal to the minimum discharge flow of the reservoir in the tth emergency dispatching period.
9. A water emergency dispatching system for multiple water source projects in a river basin, characterized by: Used to implement the water emergency dispatching method for a river basin multi-water source project as described in any one of claims 1-8.
