A multi-scale underground engineering disaster early warning system and method under water-rich conditions

By combining transient electromagnetic detection and microseismic data, a three-dimensional spatial distribution model is generated to monitor the density of microseismic events in real time. This solves the problem of low accuracy in detecting water-rich rock masses and enables accurate early warning of water inrush and inrush, thus improving construction safety.

CN118273769BActive Publication Date: 2026-11-17CHINA COAL TECH & ENG GRP CHONGQING RES INST CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410522907.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-28
Publication Date
2026-11-17
Estimated Expiration
2044-04-28

AI Technical Summary

Technical Problem

Existing water-rich rock mass detection technologies are not very accurate under water-rich conditions and cannot provide timely warnings of water inrush at the working face, resulting in insufficient construction safety.

Method used

By combining transient electromagnetic detection and microseismic data, data is collected through a transient electromagnetic detection antenna to generate a three-dimensional spatial distribution model. This model is then combined with microseismic sensors to monitor the density of microseismic events, thereby assessing the likelihood of water inrush and issuing early warnings in real time.

Benefits of technology

It enables accurate detection and timely early warning of water inrush at the working face under water-rich conditions, improving construction safety and detection accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118273769B_ABST
    Figure CN118273769B_ABST
Patent Text Reader

Abstract

This invention relates to the field of construction tunnel detection, monitoring, and early warning technology, specifically to a multi-scale underground engineering disaster early warning system and method under water-rich conditions. The system includes a transient electromagnetic detection and acquisition module, a transient electromagnetic data processing module, a microseismic data acquisition module, a microseismic data processing module, and a judgment and early warning module. The judgment and early warning module is used to determine whether there is a possibility of water inrush at the current construction tunnel face based on the location information of the conductive water body at the tunnel face and the areas corresponding to the density of various microseismic events. If not, no early warning is issued, and excavation of the current construction tunnel face continues. Conversely, if there is a possibility of water inrush within the tunnel, a red early warning is issued to the client if the water inrush is present, and a yellow early warning is issued to the client if the water inrush is absent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of construction tunnel detection, monitoring, and early warning technology, specifically to a multi-scale underground engineering disaster early warning system and method under water-rich conditions. Background Technology

[0002] With the rapid development of transportation infrastructure in my country, the focus of highway and railway construction has gradually shifted westward. The western region, especially the southwest, has complex geological structures and water-rich strata. Tunnel construction faces adverse geological challenges such as complex geological formations, high-pressure water-rich faults, and large deformations of fractured soft rock. Therefore, the detection and early warning of water-rich rock masses is a crucial aspect of underground engineering construction.

[0003] Existing detection technologies, typically employing TSP (Transient Sensor Probe) and conventional transient electromagnetic probing, have provided some information about the distribution and properties of water-rich rock masses. However, these technologies still have many shortcomings in practical applications.

[0004] TSP (Through Seismic Probing) technology primarily relies on the propagation characteristics of seismic waves within rock masses. By receiving and analyzing reflected seismic wave signals, it infers the structure and properties of the rock mass. However, because seismic waves are affected by various factors during propagation, such as the heterogeneity of the rock mass and the presence of groundwater, the results of TSP often contain significant errors.

[0005] Conventional transient electromagnetic detection technology infers the conductivity and water content of rock masses by measuring the distribution and changes in electromagnetic fields within them. While this method can directly reflect the hydrogeological conditions of rock masses, its detection depth is often limited, making it difficult to accurately analyze deep geological structures.

[0006] In summary, existing methods for detecting water-rich rock masses suffer from low accuracy and are unable to accurately detect and provide timely warnings of water inrush at the working face under water-rich conditions, thus leading to high risks during excavation at the working face. Summary of the Invention

[0007] One of the objectives of this invention is to provide a multi-scale underground engineering disaster early warning system and method under water-rich conditions, which can accurately detect and provide timely early warning of water inrush at the working face under water-rich conditions, thereby improving the safety of the excavation process at the working face.

[0008] To achieve the above objectives, a multi-scale underground engineering disaster early warning system under water-rich conditions is provided.

[0009] Including server-side and client-side;

[0010] The server includes:

[0011] The transient electromagnetic detection and acquisition module is used to collect data on the induced electromotive force in front of the tunnel face during construction through a transient electromagnetic detection antenna, and to form corresponding transient electromagnetic detection data.

[0012] The transient electromagnetic processing module is used to determine the location information of the conductive water body in front of the tunnel face based on the generated transient electromagnetic detection data and a transient electromagnetic processing strategy, and to generate a three-dimensional spatial distribution model of the underground medium corresponding to the tunnel face. The location information of the conductive water body includes its orientation, location coordinates, size, and distribution pattern. The conductive water body is then visualized on the three-dimensional spatial distribution model of the underground medium.

[0013] The microseismic data acquisition module is used to acquire microseismic data corresponding to the current tunnel face during the excavation process by setting up microseismic sensors between the current tunnel face and the secondary lining structure.

[0014] The microseismic processing module is used to determine the density of microseismic events corresponding to the current tunnel face under construction based on the collected microseismic data, and to determine the area corresponding to each microseismic event density.

[0015] The judgment and early warning module is used to determine whether there is a possibility of water inrush at the current construction tunnel face based on the location information of the conductive water body at the current construction tunnel face and the area corresponding to the density of each microseismic event. If not, no warning is issued, and excavation of the current construction tunnel face continues; otherwise, it judges whether there is water inrush fluctuation in the tunnel. If so, a red warning is issued to the client; otherwise, a yellow warning is issued to the client.

[0016] The technical principle and effect of this solution are as follows: First, a transient electromagnetic detection antenna is used to detect the tunnel face under construction in all directions, thereby generating transient electromagnetic detection data corresponding to the current tunnel face. Then, based on the transient electromagnetic processing strategy, the transient electromagnetic detection data is processed to determine the location information of the conductive water body in front of the tunnel face and generate a corresponding three-dimensional spatial distribution model of the underground medium. The location information of the conductive water body is then visualized through this model.

[0017] During the subsequent excavation of the tunnel face, as excavation progresses, microseismic sensors installed in the initial support and secondary lining of the tunnel face collect microseismic data corresponding to the tunnel face. This allows for the identification of microseismic events in front of and around the tunnel face, as well as the determination of the density of these events. Based on different microseismic event densities, different areas are defined, assigning specific zones to microseismic events of varying densities. Using these zone divisions based on different microseismic event densities and the previously collected information on the location of conductive water bodies, it is determined whether there is a possibility of water inrush at the tunnel face. If so, further analysis is conducted to assess whether there is water inrush fluctuation within the tunnel face. The assessment result determines whether to send a yellow or red alert to the client, thus determining the alert level and using different alert methods to alert the client.

[0018] Furthermore, the transient electromagnetic processing strategy includes:

[0019] The data preprocessing module is used to preprocess the generated transient electromagnetic detection data. The preprocessing includes removing bad and suspicious measurement point data, determining the effective measurement range, and evaluating the logical matching degree of multi-measurement point and multi-measurement line data.

[0020] The three-dimensional interpolation calculation module is used to determine the neighborhood attribute value of the interpolation point based on the three-dimensional interpolation calculation formula after the preprocessed transient electromagnetic detection data, and to determine the induced electromotive force data corresponding to the interpolation point based on the neighborhood attribute value of the interpolation point, thereby forming new transient detection data.

[0021] The three-dimensional interpolation calculation formula is as follows:

[0022]

[0023] In the formula, K(x) k ,y k ,z k Let K be any point in space, and let J(x) be a known point in the neighborhood of K. i ,y i ,z i ), i = 1, 2, 3, 4, ..., n; d i X is the distance between the point to be inserted and the i-th point in the neighborhood. K Y K Z K These are the domain attribute values ​​for the corresponding K-point;

[0024] The apparent resistivity calculation module is used to calculate the apparent resistivity of each point based on the new transient electromagnetic detection data processed by the three-dimensional interpolation calculation module, according to the apparent resistivity calculation formula, by setting the corresponding calculation parameters, and to draw the apparent resistivity contour map of each measurement line based on the location information of each point.

[0025] The continuity judgment module is used to determine the location information of the conductive water body in front of the current working face based on the apparent resistivity contour map corresponding to each drawn measuring line;

[0026] The model generation module is used to generate a three-dimensional spatial distribution model of the underground medium in the area in front of the tunnel face of the current construction tunnel based on the apparent resistivity contour map corresponding to each drawn survey line, and to visualize the water body on the three-dimensional spatial distribution model of the underground medium based on the location information of the water body.

[0027] Furthermore, the server also includes a sensor dynamic adjustment module, which is used to calculate the distance between the current tunnel face and the row of sensors closest to the current tunnel face in real time during the excavation process. If the distance is greater than a preset threshold, an adjustment signal is sent to the client, instructing the client to move the row of sensors furthest from the current tunnel face to a position at a preset distance from the current tunnel face.

[0028] Beneficial effects: During the excavation of the tunnel face, the position of the tunnel face continuously moves forward. As a result, the distance between the tunnel face and the sensors increases. Since the effective monitoring distance of the sensors is limited, exceeding this distance leads to greater errors in the microseismic information obtained when monitoring the location of microseismic events in the rock mass. Therefore, this solution employs a dynamic, rotating sensor arrangement. As the distance to the tunnel face moves forward, the sensor positions are adjusted promptly when they exceed the sensor's monitoring range. Specifically, if the interval distance exceeds a preset threshold, an adjustment signal is sent to the client, instructing the client to move the row of sensors furthest from the tunnel face to a position at a preset distance. This method not only improves the effectiveness of microseismic positioning but also protects the sensors from the impact of blasting.

[0029] Furthermore, the server also includes a sensor design module, which, when sending an adjustment signal to the client, designs and adjusts the sensor layout scheme corresponding to moving the row of sensors furthest from the current construction tunnel face to a position at a preset distance from the current construction tunnel face, based on the conductive water body and its location information displayed on the three-dimensional spatial distribution model of the underground medium at the current construction tunnel face.

[0030] Beneficial effects: In this scheme, when moving the row of sensors furthest from the current tunnel face to the front, the design is not based on the arrangement at the furthest point. Instead, it is based on the water bodies and their locations displayed on the three-dimensional spatial model of the underground medium at the current tunnel face. This makes the sensor arrangement more in line with the monitoring requirements of the current tunnel face, enabling more accurate and comprehensive monitoring of the water bodies and greatly improving the timeliness and reliability of monitoring their locations.

[0031] Furthermore, the sensor design module includes:

[0032] The data retrieval module is used to retrieve the conductive water body and its location information displayed on the three-dimensional spatial distribution model of the underground medium at the current construction tunnel face when sending adjustment signals to the client.

[0033] The scheme formulation module is used to determine the installation distance of the microseismic sensor from the current construction tunnel face and the installation density of the sensor at the location corresponding to the conductive water body, based on the microseismic sensor layout optimization formula, according to the conductive water body and the location information of the conductive water body displayed on the three-dimensional spatial distribution model of the underground medium at the current construction tunnel face.

[0034] The formula for optimizing the arrangement of the microseismic sensors is as follows:

[0035]

[0036]

[0037] In the formula, L s L represents the installation distance of the microseismic sensor from the tunnel face currently under construction. y For the preset distance, D w M represents the distance from the tunnel face under construction to the diversion water body; c To determine the sensor density at locations corresponding to the water body, M b For standard density, l w The distance from the sensor to the conductive water body is m. wThe projection area corresponding to the water body being projected onto the tunnel face during current construction is l. b The standard distance from the sensor to the channeled water body is in meters (m). b α represents the standard projection area corresponding to the water body being projected onto the tunnel face during current construction; ∝ represents the corresponding weighting coefficient.

[0038] Beneficial effects: The sensor layout optimization formula in the scheme enables the rationalization and scientification of the sensor layout when the last row of sensors is moved to the front. That is, the distance and density of the corresponding sensor positions from the current tunnel face are more reasonable. For example, when the last row of sensors is initially set with the standard density, when it is moved to the front, the position of the water channel corresponding to the tunnel face needs to be taken into account. At the height of the water channel, the density should be higher. The specific density is adjusted according to the projection area of ​​the water channel and the distance to the sensor, so that the sensor monitoring of the water channel is more comprehensive and in line with reality.

[0039] This invention also provides a method for early warning of disasters in multi-scale underground engineering projects under water-rich conditions. Using the aforementioned early warning system for disasters in multi-scale underground engineering projects under water-rich conditions, the method includes the following steps:

[0040] S1. Data collection of induced electromotive force in all directions in front of the tunnel face during construction is carried out through transient electromagnetic detection antenna to form corresponding transient electromagnetic detection data.

[0041] S2. Based on the transient electromagnetic detection data, and using a transient electromagnetic processing strategy, determine the location information of the conductive water body in front of the tunnel face, and generate a three-dimensional spatial distribution model of the underground medium corresponding to the tunnel face. The location information of the conductive water body includes its orientation, location coordinates, scale, and distribution pattern. The conductive water body is then visualized on the three-dimensional spatial distribution model of the underground medium.

[0042] S3. During the excavation of the tunnel face under construction, microseismic data corresponding to the tunnel face under construction is collected by setting up microseismic sensors between the tunnel face under construction and the secondary lining structure.

[0043] S4. Based on the collected microseismic data, determine the density of microseismic events corresponding to the current tunnel face under construction, and determine the area corresponding to each microseismic event density.

[0044] S5. Based on the location information of the water body at the current tunnel face and the area corresponding to the density of each microseismic event, determine whether there is a possibility of water inrush at the current tunnel face. If not, no warning is issued and excavation of the current tunnel face continues. Otherwise, determine whether there is water inrush fluctuation in the tunnel. If so, issue a red warning to the client; if not, issue a yellow warning to the client. Attached Figure Description

[0045] Figure 1 This is a logic block diagram of the multi-scale underground engineering disaster early warning system under water-rich conditions in Embodiment 1 of the present invention.

[0046] Figure 2 This is a flowchart of the multi-scale underground engineering disaster early warning method under water-rich conditions in Embodiment 1 of the present invention.

[0047] Figure 3 This is the contour map of apparent resistivity corresponding to the longitudinal scan.

[0048] Figure 4 This is the contour map of apparent resistivity corresponding to the horizontal scan. Detailed Implementation

[0049] The following detailed description illustrates the specific implementation method:

[0050] Example 1

[0051] A multi-scale underground engineering disaster early warning system under water-rich conditions, basically as follows: Figure 1 As shown, it includes a server and a client; the server includes:

[0052] The transient electromagnetic detection and acquisition module is used to collect data on the induced electromotive force in front of the tunnel face during construction via a transient electromagnetic detection antenna, forming corresponding transient electromagnetic detection data. In this embodiment, to effectively detect the location of anomalies in the entire underground space, the azimuth control of the transient electromagnetic antenna directly affects the detection effect. Considering that underground detection mainly involves elevation and azimuth angles, the azimuth and elevation angles of the detection antenna need to be strictly controlled during transient electromagnetic advance detection at different directional angles. A three-dimensional electronic compass combined with a microcontroller is used to realize the digital automatic measurement of the antenna azimuth. The sensor adopts a three-component electronic compass, which contains a three-axis gravity accelerometer and a geomagnetic sensor to measure the elevation and azimuth angles of the antenna, respectively. In this embodiment, the corresponding detection scan is divided into longitudinal and transverse scanning. For example, the longitudinal direction scans a range of 60° vertically, with one measuring point every 10°, for a total of 11 measuring points; the transverse direction scans a range of 60° horizontally, with one measuring point every 10°, for a total of 11 measuring points.

[0053] The transient electromagnetic processing module is used to determine the location information of the conductive water body in front of the tunnel face based on the generated transient electromagnetic detection data and a transient electromagnetic processing strategy, and to generate a three-dimensional spatial distribution model of the underground medium corresponding to the tunnel face. The location information of the conductive water body includes its orientation, location coordinates, size, and distribution pattern. The conductive water body is then visualized on the three-dimensional spatial distribution model of the underground medium.

[0054] The transient electromagnetic processing strategy includes:

[0055] The data preprocessing module is used to preprocess the generated transient electromagnetic detection data. The preprocessing includes removing bad and suspicious measurement point data, determining the effective measurement range, and evaluating the logical matching degree of multi-measurement point and multi-measurement line data.

[0056] The three-dimensional interpolation calculation module is used to determine the neighborhood attribute value of the interpolation point based on the three-dimensional interpolation calculation formula after the preprocessed transient electromagnetic detection data, and to determine the induced electromotive force data corresponding to the interpolation point based on the neighborhood attribute value of the interpolation point, thereby forming new transient detection data.

[0057] The three-dimensional interpolation calculation formula is as follows:

[0058]

[0059] In the formula, K(x) k ,y k ,z k Let K be any point in space, and let J(x) be a known point in the neighborhood of K. i ,y i ,z i ), i = 1, 2, 3, 4, ..., n; d i X is the distance between the point to be inserted and the i-th point in the neighborhood. K Y K Z K These are the domain attribute values ​​for the corresponding K-point;

[0060] The apparent resistivity calculation module is used to calculate the apparent resistivity at each point based on the new transient electromagnetic detection data processed by the 3D interpolation module, according to the apparent resistivity calculation formula and corresponding calculation parameters. Based on the location information of each point, it then draws the apparent resistivity contour maps for each survey line. The corresponding longitudinal and transverse scan apparent resistivity contour maps are shown below. Figure 3 and Figure 4 As shown.

[0061] In this embodiment, the formula for calculating apparent resistivity is:

[0062]

[0063] In the formula, C is the full-space response coefficient, S is the area of ​​the receiving loop coil, N is the number of turns of the receiving loop coil, t is the secondary field attenuation time, and V(t) / I is the normalized secondary field potential value received. The full-space response coefficient is a key parameter that distinguishes half-space. In this embodiment, the value of C is 1.842. Of course, it can be adjusted accordingly in actual use.

[0064] In this embodiment, time depth conversion is also performed, and the specific calculation formula is as follows:

[0065]

[0066] In the formula, t i ρ represents the time window value of the corresponding instrument at a certain moment. (ti) Let μ0 be the apparent resistivity of the instrument at a certain moment, and μ0 be the permeability of free space, which has a value of 4π × 102. -7 Henry / meter (H / m), h s This represents the apparent depth value.

[0067] The continuity judgment module is used to determine the location information of the conductive water body in front of the current working face based on the apparent resistivity contour maps corresponding to each drawn survey line. In this embodiment, the determination of the location information of the conductive water body realizes the delineation of the possible area of ​​water inrush using the results corresponding to the apparent resistivity contour maps. For example, Figure 3 As shown, the apparent resistivity distribution in the 0-100m section directly in front of the tunnel face is uneven, and the attenuation of the secondary electromagnetic field is also uneven. Based on the geological data and site conditions, it is inferred that the bedding and joint fissures in this tunnel section are relatively well-developed, and most of the fissures are water-bearing fissures. A certain amount of runoff groundwater exists locally in the area approximately 9m in front of the tunnel face and in the 20-50m section. Figure 4 As shown, the apparent resistivity distribution in the 0-100m section directly in front of the tunnel face is uneven, and the attenuation of the secondary electromagnetic field is also uneven. Based on the geological data and the analysis of the site conditions, it is inferred that the bedding and joints in this tunnel section are relatively well-developed, and most of the fissures are water-bearing fissures. It is inferred that the two strip-shaped low-resistivity areas in front of the right side of the tunnel face are areas through which the interlayer groundwater flow channels pass.

[0068] The model generation module is used to generate a three-dimensional spatial distribution model of the underground medium in the area in front of the tunnel face of the current construction tunnel based on the apparent resistivity contour map corresponding to each drawn survey line, and to visualize the water body on the three-dimensional spatial distribution model of the underground medium based on the location information of the water body.

[0069] The microseismic data acquisition module is used to collect microseismic data corresponding to the current tunnel face during excavation by setting up microseismic sensors between the current tunnel face and the secondary lining structure. In this embodiment, when conducting microseismic monitoring in the tunnel, sensors can usually only be deployed behind the tunnel face, while microseismic events are mainly concentrated near the tunnel face. The current tunnel face is the excavation face, which is dynamically changing as the tunneling construction progresses. Sensors for the construction tunnel are generally arranged in the primary support and secondary lining, or installed in the surrounding rock through drilling.

[0070] The microseismic processing module is used to determine the density of microseismic events corresponding to the current tunnel face under construction based on the collected microseismic data, and to determine the area corresponding to each microseismic event density.

[0071] The judgment and early warning module is used to determine whether there is a possibility of water inrush at the current construction tunnel face based on the location information of the conductive water body at the current construction tunnel face and the area corresponding to the density of each microseismic event. If not, no warning is issued and excavation of the current construction tunnel face continues; otherwise, it judges whether there is water inrush fluctuation in the tunnel. If so, a red warning is issued to the client; if not, a yellow warning is issued to the client.

[0072] The server also includes a sensor dynamic adjustment module. During the excavation of the tunnel face, as the tunnel face moves forward, the module calculates in real-time the distance between the current tunnel face and the row of sensors closest to it. If the distance exceeds a preset threshold, an adjustment signal is sent to the client, instructing the client to move the row of sensors furthest from the tunnel face to a preset distance. For example, when the row of sensors closest to the face reaches 100m, the row of sensors furthest from the face is moved to a position 40m away.

[0073] The server also includes a sensor design module, which, when sending an adjustment signal to the client, designs and adjusts the sensor layout scheme corresponding to moving the row of sensors furthest from the current construction tunnel face to a position at a preset distance from the current construction tunnel face, based on the conductive water body and its location information displayed on the three-dimensional spatial distribution model of the underground medium at the current construction tunnel face.

[0074] The sensor design module includes:

[0075] The data retrieval module is used to retrieve the conductive water body and its location information displayed on the three-dimensional spatial distribution model of the underground medium at the current construction tunnel face when sending adjustment signals to the client.

[0076] The scheme formulation module is used to determine the installation distance of the microseismic sensor from the current construction tunnel face and the installation density of the sensor at the location corresponding to the conductive water body, based on the microseismic sensor layout optimization formula, according to the conductive water body and the location information of the conductive water body displayed on the three-dimensional spatial distribution model of the underground medium at the current construction tunnel face.

[0077] The formula for optimizing the arrangement of the microseismic sensors is as follows:

[0078]

[0079]

[0080] In the formula, L s L represents the installation distance of the microseismic sensor from the tunnel face currently under construction. y For the preset distance, D w M represents the distance from the tunnel face under construction to the diversion water body; c To determine the sensor density at locations corresponding to the water body, M b For standard density, l w n is the distance from the sensor to the conductive water body. w The projection area corresponding to the water body being projected onto the tunnel face during current construction is l. b The standard distance from the sensor to the channeled water body is in meters (m). b α represents the standard projection area corresponding to the water body being projected onto the tunnel face during current construction; ∝ represents the corresponding weighting coefficient.

[0081] This embodiment also discloses a method for early warning of disasters in multi-scale underground engineering projects under water-rich conditions. Using the aforementioned early warning system for disasters in multi-scale underground engineering projects under water-rich conditions, the method includes the following steps:

[0082] S1. Data collection of induced electromotive force in all directions in front of the tunnel face during construction is carried out through transient electromagnetic detection antenna to form corresponding transient electromagnetic detection data.

[0083] S2. Based on the transient electromagnetic detection data, and using a transient electromagnetic processing strategy, determine the location information of the conductive water body in front of the tunnel face, and generate a three-dimensional spatial distribution model of the underground medium corresponding to the tunnel face. The location information of the conductive water body includes its orientation, location coordinates, scale, and distribution pattern. The conductive water body is then visualized on the three-dimensional spatial distribution model of the underground medium.

[0084] S3. During the excavation of the tunnel face under construction, microseismic data corresponding to the tunnel face under construction is collected by setting up microseismic sensors between the tunnel face under construction and the secondary lining structure.

[0085] S4. Based on the collected microseismic data, determine the density of microseismic events corresponding to the current tunnel face under construction, and determine the area corresponding to each microseismic event density.

[0086] S5. Based on the location information of the water body at the current tunnel face and the area corresponding to the density of each microseismic event, determine whether there is a possibility of water inrush at the current tunnel face. If not, no warning is issued and excavation of the current tunnel face continues. Otherwise, determine whether there is water inrush fluctuation in the tunnel. If so, issue a red warning to the client; if not, issue a yellow warning to the client.

[0087] The above descriptions are merely embodiments of the present invention. Commonly known structures and characteristics are not described in detail here. Those skilled in the art are aware of all common technical knowledge in the field prior to the application date or priority date, are aware of all existing technologies in that field, and have the ability to apply conventional experimental methods prior to that date. Those skilled in the art can, based on the guidance provided in this application, improve and implement this solution in combination with their own capabilities. Some typical well-known structures or methods should not be obstacles for those skilled in the art to implement this application. It should be noted that those skilled in the art can make several modifications and improvements without departing from the structure of the present invention. These should also be considered within the scope of protection of the present invention, and will not affect the effectiveness of the implementation of the present invention or the practicality of the patent. The scope of protection claimed in this application should be determined by the content of its claims, and the specific embodiments described in the specification can be used to interpret the content of the claims.

Claims

1. A multi-scale underground engineering disaster early warning system under water-rich conditions, characterized in that: Including server-side and client-side; The server includes: The transient electromagnetic detection and acquisition module is used to collect data on the induced electromotive force in front of the tunnel face during construction through a transient electromagnetic detection antenna, and to form corresponding transient electromagnetic detection data. The transient electromagnetic processing module is used to determine the location information of the conductive water body in front of the tunnel face based on the generated transient electromagnetic detection data and a transient electromagnetic processing strategy, and to generate a three-dimensional spatial distribution model of the underground medium corresponding to the tunnel face. The location information of the conductive water body includes its orientation, location coordinates, size, and distribution pattern. The conductive water body is then visualized on the three-dimensional spatial distribution model of the underground medium. The microseismic data acquisition module is used to acquire microseismic data corresponding to the current tunnel face during the excavation process by setting up microseismic sensors between the current tunnel face and the secondary lining structure. The microseismic processing module is used to determine the density of microseismic events corresponding to the current tunnel face under construction based on the collected microseismic data, and to determine the area corresponding to each microseismic event density. The judgment and early warning module is used to determine whether there is a possibility of water inrush at the current construction tunnel face based on the location information of the water body at the current construction tunnel face and the area corresponding to the density of each microseismic event. If not, no warning is issued and the excavation of the current construction tunnel face continues; otherwise, it judges whether there is water inrush fluctuation in the tunnel. If so, a red warning is issued to the client; if not, a yellow warning is issued to the client. The server also includes a sensor dynamic adjustment module, which is used to calculate the distance between the current construction tunnel face and the row of sensors closest to the current construction tunnel face in real time during the excavation process. If the distance is greater than a preset threshold, an adjustment signal is sent to the client, and the client is informed to move the row of sensors farthest from the current construction tunnel face to a position at a preset distance from the current construction tunnel face. The server also includes a sensor design module, which, when sending an adjustment signal to the client, designs and adjusts the sensor layout scheme corresponding to moving the row of sensors furthest from the current construction tunnel face to a position at a preset distance from the current construction tunnel face, based on the conductive water body and its location information displayed on the three-dimensional spatial distribution model of the underground medium at the current construction tunnel face. 2.The multi-scale underground engineering disaster early warning system under water-rich conditions according to claim 1, characterized in that: The transient electromagnetic processing strategy includes: The data preprocessing module is used to preprocess the generated transient electromagnetic detection data. The preprocessing includes removing bad and suspicious measurement point data, determining the effective measurement range, and evaluating the logical matching degree of multi-measurement point and multi-measurement line data. The three-dimensional interpolation calculation module is used to determine the neighborhood attribute value of the interpolation point based on the three-dimensional interpolation calculation formula after the preprocessed transient electromagnetic detection data, and to determine the induced electromotive force data corresponding to the interpolation point based on the neighborhood attribute value of the interpolation point, thereby forming new transient detection data. The three-dimensional interpolation calculation formula is as follows: In the formula, Let K be any point in space, and let there be known points in the neighborhood of point K. ; Let be the distance between the point to be inserted and the i-th point in the neighborhood. , , These are the domain attribute values ​​for the corresponding K-point; The apparent resistivity calculation module is used to calculate the apparent resistivity of each point based on the new transient electromagnetic detection data processed by the three-dimensional interpolation calculation module, according to the apparent resistivity calculation formula, by setting the corresponding calculation parameters, and to draw the apparent resistivity contour map of each measurement line based on the location information of each point. The continuity judgment module is used to determine the location information of the conductive water body in front of the current working face based on the apparent resistivity contour map corresponding to each drawn measuring line; The model generation module is used to generate a three-dimensional spatial distribution model of the underground medium in the area in front of the tunnel face of the current construction tunnel based on the apparent resistivity contour map corresponding to each drawn survey line, and to visualize the water body on the three-dimensional spatial distribution model of the underground medium based on the location information of the water body.

3. The multi-scale underground engineering disaster early warning system under water-rich conditions according to claim 2, characterized in that: The sensor design module includes: The data retrieval module is used to retrieve the conductive water body and its location information displayed on the three-dimensional spatial distribution model of the underground medium at the current construction tunnel face when sending adjustment signals to the client. The scheme formulation module is used to determine the installation distance of the microseismic sensor from the current construction tunnel face and the installation density of the sensor at the location corresponding to the conductive water body, based on the microseismic sensor layout optimization formula, according to the conductive water body and the location information of the conductive water body displayed on the three-dimensional spatial distribution model of the underground medium at the current construction tunnel face. The formula for optimizing the arrangement of the microseismic sensors is as follows: In the formula, This refers to the installation distance of the microseismic sensor from the tunnel face currently under construction. For the preset distance, This represents the distance from the tunnel face under construction to the water channel. To determine the sensor density at locations corresponding to the water body. For standard density, The distance from the sensor to the water body. This refers to the projection area corresponding to the water flow channel projected onto the tunnel face during current construction. This is the standard distance from the sensor to the water body. This refers to the standard projection area corresponding to the water body being projected onto the tunnel face during current construction. , , These are the corresponding weighting coefficients.

4. A method for early warning of disasters in multi-scale underground engineering projects under water-rich conditions, using the early warning system for disasters in multi-scale underground engineering projects under water-rich conditions according to any one of claims 1-3, characterized in that: Includes the following steps: S1. Data collection of induced electromotive force in all directions in front of the tunnel face during construction is carried out through transient electromagnetic detection antenna to form corresponding transient electromagnetic detection data; S2. Based on the transient electromagnetic detection data, and using a transient electromagnetic processing strategy, determine the location information of the conductive water body in front of the tunnel face at the current construction site, and generate a three-dimensional spatial distribution model of the underground medium corresponding to the tunnel face at the current construction site; the location information of the conductive water body includes its orientation, location coordinates, scale, and distribution pattern; and visualize the conductive water body on the three-dimensional spatial distribution model of the underground medium. S3. During the excavation of the tunnel face under construction, microseismic data corresponding to the tunnel face under construction is collected by setting up microseismic sensors between the tunnel face under construction and the secondary lining structure. S4. Based on the collected microseismic data, determine the density of microseismic events corresponding to the current tunnel face under construction, and determine the area corresponding to each microseismic event density. S5. Based on the location information of the water body at the current tunnel face and the area corresponding to the density of each microseismic event, determine whether there is a possibility of water inrush at the current tunnel face. If not, no warning is issued and excavation of the current tunnel face continues. Otherwise, determine whether there is water inrush fluctuation in the tunnel. If so, issue a red warning to the client; if not, issue a yellow warning to the client.

Citation Information

Patent Citations

  • Coal seam floor water inrush identification method

    CN114818233A

  • Construction tunnel disaster detection and early warning system and method

    CN117759338A