A construction project investment evaluation method and system based on digital twin technology

By using digital twin technology to analyze construction project information and regional influencing factors, it solves the problem of difficulty in assessing the connection between wind energy zones and industrial zones in energy self-sufficient factories in the existing technology, and achieves an accurate and accurate risk and benefit assessment of energy self-sufficient factory projects. Comprehensiveness to help investors formulate appropriate investment plans.

CN118313692BActive Publication Date: 2024-10-25HUNAN RUIDA ENG CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410593080.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-14
Publication Date
2024-10-25
Estimated Expiration
2044-05-14

AI Technical Summary

Technical Problem

When existing digital twin technology is used to evaluate investment in energy self-sufficient factory construction projects that combine wind power generation equipment with industrial production plants, it is difficult to accurately assess the connections and conflicts between the energy production part and the industrial production part.

Method used

Adopting a construction project investment assessment method based on digital twin technology, by analyzing construction project information, extracting industrial production processes, using virtual models to simulate industrial production processes, determining investment plans, and adjusting virtual models based on regional influencing factors to evaluate strokes in energy self-sufficient factories Connections and conflicts between energy and industrial areas.

Benefits of technology

Before investors finalize their investment plans, we conduct an assessment of the risks and benefits of energy self-sufficiency plants to improve the accuracy and comprehensiveness of the assessment results and help investors determine an investment plan that meets their own investment goals.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118313692B_ABST
    Figure CN118313692B_ABST
Patent Text Reader

Abstract

The present application relates to the field of investment evaluation technology, and in particular to a construction project investment evaluation method and system based on digital twin technology. The method includes: obtaining construction project information, and constructing a virtual model of the construction project based on the digital twin technology; analyzing the construction project information, extracting the industrial production process of the construction project, simulating the industrial production process using the virtual model, and determining the simulation data, thereby determining the first investment plan; determining regional influencing factors based on the construction project information; analyzing the regional influencing factors, determining an adjustment plan, adjusting the virtual model according to the adjustment plan, and determining the second investment plan according to the adjusted virtual model; analyzing the first investment plan and the second investment plan, determining the investment plan analysis results, and determining the final investment plan according to the investor type and the investment plan analysis results. This application makes the evaluation results more accurate and comprehensive by analyzing and determining regional influencing factors.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of investment evaluation technology, and in particular to a construction project investment evaluation method and system based on digital twin technology. Background Art

[0002] Digital twin technology, also known as digital twin technology (Digital Twin Technolog), is an innovative technology that combines the physical world and the digital world. It reflects the operating status, performance and prediction results of the entity or system in real time by constructing digital images, models or simulations of physical entities or systems. It is widely used in construction, manufacturing, agriculture and other fields.

[0003] When the digital twin technology is currently used to conduct investment evaluation on the construction project of an Energy Self-sufficient Factory that combines wind power generation equipment with an industrial production plant, only the energy production part and the industrial production part of the new project are evaluated in a single way, and it is difficult to make an accurate evaluation of the connection between the energy production part and the industrial production part. Summary of the invention

[0004] The present application provides a construction project investment evaluation method and system based on digital twin technology to solve the above-mentioned technical problems.

[0005] In a first aspect, the present application provides a construction project investment evaluation method based on digital twin technology, the method comprising:

[0006] Analyze the construction project information, extract the industrial production process of the construction project, simulate the industrial production process using the virtual model, determine simulation data, and determine a first investment plan based on the simulation data;

[0007] Determine regional influencing factors based on the construction project information;

[0008] Analyze the regional influencing factors, determine an adjustment plan, adjust the virtual model according to the adjustment plan, and determine a second investment plan according to the adjusted virtual model;

[0009] Analyze the first investment plan and the second investment plan to determine an investment plan analysis result, and determine a final investment plan based on the investor type and the investment plan analysis result.

[0010] Through the method provided in this application, the risks and benefits of the energy self-sufficient factory construction project can be evaluated before the investor finalizes the investment plan. At the same time, by analyzing and determining the regional influencing factors, the connection and conflict between the wind energy area and the industrial area in the energy self-sufficient factory are fully considered, making the evaluation result more accurate and comprehensive, helping investors to determine the investment plan that meets their own investment goals.

[0011] Optionally, the construction project information includes but is not limited to energy zone data and industrial zone data, the energy zone data includes but is not limited to wind energy zone site selection information and planned energy output, the industrial zone data includes but is not limited to industrial zone site selection information, industrial zone product types, and planned industrial output, and the acquiring of the construction project information and constructing a virtual model of the construction project based on the digital twin technology according to the construction project information include:

[0012] According to the wind energy area site selection information, obtaining wind energy information of the area corresponding to the wind energy area site selection information, the wind energy information including but not limited to air density and wind speed;

[0013] According to the wind energy information, the wind energy output of the area corresponding to the wind energy zone site selection information is calculated using the following formula:

[0014] W=0.5×ρ×V 3 ×Cp

[0015] Among them, W is the wind energy output, ρ is the air density, V is the wind speed, and Cp is the wind energy utilization coefficient;

[0016] According to the construction project information and the wind energy output, a virtual model of the construction project is constructed based on digital twin technology.

[0017] The above technical solution calculates the wind energy output to quickly and accurately determine the energy output of the wind energy zone in the energy self-sufficient factory under the current wind energy zone site selection information, thereby improving the accuracy of subsequent benefit evaluation of the energy self-sufficient factory project.

[0018] Optionally, analyzing the construction project information, extracting the industrial production process of the construction project, simulating the industrial production process using the virtual model, determining simulation data, and determining a first investment plan based on the simulation data includes:

[0019] Simulating the production process of the industrial zone in the construction project according to the virtual model to determine the industrial output and industrial energy consumption;

[0020] The matching coefficient between the industrial energy consumption and the wind energy output is calculated by the following formula:

[0021] M=E / W

[0022] Wherein, M is the matching coefficient, E is the industrial energy consumption, and W is the wind energy output;

[0023] The wind energy output, the industrial output, the industrial energy consumption and the matching coefficient are input into the virtual model for simulation analysis, and the first investment plan is determined according to the analysis result.

[0024] The above technical solution can quickly determine the matching degree between industrial energy consumption and wind energy output in the energy self-sufficient factory project by calculating the matching coefficient, thereby further making the benefit evaluation of the energy self-sufficient factory project more accurate.

[0025] Optionally, determining the regional influencing factors according to the construction project information includes:

[0026] Determine the construction area corresponding to the construction project according to the wind energy zone site selection information and the industrial zone site selection information in the construction project information;

[0027] According to the construction area, obtaining regional impact information, the regional impact information including but not limited to regional climate and geographical data;

[0028] Analyze the climate of the region to determine wind direction frequency distribution information, and analyze the wind direction frequency distribution information to determine a high-frequency wind direction area;

[0029] According to the wind direction high-frequency area and the wind energy area site selection information, determining whether the wind energy area site selection information is located in the wind direction high-frequency area in the wind direction frequency distribution information;

[0030] If the wind energy zone site selection information is not located in the wind direction high frequency area, the wind direction frequency distribution information is included in the regional influencing factors;

[0031] Analyze the geographic data to determine whether there is a terrain obstacle between the location of the high-frequency wind direction area and the industrial zone site selection information;

[0032] If there are terrain obstacles, they will be included in the regional influencing factors.

[0033] The above technical solution provides a basis for the subsequent adjustment of the site selection information of the wind energy zone by incorporating the wind direction frequency distribution information into the regional influencing factors, so as to facilitate the determination of the wind resources in the construction area, maximize the power generation of the wind energy zone, and improve the stability of the energy supply in the wind energy zone. At the same time, by incorporating terrain obstacles into the regional influencing factors, it further provides a basis for the subsequent adjustment of the site selection information of the wind energy zone, reduces the difficulty and cost of the construction of transmission lines between wind energy zones and industrial zones, improves the stability of the power supply from wind energy zones to industrial zones, and thus makes the risk and benefit assessment of energy self-sufficiency projects more accurate.

[0034] Optionally, the regional climate includes historical wind direction data of the construction area, and the analyzing the regional climate to determine wind direction frequency distribution information and analyzing the wind direction frequency distribution information to determine the wind direction high frequency area include:

[0035] The historical wind direction data is divided into several direction intervals, and the wind direction frequency of each direction interval is calculated by the following formula:

[0036]

[0037] Wherein, f is the wind direction frequency, n i is the number of data in the direction interval, and N is the number of historical wind direction data;

[0038] The wind direction high-frequency area is determined according to the wind direction frequency in each direction interval.

[0039] The above technical scheme can quickly calculate the wind direction frequency of each area in the construction area based on historical wind direction data, provide an accurate data basis for determining the high-frequency wind direction area, and facilitate rapid judgment of whether the corresponding area in the current wind energy zone site selection information is located in the high-frequency wind direction area, providing intuitive data support for the benefit evaluation of the wind energy zone.

[0040] Optionally, the method further comprises:

[0041] Determine the wind direction frequency of the industrial area according to the climate of the area;

[0042] Determining the amount of pollution spread from the industrial zone to the wind energy zone based on the emission of the industrial zone and the wind direction frequency of the industrial zone;

[0043] Determining, according to the wind energy zone site selection information and the pollution amount, a pollution concentration when the pollution amount reaches the wind energy zone site selection information;

[0044] The pollution concentration is compared with a preset pollution concentration threshold, and if the pollution concentration is greater than the preset pollution concentration threshold, the pollution concentration is included in the regional influencing factors.

[0045] The above technical solution analyzes the pollution concentration of pollutants generated during the production process in the industrial zone when they spread to the wind power zone, and determines whether the pollutants in the industrial zone in the current energy self-sufficiency factory project plan will have a negative impact on the wind power equipment in the wind power zone, thereby further improving the accuracy and comprehensiveness of the risk assessment of the energy self-sufficiency factory project.

[0046] Optionally, determining, according to the wind energy zone site selection information and the pollution amount, a pollution concentration when the pollution amount reaches the wind energy zone site selection information includes:

[0047] The pollution concentration when the pollution reaches the wind energy zone site selection information is calculated by the following formula:

[0048]

[0049] Wherein, C(x, y, z, t) represents the pollution concentration, Q represents the pollution amount, σ x and σ y is the diffusion coefficient of pollutants in the horizontal direction, (x, y, z) is the corresponding coordinate information of the wind energy zone site selection information, t is the diffusion time, and τ is the standard deviation in the time direction.

[0050] The above technical solution quickly calculates the concentration of pollutants emitted from industrial areas when they reach wind power areas, providing accurate data support for judging whether pollutants from industrial areas will have a significant negative impact on wind power equipment in wind power areas, and further improving the accuracy of risk assessment of energy self-sufficient factory projects.

[0051] Optionally, analyzing the regional influencing factors, determining an adjustment plan, adjusting the virtual model according to the adjustment plan, and determining a second investment plan according to the adjusted virtual model includes:

[0052] If the regional influencing factors include the wind direction frequency distribution information and the terrain obstacles, analyzing the wind direction frequency distribution information and the geographic data, determining the wind energy adjustment area with the highest wind direction frequency when the terrain obstacles do not exist, and incorporating the wind energy adjustment area into the adjustment plan;

[0053] If the regional influencing factors include the pollution concentration, analyzing the geographical data and the wind direction frequency of the industrial zone, determining the industrial adjustment area, and incorporating the industrial adjustment area into the adjustment plan;

[0054] Adjusting the virtual model according to the wind energy adjustment area and the industrial adjustment area in the adjustment plan;

[0055] Obtaining the wind energy output, the industrial output, the industrial energy consumption and the matching coefficient determined after simulation calculation of the adjusted virtual model;

[0056] The second investment plan is determined according to the wind energy output, the industrial output, the industrial energy consumption and the matching coefficient.

[0057] The above technical solution analyzes the regional influencing factors, obtains the risks existing in the current energy self-sufficiency project plan, and determines the corresponding position adjustment results of the wind energy zone and the industrial zone. After inputting the position adjustment results into the existing virtual model, the relevant data of the new energy self-sufficiency project plan is obtained, and the second investment plan is determined based on this. While conducting a risk assessment on the energy self-sufficiency project plan, it can provide corresponding adjustment plans for the existing risks and provide investors with adjusted alternative investment plans, so that investors can make more accurate investment choices.

[0058] Optionally, analyzing the first investment plan and the second investment plan to determine an investment plan analysis result, and determining a final investment plan according to the investor type and the investment plan analysis result, includes:

[0059] Analyze the first investment plan and the second investment plan to determine the total risk weight and total benefit corresponding to the first investment plan and the second investment plan;

[0060] Based on historical investment data, the weight of each risk factor is calculated using the following formula:

[0061] Weight=Impact i ×Probability i

[0062] Among them, Weight is the weight of the current risk factor, Impact i Probability is the impact degree of the current risk factor when it occurs. i The impact of the current risk factor after it occurs;

[0063] Then, the total risk weights of the first investment plan and the second investment plan are calculated respectively by the following formula:

[0064]

[0065] Among them, Risk Weight is the total risk weight of the current investment plan, n is the total number of risk factors in the historical investment data, and Weight i is the weight of the ith risk factor;

[0066] The final investment plan is determined according to the investor type and the total risk weight and total benefit corresponding to the first investment plan and the second investment plan.

[0067] The above technical solution calculates the total risk weight and total benefit of the first investment plan and the second investment plan, so that investors can accurately and intuitively understand the risks and benefits in each investment plan, thereby making investors' evaluation of the project more accurate. At the same time, the final investment plan is determined according to different types of investors so that the final plan meets the investment objectives of investors.

[0068] In a second aspect, the present application provides a construction project investment evaluation system based on digital twin technology, the system comprising:

[0069] A model building module, which obtains construction project information and builds a virtual model of the construction project based on the digital twin technology according to the construction project information;

[0070] A first investment plan determination module, which analyzes the construction project information, extracts the industrial production process of the construction project, simulates the industrial production process using the virtual model, determines simulation data, and determines a first investment plan based on the simulation data;

[0071] A regional influencing factor determination module, which determines regional influencing factors according to the construction project information;

[0072] A second investment plan determination module, analyzing the regional influencing factors, determining an adjustment plan, adjusting the virtual model according to the adjustment plan, and determining a second investment plan according to the adjusted virtual model;

[0073] The final investment plan determination module analyzes the first investment plan and the second investment plan, determines the investment plan analysis results, and determines the final investment plan according to the investor type and the investment plan analysis results.

[0074] Optionally, the model building module is specifically used to:

[0075] According to the wind energy area site selection information, obtaining wind energy information of the area corresponding to the wind energy area site selection information, the wind energy information including but not limited to air density and wind speed;

[0076] According to the wind energy information, the wind energy output of the area corresponding to the wind energy zone site selection information is calculated using the following formula:

[0077] W=0.5×ρ×V 3 ×Cp

[0078] Among them, W is the wind energy output, ρ is the air density, V is the wind speed, and Cp is the wind energy utilization coefficient;

[0079] According to the construction project information and the wind energy output, a virtual model of the construction project is constructed based on digital twin technology.

[0080] Optionally, the first investment plan determination module is specifically used to:

[0081] Simulating the production process of the industrial zone in the construction project according to the virtual model to determine the industrial output and industrial energy consumption;

[0082] The matching coefficient between the industrial energy consumption and the wind energy output is calculated by the following formula:

[0083] M=E / W

[0084] Wherein, M is the matching coefficient, E is the industrial energy consumption, and W is the wind energy output;

[0085] The wind energy output, the industrial output, the industrial energy consumption and the matching coefficient are input into the virtual model for simulation analysis, and the first investment plan is determined according to the analysis result.

[0086] Optionally, the regional influencing factor determination module is specifically used to:

[0087] Determine the construction area corresponding to the construction project according to the wind energy zone site selection information and the industrial zone site selection information in the construction project information;

[0088] According to the construction area, obtaining regional impact information, the regional impact information including but not limited to regional climate and geographical data;

[0089] Analyze the climate of the region to determine wind direction frequency distribution information, and analyze the wind direction frequency distribution information to determine a high-frequency wind direction area;

[0090] According to the wind direction high-frequency area and the wind energy area site selection information, determining whether the wind energy area site selection information is located in the wind direction high-frequency area in the wind direction frequency distribution information;

[0091] If the wind energy zone site selection information is not located in the wind direction high frequency area, the wind direction frequency distribution information is included in the regional influencing factors;

[0092] Analyze the geographic data to determine whether there is a terrain obstacle between the location of the high-frequency wind direction area and the industrial zone site selection information;

[0093] If there are terrain obstacles, they will be included in the regional influencing factors.

[0094] Optionally, the regional influencing factor determination module is specifically used to:

[0095] The historical wind direction data is divided into several direction intervals, and the wind direction frequency of each direction interval is calculated by the following formula:

[0096]

[0097] Wherein, f is the wind direction frequency, n i is the number of data in the direction interval, and N is the number of historical wind direction data;

[0098] The wind direction high-frequency area is determined according to the wind direction frequency in each direction interval.

[0099] Optionally, the system further comprises a pollution analysis module, for:

[0100] Analyzing the construction project information to determine emissions from the industrial zone;

[0101] Determine the wind direction frequency of the industrial area according to the climate of the area;

[0102] Determining the amount of pollution spread from the industrial zone to the wind energy zone based on the emission of the industrial zone and the wind direction frequency of the industrial zone;

[0103] Determining, according to the wind energy zone site selection information and the pollution amount, a pollution concentration when the pollution amount reaches the wind energy zone site selection information;

[0104] The pollution concentration is compared with a preset pollution concentration threshold, and if the pollution concentration is greater than the preset pollution concentration threshold, the pollution concentration is included in the regional influencing factors.

[0105] Optionally, the pollution analysis module is specifically used to:

[0106] The pollution concentration when the pollution reaches the wind energy zone site selection information is calculated by the following formula:

[0107]

[0108] Wherein, C(x, y, z, t) represents the pollution concentration, Q represents the pollution amount, σ x and σ y is the diffusion coefficient of pollutants in the horizontal direction, (x, y, z) is the corresponding coordinate information of the wind energy zone site selection information, t is the diffusion time, and τ is the standard deviation in the time direction.

[0109] Optionally, the second investment plan determination module is specifically used to:

[0110] If the regional influencing factors include the wind direction frequency distribution information and the terrain obstacles, analyzing the wind direction frequency distribution information and the geographic data, determining the wind energy adjustment area with the highest wind direction frequency when the terrain obstacles do not exist, and incorporating the wind energy adjustment area into the adjustment plan;

[0111] If the regional influencing factors include the pollution concentration, analyzing the geographical data and the wind direction frequency of the industrial zone, determining the industrial adjustment area, and incorporating the industrial adjustment area into the adjustment plan;

[0112] Adjusting the virtual model according to the wind energy adjustment area and the industrial adjustment area in the adjustment plan;

[0113] Obtaining the wind energy output, the industrial output, the industrial energy consumption and the matching coefficient determined after simulation calculation of the adjusted virtual model;

[0114] The second investment plan is determined according to the wind energy output, the industrial output, the industrial energy consumption and the matching coefficient.

[0115] Optionally, the final investment plan determination module is specifically used to:

[0116] Analyze the first investment plan and the second investment plan to determine the total risk weight and total benefit corresponding to the first investment plan and the second investment plan;

[0117] Based on historical investment data, the weight of each risk factor is calculated using the following formula:

[0118] Weight=Impact i ×Probability i

[0119] Among them, Weight is the weight of the current risk factor, Impact i Probability is the impact degree of the current risk factor when it occurs. i The impact of the current risk factor after it occurs;

[0120] Then, the total risk weights of the first investment plan and the second investment plan are calculated respectively by the following formula:

[0121]

[0122] Among them, Risk Weight is the total risk weight of the current investment plan, n is the total number of risk factors in the historical investment data, and Weight i is the weight of the ith risk factor;

[0123] The final investment plan is determined according to the investor type and the total risk weight and total benefit corresponding to the first investment plan and the second investment plan.

[0124] The above technical solution adopted in this application has the following advantages:

[0125] Before investors finalize their investment plans, they can evaluate the risks and benefits of energy self-sufficient plant construction projects. At the same time, by analyzing and determining regional influencing factors, the connection and conflict between wind energy areas and industrial areas in energy self-sufficient plants are fully considered, making the evaluation results more accurate and comprehensive, helping investors determine investment plans that meet their investment goals.

[0126] By calculating the wind energy output, the energy output of the wind energy zone in the energy self-sufficient factory under the current wind energy zone site selection information can be quickly and accurately determined, thereby improving the accuracy of subsequent benefit evaluation of the energy self-sufficient factory project.

[0127] By calculating the matching coefficient, the matching degree between the industrial energy consumption and the wind energy output in the energy self-sufficient factory project can be quickly determined, which further makes the benefit evaluation of the energy self-sufficient factory project more accurate.

[0128] By incorporating wind direction frequency distribution information into regional influencing factors, a basis is provided for subsequent adjustments to the site selection information of wind energy zones, so as to determine the wind resources in the construction area, maximize the power generation of the wind energy zone, and improve the stability of energy supply in the wind energy zone. At the same time, by incorporating terrain obstacles into regional influencing factors, a basis is further provided for subsequent adjustments to the site selection information of wind energy zones, reducing the difficulty and cost of constructing transmission lines between wind energy zones and industrial zones, and improving the stability of power supply from wind energy zones to industrial zones, thereby making the risk and benefit assessment of energy self-sufficiency projects more accurate.

[0129] The wind direction frequency of each area in the construction area can be quickly calculated based on historical wind direction data, providing an accurate data basis for determining the high-frequency wind direction area, facilitating a quick judgment on whether the corresponding area in the current wind energy zone site selection information is located in the high-frequency wind direction area, and providing intuitive data support for the benefit evaluation of the wind energy zone.

[0130] By analyzing the pollution concentration of pollutants generated during the production process in the industrial zone when they spread to the wind power zone, it is determined whether the pollutants in the industrial zone in the current energy self-sufficiency factory project plan will have a negative impact on the wind power equipment in the wind power zone, further improving the accuracy and comprehensiveness of the risk assessment of the energy self-sufficiency factory project.

[0131] By quickly calculating the concentration of pollutants emitted from industrial areas when they reach wind power areas, accurate data support can be provided to determine whether pollutants from industrial areas will have a significant negative impact on wind power equipment in wind power areas, further improving the accuracy of risk assessment of energy self-sufficient factory projects.

[0132] Through the analysis of regional influencing factors, the risks existing in the current energy self-sufficiency project plan are obtained, and the corresponding position adjustment results of the wind energy zone and the industrial zone are determined. After the position adjustment results are input into the existing virtual model, the relevant data of the new energy self-sufficiency project plan is obtained, and the second investment plan is determined based on this. While conducting a risk assessment on the energy self-sufficiency project plan, corresponding adjustment plans can be provided for the existing risks, and adjusted alternative investment plans can be provided to investors, so that investors can make more accurate investment choices.

[0133] By calculating the total risk weight and total benefit of the first investment plan and the second investment plan, investors can accurately and intuitively understand the risks and benefits of each investment plan, thereby making investors' evaluation of the project more accurate. At the same time, the final investment plan can be determined according to different types of investors so that the final plan meets the investors' investment goals. BRIEF DESCRIPTION OF THE DRAWINGS

[0134] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0135] Figure 1 A schematic diagram of an application scenario provided for an embodiment of the present application;

[0136] Figure 2 A flowchart of a construction project investment evaluation method based on digital twin technology provided in one embodiment of the present application;

[0137] Figure 3 A structural schematic diagram of a construction project investment evaluation system based on digital twin technology provided in one embodiment of the present application. DETAILED DESCRIPTION

[0138] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0139] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.

[0140] The embodiments of the present application are further described in detail below in conjunction with the drawings in the specification.

[0141] Digital twin technology, also known as digital twin technology (Digital Twin Technolog), is an innovative technology that combines the physical world and the digital world.

[0142] However, when the digital twin technology is currently used to conduct investment evaluation on the construction project of Energy Self-sufficient Factory (ESF) that combines wind power generation equipment with industrial production plants, only the energy production part and the industrial production part of the new project are evaluated in a single way, and it is difficult to make an accurate evaluation of the connection between the energy production part and the industrial production part.

[0143] Based on this, this application provides a construction project investment evaluation method and system based on digital twin technology. Before investors finalize their investment plans, the risks and benefits of energy self-sufficient plant construction projects are evaluated. At the same time, by analyzing and determining regional influencing factors, the connection and conflict between wind energy areas and industrial areas in energy self-sufficient plants are fully considered, making the evaluation results more accurate and comprehensive, helping investors determine investment plans that meet their investment goals.

[0144] Figure 1 A schematic diagram of an application scenario provided for this application is used to evaluate the investment in a construction project using the method of this application. Specifically, the project party provides the construction project information to the server, and the server uses the digital twin technology to construct a virtual model of the construction project based on the construction project information, and analyzes and determines the regional influencing factors at the same time, inputs the regional influencing factors into the virtual model, obtains adjusted data, evaluates the construction project based on the construction project information and the regional influencing factors, and obtains the evaluation results to help investors make more accurate investment choices. The specific implementation method can refer to the following embodiments.

[0145] Figure 2 This is a flowchart of a construction project investment evaluation method based on digital twin technology provided in one embodiment of the present application. The method of this embodiment can be applied to the server in the above scenario. Figure 2 As shown, the method includes:

[0146] S201. Obtain construction project information, and build a virtual model of the construction project based on the digital twin technology according to the construction project information.

[0147] The construction project information may be provided by the project party, and the construction project information includes but is not limited to wind energy zone data and industrial zone data.

[0148] Wind energy zone data includes, but is not limited to, static information such as wind energy zone site selection information and planned energy output.

[0149] Industrial zone data includes but is not limited to static information such as industrial zone location information, industrial zone product types and planned industrial output.

[0150] The above static information can be information that does not need to be changed unless there are special circumstances in the project.

[0151] It should be noted that the process of building a virtual model of a construction project based on digital twin technology can adopt existing model building technologies in the field of digital twins, such as BIM (Building Information Modeling). According to the above-mentioned industrial zone data and wind energy zone data, the construction project can be fully modeled to realize information management of the construction project life cycle.

[0152] Based on the construction project information, a three-dimensional model is constructed for the construction project to be invested in, and the subsequent production process of the construction project is simulated and analyzed using the virtual model. Before the investment plan is finalized, the subsequent development of the construction project is estimated in advance, the risks and benefits of the construction project are analyzed and determined, and a corresponding investment plan is formulated.

[0153] S202, analyzing the construction project information, extracting the industrial production process of the construction project, simulating the industrial production process using a virtual model, determining simulation data, and determining a first investment plan based on the simulation data.

[0154] Industrial production processes can be related processes in construction projects involving the production of industrial products.

[0155] The simulation data include but are not limited to wind energy output, industrial output, industrial energy consumption and matching coefficient.

[0156] The first investment plan may be a project plan including at least simulation data calculated by the current virtual model.

[0157] Since the aforementioned virtual model only contains static information of the construction project after construction, if an investment plan is formulated only based on static information, it is easy to ignore the problems and risks in the industrial production process of the construction project, resulting in a situation where the expected risks and returns are too different from the actual risks and returns. The industrial production process is simulated through a virtual model so that the first investment plan can be determined based on the industrial production process simulated by the virtual model.

[0158] S203. Determine regional influencing factors based on construction project information.

[0159] Regional influencing factors include but are not limited to regional climate, geographical data and pollution concentration that may affect the construction project, where regional climate includes but is not limited to wind direction frequency distribution information, and geographical data includes but is not limited to terrain obstacles.

[0160] The aforementioned virtual model only contains the static information and dynamic information of the construction project itself. From the perspective of the comprehensiveness of the investment plan, external factors cannot be ignored. Since the evaluation method of this plan is aimed at energy self-sufficient factory construction projects that combine wind power generation equipment with industrial production plants, it is necessary to focus on the climate and topography in the regional influencing factors. For example, the frequency distribution of wind direction in the climate will have a direct impact on the power generation efficiency of wind power generation equipment in the energy self-sufficient factory construction project, so as to more accurately determine the impact of external factors on wind power generation and industrial production in the energy self-sufficient factory construction project, so as to make the risk assessment of the energy self-sufficient factory construction project more accurate.

[0161] S204, analyzing regional influencing factors, determining an adjustment plan, adjusting the virtual model according to the adjustment plan, and determining a second investment plan according to the adjusted virtual model.

[0162] Adjustment plans may include adjustments to the location of industrial areas and wind energy areas.

[0163] When analyzing regional influencing factors, it is necessary to consider the situation where multiple regional influencing factors exist at the same time to make the evaluation results more accurate. For example: when the regional influencing factors include wind direction frequency distribution information and terrain obstacles, it means that the wind energy zone in the current project plan is not located in the high-frequency wind direction area, and there are terrain obstacles between the wind energy zone and the industrial area. If the location of the wind energy zone is not adjusted, the power generation efficiency and transmission efficiency of the wind energy zone will be significantly reduced. Therefore, it is necessary to first find the area without terrain obstacles between the industrial area based on geographic data, and then determine the area with the highest wind direction frequency among these areas based on the wind direction frequency distribution information, and determine it as the wind energy adjustment area, and then incorporate the adjustment of the wind energy zone location into the adjustment plan.

[0164] At the same time, it is also necessary to consider the impact of regional influencing factors on the coordination between industrial zones and wind energy zones in energy self-sufficient factory construction projects to make the evaluation results more comprehensive. For example, when the regional influencing factors include pollution concentration, it means that the pollution generated by the industrial zone in the current project plan will have a significant negative impact on the wind power equipment in the wind energy zone. At this time, it is necessary to find areas with lower wind direction frequencies in the direction of the wind energy zone and no terrain obstacles between the wind energy zone and the wind energy zone based on geographical data and wind direction frequencies in the industrial zone, and determine them as industrial adjustment areas, and then incorporate the adjustment of the location of the industrial zone into the adjustment plan.

[0165] After determining the corresponding adjustment plan based on regional influencing factors, the corresponding data in the virtual model is adjusted, and the adjusted data is calculated using the adjusted virtual model to determine the second investment plan. By formulating multiple investment plans, the evaluation results can be more comprehensive and accurate, which helps to improve the accuracy of investors' decisions.

[0166] S205. Analyze the first investment plan and the second investment plan to determine the investment plan analysis results, and determine the final investment plan based on the investor type and the investment plan analysis results.

[0167] The analysis results include but are not limited to the total risk weight and total benefit corresponding to the first investment plan and the second investment plan.

[0168] Although the second investment plan has made risk adjustments based on the first investment plan, the process of reducing risks often requires increasing investment costs and time costs. Therefore, after the first investment plan and the second investment plan are obtained, it is necessary to analyze the total risk weights and total benefits corresponding to the first investment plan and the second investment plan in order to determine the final investment plan that meets the needs of investors.

[0169] Specifically, risk and benefit are one of the factors that investors consider most when evaluating the feasibility of an investment. After planning the investment plan, this plan also requires an analysis of the risks and benefits corresponding to the investment plan to determine the risks and benefits corresponding to the investment plan. This plan can also determine the final investment plan from multiple candidate investment plans based on the type of investor, so that investors can quickly determine the final investment plan that meets their investment goals.

[0170] Through the method provided in this application, the risks and benefits of the energy self-sufficient factory construction project can be evaluated before the investor finalizes the investment plan. At the same time, the connection and conflict between the wind energy area and the industrial area in the energy self-sufficient factory are taken into consideration, making the evaluation result more accurate and comprehensive, and helping investors determine the investment plan that meets their own investment goals.

[0171] In some embodiments, according to the wind energy area site selection information, wind energy information of the area corresponding to the wind energy area site selection information is obtained, and the wind energy information includes but is not limited to air density and wind speed; according to the wind energy information, the wind energy output of the area corresponding to the wind energy area site selection information is calculated using formula (1):

[0172] W=0.5×ρ×V 3 ×Cp (1)

[0173] Among them, W is the wind energy output, ρ is the air density, V is the wind speed, and Cp is the wind energy utilization coefficient;

[0174] According to the construction project information and wind energy output, a virtual model of the construction project is constructed based on digital twin technology.

[0175] The wind energy utilization factor can be obtained through wind speed and power generation monitoring experiments on wind power equipment.

[0176] Specifically, the wind energy output directly reflects the wind power energy output of the wind energy zone under the wind energy site selection information, and also reflects the degree of dependence of the energy self-sufficient factory on traditional energy.

[0177] The method of this embodiment calculates the wind energy output to quickly and accurately determine the energy output of the wind energy zone in the energy self-sufficient factory under the current wind energy zone site selection information, thereby improving the accuracy of subsequent benefit evaluation of the energy self-sufficient factory project.

[0178] In some embodiments, the production process of the industrial zone in the construction project is simulated according to the virtual model to determine the industrial output and industrial energy consumption; the matching coefficient between the industrial energy consumption and the wind energy output is calculated by formula (2):

[0179] M=E / W (2)

[0180] Among them, M is the matching coefficient, E is the industrial energy consumption, and W is the wind energy output;

[0181] The wind energy output, industrial output, industrial energy consumption and matching coefficient are input into the virtual model for simulation analysis, and the first investment plan is determined based on the analysis results.

[0182] Specifically, the matching coefficient reflects the efficiency and matching degree of the factory in utilizing wind energy for power generation. The higher the matching coefficient, the more the wind energy can meet the factory's energy needs, and the higher the energy utilization efficiency.

[0183] This embodiment quickly determines the matching degree between the industrial energy consumption and the wind energy output in the energy self-sufficient factory project by calculating the matching coefficient, thereby further making the benefit evaluation of the energy self-sufficient factory project more accurate.

[0184] In some embodiments, the construction area corresponding to the construction project is determined based on the wind energy zone site selection information and the industrial zone site selection information in the construction project information; based on the construction area, regional impact information is obtained, and the regional impact information includes but is not limited to regional climate and geographical data; the regional climate is analyzed to determine the wind direction frequency distribution information, and the wind direction frequency distribution information is analyzed to determine the wind direction high-frequency area; based on the wind direction high-frequency area and the wind energy zone site selection information, it is determined whether the wind energy zone site selection information is located in the wind direction high-frequency area in the wind direction frequency distribution information; if the wind energy zone site selection information is not located in the wind direction high-frequency area, the wind direction frequency distribution information is included in the regional impact factors; the geographical data is analyzed to determine whether there are terrain obstacles between the location of the wind direction high-frequency area and the industrial zone site selection information; if there are terrain obstacles, the terrain obstacles are included in the regional impact factors.

[0185] The wind energy zone siting information may include the specific address of the wind energy zone during the planning stage.

[0186] Industrial zone site selection information may include the specific address during the industrial zone planning stage.

[0187] The construction area may be the entire area to be constructed of a construction project.

[0188] The regional climate in the regional impact information can be obtained from the meteorological department, and the regional climate may include the historical wind direction data of the construction area.

[0189] The geographic data in the regional impact information can be obtained from the geographic information platform.

[0190] Geographic data may include topographic information of the construction area.

[0191] The wind direction frequency distribution information may include the distribution frequency of each wind direction in each area within the construction area.

[0192] A high-frequency wind direction area may be an area within a construction area where a certain wind direction occurs more frequently.

[0193] Terrain obstacles include, but are not limited to, mountains, swamps, and lakes.

[0194] Specifically, since the wind energy zone within the energy self-sufficient factory project requires a large amount of wind resources to ensure the wind energy output of the wind energy zone, the site selection of the wind energy zone is particularly important, and the wind direction frequency distribution information in the construction area is an important data basis for the site selection of the wind energy zone. By analyzing the wind direction frequency distribution information, the high-frequency wind direction area in the construction area can be determined, and then it can be determined whether the site selection information of the wind energy zone in the first investment plan is located in the high-frequency wind direction area. If not, the risk frequency distribution information is included in the regional influencing factors. At the same time, by analyzing the terrain information of the construction area, it is determined whether there are terrain obstacles between the wind energy zone and the industrial area in the first investment plan. If there are terrain obstacles, the difficulty and cost of constructing the transmission line between the wind energy zone and the industrial area will be greatly increased, affecting the stability of the wind energy zone's power supply to the industrial area, and causing a significant negative impact on industrial production in the industrial area. Therefore, it is necessary to include the terrain obstacles in the regional influencing factors.

[0195] The method of this embodiment, by incorporating wind direction frequency distribution information into regional influencing factors, provides a basis for subsequent adjustments to wind energy zone site selection information, so as to facilitate determination of wind resources in the construction area, maximize the power generation of the wind energy zone, and improve the stability of energy supply in the wind energy zone. At the same time, by incorporating terrain obstacles into regional influencing factors, it further provides a basis for subsequent adjustments to wind energy zone site selection information, reduces the difficulty and cost of power transmission line construction between wind energy zones and industrial zones, improves the stability of power supply from wind energy zones to industrial zones, and thereby makes the risk and benefit assessment of energy self-sufficiency projects more accurate.

[0196] In some embodiments, the historical wind direction data is divided into several direction intervals, and the wind direction frequency of each direction interval is calculated by the following formula:

[0197]

[0198] Where f is the wind direction frequency, n i is the number of data in the direction interval, and N is the number of historical wind direction data;

[0199] According to the wind direction frequency in each direction interval, the high-frequency wind direction area is determined.

[0200] The direction intervals may be divided into a number of evenly spaced direction intervals on a 360-degree circle, for example, with 10 degrees as one interval, and the wind direction data may be divided into 36 intervals.

[0201] The amount of historical wind direction data may be the total amount of historical wind direction data, or the amount of data may be specified according to demand, and this solution does not make any specific limitation.

[0202] It should be noted that the wind direction frequency can be calculated using mathematical analysis software, such as MATLAB. The above historical wind direction data is imported into MATLAB as a parameter, and the MATLAB script generated based on the above formula (3) is run to accurately calculate the wind direction frequency.

[0203] The method of this embodiment can quickly calculate the wind direction frequency of each area in the construction area based on historical wind direction data, provide an accurate data basis for determining the high-frequency wind direction area, and facilitate rapid judgment of whether the corresponding area in the current wind energy zone site selection information is located in the high-frequency wind direction area, providing intuitive data support for the benefit evaluation of the wind energy zone.

[0204] In some embodiments, construction project information is analyzed to determine emissions from industrial zones; the wind direction frequency of industrial zones is determined based on regional climate; the amount of pollution spread from industrial zones to wind power zones is determined based on emissions from industrial zones and the wind direction frequency of industrial zones; the pollution concentration when the pollution reaches the wind power zone site selection information is determined based on the wind power zone site selection information and the pollution amount; the pollution concentration is compared with a preset pollution concentration threshold, and if the pollution concentration is greater than the preset pollution concentration threshold, the pollution concentration is included in the regional influencing factors.

[0205] The emission volume of an industrial zone can be the amount of pollutants emitted by the industrial zone per unit time.

[0206] The wind direction frequency of the industrial zone may be the wind direction frequency data of the industrial zone in the current area, which may be obtained by formula (3).

[0207] The amount of pollution may be data on the amount of pollutants emitted from industrial areas and dissipated toward wind energy areas.

[0208] The pollution concentration can be the concentration of pollutants when they reach the wind energy area after being diffused through the air.

[0209] The preset pollution concentration threshold can be obtained by detecting the pollution concentration of wind power equipment in the wind energy area.

[0210] The emission volume of industrial zones per unit time can be estimated through construction project information. The frequency of occurrence of each wind direction in the industrial zone can be known based on the risk frequency of the industrial zone. The direction of the wind energy zone relative to the industrial zone can be known based on the site selection information of the wind energy zone and the industrial zone. The amount of pollution emitted by the industrial zone in that direction can be determined based on the wind direction frequency in that direction.

[0211] Specifically, in the process of evaluating the energy self-sufficient factory project, this plan takes into account that the pollutants generated during the production process in the industrial zone will spread to the wind power zone, which will have a negative impact on the wind power equipment in the wind power zone. Specifically, as time goes by, the pollutants continue to attach to the wind power equipment, which reduces the power generation efficiency of the wind power equipment and even causes damage to the wind power equipment, significantly increasing the risk of the energy self-sufficient factory project. When the pollution concentration is higher than the preset pollution concentration, it means that in the current energy self-sufficient factory project plan, the pollutants generated in the industrial zone will have a significant negative impact on the wind power equipment in the wind power zone. Therefore, the pollution concentration needs to be included in the regional influencing factors.

[0212] The method of this embodiment, by analyzing the pollution concentration of pollutants generated during the production process in the industrial zone when they diffuse into the wind power zone, determines whether the pollutants in the industrial zone in the current energy self-sufficiency factory project plan will have a negative impact on the wind power equipment in the wind power zone, thereby further improving the accuracy and comprehensiveness of the risk assessment of the energy self-sufficiency factory project.

[0213] In some embodiments, the pollution concentration when the pollution reaches the wind energy zone site selection information is calculated by the following formula (4):

[0214]

[0215] Among them, C(x,y,z,t) represents the pollution concentration, Q is the pollution amount, σ x and σ y is the diffusion coefficient of pollutants in the horizontal direction, (x, y, z) is the corresponding coordinate information of the wind energy zone site selection information, t is the diffusion time, and τ is the standard deviation in the time direction.

[0216] The standard deviation in the time direction can be obtained through statistics of pollutant diffusion experimental data.

[0217] The corresponding coordinate information of the wind energy zone site selection information can be obtained using the virtual model of the energy self-sufficient plant.

[0218] It should be noted that the pollution concentration can be calculated using mathematical analysis software, such as MATLAB. The above pollution amount, diffusion coefficient, corresponding coordinate information of the wind energy zone site selection information and the standard deviation in the time direction are imported into MATLAB as parameters, and the pollution concentration can be accurately calculated by running the MATLAB script generated based on the above formula (4).

[0219] The method of this embodiment can provide accurate data support for judging whether the pollutants emitted from the industrial area will have a significant negative impact on the wind power equipment in the wind power area by quickly calculating the concentration of pollutants emitted from the industrial area when they reach the wind power area, thereby further improving the accuracy of risk assessment of energy self-sufficient factory projects.

[0220] In some embodiments, if the regional influencing factors include wind direction frequency distribution information and terrain obstacles, the wind direction frequency distribution information and geographic data are analyzed to determine the wind energy adjustment area with the highest wind direction frequency in the absence of terrain obstacles, and the wind energy adjustment area is included in the adjustment plan; if the regional influencing factors include pollution concentration, the geographic data and the wind direction frequency of the industrial area are analyzed to determine the industrial adjustment area, and the industrial adjustment area is included in the adjustment plan; the virtual model is adjusted according to the wind energy adjustment area and the industrial adjustment area in the adjustment plan; the wind energy output, industrial output, industrial energy consumption and matching coefficient determined after the simulation calculation of the adjusted virtual model are obtained; and the second investment plan is determined according to the wind energy output, industrial output, industrial energy consumption and matching coefficient.

[0221] The wind energy adjustment area may be address information of a wind energy zone address that needs to be adjusted.

[0222] Specifically, when the regional influencing factors include wind direction frequency distribution information and terrain obstacles, it means that the wind energy zone in the current project plan is not located in the high-frequency wind direction area, and there are terrain obstacles between the wind energy zone and the industrial area. If the position of the wind energy zone is not adjusted, the power generation efficiency and transmission efficiency of the wind energy zone will be significantly reduced, which will reduce the project benefits and increase the project risks. Therefore, it is necessary to first find the area without terrain obstacles between the industrial area and the geographical data, and then determine the area with the highest wind direction frequency among these areas according to the wind direction frequency distribution information, and determine it as the wind energy adjustment area.

[0223] Furthermore, if the regional influencing factors include pollution concentration, it means that the pollution generated by the industrial zone in the current project plan will have a significant negative impact on the wind power equipment in the wind power zone. At this time, it is necessary to find areas with a lower wind direction frequency towards the wind power zone and no terrain obstacles between the wind power zone and the wind power zone based on geographical data and wind direction frequency in the industrial zone, and determine them as industrial adjustment areas.

[0224] Then, the above-mentioned wind energy adjustment area and industrial adjustment area are input into the above-mentioned virtual model, and the wind energy zone position and industrial zone position in the above-mentioned constructed virtual model are adjusted. Based on the mathematical formulas involved in the above-mentioned embodiments, the wind energy output of the energy self-sufficient factory under the above-mentioned wind energy adjustment area and industrial adjustment area is simulated and calculated, and then the industrial output, industrial energy consumption and matching coefficient under the wind energy output are simulated through BIM technology to determine the second investment plan.

[0225] The method of this embodiment analyzes the regional influencing factors to obtain the risks existing in the current energy self-sufficiency project plan, and determines the corresponding position adjustment results of the wind energy zone and the industrial zone. After inputting the position adjustment results into the existing virtual model, the relevant data of the new energy self-sufficiency project plan is obtained, and the second investment plan is determined based on this. While conducting a risk assessment on the energy self-sufficiency project plan, corresponding adjustment plans can be provided for the existing risks, and adjusted alternative investment plans can be provided to investors, so that investors can make more accurate investment choices.

[0226] In some embodiments, the first investment plan and the second investment plan are analyzed to determine the total risk weight and total benefit corresponding to the first investment plan and the second investment plan;

[0227] Based on historical investment data and formula (5), the weight of each risk factor is calculated:

[0228] Weight=Impact i ×Probability i (5)

[0229] Among them, Weight is the weight of the current risk factor, Impact i Probability is the impact degree of the current risk factor when it occurs. i The impact of the current risk factor after it occurs;

[0230] Then, the total risk weights of the first investment plan and the second investment plan are calculated respectively by formula (6):

[0231]

[0232] Among them, Risk Weigth is the total risk weight of the current investment plan, n is the total number of risk factors in the historical investment data, and Weight i is the weight of the ith risk factor;

[0233] The final investment plan is determined according to the investor type and the total risk weight and total benefit corresponding to the first investment plan and the second investment plan.

[0234] Specifically, the total benefits corresponding to the first investment plan and the second investment plan are calculated respectively by formula (7):

[0235] B=(WC)×Wp+N×Np (7)

[0236] Among them, B is the total benefit corresponding to the investment plan, W is the wind energy output, Wp is the wind power price, N is the industrial output, Np is the industrial product price, and C is the energy consumption.

[0237] It should be noted that the total risk weight and total benefit can be calculated by mathematical analysis software, such as MATLAB. The historical investment data, wind energy output, wind power price, industrial output, industrial product price and energy consumption are imported into MATLAB as parameters, and the MATLAB script generated based on the above formulas (5), (6) and (7) is run to accurately calculate the total risk weight and total benefit.

[0238] Although the second investment plan has made risk adjustments based on the first investment plan, it does not mean that the second investment plan is more in line with the needs of investors. In project management, the reduction of project risks is usually accompanied by a reduction in benefits, because the process of reducing risks often requires increasing investment costs and time costs.

[0239] Therefore, after arriving at the first investment plan and the second investment plan, further analysis of the risks and benefits corresponding to the first investment plan and the second investment plan is required to determine the final investment plan that meets the needs of investors.

[0240] Investor types include, but are not limited to, conservative investors, balanced investors, and aggressive investors;

[0241] If the investor type is a conservative investor, the plan with the lower total risk weight between the first investment plan and the second investment plan will be determined as the final investment plan;

[0242] If the investor type is a balanced investor, the plan between the first investment plan and the second investment plan that has a relatively balanced total risk weight and total benefit will be determined as the final investment plan;

[0243] If the investor type is an aggressive investor, the plan with a higher total risk weight and a higher total benefit between the first investment plan and the second investment plan will be determined as the final investment plan.

[0244] The method of this embodiment calculates the total risk weight and total benefit of the first investment plan and the second investment plan, so that investors can accurately and intuitively understand the risks and benefits in each investment plan, thereby making investors' evaluation of the project more accurate. At the same time, the final investment plan is determined according to different types of investors so that the final plan meets the investment objectives of the investors.

[0245] Figure 3 A schematic diagram of a construction project investment evaluation system based on digital twin technology is provided in one embodiment of the present application. Figure 3As shown, the construction project investment evaluation system 300 based on digital twin technology of this embodiment includes: a model building module 301, a first investment plan determination module 302, a regional influencing factor determination module 303, a second investment plan determination module 304 and a final investment plan determination module 305.

[0246] The model building module 301 acquires construction project information, and builds a virtual model of the construction project based on the digital twin technology according to the construction project information;

[0247] A first investment plan determination module 302 is configured to analyze the construction project information, extract the industrial production process of the construction project, simulate the industrial production process using the virtual model, determine simulation data, and determine a first investment plan based on the simulation data;

[0248] A regional influencing factor determination module 303 is configured to determine regional influencing factors based on the construction project information;

[0249] The second investment plan determination module 304 analyzes the regional influencing factors, determines an adjustment plan, adjusts the virtual model according to the adjustment plan, and determines a second investment plan according to the adjusted virtual model;

[0250] The final investment plan determination module 305 analyzes the first investment plan and the second investment plan to determine the investment plan analysis results, and determines the final investment plan according to the investor type and the investment plan analysis results.

[0251] Optionally, the model building module 301 is specifically used to:

[0252] According to the wind energy area site selection information, obtaining wind energy information of the area corresponding to the wind energy area site selection information, the wind energy information including but not limited to air density and wind speed;

[0253] According to the wind energy information, the wind energy output of the area corresponding to the wind energy zone site selection information is calculated using the following formula:

[0254] W=0.5×ρ×V 3 ×Cp

[0255] Among them, W is the wind energy output, ρ is the air density, V is the wind speed, and Cp is the wind energy utilization coefficient;

[0256] According to the construction project information and the wind energy output, a virtual model of the construction project is constructed based on digital twin technology.

[0257] Optionally, the first investment plan determination module 302 is specifically configured to:

[0258] Simulating the production process of the industrial zone in the construction project according to the virtual model to determine the industrial output and industrial energy consumption;

[0259] The matching coefficient between the industrial energy consumption and the wind energy output is calculated by the following formula:

[0260] M=E / W

[0261] Wherein, M is the matching coefficient, E is the industrial energy consumption, and W is the wind energy output;

[0262] The wind energy output, the industrial output, the industrial energy consumption and the matching coefficient are input into the virtual model for simulation analysis, and the first investment plan is determined according to the analysis result.

[0263] Optionally, the regional influencing factor determination module 303 is specifically configured to:

[0264] Determine the construction area corresponding to the construction project according to the wind energy zone site selection information and the industrial zone site selection information in the construction project information;

[0265] According to the construction area, obtaining regional impact information, the regional impact information including but not limited to regional climate and geographical data;

[0266] Analyze the climate of the region to determine wind direction frequency distribution information, and analyze the wind direction frequency distribution information to determine a high-frequency wind direction area;

[0267] According to the wind direction high-frequency area and the wind energy area site selection information, determining whether the wind energy area site selection information is located in the wind direction high-frequency area in the wind direction frequency distribution information;

[0268] If the wind energy zone site selection information is not located in the wind direction high frequency area, the wind direction frequency distribution information is included in the regional influencing factors;

[0269] Analyze the geographic data to determine whether there is a terrain obstacle between the location of the high-frequency wind direction area and the industrial zone site selection information;

[0270] If there are terrain obstacles, they will be included in the regional influencing factors.

[0271] Optionally, the regional influencing factor determination module 303 is specifically configured to:

[0272] The historical wind direction data is divided into several direction intervals, and the wind direction frequency of each direction interval is calculated by the following formula:

[0273]

[0274] Wherein, f is the wind direction frequency, n i is the number of data in the direction interval, and N is the number of historical wind direction data;

[0275] The wind direction high-frequency area is determined according to the wind direction frequency in each direction interval.

[0276] Optionally, the system 300 further includes a pollution analysis module 306, which is used to:

[0277] Analyzing the construction project information to determine emissions from the industrial zone;

[0278] Determine the wind direction frequency of the industrial area according to the climate of the area;

[0279] Determining the amount of pollution spread from the industrial zone to the wind energy zone based on the emission of the industrial zone and the wind direction frequency of the industrial zone;

[0280] Determining, according to the wind energy zone site selection information and the pollution amount, a pollution concentration when the pollution amount reaches the wind energy zone site selection information;

[0281] The pollution concentration is compared with a preset pollution concentration threshold, and if the pollution concentration is greater than the preset pollution concentration threshold, the pollution concentration is included in the regional influencing factors.

[0282] Optionally, the pollution analysis module 306 is specifically used to:

[0283] The pollution concentration when the pollution reaches the wind energy zone site selection information is calculated by the following formula:

[0284]

[0285] Wherein, C(x,y,z,y) represents the pollution concentration, Q is the pollution amount, σ x and σ y is the diffusion coefficient of pollutants in the horizontal direction, (x, y, z) is the corresponding coordinate information of the wind energy zone site selection information, and t is the diffusion time.

[0286] Optionally, the second investment plan determination module 304 is specifically configured to:

[0287] If the regional influencing factors include the wind direction frequency distribution information and the terrain obstacles, analyzing the wind direction frequency distribution information and the geographic data, determining the wind energy adjustment area with the highest wind direction frequency when the terrain obstacles do not exist, and incorporating the wind energy adjustment area into the adjustment plan;

[0288] If the regional influencing factors include the pollution concentration, analyzing the geographical data and the wind direction frequency of the industrial zone, determining the industrial adjustment area, and incorporating the industrial adjustment area into the adjustment plan;

[0289] Adjusting the virtual model according to the wind energy adjustment area and the industrial adjustment area in the adjustment plan;

[0290] Obtaining the wind energy output, the industrial output, the industrial energy consumption and the matching coefficient determined after simulation calculation of the adjusted virtual model;

[0291] The second investment plan is determined according to the wind energy output, the industrial output, the industrial energy consumption and the matching coefficient.

[0292] Optionally, the final investment plan determination module 305 is specifically used to:

[0293] Analyze the first investment plan and the second investment plan to determine the total risk weight and total benefit corresponding to the first investment plan and the second investment plan;

[0294] Based on historical investment data, the weight of each risk factor is calculated using the following formula:

[0295] Weight=Impact i ×Probability i

[0296] Among them, Weight is the weight of the current risk factor, impact i Probability is the impact degree of the current risk factor when it occurs. i The impact of the current risk factor after it occurs;

[0297] Then, the total risk weights of the first investment plan and the second investment plan are calculated respectively by the following formula:

[0298]

[0299] Among them, Risk Weight is the total risk weight of the current investment plan, n is the total number of risk factors in the historical investment data, and Weight i is the weight of the ith risk factor;

[0300] The final investment plan is determined according to the investor type and the total risk weight and total benefit corresponding to the first investment plan and the second investment plan.

[0301] The system of this embodiment can be used to execute the method of any of the above embodiments. The implementation principles and technical effects are similar and will not be described in detail here.

Claims

1. A construction project investment evaluation method based on digital twin technology, It is characterized in that include: Acquire construction project information, and construct a virtual model of the construction project based on the digital twin technology according to the construction project information; the construction project information includes energy zone data and industrial zone data, the energy zone data includes wind energy zone site selection information and planned energy output, and the industrial zone data includes industrial zone site selection information, industrial zone product types, and planned industrial output; Analyze the construction project information, extract the industrial production process of the construction project, simulate the industrial production process using the virtual model, determine simulation data, and determine a first investment plan based on the simulation data; the simulation data includes wind energy output, industrial output, industrial energy consumption and matching coefficient; the first investment plan is a project plan that at least includes the simulation data calculated by the current virtual model; Determine regional influencing factors based on the construction project information; Analyze the regional influencing factors, determine an adjustment plan, adjust the virtual model according to the adjustment plan, and determine a second investment plan according to the adjusted virtual model; Analyze the first investment plan and the second investment plan to determine an investment plan analysis result, and determine a final investment plan based on the investor type and the investment plan analysis result; The step of analyzing the construction project information, extracting the industrial production process of the construction project, simulating the industrial production process using the virtual model, determining simulation data, and determining a first investment plan based on the simulation data includes: Simulating the production process of the industrial zone in the construction project according to the virtual model to determine the industrial output and industrial energy consumption; The matching coefficient between the industrial energy consumption and the wind energy output is calculated by the following formula: M=E / W Wherein, M is the matching coefficient, E is the industrial energy consumption, and W is the wind energy output; Inputting the wind energy output, the industrial output, the industrial energy consumption and the matching coefficient into the virtual model for simulation analysis, and determining the first investment plan according to the analysis result; Determining regional influencing factors based on the construction project information includes: Determine the construction area corresponding to the construction project according to the wind energy zone site selection information and the industrial zone site selection information in the construction project information; According to the construction area, obtaining regional impact information, the regional impact information including regional climate and geographical data; Analyze the climate of the region to determine wind direction frequency distribution information, and analyze the wind direction frequency distribution information to determine a high-frequency wind direction area; According to the wind direction high-frequency area and the wind energy area site selection information, determining whether the wind energy area site selection information is located in the wind direction high-frequency area in the wind direction frequency distribution information; If the wind energy zone site selection information is not located in the wind direction high frequency area, the wind direction frequency distribution information is included in the regional influencing factors; Analyze the geographic data to determine whether there is a terrain obstacle between the location of the high-frequency wind direction area and the industrial zone site selection information; If there are terrain obstacles, the terrain obstacles are included in the regional influencing factors; The analyzing the regional influencing factors, determining an adjustment plan, adjusting the virtual model according to the adjustment plan, and determining a second investment plan according to the adjusted virtual model includes: If the regional influencing factors include the wind direction frequency distribution information and the terrain obstacles, analyzing the wind direction frequency distribution information and the geographic data, determining the wind energy adjustment area with the highest wind direction frequency when the terrain obstacles do not exist, and incorporating the wind energy adjustment area into the adjustment plan; If the regional influencing factors include pollution concentration, analyzing the geographical data and the wind direction frequency of the industrial zone, determining the industrial adjustment area, and incorporating the industrial adjustment area into the adjustment plan; Adjusting the virtual model according to the wind energy adjustment area and the industrial adjustment area in the adjustment plan; Obtaining the wind energy output, the industrial output, the industrial energy consumption and the matching coefficient determined after simulation calculation of the adjusted virtual model; The second investment plan is determined according to the wind energy output, the industrial output, the industrial energy consumption and the matching coefficient.

2. The method according to claim 1, It is characterized in that The obtaining of construction project information and constructing a virtual model of the construction project based on the digital twin technology according to the construction project information includes: According to the wind energy area site selection information, obtaining wind energy information of an area corresponding to the wind energy area site selection information, wherein the wind energy information includes air density and wind speed; According to the wind energy information, the wind energy output of the area corresponding to the wind energy zone site selection information is calculated using the following formula: W=0.5×ρ×V 3 ×Cp Among them, W is the wind energy output, ρ is the air density, V is the wind speed, and Cp is the wind energy utilization coefficient; According to the construction project information and the wind energy output, a virtual model of the construction project is constructed based on digital twin technology.

3. The method according to claim 1, It is characterized in that The regional climate includes historical wind direction data of the construction area, and the analyzing the regional climate to determine wind direction frequency distribution information, and analyzing the wind direction frequency distribution information to determine the wind direction high frequency area, include: The historical wind direction data is divided into several direction intervals, and the wind direction frequency of each direction interval is calculated by the following formula: Wherein, f is the wind direction frequency, n i is the number of data in the direction interval, and N is the number of historical wind direction data; The wind direction high-frequency area is determined according to the wind direction frequency in each direction interval.

4. The method according to claim 1, It is characterized in that The method further comprises: Analyzing the construction project information to determine emissions from the industrial zone; Determine the wind direction frequency of the industrial area according to the climate of the area; Determining the amount of pollution spread from the industrial zone to the wind energy zone based on the emission of the industrial zone and the wind direction frequency of the industrial zone; Determining, according to the wind energy zone site selection information and the pollution amount, a pollution concentration when the pollution amount reaches the wind energy zone site selection information; The pollution concentration is compared with a preset pollution concentration threshold, and if the pollution concentration is greater than the preset pollution concentration threshold, the pollution concentration is included in the regional influencing factors.

5. The method according to claim 4, It is characterized in that The step of determining the pollution concentration when the pollution amount reaches the wind energy area site selection information according to the wind energy area site selection information and the pollution amount includes: The pollution concentration when the pollution reaches the wind energy zone site selection information is calculated by the following formula: Wherein, C(x, y, z, t) represents the pollution concentration, Q represents the pollution amount, σ x and σ y is the diffusion coefficient of pollutants in the horizontal direction, (x, y, z) is the corresponding coordinate information of the wind energy zone site selection information, t is the diffusion time, and τ is the standard deviation in the time direction.

6. The method according to claim 5, It is characterized in that The analyzing the first investment plan and the second investment plan to determine the investment plan analysis result, and determining the final investment plan according to the investor type and the investment plan analysis result, comprises: Analyze the first investment plan and the second investment plan to determine the total risk weight and total benefit corresponding to the first investment plan and the second investment plan; Based on historical investment data, the weight of each risk factor is calculated using the following formula: Weight=Impact i ×Probability i Among them, Weight is the weight of the current risk factor, Impact i Probability is the impact degree of the current risk factor when it occurs. i The impact of the current risk factor after it occurs; Then, the total risk weights of the first investment plan and the second investment plan are calculated respectively by the following formula: Among them, Risk Weight is the total risk weight of the current investment plan, n is the total number of risk factors in the historical investment data, and Weight i is the weight of the ith risk factor; The final investment plan is determined according to the investor type and the total risk weight and total benefit corresponding to the first investment plan and the second investment plan.

7. A construction project investment evaluation system based on digital twin technology, It is characterized in that include: A model building module is used to obtain construction project information, and build a virtual model of the construction project based on the digital twin technology according to the construction project information; the construction project information includes energy zone data and industrial zone data, the energy zone data includes wind energy zone site selection information and planned energy output, and the industrial zone data includes industrial zone site selection information, industrial zone product types, and planned industrial output; The first investment plan determination module is used to analyze the construction project information, extract the industrial production process of the construction project, simulate the industrial production process using the virtual model, determine simulation data, and determine the first investment plan based on the simulation data; the simulation data includes wind energy output, industrial output, industrial energy consumption and matching coefficient; the first investment plan is a project plan that at least includes the simulation data calculated by the current virtual model; A regional influencing factor determination module, used to determine regional influencing factors based on the construction project information; A second investment plan determination module is used to analyze the regional influencing factors, determine an adjustment plan, adjust the virtual model according to the adjustment plan, and determine a second investment plan according to the adjusted virtual model; Final investment plan determination module: used for analyzing the first investment plan and the second investment plan, determining the investment plan analysis results, and determining the final investment plan according to the investor type and the investment plan analysis results; The step of analyzing the construction project information, extracting the industrial production process of the construction project, simulating the industrial production process using the virtual model, determining simulation data, and determining a first investment plan based on the simulation data includes: Simulating the production process of the industrial zone in the construction project according to the virtual model to determine the industrial output and industrial energy consumption; The matching coefficient between the industrial energy consumption and the wind energy output is calculated by the following formula: M=E / W Wherein, M is the matching coefficient, E is the industrial energy consumption, and W is the wind energy output; Inputting the wind energy output, the industrial output, the industrial energy consumption and the matching coefficient into the virtual model for simulation analysis, and determining the first investment plan according to the analysis result; Determining regional influencing factors based on the construction project information includes: Determine the construction area corresponding to the construction project according to the wind energy zone site selection information and the industrial zone site selection information in the construction project information; According to the construction area, obtaining regional impact information, the regional impact information including regional climate and geographical data; Analyze the climate of the region to determine wind direction frequency distribution information, and analyze the wind direction frequency distribution information to determine a high-frequency wind direction area; According to the wind direction high-frequency area and the wind energy area site selection information, determining whether the wind energy area site selection information is located in the wind direction high-frequency area in the wind direction frequency distribution information; If the wind energy zone site selection information is not located in the wind direction high frequency area, the wind direction frequency distribution information is included in the regional influencing factors; Analyze the geographic data to determine whether there is a terrain obstacle between the location of the high-frequency wind direction area and the industrial zone site selection information; If there are terrain obstacles, the terrain obstacles are included in the regional influencing factors; The analyzing the regional influencing factors, determining an adjustment plan, adjusting the virtual model according to the adjustment plan, and determining a second investment plan according to the adjusted virtual model includes: If the regional influencing factors include the wind direction frequency distribution information and the terrain obstacles, analyzing the wind direction frequency distribution information and the geographic data, determining the wind energy adjustment area with the highest wind direction frequency when the terrain obstacles do not exist, and incorporating the wind energy adjustment area into the adjustment plan; If the regional influencing factors include pollution concentration, analyzing the geographical data and the wind direction frequency of the industrial zone, determining the industrial adjustment area, and incorporating the industrial adjustment area into the adjustment plan; Adjusting the virtual model according to the wind energy adjustment area and the industrial adjustment area in the adjustment plan; Obtaining the wind energy output, the industrial output, the industrial energy consumption and the matching coefficient determined after simulation calculation of the adjusted virtual model; The second investment plan is determined according to the wind energy output, the industrial output, the industrial energy consumption and the matching coefficient.