A front transition flange flatness gauge and its testing method
By designing a front transition flange flatness inspection tool that includes flushing, drying, cleaning and testing mechanisms, the problem of the impact of impurities on the front end face of flange testing is solved and the testing accuracy and efficiency are improved.
Patent Information
- Application Number
- CN202410442839.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-12
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-04-12
AI Technical Summary
In the existing technology, the front transition flange is easily contaminated with impurities on the front end face of the detection, resulting in a decrease in the accuracy of the detection results.
A front transition flange flatness inspection tool is designed, including a flushing mechanism, a drying mechanism, a cleaning mechanism and a testing mechanism. It ensures the cleanliness of the flange end face through high-pressure water column flushing, hot air drying, brush cleaning and lighting inspection. and flatness.
It effectively solves the problem of reduced accuracy of test results caused by impurities in the flange before testing, and improves the accuracy and efficiency of test results.
Smart Images

Figure CN118328911B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of flange flatness detection, and in particular to a front transition flange flatness detection tool and a detection method thereof. Background Art
[0002] A flange is a disc-shaped part, which is mainly used for connection between pipes and valves, between pipes and pipes, and between pipes and equipment, etc., and plays a sealing role. A transition flange is a type of flange, which is usually used to connect two pipes or equipment of different sizes to achieve a smooth transition effect.
[0003] The front transition flange is usually supported by carbon steel, and can also be made of stainless steel or alloy steel. When the flange is used to connect two pipes, the flatness of its end face is directly related to the sealing between the two pipes. Therefore, its flatness needs to be tested. In the prior art, when testing the front transition flange, the illumination method is usually used for testing. The front end face of the flange is easily contaminated with impurities during testing, which will affect the test results and reduce the accuracy of the test results.
[0004] Therefore, we proposed a front transition flange flatness inspection fixture and its inspection method to solve the above problems. Summary of the invention
[0005] The purpose of the present invention is to provide a front transition flange flatness inspection tool and a detection method thereof, so as to solve the problem raised in the above-mentioned background technology that when inspecting the front transition flange, the illumination method is usually used for inspection, and the front surface of the flange is easily contaminated with impurities during inspection, which will affect the inspection results and reduce the accuracy of the inspection results.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a front transition flange flatness inspection tool, comprising a platform, a positioning mechanism is arranged on the top of the platform, a connecting frame is symmetrically fixedly connected to the outer surface of the platform, a top cover is fixedly connected to a position near the top between the outer surfaces of the two connecting frames, a mounting platform is slidably arranged between the inner surface walls of the top cover, a flushing mechanism, a drying mechanism, a cleaning mechanism and a detection mechanism are respectively arranged on the top of the mounting platform near the four corners, the detection mechanism comprises a cover top and a fifth motor, the cover top is fixedly connected to a position near one of the corners of the bottom of the mounting platform, a camera is installed on the inner top of the cover top, a second bearing is fixedly connected to the outer surface of the cover top, an outer ring is fixedly connected to the outer surface of the second bearing, and a lighting lamp is obliquely arranged on the outside of the outer ring.
[0007] A method for detecting a front transition flange flatness inspection tool comprises the following steps:
[0008] S1. When the flange moves to the position below the flushing mechanism, the water pump inside the water tank pumps out water and sends it to the outlet pipe. At this time, the water will enter the hollow shell through the connecting pipe below, and form a high-pressure water column under the action of the booster pump and the high-pressure nozzle to impact the flange end face, thereby flushing away the impurities on its surface;
[0009] S2. When the flushed flange moves to the bottom of the drying mechanism, the high-resistance heating wire is started to convert electrical energy into thermal energy and then the fan is started. At this time, the fan blows the heated air inside the shell into the ventilation pipe. At this time, the hot air passes through the ventilation pipe and enters the interior of the conical cover, and is ejected from the through holes on the surface of the manifold. The ejected hot air dries the water stains remaining on the surface of the flange;
[0010] S3. When the dried front transition flange moves to the bottom of the cleaning mechanism, the bristles will contact the flange end surface. At this time, starting the fourth motor can drive the turntable to rotate at high speed. During the high-speed rotation of the turntable, the bristles below can clean the flange end surface again to ensure the cleanliness of the end surface.
[0011] S4. After the cleaned front transition flange is moved to the bottom of the detection mechanism, the lighting lamp is started to emit light and illuminate the flange end face, and the camera is started to take a picture of the flange end face from directly above and the image is converted into an electrical signal and transmitted to the host. At this time, the image processing system inside the host can compare and analyze the shadow part in the flange photo to determine the flatness of the front transition flange end face.
[0012] Compared with the prior art, the present invention has the following beneficial effects:
[0013] 1. When in use, the first motor, the first pulley, the first transmission belt and the second pulley cooperate to drive the flange to rotate, and the starting cylinder drives the flushing mechanism, the drying mechanism, the cleaning mechanism and the detection mechanism on the mounting table to move toward the flange. The flushing mechanism plays a role in high-pressure flushing of the flange end face, the drying mechanism plays a role in drying the water stains on the flange end face, the cleaning mechanism plays a role in cleaning the flange end face, and the detection mechanism plays a role in judging the flatness according to the shadow state of the flange surface after illumination. The overall structure has good functionality and can effectively solve the problem that the flange is contaminated with impurities before detection, which will lead to a decrease in the accuracy of the detection result;
[0014] 2. During use, the second motor is started to drive the first gear to rotate during the flushing process, and the first gear sleeve can drive the high-pressure nozzle to rotate and flush the flange end face below, thereby improving the flushing effect. When the third motor is started to drive the third pulley, the fourth pulley and the vent pipe will be synchronously driven to rotate under the action of the second transmission belt, thereby playing the role of rotating and spraying hot air, so that the hot air and the flange end face contact more evenly, improving the drying effect. When the lighting lamp irradiates the flange, after the fifth motor is started to drive the second gear to rotate, the second gear sleeve on the outer ring surface is meshed with the second gear, so the outer ring will drive the lighting lamp below to rotate to different directions of the flange, thereby effectively avoiding blind spots of illumination and further improving the accuracy of the detection results.
[0015] 3. When in use, hold the rotating wheel and drive the screw to rotate on the top of the cross table. At this time, the lifting sleeve can only move up and down because it is limited by the limit column, and the inside is connected to the screw thread, so the lifting sleeve will move downward. At this time, all the first connecting blocks on the surface of the lifting sleeve will follow and drive the connecting rod from an inclined state to a horizontal state. At this time, the other end of the connecting rod will push the second connecting block and the second clamping block close to the first clamping block to tighten the flange, thereby ensuring the stability of the flange detection process and improving the accuracy of the detection results. The design structure is simple and reasonable, which can greatly reduce the time consumed in fixing the flange and improve the detection efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 A stereoscopic diagram of a front transition flange flatness inspection tool of the present invention;
[0017] Figure 2 It is a three-dimensional view from another angle of a front transition flange flatness inspection tool of the present invention;
[0018] Figure 3 A stereoscopic diagram of a front transition flange flatness inspection tool of the present invention;
[0019] Figure 4 It is a schematic diagram of the platform structure of a front transition flange flatness inspection tool of the present invention;
[0020] Figure 5 It is a schematic diagram of the positioning mechanism structure of a front transition flange flatness inspection tool of the present invention;
[0021] Figure 6 It is a partial structural schematic diagram of a positioning mechanism of a front transition flange flatness inspection tool of the present invention;
[0022] Figure 7 It is a partial structural schematic diagram of a front transition flange flatness inspection tool of the present invention;
[0023] Figure 8It is a schematic diagram of the structure of a flushing mechanism of a front transition flange flatness inspection tool of the present invention;
[0024] Fig. 9 It is a schematic diagram of the structure of a cleaning mechanism of a front transition flange flatness inspection tool of the present invention;
[0025] Fig.10 The present invention is a schematic diagram of the structure of a detection mechanism of a front transition flange flatness detection device.
[0026] In the figure:
[0027] 1. Bracket; 11. Platform; 12. First motor; 13. Support ring; 14. First pulley; 15. Second pulley; 16. First transmission belt; 17. Main unit; 18. Connecting frame; 2. Positioning mechanism; 201. Cross table; 202. First clamping block; 203. Limiting column; 204. Lifting sleeve; 205. Screw rod; 206. Rotating wheel; 207. First connecting block; 208. Connecting rod; 209. Second connecting block; 210. Second clamping block; 3. Mounting table; 31. Top cover; 32. Cylinder; 33. Limiting rod; 4. Flushing mechanism; 401. Water tank; 402. Water outlet pipe; 403. Booster pump; 404. Connecting pipe; 405. First bearing; 406. Second Motor; 407, first gear; 408, hollow shell; 409, high-pressure nozzle; 410, first gear sleeve; 5, drying mechanism; 501, outer shell; 502, high-resistance heating wire; 503, fan; 504, ventilation pipe; 505, conical cover; 506, diverter plate; 507, third motor; 508, third pulley; 509, fourth pulley; 510, second transmission belt; 6, cleaning mechanism; 601, fourth motor; 602, turntable; 603, brush; 7, detection mechanism; 701, cover top; 702, second bearing; 703, outer ring; 704, second gear sleeve; 705, lighting lamp; 706, fifth motor; 707, second gear; 708, camera. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] Reference Figure 1-Figure 10As shown: a front transition flange flatness inspection tool, including a platform 11, a positioning mechanism 2 is arranged on the top of the platform 11, a connecting frame 18 is symmetrically fixedly connected to the outer surface of the platform 11, a top cover 31 is fixedly connected between the outer surfaces of the two connecting frames 18 near the top, a mounting platform 3 is slidably arranged between the inner surface walls of the top cover 31, a flushing mechanism 4, a drying mechanism 5, a cleaning mechanism 6 and a detection mechanism 7 are respectively arranged on the top of the mounting platform 3 near the four corners, the detection mechanism 7 includes a cover top 701 and a fifth motor 706, the cover top 701 is fixedly connected to the bottom of the mounting platform 3 near one of the corners, a camera 708 is installed on the inner top of the cover top 701, a second bearing 702 is fixedly connected to the outer surface of the cover top 701, an outer ring 703 is fixedly connected to the outer surface of the second bearing 702, and a lighting lamp 705 is obliquely arranged on the outside of the outer ring 703.
[0030] like Figure 1 , Figure 4 and Figure 5 As shown, the positioning mechanism 2 includes a cross table 201, and the top of the cross table 201 near the four convex corners are fixedly connected with a first clamping block 202, and the top of the cross table 201 near the first clamping block 202 is slidably connected with a second clamping block 210. The main body of the cross table 201 is in a cross shape, and the four convex corners are circular support plates for placing the flange to be detected. When the first clamping block 202 and the second clamping block 210 are close to each other, they play a role in squeezing the flange and positioning it. The bottom of the second clamping block 210 is slidably installed on the top of the cross table 201 through the T-block and the T-slot on the top of the cross table 201, so the second clamping block 210 can only slide in a straight line.
[0031] like Figure 1 , Figure 4 and Figure 5As shown, a plurality of limiting columns 203 are equidistantly fixedly connected to the top of the cross table 201 near the middle position, a screw rod 205 is rotatably connected to the top center of the cross table 201, a lifting sleeve 204 is threadedly sleeved on the outer surface of the screw rod 205, a rotating wheel 206 is fixedly connected to the top of the screw rod 205, the outer surface of the limiting column 203 slides through the outer surface of the lifting sleeve 204, the outer surface of the lifting sleeve 204 is equidistantly fixedly connected to four first connecting blocks 207, the outer surface of the first connecting block 207 is rotatably connected to a connecting rod 208, the other end of the connecting rod 208 is rotatably connected to a second connecting block 209, the second connecting block 209 is fixedly connected to the outer surface of the second clamping block 210, when the end surface flatness of the front transition flange is detected, the flanges are placed on the cross table 201 in sequence, and then the rotating wheel 206 is held to drive the screw rod 205 to be moved on the top of the cross table 201 Rotation, at this time, since the lifting sleeve 204 can only move up and down after being limited by the limiting column 203, and the interior is threadedly connected with the screw rod 205, the lifting sleeve 204 will move downward. At this time, all the first connecting blocks 207 on the surface of the lifting sleeve 204 will follow and descend and drive the connecting rod 208 from an inclined state to a horizontal state. At this time, the other end of the connecting rod 208 will push the second connecting block 209 and the second clamping block 210 close to the first clamping block 202 and press the flange tightly, ensuring the stability of the flange detection process and improving the accuracy of the detection result. The design structure is simple and reasonable, which can greatly reduce the time consumed in fixing the flange and improve the detection efficiency. In addition, by increasing the number of the first connecting block 207, the connecting rod 208, the second connecting block 209, the second clamping block 210 and the first clamping block 202, a large number of flange workpieces can be fixed and detected at one time.
[0032] like Figure 1-Figure 3As shown, the bottom of the platform 11 is fixedly connected with the bracket 1, and a main machine 17 is arranged between the outer surface of the platform 11 and the bracket 1. A first motor 12 is installed near the edge of the bottom of the platform 11, and the output end of the first motor 12 slides through the bottom of the platform 11 and extends to the top. The output end of the first motor 12 is fixedly connected with a first pulley 14, and a support ring 13 is embedded in the top center of the platform 11. A second pulley 15 is rotatably connected between the inner surface walls of the support ring 13, and a first transmission belt 16 is arranged between the outer surfaces of the first pulley 14 and the second pulley 15. The top of the second pulley 15 and the bottom of the cross platform 201 are connected. The first motor 12 is started to drive the first pulley 14 to rotate. At this time, the second pulley 15 under the cross table 201 will be driven to rotate synchronously under the action of the first transmission belt 16, thereby driving the flange above the cross table 201 to rotate, so that the flange can pass under the flushing mechanism 4, the drying mechanism 5, the cleaning mechanism 6 and the detection mechanism 7 in sequence. The top of the support ring 13 fits under the top of the cross table 201, which supports the cross table 201, so that the cross table 201 has good stability when rotating and is not prone to tilting.
[0033] like Figure 1 , Figure 2 and Figure 6 As shown, a cylinder 32 is fixedly installed on the top of the top cover 31, and the telescopic end of the cylinder 32 passes through the top of the top cover 31 and extends to the bottom. The telescopic end of the cylinder 32 is connected to the top of the mounting platform 3, and a plurality of groups of limit rods 33 are fixedly connected to the top of the mounting platform 3 near the edge. The outer surface of the limit rod 33 slides through the outer surface of the top cover 31 and extends to the top. The mounting platform 3 is located inside the top cover 31 in the normal state. When the cylinder 32 is started, the mounting platform 3 can be driven to move downward, thereby driving the flushing mechanism 4, the drying mechanism 5, the cleaning mechanism 6 and the detection mechanism 7 on the mounting platform 3 to move downward and close to the flange below. When the mounting platform 3 moves up and down, the outer surface of the limit rod 33 will pass through the top cover 31, so as to limit the mounting platform 3, so that it maintains good stability when it is raised or lowered.
[0034] like Figure 1 , Figure 2 and Figure 7As shown, the flushing mechanism 4 includes a water tank 401 and a second motor 406. The water tank 401 is fixedly installed on the top of the mounting platform 3 near the edge. The outer surface of the water tank 401 is fixedly connected with a water outlet pipe 402. The outside of the water outlet pipe 402 is equipped with a booster pump 403. The bottom end of the water outlet pipe 402 is rotatably connected with a connecting pipe 404. The outer surface of the connecting pipe 404 is fixedly connected with a first bearing 405. The first bearing 405 is embedded in the interior of the mounting platform 3. The bottom of the connecting pipe 404 is fixedly connected with a hollow shell 408. A plurality of high-pressure nozzles 409 are installed at the bottom of the hollow shell 408. The outer surface of the connecting pipe 404 is located below the mounting platform 3 and is fixedly connected with a first gear sleeve 410. The output end of the second motor 406 slides through the outer surface of the mounting platform 3 and extends to the bottom. The output end of the second motor 406 is fixedly connected with a first gear 407. The first gear 407 is meshed with the first gear sleeve 410. The water tank 401 is provided with a water The pump is mainly used to discharge the internal water from the water outlet pipe 402, and the booster pump 403 is mainly used to increase the water pressure inside the water outlet pipe 402 to improve the impact force of the subsequent water flow. When the flange moves to the position below the flushing mechanism 4, the water pump inside the water tank 401 pumps out the water and sends it into the water outlet pipe 402. At this time, the water will enter the interior of the hollow shell 408 through the connecting pipe 404 below, and under the action of the booster pump 403 and the high-pressure nozzle 409, a high-pressure water column is formed to impact the flange end face, thereby flushing away the impurities on the surface thereof. In addition, during the flushing process, the second motor 406 is started to drive the first gear 407 to rotate. Since the first gear sleeve 410 on the surface of the connecting pipe 404 is meshed and connected with the first gear 407, and the connecting pipe 404 is rotatably connected to the mounting table 3 through the first bearing 405, the hollow shell 408 below the connecting pipe 404 cooperates with the high-pressure nozzle 409 to flush the flange end face below while rotating, thereby improving the flushing effect.
[0035] like Figure 2 and Figure 8As shown, the drying mechanism 5 includes a shell 501 and a third motor 507, the shell 501 and the third motor 507 are fixedly mounted on the top of the mounting platform 3 near the edge, the bottom of the shell 501 is rotatably connected to a vent pipe 504, the outer surface of the vent pipe 504 passes through the top of the mounting platform 3 and extends to the bottom, the bottom of the vent pipe 504 is fixedly connected to a conical cover 505, the bottom of the conical cover 505 is installed with a diverter plate 506, the outer surface of the vent pipe 504 is fixedly connected to a fourth pulley 509, the output end of the third motor 507 passes through the top of the mounting platform 3 and extends to the bottom, the output end of the third motor 507 is fixedly connected to a third pulley 508, a second transmission belt 510 is arranged between the outer surfaces of the third pulley 508 and the fourth pulley 509, a high-resistance heating wire 502 is installed inside the shell 501, a fan 503 is installed on the top of the shell 501, and a blower 503 is installed on the top of the shell 501. When the washed flange moves to the bottom of the drying mechanism 5, the high-resistance heating wire 502 is started to convert electrical energy into thermal energy and then the fan 503 is started. At this time, the fan 503 blows the heated air inside the shell 501 into the vent pipe 504. At this time, the hot air enters the interior of the conical cover 505 after passing through the vent pipe 504, and is ejected from the through holes on the surface of the diverter plate 506. The ejected hot air dries the water stains remaining on the surface of the flange. In the drying process, when the third motor 507 is started to drive the third pulley 508, the fourth pulley 509 and the vent pipe 504 are synchronously driven to rotate under the action of the second transmission belt 510, thereby playing the role of spraying hot air while rotating, so that the hot air and the flange end face are in contact more evenly, thereby improving the drying effect. The vent pipe 504 is connected to the bottom of the shell 501 through the inner bearing, and the two can rotate relative to each other.
[0036] like Figure 2 and Fig. 9 As shown, the cleaning mechanism 6 includes a fourth motor 601, which is fixedly mounted on the top of the mounting platform 3 near the edge, and the output end of the fourth motor 601 slides through the top of the mounting platform 3 and extends to the bottom, and the output end of the fourth motor 601 is fixedly connected to a turntable 602, and bristles 603 are arranged at the bottom of the turntable 602. When the dried front transition flange moves to the bottom of the cleaning mechanism 6, the bristles 603 will contact the flange end face. At this time, starting the fourth motor 601 can drive the turntable 602 to rotate at high speed. During the high-speed rotation of the turntable 602, the bristles 603 below can clean the flange end face again to ensure the cleanliness of the end face.
[0037] like Figure 2 and Fig.10As shown, the fifth motor 706 is fixedly installed on the top of the mounting platform 3 near the edge, the output end of the fifth motor 706 slides through the top of the mounting platform 3 and extends to the bottom, the output end of the fifth motor 706 is fixedly connected to the second gear 707, the outer surface of the outer ring 703 is fixedly connected to the second gear sleeve 704, the second gear sleeve 704 and the second gear 707 are meshed and connected, after the cleaned front transition flange is moved to the bottom of the detection mechanism 7, by starting the lighting lamp 705 to emit light and illuminate the flange end face, the camera 708 is started to take a picture of the flange end face from directly above and the image is converted into an electrical signal and then transmitted to the host 17, at this time, the inside of the host 17 The image processing system can determine the flatness of the end face of the front transition flange after comparing and analyzing the shadow part in the flange photo. The overall structure has good functionality and can effectively solve the problem that the flange is contaminated with impurities before detection, which will lead to a decrease in the accuracy of the detection result. When the lighting lamp 705 illuminates the flange, the fifth motor 706 is started to drive the second gear 707 to rotate. Since the second gear sleeve 704 on the surface of the outer ring 703 is engaged with the second gear 707, the outer ring 703 will drive the lighting lamp 705 below to rotate to positions in different directions of the flange, thereby effectively avoiding blind spots in lighting and further improving the accuracy of the detection results.
[0038] In the present invention, when the end surface flatness of the front transition flange is detected, the flange is placed on the cross table 201 in sequence, and then the rotating wheel 206 is held to drive the screw rod 205 to rotate on the top of the cross table 201. At this time, since the lifting sleeve 204 can only move up and down after being limited by the limiting column 203, and the interior is threadedly connected with the screw rod 205, the lifting sleeve 204 will move downward. At this time, all the first connecting blocks 207 on the surface of the lifting sleeve 204 will follow and descend and drive the connecting rod 208 to transform from an inclined state to a horizontal state. At this time, the other end of the connecting rod 208 will push the second connecting block 209 and the second clamping block 210 to approach the first clamping block 202 and then press the flange tightly, thereby ensuring the stability of the flange detection process and improving the accuracy of the detection result. The design structure is simple and reasonable, which can greatly reduce the time consumed in fixing the flange and improve the detection efficiency. Subsequently, the first motor 12 is started to drive the first pulley 14 to rotate. At this time, under the action of the first transmission belt 16, the second pulley 15 under the cross table 201 will be driven to rotate synchronously, thereby driving the flange above the cross table 201 to rotate, so that the flange can pass under the flushing mechanism 4, the drying mechanism 5, the cleaning mechanism 6 and the detection mechanism 7 in turn. When the flange reaches different positions, the cylinder 32 is started to drive the mounting platform 3 to move downward, and then drives the flushing mechanism 4, the drying mechanism 5, the cleaning mechanism 6 and the detection mechanism 7 to move downward and approach the flange below. When the flange moves to the position below the flushing mechanism 4, the water inside the water tank 401 After the pump pumps out the water, it sends it into the water outlet pipe 402. At this time, the water will enter the interior of the hollow shell 408 through the connecting pipe 404 below, and under the action of the booster pump 403 and the high-pressure nozzle 409, a high-pressure water column will be formed to impact the flange end face, thereby washing away the impurities on the surface. In addition, during the washing process, the second motor 406 is started to drive the first gear 407 to rotate. Since the first gear sleeve 410 on the surface of the connecting pipe 404 is meshed and connected with the first gear 407, and the connecting pipe 404 is rotatably connected to the mounting platform 3 through the first bearing 405, the hollow shell 408 below the connecting pipe 404 cooperates with the high-pressure nozzle 409 to rotate and wash the flange end face below, thereby improving the washing effect. When the washed flange moves to the bottom of the drying mechanism 5, the high-resistance nozzle 409 is started. After the heating wire 502 converts the electrical energy into heat energy, the fan 503 is started. At this time, the fan 503 blows the heated air inside the shell 501 into the ventilation pipe 504. At this time, the hot air enters the interior of the conical cover 505 after passing through the ventilation pipe 504, and is ejected from the through holes on the surface of the diverter plate 506. The ejected hot air has the effect of drying the water stains remaining on the surface of the flange. In the drying process, when the third motor 507 is started to drive the third pulley 508, the fourth pulley 509 and the ventilation pipe 504 are synchronously driven to rotate under the action of the second transmission belt 510, thereby playing the role of rotating and spraying hot air, so that the hot air and the flange end face contact more evenly, thereby improving the drying effect. When the dried front transition flange moves to the bottom of the cleaning mechanism 6,The bristles 603 will contact the flange end face. At this time, starting the fourth motor 601 can drive the turntable 602 to rotate at high speed. During the high-speed rotation of the turntable 602, the bristles 603 below can clean the flange end face again to ensure the cleanliness of the end face. After the cleaned front transition flange is moved to the bottom of the detection mechanism 7, the lighting lamp 705 is started to emit light and illuminate the flange end face. The camera 708 is started to take a picture of the flange end face from directly above and the image is converted into an electrical signal and transmitted to the host 17. At this time, the image processing system inside the host 17 processes the shadow part in the flange photo. After comparison and analysis, the flatness of the front transition flange end face can be determined. The overall structure has good functionality and can effectively solve the problem that the flange is contaminated with impurities before detection, which will lead to a decrease in the accuracy of the detection result. When the illuminating lamp 705 illuminates the flange, the fifth motor 706 is started to drive the second gear 707 to rotate. Since the second gear sleeve 704 on the surface of the outer ring 703 is meshed with the second gear 707, the outer ring 703 will drive the illuminating lamp 705 below to rotate to different directions of the flange, thereby effectively avoiding blind spots of illumination and further improving the accuracy of the detection result.
[0039] The wiring diagram of the first motor 12, the main unit 17, the cylinder 32, the booster pump 403, the second motor 406, the high-resistance heating wire 502, the fan 503, the third motor 507, the fourth motor 601, the lighting lamp 705, the fifth motor 706 and the camera 708 in the present invention is common knowledge in the art, and its working principle is a well-known technology. The model is selected according to the actual use. Therefore, the control method and wiring arrangement of the first motor 12, the main unit 17, the cylinder 32, the booster pump 403, the second motor 406, the high-resistance heating wire 502, the fan 503, the third motor 507, the fourth motor 601, the lighting lamp 705, the fifth motor 706 and the camera 708 will no longer be explained in detail.
[0040] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A front transition flange flatness inspection tool, comprising a platform (11), Features: A positioning mechanism (2) is provided on the top of the platform (11); a connecting frame (18) is symmetrically fixedly connected to the outer surface of the platform (11); a top cover (31) is fixedly connected between the outer surfaces of the two connecting frames (18) near the top; a mounting platform (3) is slidably provided between the inner surface walls of the top cover (31); a flushing mechanism (4), a drying mechanism (5), a cleaning mechanism (6) and a detection mechanism (7) are respectively provided at the top of the mounting platform (3) near the four corners; The detection mechanism (7) comprises a cover top (701) and a fifth motor (706); the cover top (701) is fixedly connected to a position near one of the corners at the bottom of the mounting platform (3); a camera (708) is installed on the inner top of the cover top (701); a second bearing (702) is fixedly connected to the outer surface of the cover top (701); an outer ring (703) is fixedly connected to the outer surface of the second bearing (702); and an illumination lamp (705) is obliquely arranged on the outside of the outer ring (703); The positioning mechanism (2) comprises a cross platform (201), the top of the cross platform (201) being fixedly connected to positions near four convex corners with first clamping blocks (202), and the top of the cross platform (201) being slidably connected to positions near the first clamping blocks (202) with second clamping blocks (210); A plurality of limiting columns (203) are equidistantly fixedly connected to a position near the middle of the top of the cross platform (201); a screw rod (205) is rotatably connected to the center of the top of the cross platform (201); a lifting sleeve (204) is threadedly sleeved on the outer surface of the screw rod (205); a rotating wheel (206) is fixedly connected to the top of the screw rod (205); the outer surface of the limiting column (203) slides through the outer surface of the lifting sleeve (204); four first connecting blocks (207) are equidistantly fixedly connected to the outer surface of the lifting sleeve (204); a connecting rod (208) is rotatably connected to the outer surface of the first connecting block (207); the other end of the connecting rod (208) is rotatably connected to a second connecting block (209); and the second connecting block (209) is fixedly connected to the outer surface of the second clamping block (210).
2. A front transition flange flatness inspection tool according to claim 1, Features: The bottom of the platform (11) is fixedly connected to a bracket (1), a main machine (17) is arranged between the outer surfaces of the platform (11) and the bracket (1), a first motor (12) is installed near the edge of the bottom of the platform (11), the output end of the first motor (12) slides through the bottom of the platform (11) and extends to the top, the output end of the first motor (12) is fixedly connected to a first pulley (14), a support ring (13) is embedded at the top center of the platform (11), a second pulley (15) is rotatably connected between the inner surface walls of the support ring (13), a first transmission belt (16) is arranged between the outer surfaces of the first pulley (14) and the second pulley (15), and the top of the second pulley (15) is connected to the bottom of the cross platform (201).
3. A front transition flange flatness inspection tool according to claim 2, Features: A cylinder (32) is fixedly mounted on the top of the top cover (31); a telescopic end of the cylinder (32) penetrates the top of the top cover (31) and extends downward; the telescopic end of the cylinder (32) is connected to the top of the mounting platform (3); a plurality of groups of limit rods (33) are fixedly connected at equal distances to the top of the mounting platform (3) near the edge; the outer surfaces of the limit rods (33) slide through the outer surface of the top cover (31) and extend upward.
4. A front transition flange flatness inspection tool according to claim 3, Features: The flushing mechanism (4) comprises a water tank (401) and a second motor (406); the water tank (401) is fixedly mounted on the top of the mounting platform (3) near the edge; the outer surface of the water tank (401) is fixedly connected to a water outlet pipe (402); the outer portion of the water outlet pipe (402) is provided with a booster pump (403); the bottom end of the water outlet pipe (402) is rotatably connected to a connecting pipe (404); the outer surface of the connecting pipe (404) is fixedly connected to a first bearing (405); the first bearing (405) is embedded in the mounting platform (3). Inside, the bottom of the connecting pipe (404) is fixedly connected to a hollow shell (408), and a plurality of high-pressure nozzles (409) are installed at the bottom of the hollow shell (408). The outer surface of the connecting pipe (404) is fixedly connected to a first gear sleeve (410) at a position below the mounting platform (3). The output end of the second motor (406) slides through the outer surface of the mounting platform (3) and extends downward. The output end of the second motor (406) is fixedly connected to a first gear (407), and the first gear (407) and the first gear sleeve (410) are meshingly connected.
5. A front transition flange flatness inspection tool according to claim 4, Features: The drying mechanism (5) comprises a housing (501) and a third motor (507); the housing (501) and the third motor (507) are fixedly mounted on the top of the mounting platform (3) near the edge; the bottom of the housing (501) is rotatably connected to a ventilation pipe (504); the outer surface of the ventilation pipe (504) passes through the top of the mounting platform (3) and extends downward; the bottom of the ventilation pipe (504) is fixedly connected to a conical cover (505); the bottom of the conical cover (505) is installed with a diverter plate (506); The outer surface of the ventilation pipe (504) is fixedly connected to a fourth pulley (509); the output end of the third motor (507) passes through the top of the mounting platform (3) and extends to the bottom; the output end of the third motor (507) is fixedly connected to a third pulley (508); a second transmission belt (510) is arranged between the outer surfaces of the third pulley (508) and the fourth pulley (509); a high-resistance heating wire (502) is installed inside the housing (501); and a fan (503) is installed on the top of the housing (501).
6. A front transition flange flatness inspection tool according to claim 5, Features: The cleaning mechanism (6) comprises a fourth motor (601), the fourth motor (601) being fixedly mounted on the top of the mounting platform (3) near the edge, the output end of the fourth motor (601) slidingly passing through the top of the mounting platform (3) and extending downward, the output end of the fourth motor (601) being fixedly connected to a rotating disk (602), the bottom of the rotating disk (602) being provided with brush bristles (603).
7. A front transition flange flatness inspection tool according to claim 6, Features: The fifth motor (706) is fixedly mounted on the top of the mounting platform (3) near the edge, the output end of the fifth motor (706) slides through the top of the mounting platform (3) and extends to the bottom, the output end of the fifth motor (706) is fixedly connected to the second gear (707), the outer surface of the outer ring (703) is fixedly connected to the second gear sleeve (704), and the second gear sleeve (704) and the second gear (707) are meshingly connected.
8. A method for detecting the flatness of a front transition flange. It is characterized in that The front transition flange flatness inspection tool described in claim 7 is used, comprising the following steps: S1. When the flange moves to a position below the flushing mechanism (4), the water pump inside the water tank (401) pumps water out and sends it to the water outlet pipe (402). At this time, the water enters the hollow shell (408) through the connecting pipe (404) below, and forms a high-pressure water column under the action of the booster pump (403) and the high-pressure nozzle (409) to impact the flange end face, thereby flushing away impurities on the surface; S2, when the flushed flange moves to the bottom of the drying mechanism (5), the high-resistance heating wire (502) is started to convert electrical energy into thermal energy and then the fan (503) is started. At this time, the fan (503) blows the heated air inside the housing (501) into the ventilation pipe (504). At this time, the hot air passes through the ventilation pipe (504) and enters the interior of the conical cover (505), and is ejected from the through holes on the surface of the diverter plate (506). The ejected hot air dries the water stains remaining on the surface of the flange; S3, when the dried front transition flange moves to the bottom of the cleaning mechanism (6), the bristles (603) will contact the flange end surface. At this time, the fourth motor (601) is started to drive the turntable (602) to rotate at high speed. During the high-speed rotation of the turntable (602), the bristles (603) below can clean the flange end surface again, thereby ensuring the cleanliness of the end surface; S4. After the cleaned front transition flange is moved to the bottom of the detection mechanism (7), the lighting lamp (705) is started to emit light and illuminate the flange end face, and the camera (708) is started to take a picture of the flange end face from directly above and the image is converted into an electrical signal and transmitted to the host (17). At this time, the image processing system inside the host (17) compares and analyzes the shadow part in the flange photo to determine the flatness of the front transition flange end face.
Citation Information
Patent Citations
Wafer inspection method and wafer inspection apparatus
CN105489523A
Blade size precision automatic measurement and detection system
CN112474112A
Automatic welding, detecting, cleaning and rust preventing integrated production process for rotor and stator
CN116890164A
PCB hole detection device and method
CN117419623A
Detection tool facilitating workpiece taking and placing for automobile part machining
CN213874056U
