Through the smart factory data intelligent analysis and management system, combined with operating hours and order data, the single product time analysis value and order confirmation analysis value are calculated, which solves the problem of inaccurate and intuitive analysis results of the existing system, and improves the efficiency and efficiency of production management decision-making. Resource utilization ensures customer satisfaction and production process stability.
Patent Information
- Application Number
- CN202410763806.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-06-14
AI Technical Summary
The existing smart factory data intelligent analysis and management system fails to fully consider various factors in the production process, such as the correlation between products, when processing and analyzing data, resulting in low accuracy of analysis results and lack of intuitive display of results. It is difficult to help production managers make wise decisions.
A smart factory data intelligent analysis and management system is designed. Through the data collection, processing and analysis unit, the single product time analysis value and order confirmation analysis value of the product are calculated. Combined with the operation hours and order data, it is judged whether the order to be received can be processed at the current time. Complete within the cycle, and provide intuitive analysis results through the data display unit, recommending orders and resource optimization plans that can be completed.
It improves decision-making efficiency, optimizes resource allocation, increases the economic benefits of the enterprise, ensures customer satisfaction and the stability of the production process, adapts to the variability of market demand, and provides data-driven decision support.
Smart Images

Figure CN118333580B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of smart factories, and in particular to a smart factory data intelligent analysis and management system. Background Art
[0002] With the acceleration of industrialization, the scale and complexity of factory production are also increasing. In modern industrial production, how to effectively manage production data, predict product production time, reasonably arrange production tasks, ensure that orders are completed on time, and improve customer satisfaction are challenges faced by every factory. Traditional production management methods often rely on manual experience, lack scientific data support, and cannot meet the accuracy and real-time requirements of modern production.
[0003] In order to solve this problem, a smart factory data intelligent analysis and management system has emerged. This system collects factory production data and order data through the data acquisition unit, then processes and analyzes these data through the data processing unit, and finally further analyzes the processed and analyzed data through the data analysis unit to make a more scientific and reasonable production plan.
[0004] However, the existing intelligent factory data intelligent analysis and management systems often fail to take into account various factors in the production process, such as the correlation between products, when processing and analyzing data, resulting in low accuracy of the analysis results. In addition, the existing systems often lack intuitiveness when displaying analysis results, making it difficult for production managers to quickly understand various situations in the production process.
[0005] Therefore, a new smart factory data intelligent analysis and management system is needed that can more accurately analyze and predict product production time and order completion status, and at the same time display the analysis results in a more intuitive way to facilitate production managers to make more informed decisions. Summary of the invention
[0006] In view of the deficiencies in the prior art, the present invention provides an intelligent factory data intelligent analysis and management system, which solves the problems raised in the background technology.
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: an intelligent factory data intelligent analysis and management system, comprising:
[0008] A data collection unit, used to collect factory production data in multiple historical target cycles and order data in the current target cycle in the target factory;
[0009] Factory production data includes operating hours within the target period, production volume of different specified products and their corresponding effective production hours; order data includes required production volume of different specified products, and is divided into received order data and pending order data;
[0010] The data processing unit is used to calculate and process the factory production data in the previous cycle and obtain the single product time analysis value of each different specified product:
[0011] The single product time analysis value is the average value of multiple production times of a specified product calculated based on the production volume and effective production hours of the specified product in the factory production data, and the corresponding production time is obtained after performing discrete value analysis on the production time;
[0012] The data analysis unit is used to perform pending order determination analysis based on the required production quantities of the received order data and the pending order data in combination with the data calculation and processing results of the data processing unit, and judge whether the pending order data can be completed within the current target period based on the order determination analysis results, and then send the judgment result to the data display unit;
[0013] The data display unit is used to display the analysis results obtained by the data analysis unit to the production management personnel.
[0014] Preferably, the start and end time nodes corresponding to the multiple historical target cycles and the current target cycle are different, and the cycle intervals are the same in length, that is, the operating hours are the same.
[0015] Preferably, the data calculation and processing method is as follows:
[0016] Step R1. Select a specified product, obtain the production volume of the specified product and its corresponding effective production hours in multiple historical periods, and mark them as Li and Si, i = 1, 2, ... m, m represents the number of historical periods, Li represents the production volume of the specified product in the nth historical period, and Si represents the effective production hours of the specified product in the nth historical period;
[0017] Step R2, then calculate through formula 1: , calculate the discrete value L1 corresponding to the time of the specified product;
[0018] In calculation formula 1: DSi represents the time taken to produce a specified product in a historical period, recorded as the single product time; DSp represents the average time taken for all single products corresponding to the specified product in multiple historical periods;
[0019] Step R3, compare L1 with the preset discrete threshold Ly:
[0020] If L1>Ly, it means that the discrete value of the time taken by each single product for the specified product is large, and then the corresponding DSi values are deleted in the order of |DSi-DSp| from large to small;
[0021] Step R4, according to Step R3, and then through the calculation formula 2, , correspondingly calculate the deviation value L1 of the undeleted DSi until L1≤Ly;
[0022] In the calculation formula 2, the corresponding DSi is the value after deletion, and DSp is the average value of DSi before deletion;
[0023] Step R5. If L1≤Ly, extract all DSi used for calculating L1, then calculate the average value of all DSi, and record the value as the single product time analysis value DF.
[0024] Preferably, the order confirmation analysis method is as follows:
[0025] Step E1, obtain the required production quantity of each specified product from the received order data;
[0026] At the same time, according to each designated product in the received order data, the single product time analysis value of the corresponding product is obtained from the data calculation processing result of the data processing unit;
[0027] Step E2, mark the operating hours in the target period as YG;
[0028] The required production quantity of each specified product in Step E1 is marked as XLj, and the single product time analysis value of each specified product is marked as DFj, j = 1, 2, ... m, m represents the number of categories of all different specified products in the received order data;
[0029] Step E3, by calculating formula 3: , calculate the processing time JY used to produce the received order data, and record it as the processing time consumed JY0;
[0030] Step E4, obtain the required production quantity of each specified product from the pending order data;
[0031] At the same time, according to each designated product in the pending order data, the single product time analysis value of the corresponding product is obtained from the data calculation processing result of the data processing unit;
[0032] Then mark it according to the method of Step E2, and calculate it according to the calculation formula 3 in Step E3 to calculate the processing time JY used to produce the pending order data, and record it as the processing analysis time JY1;
[0033] Step E5, then compare JY1 with YG-JY0:
[0034] Among them, the result value obtained by YG-JY0 represents the continuous processing hours after the production of the received order data;
[0035] If JY1≤YG-JY0, it means that the pending order data can be completed within the current target period;
[0036] If JY1>YG-JY0, it means that the pending order data cannot be completed within the current target cycle.
[0037] Preferably, the result value obtained by YG-JY0 represents the continuous processing hours after the production of the received order data is completed.
[0038] Preferably, when the data analysis unit performs the determination analysis, the number of corresponding production equipment and the number of workers used are consistent with the number of corresponding production equipment and the number of workers used by the data collection unit to collect the corresponding production volume and the corresponding effective production hours;
[0039] Moreover, there is a correlation between the relevant production equipment and workers used for different designated products, that is, the operating hours consumed by different designated products are not in a parallel relationship. Among them, the parallel relationship of time means that multiple events or processes can be executed overlappingly in the same time period.
[0040] Preferably, the data collection unit is also used to collect the predetermined production cost and production unit price corresponding to each designated product.
[0041] Preferably, it also includes:
[0042] The recommendation analysis unit is used to select the pending order data that can be completed within the current target period from multiple pending order data, and generate corresponding recommendation coefficients, and then transmit the pending order data that can be completed within the current target period and its recommendation coefficient to the data display unit.
[0043] Preferably, the analysis method of the recommended analysis unit is as follows:
[0044] Step W1, importing multiple pending order data into the data analysis unit respectively, performing pending order determination analysis, and filtering out pending order data that cannot be completed within the current target period based on the analysis results, and retaining pending order data that can be completed within the current target period;
[0045] At the same time, the processing analysis time corresponding to each pending order data that can be completed within the current target cycle is obtained, and it is marked as JY1t, t=1, 2, ... v, v represents the order batch of the pending order data that can be completed within the current target cycle, and the processing time JY0 and the operating hours YG within the target cycle are also obtained;
[0046] Step W2, select the corresponding designated products from the waiting order data that can be completed within the current target period, calculate the profit value of each designated product according to the predetermined production cost and production unit price of each designated product, and mark it as YZt;
[0047] Step W3, extract the corresponding required production quantity from each pending order data that can be completed within the current target period, and mark it as XLt;
[0048] Step W4, through calculation formula 4: , calculate the recommendation coefficient TXT of each pending order data;
[0049] In calculation formula 4, α1 and α2 are preset proportional factors.
[0050] Preferably, the data display unit is also used to display the recommendation coefficients of each pending order data to the production management personnel, so that the production management personnel can obtain the pending order data that can be signed based on the maximum recommendation coefficient.
[0051] The present invention provides a smart factory data intelligent analysis and management system. Compared with the prior art, it has the following beneficial effects:
[0052] Improve decision-making efficiency: Through intelligent analysis of incoming order data, production managers can quickly identify orders that can be completed within the current target cycle.
[0053] Optimize resource allocation: Based on the fulfillability and profit value of orders, it can provide scientific recommendations to production managers to help them optimize resource allocation and ensure efficient use of resources.
[0054] Increase the economic benefits of the enterprise: By calculating the unit profit value of each specified product and combining it with the required production quantity, the system can recommend the order combination with the highest total profit.
[0055] Ensure corporate reputation and customer satisfaction: Use recommendation coefficients to help avoid the risk of default that may result from blindly signing contracts, thereby ensuring corporate reputation and customer satisfaction.
[0056] Ensure that the factory's production process is smoother: Through the reasonable screening and recommendation of orders, the factory's production process can be ensured to be smoother and reduce production interruptions or confusion caused by the insertion of emergency orders.
[0057] Adapt to the variability of market demand: Be able to handle multiple batches of orders corresponding to multiple demand parties and adapt to the variability of market demand.
[0058] Flexible adjustment: It can be flexibly adjusted according to different products and order requirements.
[0059] Provide data-driven decision support: The recommendation analysis unit provides data-driven decision support, allowing production managers to make decisions based on objective data analysis results rather than just experience. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 It is a system block diagram of the present invention. DETAILED DESCRIPTION
[0061] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0062] As embodiment 1 of the present invention
[0063] See also Figure 1 The present invention provides a technical solution: an intelligent factory data intelligent analysis and management system, comprising:
[0064] A data collection unit, used to collect factory production data in multiple historical target cycles and order data in the current target cycle in the target factory;
[0065] Factory production data includes operating hours within the target period, production volume of different specified products and their corresponding effective production hours;
[0066] Operating hours refer to the normal working hours of a specified factory excluding overtime, and effective production hours refer to the production hours of the corresponding production volume of a specified product.
[0067] Among them, the corresponding start and end time nodes between multiple historical target cycles and the current target cycle are different, and the cycle intervals are the same, that is, the operating hours are the same;
[0068] The order data includes the required production quantity of different specified products, and is divided into received order data and pending order data;
[0069] The data processing unit is used to calculate and process the factory production data in the previous cycle:
[0070] The method is as follows:
[0071] StepR1, take a specified product as an example;
[0072] In multiple historical periods, the production volume of the specified product and its corresponding effective production hours are obtained, and they are marked as Li and Si respectively, i=1, 2, ...m, m represents the number of historical periods, Li represents the production volume of the specified product in the nth historical period, and Si represents the effective production hours of the specified product in the nth historical period;
[0073] Step R2, then calculate through formula 1: , calculate the discrete value L1 corresponding to the time of the specified product;
[0074] In calculation formula 1:
[0075] DSi represents the time taken to produce a specified product in a historical cycle, recorded as single product time;
[0076] DSp is expressed as the average time of all items corresponding to a specified product in multiple historical periods;
[0077] Step R3, compare L1 with the preset discrete threshold Ly:
[0078] If L1>Ly, it means that the discrete value of the time taken by each single product for the specified product is large, and then the corresponding DSi values are deleted in the order of |DSi-DSp| from large to small;
[0079] Step R4, according to Step R3, and then through the calculation formula 2, , correspondingly calculate the deviation value L1 of the undeleted DSi until L1≤Ly;
[0080] In the calculation formula 2, the corresponding DSi is the value after deletion, and DSp is the average value of DSi before deletion;
[0081] Step R5, if L1≤Ly, extract all DSi used for calculating L1, then calculate the average value of all DSi, and record the value as the single product time analysis value DF;
[0082] Step R6, calculate the single product time analysis value of each other different specified product according to the method in Step R1 to Step R5;
[0083] A data analysis unit is used to perform confirmation analysis of pending orders based on the required production quantities of the received order data and the pending order data in combination with the data calculation and processing results of the data processing unit;
[0084] The method is as follows:
[0085] Step E1, obtain the required production quantity of each specified product from the received order data;
[0086] At the same time, according to each designated product in the received order data, the single product time analysis value of the corresponding product is obtained from the data calculation processing result of the data processing unit;
[0087] Step E2, mark the operating hours in the target period as YG;
[0088] Mark the required production quantity of each specified product in StepE1 as XLj, and the single product time analysis value of each specified product as DFj;
[0089] Where j = 1, 2, ..., m, and m represents the number of categories of all different specified products in the received order data;
[0090] Step E3, by calculating formula 3: , calculate the processing time JY used to produce the received order data, and record it as the processing time consumed JY0;
[0091] Step E4, obtain the required production quantity of each specified product from the pending order data;
[0092] In this embodiment, the order batch value corresponding to the pending order data is 1, which means a batch of orders from a single customer or demander;
[0093] At the same time, according to each designated product in the pending order data, the single product time analysis value of the corresponding product is obtained from the data calculation processing result of the data processing unit;
[0094] Then mark it according to the method of Step E2, and calculate it according to the calculation formula 3 in Step E3 to calculate the processing time JY used to produce the pending order data, and record it as the processing analysis time JY1;
[0095] Step E5, then compare JY1 with YG-JY0:
[0096] Among them, the result value obtained by YG-JY0 represents the continuous processing hours after the production of the received order data;
[0097] If JY1≤YG-JY0, it means that the pending order data can be completed within the current target period;
[0098] If JY1>YG-JY0, it means that the pending order data cannot be completed within the current target cycle;
[0099] Among them, when the data analysis unit performs determination and analysis, the number of corresponding production equipment and the number of workers used are consistent with the number of corresponding production equipment and the number of workers used by the data collection unit to collect the corresponding production volume and the corresponding effective production hours; and there is a correlation between the relevant production equipment and workers used by different specified products, that is, the operating hours consumed by different specified products are not in a parallel relationship, wherein the parallel relationship of time means that multiple events or processes can be executed overlappingly in the same time period;
[0100] This embodiment can predict the production time of different products by analyzing historical production data, provide a basis for production plan formulation, help to reasonably arrange production tasks, and ensure that orders are completed on time. By analyzing order data, the production cycle can be predicted to ensure that orders are completed on time and improve customer satisfaction. The data display unit will display the analysis results to production managers in an intuitive manner, so that they can quickly understand various situations in the production process and make more informed decisions. The system can be flexibly adjusted according to different products and order requirements to adapt to diverse production environments.
[0101] Embodiment 2
[0102] See also Figure 1 As the second embodiment of the present invention, when the present application is implemented, compared with the first embodiment, the technical solution of the present embodiment is different from that of the first embodiment only in that:
[0103] In this embodiment, the order batch value corresponding to the pending order data is greater than 1, which means that there are multiple batches of orders corresponding to multiple demanders;
[0104] The data collection unit is also used to collect the predetermined production cost and production unit price corresponding to each designated product;
[0105] And this embodiment also includes:
[0106] A recommendation analysis unit, for selecting, from a plurality of pending order data, pending order data that can be completed within the current target period, and generating a corresponding recommendation coefficient, and then transmitting the pending order data that can be completed within the current target period and its recommendation coefficient to a data display unit;
[0107] The specific selection method is as follows:
[0108] Step W1, importing multiple pending order data into the data analysis unit respectively, performing pending order determination analysis, and filtering out pending order data that cannot be completed within the current target period based on the analysis results, and retaining pending order data that can be completed within the current target period;
[0109] At the same time, the processing analysis time corresponding to each pending order data that can be completed within the current target cycle is obtained, and it is marked as JY1t, t=1, 2, ... v, v represents the order batch of the pending order data that can be completed within the current target cycle, and the processing time JY0 and the operating hours YG within the target cycle are also obtained;
[0110] Step W2, select the corresponding designated products from the waiting order data that can be completed within the current target period, calculate the profit value of each designated product according to the predetermined production cost and production unit price of each designated product, and mark it as YZt;
[0111] Step W3, extract the corresponding required production quantity from each pending order data that can be completed within the current target period, and mark it as XLt;
[0112] Step W4, through calculation formula 4: , calculate the recommendation coefficient TXT of each pending order data;
[0113] In calculation formula 4, α1 and α2 are preset proportional factors;
[0114] The data display unit is also used to display the recommendation coefficient of each pending order data to the production management personnel, so that the production management personnel can obtain the pending order data that can be signed based on the maximum recommendation coefficient, avoiding blind signing of contracts that may result in the pending order data after signing not being completed within the specified time, thereby creating a risk of breach of contract.
[0115] Embodiment 3
[0116] As the third embodiment of the present invention, when the present application is specifically implemented, compared with the first and second embodiments, the technical solution of this embodiment is to combine the solutions of the first and second embodiments, and the difference between the technical solution of this embodiment and the first and second embodiments is that in this embodiment, before calculating by the calculation formula 4 in the second embodiment;
[0117] Furthermore, by adding up the processing analysis times corresponding to two or more waiting order data, a sum of multiple corresponding processing analysis times is obtained;
[0118] Then, the sum of each corresponding analysis time to be processed is compared with the value obtained by YG-JY0, and the waiting order data corresponding to the sum of the corresponding analysis time to be processed that is less than or equal to YG-JY0 is obtained, and it is combined into multiple packages to be recommended;
[0119] Then the recommendation coefficients of multiple packages to be recommended are calculated as follows:
[0120] The sum of the processing analysis time in each package to be recommended is marked as JY2g, g = 1, 2, ... f, and f represents the number of packages to be recommended;
[0121] At the same time, according to the profit value of each designated product in the package to be recommended and its corresponding required production quantity, the total profit of each designated product in the package to be recommended is calculated, and the sum ZLZg of the total profits of all designated products in the package to be recommended is obtained;
[0122] Then calculate the transformation formula of formula 4: , calculate the recommendation coefficient TXT of each package to be recommended;
[0123] The data display unit is also used to display the recommendation coefficients of each package to be recommended to the production management personnel, so that the production management personnel can obtain multiple pending order data in the package to be recommended that can be signed based on the maximum recommendation coefficient, so as to avoid blindly signing contracts, resulting in the pending order data after signing cannot be produced within the specified time, and causing the risk of breach of contract;
[0124] Implementation 2 and Implementation 3 use intelligent analysis of pending order data to enable production managers to quickly identify orders that can be completed within the current target cycle, thereby improving decision-making efficiency; can provide scientific recommendations to production managers based on the completeability and profit value of orders, helping them optimize resource allocation and ensure efficient use of resources; by calculating the unit profit value of each designated product and combining it with the required production volume, the system can recommend the order combination with the highest total profit, thereby increasing the company's economic benefits; through the recommendation coefficient, it helps avoid the risk of default that may result from blind signing of contracts, and ensures corporate reputation and customer satisfaction; through reasonable screening and recommendation of orders, the factory's production process can be ensured to be smoother, reducing production interruptions or confusion caused by the insertion of emergency orders; can handle multiple batches of orders corresponding to multiple demand parties, adapt to the variability of market demand, and can flexibly adjust according to different product and order requirements; the recommendation analysis unit provides data-driven decision support, allowing production managers to make decisions based on objective data analysis results rather than based solely on experience.
[0125] Embodiment 4
[0126] As the fourth embodiment of the present invention, when the present application is specifically implemented, compared with the first, second and third embodiments, the technical solution of this embodiment is to combine and implement the solutions of the above-mentioned first, second and third embodiments.
[0127] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters and thresholds in the formula are set by technicians in this field according to actual conditions.
[0128] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0129] The above embodiments of the present invention are described in detail, but the contents are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. An intelligent factory data intelligent analysis and management system, characterized in that: include: A data collection unit, used to collect factory production data in multiple historical target cycles and order data in the current target cycle in the target factory; Factory production data includes operating hours within the target period, production volume of different specified products and their corresponding effective production hours; order data includes required production volume of different specified products, and is divided into received order data and pending order data; The data processing unit is used to calculate and process the factory production data in the previous cycle and obtain the single product time analysis value of each different specified product: The data calculation and processing method is as follows: Step R1. Select a specified product, obtain the production volume of the specified product and its corresponding effective production hours in multiple historical periods, and mark them as Li and Si, i = 1, 2, ... m, m represents the number of historical periods, Li represents the production volume of the specified product in the nth historical period, and Si represents the effective production hours of the specified product in the nth historical period; Step R2, then calculate through formula 1: , calculate the discrete value L1 corresponding to the time of the specified product; In calculation formula 1: DSi represents the time taken to produce a specified product in a historical period, recorded as the single product time; DSp represents the average time taken for all single products corresponding to the specified product in multiple historical periods; Step R3, compare L1 with the preset discrete threshold Ly: If L1>Ly, it means that the discrete value of the time taken by each single product for the specified product is large, and then the corresponding DSi values are deleted in the order of |DSi-DSp| from large to small; Step R4, according to Step R3, and then through the calculation formula 2, , correspondingly calculate the deviation value L1 of the undeleted DSi until L1≤Ly; In the calculation formula 2, the corresponding DSi is the value after deletion, and DSp is the average value of DSi before deletion; Step R5, if L1≤Ly, extract all DSi used for calculating L1, then calculate the average value of all DSi, and record the value as the single product time analysis value DF; The single product time analysis value is the average value of multiple production times of a specified product calculated based on the production volume and effective production hours of the specified product in the factory production data, and the corresponding production time is obtained after performing discrete value analysis on the production time; The data analysis unit is used to perform pending order determination analysis based on the required production quantities of the received order data and the pending order data in combination with the data calculation and processing results of the data processing unit, and judge whether the pending order data can be completed within the current target period based on the order determination analysis results, and then send the judgment result to the data display unit; The order confirmation analysis is as follows: Step E1, obtain the required production quantity of each specified product from the received order data; At the same time, according to each designated product in the received order data, the single product time analysis value of the corresponding product is obtained from the data calculation processing result of the data processing unit; Step E2, mark the operating hours in the target period as YG; The required production quantity of each specified product in Step E1 is marked as XLj, and the single product time analysis value of each specified product is marked as DFj, j = 1, 2, ... m, m represents the number of categories of all different specified products in the received order data; Step E3, by calculating formula 3: , calculate the processing time JY used to produce the received order data, and record it as the processing time consumed JY0; Step E4, obtain the required production quantity of each specified product from the pending order data; At the same time, according to each designated product in the pending order data, the single product time analysis value of the corresponding product is obtained from the data calculation processing result of the data processing unit; Then mark it according to the method of Step E2, and calculate it according to the calculation formula 3 in Step E3 to calculate the processing time JY used to produce the pending order data, and record it as the processing analysis time JY1; Step E5, then compare JY1 with YG-JY0: Among them, the result value obtained by YG-JY0 represents the continuous processing hours after the production of the received order data; If JY1≤YG-JY0, it means that the pending order data can be completed within the current target period; If JY1>YG-JY0, it means that the pending order data cannot be completed within the current target cycle; The data display unit is used to display the analysis results obtained by the data analysis unit to the production management personnel.
2. The intelligent factory data intelligent analysis and management system according to claim 1 is characterized by: The corresponding start and end time nodes between multiple historical target cycles and the current target cycle are different, and the cycle intervals are the same, that is, the operating hours are the same.
3. The intelligent factory data intelligent analysis and management system according to claim 1 is characterized by: in, The result value obtained by YG-JY0 represents the working hours that can be continued after the received order data is produced.
4. The intelligent factory data intelligent analysis and management system according to claim 1, characterized in that: in, When the data analysis unit performs determination and analysis, the number of corresponding production equipment and the number of workers used are consistent with the number of corresponding production equipment and the number of workers used by the data collection unit to collect the corresponding production volume and its corresponding effective production hours; Moreover, there is a correlation between the relevant production equipment and workers used for different designated products, that is, the operating hours consumed by different designated products are not in a parallel relationship. Among them, the parallel relationship of time means that multiple events or processes can be executed overlappingly in the same time period.
5. The intelligent factory data intelligent analysis and management system according to claim 1, characterized in that: The data collection unit is also used to collect the predetermined production cost and production unit price corresponding to each designated product.
6. The intelligent factory data intelligent analysis and management system according to claim 5, characterized in that: Also includes: The recommendation analysis unit is used to select the pending order data that can be completed within the current target period from multiple pending order data, and generate corresponding recommendation coefficients, and then transmit the pending order data that can be completed within the current target period and its recommendation coefficient to the data display unit.
7. The intelligent factory data intelligent analysis and management system according to claim 6 is characterized by: The analysis method of the recommended analysis unit is as follows: Step W1, importing multiple pending order data into the data analysis unit respectively, performing pending order determination analysis, and filtering out pending order data that cannot be completed within the current target period based on the analysis results, and retaining pending order data that can be completed within the current target period; At the same time, the processing analysis time corresponding to each pending order data that can be completed within the current target cycle is obtained, and it is marked as JY1t, t=1, 2, ... v, v represents the order batch of the pending order data that can be completed within the current target cycle, and the processing time JY0 and the operating hours YG within the target cycle are also obtained; Step W2, select the corresponding designated products from the waiting order data that can be completed within the current target period, calculate the profit value of each designated product according to the predetermined production cost and production unit price of each designated product, and mark it as YZt; Step W3, extract the corresponding required production quantity from each pending order data that can be completed within the current target period, and mark it as XLt; Step W4, through calculation formula 4: , calculate the recommendation coefficient TXT of each pending order data; In calculation formula 4, α1 and α2 are preset proportional factors.
8. The intelligent factory data intelligent analysis and management system according to claim 6, characterized in that: The data display unit is also used to display the recommendation coefficients of each pending order data to the production management personnel, so that the production management personnel can obtain the pending order data that can be signed based on the maximum recommendation coefficient.