A method for unit commitment in power system based on target robustness optimization
By adopting the target robustness optimization method in the power system and utilizing the Wasserstein distributed distance metric and linear decision rules, the problem of solar output randomness and intermittency is solved, a flexible and adaptive unit combination plan is achieved, and the utility cost is reduced. cost and improves the predictability of system operation.
Patent Information
- Application Number
- CN202410789360.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-06-19
AI Technical Summary
Existing uncertain power system unit mix technologies are unable to effectively mitigate the randomness and intermittency of solar output, resulting in unnecessary conservatism and unacceptable robustness increases in utility costs.
A method based on objective robustness optimization is adopted, by establishing a unit combination model, introducing photovoltaic output random variables, using the Wasserstein distribution distance metric to describe the empirical neighborhood of the photovoltaic output prediction error distribution, giving priority to the most robust constraints, and adopting linear decision rules and duality theorem to solve the model and obtain a flexible and adaptive unit start-stop plan.
It has achieved predictable power system operating cost targets from the perspective of commercial final accounts, obtained reliable unit startup and shutdown plans, made full use of historical data, reduced utility costs, and improved the flexibility and adaptability of system operations.
Smart Images

Figure CN118353102B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of uncertain power system unit combination, in particular to a power system unit combination method based on target robustness optimization. Background Art
[0002] The goal of the existing unit commitment (UC) problem is to obtain the minimum operating cost of the power system by determining the output of generators within the delivery cycle under the load demand constraint. Recently, photovoltaic (PV) panels and other renewable power generation equipment have been increasingly integrated into the system, reducing fossil fuel consumption and greenhouse gas emissions. Unlike traditional thermal power units, the available solar energy depends on chaotic weather conditions, so the solar energy output cannot be dispatched in the traditional sense. Although the solar energy output limit varies within the delivery cycle, the UC solution should be formulated before understanding the available solar energy. How to penetrate solar energy into the system as much as possible while mitigating the randomness and intermittency of its output limit is a long-standing problem facing society.
[0003] UC problems under uncertainty are often associated with uncertainty models, which has spawned a large number of methods in the field of power engineering. Stochastic optimization (SO) formulations usually assume an uncertainty model with a discrete probability distribution and incorporate this distribution into a chance constraint or risk-aware objective function. More specifically, empirical optimization (EO) assumes realized uncertainty data records as samples of its empirical distribution, deploying sample average approximation (SAA) and other techniques to reformulate the problem into a tractable form. However, its out-of-sample performance may be lower than expected due to the difference between the true distribution and the empirical distribution. Given enough samples, SO integrates a data generation model to approximate the true distribution that nature uses to generate historical and future samples. However, it may complicate the model solution and thus rely on the performance of scenario generation and simplification techniques.
[0004] Through adversarial uncertainty models, robust optimization (RO) selects the uncertainty parameters with the worst impact on the feasibility and utility cost of the problem from a set of uncertainties that restricts the fluctuation range of the uncertainty parameters. However, the worst-case uncertainty may be statistically impossible, resulting in unnecessary conservatism and unacceptable increase in utility costs. Distributed robust optimization (DRO) generalizes RO by using random variables to describe the uncertain parameters and selecting the worst distribution of the random variables over a set of fuzzinesses of a restricted set of potential distributions, where the worst-case distribution is usually related to the true distribution of the uncertainty. It significantly improves UC solutions considering uncertain parameters in demand, renewable energy, and price. Fuzzy sets can be constructed from moment information of the empirical distribution (e.g., mean and variance) and distribution distance measures around the empirical distribution that contain the true distribution with a certain confidence level, such as the Wasserstein metric and the Kullback-Leibler divergence. Focusing on distance-based fuzziness, we note that many studies use the Wasserstein sphere as the empirical neighborhood and determine its appropriate radius by trial and error. However, the effect of radius on the out-of-sample performance of DRO formulations remains a mystery. The lack of theoretical guidance for the distribution radius may impair its reliability under practical conditions, especially for situations that require frequent parameter changes, such as distribution shift, which may hinder its implementation.
[0005] Therefore, there is still room for improvement in the prior art. Summary of the invention
[0006] The purpose of the present invention is to provide a method for combining power system units based on target robustness optimization, aiming to solve the technical problem that the existing uncertain power system unit combination cannot alleviate the randomness and intermittency of its output limitation, resulting in unnecessary conservatism and unacceptable robustness, and increased utility costs.
[0007] To achieve the above-mentioned purpose, the technical solution of the present invention is: A method for unit combination of a power system based on target robustness optimization, which specifically includes the following steps:
[0008] First, a unit commitment model is established. The objective function of the unit commitment model is to minimize the sum of fuel cost, startup cost and weighted load loss, where the fuel cost is expressed as a piecewise linearized consumption function.
[0009] ,
[0010] In the formula, It is the start and stop plan vector of coal-fired units; It is the output planning vector of coal-fired units; It is the output planning vector of the photovoltaic power station; is the load loss state vector; is the busbar number, is the number of buses; is the serial number of the coal-fired unit, is the number of coal-fired units; is the coefficient number of the piecewise linearized consumption function, is the number of coefficients of the piecewise linearized consumption function; To schedule the time, is the scheduling period; Represents the scroll index, i.e. , Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; For the Coal-fired units in The start and stop plan of the dispatch time, For the Coal-fired units in Start and stop plan at dispatch time; For the Coal-fired units in The output plan at the moment, in MW; is the piecewise linearized consumption function Section coefficient, unit is yuan per MW; Represents the piecewise linearized consumption function Segment constant, unit is yuan; For the The startup cost of a coal-fired unit, in yuan; is the loss load weight coefficient; For the The busbars are The amount of load loss at the moment, in MW.
[0011] The constraints involve DC power flow, unit output, PV output and load loss, where the source-load balance at each moment is expressed as an equality constraint:
[0012] ,
[0013] In the formula, For the The busbars are The actual load demand at the moment, in MW; is the serial number of the photovoltaic power station, is the number of photovoltaic power stations; For the Photovoltaic power plants in Timely output plan.
[0014] The bidirectional power flow of the line between any two nodes is less than or equal to the line capacity:
[0015] ,
[0016] ,
[0017] In the formula, For the The capacity of the line, in MW; is the power transfer distribution factor;
[0018] The unit output and its ramp rate satisfy the following inequality constraints:
[0019] ,
[0020] ,
[0021] ,
[0022] In the formula, For the The minimum output of each coal-fired unit, For the Maximum output of a coal-fired unit, in MW; For the Maximum upward ramp rate of a coal-fired unit, For the Maximum downward ramp rate of each coal-fired unit, in MW per hour;
[0023] Predicted value of PV output limit:
[0024] ,
[0025] In the formula, For the Photovoltaic power plants in The predicted value of the photovoltaic output limit at the moment, in MW;
[0026] Second, the target robust optimization model considering the uncertainty of photovoltaic output limitation is introduced, and the photovoltaic output random variable is the sum of the photovoltaic output expectation and the photovoltaic output prediction error term:
[0027] ,
[0028] In the formula, For the Photovoltaic power plants in The expected photovoltaic output at the moment, in MW; For the Photovoltaic power plants in Maximum error of photovoltaic output prediction at the moment, in MW; For the Photovoltaic power plants in A random variable representing the percentage error of photovoltaic output forecast at the moment;
[0029] The error percentage of photovoltaic output prediction is in the range of When , the support of the random variable about the percentage error of photovoltaic output prediction can be expressed as a "box-type" uncertainty set:
[0030] ,
[0031] In the formula, About Photovoltaic power plants in The uncertainty of the percentage error in the photovoltaic output forecast at the moment; is the uncertainty set regarding the percentage error of PV output prediction;
[0032] The unit combination model is represented as a two-stage problem of unit combination-economic dispatch, where the first stage problem focuses on the expectation of the "worst case" of the photovoltaic output forecast error distribution in the second stage problem; considering the uncertainty of photovoltaic output limit, a target robustness optimization model for the unit combination model can be established, giving priority to the most robust constraints, and making a unit start and stop plan:
[0033] ,
[0034] ,
[0035] ,
[0036] In the formula, is the operating cost budget given by the dispatch center, in yuan; Factors to quantify the impact of uncertainty on the plan; is the potential distribution of PV output forecast errors; is the empirical distribution of PV output prediction error; is the set of all possible distributions of PV output prediction errors; is the function of the second stage optimization problem; is the distribution distance metric function;
[0037] It is assumed that there is a correlation between the decision variables and state quantities of the second-stage optimization problem and the uncertainty of the photovoltaic prediction error, that is, the decision variables and state quantities of the second-stage optimization problem are expressed as a function of the uncertainty of the photovoltaic prediction error; given the unit start-stop plan and photovoltaic output limit, the second-stage optimization problem makes the unit output and photovoltaic output plan within the scheduling period, and estimates the load loss state at the same time:
[0038] ,
[0039] ,
[0040] ,
[0041] ,
[0042] ,
[0043] ,
[0044] ,
[0045] ,
[0046] ,
[0047] ,
[0048] In the formula, is the uncertainty vector of photovoltaic output prediction error; 1 to The uncertainty vector of the photovoltaic output prediction error at the moment; For the The output plan of the coal-fired units at time 1; For the The uncertainty of the photovoltaic prediction error of the coal-fired unit at time 2 as of time 1 Output planning function;
[0049] Without loss of generality, the target robustness optimization model uses the Wasserstein distribution distance metric based on the L1-norm to describe the empirical neighborhood of the photovoltaic output forecast error distribution:
[0050] ,
[0051] In the formula, is the historical data of photovoltaic output prediction error, Joint distribution of PV output forecast error uncertainty and historical data;
[0052] Then the target robustness optimization model based on Wasserstein index is:
[0053] ,
[0054] ,
[0055] ,
[0056] ,
[0057] in, ,
[0058] In the formula, is a fuzzy set containing potential joint distributions;
[0059] Third, the solution of the model; using different scenarios of PV output forecast error distribution, that is, different time series of historical data, the opportunity constraint (25) can be expressed as:
[0060] ,
[0061] In the formula, is the historical scene number, is the number of historical scenes; is the conditional distribution.
[0062] The power system unit combination method based on target robustness optimization is described, wherein for the worst scenario of photovoltaic output forecast error distribution, the conditional expectation of the second stage optimization problem in the chance constraint (27) can be expressed as:
[0063] .
[0064] The target robustness optimization-based power system unit combination method, wherein the target robustness optimization model introduces a linear decision rule to approximately describe the relationship between the decision variables and state quantities of the second-stage optimization problem and the uncertainty of the photovoltaic prediction error; an auxiliary variable is introduced near the empirical distribution The photovoltaic output prediction error uncertainty and the lifting support set of auxiliary variables can be expressed as:
[0065] ,
[0066] Then the opportunity constraint (28) can be expressed as:
[0067] ,
[0068] Among them, the linear decision rules include:
[0069] ,
[0070] ,
[0071] ,
[0072] ,
[0073] ,
[0074] ,
[0075] In the formula, For the The busbars are Time about ending Uncertainty of photovoltaic prediction error at each moment and its The load loss function of each historical scenario; For the Coal-fired units in Time about ending Uncertainty of photovoltaic prediction error at each moment and its Output planning function for each historical scenario; For the Photovoltaic power plants in Time about ending Uncertainty of photovoltaic prediction error at each moment and its Output planning function for each historical scenario; For the The busbars are The uncertainty of the photovoltaic prediction error at the moment; For the Coal-fired units in The uncertainty of the photovoltaic prediction error at the moment; For the Photovoltaic power plants in The uncertainty of the photovoltaic prediction error at the moment; They are The intercept, slope, and auxiliary variable coefficients of ; For The intercept, slope, and auxiliary variable coefficients of ; They are The intercept, slope, and auxiliary variable coefficients of ;
[0076] The method for unit combination of a power system based on target robustness optimization is described, wherein, within the uncertainty set, the uncertainty of the photovoltaic output prediction error takes infinite values, resulting in infinite constraints containing the photovoltaic output prediction error random variable, and the target robustness optimization model is a semi-infinite programming problem that is difficult to solve; for ease of processing, the robust corresponding part of each constraint containing the photovoltaic output prediction error random variable should be reformulated separately through the duality theorem to obtain a target robustness optimization model with finite constraints; the maximization subproblem in the chance constraint (29) can be expressed in a general matrix form:
[0077] ,
[0078] ,
[0079] ,
[0080] ,
[0081] In the formula, is the piecewise linearized consumption function constant matrix; is the startup cost vector of coal-fired units; is the coefficient matrix of the piecewise linearized consumption function; is the first stage coefficient vector; is the second stage coefficient vector; The decision variables for the first stage optimization problem; are the intercept, slope, and auxiliary variable coefficients of the decision variables in the second-stage optimization problem; for The lower limit vector of the uncertainty of the output prediction error of a photovoltaic power station, for The upper limit vector of the uncertainty of the output prediction error of a photovoltaic power station; For the A device (may be a busbar, coal-fired unit or photovoltaic power station) The uncertainty of the photovoltaic prediction error at the moment.
[0082] The power system unit combination method based on target robustness optimization is described, wherein the formula (39) is replaced by the following formula:
[0083] ,
[0084] ,
[0085] ,
[0086] In the formula, for No. A historical scene; is an auxiliary variable;
[0087] Then the solvable form of the maximization subproblem in the chance constraint (29), that is, the target robustness optimization model, is:
[0088] ,
[0089] ,
[0090] ,
[0091] ,
[0092] ,
[0093] In the formula, is the dual variable matrix corresponding to constraint (37); is the dual variable matrix corresponding to constraint (38); is the dual variable matrix corresponding to constraint (40); is the dual variable matrix corresponding to constraint (41); is the dual variable corresponding to constraint (42); For the A device (may be a busbar, coal-fired unit or photovoltaic power station) The dual variable of the moment constraint (37); For the A device (may be a busbar, coal-fired unit or photovoltaic power station) The dual variable of the moment constraint (38); For the A device (may be a busbar, coal-fired unit or photovoltaic power station) The dual variable of the moment constraint (40); For the A device (may be a busbar, coal-fired unit or photovoltaic power station) The dual variable of the moment constraint (41); To satisfy An indicator function that outputs 1 when .
[0094] Beneficial effects: The unit combination model of the present invention involves decision quantities such as coal-fired units, photovoltaic power stations and load loss, while considering safety constraints to obtain a reliable unit start-up and shutdown plan, and at the same time estimate the actual photovoltaic output, load loss status and the corresponding unit output plan; the target robustness optimization model of the present invention uses the Wasserstein indicator to measure the distance between the empirical distribution and the potential distribution of photovoltaic output uncertainty, so as to make full use of historical data and achieve the predictable power system operation cost budget target from the perspective of commercial settlement; in addition, the solution scheme of the model of the present invention includes linear decision rules, duality theorems, etc., which express the solvable form of the model to solve the unit combination model based on target robustness optimization, thereby obtaining a flexible and adaptive unit start-up and shutdown plan. BRIEF DESCRIPTION OF THE DRAWINGS
[0095] Figure 1 The invention discloses a power system unit combination technology framework based on target robustness optimization. DETAILED DESCRIPTION
[0096] In order to make the objectives, technical solutions and advantages of the present invention more clear and explicit, the present invention is further described in detail below with reference to the accompanying drawings and examples.
[0097] like Figure 1 As shown, the present invention discloses a method for combining power system units based on target robustness optimization, which specifically includes the following steps:
[0098] First, a unit commitment model is established. The objective function of the unit commitment model is to minimize the sum of fuel cost, startup cost and weighted load loss, where the fuel cost is expressed as a piecewise linearized consumption function.
[0099] ,
[0100] In the formula, It is the start and stop plan vector of coal-fired units; It is the output planning vector of coal-fired units; It is the output planning vector of the photovoltaic power station; is the load loss state vector; is the busbar number, is the number of buses; is the serial number of the coal-fired unit, is the number of coal-fired units; is the coefficient number of the piecewise linearized consumption function, is the number of coefficients of the piecewise linearized consumption function; To schedule the time, is the scheduling period; Represents the scroll index, i.e. , Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; For the Coal-fired units in The start and stop plan of the dispatch time, For the Coal-fired units in Start and stop plan at dispatch time; For the Coal-fired units in The output plan at the moment, in MW; is the piecewise linearized consumption function Section coefficient, unit is yuan per MW; Represents the piecewise linearized consumption function Segment constant, unit is yuan; For the The startup cost of a coal-fired unit, in yuan; is the loss load weight coefficient; For the The busbars are The amount of load loss at the moment, in MW.
[0101] The constraints involve DC power flow, unit output, PV output and load loss, where the source-load balance at each moment is expressed as an equality constraint:
[0102] ,
[0103] In the formula, For the The busbars are The actual load demand at the moment, in MW; is the serial number of the photovoltaic power station, is the number of photovoltaic power stations; For the Photovoltaic power plants in Timely output plan.
[0104] The bidirectional power flow of the line between any two nodes is less than or equal to the line capacity:
[0105] ,
[0106] ,
[0107] In the formula, For the The capacity of the line, in MW; is the power transfer distribution factor;
[0108] The unit output and its ramp rate satisfy the following inequality constraints:
[0109] ,
[0110] ,
[0111] ,
[0112] In the formula, For the The minimum output of each coal-fired unit, For the Maximum output of a coal-fired unit, in MW; For the Maximum upward ramp rate of a coal-fired unit, For the Maximum downward ramp rate of each coal-fired unit, in MW per hour;
[0113] Predicted value of PV output limit:
[0114] ,
[0115] In the formula, For the Photovoltaic power plants in The predicted value of the photovoltaic output limit at the moment, in MW;
[0116] Second, the target robust optimization model considering the uncertainty of photovoltaic output limitation is introduced, and the photovoltaic output random variable is the sum of the photovoltaic output expectation and the photovoltaic output prediction error term:
[0117] ,
[0118] In the formula, For the Photovoltaic power plants in The expected photovoltaic output at the moment, in MW; For the Photovoltaic power plants in Maximum error of photovoltaic output prediction at the moment, in MW; For the Photovoltaic power plants in A random variable representing the percentage error of photovoltaic output forecast at the moment;
[0119] The error percentage of photovoltaic output prediction is in the range of When , the support of the random variable about the percentage error of photovoltaic output prediction can be expressed as a "box-type" uncertainty set:
[0120] ,
[0121] In the formula, About Photovoltaic power plants in The uncertainty of the percentage error in the photovoltaic output forecast at the moment; is the uncertainty set regarding the percentage error of PV output prediction;
[0122] The unit combination model is represented as a two-stage problem of unit combination-economic dispatch, where the first stage problem focuses on the expectation of the "worst case" of the photovoltaic output forecast error distribution in the second stage problem; considering the uncertainty of photovoltaic output limit, a target robustness optimization model for the unit combination model can be established, giving priority to the most robust constraints, and making a unit start and stop plan:
[0123] ,
[0124] ,
[0125] ,
[0126] In the formula, is the operating cost budget given by the dispatch center, in yuan; Factors to quantify the impact of uncertainty on the plan; is the potential distribution of PV output forecast errors; is the empirical distribution of PV output prediction error; is the set of all possible distributions of PV output prediction errors; is the function of the second stage optimization problem; is the distribution distance metric function;
[0127] It is assumed that there is a correlation between the decision variables and state quantities of the second-stage optimization problem and the uncertainty of the photovoltaic prediction error, that is, the decision variables and state quantities of the second-stage optimization problem are expressed as a function of the uncertainty of the photovoltaic prediction error; given the unit start-stop plan and photovoltaic output limit, the second-stage optimization problem makes the unit output and photovoltaic output plan within the scheduling period, and estimates the load loss state at the same time:
[0128] ,
[0129] ,
[0130] ,
[0131] ,
[0132] ,
[0133] ,
[0134] ,
[0135] ,
[0136] ,
[0137] ,
[0138] In the formula, is the uncertainty vector of photovoltaic output prediction error; 1 to The uncertainty vector of the photovoltaic output prediction error at the moment; For the The output plan of the coal-fired units at time 1; For the The uncertainty of the photovoltaic prediction error of the coal-fired unit at time 2 as of time 1 Output planning function;
[0139] Without loss of generality, the target robustness optimization model uses the Wasserstein distribution distance metric based on the L1-norm to describe the empirical neighborhood of the photovoltaic output forecast error distribution:
[0140] ,
[0141] In the formula, is the historical data of photovoltaic output prediction error, It is the joint distribution of the uncertainty of photovoltaic output forecast error and historical data;
[0142] Then the target robustness optimization model based on Wasserstein index is:
[0143] ,
[0144] ,
[0145] ,
[0146] ,
[0147] in, , where is a fuzzy set containing potential joint distributions;
[0148] Third, the solution of the model; using different scenarios of PV output forecast error distribution, that is, different time series of historical data, the opportunity constraint (25) can be expressed as:
[0149] ,
[0150] In the formula, is the historical scene number, S is the number of historical scenes; is the conditional distribution.
[0151] The power system unit combination method based on target robustness optimization is described, wherein for the worst scenario of photovoltaic output forecast error distribution, the conditional expectation of the second stage optimization problem in the chance constraint (27) can be expressed as:
[0152] ,
[0153] The target robustness optimization-based power system unit combination method, wherein the target robustness optimization model introduces a linear decision rule to approximately describe the relationship between the decision variables and state quantities of the second-stage optimization problem and the uncertainty of the photovoltaic prediction error; an auxiliary variable is introduced near the empirical distribution The photovoltaic output prediction error uncertainty and the lifting support set of auxiliary variables can be expressed as:
[0154] ,
[0155] Then the opportunity constraint (28) can be expressed as:
[0156] ,
[0157] Among them, the linear decision rules include:
[0158] ,
[0159] ,
[0160] ,
[0161] ,
[0162] ,
[0163] ,
[0164] In the formula, For the The busbars are Time about ending Uncertainty of photovoltaic prediction error at each moment and its The load loss function of each historical scenario; For the Coal-fired units in Time about ending Uncertainty of photovoltaic prediction error at each moment and its Output planning function for each historical scenario; For the Photovoltaic power plants in Time about ending Uncertainty of photovoltaic prediction error at each moment and its Output planning function for each historical scenario; For the The busbars are The uncertainty of the photovoltaic prediction error at the moment; For the Coal-fired units in The uncertainty of the photovoltaic prediction error at the moment; For the Photovoltaic power plants in The uncertainty of the photovoltaic prediction error at the moment; They are The intercept, slope, and auxiliary variable coefficients of ; They are The intercept, slope, and auxiliary variable coefficients of ; They are The intercept, slope, and auxiliary variable coefficients of .
[0165] The method for unit combination of a power system based on target robustness optimization is described, wherein, within the uncertainty set, the uncertainty of the photovoltaic output prediction error takes infinite values, resulting in infinite constraints containing the photovoltaic output prediction error random variable, and the target robustness optimization model is a semi-infinite programming problem that is difficult to solve; for ease of processing, the robust corresponding part of each constraint containing the photovoltaic output prediction error random variable should be reformulated separately through the duality theorem to obtain a target robustness optimization model with finite constraints; the maximization subproblem in the chance constraint (29) can be expressed in a general matrix form:
[0166] ,
[0167] ,
[0168] ,
[0169] ,
[0170] In the formula, is the piecewise linearized consumption function constant matrix; is the startup cost vector of coal-fired units; is the coefficient matrix of the piecewise linearized consumption function; is the first stage coefficient vector; is the second stage coefficient vector; The decision variables for the first stage optimization problem; The intercept, slope, and auxiliary variable coefficients of the decision variables for the second-stage optimization problem; for The lower limit vector of the uncertainty of the output prediction error of a photovoltaic power station, for The upper limit of the uncertainty of the output prediction error of a photovoltaic power station; For the A device (may be a busbar, coal-fired unit or photovoltaic power station) The uncertainty of the photovoltaic prediction error at the moment.
[0171] The power system unit combination method based on target robustness optimization is described, wherein the formula (39) is replaced by the following formula:
[0172] ,
[0173] ,
[0174] ,
[0175] In the formula, for No. A historical scene; is an auxiliary variable;
[0176] Then the solvable form of the maximization subproblem in the chance constraint (29), that is, the target robustness optimization model, is:
[0177] ,
[0178] ,
[0179] ,
[0180] ,
[0181] ,
[0182] In the formula, is the dual variable matrix corresponding to constraint (37); is the dual variable matrix corresponding to constraint (38); is the dual variable matrix corresponding to constraint (40); is the dual variable matrix corresponding to constraint (41); is the dual variable corresponding to constraint (42); For the A device (may be a busbar, coal-fired unit or photovoltaic power station) The dual variable of the moment constraint (37); For the A device (may be a busbar, coal-fired unit or photovoltaic power station) The dual variable of the moment constraint (38); For the A device (may be a busbar, coal-fired unit or photovoltaic power station) The dual variable of the moment constraint (40); For the A device (may be a busbar, coal-fired unit or photovoltaic power station) The dual variable of the moment constraint (41); To satisfy An indicator function that outputs 1 when .
[0183] The current mainstream solution is the unit commitment method based on distributionally robust optimization, in which the distributionally robust optimization model based on L1-norm Wasserstein distance can be expressed as:
[0184] ,
[0185] ,
[0186] In the formula, represents the fuzzy set of all possible distributions of the photovoltaic output error limit, is a parameter that limits the range of the fuzzy set.
[0187] Based on the uncertainty support set, for:
[0188] .
[0189] Comparing the robust optimization and target robust optimization, we can get:
[0190] 1. Parameters It has no actual physical meaning and requires repeated debugging to determine. A neighborhood that is too small may miss the true distribution, while a neighborhood that is too large may reduce the confidence level. Therefore, it is difficult to apply to situations where the distribution of photovoltaic output forecast errors changes frequently, that is, distribution drift. The target robustness optimization model can ensure the interpretability of the system operation plan, which in turn helps in practical applications.
[0191] 2. Wasserstein distance can make full use of historical data of photovoltaic output prediction errors.
[0192] 3. Improving the linear decision rules can improve the solution accuracy of the target robustness optimization model and improve the flexibility of the unit combination scheme based on target robustness optimization.
[0193] The unit combination model of the present invention involves decision quantities such as coal-fired units, photovoltaic power stations and load loss, while considering safety constraints to obtain a reliable unit start-up and shutdown plan, and at the same time estimate the actual photovoltaic output, load loss state and the corresponding unit output plan; the target robustness optimization model of the present invention uses the Wasserstein indicator to measure the distance between the empirical distribution and the potential distribution of photovoltaic output uncertainty, so as to make full use of historical data and achieve a predictable power system operation cost budget target from the perspective of commercial settlement; in addition, the solution scheme of the model of the present invention includes linear decision rules, duality theorems, etc., which express the solvable form of the model to solve the unit combination model based on target robustness optimization, thereby obtaining a flexible and adaptive unit start-up and shutdown plan, while maintaining a more reasonable expenditure budget.
[0194] The above are only preferred implementation modes of the present invention, which certainly cannot be used to limit the scope of rights of the present invention. It should be pointed out that for technicians in this technical field, any modification or equivalent replacement of the technical solution of the present invention without creative work does not depart from the protection scope of the technical solution of the present invention.
Claims
1. A power system unit commitment method based on target robustness optimization, It is characterized in that The specific steps include: Step 1: Establish a unit commitment model, wherein the objective function of the unit commitment model is to minimize the sum of fuel cost, startup cost and weighted load loss, wherein the fuel cost is expressed as a piecewise linearized consumption function; , In the formula, It is the start and stop plan vector of coal-fired units; It is the output planning vector of coal-fired units; It is the output planning vector of the photovoltaic power station; is the load loss state vector; is the busbar number, is the number of buses; is the serial number of the coal-fired unit, is the number of coal-fired units; is the coefficient number of the piecewise linearized consumption function, is the number of coefficients of the piecewise linearized consumption function; To schedule the time, is the scheduling period; Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; Represents the scroll index, i.e. ; For the Coal-fired units in The start and stop plan of the dispatch time, For the Coal-fired units in Start and stop plan at dispatch time; For the Coal-fired units in The output plan at the moment, in MW; is the piecewise linearized consumption function Section coefficient, unit is yuan per MW; Represents the piecewise linearized consumption function Segment constant, unit is yuan; For the The startup cost of a coal-fired unit, in yuan; is the loss load weight coefficient; For the The busbars are The load loss at the moment, in MW; The constraints of the unit combination model involve DC power flow, unit output, photovoltaic output and load loss, where the source-load balance at each moment is expressed as an equality constraint: , In the formula, For the The busbars are The actual load demand at the moment, in MW; is the serial number of the photovoltaic power station, is the number of photovoltaic power stations; For the Photovoltaic power stations in Timely output plan; The bidirectional power flow of the line between any two nodes is less than or equal to the line capacity: , , In the formula, For the The capacity of the line, in MW; is the power transfer distribution factor; The unit output and its ramp rate satisfy the following inequality constraints: , , , In the formula, For the The minimum output of each coal-fired unit, For the Maximum output of a coal-fired unit, in MW; For the Maximum upward ramp rate of a coal-fired unit, For the Maximum downward ramp rate of each coal-fired unit, in MW per hour; Predicted value of PV output limit: , In the formula, For the k Photovoltaic power stations in The predicted value of the photovoltaic output limit at the moment, in MW; Step 2: Consider the target robust optimization model with uncertainty in PV output limitation, and introduce the PV output random variable as the sum of the PV output expectation and the PV output prediction error term: , In the formula, For the Photovoltaic power stations in The expected photovoltaic output at the moment, in MW; For the Photovoltaic power stations in Maximum error of photovoltaic output prediction at the moment, in MW; For the Photovoltaic power stations in A random variable representing the percentage error of photovoltaic output forecast at the moment; When the interval of the photovoltaic output prediction error percentage is [-1,1], the support of the random variable about the photovoltaic output prediction error percentage can be expressed as a "box-type" uncertainty set: , In the formula, About Photovoltaic power stations in The uncertainty of the percentage error in the photovoltaic output forecast at the moment; is the uncertainty set regarding the percentage error of PV output prediction; The unit combination model is represented as a two-stage problem of unit combination-economic dispatch, in which the first stage problem focuses on the expectation of the "worst case" of the photovoltaic output forecast error distribution in the second stage problem; considering the uncertainty of photovoltaic output limit, a target robustness optimization model for the unit combination model can be established, giving priority to the most robust constraints, and making a unit start and stop plan: , , , In the formula, is the operating cost budget given by the dispatch center, in yuan; Factors to quantify the impact of uncertainty on the plan; is the potential distribution of PV output forecast errors; is the empirical distribution of PV output prediction error; is the set of all possible distributions of PV output prediction errors; is the function of the second stage optimization problem; is the distribution distance metric function; It is assumed that there is a correlation between the decision variables and state quantities of the second-stage optimization problem and the uncertainty of the photovoltaic prediction error, that is, the decision variables and state quantities of the second-stage optimization problem are expressed as a function of the uncertainty of the photovoltaic prediction error; given the unit start-stop plan and photovoltaic output limit, the second-stage optimization problem makes the unit output and photovoltaic output plan within the scheduling period, and estimates the load loss state at the same time: , , , , , , , , , , In the formula, is the uncertainty vector of photovoltaic output prediction error; 1 to The uncertainty vector of the photovoltaic output prediction error at the moment; For the The output plan of the coal-fired units at time 1; For the The uncertainty of the photovoltaic prediction error of the coal-fired unit at time 2 as of time 1 Output planning function; Without loss of generality, the target robustness optimization model uses the Wasserstein distribution distance metric based on the L1-norm to describe the empirical neighborhood of the photovoltaic output forecast error distribution: , In the formula, is the historical data of photovoltaic output prediction error, It is the joint distribution of the uncertainty of photovoltaic output forecast error and historical data; Then the target robustness optimization model based on Wasserstein index is: , , , (14)-(21), in, , where is a fuzzy set containing potential joint distributions; Step 3: Solution of the model; using different scenarios of PV output forecast error distribution, i.e. different time series of historical data, the opportunity constraint (25) can be expressed as: , In the formula, is the historical scene number, is the number of historical scenes; is the conditional distribution.
2. A method for unit commitment of a power system based on target robustness optimization according to claim 1, It is characterized in that For the worst scenario of PV output forecast error distribution, the conditional expectation of the second-stage optimization problem in the chance constraint (27) can be expressed as: 。 3. A method for unit commitment of a power system based on target robustness optimization according to claim 2, It is characterized in that The target robustness optimization model introduces a linear decision rule to approximately describe the relationship between the decision variables and state quantities of the second-stage optimization problem and the uncertainty of the photovoltaic prediction error; an auxiliary variable is introduced near the empirical distribution. The photovoltaic output prediction error uncertainty and the lifting support set of auxiliary variables can be expressed as: , Then the opportunity constraint (28) can be expressed as: , Among them, the linear decision rules include: , , , , , , In the formula, For the The busbars are Time about ending Uncertainty of photovoltaic prediction error at each moment and its The load loss function of each historical scenario; For the Coal-fired units in Time about ending Uncertainty of photovoltaic prediction error at each moment and its Output planning function for each historical scenario; For the Photovoltaic power stations in Time about ending Uncertainty of photovoltaic prediction error at each moment and its Output planning function for each historical scenario; For the The busbars are The uncertainty of the photovoltaic prediction error at the moment; For the Coal-fired units in The uncertainty of the photovoltaic prediction error at the moment; For the Photovoltaic power stations in The uncertainty of the photovoltaic prediction error at the moment; They are The intercept, slope, and auxiliary variable coefficients of ; They are The intercept, slope, and auxiliary variable coefficients of ; They are The intercept, slope, and auxiliary variable coefficients of .
4. A method for unit commitment of a power system based on target robustness optimization according to claim 3, It is characterized in that In the uncertainty set, the uncertainty of the photovoltaic output forecast error takes infinite values, resulting in an infinite number of constraints containing the photovoltaic output forecast error random variable. The target robustness optimization model is a semi-infinite programming problem that is difficult to solve. For ease of handling, the robust corresponding part of each constraint containing the photovoltaic output forecast error random variable should be reformulated separately through the duality theorem to obtain a target robustness optimization model with finite constraints. The maximization subproblem in the chance constraint (29) can be expressed in a general matrix form: , , , , In the formula, is the piecewise linearized consumption function constant matrix; is the startup cost vector of coal-fired units; is the coefficient matrix of the piecewise linearized consumption function; is the first stage coefficient vector; is the second stage coefficient vector; The decision variables for the first stage optimization problem; are the intercept, slope, and auxiliary variable coefficients of the decision variables in the second-stage optimization problem; for The lower limit vector of the uncertainty of the output prediction error of a photovoltaic power station, for The upper limit vector of the uncertainty of the output prediction error of a photovoltaic power station; For the Devices in The uncertainty of the photovoltaic prediction error at the moment.
5. A method for unit commitment of a power system based on target robustness optimization according to claim 4, It is characterized in that Formula (39) is replaced by the following formula: , , , In the formula, for No. A historical scene; is an auxiliary variable; Then the solvable form of the maximization subproblem in the chance constraint (29), that is, the target robustness optimization model, is: , , , , , In the formula, is the dual variable matrix corresponding to constraint (37); is the dual variable matrix corresponding to constraint (38); is the dual variable matrix corresponding to constraint (40); is the dual variable matrix corresponding to constraint (41); is the dual variable corresponding to constraint (42); For the Devices in The dual variable of the moment constraint (37); For the Devices in The dual variable of the moment constraint (38); For the Devices in The dual variable of the moment constraint (40); For the Devices in The dual variable of the moment constraint (41); To satisfy An indicator function that outputs 1 when .
Citation Information
Patent Citations
Method and device for establishing unit optimization scheduling model
CN112668751A
Installation capacity feasible region model for photovoltaic multi-point access and observation method
CN117972968A