Power operation and maintenance ship

By using the detachable slide rail and track wheel system on the power operation and maintenance ship, the flexible deployment of the main transformer and the maximization of the operation and maintenance space are achieved, which solves the power loss and operation and maintenance problems during the maintenance of the offshore booster station, and improves the sea-rising capacity. The operation and maintenance efficiency of the station.

CN118387233BActive Publication Date: 2024-10-25SHANGHAI INVESTIGATION DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410266214.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-08
Publication Date
2024-10-25
Estimated Expiration
2044-03-08

AI Technical Summary

Technical Problem

It is difficult to deploy the main transformer on the limited hull area and leave enough space for operation and maintenance. Especially when repairing the offshore booster station, when the main transformer is damaged due to disasters such as earthquakes, the repair is difficult and the power loss is serious.

Method used

Design a power operation and maintenance ship that uses a detachable slide rail system to move the main transformer on the hull through rail wheels. It uses detachable fixed ends and input and output busbar components to achieve flexible deployment of the main transformer, and through the neutral A complete set of protection devices are connected to the hull to ensure power grounding and utilization of operation and maintenance space.

Benefits of technology

It achieves the flexibility of deploying the main transformer on a limited-area hull and maximizes the operation and maintenance space, reduces power loss and maintenance difficulty, and improves the operation and maintenance efficiency of offshore booster stations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118387233B_ABST
    Figure CN118387233B_ABST
Patent Text Reader

Abstract

The electric power operation and maintenance ship provided by the present application belongs to the technical field of electric power equipment, and includes: a hull; at least one main transformer, the main transformer is provided with a fixed end that is detachably fixed to the hull, the main transformer is provided with an input and output busbar assembly, and the bottom of the main transformer is provided with a track wheel; at least one slide rail, the slide rail is at least two sections, and the detachable and sequentially connected sections are respectively installed in the operation and maintenance operation area on the hull and the receiving area for receiving the main transformer. Since the slide rail is at least two sections, the main transformer is moved to the receiving area through the operation and maintenance operation area through the cooperation of the track wheel and the slide rail, and is detachably fixed in the receiving area by the fixed end, and the slide rail section located in the operation and maintenance operation area can be disassembled after completing the task of transporting the main transformer, thereby increasing the use area of ​​the operation and maintenance operation area, and realizing the deployment of the main transformer on a hull of limited area, and leaving enough operation and maintenance space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of electric power equipment, and more specifically, to an electric power operation and maintenance vessel. Background Art

[0002] As a national strategic emerging industry, my country has built dozens of offshore wind farms in the past decade. With the commissioning of a large number of offshore wind power projects, the operation and maintenance of offshore wind farms has also become a focus issue.

[0003] The offshore booster station in an offshore wind farm can connect dozens of offshore wind turbines, integrating the functions of aggregation, boosting, and transmission, and is the core structure of the entire wind farm. Each offshore wind farm generally only has 1-2 offshore booster stations, which can gather the electricity generated by all wind turbines on the site, and then the main transformer installed inside the offshore booster station will boost the voltage and transmit it to the land via submarine cables to reduce power loss. It can be seen that the main transformer is the core functional equipment of the offshore booster station. Generally, 2-3 main transformers are installed in the offshore booster station at the same time to prevent the offshore booster station from losing its most important boosting function after a main transformer is damaged and loses its function.

[0004] When encountering disasters such as earthquakes, the main transformer and its matching neutral point protection device include a cantilever porcelain bushing structure, which is more vulnerable to earthquakes than GIS equipment (Gas Insulated Switchgear) and electrical secondary equipment. If multiple main transformers are damaged and fail due to an earthquake, it will be extremely difficult to repair them, and a large amount of power will be lost in the power grid before the repair is completed.

[0005] Therefore, when the main transformer of an offshore substation fails, it is very necessary to deploy a spare main transformer on the limited area of ​​the operation and maintenance hull and leave enough operation and maintenance space. The main transformer can be deployed on the hull for temporary access to reduce power loss. However, the hull area is limited, and the remaining operation and maintenance space after the deployment of the main transformer is very small, which can easily cause accidents and affect the work of the staff.

[0006] Therefore, how to deploy the main transformer on a ship with limited area and leave enough space for operation and maintenance is an urgent problem to be solved by technicians in this field. Summary of the invention

[0007] In view of this, the present application provides an electric power operation and maintenance vessel to deploy a main transformer on a hull of limited area while leaving sufficient operation and maintenance space.

[0008] In order to achieve the above objectives, this application provides the following technical solutions:

[0009] An electric power operation and maintenance ship, comprising:

[0010] hull;

[0011] At least one main transformer, the main transformer is provided with a fixed end detachably connected to the hull, the main transformer is provided with an input and output busbar assembly, and the bottom of the main transformer is provided with a track wheel;

[0012] Neutral point protection set. The number of neutral point protection sets is the same as that of the main transformer. They are installed on the hull and matched with the main transformer.

[0013] At least one slide rail is composed of at least two sections, which are detachably connected in sequence and are respectively installed in the operation and maintenance area on the hull and the receiving area for receiving the main transformer.

[0014] Optionally, the operation and maintenance area and the loading area are adjacently arranged on the ship deck of the hull.

[0015] Optionally, the operation and maintenance area and the loading area are adjacently arranged in a dock compartment in the belly of the ship.

[0016] Optionally, the slide rail is divided into two sections, including a transport slide rail and a loading slide rail. The transport slide rail extends from the edge of the ship deck to the loading area, and the loading slide rail is arranged in the loading area.

[0017] Optionally, the transport rail extends from the stern of the hull to the loading area on the deck of the vessel.

[0018] Optionally, the length of the receiving slide rail is equal to the length of the main transformer extending on the receiving slide rail.

[0019] Optionally, the transport rail and the receiving rail are connected to the hull by bolts.

[0020] Optionally, the input-output busbar assembly includes an input busbar for connecting the power collected by the offshore booster station to the main transformer and an output busbar for connecting the boosted power to the remaining electrical equipment of the offshore booster station.

[0021] Optionally, the slide rail is a steel rail.

[0022] The electric power operation and maintenance ship provided in the present application comprises: a hull; at least one main transformer, the main transformer is provided with a fixed end detachably connected to the hull, the main transformer is provided with an input and output busbar assembly, and the bottom of the main transformer is provided with a track wheel; a neutral point complete set of protection devices, the number of which is consistent with the main transformer, and which is arranged on the hull and matched with the main transformer; at least one slide rail, the slide rail is composed of at least two sections, which are detachably connected in sequence and are respectively installed in an operation and maintenance operation area on the hull and a receiving area for receiving the main transformer.

[0023] The hull provides a mobile platform in the ocean. The number of main transformers can be one or more according to the carrying capacity of the hull, which are used to undertake the work of the main transformer under maintenance on the offshore booster station. After the main transformer is installed on the hull, it can be disassembled through the fixed end to achieve flexible deployment. The input and output busbar assemblies are used to access electricity and output boosted electricity. The track wheels are used to cooperate with the slide rails on the hull to achieve the function of moving the main transformer. The neutral point protection device is connected to the neutral point of the main transformer, and the neutral point protection device is connected to the hull to achieve the purpose of working grounding.

[0024] Since the slide rail is composed of at least two sections, the main transformer is moved from the operation and maintenance area to the loading area through the cooperation of the track wheel and the slide rail, and is detachably fixed in the loading area by the fixed end. The slide rail segment below the main transformer cannot be removed because it is pressed, and the slide rail segment does not take up a lot of extra space. The slide rail segment located in the operation and maintenance area can be removed after completing the task of transporting the main transformer. This increases the usable area of ​​the operation and maintenance area, realizes the deployment of the main transformer on a hull with a limited area, and leaves enough operation and maintenance space. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The novel features of the present application are specifically set forth in the appended claims. The features and advantages of the present application will be better understood by reference to the following detailed description and accompanying drawings which set forth illustrative embodiments in which the principles of the present application are utilized. The accompanying drawings are only used for the purpose of illustrating the embodiments and should not be considered as limiting the present application. Also, throughout the drawings, the same reference numerals are used to represent the same elements.

[0026] In the attached figure: Figure 1 This is a schematic diagram of the structure of the electric power operation and maintenance vessel provided in this application.

[0027] In the attached figure: Figure 2 This is a schematic diagram of the slide rail installation structure of the electric power operation and maintenance vessel provided in this application.

[0028] In the attached figure: Figure 3 This is a schematic diagram of the grounding of the main transformer of the power operation and maintenance ship provided in this application.

[0029] Among them, the figure marks are: 1 is the hull, 2 is the main transformer, 3 is the neutral point protection device, 4 is the operation and maintenance area, 5 is the slide rail, 51 is the transport slide rail, 52 is the loading slide rail, 6 is the input and output busbar assembly, 61 is the input busbar, 62 is the output busbar, 7 is the grounding wire, and 8 is the track wheel. DETAILED DESCRIPTION

[0030] The following is an explanation of the implementation of the present application by means of specific embodiments. People familiar with the technology can easily understand other advantages and effects of the present application from the contents disclosed in this specification.

[0031] It should be noted that, in the absence of conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present application will be described in detail below with reference to the drawings and in combination with the embodiments. In order to enable those skilled in the art to better understand the present application scheme, the technical scheme in the embodiments of the present application will be clearly and completely described below in combination with the drawings in the embodiments of the present application. Obviously, the described embodiments are only embodiments of a part of the present application, not all embodiments. Based on the embodiments of the present application, all other embodiments obtained by ordinary technicians in the field without making creative work should fall within the scope of protection of the present application.

[0032] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0033] It should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0034] The present application provides an electric power operation and maintenance ship, which realizes the deployment of a main transformer on a hull of limited area and leaves sufficient operation and maintenance space.

[0035] In the attached figure: Figure 1 A schematic diagram of the structure of the electric power operation and maintenance ship provided for this application; Figure 2 A schematic diagram of the slide rail installation structure of the power operation and maintenance ship provided in this application; Figure 3 This is a schematic diagram of the grounding of the main transformer of the power operation and maintenance ship provided in this application.

[0036] The electric power operation and maintenance ship provided by the present application includes: a hull 1; at least one main transformer 2, the main transformer 2 is provided with a fixed end detachably connected to the hull 1, the main transformer 2 is provided with an input and output busbar assembly 6, and a track wheel 8 is provided at the bottom of the main transformer 2; a neutral point complete set of protection devices 3, the number of neutral point complete sets of protection devices 3 is consistent with the main transformer 2, and they are arranged on the hull 1 and matched with the main transformer 2; at least one slide rail 5, the slide rail 5 is at least two sections, which are detachably connected in sequence and are respectively installed in an operation and maintenance operation area 4 on the hull 1 and a receiving area for receiving the main transformer 2.

[0037] The hull 1 provides a mobile platform in the ocean. The number of main transformers 2 can be one or more according to the carrying capacity of the hull 1, which are used to undertake the work of the main transformer 2 under maintenance on the offshore substation. After the main transformer 2 is installed on the hull 1, it can be disassembled through the fixed end to achieve flexible deployment. The input and output busbar assembly 6 is used to access electricity and output boosted electricity. The track wheel 8 is used to cooperate with the slide rail 5 on the hull 1 to achieve the function of moving the main transformer 2. The neutral point protection device 3 is connected to the neutral point of the main transformer 2, and the neutral point protection device 3 is connected to the hull 1 to achieve the purpose of working grounding.

[0038] Since the slide rail 5 is at least two sections, the main transformer 2 is moved to the loading area via the operation and maintenance operation area 4 through the cooperation of the track wheel 8 and the slide rail 5, and is detachably fixed in the loading area by the fixed end. The slide rail segment located below the main transformer 2 cannot be removed because it is pressed, and the slide rail segment does not take up a lot of extra space. The slide rail segment located in the operation and maintenance operation area 4 can be removed after completing the task of transporting the main transformer 2. This increases the usable area of ​​the operation and maintenance operation area 4, realizes the deployment of the main transformer 2 on the hull 1 of limited area, and leaves enough operation and maintenance space.

[0039] The above-mentioned slide rail 5 can be one, two or more. Multiple main transformers 2 can be transported to the load-bearing area along one slide rail 5 and then fixed in the load-bearing area. Multiple main transformers 2 can also be transported to the load-bearing area along different slide rails 5 and then fixed in the load-bearing area.

[0040] The electric power operation and maintenance vessel provided in this application can be used in offshore wind power scenarios, as well as in all other related scenarios such as offshore tidal power stations, island power stations, coastal power stations, etc.

[0041] In a specific embodiment of the present application, the operation and maintenance area 4 and the loading area are adjacently arranged on the ship deck of the hull 1. Arranging on the ship deck is a preferred implementation method, because the main transformer 2 is large in size and weight, and can be transported to the ship deck by hoisting, or by extending the slide rail 5 to the port terminal, and transported from the ground to the ship deck. The ship deck is flat and suitable for stably placing the main transformer 2. The slide rail 5 can be arranged on the ship deck, and the slide rail segment located in the operation and maintenance area 4 can be disassembled after performing the task of transporting the main transformer 2, thereby increasing the use area of ​​the operation and maintenance area 4.

[0042] In a specific embodiment of the present application, the operation and maintenance area 4 and the loading area are adjacently arranged in the belly dock of the ship 1. Arranging in the belly dock of the ship is a preferred embodiment, because the main transformer 2 is large in size and weight, and can be transported from the ground to the belly dock of the ship by extending the slide rail 5 to the port terminal. The belly dock of the ship is flat and suitable for stably placing the main transformer 2. The slide rail 5 can be arranged in the belly dock of the ship, and the slide rail segment located in the operation and maintenance area 4 can be disassembled after performing the task of transporting the main transformer 2, thereby increasing the use area of ​​the operation and maintenance area 4. The main transformer 2 is arranged in the belly dock of the ship to be better protected, and the working conditions are more stable and are not exposed to wind and rain.

[0043] In a specific embodiment of the present application, the slide rail 5 is divided into two sections, including a transport slide rail 51 and a loading slide rail 52. The transport slide rail 51 extends from the edge of the ship deck to the edge of the loading area, and the loading slide rail 52 is arranged in the loading area. The operation and maintenance operation area 4 may include all positions on the ship deck except the loading area. The transport slide rail 51 plays a role of transportation, but the slide rail segment through which the main transformer 2 passes extends to the edge of the loading area and does not enter the loading area. In this way, after the main transformer 2 reaches the loading slide rail 52 in the loading area, the transport slide rail 51 can be disassembled, while the loading slide rail 52 does not need to be disassembled because it is pressed by the main transformer 2.

[0044] It should be noted that the slide rail 5 described here is divided into two sections, including a transport slide rail 51 and a receiving slide rail 52, which does not mean that the transport slide rail 51 and the receiving slide rail 52 must be a complete section. Each of the transport slide rail 51 and the receiving slide rail 52 can be composed of multiple short slide rail segments assembled and extended.

[0045] In a specific embodiment of the present application, the transport rail 51 extends from the tail of the hull 1 to the loading area on the ship deck. This is a preferred embodiment, because the ship generally used has a cab at the bow and a large space at the stern, so the transport rail 51 extends from the tail of the ship deck to the loading area, and the loading area is generally located in the middle of the ship deck. This is also considered that the main transformer 2 is heavy, especially when multiple main transformers 2 are installed, the center of gravity of the hull 1 needs to be optimized.

[0046] In a specific embodiment of the present application, the length of the receiving slide rail 52 is equal to the length of the main transformer 2 extending on the receiving slide rail 52. If the length of the receiving slide rail 52 is too short, it will not be enough to carry the main transformer 2, and if the length of the receiving slide rail 52 is too long, it will occupy too much operation and maintenance space, so the length of the receiving slide rail 52 is equal to the length of the main transformer 2 extending on the receiving slide rail 52, which is just right.

[0047] In a specific embodiment of the present application, the transport rail 51 and the receiving rail 52 are connected to the hull 1 by bolts. The bolt connection can well realize a detachable connection.

[0048] In a specific embodiment of the present application, the input and output busbar assembly 6 includes an input busbar 61 for connecting the power collected by the offshore booster station to the main transformer 2 and an output busbar 62 for connecting the boosted power to the remaining electrical equipment of the offshore booster station. The power is boosted by the main transformer installed inside the offshore booster station and then transmitted to the land via a submarine cable to reduce power loss.

[0049] In a specific embodiment of the present application, the slide rail 5 is a steel rail. The steel rail is a good technical solution for use as a track, which is cheap and strong and is conducive to large-scale production and use.

[0050] It should be noted that, during operation, the metal shell of the main transformer 2 needs to be connected to the steel plate of the hull 1 through the wire 7 for protective grounding. The neutral point of the main transformer 2 is connected to the neutral point protection device 3, and the neutral point protection device 3 is connected to the steel plate of the hull 1 for working grounding.

[0051] Furthermore, the method of using the above-mentioned power operation and maintenance vessel is as follows:

[0052] (1) A spare main transformer 2 with the same specifications as the offshore booster station is installed on the deck or belly dock of the power operation and maintenance ship, and the power operation and maintenance ship is driven to a location near the offshore booster station to drop anchor and fix it;

[0053] (2) Connect the input busbar and output busbar of the main transformer in the offshore booster station to the spare main transformer 2 on the operation and maintenance ship, and start the boosting operation;

[0054] (3) After the boosting operation begins, the operation and maintenance personnel will operate and maintain the offshore booster station;

[0055] (4) After the operation and maintenance of the offshore substation is completed, the input and output busbar assembly 6 of the standby main transformer 2 connected to the power operation and maintenance ship is disconnected and reconnected to the main transformer of the offshore substation;

[0056] (5) After the operation and maintenance is completed, the power operation and maintenance ship leaves.

[0057] It should be understood that the various steps described in the method implementation of the present disclosure can be performed in different orders and / or performed in parallel. In addition, the method implementation may include additional steps and / or omit the steps shown. The scope of the present application is not limited in this respect.

[0058] In the specification provided herein, a large number of specific details are described. However, it should be understood that the embodiments of the present disclosure can be practiced without these specific details. In some embodiments, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this specification.

[0059] Although exemplary embodiments of the present application have been shown and described herein, it is apparent to those skilled in the art that such embodiments are provided by way of example only. Those skilled in the art will now appreciate many changes, modifications and substitutions without departing from the present application. It should be understood that various alternatives to the embodiments of the present application described herein may be adopted in the process of practicing the present application. The following claims are intended to define the scope of the present application, and therefore cover methods and structures and their equivalents within the scope of these claims.

Claims

1. A power operation and maintenance ship, characterized in that: include: hull(1); at least one main transformer (2), the main transformer (2) being provided with a fixed end detachably fixed to the hull (1), the main transformer (2) being provided with an input / output busbar assembly (6), the input / output busbar assembly (6) comprising an input busbar (61) for connecting the electric power collected by the offshore booster station to the main transformer (2) and an output busbar (62) for connecting the boosted electric power to other electrical equipment of the offshore booster station, and a rail wheel (8) being provided at the bottom of the main transformer (2); A neutral point protection device set (3), the number of the neutral point protection device set (3) is the same as the main transformer (2), and the neutral point protection device set (3) is arranged on the hull (1) and is installed in matching with the main transformer (2); At least one slide rail (5), the slide rail (5) being composed of two sections, which are detachably connected in sequence and respectively installed in an operation and maintenance operation area (4) on the hull (1) and a receiving area for receiving the main transformer (2), the slide rail (5) comprising a transport slide rail (51) and a receiving slide rail (52), the transport slide rail (51) extending from the edge of the ship deck to the edge of the receiving area, the receiving slide rail (52) being arranged in the receiving area, wherein after the main transformer (2) arrives on the receiving slide rail (52) in the receiving area, the transport slide rail (51) is removed and the receiving slide rail (52) is pressed by the main transformer (2).

2. The electric power operation and maintenance ship according to claim 1, characterized in that: The operation and maintenance area (4) and the loading area are arranged adjacent to each other on the ship deck of the hull (1).

3. The electric power operation and maintenance ship according to claim 1, characterized in that: The operation and maintenance area (4) and the loading area are arranged adjacent to each other in the belly dock of the hull (1).

4. The electric power operation and maintenance ship according to claim 2, characterized in that: The transport slide rail (51) extends from the rear of the hull (1) to the loading area on the ship deck.

5. The electric power operation and maintenance ship according to claim 4, characterized in that: The length of the receiving slide rail (52) is equal to the length of the main transformer (2) extending on the receiving slide rail (52).

6. The electric power operation and maintenance ship according to claim 5, characterized in that: The transport slide rail (51) and the receiving slide rail (52) are connected to the hull (1) via bolts.

7. The electric power operation and maintenance ship according to claim 6, characterized in that: The slide rail (5) is a steel rail.