Digital twin visualization model display method, device, equipment and medium

Through the digital twin visual model display method, the status of power grid equipment is detected and adjusted in real time, and the problem of low detection efficiency of power grid equipment is solved and efficient status detection and adjustment is achieved.

CN118396777BActive Publication Date: 2024-11-19SHENZHEN POWER SUPPLY BUREAU
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202410814671.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-11-19
Estimated Expiration
2044-06-24

AI Technical Summary

Technical Problem

In the prior art, the status detection efficiency of power grid equipment is low, and a large amount of manpower and material resources are required for regular inspection, resulting in low detection efficiency.

Method used

Using the digital twin visualization model display method, by obtaining the digital twin visualization model of the target power grid area, we can understand the operating status of the power equipment in real time, mark abnormal equipment, generate operation adjustment information, perform equipment adjustment and simulation status analysis, and realize accurate data updates and exhibit.

Benefits of technology

It improves the efficiency of power grid equipment status detection, can quickly and accurately adjust operating status abnormalities, reduce manpower and material investment, and improve detection efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118396777B_ABST
    Figure CN118396777B_ABST
Patent Text Reader

Abstract

The embodiments of the present disclosure disclose a method, device, equipment and medium for displaying a digital twin visualization model. A specific implementation of the method includes: obtaining a digital twin visualization model; marking the digital objects corresponding to the power equipment and / or power area indicating abnormal operating status and / or digital area marking; determining the object operation event timeline information; generating operation adjustment information and object operation simulation status information; adjusting the power equipment; simulating the operating status of the adjusted power equipment to generate equipment simulation status information; de-marking the first digital object to obtain a digital twin visualization model after removal; and displaying the digital twin visualization model after removal on a target display device. This implementation can quickly and accurately adjust the digital objects with abnormal operating status displayed by the digital twin visualization model, thereby improving the status detection efficiency of power grid equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present disclosure relate to the field of computer technology, and in particular to methods, devices, equipment, and media for displaying digital twin visualization models. Background Art

[0002] At present, with the continuous upgrading of the power grid system, the application development of power grid related processing is becoming more and more important, which greatly affects people's daily normal life. For the real-time detection of the status of power grid equipment, the usual method is to regularly detect the operating status of power grid equipment through manual methods.

[0003] However, when the above method is used to detect the operating status of power grid equipment, the following technical problems often occur:

[0004] A lot of manpower and material resources need to be wasted to carry out regular inspections, and the large workload leads to low inspection efficiency.

[0005] The above information disclosed in this Background section is only for enhancement of understanding of the background of the inventive concept and therefore it may contain information that does not form the prior art that is already known in this country to a person of ordinary skill in the art. Summary of the invention

[0006] The content of this disclosure is used to introduce concepts in a brief form, which will be described in detail in the detailed implementation section below. The content of this disclosure is not intended to identify the key features or essential features of the technical solution claimed for protection, nor is it intended to limit the scope of the technical solution claimed for protection.

[0007] Some embodiments of the present disclosure propose digital twin visualization model display methods, devices, equipment and media to solve one or more of the technical problems mentioned in the above background technology section.

[0008] In a first aspect, some embodiments of the present disclosure provide a method for displaying a digital twin visualization model, comprising: obtaining a digital twin visualization model for a target power grid area; in response to receiving operation status detection information of power equipment for the target power grid area, instructing digital objects corresponding to power equipment and / or power areas with abnormal operation status in the digital twin visualization model to perform object marking and / or digital area marking; in response to receiving object selection information in the marked digital twin visualization model, determining object operation event timeline information corresponding to a first digital object, wherein the first digital object corresponds to the object selection information; and according to the object operation The event timeline information is collected to generate the operation adjustment information and the object operation simulation status information corresponding to the first digital object in the current time period; according to the operation adjustment information, the power equipment corresponding to the first digital object is adjusted; the operation status of the adjusted power equipment is simulated to generate the equipment simulation status information; in response to determining that the state difference information between the object operation simulation status information and the equipment simulation status information meets the target information condition, the first digital object in the marked digital twin visualization model is unmarked to obtain the removed digital twin visualization model; and the removed digital twin visualization model is displayed on the target display device.

[0009] In a second aspect, some embodiments of the present disclosure provide a digital twin visualization model display device, including: an acquisition unit, configured to acquire a digital twin visualization model for a target power grid area; an indication unit, configured to, in response to receiving operation status detection information of power equipment for the target power grid area, indicate to perform object marking and / or digital area marking on digital objects corresponding to power equipment and / or power areas with abnormal operation status in the digital twin visualization model; a determination unit, configured to, in response to receiving object selection information in the marked digital twin visualization model, determine object operation event timeline information corresponding to a first digital object, wherein the first digital object corresponds to the object selection information; a generation unit, configured to generate object operation event timeline information according to the object operation event. Timeline information, generating operation adjustment information and object operation simulation status information corresponding to the above-mentioned first digital object in the current time period; an adjustment unit, configured to adjust the power equipment corresponding to the above-mentioned first digital object according to the above-mentioned operation adjustment information; an operation status simulation unit, configured to simulate the operation status of the adjusted power equipment to generate equipment simulation status information; a de-marking processing unit, configured to respond to determining that the state difference information between the above-mentioned object operation simulation status information and the above-mentioned equipment simulation status information meets the target information condition, and de-mark the first digital object in the above-mentioned marked digital twin visualization model to obtain the removed digital twin visualization model; a display unit, configured to display the above-mentioned removed digital twin visualization model on a target display device.

[0010] In a third aspect, some embodiments of the present disclosure provide an electronic device comprising: one or more processors; a storage device on which one or more programs are stored, and when the one or more programs are executed by the one or more processors, the one or more processors implement the method described in any implementation manner in the first aspect.

[0011] In a fourth aspect, some embodiments of the present disclosure provide a computer-readable medium having a computer program stored thereon, wherein when the program is executed by a processor, the method described in any implementation manner in the first aspect is implemented.

[0012] The above-mentioned embodiments of the present disclosure have the following beneficial effects: through the digital twin visualization model display method of some embodiments of the present disclosure, the digital objects with abnormal operating status displayed by the digital twin visualization model can be adjusted quickly and accurately, thereby improving the state detection efficiency of the power grid equipment. Specifically, the reason why the state detection efficiency of the relevant power grid equipment is not high enough is that a large amount of manpower and material resources need to be wasted to perform regular detection, and the detection efficiency is low due to the large workload of the detection. Based on this, the digital twin visualization model method of some embodiments of the present disclosure first obtains a digital twin visualization model for the target power grid area. Here, through the digital twin method, not only can the operating status of each power device in the target power grid area be understood in real time, but also various equipment operation data corresponding to each power device can be obtained in real time, so as to efficiently compensate for the abnormal operation of the power device. Then, in response to receiving the operating status detection information of the power device in the above-mentioned target power grid area, the digital objects corresponding to the power device and / or the power area with abnormal operating status in the above-mentioned digital twin visualization model are instructed to perform object marking and / or digital area marking, so as to clearly let the power grid responsible object in the target power grid area understand the operating status of each power device. Then, in response to receiving the object selection information in the digital twin visualization model after marking, the object operation event timeline information corresponding to the first digital object is determined, so as to clearly understand the various types of operation events that occur in the corresponding object in each time period, and to ensure that the operation status of the first digital object is fully understood, so as to facilitate the timely maintenance and abnormal handling of the equipment. Among them, there is a corresponding relationship between the above-mentioned first digital object and the above-mentioned object selection information. Furthermore, according to the above-mentioned object operation event timeline information, the operation adjustment information and object operation simulation state information corresponding to the above-mentioned first digital object in the current time period can be accurately generated, so as to timely discover the operation status of the first digital object and facilitate timely problem remediation. Secondly, according to the above-mentioned operation adjustment information, the power equipment corresponding to the above-mentioned first digital object can be adjusted quickly and efficiently. Further, the operation state of the adjusted power equipment is simulated to generate equipment simulation state information to determine the simulated operation state corresponding to the current adjusted power equipment. Next, in response to determining that the state difference information between the object operation simulation state information and the device simulation state information meets the target information condition, the first digital object in the marked digital twin visualization model is unmarked to obtain the removed digital twin visualization model, so as to achieve accurate data update of the digital twin visualization model. Finally, the removed digital twin visualization model is displayed on the target display device.In summary, by using the digital twin visualization model to visualize the target power grid area and accurately updating each digital object in the digital twin visualization model in real time, digital objects with abnormal operating status displayed by the digital twin visualization model can be quickly and accurately adjusted, thereby improving the status detection efficiency of power grid equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and that components and elements are not necessarily drawn to scale.

[0014] Figure 1 is a flowchart of some embodiments of the digital twin visualization model display method according to the present disclosure;

[0015] Figure 2 It is a structural schematic diagram of some embodiments of the digital twin visualization model display device according to the present disclosure;

[0016] Figure 3 It is a schematic diagram of the structure of an electronic device suitable for implementing some embodiments of the present disclosure. DETAILED DESCRIPTION

[0017] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments set forth herein. On the contrary, these embodiments are provided to provide a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.

[0018] It should also be noted that, for ease of description, only the parts related to the invention are shown in the drawings. In the absence of conflict, the embodiments and features in the embodiments of the present disclosure can be combined with each other.

[0019] It should be noted that the concepts such as "first" and "second" mentioned in the present disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.

[0020] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".

[0021] The names of the messages or information exchanged between multiple devices in the embodiments of the present disclosure are only used for illustrative purposes and are not used to limit the scope of these messages or information.

[0022] The present disclosure will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.

[0023] refer to Figure 1 , shows a process 100 of some embodiments of the digital twin visualization model display method according to the present disclosure. The digital twin visualization model display method includes the following steps:

[0024] Step 101, obtaining a digital twin visualization model for a target power grid area.

[0025] In some embodiments, the execution subject (for example, an electronic device) of the above-mentioned digital twin visualization model display method can obtain the digital twin visualization model for the target power grid area through a wired connection method or a wireless connection method. Among them, the target power grid area can be a power grid area where power equipment processing is to be performed. Power equipment processing can be but is not limited to at least one of the following: power equipment fault display, power equipment fault repair, and power equipment operating status display. The digital twin visualization model can be a digital twin model that supports visualization and is modeled for each power equipment in the above-mentioned target power grid area.

[0026] Step 102, in response to receiving the operating status detection information of the power equipment for the above-mentioned target power grid area, instruct the digital objects corresponding to the power equipment and / or power areas with abnormal operating status in the above-mentioned digital twin visualization model to perform object marking and / or digital area marking.

[0027] In some embodiments, in response to receiving the operation status detection information of the power equipment in the target power grid area, the execution subject may instruct the digital objects corresponding to the power equipment and / or power area with abnormal operation status in the digital twin visualization model to perform object marking and / or digital area marking. Among them, the power equipment may be an equipment unit in the target power grid area, which is the smallest unit in the digital twin visualization model. In practice, the power equipment may be but not limited to at least one of the following: a generator, a transformer, and a mutual inductor. The operation status detection information may be a request information for operation status detection. The operation status detection may be a detection of the operation status of the power equipment in the current time period. In practice, the operation status is one of the following: abnormal state, normal state. The power area may be a sub-area of ​​the corresponding area of ​​the target power grid area. The power equipment with abnormal operation status may be a power equipment with abnormal operation status. The power area with abnormal operation status may be a sub-area with abnormal operation status. The power area with abnormal state may be an area where the operation status corresponding to most power equipment in the area is abnormal. The digital object may be a digital object virtualized for the power equipment in the digital twin visualization model. The digital object may be modeled by a predetermined ratio for the size and position of the power equipment. In practice, object marking may be marking a digital object in a digital twin visualization model in red. Digital area marking may be marking a corresponding digital area in a digital twin visualization model in red.

[0028] Step 103: In response to receiving object selection information in the marked digital twin visualization model, determine object operation event timeline information corresponding to the first digital object.

[0029] In some embodiments, in response to receiving object selection information in the digital twin visualization model after marking, the above-mentioned execution subject can determine the object operation event timeline information corresponding to the first digital object. Among them, the object selection information can be request information for selecting a certain digital object. The object operation event timeline information can be the timeline information of each event in the operation process corresponding to the first digital object. Specifically, each event can include but is not limited to at least one of the following: object normal operation event, object stop operation event, object fault operation event, object new connection event. The timeline information can be summarized for each event in the order of the occurrence time of the event, and the information characterizing the occurrence content of each event. For example, the object operation event timeline information can include {first event information: December 1, second event information: December 2-December 4, third event information: December 5-December 7}.

[0030] As an example, the execution entity may obtain object execution event timeline information corresponding to the first digital object from the target database.

[0031] Step 104: Generate operation adjustment information and object operation simulation state information corresponding to the first digital object in the current time period according to the object operation event timeline information.

[0032] In some embodiments, the execution subject may generate operation adjustment information and object operation simulation state information corresponding to the first digital object in the current time period according to the object operation event timeline information. The current time period may be a time period including the current time. The operation adjustment information may represent adjustment operation information for adjusting the power equipment corresponding to the first digital object from an abnormal state to a normal state. The object operation simulation state information may be object operation state information of the power equipment corresponding to the first digital object in a simulated normal state. The object operation simulation state information may be various operation indicator parameter information of the power equipment in a normal state. The operation indicator parameter information may be an indicator value of an operation indicator. The operation indicator may be a key indicator of the power equipment under operation conditions.

[0033] In some optional implementations of some embodiments, the generating of the operation adjustment information and the object operation simulation state information corresponding to the first digital object in the current time period according to the object operation event timeline information may include the following steps:

[0034] The first step is to extract a digital object operation data set in the current time period from the object operation event timeline information. The digital object operation data set may be an operation data set of the first digital object in the current time period. Specifically, the operation data set may include: indicator data of various data indicators of the first digital object in the current time period.

[0035] The second step is to extract historical operation abnormality node information from the above object operation event timeline information to obtain at least one historical operation abnormality node information. The historical operation abnormality node information may be node information where the first digital object has an operation abnormality in a historical time period. In practice, the historical operation abnormality node information may include: historical operation abnormality node time.

[0036] In the third step, for each piece of historical abnormal operation node information in the at least one piece of historical abnormal operation node information, the following comparison steps are performed:

[0037] The first sub-step is to obtain the operation data set corresponding to the historical operation abnormal node information.

[0038] The operation data set corresponding to the historical operation abnormal node information may be the operation data set at the time of the historical operation abnormal node.

[0039] The second sub-step is to compare the digital object operation data set with the operation data set to generate a data comparison score. The data comparison score can represent the degree of data difference between the digital object operation data in the digital object operation data set and the operation data in the operation data set. The larger the data comparison score, the greater the degree of data difference.

[0040] As an example, the above-mentioned execution entity can input the digital object operation dataset and the above-mentioned operation dataset into a pre-trained convolutional neural network model + fully connected layer to generate a data comparison score.

[0041] The fourth step is to select the historical operation abnormal node information whose corresponding data comparison score is within the target number from the at least one historical operation abnormal node information to obtain the historical operation abnormal node information group. The target number may be a preset number. For example, the target number may be 4.

[0042] The fifth step is to obtain the historical abnormal operation node processing information group corresponding to the historical abnormal operation node information group as the operation adjustment information. There is a one-to-one correspondence between the historical abnormal operation node information in the historical abnormal operation node information group and the historical abnormal operation node processing information in the historical abnormal operation node processing information group.

[0043] Step 6: Obtain an operating parameter indicator information set for the first digital object. The operating parameter indicator information in the operating parameter indicator information set has a one-to-one correspondence with the operating parameter indicators in the operating parameter indicator set. The operating parameter indicator information may be a specific value corresponding to the operating parameter indicator. The operating parameter indicator set may be a parameter indicator set of the first digital object in the operating state.

[0044] Step 7: Utilize the target virtual simulation software to execute the object simulation operation processing for the above operation parameter index information set. The target virtual simulation software may be software used for virtual simulation of the actual operation processing of digital objects.

[0045] The eighth step is to obtain the object operation simulation state information of the first digital object under the object simulation operation.

[0046] Step 105: Adjust the power equipment corresponding to the first digital object according to the operation adjustment information.

[0047] In some embodiments, the execution entity may adjust the power equipment corresponding to the first digital object according to the operation adjustment information.

[0048] As an example, the execution entity may adjust the power equipment corresponding to the first digital object according to the adjustment strategy corresponding to the operation adjustment information.

[0049] Step 106, simulating the operating state of the adjusted power equipment to generate equipment simulation state information.

[0050] In some embodiments, the execution subject may simulate the operation state of the adjusted power equipment to generate equipment simulation state information, wherein the equipment simulation state information may be state information obtained after the equipment operation simulation is performed on the adjusted power equipment.

[0051] As an example, the above-mentioned execution subject can use the target virtual simulation software to simulate the operating state of the adjusted power equipment to generate equipment simulation state information.

[0052] Step 107, in response to determining that the state difference information between the above-mentioned object operation simulation state information and the above-mentioned device simulation state information meets the target information condition, the first digital object in the above-mentioned marked digital twin visualization model is unmarked to obtain the removed digital twin visualization model.

[0053] In some embodiments, in response to determining that the state difference information between the object operation simulation state information and the device simulation state information meets the target information condition, the execution subject may perform a de-marking process on the first digital object in the marked digital twin visualization model to obtain the de-marked digital twin visualization model. The target information condition may be that the information difference between the corresponding operation index parameter information between the object operation simulation state information and the device simulation state information is within a corresponding interval.

[0054] Step 108: Display the digital twin visualization model after the removal on the target display device.

[0055] In some embodiments, the execution entity may display the removed digital twin visualization model on a target display device.

[0056] In some optional implementations of some embodiments, after step 108, the steps further include:

[0057] The first step is to determine the load distribution information corresponding to the second digital object in response to receiving the load distribution acquisition information for the digital twin visualization model after the removal. There is a corresponding relationship between the second digital object and the load distribution acquisition information. The load distribution acquisition information may be request information for obtaining the load distribution corresponding to the digital object. The load distribution may be the distribution of the load connected to the digital object. The load distribution information corresponding to the second digital object may be the distribution of each load connected to the second digital object.

[0058] The second step is to obtain the pre-stored energy flow storage data for the target power grid area in response to receiving the energy flow acquisition information in the digital twin visualization model after the removal. The energy flow acquisition information may be request information for obtaining the specific situation of energy flow. The energy flow storage data may be flow data characterizing the specific situation of energy flow in the target power grid area. Specifically, energy flow may include: traditional energy flow and non-renewable energy flow.

[0059] The third step is to render the energy flow dynamic mark of each digital object in the above-mentioned removed digital twin visualization model according to the above-mentioned energy flow storage data, so as to generate a rendered digital twin visualization model. Among them, the rendered digital twin visualization model contains mark information that characterizes the specific energy flow direction and flow size.

[0060] As an example, the above-mentioned execution entity can render the specific flow dynamic information corresponding to the above-mentioned energy flow storage data in the above-mentioned removed digital twin visualization model to generate a rendered digital twin visualization model.

[0061] In the fourth step, in response to receiving the local object energy flow acquisition information for the third digital object in the rendered digital twin visualization model, the rendered digital twin visualization model is enlarged with the location of the third digital object as the center, and the local object energy flow mark is performed for the surrounding area corresponding to the third digital object to generate a local object energy flow model for the third digital object. The local object energy flow acquisition information can be the object energy flow acquisition information of the local area.

[0062] In some optional implementations of some embodiments, after step 108, the steps further include:

[0063] The first step is to obtain the pre-stored real-time communication flow data for the target power grid area in response to receiving the communication status acquisition information for the digital twin visualization model after the removal. The communication status acquisition information may be request information for obtaining the communication status of each power device in the target power grid area. The real-time communication flow data may be specific data of the communication flow of each power device in the current target power grid area.

[0064] In the second step, according to the above real-time communication flow data, each digital object in the above removed digital twin visualization model is dynamically marked for communication flow to generate a processed digital twin visualization model. The specific method for generating the processed digital twin visualization model can refer to the method for generating the rendered digital twin visualization model.

[0065] In the third step, in response to receiving the local object communication flow acquisition information for the fourth digital object in the processed digital twin visualization model, the processed digital twin visualization model is enlarged with the location of the fourth digital object as the center, and the local object communication flow mark is performed for the corresponding nearby area of ​​the fourth digital object to generate a local object communication flow model for the fourth digital object. The local object communication flow mark can be the object communication flow acquisition information of the local area.

[0066] In some optional implementations of some embodiments, after step 108, the steps further include:

[0067] The first step is to extract a sequence of digital object operation data sets for the fourth digital object in the historical time period from the object operation event timeline information in response to receiving the device state prediction acquisition information in the digital twin visualization model after the above removal. Among them, the fourth digital object is an object with a corresponding relationship with the device state prediction acquisition information. The device state prediction acquisition information may be request information for obtaining device state prediction information. The device state prediction information may be the device operation state of the power equipment at a future time point. There is a one-to-one correspondence between the digital object operation data set in the digital object operation data set sequence and the historical time in the historical time period. The digital object operation data set can represent the operation data set of the fourth digital object at the corresponding historical time.

[0068] The second step is to determine the operation indicator set corresponding to each historical operation abnormal node information in the above historical operation abnormal node information group to obtain an operation indicator set group.

[0069] The third step is to sort at least one operating indicator in the above operating indicator set according to the descending order of the number of repetitions of the operating indicator to obtain an operating indicator sequence.

[0070] The fourth step is to divide the above-mentioned operation index sequence into a target number of subsequences to obtain a first operation index subsequence, a second operation index subsequence, a third operation index subsequence and a fourth operation index subsequence. Among them, the number of repetitions of the operation index corresponding to the operation index in the above-mentioned first operation index subsequence is greater than the number of repetitions of the operation index corresponding to the operation index in the above-mentioned second operation index subsequence, the number of repetitions of the operation index corresponding to the operation index in the above-mentioned second operation index subsequence is greater than the number of repetitions of the operation index corresponding to the operation index in the above-mentioned third operation index subsequence, and the number of repetitions of the operation index corresponding to the operation index in the above-mentioned third operation index subsequence is greater than the number of repetitions of the operation index corresponding to the operation index in the above-mentioned fourth operation index subsequence.

[0071] Step 5: For each at least one first operating indicator in the first operating indicator subsequence, the following first generating step is performed:

[0072] The first sub-step is to select at least one second operating indicator from the second operating indicator sub-sequence, wherein the number of indicators corresponding to the at least one second operating indicator is less than or equal to the number of indicators corresponding to the at least one first operating indicator.

[0073] The second sub-step is to select at least one third operating indicator from the third operating indicator sub-sequence, wherein the number of indicators corresponding to the at least one third operating indicator is less than or equal to the number of indicators corresponding to the at least one first operating indicator.

[0074] The third sub-step is to select at least one fourth operating indicator from the fourth operating indicator sub-sequence, wherein the number of indicators corresponding to the at least one fourth operating indicator is less than or equal to the number of indicators corresponding to the at least one first operating indicator.

[0075] The fourth sub-step is to obtain, based on the digital object operation data set sequence, an indicator data set sequence corresponding to the at least one first operation indicator, an indicator data set sequence corresponding to the at least one second operation indicator, an indicator data set sequence corresponding to the at least one third operation indicator, and an indicator data set sequence corresponding to the at least one fourth operation indicator, as the first indicator data set sequence, the second indicator data set sequence, the third indicator data set sequence, and the fourth indicator data set sequence, respectively.

[0076] As an example, the above-mentioned execution entity can extract data from the digital object operation data set sequence to generate an indicator data set sequence corresponding to the above-mentioned at least one first operation indicator, an indicator data set sequence corresponding to the above-mentioned at least one second operation indicator, an indicator data set sequence corresponding to the above-mentioned at least one third operation indicator, and an indicator data set sequence corresponding to the above-mentioned at least one fourth operation indicator.

[0077] The fifth sub-step is to fuse the first indicator dataset sequence, the second indicator dataset sequence, the third indicator dataset sequence and the fourth indicator dataset sequence in corresponding time periods to generate a fused indicator dataset sequence.

[0078] The sixth sub-step is to determine the indicator combination importance information corresponding to the at least one first operating indicator, the at least one second operating indicator, the at least one third operating indicator and the at least one fourth operating indicator. The indicator combination importance information may characterize the indicator feature combination importance between the at least one first operating indicator, the at least one second operating indicator, the at least one third operating indicator and the at least one fourth operating indicator.

[0079] The seventh sub-step is to use the device state prediction information generation model to generate candidate device state prediction information based on the above fusion indicator data set sequence. In practice, the device state prediction information generation model can be a time series neural network model. For example, the device state prediction information generation model can be an LSTM model.

[0080] Step 6: Generate device state prediction information for the fourth digital object based on the obtained indicator combination importance information set and the corresponding candidate device state prediction information set.

[0081] As an example, first, the execution subject can filter out the candidate device state prediction information whose corresponding device state is characterized as a normal operating state from the candidate device state prediction information set to obtain a first candidate device state prediction information subset. Then, remove the first candidate device state prediction information subset from the candidate device state prediction information set to obtain a second candidate device state prediction information subset. Next, determine the indicator combination importance information subset corresponding to the first candidate device state prediction information subset as the first indicator combination importance information subset, and determine the indicator combination importance information subset corresponding to the second candidate device state prediction information subset as the second indicator combination importance information subset. Further, add each first indicator combination importance information in the first indicator combination importance information subset to generate a first addition result, and add each second indicator combination importance information in the second indicator combination importance information subset to generate a second addition result. Finally, in response to determining that the first addition result is greater than or equal to the second addition result, generate device state prediction information representing a normal operating state. In response to determining that the first addition result is less than the second addition result, generate device state prediction information representing an abnormal operating state.

[0082] The seventh step is to display the above-mentioned equipment status prediction information in the area position corresponding to the above-mentioned fourth digital object in the above-mentioned removed digital twin visualization model.

[0083] In some optional implementations of some embodiments, the above-mentioned generation of a model using device state prediction information according to the above-mentioned fusion indicator data set sequence to generate candidate device state prediction information may include the following steps:

[0084] In the first step, the fusion index data set sequence is divided into a first fusion index data set subsequence, a second fusion index data set subsequence and a third fusion index data set subsequence.

[0085] As an example, the execution entity may divide the fusion indicator dataset sequence into three equal parts according to the time sequence, namely, a first fusion indicator dataset subsequence, a second fusion indicator dataset subsequence, and a third fusion indicator dataset subsequence.

[0086] The second step is to generate first candidate device state prediction information based on the first fusion indicator data set subsequence and the device state prediction information generation model, wherein the prediction time corresponding to the first candidate device state prediction information is the same as the prediction time corresponding to the candidate device state prediction information.

[0087] As an example, the execution entity may input the first fusion indicator data set subsequence into the device state prediction information generation model to generate first candidate device state prediction information.

[0088] The third step is to generate second candidate device state prediction information based on the second fusion indicator data set subsequence and the device state prediction information generation model, wherein the prediction time corresponding to the second candidate device state prediction information is the same as the prediction time corresponding to the candidate device state prediction information.

[0089] As an example, the execution entity may input the second fusion indicator data set subsequence into the device state prediction information generation model to generate second candidate device state prediction information.

[0090] The fourth step is to generate third candidate device state prediction information based on the third fusion indicator data set subsequence and the device state prediction information generation model, wherein the prediction time corresponding to the third candidate device state prediction information is the same as the prediction time corresponding to the candidate device state prediction information.

[0091] As an example, the execution entity may input the third fusion indicator data set subsequence into the device state prediction information generation model to generate third candidate device state prediction information.

[0092] The fifth step is to generate the candidate device state prediction information according to the first candidate device state prediction information, the second candidate device state prediction information and the third candidate device state prediction information.

[0093] As an example, the execution subject may generate the candidate device state prediction information according to the first candidate device state prediction information, the second candidate device state prediction information and the third candidate device state prediction information through a voting mechanism.

[0094] Regarding the technical problem: how to accurately generate equipment status information based on the data of the indicator data set, we decided to adopt the following solution:

[0095] In some optional implementations of some embodiments, the above-mentioned device state prediction information generation model includes: a first indicator prediction data generation model, a device state prediction information generation model based on indicator data, a second indicator prediction data generation model based on a time series neural network model, and a device state prediction information generation model based on a time series neural network model. Among them, the first indicator prediction data generation model may be a neural network model that generates indicator prediction data at a future time point. In practice, the first indicator prediction data generation model may be a time series neural network model. For example, the first indicator prediction data generation model may be a recurrent neural network model. The device state prediction information generation model based on indicator data may be a neural network model that predicts the state of the device. In practice, the device state prediction information generation model may be a classification model. For example, the device state prediction information generation model may be a multi-layer series fully connected layer. The device state prediction information generation model based on the time series neural network model is also a neural network model that can predict the state of the device. In practice, the device state prediction information generation model based on the time series neural network model may include: LSTM model + multi-layer series fully connected layer. The second indicator prediction data generation model based on the time series neural network model may be a neural network model that generates indicator prediction data at a future time point. In practice, the second indicator prediction data generation model may be a recurrent neural network model.

[0096] Optionally, the above-mentioned generation of a model using the device state prediction information according to the above-mentioned fusion indicator data set sequence to generate candidate device state prediction information may include the following steps:

[0097] In the first step, for each of the at least one operating indicator, the following second generating step is performed:

[0098] The first sub-step is to extract an operation indicator data sequence corresponding to the operation indicator information from the fusion indicator data set sequence.

[0099] The second sub-step is to input the above-mentioned operation indicator data sequence into the above-mentioned first indicator prediction data generation model to generate the first indicator prediction data for the above-mentioned operation indicator.

[0100] In the second step, based on the obtained at least one first indicator prediction data, the first initial equipment state prediction information is generated using the equipment state prediction information generation model based on the indicator data.

[0101] As an example, the above-mentioned execution entity can directly input at least one first indicator prediction data into the device state prediction information generation model based on the indicator data to generate the first initial device state prediction information.

[0102] The third step is to input each fusion indicator data set in the above fusion indicator data set sequence into a second indicator prediction data generation model based on a time series neural network model to generate at least one second indicator prediction data.

[0103] The fourth step is to generate second initial equipment state prediction information based on the at least one second indicator prediction data and the equipment state prediction information generation model based on the indicator data.

[0104] As an example, the execution entity may input the at least one second indicator prediction data into the indicator data-based device state prediction information generation model to generate second initial device state prediction information.

[0105] The fifth step is to input each fusion indicator data set in the above fusion indicator data set sequence into the equipment state prediction information generation model based on the time series neural network model to generate the third initial equipment state prediction information.

[0106] In the sixth step, in response to determining that at least two of the first initial device state prediction information, the second initial device state prediction information and the third initial device state prediction information all represent abnormal device states, the information representing the abnormal device state is determined as the candidate device state prediction information.

[0107] In the seventh step, in response to determining that at least two of the first initial device state prediction information, the second initial device state prediction information and the third initial device state prediction information all indicate that the device state is normal, the information indicating that the device state is normal is determined as the candidate device state prediction information.

[0108] The above-mentioned optional implementation methods and optional contents in some embodiments, as an inventive point of the present disclosure, solve the technical problem "how to accurately generate device status information based on the data of the indicator data set". Based on this, the present disclosure designs the above-mentioned device status prediction information generation model including: a first indicator prediction data generation model, a device status prediction information generation model based on the indicator data, a second indicator prediction data generation model based on the time series neural network model, and a network structure form of a device status prediction information generation model based on the time series neural network model, so as to accurately generate device status information based on the data of the indicator data set.

[0109] The above-mentioned embodiments of the present disclosure have the following beneficial effects: through the digital twin visualization model display method of some embodiments of the present disclosure, the digital objects with abnormal operating status displayed by the digital twin visualization model can be adjusted quickly and accurately, thereby improving the state detection efficiency of the power grid equipment. Specifically, the reason why the state detection efficiency of the relevant power grid equipment is not high enough is that a large amount of manpower and material resources need to be wasted to perform regular detection, and the detection efficiency is low due to the large workload of the detection. Based on this, the digital twin visualization model method of some embodiments of the present disclosure first obtains a digital twin visualization model for the target power grid area. Here, through the digital twin method, not only can the operating status of each power device in the target power grid area be understood in real time, but also various equipment operation data corresponding to each power device can be obtained in real time, so as to efficiently compensate for the abnormal operation of the power device. Then, in response to receiving the operating status detection information of the power device in the above-mentioned target power grid area, the digital objects corresponding to the power device and / or the power area with abnormal operating status in the above-mentioned digital twin visualization model are instructed to perform object marking and / or digital area marking, so as to clearly let the power grid responsible object in the target power grid area understand the operating status of each power device. Then, in response to receiving the object selection information in the digital twin visualization model after marking, the object operation event timeline information corresponding to the first digital object is determined, so as to clearly understand the various types of operation events that occur in the corresponding object in each time period, and to ensure that the operation status of the first digital object is fully understood, so as to facilitate the timely maintenance and abnormal handling of the equipment. Among them, there is a corresponding relationship between the above-mentioned first digital object and the above-mentioned object selection information. Furthermore, according to the above-mentioned object operation event timeline information, the operation adjustment information and object operation simulation state information corresponding to the above-mentioned first digital object in the current time period can be accurately generated, so as to timely discover the operation status of the first digital object and facilitate timely problem remediation. Secondly, according to the above-mentioned operation adjustment information, the power equipment corresponding to the above-mentioned first digital object can be adjusted quickly and efficiently. Further, the operation state of the adjusted power equipment is simulated to generate equipment simulation state information to determine the simulated operation state corresponding to the current adjusted power equipment. Next, in response to determining that the state difference information between the object operation simulation state information and the device simulation state information meets the target information condition, the first digital object in the marked digital twin visualization model is unmarked to obtain the removed digital twin visualization model, so as to achieve accurate data update of the digital twin visualization model. Finally, the removed digital twin visualization model is displayed on the target display device.In summary, by using the digital twin visualization model to visualize the target power grid area and accurately updating each digital object in the digital twin visualization model in real time, digital objects with abnormal operating status displayed by the digital twin visualization model can be quickly and accurately adjusted, thereby improving the status detection efficiency of power grid equipment.

[0110] Further references Figure 2 As an implementation of the methods shown in the above figures, the present disclosure provides some embodiments of a digital twin visualization model display device. These device embodiments are similar to Figure 1 Corresponding to the method embodiments shown, the digital twin visualization model display device can be specifically applied to various electronic devices.

[0111] like Figure 2 As shown, a digital twin visualization model display device 200 includes: an acquisition unit 201, an indication unit 202, a determination unit 203, a generation unit 204, an adjustment unit 205, an operation status simulation unit 206, a de-marking processing unit 207 and a display unit 208. Among them, the acquisition unit 201 is configured to acquire a digital twin visualization model for a target power grid area; the indication unit 202 is configured to, in response to receiving the operation status detection information of the power equipment for the above-mentioned target power grid area, indicate the digital objects corresponding to the power equipment and / or power area with abnormal operation status in the above-mentioned digital twin visualization model to perform object marking and / or digital area marking; the determination unit 203 is configured to, in response to receiving the object selection information in the marked digital twin visualization model, determine the object operation event timeline information corresponding to the first digital object, wherein the above-mentioned first digital object has a corresponding relationship with the above-mentioned object selection information; the generation unit 204 is configured to generate the above-mentioned object operation event timeline information for the current time period according to the above-mentioned object operation event timeline information. The operation adjustment information and the object operation simulation state information corresponding to the first digital object; the adjustment unit 205 is configured to adjust the power equipment corresponding to the first digital object according to the operation adjustment information; the operation state simulation unit 206 is configured to simulate the operation state of the adjusted power equipment to generate the equipment simulation state information; the de-marking processing unit 207 is configured to respond to determining that the state difference information between the object operation simulation state information and the equipment simulation state information meets the target information condition, and de-mark the first digital object in the digital twin visualization model after marking to obtain the digital twin visualization model after removal; the display unit 208 is configured to display the digital twin visualization model after removal on the target display device.

[0112] It is understandable that the units recorded in the digital twin visualization model display device 200 and the reference Figure 1Therefore, the operations, features and beneficial effects described above for the method are also applicable to the digital twin visualization model display device 200 and the units contained therein, and will not be repeated here.

[0113] Reference below Figure 3 , which shows a structural schematic diagram of an electronic device (eg, an electronic device) 300 suitable for implementing some embodiments of the present disclosure. Figure 3 The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.

[0114] like Figure 3 As shown, the electronic device 300 may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 301, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 302 or a program loaded from a storage device 308 to a random access memory (RAM) 303. In the RAM 303, various programs and data required for the operation of the electronic device 300 are also stored. The processing device 301, the ROM 302, and the RAM 303 are connected to each other via a bus 304. An input / output (I / O) interface 305 is also connected to the bus 304.

[0115] Typically, the following devices may be connected to the I / O interface 305: an input device 306 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 307 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 308 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 309. The communication device 309 may allow the electronic device 300 to communicate with other devices wirelessly or by wire to exchange data. Figure 3 The electronic device 300 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead. Figure 3 Each block shown in the figure may represent one device, or may represent multiple devices as required.

[0116] In particular, according to some embodiments of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, some embodiments of the present disclosure include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In some such embodiments, the computer program can be downloaded and installed from the network through the communication device 309, or installed from the storage device 308, or installed from the ROM 302. When the computer program is executed by the processing device 301, the above-mentioned functions defined in the method of some embodiments of the present disclosure are executed.

[0117] It should be noted that the computer-readable medium mentioned above in some embodiments of the present disclosure may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In some embodiments of the present disclosure, the computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, device or device. In some embodiments of the present disclosure, the computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer readable signal media may also be any computer readable medium other than computer readable storage media, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0118] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.

[0119] The above-mentioned computer-readable medium may be included in the above-mentioned electronic device; or it may exist independently without being assembled into the electronic device. The above-mentioned computer-readable medium carries one or more programs. When the above-mentioned one or more programs are executed by the electronic device, the electronic device: obtains a digital twin visualization model for the target power grid area; in response to receiving the operating status detection information of the power equipment for the above-mentioned target power grid area, instructs the digital objects corresponding to the power equipment and / or power area with abnormal operating status in the above-mentioned digital twin visualization model to perform object marking and / or digital area marking; in response to receiving the object selection information in the digital twin visualization model after marking, determines the object operation event timeline information corresponding to the first digital object, wherein there is a corresponding relationship between the above-mentioned first digital object and the above-mentioned object selection information; According to the object operation event timeline information, the operation adjustment information and the object operation simulation status information corresponding to the first digital object in the current time period are generated; according to the operation adjustment information, the power equipment corresponding to the first digital object is adjusted; the operation status of the adjusted power equipment is simulated to generate equipment simulation status information; in response to determining that the state difference information between the object operation simulation status information and the equipment simulation status information meets the target information condition, the first digital object in the marked digital twin visualization model is unmarked to obtain the removed digital twin visualization model; the removed digital twin visualization model is displayed on the target display device.

[0120] Computer program code for performing the operations of some embodiments of the present disclosure may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0121] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present disclosure. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0122] The units described in some embodiments of the present disclosure may be implemented by software or by hardware. The described units may also be set in a processor, for example, it may be described as: a processor includes an acquisition unit, an indication unit, a determination unit, a generation unit, an adjustment unit, an operation status simulation unit, a de-marking processing unit and a display unit. Among them, the names of these units do not constitute a limitation on the unit itself under certain circumstances. For example, the display unit may also be described as "a unit that displays the above-mentioned removed digital twin visualization model on the target display device".

[0123] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0124] The above descriptions are only some preferred embodiments of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present disclosure is not limited to the technical solutions formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the embodiments of the present disclosure.

Claims

1. A digital twin visualization model display method, comprising: Obtain a digital twin visualization model for the target grid area; In response to receiving the operating status detection information of the power equipment in the target power grid area, instructing the digital objects corresponding to the power equipment and / or power area with abnormal operating status in the digital twin visualization model to perform object marking and / or digital area marking; In response to receiving object selection information in the marked digital twin visualization model, determining object running event timeline information corresponding to a first digital object, wherein the first digital object corresponds to the object selection information; Generate operation adjustment information and object operation simulation state information corresponding to the first digital object in the current time period according to the object operation event timeline information, wherein the object operation simulation state information is object operation state information of the electric device corresponding to the first digital object in a simulated normal state, and the object operation simulation state information is various operation index parameter information of the electric device in a normal state, and the operation index parameter information is the index value of the operation index, and the operation index is the key index of the electric device under the operation condition; According to the operation adjustment information, adjusting the electric power equipment corresponding to the first digital object; Performing operation state simulation on the adjusted electric power equipment to generate equipment simulation state information, wherein the equipment simulation state information is state information obtained after performing equipment operation simulation on the adjusted electric power equipment; In response to determining that the state difference information between the object operation simulation state information and the device simulation state information satisfies the target information condition, the first digital object in the marked digital twin visualization model is unmarked to obtain the removed digital twin visualization model, wherein the target information condition is that the information difference between the corresponding operation indicator parameter information between the object operation simulation state information and the device simulation state information is in a corresponding interval; The removed digital twin visualization model is displayed on a target display device.

2. The method according to claim 1, wherein: The method further comprises: In response to receiving the load distribution acquisition information for the removed digital twin visualization model, determining the load distribution information corresponding to the second digital object, wherein the second digital object has a corresponding relationship with the load distribution acquisition information; In response to receiving the energy flow acquisition information for the removed digital twin visualization model, acquiring pre-stored energy flow storage data for the target power grid area; According to the energy flow storage data, performing energy flow dynamic marking rendering on each digital object in the removed digital twin visualization model to generate a rendered digital twin visualization model; In response to receiving the local object energy flow acquisition information for the third digital object in the rendered digital twin visualization model, the rendered digital twin visualization model is enlarged with the location of the third digital object as the center, and the local object energy flow is marked for the nearby area corresponding to the third digital object to generate a local object energy flow model for the third digital object.

3. The method according to claim 1, wherein: The method further comprises: In response to receiving the communication status acquisition information for the removed digital twin visualization model, acquiring pre-stored real-time communication flow data for the target power grid area; According to the real-time communication flow data, each digital object in the removed digital twin visualization model is subjected to communication flow dynamic marking processing to generate a processed digital twin visualization model; In response to receiving local object communication flow acquisition information for the fourth digital object in the processed digital twin visualization model, the processed digital twin visualization model is enlarged with the location of the fourth digital object as the center, and the local object communication flow marking is performed on the corresponding nearby area of ​​the fourth digital object to generate a local object communication flow model for the fourth digital object.

4. The method according to claim 1, wherein: The step of generating operation adjustment information and object operation simulation state information corresponding to the first digital object in the current time period according to the object operation event timeline information includes: Extracting a digital object operation data set in a current time period from the object operation event timeline information; Extracting historical operation abnormal node information from the object operation event timeline information to obtain at least one historical operation abnormal node information; For each piece of historical abnormal operation node information in the at least one piece of historical abnormal operation node information, the following comparison steps are performed: Obtain the operation data set corresponding to the historical operation abnormal node information; Comparing the digital object operation data set with the operation data set for data correspondence to generate a data comparison score; Filter out the historical operation abnormality node information whose corresponding data comparison score is within the front target number from the at least one historical operation abnormality node information to obtain a historical operation abnormality node information group; Acquire a historical operation abnormal node processing information group corresponding to the historical operation abnormal node information group as operation adjustment information; Acquire an operating parameter indicator information set for the first digital object; Utilizing target virtual simulation software to execute object simulation operation processing for the operation parameter index information set; Obtain object operation simulation state information of the first digital object under object simulation operation.

5. The method according to claim 4, wherein: The method further comprises: In response to receiving the device state prediction acquisition information for the removed digital twin visualization model, extracting a digital object operation data set sequence for a fourth digital object in a historical time period from the object operation event timeline information, wherein the fourth digital object corresponds to the device state prediction acquisition information; Determine an operation indicator set corresponding to each piece of historical operation abnormality node information in the historical operation abnormality node information group to obtain an operation indicator set group; Sorting at least one operating indicator in the operating indicator set according to the descending order of the number of repetitions of the operating indicator to obtain an operating indicator sequence; Divide the operating indicator sequence into a target number of subsequences to obtain a first operating indicator subsequence, a second operating indicator subsequence, a third operating indicator subsequence, and a fourth operating indicator subsequence, wherein the number of operating indicator repetitions corresponding to the operating indicators in the first operating indicator subsequence is greater than the number of operating indicator repetitions corresponding to the operating indicators in the second operating indicator subsequence, the number of operating indicator repetitions corresponding to the operating indicators in the second operating indicator subsequence is greater than the number of operating indicator repetitions corresponding to the operating indicators in the third operating indicator subsequence, and the number of operating indicator repetitions corresponding to the operating indicators in the third operating indicator subsequence is greater than the number of operating indicator repetitions corresponding to the operating indicators in the fourth operating indicator subsequence; For each at least one first operating indicator in the first operating indicator subsequence, the following first generating step is performed: Filtering out at least one second operating indicator from the second operating indicator subsequence, wherein the number of indicators corresponding to the at least one second operating indicator is less than or equal to the number of indicators corresponding to the at least one first operating indicator; Filtering out at least one third operating indicator from the third operating indicator subsequence, wherein the number of indicators corresponding to the at least one third operating indicator is less than or equal to the number of indicators corresponding to the at least one first operating indicator; Filtering out at least one fourth operating indicator from the fourth operating indicator subsequence, wherein the number of indicators corresponding to the at least one fourth operating indicator is less than or equal to the number of indicators corresponding to the at least one first operating indicator; According to the digital object operation data set sequence, an indicator data set sequence corresponding to the at least one first operation indicator, an indicator data set sequence corresponding to the at least one second operation indicator, an indicator data set sequence corresponding to the at least one third operation indicator, and an indicator data set sequence corresponding to the at least one fourth operation indicator are acquired as the first indicator data set sequence, the second indicator data set sequence, the third indicator data set sequence, and the fourth indicator data set sequence, respectively; Fusing the first indicator dataset sequence, the second indicator dataset sequence, the third indicator dataset sequence and the fourth indicator dataset sequence in corresponding time periods to generate a fused indicator dataset sequence; Determine indicator combination importance information corresponding to the at least one first operating indicator, the at least one second operating indicator, the at least one third operating indicator, and the at least one fourth operating indicator; According to the fusion indicator data set sequence, a model is generated using the device state prediction information to generate candidate device state prediction information; Generate device state prediction information for the fourth digital object according to the obtained indicator combination importance information set and the corresponding candidate device state prediction information set; The device status prediction information is displayed at the area location corresponding to the fourth digital object in the digital twin visualization model after the removal.

6. The method according to claim 5, wherein: The generating model using the device state prediction information according to the fusion indicator data set sequence to generate candidate device state prediction information includes: Dividing the fusion index data set sequence into a first fusion index data set subsequence, a second fusion index data set subsequence and a third fusion index data set subsequence; According to the first fusion indicator data set subsequence, using the device state prediction information generation model, generating first candidate device state prediction information; According to the second fusion indicator data set subsequence, using the device state prediction information generation model, generating second candidate device state prediction information; According to the third fusion indicator data set subsequence, using the device state prediction information generation model, third candidate device state prediction information is generated; The candidate device state prediction information is generated according to the first candidate device state prediction information, the second candidate device state prediction information and the third candidate device state prediction information.

7. A digital twin visualization model display device, comprising: an acquisition unit configured to acquire a digital twin visualization model for a target power grid area; an indicating unit, configured to, in response to receiving the operating status detection information of the power equipment in the target power grid area, instruct the digital objects corresponding to the power equipment and / or power area with abnormal operating status in the digital twin visualization model to perform object marking and / or digital area marking; A determining unit is configured to determine object operation event timeline information corresponding to a first digital object in response to receiving object selection information in the marked digital twin visualization model, wherein the first digital object has a corresponding relationship with the object selection information; a generating unit configured to generate, according to the object operation event timeline information, operation adjustment information and object operation simulation state information corresponding to the first digital object in the current time period, wherein the object operation simulation state information is object operation state information of the electric device corresponding to the first digital object in a simulated normal state, and the object operation simulation state information is various operation index parameter information of the electric device in a normal state, and the operation index parameter information is the index value of the operation index, and the operation index is the key index of the electric device under the operation condition; an adjustment unit, configured to adjust the electric power equipment corresponding to the first digital object according to the operation adjustment information; An operation status simulation unit is configured to perform operation status simulation on the adjusted power equipment to generate equipment simulation status information, wherein the equipment simulation status information is status information obtained after the equipment operation simulation is performed on the adjusted power equipment; A de-marking processing unit is configured to, in response to determining that the state difference information between the object operation simulation state information and the device simulation state information satisfies a target information condition, perform de-marking processing on the first digital object in the marked digital twin visualization model to obtain the removed digital twin visualization model, wherein the target information condition is that the information difference between the corresponding operation indicator parameter information between the object operation simulation state information and the device simulation state information is in a corresponding interval; The display unit is configured to display the removed digital twin visualization model on a target display device.

8. An electronic device comprising: one or more processors; a storage device having one or more programs stored thereon, When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 6.

9. A computer readable medium having a computer program stored thereon, wherein: When the program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.

Citation Information

Patent Citations

  • Equipment state information processing method and device, equipment and storage medium

    CN116089228A

  • Equipment abnormity monitoring method, electronic equipment and storage medium

    CN116380166A

  • Abnormal spatial position positioning method and system based on digital twinning

    CN116702407A

  • Simulation system based on digital twin technology and application thereof in logistics system

    CN117093003A

  • Transformer substation remote optimization control method and system based on digital twinning

    CN117154935A