Power distribution abnormality alarm method, device, electronic device and computer readable medium

By constructing a 3D model of the power distribution room and displaying real-time data in the form of graphics maps, the problem of memory consumption and response delay caused by the 3D model interaction method is solved, the detection efficiency and visualization effect are improved, and a more intuitive alarm operation is achieved.

CN118397195BActive Publication Date: 2024-10-29SHENZHEN POWER SUPPLY BUREAU
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410814959.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-10-29
Estimated Expiration
2044-06-24

AI Technical Summary

Technical Problem

In existing power distribution anomaly detection methods, the interaction method of the 3D model leads to memory resource consumption and response delay, which affects real-time data display and detection efficiency, and the 3D model visualization effect is poor.

Method used

By obtaining the distribution room modeling information and data rendering information, a three-dimensional model is constructed, and the real-time operating data is displayed on the three-dimensional model in the form of graphics maps to reduce binding to event listeners and use a variety of modeling tools to perform three-dimensional modeling. Modeling optimization.

Benefits of technology

It improves the power distribution anomaly detection efficiency and visualization effect, reduces the data display response delay, realizes more intuitive alarm operations, and avoids the consumption of video memory for event monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118397195B_ABST
    Figure CN118397195B_ABST
Patent Text Reader

Abstract

The embodiments of the present disclosure disclose a power distribution anomaly alarm method, device, electronic device and computer-readable medium. A specific implementation of the method includes: obtaining distribution room modeling information and data rendering information; constructing a three-dimensional model of the distribution room; collecting real-time operation data of the distribution room; performing graphic rendering on the real-time operation data of the distribution room; displaying the operation data maps of each distribution device on the corresponding three-dimensional models of each distribution device; displaying the updated three-dimensional model of the distribution room; for each real-time operation data of the distribution device, performing the following steps: performing distribution anomaly detection processing on the real-time operation data of the distribution device to obtain the distribution anomaly detection result; in response to determining the distribution anomaly, performing a distribution anomaly alarm operation according to the corresponding distribution device operation data map. This implementation can improve the efficiency of distribution anomaly detection, reduce the time consumption of anomaly detection, and provide visualized distribution anomaly detection results.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present disclosure relate to the field of computer technology, and in particular to a power distribution abnormality alarm method, device, electronic device, and computer-readable medium. Background Art

[0002] In modern power systems, the stable operation of distribution rooms is crucial to ensuring the safety and normal operation of the power grid. At present, when performing power distribution anomaly detection, the commonly used methods are: manually performing anomaly detection data on each distribution device in the distribution room or performing anomaly data detection by combining the Internet of Things with visualization technology.

[0003] However, when the above method is used to issue an abnormal power distribution alarm, the following technical problems often occur:

[0004] First, the three-dimensional model of the power distribution equipment displays the real-time data or abnormal alarm of the power distribution equipment through interactive methods (such as hovering, clicking, moving in or out). Therefore, each three-dimensional model of the power distribution equipment needs to be bound to each event listener, which consumes additional video memory resources and causes response delays in event listening, resulting in untimely display of real-time data and poor user experience for inspection personnel.

[0005] Second, when constructing a three-dimensional model of a distribution room by independently modeling the three-dimensional model of the distribution equipment, the visualization effect of the three-dimensional model constructed using a single modeling tool or modeling method is poor.

[0006] The above information disclosed in this Background section is only for enhancement of understanding of the background of the inventive concept and therefore it may contain information that does not form the prior art that is already known to a person of ordinary skill in the art. Summary of the invention

[0007] The content of this disclosure is used to introduce concepts in a brief form, which will be described in detail in the detailed implementation section below. The content of this disclosure is not intended to identify the key features or essential features of the technical solution claimed for protection, nor is it intended to limit the scope of the technical solution claimed for protection.

[0008] Some embodiments of the present disclosure propose a power distribution abnormality alarm method, device, electronic device and computer-readable medium to solve one or more of the technical problems mentioned in the above background technology section.

[0009] In a first aspect, some embodiments of the present disclosure provide a method for abnormal power distribution alarm, the method comprising: obtaining power distribution room modeling information and data rendering information, wherein the power distribution room modeling information includes modeling information of each power distribution device; constructing a three-dimensional model of the power distribution room according to the power distribution room modeling information, wherein the three-dimensional model of the power distribution room includes three-dimensional models of each power distribution device; collecting real-time operation data of the power distribution room through associated data acquisition devices, wherein the real-time operation data of the power distribution room includes real-time operation data of each power distribution device; performing graphic rendering on the collected real-time operation data of the power distribution room according to the data rendering information to generate a three-dimensional model of each power distribution device; The invention relates to a method for generating a power distribution room data map; displaying the operation data map of each of the above-mentioned power distribution equipment on the corresponding three-dimensional models of each of the above-mentioned power distribution equipment to update the three-dimensional models of each of the above-mentioned power distribution equipment; displaying the updated three-dimensional model of the power distribution room through an associated display device; for each of the real-time operation data of the power distribution room included in the real-time operation data of the above-mentioned power distribution room, executing the following steps: performing power distribution anomaly detection processing on the real-time operation data of the above-mentioned power distribution equipment to obtain a power distribution anomaly detection result; in response to determining that the above-mentioned power distribution anomaly detection result represents a power distribution anomaly, performing a power distribution anomaly alarm operation according to the power distribution equipment operation data map corresponding to the real-time operation data of the above-mentioned power distribution equipment.

[0010] In a second aspect, some embodiments of the present disclosure provide a power distribution abnormality alarm device, the device comprising: an acquisition unit, configured to acquire distribution room modeling information and data rendering information, wherein the distribution room modeling information includes modeling information of each distribution device; a construction unit, configured to construct a three-dimensional model of the distribution room according to the distribution room modeling information, wherein the three-dimensional model of the distribution room includes three-dimensional models of each distribution device; a collection unit, configured to collect real-time operation data of the distribution room through associated data collection devices, wherein the real-time operation data of the distribution room includes real-time operation data of each distribution device; a graphics rendering unit, configured to perform graphics rendering on the collected real-time operation data of the distribution room according to the data rendering information, so as to generate graphics of each distribution room. An electric equipment operation data map; a surface display unit configured to display the above-mentioned distribution equipment operation data maps on the corresponding three-dimensional models of each distribution equipment to update the above-mentioned three-dimensional models of each distribution equipment; a display unit configured to display the updated three-dimensional model of the distribution room through an associated display device; an execution unit configured to perform the following steps for each distribution equipment real-time operation data included in the above-mentioned distribution room real-time operation data: performing distribution anomaly detection processing on the above-mentioned distribution equipment real-time operation data to obtain a distribution anomaly detection result; in response to determining that the above-mentioned distribution anomaly detection result represents a distribution anomaly, performing a distribution anomaly alarm operation according to the distribution equipment operation data map corresponding to the above-mentioned distribution equipment real-time operation data.

[0011] In a third aspect, some embodiments of the present disclosure provide an electronic device comprising: one or more processors; a storage device on which one or more programs are stored, and when the one or more programs are executed by the one or more processors, the one or more processors implement the method described in any implementation manner of the above-mentioned first aspect.

[0012] In a fourth aspect, some embodiments of the present disclosure provide a computer-readable medium having a computer program stored thereon, wherein when the program is executed by a processor, the method described in any implementation manner of the above-mentioned first aspect is implemented.

[0013] The above-mentioned embodiments of the present disclosure have the following beneficial effects: the power distribution abnormality alarm method of some embodiments of the present disclosure can improve the power distribution abnormality detection efficiency, reduce the display response delay of real-time data or abnormal alarm of the power distribution equipment, and thus provide a visual power distribution abnormality detection result in time. Specifically, the reasons for the low power distribution abnormality detection efficiency and untimely data display are: the three-dimensional model of the power distribution equipment displays the real-time data or abnormal alarm of the power distribution equipment through an interactive method (such as hovering, clicking, moving in or moving out), so each three-dimensional model of the power distribution equipment needs to be bound to each event listener, thereby consuming additional video memory resources and event listening has a response delay, which leads to untimely display of real-time data and poor user experience for detection personnel. Based on this, the power distribution abnormality alarm method of some embodiments of the present disclosure, first, obtains the distribution room modeling information and data rendering information. Among them, the above-mentioned distribution room modeling information includes the modeling information of each distribution equipment. Thus, the distribution room modeling information and data rendering information used for three-dimensional modeling can be obtained. Then, according to the above-mentioned distribution room modeling information, a three-dimensional model of the distribution room is constructed. Among them, the above-mentioned three-dimensional model of the distribution room includes the three-dimensional model of each distribution equipment. Thus, a three-dimensional model of a power distribution room reflecting the distribution of each power distribution equipment in the power distribution room can be constructed. Afterwards, the real-time operation data of the power distribution room is collected through the associated data collection devices. Among them, the real-time operation data of the power distribution room includes the real-time operation data of each power distribution equipment. Thus, the operation data of the power distribution equipment can be collected in real time for subsequent power distribution anomaly detection. Secondly, according to the data rendering information, the collected real-time operation data of the power distribution room is graphically rendered to generate operation data maps of each power distribution equipment. Thus, after the collected real-time operation data of the power distribution room is subjected to a lightweight graphical rendering step, the real-time data can be converted into a graphical map, thereby improving the visualization effect of the power distribution data. Then, the operation data maps of each power distribution equipment are displayed on the corresponding three-dimensional models of each power distribution equipment to update the three-dimensional models of each power distribution equipment. Thus, by displaying the operation data map on the corresponding three-dimensional model of the power distribution equipment, the real-time operation data of the corresponding power distribution equipment can be displayed, and the data display in the form of a data map does not require the user to interact with the corresponding three-dimensional model of the power distribution equipment, and the display response time and display delay of the real-time data are shorter. Then, the updated three-dimensional model of the power distribution room is displayed through the associated display device. Thus, the updated three-dimensional model of the power distribution room and the real-time operation data of the power distribution equipment contained in the three-dimensional model map of each power distribution equipment can be intuitively displayed. Then, for each real-time operation data of the power distribution room included in the real-time operation data of the power distribution room, the following steps are performed: the first step is to perform power distribution anomaly detection processing on the real-time operation data of the power distribution equipment to obtain the power distribution anomaly detection result.Therefore, the time and error rate of manual analysis can be reduced through the automated power distribution anomaly detection method, thereby significantly improving the efficiency and accuracy of power distribution anomaly detection. In the second step, in response to determining that the above power distribution anomaly detection result represents a power distribution anomaly, a power distribution anomaly alarm operation is performed according to the power distribution equipment operation data map corresponding to the real-time operation data of the above power distribution equipment. Therefore, when there is a power distribution anomaly, a more intuitive alarm operation can be performed by updating the corresponding power distribution equipment operation data map. Therefore, for the distribution room inspection personnel, the three-dimensional model of the distribution room and the real-time operation data of each distribution equipment are displayed through data mapping. Since the data is directly mounted on the three-dimensional model surface in the form of lightweight rendered maps, users can directly obtain the real-time operation data of the distribution equipment or the distribution abnormality alarm from the displayed three-dimensional model surface of each distribution equipment. Therefore, there is no need to interact with the three-dimensional model of the distribution equipment, and there is no need to bind an event listener to each three-dimensional model of the distribution equipment. When the data surface is updated subsequently, there is no need to adjust or update the listener, thereby avoiding the extra consumption of video memory resources by event monitoring and reducing data display response time and data display delay. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and that components and elements are not necessarily drawn to scale.

[0015] Figure 1 is a flow chart of some embodiments of the power distribution abnormality alarm method according to the present disclosure;

[0016] Figure 2 It is a structural schematic diagram of some embodiments of the power distribution abnormality alarm device according to the present disclosure;

[0017] Figure 3 It is a schematic diagram of the structure of an electronic device suitable for implementing some embodiments of the present disclosure. DETAILED DESCRIPTION

[0018] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments set forth herein. On the contrary, these embodiments are provided to provide a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.

[0019] It should also be noted that, for ease of description, only the parts related to the invention are shown in the drawings. In the absence of conflict, the embodiments and features in the embodiments of the present disclosure can be combined with each other.

[0020] It should be noted that the concepts such as "first" and "second" mentioned in the present disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.

[0021] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".

[0022] The names of the messages or information exchanged between multiple devices in the embodiments of the present disclosure are only used for illustrative purposes and are not used to limit the scope of these messages or information.

[0023] The present disclosure will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.

[0024] Figure 1 The process 100 of some embodiments of the power distribution abnormality alarm method according to the present disclosure is shown. The power distribution abnormality alarm method comprises the following steps:

[0025] Step 101, obtaining distribution room modeling information and data rendering information.

[0026] In some embodiments, the execution subject (such as a computing device) of the power distribution abnormality alarm can obtain the distribution room modeling information and data rendering information from the target database through a wireless connection method or a wired connection method. Among them, the above-mentioned target database may be a database corresponding to the above-mentioned execution subject. The above-mentioned execution subject may be a server. The above-mentioned distribution room modeling information includes the modeling information of each distribution device. The above-mentioned distribution room modeling information may include the modeling information of each distribution device, the distribution room scene modeling information, the device location information and the global rendering parameter information. The above-mentioned distribution equipment modeling information may include a distribution equipment point cloud data set, a distribution equipment image and a distribution equipment rendering parameter information. The above-mentioned distribution equipment point cloud data set may be each point cloud data obtained after laser scanning the corresponding distribution equipment. The above-mentioned distribution equipment image may be a device picture of the corresponding distribution equipment. The above-mentioned distribution equipment rendering parameter information may be each rendering parameter used to render the three-dimensional model of the distribution equipment. The above-mentioned distribution room scene modeling information may include a distribution room scene point cloud data set, a distribution room scene image and a distribution room scene rendering parameter information. The above-mentioned distribution room scene point cloud data set may be each point cloud data obtained after laser scanning of the indoor scene of the corresponding distribution room. The above-mentioned distribution room scene image may be an indoor scene image of the distribution room. The above-mentioned distribution room scene rendering parameter information may be each rendering parameter used to render the distribution room scene three-dimensional model. The above-mentioned global rendering parameter information is each rendering parameter used to render the distribution room three-dimensional model. The above-mentioned rendering parameters may include but are not limited to: resolution, light source size and light source position, shadow range, and global illumination parameters. The above-mentioned each distribution equipment modeling information corresponds to the distribution equipment identification information. The above-mentioned distribution equipment identification information may be a character string, which corresponds one-to-one to the distribution equipment in the distribution room. The above-mentioned equipment location information may include the location coordinates of each distribution equipment to characterize the positional relationship between each distribution equipment. The location coordinates of each distribution equipment included in the above-mentioned equipment location information also correspond to the identification information of each distribution equipment. The above-mentioned distribution equipment location coordinates may be the location coordinates of the corresponding distribution equipment in the distribution room. It should be noted that the above-mentioned distribution equipment location coordinates may be coordinates determined in a coordinate system constructed with the distribution room entrance as the origin, the east-west direction as the horizontal axis, and the north-south direction as the vertical axis, and are not limited here. The above-mentioned data rendering information may be various graphic rendering parameters for rendering the distribution equipment operation data map generated based on the real-time operation data of the distribution room. The above-mentioned graphic rendering parameters may include, but are not limited to: image brightness, image saturation, image contrast, and graphic resolution.

[0027] It should be noted that the above-mentioned wireless connection methods may include but are not limited to 3G / 4G / 5G connection, WiFi connection, Bluetooth connection, WiMAX connection, Zigbee connection, UWB (ultra wideband) connection, and other wireless connection methods currently known or to be developed in the future.

[0028] Step 102: construct a three-dimensional model of the power distribution room according to the power distribution room modeling information.

[0029] In some embodiments, the execution entity may construct a three-dimensional model of the distribution room according to the distribution room modeling information. The three-dimensional model of the distribution room includes three-dimensional models of various distribution equipment. The three-dimensional model of the distribution room may include three-dimensional models of various distribution equipment and a three-dimensional model of the distribution room scene. The three-dimensional model of the distribution room scene may be a three-dimensional visualization model obtained by three-dimensional modeling of the corresponding distribution room indoor scene. The three-dimensional model of the distribution equipment included in the three-dimensional model of the distribution room may be a three-dimensional visualization model obtained by three-dimensional modeling of the corresponding distribution equipment in the distribution room.

[0030] In some optional implementations of some embodiments, the execution subject may construct a three-dimensional model of the power distribution room according to the power distribution room modeling information through the following steps:

[0031] The first step is to pre-process the modeling information of each power distribution device included in the above-mentioned power distribution room modeling information to obtain the modeling information of each power distribution device after processing.

[0032] The second step is to preprocess the distribution room scene modeling information included in the distribution room modeling information to obtain the processed distribution room scene modeling information. In practice, the implementation steps of "preprocessing the distribution room scene modeling information included in the distribution room modeling information to obtain the processed distribution room scene modeling information" can refer to the implementation steps of "preprocessing the modeling information of each distribution equipment included in the distribution room modeling information to obtain the modeling information of each processed distribution equipment", which will not be repeated here.

[0033] The third step is to construct a three-dimensional model of the distribution room based on the above-mentioned processed distribution equipment modeling information, the above-mentioned processed distribution room scene modeling information and the model building tool.

[0034] Optionally, the model building tool includes a first modeling tool and a second modeling tool. The first modeling tool and the second modeling tool may be software for three-dimensional modeling. As an example, the first modeling tool may be a 3D Max modeling tool. The second modeling tool may be a Unity 3D modeling tool.

[0035] In some optional implementations of some embodiments, the execution subject may perform modeling information preprocessing on each power distribution equipment modeling information included in the power distribution room modeling information to obtain each processed power distribution equipment modeling information through the following steps:

[0036] In the first step, for each distribution equipment modeling information included in the distribution room modeling information, the following modeling data preprocessing steps are performed:

[0037] In the first sub-step, the power distribution equipment point cloud data set included in the power distribution equipment modeling information is subjected to denoising to obtain the power distribution equipment point cloud data set after denoising. In practice, the execution subject may perform denoising on the power distribution equipment point cloud data set included in the power distribution equipment modeling information by using a preset point cloud denoising algorithm to obtain the power distribution equipment point cloud data set after denoising. As an example, the preset point cloud denoising algorithm may be, but is not limited to, a bilateral filtering algorithm, a Gaussian filtering algorithm, and a KD-Tree algorithm.

[0038] The second sub-step is to perform point cloud registration processing on the above-mentioned point cloud data of the power distribution equipment after noise reduction to obtain the point cloud data set of the power distribution equipment after registration. In practice, the above-mentioned execution subject can perform point cloud registration processing on the above-mentioned point cloud data of the power distribution equipment after noise reduction through a preset point cloud registration algorithm to obtain the point cloud data set of the power distribution equipment after registration. As an example, the preset point cloud registration algorithm can be but is not limited to the ICP (Iterative Closest Point) algorithm, the NDT (Normal Distribution Transform) algorithm and the 3D-NDT algorithm.

[0039] The third sub-step is to downsample the image of the power distribution equipment included in the power distribution equipment modeling information to obtain the processed image of the power distribution equipment. In practice, the execution subject may downsample the image of the power distribution equipment included in the power distribution equipment modeling information by a preset point downsampling algorithm to obtain the processed image of the power distribution equipment. As an example, the preset downsampling algorithm may be, but is not limited to, a pyramid downsampling algorithm, a bilinear interpolation algorithm, and a regional average algorithm.

[0040] The fourth sub-step is to filter the processed power distribution equipment image to obtain the filtered power distribution equipment image. In practice, the execution subject may filter the processed power distribution equipment image through a preset filter to obtain the filtered power distribution equipment image. As an example, the preset filter may be, but is not limited to, a Gaussian filter, a mean filter, and a median filter.

[0041] In the second step, the registered power distribution equipment point cloud data set, the filtered power distribution equipment image and the power distribution equipment rendering parameter information included in the power distribution equipment modeling information are determined as the processed power distribution equipment modeling information.

[0042] In some optional implementations of some embodiments, the execution subject may construct a three-dimensional model of a power distribution room according to the above-mentioned processed power distribution equipment modeling information and a model building tool through the following steps:

[0043] In the first step, for each processed power distribution equipment modeling information in the above-mentioned processed power distribution equipment modeling information, the following modeling steps are performed:

[0044] The first sub-step is to import the registered distribution equipment point cloud dataset included in the processed distribution equipment modeling information into the first modeling tool. In practice, the execution entity may import the registered distribution equipment point cloud dataset included in the processed distribution equipment modeling information into the first modeling tool.

[0045] The second sub-step is to perform three-dimensional reconstruction on the imported registered distribution equipment point cloud data set through the first modeling tool to obtain an initial three-dimensional model of the distribution equipment. In practice, the execution subject can use each registered distribution equipment point cloud data in the registered distribution equipment point cloud data set as a model node, and connect the spatially adjacent model nodes to each other through the first modeling tool, thereby converting the registered distribution equipment point cloud data set into a three-dimensional mesh model to complete the three-dimensional reconstruction and obtain the initial three-dimensional model of the distribution equipment.

[0046] In the third sub-step, the filtered distribution equipment image included in the processed distribution equipment modeling information is mapped as a distribution equipment model map to the initial distribution equipment three-dimensional model through the first modeling tool to obtain the mapped distribution equipment three-dimensional model. In practice, the execution subject can use the first modeling tool to map the filtered distribution equipment image included in the processed distribution equipment modeling information as a distribution equipment model map to the preset model map position of the initial distribution equipment three-dimensional model to obtain the mapped distribution equipment three-dimensional model. The distribution room scene map model is obtained.

[0047] The fourth sub-step is to perform model rendering processing on the three-dimensional model of the power distribution equipment through the first modeling tool and the power distribution equipment rendering parameter information included in the processed power distribution equipment modeling information, so as to obtain the rendered three-dimensional model of the power distribution equipment. In practice, the execution subject can perform model rendering processing on the three-dimensional model of the power distribution equipment through the first modeling tool according to the various power distribution equipment rendering parameters included in the power distribution equipment rendering parameter information included in the processed power distribution equipment modeling information, so as to obtain the rendered three-dimensional model of the power distribution equipment.

[0048] The fifth sub-step is to perform model compression processing on the above-mentioned rendered three-dimensional model of the power distribution equipment to obtain a compressed three-dimensional model of the power distribution equipment. In practice, the above-mentioned execution subject can perform model compression processing on the above-mentioned rendered three-dimensional model of the power distribution equipment through a preset model compression algorithm to obtain a compressed three-dimensional model of the power distribution equipment. As an example, the above-mentioned model compression algorithm may include but is not limited to: Draco compression algorithm, LZMA compression algorithm, LZO compression algorithm and Zlib compression algorithm.

[0049] The sixth sub-step is to export the compressed three-dimensional model of the power distribution equipment from the first modeling tool in the form of a file according to the preset format information to obtain the three-dimensional model file of the power distribution equipment. The preset format information may be a file format suffix to characterize the corresponding file format. In practice, the execution entity may export the compressed three-dimensional model of the power distribution equipment from the first modeling tool in a file format corresponding to the preset format information to obtain the three-dimensional model file of the power distribution equipment. As an example, the file format corresponding to the preset format information may be an FBX file format.

[0050] The second step is to generate a three-dimensional model file of the distribution room scene according to the above-mentioned processed distribution room scene modeling information and model building tools. In practice, the implementation steps of "generating a three-dimensional model file of the distribution room scene according to the above-mentioned processed distribution room scene modeling information and model building tools" can refer to the implementation steps of "generating a three-dimensional model file of the distribution equipment" and will not be repeated here.

[0051] The third step is to import the obtained three-dimensional model files of each power distribution device into the second modeling tool to obtain the three-dimensional models of each imported power distribution device. In practice, the execution subject can import the obtained three-dimensional model files of each power distribution device into the second modeling tool one by one to obtain the three-dimensional models of each imported power distribution device.

[0052] The fourth step is to import the generated distribution room scene 3D model file into the second modeling tool to obtain the imported distribution room scene 3D model. In practice, the execution subject can import the generated distribution room scene 3D model file into the second modeling tool to obtain the imported distribution room scene 3D model.

[0053] The fifth step is to smooth the above-mentioned three-dimensional models of the imported power distribution equipment and the three-dimensional models of the imported power distribution room scenes to obtain the processed three-dimensional models of the power distribution equipment and the three-dimensional models of the processed power distribution room scenes. In practice, the above-mentioned execution subject can smooth the above-mentioned three-dimensional models of the imported power distribution equipment and the three-dimensional models of the imported power distribution room scenes one by one through a preset model smoothing algorithm to obtain the processed three-dimensional models of the power distribution equipment and the three-dimensional models of the processed power distribution room scenes. As an example, the above-mentioned preset model smoothing algorithm can be a Laplace (Laplacian Smoothing) smoothing algorithm, a HC (Humphrey's Classes Smoothing) smoothing algorithm, and a bilateral filtering (bilateral grid) algorithm.

[0054] The sixth step is to splice the above-mentioned processed distribution equipment three-dimensional models and the above-mentioned processed distribution room scene three-dimensional model according to the above-mentioned equipment location information to obtain the initial distribution room three-dimensional model. In practice, first, the above-mentioned execution subject can convert the position coordinates of each distribution equipment included in the above-mentioned equipment location information to the coordinate system of the second modeling tool through the above-mentioned second modeling tool and the coordinate system conversion algorithm to obtain the position coordinates of each converted distribution equipment. Among them, each of the above-mentioned converted distribution equipment position coordinates can represent the position of the corresponding processed distribution equipment three-dimensional model in the above-mentioned processed distribution room scene three-dimensional model. Then, the above-mentioned execution subject can splice each of the above-mentioned processed distribution equipment three-dimensional models according to the corresponding converted distribution equipment position coordinates with the above-mentioned processed distribution room scene three-dimensional model to obtain the initial distribution room three-dimensional model. As an example, the above-mentioned coordinate system conversion algorithm can be a homogeneous coordinate transformation algorithm.

[0055] In the seventh step, the initial three-dimensional model of the power distribution room is globally optimized to obtain the three-dimensional model of the power distribution room. In practice, the execution subject can globally optimize the initial three-dimensional model of the power distribution room through a preset optimization algorithm to obtain the three-dimensional model of the power distribution room. As an example, the preset optimization algorithm can be a QEM (Quadic Error Metrics, mesh simplification) algorithm, an edge collapse simplification algorithm (Edge Collapse Simplification) algorithm, and a vertex clustering algorithm.

[0056] The first to seventh steps mentioned above, as an inventive point of an embodiment of the present disclosure, solve the second technical problem mentioned in the background technology, "When constructing a three-dimensional model of a distribution room by independently modeling the three-dimensional model of the distribution equipment, the visualization effect of the three-dimensional model constructed by using a single modeling tool or modeling method is poor". The factors that lead to the poor visualization effect of the constructed three-dimensional model are often as follows: When constructing a three-dimensional model of a distribution room by independently modeling the three-dimensional model of the distribution equipment, the visualization effect of the three-dimensional model constructed by using a single modeling tool or modeling method is poor. If the above factors are solved, the visualization effect of the constructed three-dimensional model can be improved. In order to achieve this effect, the present disclosure, first, combines the independent modeling method with a variety of modeling tools. Since different modeling tools have different modeling performance and modeling advantages, in the process of constructing each three-dimensional model of the distribution equipment, each construction node is distributed to different modeling tools so that the tool performance of each modeling tool can be used, so that each independent three-dimensional model of the distribution equipment with better visualization effect can be constructed. Afterwards, the three-dimensional model of the power distribution room is locally optimized and globally optimized in succession, so that the three-dimensional models of the independent power distribution equipment in the three-dimensional model of the power distribution room can present a better visualization effect as a whole.

[0057] Step 103, collecting real-time operation data of the power distribution room through various associated data collection devices.

[0058] In some embodiments, the execution subject may collect the real-time operation data corresponding to each power distribution device through the associated data collection devices to obtain the real-time operation data of the power distribution room. The real-time operation data of the power distribution room includes the data of each power distribution device during real-time operation. The power distribution equipment may include but is not limited to: distributor, isolator and transformer. The real-time operation data of the power distribution room may include but is not limited to: current intensity, voltage intensity, electric power, interruption rate, power supply frequency and harmonic distortion. The real-time operation data of the power distribution equipment may be the real-time operation data of the corresponding power distribution equipment. The data collection equipment may include but is not limited to: voltage sensor, current sensor, smart meter, power sensor, transformer, circuit breaker and cable. In practice, first, the execution subject may collect the real-time operation data of each power distribution device in the corresponding power distribution room through the pre-deployed power distribution room sensors to obtain the real-time operation data of each power distribution device. Finally, the execution subject may determine the obtained real-time operation data of each power distribution device as the real-time operation data of the power room. It should be noted that each real-time operation data of the power distribution equipment included in the real-time operation data of the power distribution room corresponds to the device identification information to characterize the source of the collected data.

[0059] Step 104 , based on the data rendering information, the collected real-time operation data of the power distribution room is graphically rendered to generate operation data maps of each power distribution equipment.

[0060] In some embodiments, the execution subject may perform graphical rendering on the collected real-time operation data of the power distribution room according to the data rendering information to generate operation data maps of each power distribution equipment. Each generated operation data map of the power distribution equipment may be an image generated after data visualization of the corresponding real-time operation data of the power distribution equipment.

[0061] In some optional implementations of some embodiments, the execution subject may perform graphical rendering on the collected real-time operation data of the power distribution room according to the data rendering information through the following steps to generate operation data maps of each power distribution device:

[0062] In the first step, for the real-time operation data of each power distribution device included in the real-time operation data of the power distribution room, the following data processing steps are performed:

[0063] The first sub-step is to perform structured processing on the real-time operation data of the power distribution equipment to obtain structured power distribution equipment operation data. In practice, the execution subject may use each attribute in the real-time operation data of the power distribution equipment as a field, and determine each attribute value as the field value of the corresponding field, so as to perform structured processing on the real-time operation data of the power distribution equipment to obtain structured power distribution equipment operation data.

[0064] The second sub-step is to normalize the structured power distribution equipment operation data to obtain the normalized power distribution equipment operation data. In practice, the execution subject may normalize the field value of each field included in the structured power distribution equipment operation data to obtain the normalized power distribution equipment operation data.

[0065] The third sub-step is to perform color mapping on the normalized distribution equipment operation data to obtain the operation data color mapping information. In practice, the execution subject may map each field value included in the normalized distribution equipment operation data to a color value through a color mapping table (e.g., the YlOrRd color mapping table in the Matplotlib library function of the Python language), and determine each obtained color value as the operation data color mapping information.

[0066] The fourth sub-step is to generate an initial distribution equipment operation data map according to the operation data color mapping information. In practice, the execution subject can use a related library function to draw each color value included in the operation data color mapping information into a bar graph as the initial distribution equipment operation data map.

[0067] The fifth sub-step is to perform graphic rendering on the initial power distribution equipment operation data map according to the data rendering information to obtain the power distribution equipment operation data map. In practice, the execution subject may perform graphic rendering on the initial power distribution equipment operation data map according to the various image rendering parameters included in the data rendering information through a renderer or the first modeling tool to obtain the power distribution equipment operation data map.

[0068] Step 105 , displaying the operation data maps of each power distribution device on the corresponding three-dimensional models of each power distribution device to update the three-dimensional models of each power distribution device.

[0069] In some embodiments, the above-mentioned execution subject can display the above-mentioned various power distribution equipment operation data maps on the corresponding three-dimensional models of each power distribution equipment to update the above-mentioned three-dimensional models of each power distribution equipment. It should be noted that in the above-mentioned practice, for each of the above-mentioned various power distribution equipment operation data maps, the above-mentioned execution subject can perform the following steps: First, from the various power distribution equipment three-dimensional models included in the above-mentioned distribution room three-dimensional model, select the power distribution equipment three-dimensional model whose corresponding device identification information is the same as the device identification information corresponding to the above-mentioned power distribution equipment operation data map as the target power distribution equipment three-dimensional model. Then, the above-mentioned power distribution equipment operation data map is pasted to the surface of the above-mentioned target power distribution equipment three-dimensional model to update the above-mentioned target power distribution equipment three-dimensional model.

[0070] Step 106: display the updated three-dimensional model of the power distribution room through an associated display device.

[0071] In some embodiments, the execution entity may display the updated three-dimensional model of the power distribution room through an associated display device. The display device may be a display screen. In practice, the execution entity may display the updated three-dimensional model of the power distribution room on an associated display screen.

[0072] Step 107: for each power distribution equipment real-time operation data included in the power distribution room real-time operation data, perform the following steps:

[0073] Step 1071, perform power distribution anomaly detection processing on the real-time operation data of the power distribution equipment to obtain a power distribution anomaly detection result.

[0074] In some embodiments, the execution subject may perform power distribution anomaly detection processing on the real-time operation data of the power distribution equipment to obtain a power distribution anomaly detection result. The power distribution anomaly detection result may be a Boolean value. For example, when the power distribution anomaly detection result is "TRUE", it may indicate that there is a power distribution anomaly. When the power distribution anomaly detection result is "FLASE", it may indicate that there is no power distribution anomaly.

[0075] In some optional implementations of some embodiments, the execution subject may perform power distribution anomaly detection processing on the real-time operation data of the power distribution equipment through the following steps to obtain a power distribution anomaly detection result:

[0076] The first step is to perform structured processing on the real-time operation data of the above-mentioned power distribution equipment to obtain the operation data to be tested. It should be noted that the implementation steps of the above-mentioned "perform structured processing on the real-time operation data of the above-mentioned power distribution equipment to obtain the operation data to be tested" can refer to the implementation steps of "perform structured processing on the real-time operation data of the above-mentioned power distribution equipment to obtain structured power distribution equipment operation data", which will not be repeated here.

[0077] The second step is to input the above-mentioned operation data to be detected into a pre-built power distribution anomaly detection model to obtain the power distribution anomaly detection result. The above-mentioned power distribution anomaly detection model can be a neural network model that takes the structured real-time operation data of the power distribution equipment as input and the power distribution anomaly detection result as output. As an example, the above-mentioned power distribution anomaly detection model can be, but is not limited to, a recurrent neural network model, a long short-term memory network model, and a Transformer model.

[0078] Optionally, the above power distribution anomaly detection model can be constructed by following the steps:

[0079] The first step is to build an initial power distribution anomaly detection model. In practice, the above execution entity can build an initial power distribution anomaly detection model through relevant library functions (for example, the pytorch library in Python).

[0080] The second step is to obtain the historical operation data set of the power distribution equipment. Among them, the power distribution equipment operation history data in the above-mentioned power distribution equipment historical operation data set corresponds to a data anomaly label. The above-mentioned data anomaly label can indicate whether the corresponding power distribution equipment operation history data is data generated under abnormal power distribution conditions. The above-mentioned data anomaly label can be a Boolean type variable. For example, when the above-mentioned data anomaly label is "TRUE", it can indicate that the corresponding power distribution equipment operation history data is abnormal power distribution data. When the above-mentioned data anomaly label is "FLASE", it can indicate that the corresponding power distribution equipment operation history data is not abnormal power distribution data.

[0081] The third step is to perform the following model training steps based on the historical operation data set of the power distribution equipment:

[0082] In the first sub-step, at least one historical operation data of a power distribution device in the historical operation data set of the power distribution device is input into the initial power distribution anomaly detection model to obtain a detection result label corresponding to each historical operation data of the power distribution device in the at least one historical operation data of the power distribution device. The above detection result label can be a Boolean type variable. For example, when the above detection result label is "TRUE", it can be characterized that the corresponding historical operation data of the power distribution device is abnormal power distribution data. When the above detection result label is "FALSE", it can be characterized that the corresponding historical operation data of the power distribution device is normal power distribution data.

[0083] In the second sub-step, the detection result label corresponding to each power distribution equipment historical operation data in at least one power distribution equipment historical operation data is compared with the corresponding data anomaly label. In practice, the execution subject can compare whether the detection result label obtained above is the same as the data anomaly label. If the above two are the same, it can be indicated that the detection result of the corresponding power distribution equipment historical operation data is correct. If the Boolean type variables of the above two are different, it can be indicated that the detection result of the corresponding power distribution equipment historical operation data is wrong.

[0084] The third sub-step is to determine the detection accuracy of the initial power distribution fault detection model based on the comparison result. In practice, the execution entity may determine the detection accuracy of the initial power distribution fault detection model as the ratio of the total number of historical operation data of the power distribution equipment with correct detection results to the total number of historical operation data of at least one power distribution equipment.

[0085] In a fourth sub-step, in response to determining that the detection accuracy is greater than or equal to a preset detection accuracy, the initial power distribution anomaly detection model is determined as a power distribution fault detection model. For example, the preset detection accuracy may be 95%.

[0086] In a fifth sub-step, in response to determining that the detection accuracy is less than a preset detection accuracy, the model parameters of the initial power distribution anomaly detection model are adjusted, the historical operation data of the unused power distribution equipment are combined into a set of historical operation data of the power distribution equipment, and the adjusted initial power distribution fault detection model is determined as the initial power distribution anomaly detection model, and the above-mentioned model training step is performed again. In practice, the above-mentioned execution subject can adjust the model parameters of the initial power distribution anomaly detection model through a back propagation algorithm and a gradient descent algorithm.

[0087] Step 1072, in response to determining that the power distribution anomaly detection result indicates a power distribution anomaly, a power distribution anomaly alarm operation is performed according to a power distribution equipment operation data map corresponding to the real-time operation data of the power distribution equipment.

[0088] In some embodiments, in response to determining that the above-mentioned power distribution anomaly detection result represents a power distribution anomaly, the above-mentioned execution subject may perform a power distribution anomaly alarm operation based on the power distribution equipment operation data map corresponding to the above-mentioned power distribution equipment real-time operation data. It should be noted that the above-mentioned "power distribution equipment operation data map corresponding to the real-time operation data of the power distribution equipment" may be a power distribution equipment operation data map whose corresponding device identification information is the same as the device identification information corresponding to the above-mentioned real-time operation data of the power distribution equipment. In practice, first, the above-mentioned execution subject may re-render the above-mentioned power distribution equipment operation data map through a renderer or the above-mentioned second modeling tool according to the preset alarm rendering parameter information to obtain a rendered power distribution equipment operation data map. Among them, the above-mentioned preset alarm rendering parameter information may be the various rendering parameters for re-rendering the power distribution equipment operation data map in the presence of power distribution anomalies. The above-mentioned preset alarm rendering parameter information may include various preset rendering parameters. Then, the above-mentioned execution entity can re-apply the above-mentioned rendered distribution equipment operation data map to the distribution equipment three-dimensional model corresponding to the above-mentioned rendered distribution equipment operation data map in each distribution equipment three-dimensional model included in the displayed distribution room three-dimensional model, so as to update the above-mentioned distribution room three-dimensional model. Finally, the above-mentioned execution entity can re-display the updated distribution room three-dimensional model on the associated display screen. Thereby, the power distribution abnormality alarm can be issued through the updated distribution room three-dimensional model. It should be noted that the device identification information corresponding to the distribution equipment three-dimensional model corresponding to the above-mentioned rendered distribution equipment operation data map is the same as the device identification information corresponding to the above-mentioned rendered distribution equipment operation data map.

[0089] The above-mentioned embodiments of the present disclosure have the following beneficial effects: the power distribution abnormality alarm method of some embodiments of the present disclosure can improve the power distribution abnormality detection efficiency, reduce the display response delay of real-time data or abnormal alarm of the power distribution equipment, and thus provide a visual power distribution abnormality detection result in time. Specifically, the reasons for the low power distribution abnormality detection efficiency and untimely data display are: the three-dimensional model of the power distribution equipment displays the real-time data or abnormal alarm of the power distribution equipment through an interactive method (such as hovering, clicking, moving in or moving out), so each three-dimensional model of the power distribution equipment needs to be bound to each event listener, thereby consuming additional video memory resources and event listening has a response delay, which leads to untimely display of real-time data and poor user experience for detection personnel. Based on this, the power distribution abnormality alarm method of some embodiments of the present disclosure, first, obtains the distribution room modeling information and data rendering information. Among them, the above-mentioned distribution room modeling information includes the modeling information of each distribution equipment. Thus, the distribution room modeling information and data rendering information used for three-dimensional modeling can be obtained. Then, according to the above-mentioned distribution room modeling information, a three-dimensional model of the distribution room is constructed. Among them, the above-mentioned three-dimensional model of the distribution room includes the three-dimensional model of each distribution equipment. Thus, a three-dimensional model of a power distribution room reflecting the distribution of each power distribution equipment in the power distribution room can be constructed. Afterwards, the real-time operation data of the power distribution room is collected through the associated data collection devices. Among them, the real-time operation data of the power distribution room includes the real-time operation data of each power distribution equipment. Thus, the operation data of the power distribution equipment can be collected in real time for subsequent power distribution anomaly detection. Secondly, according to the data rendering information, the collected real-time operation data of the power distribution room is graphically rendered to generate operation data maps of each power distribution equipment. Thus, after the collected real-time operation data of the power distribution room is subjected to a lightweight graphical rendering step, the real-time data can be converted into a graphical map, thereby improving the visualization effect of the power distribution data. Then, the operation data maps of each power distribution equipment are displayed on the corresponding three-dimensional models of each power distribution equipment to update the three-dimensional models of each power distribution equipment. Thus, by displaying the operation data map on the corresponding three-dimensional model of the power distribution equipment, the real-time operation data of the corresponding power distribution equipment can be displayed, and the data display in the form of a data map does not require the user to interact with the corresponding three-dimensional model of the power distribution equipment, and the display response time and display delay of the real-time data are shorter. Then, the updated three-dimensional model of the power distribution room is displayed through the associated display device. Thus, the updated three-dimensional model of the power distribution room and the real-time operation data of the power distribution equipment contained in the three-dimensional model map of each power distribution equipment can be intuitively displayed. Then, for each real-time operation data of the power distribution room included in the real-time operation data of the power distribution room, the following steps are performed: the first step is to perform power distribution anomaly detection processing on the real-time operation data of the power distribution equipment to obtain the power distribution anomaly detection result.Therefore, the time and error rate of manual analysis can be reduced through the automated power distribution anomaly detection method, thereby significantly improving the efficiency and accuracy of power distribution anomaly detection. In the second step, in response to determining that the above power distribution anomaly detection result represents a power distribution anomaly, a power distribution anomaly alarm operation is performed according to the power distribution equipment operation data map corresponding to the real-time operation data of the above power distribution equipment. Therefore, when there is a power distribution anomaly, a more intuitive alarm operation can be performed by updating the corresponding power distribution equipment operation data map. Therefore, for the distribution room inspection personnel, the three-dimensional model of the distribution room and the real-time operation data of each distribution equipment are displayed through data mapping. Since the data is directly mounted on the three-dimensional model surface in the form of lightweight rendered maps, users can directly obtain the real-time operation data of the distribution equipment or the distribution abnormality alarm from the displayed three-dimensional model surface of each distribution equipment. Therefore, there is no need to interact with the three-dimensional model of the distribution equipment, and there is no need to bind an event listener to each three-dimensional model of the distribution equipment. When the data surface is updated subsequently, there is no need to adjust or update the listener, thereby avoiding the extra consumption of video memory resources by event monitoring and reducing data display response time and data display delay.

[0090] Further references Figure 2 As an implementation of the methods shown in the above figures, the present disclosure provides some embodiments of a power distribution abnormality alarm device. These device embodiments are similar to Figure 1 Corresponding to the method embodiments shown, the power distribution abnormality alarm device can be specifically applied to various electronic devices.

[0091] like Figure 2As shown, some embodiments of the power distribution abnormality alarm device 200 include: an acquisition unit 201, a construction unit 202, a collection unit 203, a graphics rendering unit 204, a surface display unit 205, a display unit 206 and an execution unit 207. The acquisition unit 201 is configured to acquire distribution room modeling information and data rendering information, wherein the distribution room modeling information includes modeling information of each distribution device; the construction unit 202 is configured to construct a three-dimensional model of the distribution room according to the distribution room modeling information, wherein the three-dimensional model of the distribution room includes three-dimensional models of each distribution device; the acquisition unit 203 is configured to collect real-time operation data of the distribution room through associated data collection devices, wherein the real-time operation data of the distribution room includes real-time operation data of each distribution device; the graphics rendering unit 204 is configured to perform graphics rendering on the collected real-time operation data of the distribution room according to the data rendering information to generate operation data maps of each distribution device; the surface display Unit 205 is configured to display the above-mentioned distribution equipment operation data maps on the corresponding three-dimensional models of each distribution equipment to update the above-mentioned three-dimensional models of each distribution equipment; the display unit 206 is configured to display the updated three-dimensional model of the distribution room through an associated display device; the execution unit 207 is configured to perform the following steps for each distribution equipment real-time operation data included in the above-mentioned distribution room real-time operation data: perform distribution anomaly detection processing on the above-mentioned distribution equipment real-time operation data to obtain a distribution anomaly detection result; in response to determining that the above-mentioned distribution anomaly detection result represents a distribution anomaly, perform a distribution anomaly alarm operation according to the distribution equipment operation data map corresponding to the above-mentioned distribution equipment real-time operation data.

[0092] It can be understood that the units recorded in the power distribution abnormality alarm device 200 are similar to those in the reference Figure 1 Therefore, the operations, features and beneficial effects described above for the method are also applicable to the power distribution abnormality alarm device 200 and the units included therein, and will not be described in detail here.

[0093] Reference below Figure 3 , which shows a structural schematic diagram of an electronic device 300 suitable for implementing some embodiments of the present disclosure. Figure 3 The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.

[0094] like Figure 3As shown, the electronic device 300 may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 301, which can perform various appropriate actions and processes according to a program stored in a read-only memory 302 or a program loaded from a storage device 308 into a random access memory 303. Various programs and data required for the operation of the electronic device 300 are also stored in the random access memory 303. The processing device 301, the read-only memory 302, and the random access memory 303 are connected to each other via a bus 304. An input / output interface 305 is also connected to the bus 304.

[0095] Typically, the following devices may be connected to the I / O interface 305: an input device 306 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 307 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 308 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 309. The communication device 309 may allow the electronic device 300 to communicate with other devices wirelessly or by wire to exchange data. Figure 3 The electronic device 300 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead. Figure 3 Each block shown in the figure may represent one device, or may represent multiple devices as required.

[0096] In particular, according to some embodiments of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, some embodiments of the present disclosure include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program contains program code for executing the method shown in the flowchart. In some such embodiments, the computer program can be downloaded and installed from the network through the communication device 309, or installed from the storage device 308, or installed from the read-only memory 302. When the computer program is executed by the processing device 301, the above-mentioned functions defined in the method of some embodiments of the present disclosure are executed.

[0097] It should be noted that the computer-readable medium recorded in some embodiments of the present disclosure may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In some embodiments of the present disclosure, a computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, device or device. In some embodiments of the present disclosure, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer readable signal media may also be any computer readable medium other than computer readable storage media, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0098] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (Hyper Text Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.

[0099] The above-mentioned computer-readable medium may be included in the above-mentioned electronic device; or it may exist independently without being assembled into the electronic device. The above-mentioned computer-readable medium carries one or more programs. When the above-mentioned one or more programs are executed by the electronic device, the electronic device: obtains distribution room modeling information and data rendering information, wherein the above-mentioned distribution room modeling information includes modeling information of each distribution device; constructs a three-dimensional model of the distribution room according to the above-mentioned distribution room modeling information, wherein the above-mentioned three-dimensional model of the distribution room includes three-dimensional models of each distribution device; collects real-time operation data of the distribution room through associated data acquisition devices, wherein the above-mentioned real-time operation data of the distribution room includes real-time operation data of each distribution device; performs graphic rendering on the collected real-time operation data of the distribution room according to the above-mentioned data rendering information to generate The invention relates to a method for generating operation data maps of each power distribution device; displaying the operation data maps of each power distribution device on the corresponding three-dimensional models of each power distribution device to update the three-dimensional models of each power distribution device; displaying the updated three-dimensional model of the power distribution room through the associated display device; for each real-time operation data of the power distribution room included in the real-time operation data of the power distribution room, executing the following steps: performing power distribution anomaly detection processing on the real-time operation data of the power distribution equipment to obtain a power distribution anomaly detection result; in response to determining that the power distribution anomaly detection result indicates a power distribution anomaly, performing a power distribution anomaly alarm operation according to the power distribution equipment operation data map corresponding to the real-time operation data of the power distribution equipment.

[0100] Computer program code for performing the operations of some embodiments of the present disclosure may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0101] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present disclosure. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0102] The units described in some embodiments of the present disclosure may be implemented by software or by hardware. The described units may also be provided in a processor, for example, may be described as: a processor including an acquisition unit, a construction unit, a collection unit, a graphics rendering unit, a veneer display unit, a display unit and an execution unit. The names of these units do not, in some cases, constitute limitations on the units themselves, for example, the acquisition unit may also be described as a "unit for acquiring distribution room modeling information and data rendering information".

[0103] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0104] The above descriptions are only some preferred embodiments of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present disclosure is not limited to the technical solutions formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the embodiments of the present disclosure.

Claims

1. A power distribution abnormality alarm method, comprising: Obtaining distribution room modeling information and data rendering information, wherein the distribution room modeling information includes modeling information of each distribution device, distribution room scene modeling information, global rendering parameter information and device location information; the distribution equipment modeling information in the distribution room modeling information includes a distribution equipment point cloud data set, a distribution equipment image and distribution equipment rendering parameter information; the equipment location information includes the location coordinates of each distribution equipment to characterize the positional relationship between each distribution equipment; According to the distribution room modeling information, a three-dimensional model of the distribution room is constructed, wherein the three-dimensional model of the distribution room includes three-dimensional models of various distribution equipment, wherein, according to the distribution room modeling information, the three-dimensional model of the distribution room is constructed, including: The modeling information of each power distribution device included in the power distribution room modeling information is preprocessed to obtain the modeling information of each power distribution device after processing, wherein the modeling information of each power distribution device included in the power distribution room modeling information is preprocessed to obtain the modeling information of each power distribution device after processing, including: For each distribution equipment modeling information included in the distribution room modeling information, the following modeling data preprocessing steps are performed: Performing noise reduction processing on the power distribution equipment point cloud data set included in the power distribution equipment modeling information to obtain a noise-reduced power distribution equipment point cloud data set; Performing point cloud registration processing on the noise-reduced distribution equipment point cloud data to obtain a registered distribution equipment point cloud data set; Downsampling the power distribution equipment image included in the power distribution equipment modeling information to obtain a processed power distribution equipment image; Performing filtering on the processed power distribution equipment image to obtain a filtered power distribution equipment image; Determine the registered power distribution equipment point cloud data set, the filtered power distribution equipment image and the power distribution equipment rendering parameter information included in the power distribution equipment modeling information as processed power distribution equipment modeling information; Performing modeling information preprocessing on the power distribution room scene modeling information included in the power distribution room modeling information to obtain processed power distribution room scene modeling information; According to the modeling information of each processed power distribution device, the modeling information of the processed power distribution room scene and the model building tool, a three-dimensional model of the power distribution room is constructed, wherein the three-dimensional model of the power distribution room is constructed according to the modeling information of each processed power distribution device, the modeling information of the processed power distribution room scene and the model building tool, including: For each processed power distribution equipment modeling information in the processed power distribution equipment modeling information, the following modeling steps are performed: Importing the registered power distribution equipment point cloud data set included in the processed power distribution equipment modeling information into the first modeling tool; Using the first modeling tool, three-dimensional reconstruction is performed on the imported registered power distribution equipment point cloud data set to obtain an initial three-dimensional model of the power distribution equipment; By using the first modeling tool, the filtered power distribution equipment image included in the processed power distribution equipment modeling information is mapped as a power distribution equipment model map to the initial power distribution equipment three-dimensional model to obtain a mapped power distribution equipment three-dimensional model; Performing model rendering processing on the three-dimensional model of the power distribution equipment by using the first modeling tool and the power distribution equipment rendering parameter information included in the processed power distribution equipment modeling information to obtain a rendered three-dimensional model of the power distribution equipment; Performing model compression processing on the rendered three-dimensional model of the power distribution equipment to obtain a compressed three-dimensional model of the power distribution equipment; According to the preset format information, the compressed three-dimensional model of the power distribution equipment is exported from the first modeling tool in the form of a file to obtain a three-dimensional model file of the power distribution equipment; Generate a three-dimensional model file of the power distribution room scene according to the processed power distribution room scene modeling information and the model building tool; Importing the obtained three-dimensional model files of each power distribution device into a second modeling tool to obtain the three-dimensional models of each imported power distribution device; Importing the generated three-dimensional model file of the power distribution room scene into the second modeling tool to obtain the imported three-dimensional model of the power distribution room scene; Smoothing the imported power distribution equipment three-dimensional models and the imported power distribution room scene three-dimensional models to obtain processed power distribution equipment three-dimensional models and processed power distribution room scene three-dimensional models; According to the equipment location information, the processed three-dimensional models of the power distribution equipment and the processed three-dimensional model of the power distribution room scene are spliced ​​to obtain an initial three-dimensional model of the power distribution room; Performing global optimization processing on the initial three-dimensional model of the power distribution room to obtain a three-dimensional model of the power distribution room; Collecting the real-time operation data of the power distribution room through various associated data collection devices, wherein the real-time operation data of the power distribution room includes the real-time operation data of various power distribution devices; According to the data rendering information, the collected real-time operation data of the power distribution room is graphically rendered to generate operation data maps of each power distribution device, wherein according to the data rendering information, the collected real-time operation data of the power distribution room is graphically rendered to generate operation data maps of each power distribution device, including: For each power distribution equipment real-time operation data included in the power distribution room real-time operation data, the following data processing steps are performed: Performing structured processing on the real-time operation data of the power distribution equipment to obtain structured power distribution equipment operation data; Normalizing the structured power distribution equipment operation data to obtain normalized power distribution equipment operation data; Performing color mapping processing on the normalized power distribution equipment operation data to obtain operation data color mapping information; generating an initial distribution equipment operation data map according to the operation data color mapping information; According to the data rendering information, the initial power distribution equipment operation data map is graphically rendered to obtain a power distribution equipment operation data map; Displaying the operation data maps of each power distribution device on the corresponding three-dimensional models of each power distribution device to update the three-dimensional models of each power distribution device; The updated three-dimensional model of the power distribution room is displayed through the associated display device; For each power distribution equipment real-time operation data included in the power distribution room real-time operation data, perform the following steps: Performing power distribution anomaly detection processing on the real-time operation data of the power distribution equipment to obtain a power distribution anomaly detection result, wherein performing power distribution anomaly detection processing on the real-time operation data of the power distribution equipment to obtain a power distribution anomaly detection result includes: Performing structured processing on the real-time operation data of the power distribution equipment to obtain operation data to be detected; The operation data to be detected is input into a pre-built power distribution anomaly detection model to obtain a power distribution anomaly detection result, wherein the power distribution anomaly detection model is a neural network model with the structured real-time operation data of the power distribution equipment as input and the power distribution anomaly detection result as output, and the power distribution anomaly detection model is constructed by the following steps: Build an initial power distribution anomaly detection model; Acquire a historical operation data set of a power distribution device, wherein the historical operation data of the power distribution device in the historical operation data set of the power distribution device corresponds to a data anomaly label; Based on the historical operation dataset of power distribution equipment, the following model training steps are performed: Inputting at least one power distribution equipment historical operation data in the power distribution equipment historical operation data set into the initial power distribution anomaly detection model to obtain a detection result label corresponding to each power distribution equipment historical operation data in the at least one power distribution equipment historical operation data; Compare the detection result label corresponding to each power distribution equipment historical operation data in at least one power distribution equipment historical operation data with the corresponding data anomaly label; Determine the detection accuracy of the initial power distribution fault detection model according to the comparison result; In response to determining that the detection accuracy is greater than or equal to a preset detection accuracy, determining the initial power distribution anomaly detection model as a power distribution fault detection model; In response to determining that the detection accuracy is less than a preset detection accuracy, adjusting the model parameters of the initial power distribution anomaly detection model, forming a power distribution equipment historical operation data set with the unused power distribution equipment historical operation data, and determining the adjusted initial power distribution fault detection model as the initial power distribution anomaly detection model, and performing the model training step again; In response to determining that the power distribution anomaly detection result represents a power distribution anomaly, a power distribution anomaly alarm operation is performed according to a power distribution equipment operation data map corresponding to the real-time operation data of the power distribution equipment.

2. A power distribution abnormality alarm device, comprising: An acquisition unit is configured to acquire distribution room modeling information and data rendering information, wherein the distribution room modeling information includes modeling information of each distribution device, distribution room scene modeling information, global rendering parameter information and device location information, the distribution equipment modeling information in the distribution room modeling information includes a distribution equipment point cloud data set, a distribution equipment image and distribution equipment rendering parameter information, and the equipment location information includes the location coordinates of each distribution equipment to characterize the location relationship between each distribution equipment; A construction unit is configured to construct a three-dimensional model of a distribution room according to the distribution room modeling information, wherein the three-dimensional model of the distribution room includes three-dimensional models of various distribution equipment, wherein said constructing the three-dimensional model of the distribution room according to the distribution room modeling information includes: performing modeling information preprocessing on the modeling information of various distribution equipment included in the distribution room modeling information to obtain modeling information of various distribution equipment after processing, wherein said performing modeling information preprocessing on the modeling information of various distribution equipment included in the distribution room modeling information to obtain modeling information of various distribution equipment after processing includes: for each distribution equipment modeling information included in the distribution room modeling information, performing the following modeling data preprocessing steps: performing modeling data preprocessing on the distribution equipment modeling information included The power distribution equipment point cloud data set is subjected to denoising processing to obtain a denoised power distribution equipment point cloud data set; the denoised power distribution equipment point cloud data set is subjected to point cloud registration processing to obtain a registered power distribution equipment point cloud data set; the power distribution equipment image included in the power distribution equipment modeling information is subjected to downsampling processing to obtain a processed power distribution equipment image; the processed power distribution equipment image is subjected to filtering processing to obtain a filtered power distribution equipment image; the registered power distribution equipment point cloud data set, the filtered power distribution equipment image and the power distribution equipment rendering parameter information included in the power distribution equipment modeling information are determined as the processed power distribution equipment modeling information; the power distribution room scene modeling information included in the power distribution room modeling information is subjected to modeling information preprocessing to obtain a processed power distribution equipment image; distribution room scene modeling information; constructing a three-dimensional model of the distribution room according to the modeling information of each processed distribution equipment, the modeling information of the processed distribution room scene and a model building tool, wherein the three-dimensional model of the distribution room is constructed according to the modeling information of each processed distribution equipment, the modeling information of the processed distribution room scene and a model building tool, including: for each processed distribution equipment modeling information in the processed distribution equipment modeling information, executing the following modeling steps: importing the registered distribution equipment point cloud data set included in the processed distribution equipment modeling information into a first modeling tool; performing three-dimensional reconstruction processing on the imported registered distribution equipment point cloud data set through the first modeling tool to obtain an initial distribution equipment three-dimensional model; using the first modeling tool, mapping the filtered power distribution equipment image included in the processed power distribution equipment modeling information as a power distribution equipment model map to the initial power distribution equipment three-dimensional model, and obtaining the mapped power distribution equipment three-dimensional model; using the first modeling tool and the power distribution equipment rendering parameter information included in the processed power distribution equipment modeling information, performing model rendering processing on the power distribution equipment three-dimensional model, and obtaining the rendered power distribution equipment three-dimensional model; performing model compression processing on the rendered power distribution equipment three-dimensional model, and obtaining the compressed power distribution equipment three-dimensional model; according to the preset format information, exporting the compressed power distribution equipment three-dimensional model from the first modeling tool in the form of a file, and obtaining the power distribution equipment three-dimensional model file;Generate a three-dimensional model file of the distribution room scene according to the processed distribution room scene modeling information and the model building tool; import the obtained three-dimensional model files of each distribution equipment into the second modeling tool to obtain the three-dimensional models of each imported distribution equipment; import the generated three-dimensional model file of the distribution room scene into the second modeling tool to obtain the imported three-dimensional model of the distribution room scene; smooth the three-dimensional models of each imported distribution equipment and the three-dimensional model of the imported distribution room scene to obtain the processed three-dimensional model of the distribution equipment and the processed three-dimensional model of the distribution room scene; splice the three-dimensional models of each processed distribution equipment and the three-dimensional model of the processed distribution room scene according to the equipment location information to obtain the initial three-dimensional model of the distribution room; perform global optimization processing on the initial three-dimensional model of the distribution room to obtain the three-dimensional model of the distribution room; The collection unit is configured to collect the real-time operation data of the power distribution room through various associated data collection devices, wherein the real-time operation data of the power distribution room includes the real-time operation data of various power distribution devices; A graphics rendering unit is configured to perform graphics rendering on the collected real-time operation data of the distribution room according to the data rendering information to generate operation data maps of each distribution equipment, wherein the graphics rendering on the collected real-time operation data of the distribution room according to the data rendering information to generate operation data maps of each distribution equipment includes: for each real-time operation data of the distribution equipment included in the real-time operation data of the distribution room, perform the following data processing steps: perform structured processing on the real-time operation data of the distribution equipment to obtain structured operation data of the distribution equipment; perform normalization processing on the structured operation data of the distribution equipment to obtain normalized operation data of the distribution equipment; perform color mapping processing on the normalized operation data of the distribution equipment to obtain operation data color mapping information; generate an initial operation data map of the distribution equipment according to the operation data color mapping information; perform graphics rendering on the initial operation data map of the distribution equipment according to the data rendering information to obtain an operation data map of the distribution equipment; A surface display unit is configured to display the operation data map of each power distribution device on the corresponding three-dimensional model of each power distribution device to update the three-dimensional model of each power distribution device; A display unit is configured to display the updated three-dimensional model of the power distribution room through an associated display device; The execution unit is configured to execute the following steps for each real-time operation data of the power distribution equipment included in the real-time operation data of the power distribution room: perform power distribution anomaly detection processing on the real-time operation data of the power distribution equipment to obtain a power distribution anomaly detection result, wherein the power distribution anomaly detection processing on the real-time operation data of the power distribution equipment to obtain the power distribution anomaly detection result includes: structured processing on the real-time operation data of the power distribution equipment to obtain the operation data to be detected; input the operation data to be detected into a pre-constructed power distribution anomaly detection model to obtain the power distribution anomaly detection result, wherein the power distribution anomaly detection model is a neural network model with the structured real-time operation data of the power distribution equipment as input and the power distribution anomaly detection result as output, and the power distribution anomaly detection model is constructed by the following steps: constructing an initial power distribution anomaly detection model; obtaining a historical operation data set of the power distribution equipment, wherein the historical operation data of the power distribution equipment in the historical operation data set of the power distribution equipment corresponds to a data anomaly label; based on the historical operation data set of the power distribution equipment, executing the following model training steps: converting the historical operation data of the power distribution equipment into a neural network model; Input at least one historical operation data of power distribution equipment in the data collection into the initial power distribution anomaly detection model to obtain the detection result label corresponding to each historical operation data of power distribution equipment in the at least one historical operation data of power distribution equipment; compare the detection result label corresponding to each historical operation data of power distribution equipment in the at least one historical operation data of power distribution equipment with the corresponding data anomaly label; determine the detection accuracy of the initial power distribution fault detection model according to the comparison result; in response to determining that the detection accuracy is greater than or equal to the preset detection accuracy, determine the initial power distribution anomaly detection model as the power distribution fault detection model; in response to determining that the detection accuracy is less than the preset detection accuracy, adjust the model parameters of the initial power distribution anomaly detection model, form the unused historical operation data of power distribution equipment into a set of historical operation data of power distribution equipment, and determine the adjusted initial power distribution fault detection model as the initial power distribution anomaly detection model, and execute the model training step again; in response to determining that the power distribution anomaly detection result represents the power distribution anomaly, perform the power distribution anomaly alarm operation according to the power distribution equipment operation data map corresponding to the real-time operation data of the power distribution equipment.

3. An electronic device, comprising: one or more processors; a storage device having one or more programs stored thereon; When the one or more programs are executed by the one or more processors, the one or more processors implement the method as claimed in claim 1.

4. A computer readable medium having a computer program stored thereon, wherein: When the computer program is executed by a processor, the method as claimed in claim 1 is implemented.

Citation Information

Patent Citations

  • Three-dimensional virtual simulation hydropower station monitoring method and system

    CN106154866A

  • Three-dimensional reconstruction transformer substation implementation method based on virtual simulation technology

    CN110765528A