A hydrological monitoring and control method, device and medium based on geographic information system

Through a method based on geographic information systems, UWB tags and environmental data are used to generate linkage control instructions, which solves the problem of hydrological monitoring equipment being susceptible to environmental influences, achieves high-precision and efficient hydrological monitoring and control, and improves monitoring capabilities and efficiency.

CN118408522BActive Publication Date: 2024-10-29SHANDONG FENGSHI INFORMATION TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410499260.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2024-10-29
Estimated Expiration
2044-04-24

AI Technical Summary

Technical Problem

Hydrological monitoring equipment is easily affected by the environment and has limited monitoring capabilities. It is difficult to achieve timely, accurate and effective flexible monitoring and control, especially in rainy, winter and other weather conditions where energy is insufficient and radar ranging is susceptible to interference.

Method used

Using a method based on geographic information systems, UWB tags are combined with environmental and water conservancy engineering facilities, and through preset hydrological monitoring spatial models and associated generation models, linkage control instructions are generated to achieve hydrological monitoring and control, including obtaining weather information, determining UWB tag groups, Generate linkage tag group sequences and linkage control instructions to ensure that monitoring information meets preset control standards.

Benefits of technology

It achieves high-precision hydrological monitoring, avoids environmental impact, improves monitoring capabilities and efficiency, can intelligently assist users in completing hydrological monitoring and control, and reduces the intervention of manual data analysis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118408522B_ABST
    Figure CN118408522B_ABST
Patent Text Reader

Abstract

The present application provides a hydrological monitoring and control method, equipment and medium based on a geographic information system, which belongs to the field of hydrological monitoring technology. The method inputs the monitoring information of multiple UWB tags into a preset hydrological monitoring space model to determine the corresponding UWB tag group according to the spatial position correspondence. Based on the monitoring information sets corresponding to each UWB tag group and the pre-trained association generation model, the associated tag groups corresponding to each UWB tag group under each environmental condition are determined to generate multiple linkage tag group sequences; the environmental data of each UWB tag setting area is obtained, and the corresponding linkage control instructions are generated according to the environmental data, each linkage tag group sequence and the preset linkage conditions, so that the water conservancy engineering facilities corresponding to the linkage tag group sequence that meets the preset linkage conditions are operated, so as to carry out hydrological monitoring and control; the preset linkage conditions are used to determine whether each monitoring information set meets the preset control standard according to the linkage tag group sequence.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of hydrological monitoring technology, and in particular to a hydrological monitoring and control method, equipment and medium based on a geographic information system. Background Art

[0002] At present, radar is generally used to monitor hydrological data such as water level, flow, and gates. Currently, hydrological stations are widely distributed and the site environment is complex. In order to adapt to the site environment, hydrological stations currently use solar / wind power supply mode.

[0003] However, this power supply mode has limited energy supply, and the equipment often fails to work due to insufficient energy in rainy and winter weather. In addition, radar ranging requires electromagnetic waves to be reflected by the atmosphere and has a long wavelength, so the measurement process is susceptible to interference, affecting the measurement accuracy. This also makes it difficult to achieve flexible monitoring and control in a timely, accurate and effective manner during hydrological monitoring, which brings a poor hydrological monitoring experience to monitoring personnel. Summary of the invention

[0004] The embodiments of the present application provide a hydrological monitoring and control method, equipment and medium based on a geographic information system, which are used to solve the problem that current hydrological monitoring equipment is easily affected by the environment, has limited monitoring capabilities, and is difficult to achieve flexible water conservancy monitoring and control in a timely, accurate and effective manner.

[0005] On the one hand, an embodiment of the present application provides a hydrological monitoring and control method based on a geographic information system, the method comprising:

[0006] Input the monitoring information of multiple UWB tags into a preset hydrological monitoring space model to determine a corresponding UWB tag group according to the spatial position correspondence; one UWB tag group corresponds to one water conservancy project facility;

[0007] Based on the monitoring information sets corresponding to the UWB tag groups and the pre-trained association generation model, the associated tag groups corresponding to the UWB tag groups under the environmental conditions are determined to generate a plurality of linkage tag group sequences;

[0008] Acquire environmental data of the areas where each of the UWB tags is set, and generate corresponding linkage control instructions based on the environmental data, each of the linkage tag group sequences and preset linkage conditions, so as to operate the water conservancy project facilities corresponding to the linkage tag group sequence that meets the preset linkage conditions, so as to carry out hydrological monitoring and control; the preset linkage conditions are used to determine whether each of the monitoring information sets meets the preset control standards according to the linkage tag group sequence.

[0009] In one implementation of the present application, before inputting the monitoring information of the plurality of UWB tags into the preset hydrological monitoring space model, the method further includes:

[0010] Determine weather information corresponding to the region;

[0011] When the weather information meets preset conditions, radar monitoring shutdown information is generated, and monitoring information of multiple UWB tags is obtained through multiple UWB base stations; the preset conditions at least include cloudy days, rainy days, and winter.

[0012] In one implementation of the present application, the monitoring information of multiple UWB tags is input into a preset hydrological monitoring space model to determine the corresponding UWB tag group according to the spatial position correspondence, specifically including:

[0013] Obtaining the spatial position coordinates of each of the UWB tags from a plurality of UWB base stations;

[0014] Determine the spatial position coordinate point of each of the spatial position coordinates in the preset hydrological monitoring spatial model;

[0015] Determining the correspondence between each of the spatial position coordinate points and each of the facility modeling areas according to the coordinate range of each of the facility modeling areas in the preset hydrological monitoring spatial model;

[0016] According to the water conservancy project facilities corresponding to each facility modeling area, the spatial position coordinate points corresponding to the implementation of the same water conservancy project are determined as monitoring points, and the UWB tags corresponding to each monitoring point are added to the UWB tag group.

[0017] In one implementation of the present application, the method further includes:

[0018] The sensor monitoring data from the UWB tag is obtained through the UWB base station, and the sensor monitoring data is added to the corresponding monitoring information; the sensors corresponding to the sensor monitoring data include at least one or more of the following: a rainfall sensor, a temperature sensor, and a soil temperature and humidity sensor.

[0019] In one implementation of the present application, before determining the associated tag group corresponding to each of the UWB tag groups under each environmental condition based on the monitoring information set corresponding to each of the UWB tag groups and the pre-trained associated generation model, the method further includes:

[0020] Acquire a plurality of monitoring information set sample groups with pre-marked environmental conditions; there are specified association relationships between the UWB tag group samples corresponding to the monitoring information set sample groups; the specified association relationship includes a mapping relationship between the monitoring information samples in the monitoring information set samples at least between two of the UWB tag group samples;

[0021] Each monitoring information set sample group is input into the association generation model to be trained for training until the output accuracy of the association generation model is greater than a preset threshold, thereby obtaining the trained association generation model; the association generation model is a machine learning model.

[0022] In one implementation of the present application, based on the monitoring information sets corresponding to each of the UWB tag groups and the pre-trained association generation model, the associated tag groups corresponding to each of the UWB tag groups under each environmental condition are determined to generate multiple linkage tag group sequences, specifically including:

[0023] Randomly combining one of the monitoring information sets corresponding to each of the UWB tag groups with one or more other arbitrary monitoring information sets, until exhaustive combinations of each of the monitoring information sets with any number of other monitoring information sets are obtained to obtain a plurality of monitoring information combination sets;

[0024] Inputting each of the monitoring information combination sets into the pre-trained association generation model respectively, so as to determine whether corresponding environmental conditions and associated tag groups exist according to the output results;

[0025] If so, generating the linkage tag group sequence corresponding to the environmental condition; wherein the linkage tag group sequence arranges each of the associated tag groups according to the mapping relationship;

[0026] If it does not exist, the corresponding monitoring information combination set is eliminated.

[0027] In one implementation of the present application, a corresponding linkage control instruction is generated according to the environmental data, each linkage tag group sequence and the preset linkage condition, specifically including:

[0028] Determine the control standard weights corresponding to each of the UWB tag groups according to the environmental data and the preset control weight list; the environmental data includes at least water level, rainfall, and temperature;

[0029] Determine the control standard value corresponding to each linkage tag group sequence according to each monitoring information set corresponding to each linkage tag group sequence and the control standard weight;

[0030] According to the preset linkage condition, determining whether each of the control standard values ​​is greater than a preset control standard threshold corresponding to the environmental condition of the linkage tag group sequence;

[0031] If so, it is determined that each monitoring information set corresponding to the corresponding linkage tag group sequence reaches the preset control standard corresponding to the environmental condition, and the corresponding linkage control instruction is generated.

[0032] In one implementation of the present application, generating the corresponding linkage control instruction specifically includes:

[0033] According to the environmental conditions corresponding to the preset control standards satisfied by each monitoring information set, a preset control strategy is matched, and the corresponding linkage control instructions are generated;

[0034] After generating the corresponding linkage control instruction, the method further includes:

[0035] The monitoring information of each associated tag group that executes the linkage control instruction is sent to the digital twin platform of the user terminal in real time.

[0036] On the other hand, the embodiment of the present application further provides a hydrological monitoring and control device based on a geographic information system, the device comprising:

[0037] at least one processor; and a memory in communication with the at least one processor; wherein the memory stores instructions executable by the at least one processor, the instructions being executed by the at least one processor to enable the at least one processor to:

[0038] Input the monitoring information of multiple UWB tags into a preset hydrological monitoring space model to determine a corresponding UWB tag group according to the spatial position correspondence; one UWB tag group corresponds to one water conservancy project facility;

[0039] Based on the monitoring information sets corresponding to the UWB tag groups and the pre-trained association generation model, the associated tag groups corresponding to the UWB tag groups under the environmental conditions are determined to generate a plurality of linkage tag group sequences;

[0040] Acquire environmental data of the areas where each of the UWB tags is set, and generate corresponding linkage control instructions based on the environmental data, each of the linkage tag group sequences and preset linkage conditions, so as to operate the water conservancy project facilities corresponding to the linkage tag group sequence that meets the preset linkage conditions, so as to carry out hydrological monitoring and control; the preset linkage conditions are used to determine whether each of the monitoring information sets meets the preset control standards according to the linkage tag group sequence.

[0041] On the other hand, the embodiment of the present application further provides a non-volatile computer storage medium for a hydrological monitoring and control method based on a geographic information system, storing computer executable instructions, wherein the computer executable instructions are configured as follows:

[0042] Input the monitoring information of multiple UWB tags into a preset hydrological monitoring space model to determine a corresponding UWB tag group according to the spatial position correspondence; one UWB tag group corresponds to one water conservancy project facility;

[0043] Based on the monitoring information sets corresponding to the UWB tag groups and the pre-trained association generation model, the associated tag groups corresponding to the UWB tag groups under the environmental conditions are determined to generate a plurality of linkage tag group sequences;

[0044] Acquire environmental data of the areas where each of the UWB tags is set, and generate corresponding linkage control instructions based on the environmental data, each of the linkage tag group sequences and preset linkage conditions, so as to operate the water conservancy project facilities corresponding to the linkage tag group sequence that meets the preset linkage conditions, so as to carry out hydrological monitoring and control; the preset linkage conditions are used to determine whether each of the monitoring information sets meets the preset control standards according to the linkage tag group sequence.

[0045] Compared with the prior art, the present invention has the following significant effects:

[0046] Through the above scheme, low-power UWB tags are combined with geographic information systems to achieve high-precision hydrological monitoring, and UWB tags are combined with the environment and water conservancy engineering facilities to carry out linkage management and control of hydrological monitoring, which can assist users to complete hydrological monitoring and corresponding management and control with high concurrency. This avoids the problem that hydrological monitoring is easily affected by the environment and the monitoring capacity is limited. In addition, hydrological monitoring can be achieved more intelligently, without excessive human intervention in the data analysis process of hydrological monitoring, which improves the efficiency of hydrological monitoring and control. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0048] Figure 1 A schematic diagram of a flow chart of a hydrological monitoring and control method based on a geographic information system in an embodiment of the present application;

[0049] Figure 2 This is a structural schematic diagram of a hydrological monitoring and control device based on a geographic information system in an embodiment of the present application. DETAILED DESCRIPTION

[0050] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be clearly and completely described below in combination with the specific embodiments of the present application and the corresponding drawings. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.

[0051] The embodiments of the present application provide a hydrological monitoring and control method, equipment and medium based on a geographic information system, which are used to solve the problem that current hydrological monitoring equipment is easily affected by the environment, has limited monitoring capabilities, and is difficult to achieve flexible water conservancy monitoring and control in a timely, accurate and effective manner.

[0052] The following describes in detail various embodiments of the present application in conjunction with the accompanying drawings.

[0053] The present application embodiment provides a hydrological monitoring and control method based on a geographic information system, such as Figure 1 As shown, the method may include steps S101-S103:

[0054] S101, the server inputs monitoring information of multiple UWB tags into a preset hydrological monitoring space model to determine a corresponding UWB tag group according to a spatial position correspondence.

[0055] Among them, one UWB (Ultra Wide Band) tag group corresponds to one water conservancy project facility.

[0056] It should be noted that the server, as the executor of the hydrological monitoring and control method based on the geographic information system, exists only for exemplary purposes. The executor is not limited to the server, and this application does not make any specific limitations on this.

[0057] In the embodiment of the present application, before inputting the monitoring information of the plurality of UWB tags into the preset hydrological monitoring space model, the method further includes:

[0058] The server determines the weather information corresponding to the region. When the weather information meets the preset conditions, the radar monitoring shutdown information is generated, and the monitoring information of multiple UWB tags is obtained through multiple UWB base stations. The preset conditions include at least cloudy days, rainy days, and winter.

[0059] Generally, in rainy and winter weather, there is often a lack of energy, radar equipment cannot work properly, and is easily affected by the atmospheric environment, and the measurement is easily interfered with. Therefore, through the above scheme, the server of this application can obtain the weather information of the area in real time through the Internet or the meteorological instrument set in the area where the UWB tag is located, and when the weather information is cloudy, rainy or winter, the radar monitoring shutdown information is generated, and the corresponding UWB tag and the corresponding UWB base station of this application are turned on to perform hydrological monitoring and control. In addition, the preset conditions are not limited to cloudy, rainy or winter, and other preset conditions such as heavy fog can also be added, and this application does not make specific limitations on this.

[0060] In the embodiment of the present application, the monitoring information of multiple UWB tags is input into a preset hydrological monitoring space model to determine the corresponding UWB tag group according to the spatial position correspondence, specifically including:

[0061] First, the server obtains the spatial position coordinates of each UWB tag from multiple UWB base stations. Then, the spatial position coordinate points of each spatial position coordinate in the preset hydrological monitoring space model are determined. Then, according to the coordinate range of each facility modeling area in the preset hydrological monitoring space model, the correspondence between each spatial position coordinate point and each facility modeling area is determined. Subsequently, according to the water conservancy project facilities corresponding to each facility modeling area, the spatial position coordinate points corresponding to the implementation of the same water conservancy project are determined as monitoring points, and the UWB tags corresponding to each monitoring point are added to the UWB tag group.

[0062] That is to say, the server communicates with the UWB base station, and the UWB base station can obtain the monitoring information collected by the UWB tag. Among them, the monitoring information at least includes the spatial position coordinates of the location where the UWB tag is set. For the determination of the spatial position coordinates, this application can be carried out through the following schemes, as follows:

[0063] The coordinate system adopts the 2000 National Geodetic Coordinate System. The UWB base stations include base station 1, base station 2, base station 3, and base station 4. Taking the positioning of a certain UWB tag as an example, the plane 1 where the UWB tag is located is calculated through the distance values ​​between base stations 1 and 2 and the UWB tag, the plane 2 where the UWB tag is located is calculated through the distances between base stations 2 and 3 and the UWB tag, and the plane 3 where the UWB tag is located is calculated through the distances between base stations 3 and 4 and the UWB tag. For the same UWB tag, planes 1, 2, and 3 must intersect, and the longitude, latitude, and altitude of the tag can be calculated through the common points of intersection to obtain the spatial position coordinates.

[0064] The server can mark the corresponding spatial position coordinate points in the spatial coordinate system of the preset hydrological monitoring spatial model. The hydrological monitoring spatial model at least includes the spatial modeling of the hydrological monitoring area, such as a hydrological monitoring station, and also includes the water conservancy engineering facilities installed inside. For example, dams, sluice gates, etc. The server can use the coordinate range of the facility modeling area (three-dimensional spatial model) corresponding to each water conservancy engineering facility in the preset hydrological monitoring spatial model to determine the facility modeling area where the spatial position coordinate point is located, thereby obtaining the water conservancy engineering facility corresponding to each spatial position coordinate. The spatial position coordinates are grouped according to the water conservancy project implementation where the spatial position coordinates are located. The UWB tags corresponding to the spatial position coordinates on the same water conservancy engineering facility are used to monitor the status or data of the water conservancy engineering facility, so these UWB tags are added to a UWB tag group.

[0065] For example, multiple UWB tags are respectively set on the upper part, both sides, and lower part of the sluice gate. These multiple UWB tags form a UWB tag group for monitoring the opening or closing status of the gate.

[0066] In the embodiments of the present application, in addition to the UWB tags for location monitoring, the data collected by the sensors can also be transmitted through the UWB tags. Because the sensor monitoring data is mostly transmitted back using 4G\5G\NB-IoT and other methods, the communication methods are all continuous carriers and have high power consumption.

[0067] Based on this, the present application obtains sensor monitoring data from the UWB tag through the UWB base station and adds the sensor monitoring data to the corresponding monitoring information. The sensors corresponding to the sensor monitoring data include at least one or more of the following: rainfall sensor, temperature sensor, soil temperature and humidity sensor.

[0068] UWB technology does not use continuous high-frequency carrier waves, but pulses as short as nanoseconds, so it has the characteristics of strong anti-interference ability, high positioning accuracy, and low operating power consumption. Transmitting sensor monitoring data through UWB tags can reduce data transmission power consumption and avoid the inability to conduct timely hydrological monitoring due to weather and other conditions.

[0069] The sensors corresponding to the above-mentioned sensor monitoring data are not limited to rainfall sensors, temperature sensors, soil temperature and humidity sensors, but may also include devices such as cameras, and this application does not make specific limitations on this.

[0070] The monitoring information of the UWB tag of the present application not only includes location information, but also includes sensor monitoring data. During actual use, some UWB tags can be fused with sensors to transmit spatial location coordinates in order to identify corresponding water conservancy project facilities; at the same time, the sensor monitoring data of the fused sensor is also transmitted for hydrological monitoring.

[0071] S102, the server determines the associated tag groups corresponding to each UWB tag group under each environmental condition based on the monitoring information sets corresponding to each UWB tag group and the pre-trained associated generation model, so as to generate a plurality of linkage tag group sequences.

[0072] In an embodiment of the present application, before determining the associated tag group corresponding to each UWB tag group under each environmental condition based on the monitoring information set corresponding to each UWB tag group and the pre-trained associated generation model, the method further includes:

[0073] The server obtains several monitoring information set sample groups with pre-marked environmental conditions. There is a specified association relationship between each UWB tag group sample corresponding to each monitoring information set sample group. The specified association relationship includes a mapping relationship between each monitoring information sample in the monitoring information set sample at least between each UWB tag group sample. Each monitoring information set sample group is input into the association generation model to be trained for training until the output accuracy of the association generation model is greater than a preset threshold, and a trained association generation model is obtained. The association generation model is a machine learning model.

[0074] That is to say, the association generation model is a machine learning model, which needs to be trained with pre-processed sample data before use. Specifically, the server will use the monitoring information set sample group under different environmental conditions to train the machine learning model, so that the machine learning model is trained and learned according to the specified association relationship pre-set in the monitoring information set sample group, and the corresponding model parameters are adjusted. Among them, the specified association relationship is the mapping relationship between the UWB tag group samples corresponding to the monitoring information set samples, and the mapping relationship can be a one-to-one relationship or a one-to-many relationship. According to the mapping relationship, a sequence composed of each UWB tag group sample according to the mapping relationship can be generated. For example, [a, b, (c, d)-d, e] indicates that there is a mapping relationship between UWB tag group samples a and b, b has a mapping relationship with c and d, and d has a mapping relationship with e, where b has a one-to-many mapping relationship with c and d. If there is a mapping relationship between c and d corresponding to e, it is expressed as [a, b, (c, d), e].

[0075] This application sequentially inputs each monitoring information set sample group into the association generation model to be trained for training. The server will detect the model output accuracy in real time, and when the output accuracy is greater than the preset threshold, the server determines that the model training is completed. The preset threshold is set by the user according to the actual situation, and this application does not make specific restrictions on this. The trained association generation model can extract the mapping relationship between the input monitoring information sets, and then construct a sequence, and can determine the environmental conditions corresponding to the sequence.

[0076] Furthermore, based on the monitoring information sets corresponding to each UWB tag group and the pre-trained association generation model, the associated tag groups corresponding to each UWB tag group under each environmental condition are determined to generate multiple linkage tag group sequences, specifically including:

[0077] The server randomly combines one monitoring information set from each monitoring information set corresponding to each UWB tag group with one or more other arbitrary monitoring information sets until the combination of each monitoring information set with any other number of monitoring information sets is exhaustively enumerated to obtain multiple monitoring information combination sets. Each monitoring information combination set is respectively input into a pre-trained association generation model to determine whether there are corresponding environmental conditions and associated tag groups according to the output results. When it is determined that there are corresponding environmental conditions and associated tag groups, a linkage tag group sequence corresponding to the environmental conditions is generated. Among them, the linkage tag group sequence arranges the associated tag groups according to the mapping relationship. When it is determined that there are no corresponding environmental conditions and associated tag groups, the corresponding monitoring information combination set is eliminated.

[0078] That is to say, the server can first randomly combine the various monitoring information sets, for example, select one monitoring information set and combine it with other monitoring information sets arbitrarily, such as selecting one other monitoring information set to combine, selecting two other monitoring information sets to combine, selecting three other monitoring information sets to combine... until each monitoring information set is exhaustively combined with other monitoring information sets, and several non-repetitive monitoring information combination sets are obtained.

[0079] For example, there are monitoring information sets M1, M2, M3, ..., Mn, corresponding to n different UWB tag groups, where n is a natural number. The server can perform random combinations such as {M1, M2}, {M1, M3}, ... {M1, Mn}, {M1, M2, M3}, {M1, M2, M4} ... until the final {M1, M2, M3, ..., Mn} is obtained to generate a monitoring information combination set.

[0080] The server can input each monitoring information combination set into the above-obtained association generation model in turn, and perform model processing, so as to obtain the environmental conditions and associated tag groups output by the association generation model for each monitoring information combination set. The associated tag group can be understood as each UWB tag group in the input monitoring information combination set. At the same time, the server uses the association generation model to further generate each associated tag group corresponding to the output environmental conditions, and a linkage tag group sequence generated according to the mapping relationship. If the input monitoring information combination set does not have the output environmental conditions and associated tag groups, the server will remove the input monitoring information combination set and continue to input other monitoring information combination sets for processing. In an embodiment of the present application, when the association generation model is output, the environmental conditions and the associated tag groups are output at the same time or not output at the same time, and the two exist at the same time or do not exist at the same time.

[0081] Through the above scheme, various monitoring information sets can be quickly and orderly associated, thereby facilitating users to carry out hydrological monitoring and control and improving users' hydrological monitoring experience.

[0082] S103, the server obtains the environmental data of the area where each UWB tag is set, and generates corresponding linkage control instructions according to the environmental data, each linkage tag group sequence and preset linkage conditions, so as to operate the water conservancy project facilities corresponding to the linkage tag group sequence that meets the preset linkage conditions, so as to carry out hydrological monitoring and control.

[0083] Among them, the preset linkage conditions are used to determine whether each monitoring information set meets the preset control standards according to the linkage tag group sequence.

[0084] In the embodiment of the present application, according to the environmental data, the sequence of each linkage tag group and the preset linkage conditions, the corresponding linkage control instructions are generated, specifically including:

[0085] The server determines the control standard weights corresponding to each UWB tag group based on the environmental data and the preset control weight list. The environmental data includes at least water level, rainfall, and temperature. Then, according to the monitoring information sets and control standard weights corresponding to each linkage tag group sequence, the control standard values ​​corresponding to each linkage tag group sequence are determined. Subsequently, according to the preset linkage conditions, it is determined whether each control standard value is greater than the preset control standard threshold corresponding to the environmental conditions of the linkage tag group sequence. In the case of determining that each control standard value is greater than the preset control standard threshold corresponding to the environmental conditions of the linkage tag group sequence, it is determined that each monitoring information set corresponding to the corresponding linkage tag group sequence reaches the preset control standard corresponding to the environmental conditions, and a corresponding linkage control instruction is generated.

[0086] In other words, the server pre-stores a preset control weight list, which contains the correspondence between each UWB tag group and the control standard weight. Specifically, the corresponding relationship is the correspondence between the control standard weight and the water conservancy project facilities set by the UWB tag group. At the same time, under different environmental data, each UWB tag group corresponds to different control standard weights. For example, different water levels have different control standard weights, etc. The setting value of the specific control standard weight can be set by the user, and this application does not make specific limitations on this. Different control standard weights are used to apply different environmental data in order to generate different linkage control instructions.

[0087] This application will perform product operations on each monitoring information set sorted according to the linkage tag group sequence and the management and control standard weight. Specifically, it can be understood that the data in the monitoring information set is multiplied by the management and control standard weight. In the embodiment of the present application, different monitoring information sets may be for data of different dimensions, such as monitoring the displacement data of water conservancy engineering facilities. The displacement data can be monitored by the spatial position coordinates of the UWB tag, and some UWB tags monitor the sensor monitoring data, such as the UWB tag bound to the water level monitoring sensor, which is used to monitor the water level change data. Therefore, when the server performs the product operation, it will filter the monitoring data of the monitoring dimension corresponding to the UWB tag group in the monitoring information set, and multiply the monitoring data with the management and control standard weight. Add the product values ​​corresponding to the same linkage tag group sequence to obtain the management and control standard value corresponding to the linkage tag group sequence. The server obtains the preset control standard thresholds corresponding to different linkage tag group sequences from the preset control standard threshold list corresponding to the pre-stored environmental conditions through preset linkage conditions, and compares the control standard value with the corresponding preset control standard threshold. If the control standard value is greater than the preset control standard threshold, it is determined that each monitoring information set corresponding to the corresponding linkage tag group sequence reaches the preset control standard corresponding to the environmental condition. Without detecting each monitoring information set one by one, the water conservancy engineering facilities corresponding to multiple UWB tag groups can be linked and controlled, and a linkage control instruction for control according to the linkage tag group sequence is generated. Among them, the preset control standard threshold can be set by the user based on experience, and this application does not make specific restrictions on this.

[0088] Through the above scheme, it is possible to quickly determine whether the use of water conservancy project facilities meets the linkage control conditions, and then control each water conservancy project facility in a harsh environment.

[0089] For example, for water levels and sluice gates, if the control standard value is greater than the control standard threshold, it means that the water level is too high and the sluice gate has not been opened to release water. At this time, the linkage control instruction is set to open the sluice gate to release water. At the same time, the server can use the UWB tag group corresponding to the sluice gate to determine the sluice gate displacement data in real time to determine whether it is open or the degree of opening of the sluice gate.

[0090] In the embodiment of the present application, the above-mentioned generation of corresponding linkage control instructions specifically includes:

[0091] The server matches the preset control strategy according to the environmental conditions corresponding to the preset control standards met by each monitoring information set, and generates corresponding linkage control instructions.

[0092] In other words, the server or the database connected to the server can be set with preset control strategies for different environmental conditions, and the preset control strategies correspond to different joint control instructions. The preset control strategies can be set by the user, and this application does not make specific restrictions on this.

[0093] An example of preset control strategy is to open the sluice gate when the water level reaches a certain level; or on rainy days, determine the water level increase and generate a sluice gate opening plan based on the increase. The sluice gate opening plan can indicate how long in the future the sluice gate will be opened.

[0094] In addition, after generating the corresponding linkage control instructions, it also includes:

[0095] The server will send the monitoring information of each associated tag group that executes the linkage control instruction to the digital twin platform of the user terminal in real time.

[0096] That is to say, user terminals such as laptops and desktop computers of hydrological monitoring users are equipped with digital twin platforms corresponding to the hydrological monitoring areas to display the status of water conservancy project facilities. The server can send the monitoring information of each associated tag group that executes the linkage control instruction to the user terminal and display it on the digital twin platform. For example, the sluice is open or closed, the water level rises, etc.

[0097] This application combines hydrological monitoring with UWB. Since the bandwidth used by UWB is usually between 2.4GHz and 10.6GHz, UWB has two advantages over radar. First, these frequencies are generally safer than radar and are not subject to too much interference; second, more data can be sent and received, that is, more information is contained in one transmission, so UWB can provide higher measurement accuracy and be more energy-efficient than radar in high-concurrency places. UWB signals can be transmitted and measured directly through space without passing through the atmospheric environment or electromagnetic wave reflection, which enables UWB to provide higher measurement accuracy and be more energy-efficient than radar. UWB signals are usually not disturbed by other devices or objects, so in one measurement, UWB can obtain more stable and accurate data, while radar needs to process electromagnetic wave reflection, which makes it relatively low in measurement accuracy. UWB devices can usually provide very high timestamp accuracy, which means that UWB can measure the position of the target more accurately, while radar needs to use electromagnetic wave reflection to determine the position of the target, which makes it relatively low in measurement accuracy.

[0098] Through the above scheme, low-power UWB tags are combined with geographic information systems to achieve high-precision hydrological monitoring, and UWB tags are combined with the environment and water conservancy engineering facilities to carry out linkage management and control of hydrological monitoring, which can assist users to complete hydrological monitoring and corresponding management and control with high concurrency. This avoids the problem that hydrological monitoring is easily affected by the environment and the monitoring capacity is limited. In addition, hydrological monitoring can be achieved more intelligently, without excessive human intervention in the data analysis process of hydrological monitoring, which improves the efficiency of hydrological monitoring and control.

[0099] Figure 2 A schematic diagram of the structure of a hydrological monitoring and control device based on a geographic information system provided in an embodiment of the present application is shown in FIG. Figure 2 As shown, the device includes:

[0100] At least one processor; and a memory in communication with the at least one processor. The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to:

[0101] The monitoring information of multiple UWB tags is input into the preset hydrological monitoring space model to determine the corresponding UWB tag group according to the spatial position correspondence. One UWB tag group corresponds to one water conservancy engineering facility. Based on the monitoring information sets corresponding to each UWB tag group and the pre-trained association generation model, the associated tag groups corresponding to each UWB tag group under each environmental condition are determined to generate multiple linkage tag group sequences. The environmental data of each UWB tag setting area is obtained, and the corresponding linkage control instructions are generated according to the environmental data, each linkage tag group sequence and the preset linkage conditions, so that the water conservancy engineering facilities corresponding to the linkage tag group sequence that meets the preset linkage conditions are operated, so as to carry out hydrological monitoring and control. The preset linkage conditions are used to determine whether each monitoring information set meets the preset control standard according to the linkage tag group sequence.

[0102] The embodiment of the present application also provides a non-volatile computer storage medium for a hydrological monitoring and control method based on a geographic information system, which stores computer executable instructions, and the computer executable instructions are set as follows:

[0103] The monitoring information of multiple UWB tags is input into the preset hydrological monitoring space model to determine the corresponding UWB tag group according to the spatial position correspondence. One UWB tag group corresponds to one water conservancy engineering facility. Based on the monitoring information sets corresponding to each UWB tag group and the pre-trained association generation model, the associated tag groups corresponding to each UWB tag group under each environmental condition are determined to generate multiple linkage tag group sequences. The environmental data of each UWB tag setting area is obtained, and the corresponding linkage control instructions are generated according to the environmental data, each linkage tag group sequence and the preset linkage conditions, so that the water conservancy engineering facilities corresponding to the linkage tag group sequence that meets the preset linkage conditions are operated, so as to carry out hydrological monitoring and control. The preset linkage conditions are used to determine whether each monitoring information set meets the preset control standard according to the linkage tag group sequence.

[0104] Each embodiment in this application is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device and medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiments.

[0105] The devices and media provided in the embodiments of the present application correspond one-to-one to the methods. Therefore, the devices and media also have similar beneficial technical effects as the corresponding methods. Since the beneficial technical effects of the methods have been described in detail above, the beneficial technical effects of the devices and media will not be repeated here.

[0106] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0107] The above is only an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims

1. A hydrological monitoring and control method based on a geographic information system, characterized in that: The method comprises: Input the monitoring information of multiple UWB tags into a preset hydrological monitoring space model to determine a corresponding UWB tag group according to the spatial position correspondence; one UWB tag group corresponds to one water conservancy project facility; Based on the monitoring information sets corresponding to the UWB tag groups and the pre-trained association generation model, the associated tag groups corresponding to the UWB tag groups under the environmental conditions are determined to generate a plurality of linkage tag group sequences; Acquire environmental data of the area where each of the UWB tags is set, and generate corresponding linkage control instructions according to the environmental data, each linkage tag group sequence and preset linkage conditions, so as to operate the water conservancy project facilities corresponding to the linkage tag group sequence that meets the preset linkage conditions, so as to perform hydrological monitoring and control; the preset linkage conditions are used to determine whether each of the monitoring information sets meets the preset control standards according to the linkage tag group sequence; Wherein, before determining the associated tag groups corresponding to each of the UWB tag groups under each environmental condition based on the monitoring information sets corresponding to each of the UWB tag groups and the pre-trained associated generation model, the method further includes: Acquire a plurality of monitoring information set sample groups with pre-marked environmental conditions; there are specified association relationships between the UWB tag group samples corresponding to the monitoring information set sample groups; the specified association relationship includes a mapping relationship between the monitoring information samples in the monitoring information set samples at least between two of the UWB tag group samples; Each monitoring information set sample group is input into the association generation model to be trained for training until the output accuracy of the association generation model is greater than a preset threshold, thereby obtaining the trained association generation model; the association generation model is a machine learning model.

2. A hydrological monitoring and control method based on a geographic information system according to claim 1, characterized in that: Before inputting the monitoring information of the plurality of UWB tags into the preset hydrological monitoring space model, the method further comprises: Determine weather information corresponding to the region; When the weather information meets preset conditions, radar monitoring shutdown information is generated, and monitoring information of multiple UWB tags is obtained through multiple UWB base stations; the preset conditions at least include cloudy days, rainy days, and winter.

3. A hydrological monitoring and control method based on a geographic information system according to claim 1, characterized in that: The monitoring information of multiple UWB tags is input into the preset hydrological monitoring space model to determine the corresponding UWB tag group according to the spatial position correspondence, specifically including: Obtaining the spatial position coordinates of each of the UWB tags from a plurality of UWB base stations; Determine the spatial position coordinate point of each of the spatial position coordinates in the preset hydrological monitoring spatial model; Determining the correspondence between each of the spatial position coordinate points and each of the facility modeling areas according to the coordinate range of each of the facility modeling areas in the preset hydrological monitoring spatial model; According to the water conservancy project facilities corresponding to each facility modeling area, the spatial position coordinate points corresponding to the implementation of the same water conservancy project are determined as monitoring points, and the UWB tags corresponding to each monitoring point are added to the UWB tag group.

4. A hydrological monitoring and control method based on a geographic information system according to claim 3, characterized in that: The method further comprises: The sensor monitoring data from the UWB tag is obtained through the UWB base station, and the sensor monitoring data is added to the corresponding monitoring information; the sensors corresponding to the sensor monitoring data include at least one or more of the following: a rainfall sensor, a temperature sensor, and a soil temperature and humidity sensor.

5. A hydrological monitoring and control method based on a geographic information system according to claim 1, characterized in that: Based on the monitoring information sets corresponding to the UWB tag groups and the pre-trained association generation model, the associated tag groups corresponding to the UWB tag groups under the environmental conditions are determined to generate multiple linkage tag group sequences, specifically including: Randomly combining one of the monitoring information sets corresponding to each of the UWB tag groups with one or more other arbitrary monitoring information sets, until exhaustive combinations of each of the monitoring information sets with any number of other monitoring information sets are obtained to obtain a plurality of monitoring information combination sets; Inputting each of the monitoring information combination sets into the pre-trained association generation model respectively, so as to determine whether corresponding environmental conditions and associated tag groups exist according to the output results; If so, generating the linkage tag group sequence corresponding to the environmental condition; wherein the linkage tag group sequence arranges each of the associated tag groups according to the mapping relationship; If it does not exist, the corresponding monitoring information combination set is eliminated.

6. A hydrological monitoring and control method based on a geographic information system according to claim 5, characterized in that: Generate corresponding linkage control instructions according to the environmental data, the linkage tag group sequences and the preset linkage conditions, specifically including: Determine the control standard weights corresponding to each of the UWB tag groups according to the environmental data and the preset control weight list; the environmental data includes at least water level, rainfall, and temperature; Determine the control standard value corresponding to each linkage tag group sequence according to each monitoring information set corresponding to each linkage tag group sequence and the control standard weight; According to the preset linkage condition, determining whether each of the control standard values ​​is greater than a preset control standard threshold corresponding to the environmental condition of the linkage tag group sequence; If so, it is determined that each monitoring information set corresponding to the corresponding linkage tag group sequence reaches the preset control standard corresponding to the environmental condition, and the corresponding linkage control instruction is generated.

7. A hydrological monitoring and control method based on a geographic information system according to claim 6, characterized in that: Generating the corresponding linkage control instruction specifically includes: According to the environmental conditions corresponding to the preset control standards satisfied by each monitoring information set, a preset control strategy is matched, and the corresponding linkage control instructions are generated; After generating the corresponding linkage control instruction, the method further includes: The monitoring information of each associated tag group that executes the linkage control instruction is sent to the digital twin platform of the user terminal in real time.

8. A hydrological monitoring and control device based on a geographic information system, characterized in that: The device comprises: at least one processor; and, a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute a hydrological monitoring and control method based on a geographic information system as described in any one of claims 1 to 7 above.

9. A hydrological monitoring and control method based on a geographic information system. A non-volatile computer storage medium stores computer executable instructions, characterized in that: The computer executable instructions can execute a hydrological monitoring and control method based on a geographic information system as described in any one of claims 1 to 7 above.

Citation Information

Patent Citations

  • Hydrological section positioning system based on ultra wide band technology

    CN112198475A

  • Method and system for measuring bank slope

    CN117029787A

  • Hydrological monitoring control management system based on Internet of Things

    CN209446041U

  • Method and system for automatically controlling a floodgate

    KR101662784B1

  • Intelligent rainwater management system based on real time control and method thereof

    KR1020140029155A