Highway inspection analysis management method and system based on data graph
By analyzing the influencing factors and historical data in highway inspections and dynamically predicting risks through a data map-based method, the problem of waste of resources and difficulty in pre-inspection in the existing inspection methods is solved, and targeted inspections and pre-inspections are realized. Improved highway safety.
Patent Information
- Application Number
- CN202410878997.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-07-02
AI Technical Summary
Existing highway inspections lack analysis of highway information status, resulting in scheduled inspections that waste manpower and material resources when the highway is not damaged, and it is difficult to implement targeted inspections and repairs on holidays or at night, affecting highway safety.
Adopting a highway inspection analysis method based on data maps, by obtaining influencing factors and historical inspection data, a database of correlations between damaged entities and influencing factors is constructed, dynamic analysis is performed to predict the risk probability of highway damage, and patrols are conducted for high-risk areas. Inspection plan.
It effectively reduces ineffective inspections during highway inspections, reduces the waste of manpower and material resources, realizes pre-inspection of highways, and improves highway safety.
Smart Images

Figure CN118411036B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of highway management, and in particular to a highway inspection analysis management method and system based on data graphs. Background Art
[0002] Highway information refers to the current physical and functional conditions of the road surface and its structure, including physical characteristics such as road surface flatness, cracks, potholes, rutting, degree of wear, and functional indicators such as the road's bearing capacity, skid resistance, and drainage performance. These factors together determine the safety, comfort, and durability of the road. Highway inspection is an important means to ensure the stability of highway information.
[0003] Existing highway inspections lack status analysis of highway information and adopt a scheduled inspection method. On the one hand, this method will cause a waste of manpower and material resources when the highway is not damaged. On the other hand, there is a lack of advance inspection planning for the road surface. When the road surface is damaged during holidays or at night, it is difficult to implement pre-emptive targeted inspections and repairs, making it difficult to ensure the road condition, which affects the safety of the highway. Summary of the invention
[0004] In order to solve the above technical problems, a highway inspection analysis management method and system based on data maps are provided. This technical solution solves the problem that the existing highway inspection lacks status analysis of highway information and adopts a scheduled inspection method. On the one hand, this method will cause a waste of manpower and material resources when the highway is not damaged. On the other hand, there is a lack of advance inspection planning for the road surface. When the road surface is damaged during holidays or at night, it is difficult to implement pre-targeted inspection and repair, and it is difficult to ensure the highway condition, which affects the safety of the highway.
[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:
[0006] A highway inspection analysis and management method based on data graph, comprising:
[0007] Obtain several factors that may affect road performance, record them as influencing factors, and construct influencing factor entities of a data map based on the influencing factors;
[0008] Based on historical inspection data, determine at least one type of damage that has occurred on the highway, and construct a damage entity of the data map based on the damage type;
[0009] Based on historical inspection data, a correlation relationship library between damage entities and influencing factor entities is constructed;
[0010] Obtain the actual parameter value of each influencing factor entity during road use;
[0011] The association relationship attribute between the damage entity and the influencing factor entity is called, and the actual parameter value of each influencing factor entity is substituted to determine the risk index of each damage entity on the highway. Based on the risk index, the damage entities with high risk of occurrence are screened out and recorded as inspection damage entities.
[0012] Output the inspection damage entity and plan the highway inspection for the damage type corresponding to the inspection damage entity.
[0013] Preferably, the construction of the correlation relationship attributes between the damage entity and the influencing factor entity based on the historical inspection data specifically includes:
[0014] Obtain the correlation relationship attributes between the known damage entity and the influencing factor entity, and edit them into recognizable text data;
[0015] Extract the head entity, relationship, and tail entity from the identifiable text data to obtain the data graph triples, and store them in the correlation relationship library between the damage entity and the influencing factor entity;
[0016] Based on the correlation relationship between the damage entity and the influencing factor entity, a risk association model is constructed between each damage entity and all the influencing factor entities with which it has a correlation relationship.
[0017] Preferably, the risk association model is constructed based on a Logistic regression model;
[0018] The construction of risk association model based on Logistic regression model includes the following steps:
[0019] Acquire a number of historical inspection data, and divide the historical inspection data into damage-occurring historical data and damage-non-occurring historical data based on whether the damage type corresponding to the damaged entity occurs in the historical inspection data;
[0020] Based on the parameter values of the influencing factors corresponding to each historical inspection data, the Logistic regression model is trained to obtain the risk association model;
[0021] The Logistic regression model is specifically:
[0022] In the formula, It is the risk indicator of damaged entities on the highway. is the actual parameter value of the i-th influencing factor entity that has a correlation relationship with the damage entity, is the total number of influencing factor entities that have a correlation relationship with the damage entity, All are parameters of the Logistic regression model, and the parameters of the Logistic regression model are obtained by the least squares method.
[0023] Preferably, the risk association model is constructed based on neural network training;
[0024] Building a risk association model based on neural network training specifically includes the following steps:
[0025] Acquire a number of historical inspection data, and divide the historical inspection data into damage-occurring historical data and damage-non-occurring historical data based on whether the damage type corresponding to the damage entity occurs in the historical inspection data, assign a value of 1 to the damage-occurring historical data, and assign a value of 0 to the damage-non-occurring historical data;
[0026] All historical inspection data are randomly divided into training data and test data in a ratio of 8:2;
[0027] Using the parameter values of the influencing factors corresponding to the training data as the input layer and the values assigned to the training data as the output layer, neural network training is performed to obtain at least one neural network model to be verified;
[0028] Verifying at least one neural network model to be verified based on the test data, calculating the loss value of the neural network model to be verified, and selecting the neural network model to be verified with the smallest loss value as the risk association model;
[0029] The risk association model takes the actual parameter values of all influencing factor entities that have an association relationship with the damage entity as input, and takes whether the damage entity occurs as output. If the damage entity occurs, the output value is 1, and if the damage entity does not occur, the output value is 0.
[0030] Preferably, calling the correlation relationship attribute between the damage entity and the influencing factor entity, substituting the actual parameter value of each influencing factor entity, determining the risk index of each damage entity on the highway, and screening out the damage entities with high risk of occurrence based on the risk index, and recording them as inspection damage entities specifically includes:
[0031] Call the risk association model corresponding to each damage entity, and select the actual parameter value of the influencing factor entity corresponding to the damage entity, substitute it into the risk association model, and obtain the risk index corresponding to the damage entity;
[0032] The damaged entities whose risk index is greater than the preset value or whose risk index is equal to 1 are screened out as damaged entities with high risk of occurrence.
[0033] Preferably, the screening of the actual parameter values of the influencing factor entities corresponding to the damage entities and substituting them into the risk association model specifically includes:
[0034] Obtaining at least one trend prediction scale of each influencing factor entity, and collecting a plurality of sample data of the influencing factor entity based on each trend prediction scale;
[0035] Based on the sample data, the future parameter prediction values of the influencing factor entity at each trend prediction scale are predicted by linear regression;
[0036] Determine the emphasis weight of each trend prediction scale respectively, and perform weighted summation on the future parameter prediction value of the influencing factor entity under each trend prediction scale to obtain the future parameter prediction value of the influencing factor entity;
[0037] The actual current parameter value of the influencing factor entity and the predicted future parameter value of the influencing factor entity are respectively substituted into the risk association model to obtain the real-time risk index corresponding to the damage entity and the predicted risk index corresponding to the damage entity.
[0038] Furthermore, a highway inspection and analysis system based on data graph is proposed, which is used to implement the above-mentioned highway inspection and analysis management method based on data graph, including:
[0039] A data map construction module, the data map construction module is used to obtain several factors that may affect the performance of the highway, record them as influencing factors, and construct an influencing factor entity of the data map based on the influencing factors, determine at least one type of damage that has occurred on the highway based on historical inspection data, and construct a damage entity of the data map based on the damage type, and construct a correlation relationship library between the damage entity and the influencing factor entity based on the historical inspection data;
[0040] A parameter acquisition module, which is used to obtain the actual parameter value of each influencing factor entity during the use of the road;
[0041] An inspection planning module is electrically connected to the data graph construction module and the parameter acquisition module. The inspection planning module is used to call the correlation relationship attribute between the damage entity and the influencing factor entity, substitute the actual parameter value of each influencing factor entity, determine the risk index of each damage entity appearing on the highway, and based on the risk index, screen out damage entities with high risk of appearing, record them as inspection damage entities, output the inspection damage entities, and plan highway inspections for damage types corresponding to the inspection damage entities.
[0042] Optionally, the data graph construction module includes:
[0043] An experience learning unit, the experience learning unit is used to obtain the correlation relationship attributes between the known damage entity and the influencing factor entity, and edit them into recognizable text data, and extract the head entity, relationship, and tail entity from the recognizable text data to obtain a data graph triple, and store them in the correlation relationship library between the damage entity and the influencing factor entity;
[0044] The risk association modeling unit is used to construct a risk association model between each damage entity and all the influencing factor entities with which it has an association relationship based on the association relationship between the damage entity and the influencing factor entity.
[0045] Optionally, the inspection planning module includes:
[0046] A data calling unit, the data calling unit is used to call the risk association model corresponding to each damage entity, and screen the actual parameter value of the influencing factor entity corresponding to the damage entity, substitute it into the risk association model, and obtain the risk index corresponding to the damage entity;
[0047] A screening unit is used to screen out damaged entities whose risk index is greater than a preset value or whose risk index is judged to be equal to 1 as damaged entities with high occurrence risk.
[0048] Optionally, the data calling unit includes:
[0049] An influencing factor attribute analysis subunit, the influencing factor attribute analysis unit is used to obtain at least one trend prediction scale of each influencing factor entity, and collect a number of sample data of the influencing factor entity based on each trend prediction scale;
[0050] A prediction subunit, the prediction subunit is used to predict the future parameter prediction value of the influencing factor entity at each trend prediction scale by linear regression based on the sample data, and to determine the emphasis weight of each trend prediction scale respectively, and to perform weighted summation on the future parameter prediction value of the influencing factor entity at each trend prediction scale to obtain the future parameter prediction value of the influencing factor entity;
[0051] The risk calculation subunit is used to substitute the current actual parameter value of the influencing factor entity and the future parameter prediction value of the influencing factor entity into the risk association model respectively, so as to obtain the real-time risk index corresponding to the damage entity and the predicted risk index corresponding to the damage entity.
[0052] Compared with the prior art, the present invention has the following beneficial effects:
[0053] The present invention proposes a highway inspection and analysis solution based on data maps, which constructs a data map based on the types of damage existing on the highway and various influencing factors in the highway operation process, and dynamically analyzes and predicts the risk probability of various damages on the highway based on the actual parameter values of various influencing factors collected on the highway. When the risk of a certain damage to the highway is high, the highway is inspected in a targeted manner, and at the same time, the changing trend of the influencing factors is predicted, and the risk probability of various damages on the highway in the future is simultaneously predicted based on the predicted values of the influencing factors, thereby realizing pre-inspection of the highway. In this way, ineffective inspections in the highway inspection process can be effectively reduced, and the waste of human and material resources can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] Figure 1 This is a flow chart of the highway inspection analysis and management method based on data graph proposed by the present invention;
[0055] Figure 2 A flow chart of a method for constructing an association relationship attribute between a damage entity and an influencing factor entity in the present invention;
[0056] Figure 3 A flow chart of a method for constructing a risk association model based on a Logistic regression model in the present invention;
[0057] Figure 4 A flow chart of the method for constructing a risk association model based on neural network training in the present invention;
[0058] Figure 5 This is a flowchart of a method for screening out damaged entities with high risk of occurrence in the present invention, recorded as a damaged entity inspection method;
[0059] Figure 6 A flowchart of a method for screening actual parameter values of influencing factor entities corresponding to damage entities and substituting them into a risk association model in the present invention;
[0060] Figure 7 This is a structural block diagram of the highway inspection and analysis system based on data atlas proposed in the present invention. DETAILED DESCRIPTION
[0061] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.
[0062] Reference Figure 1 As shown, a highway inspection analysis and management method based on data graphs includes:
[0063] Obtain several factors that may affect road performance, record them as influencing factors, and construct influencing factor entities of a data map based on the influencing factors;
[0064] Based on historical inspection data, determine at least one type of damage that has occurred on the highway, and construct a damage entity of the data map based on the damage type;
[0065] Based on historical inspection data, a correlation relationship library between damage entities and influencing factor entities is constructed;
[0066] Obtain the actual parameter value of each influencing factor entity during road use;
[0067] The association relationship attribute between the damage entity and the influencing factor entity is called, and the actual parameter value of each influencing factor entity is substituted to determine the risk index of each damage entity on the highway. Based on the risk index, the damage entities with high risk of occurrence are screened out and recorded as inspection damage entities.
[0068] Output the inspection damage entity and plan the highway inspection for the damage type corresponding to the inspection damage entity.
[0069] This solution constructs a data map based on the types of damage existing on the highway and the various influencing factors during the operation of the highway. Based on the actual parameter values of the various influencing factors collected on the highway, it dynamically analyzes and predicts the risk probability of various damages on the highway. When the risk of a certain damage to the highway is high, targeted inspections are carried out on the highway.
[0070] Reference Figure 2 As shown, the construction of the correlation relationship attributes between the damage entity and the influencing factor entity based on the historical inspection data specifically includes:
[0071] Obtain the correlation relationship attributes between the known damage entity and the influencing factor entity, and edit them into recognizable text data;
[0072] Extract the head entity, relationship, and tail entity from the identifiable text data to obtain the data graph triples, and store them in the correlation relationship library between the damage entity and the influencing factor entity;
[0073] Based on the correlation relationship between the damage entity and the influencing factor entity, a risk association model is constructed between each damage entity and all the influencing factor entities with which it has a correlation relationship.
[0074] It can be understood that the relationship between influencing factors and various highway damages is relevant knowledge that is already well known in the art. For example, increased traffic volume will lead to accelerated highway wear, excessive temperature will cause cracking of the highway pavement, and increased vehicle tonnage will cause highway settlement. In this solution, the relevant knowledge well known in the art is edited into recognizable text data, and entity extraction and relationship extraction are performed to construct a data map.
[0075] Reference Figure 3 As shown, in some embodiments, the risk association model is constructed based on a Logistic regression model;
[0076] The construction of risk association model based on Logistic regression model includes the following steps:
[0077] Acquire a number of historical inspection data, and divide the historical inspection data into damage-occurring historical data and damage-non-occurring historical data based on whether the damage type corresponding to the damaged entity occurs in the historical inspection data;
[0078] Based on the parameter values of the influencing factors corresponding to each historical inspection data, the Logistic regression model is trained to obtain the risk association model;
[0079] The Logistic regression model is specifically:
[0080]
[0081] In the formula, It is the risk indicator of damaged entities on the highway. is the actual parameter value of the i-th influencing factor entity that has a correlation relationship with the damage entity, is the total number of influencing factor entities that have a correlation relationship with the damage entity, All are parameters of the Logistic regression model, and the parameters of the Logistic regression model are obtained by the least squares method.
[0082] The Logistic regression model is a generalized linear regression analysis model, which is often used in data mining, automatic disease diagnosis, economic forecasting and other fields. The Logistic regression model estimates the probability of an event based on a given independent variable data set. Since the result is a probability, the range of the dependent variable is between 0 and 1. In this embodiment, several influencing factors related to the damaged entity are used as the independent variable data set, and the probability of the damaged entity is used as the dependent variable to establish a Logistic regression model, which can accurately predict the probability of various damages on the highway based on the influencing factor data during the highway operation process.
[0083] Reference Figure 4As shown, in other embodiments, the risk association model may also be constructed based on neural network training;
[0084] Building a risk association model based on neural network training specifically includes the following steps:
[0085] Acquire a number of historical inspection data, and divide the historical inspection data into damage-occurring historical data and damage-non-occurring historical data based on whether the damage type corresponding to the damage entity occurs in the historical inspection data, assign a value of 1 to the damage-occurring historical data, and assign a value of 0 to the damage-non-occurring historical data;
[0086] All historical inspection data are randomly divided into training data and test data in a ratio of 8:2;
[0087] Using the parameter values of the influencing factors corresponding to the training data as the input layer and the values assigned to the training data as the output layer, neural network training is performed to obtain at least one neural network model to be verified;
[0088] Verifying at least one neural network model to be verified based on the test data, calculating the loss value of the neural network model to be verified, and selecting the neural network model to be verified with the smallest loss value as the risk association model;
[0089] The risk association model takes the actual parameter values of all influencing factor entities that have an association relationship with the damage entity as input, and takes whether the damage entity occurs as output. If the damage entity occurs, the output value is 1, and if the damage entity does not occur, the output value is 0.
[0090] Reference Figure 5 As shown, the association relationship attribute between the damage entity and the influencing factor entity is called, the actual parameter value of each influencing factor entity is substituted, the risk index of each damage entity on the highway is determined, and based on the risk index, the damage entity with high risk of occurrence is screened out and recorded as the inspection damage entity, which specifically includes:
[0091] Call the risk association model corresponding to each damage entity, and select the actual parameter value of the influencing factor entity corresponding to the damage entity, substitute it into the risk association model, and obtain the risk index corresponding to the damage entity;
[0092] The damaged entities whose risk index is greater than the preset value or whose risk index is equal to 1 are screened out as damaged entities with high risk of occurrence.
[0093] Reference Figure 6 As shown, the actual parameter value of the influencing factor entity corresponding to the damage entity is selected and substituted into the risk association model specifically includes:
[0094] Obtaining at least one trend prediction scale of each influencing factor entity, and collecting a plurality of sample data of the influencing factor entity based on each trend prediction scale;
[0095] Based on the sample data, the future parameter prediction values of the influencing factor entity at each trend prediction scale are predicted by linear regression;
[0096] Determine the emphasis weight of each trend prediction scale respectively, and perform weighted summation on the future parameter prediction value of the influencing factor entity under each trend prediction scale to obtain the future parameter prediction value of the influencing factor entity;
[0097] The actual current parameter value of the influencing factor entity and the predicted future parameter value of the influencing factor entity are respectively substituted into the risk association model to obtain the real-time risk index corresponding to the damage entity and the predicted risk index corresponding to the damage entity.
[0098] Among them, this solution also predicts the changing trend of influencing factors, and based on the predicted values of influencing factors, simultaneously predicts the risk probability of various damages that may occur on the highway in the future, thereby realizing advance inspection of the highway;
[0099] In the process of predicting the changing trend of influencing factors, this solution performs comprehensive fitting prediction based on multiple trend prediction scales of the influencing factor entity. For example, for traffic flow data, since the traffic flow is not only related to the traffic flow on the road on that day, but also to each time period, such as the morning and evening rush hours, the traffic flow will increase, and the traffic flow will decrease at night. Therefore, when predicting the traffic flow data, the scale of the traffic flow change on that day and the scale of the time period cycle based on a daily cycle are included. Through comprehensive analysis of multiple scales, the future parameter prediction value of the influencing factor entity can be accurately predicted.
[0100] It should be noted that the above description of "the traffic flow change scale of the day and the time period cycle scale based on the daily cycle" for traffic flow is only an exemplary description, and the trend prediction scale of traffic flow is not constrained by the above description. In some embodiments, the trend prediction scale of traffic flow may also include a "holiday cycle scale" based on the annual cycle.
[0101] Further, see Figure 7 As shown, based on the same inventive concept as the above-mentioned highway inspection analysis and management method based on data atlas, this solution also proposes a highway inspection analysis system based on data atlas, including:
[0102] A data map construction module, the data map construction module is used to obtain several factors that may affect the performance of the highway, record them as influencing factors, and construct an influencing factor entity of the data map based on the influencing factors, determine at least one type of damage that has occurred on the highway based on historical inspection data, and construct a damage entity of the data map based on the damage type, and construct a correlation relationship library between the damage entity and the influencing factor entity based on the historical inspection data;
[0103] A parameter acquisition module, which is used to obtain the actual parameter value of each influencing factor entity during the use of the road;
[0104] An inspection planning module is electrically connected to the data graph construction module and the parameter acquisition module. The inspection planning module is used to call the correlation relationship attribute between the damage entity and the influencing factor entity, substitute the actual parameter value of each influencing factor entity, determine the risk index of each damage entity appearing on the highway, and based on the risk index, screen out damage entities with high risk of appearing, record them as inspection damage entities, output the inspection damage entities, and plan highway inspections for damage types corresponding to the inspection damage entities.
[0105] The data graph construction module includes:
[0106] An experience learning unit, the experience learning unit is used to obtain the correlation relationship attributes between the known damage entity and the influencing factor entity, and edit them into recognizable text data, and extract the head entity, relationship, and tail entity from the recognizable text data to obtain a data graph triple, and store them in the correlation relationship library between the damage entity and the influencing factor entity;
[0107] The risk association modeling unit is used to construct a risk association model between each damage entity and all the influencing factor entities with which it has an association relationship based on the association relationship between the damage entity and the influencing factor entity.
[0108] The inspection planning module includes:
[0109] A data calling unit, the data calling unit is used to call the risk association model corresponding to each damage entity, and screen the actual parameter value of the influencing factor entity corresponding to the damage entity, substitute it into the risk association model, and obtain the risk index corresponding to the damage entity;
[0110] A screening unit is used to screen out damaged entities whose risk index is greater than a preset value or whose risk index is judged to be equal to 1 as damaged entities with high occurrence risk.
[0111] The data calling unit comprises:
[0112] An influencing factor attribute analysis subunit, the influencing factor attribute analysis unit is used to obtain at least one trend prediction scale of each influencing factor entity, and collect a number of sample data of the influencing factor entity based on each trend prediction scale;
[0113] A prediction subunit, the prediction subunit is used to predict the future parameter prediction value of the influencing factor entity at each trend prediction scale by linear regression based on the sample data, and to determine the emphasis weight of each trend prediction scale respectively, and to perform weighted summation on the future parameter prediction value of the influencing factor entity at each trend prediction scale to obtain the future parameter prediction value of the influencing factor entity;
[0114] The risk calculation subunit is used to substitute the current actual parameter value of the influencing factor entity and the future parameter prediction value of the influencing factor entity into the risk association model respectively, so as to obtain the real-time risk index corresponding to the damage entity and the predicted risk index corresponding to the damage entity.
[0115] The process of using the above system is as follows:
[0116] Step 1: The data map construction module is used to obtain several factors that may affect the performance of the highway, record them as influencing factors, and construct the influencing factor entity of the data map based on the influencing factors. Based on the historical inspection data, at least one type of damage that has occurred on the highway is determined, and the damage entity of the data map is constructed based on the damage type.
[0117] Step 2: The data graph construction module calls the experience learning unit to obtain the known correlation relationship attributes between the damage entity and the influencing factor entity, and edits it into identifiable text data, and extracts the head entity, relationship, and tail entity from the identifiable text data to obtain the data graph triple, and stores it in the correlation relationship library between the damage entity and the influencing factor entity;
[0118] Step 3: The data graph construction module calls the risk association modeling unit to construct a risk association model between each damage entity and all the influencing factor entities with which it has an association relationship based on the association relationship between the damage entity and the influencing factor entity;
[0119] Step 4: The parameter collection module obtains the actual parameter value of each influencing factor entity during the road use process;
[0120] Step 5: The inspection planning module calls the risk association model corresponding to each damaged entity, and calls the influencing factor attribute analysis unit in the data calling unit to obtain at least one trend prediction scale of each influencing factor entity, and collects several sample data of the influencing factor entity based on each trend prediction scale, and calls the prediction subunit to predict the future parameter prediction value of the influencing factor entity under each trend prediction scale by linear regression based on the sample data, and respectively determines the emphasis weight of each trend prediction scale, and performs weighted summation on the future parameter prediction value of the influencing factor entity under each trend prediction scale to obtain the future parameter prediction value of the influencing factor entity, and calls the risk calculation subunit to substitute the current actual parameter value of the influencing factor entity and the future parameter prediction value of the influencing factor entity into the risk association model, and obtains the real-time risk index corresponding to the damaged entity and the predicted risk index corresponding to the damaged entity;
[0121] Step 6: The inspection planning module calls the screening unit to screen out the damaged entities whose risk index is greater than the preset value or whose risk index is equal to 1 as damaged entities with high risk.
[0122] In summary, the advantages of the present invention are: achieving targeted inspection and pre-inspection of highways, which can effectively reduce ineffective inspections during highway inspections and reduce the waste of human and material resources.
[0123] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.
Claims
1. A highway inspection analysis and management method based on data graph, characterized in that: include: Obtain several factors that may affect road performance, record them as influencing factors, and construct influencing factor entities of a data map based on the influencing factors; Based on historical inspection data, determine at least one type of damage that has occurred on the highway, and construct a damage entity of the data map based on the damage type; Based on historical inspection data, a correlation relationship library between damage entities and influencing factor entities is constructed; Obtain the actual parameter value of each influencing factor entity during road use; The association relationship attribute between the damage entity and the influencing factor entity is called, and the actual parameter value of each influencing factor entity is substituted to determine the risk index of each damage entity on the highway. Based on the risk index, the damage entities with high risk of occurrence are screened out and recorded as inspection damage entities. Output inspection damage entities and plan highway inspections for damage types corresponding to the inspection damage entities; The calling of the correlation relationship attribute between the damage entity and the influencing factor entity, substituting the actual parameter value of each influencing factor entity, determining the risk index of each damage entity on the highway, and screening out the damage entities with high risk of occurrence based on the risk index, which are recorded as the inspection damage entities, specifically includes: Call the risk association model corresponding to each damage entity, and select the actual parameter value of the influencing factor entity corresponding to the damage entity, substitute it into the risk association model, and obtain the risk index corresponding to the damage entity; Screen out the damaged entities whose risk index is greater than the preset value or whose risk index is equal to 1 as damaged entities with high occurrence risk; The actual parameter value of the screening influencing factor entity corresponding to the damage entity and substituting it into the risk association model specifically includes: Acquire at least one trend prediction scale of each influencing factor entity, and collect a number of sample data of the influencing factor entity based on each trend prediction scale; Based on the sample data, the future parameter prediction values of the influencing factor entity at each trend prediction scale are predicted by linear regression; Determine the emphasis weight of each trend prediction scale respectively, and perform weighted summation on the future parameter prediction value of the influencing factor entity under each trend prediction scale to obtain the future parameter prediction value of the influencing factor entity; The actual current parameter value of the influencing factor entity and the predicted future parameter value of the influencing factor entity are respectively substituted into the risk association model to obtain the real-time risk index corresponding to the damage entity and the predicted risk index corresponding to the damage entity.
2. A highway inspection analysis and management method based on data graph according to claim 1, characterized in that: The construction of the correlation relationship attributes between the damage entity and the influencing factor entity based on the historical inspection data specifically includes: Obtain the correlation relationship attributes between the known damage entity and the influencing factor entity, and edit them into recognizable text data; Extract the head entity, relationship, and tail entity from the identifiable text data to obtain the data graph triples, and store them in the correlation relationship library between the damage entity and the influencing factor entity; Based on the correlation relationship between the damage entity and the influencing factor entity, a risk association model is constructed between each damage entity and all the influencing factor entities with which it has a correlation relationship.
3. A highway inspection analysis and management method based on data graph according to claim 2, characterized in that: The risk association model is constructed based on the Logistic regression model; The construction of risk association model based on Logistic regression model includes the following steps: Acquire a number of historical inspection data, and divide the historical inspection data into damage-occurring historical data and damage-non-occurring historical data based on whether the damage type corresponding to the damaged entity occurs in the historical inspection data; Based on the parameter values of the influencing factors corresponding to each historical inspection data, the Logistic regression model is trained to obtain the risk association model; The Logistic regression model is specifically: In the formula, It is the risk indicator of damaged entities on the highway. is the actual parameter value of the i-th influencing factor entity that has a correlation relationship with the damage entity, is the total number of influencing factor entities that have a correlation relationship with the damage entity, All are parameters of the Logistic regression model, and the parameters of the Logistic regression model are obtained by the least squares method.
4. A highway inspection analysis and management method based on data graph according to claim 2, characterized in that: The risk association model is constructed based on neural network training; Building a risk association model based on neural network training specifically includes the following steps: Acquire a number of historical inspection data, and divide the historical inspection data into damage-occurring historical data and damage-non-occurring historical data based on whether the damage type corresponding to the damage entity occurs in the historical inspection data, assign a value of 1 to the damage-occurring historical data, and assign a value of 0 to the damage-non-occurring historical data; All historical inspection data are randomly divided into training data and test data in a ratio of 8:2; Using the parameter values of the influencing factors corresponding to the training data as the input layer and the values assigned to the training data as the output layer, neural network training is performed to obtain at least one neural network model to be verified; Verifying at least one neural network model to be verified based on the test data, calculating the loss value of the neural network model to be verified, and selecting the neural network model to be verified with the smallest loss value as the risk association model; The risk association model takes the actual parameter values of all influencing factor entities that have an association relationship with the damage entity as input, and takes whether the damage entity occurs as output. If the damage entity occurs, the output value is 1, and if the damage entity does not occur, the output value is 0.
5. A highway inspection analysis and management system based on data graph, characterized in that: The highway inspection analysis and management method based on data graphs according to any one of claims 1 to 4 comprises: A data map construction module, the data map construction module is used to obtain several factors that may affect the performance of the highway, record them as influencing factors, and construct an influencing factor entity of the data map based on the influencing factors, determine at least one type of damage that has occurred on the highway based on historical inspection data, and construct a damage entity of the data map based on the damage type, and construct a correlation relationship library between the damage entity and the influencing factor entity based on the historical inspection data; A parameter acquisition module, which is used to obtain the actual parameter value of each influencing factor entity during the use of the road; An inspection planning module, the inspection planning module is electrically connected to the data map construction module and the parameter acquisition module, and the inspection planning module is used to call the correlation relationship attribute between the damage entity and the influencing factor entity, substitute the actual parameter value of each influencing factor entity, determine the risk index of each damage entity on the highway, and based on the risk index, screen out the damage entities with high risk of occurrence, record them as inspection damage entities, output the inspection damage entities, and plan the highway inspection of the damage type corresponding to the inspection damage entity; The inspection planning module includes: A data calling unit, the data calling unit is used to call the risk association model corresponding to each damage entity, and screen the actual parameter value of the influencing factor entity corresponding to the damage entity, substitute it into the risk association model, and obtain the risk index corresponding to the damage entity; A screening unit, the screening unit is used to screen out damaged entities whose risk index is greater than a preset value or whose risk index is equal to 1 as damaged entities with a high risk of occurrence; The data calling unit comprises: An influencing factor attribute analysis subunit, the influencing factor attribute analysis unit is used to obtain at least one trend prediction scale of each influencing factor entity, and collect a number of sample data of the influencing factor entity based on each trend prediction scale; A prediction subunit, the prediction subunit is used to predict the future parameter prediction value of the influencing factor entity at each trend prediction scale by linear regression based on the sample data, and to determine the emphasis weight of each trend prediction scale respectively, and to perform weighted summation on the future parameter prediction value of the influencing factor entity at each trend prediction scale to obtain the future parameter prediction value of the influencing factor entity; The risk calculation subunit is used to substitute the current actual parameter value of the influencing factor entity and the future parameter prediction value of the influencing factor entity into the risk association model respectively, so as to obtain the real-time risk index corresponding to the damage entity and the predicted risk index corresponding to the damage entity.
6. A highway inspection analysis and management system based on data graph according to claim 5, characterized in that: The data graph construction module includes: An experience learning unit, the experience learning unit is used to obtain the correlation relationship attributes between the known damage entity and the influencing factor entity, and edit them into recognizable text data, and extract the head entity, relationship, and tail entity from the recognizable text data to obtain a data graph triple, and store them in the correlation relationship library between the damage entity and the influencing factor entity; The risk association modeling unit is used to construct a risk association model between each damage entity and all the influencing factor entities with which it has an association relationship based on the association relationship between the damage entity and the influencing factor entity.
