A two-stage cooling type furnace head electrode for a graphitization furnace and a method of using the same

By using a two-stage cooling box and inert gas insulation and cooling technology in the Acheson graphitization furnace, the problems of furnace head electrode oxidation erosion and low furnace core material temperature are solved, and efficient cooling and an environmentally friendly production environment are achieved.

CN118424002BActive Publication Date: 2024-10-18SHENYANG ALUMINIUM MAGNESIUM INSTITUTE
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410881522.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-10-18
Estimated Expiration
2044-07-03

AI Technical Summary

Technical Problem

The furnace head electrode of the Acheson graphitization furnace is easily oxidized and corroded at high temperatures. The traditional water cooling method will affect the temperature of the furnace core material and produce sewage, and the cooling effect is poor.

Method used

A two-stage cooling box is used to insulate and cool the burner electrode using inert gases such as nitrogen. The electrode contact performance is optimized through embedded copper electrode plates and aluminum push electrodes, and inertization is performed through primary and secondary cooling boxes respectively. Gas insulation and cooling.

Benefits of technology

It effectively avoids the oxidation corrosion of the furnace head electrode, maintains the high temperature of the furnace core material, reduces the cooling power consumption, avoids the generation of sewage, and simplifies the power transmission structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118424002B_ABST
    Figure CN118424002B_ABST
Patent Text Reader

Abstract

A two-stage cooling type furnace head electrode for a graphitization furnace and a method for using the same belong to the technical field of graphitization production of negative electrode materials for lithium-ion batteries, including a furnace head electrode, wherein a groove body recessed toward the furnace core is provided at one end of the furnace head electrode away from the furnace core, wherein an embedded copper electrode plate is provided in the groove body, and an aluminum push electrode is provided, wherein the end of the aluminum push electrode close to the furnace head electrode matches the embedded copper electrode plate of the furnace head electrode, and further comprising a two-stage cooling box, wherein the two-stage cooling box comprises a primary box body and a secondary box body connected to each other and separated by an internal box plate, wherein during production, an inert gas is introduced into the primary box body and the secondary box body, and the furnace head electrode is insulated and cooled by the inert gas. The present invention sets a two-stage cooling box outside the furnace head electrode, and uses an inert gas such as nitrogen to insulate or cool the furnace head electrode, thereby solving the problem of low material temperature near the furnace head side caused by traditional water cooling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of graphitization production of negative electrode materials for lithium ion batteries, and in particular relates to a two-stage cooling type furnace head electrode of a graphitization furnace and a use method thereof. Background Art

[0002] The production process of negative electrode materials for lithium-ion batteries is to modify graphitizable carbon materials at high temperatures so that the carbon atoms are arranged in an orderly manner at high temperatures. Currently, the Acheson graphitization furnace is mainly used in production to achieve the heating process.

[0003] Acheson graphitization furnace is an industrial high-temperature resistance furnace. Its main structure consists of furnace electrodes at both ends and furnace core materials. External power is input and output through the furnace electrodes. The furnace core materials generate heat to 3000℃ under the thermal effect of electric current to complete graphitization.

[0004] The furnace head electrode itself has resistance. When the Acheson graphitization furnace is powered on, the furnace head electrode will increase its temperature due to the thermal effect of the current. Since the furnace head electrode exposed outside the furnace head concrete shell is in contact with the air, the electrode at high temperature will be oxidized and corroded by the oxygen in the air. Therefore, in actual production, the furnace head electrode must be cooled to extend its service life. It is usually required that the maximum temperature of the exposed part of the furnace head electrode does not exceed 200℃.

[0005] like Figure 1-3 As shown, a target bolt hole 5-1, a water cooling channel 5-2, and a water cooling device cover plate placement hole 5-3 are provided inside the exposed end of the furnace head electrode 5 of the current Acheson graphitization furnace. A water cooling device cover plate placement hole 5-3 is provided on the side of the water cooling channel 5-2 close to the edge of the furnace head electrode. The target bolt hole 5-1 is arranged perpendicular to the water cooling channel 5-2. A water cooling device cover plate 5-6 is installed at the water cooling device cover plate placement hole 5-3. The water cooling device cover plate 5-6 is provided with a water inlet hole 5-8 and a water outlet hole 5-7 connected to the water cooling channel 5-2. The water cooling device cover plate 5-6 is provided with a water cooling device fixing bolt 5-5 extending into the water cooling channel 5-2. A water cooling device target bolt 5-4 is provided in the target bolt hole 5-1. The water cooling device fixing bolt 5-5 is assembled and connected with the water cooling device target bolt 5-4 to form a furnace head electrode water cooling device.

[0006] Since the furnace electrode is a good conductor of heat, the water cooling device reduces the temperature of the furnace electrode, but also reduces the temperature of the material near the furnace core, making it lower than 3000℃, which affects the quality of the material. At the same time, since the cooling process is carried out in the closed cavity inside the furnace electrode, if the water vapor generated inside does not overflow smoothly, it will block the circulation of cooling water and seriously affect the cooling effect. Therefore, it is necessary to monitor the surface temperature of the furnace electrode in production and spray water to cool the overheated furnace electrode, which seriously deteriorates the production environment and produces a large amount of sewage. Therefore, how to ensure that the furnace electrode is not oxidized and corroded, and at the same time, it does not affect the temperature of the furnace core material, is crucial to the production of Acheson graphitization furnace. Summary of the invention

[0007] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a two-stage cooling type furnace head electrode for a graphitizing furnace and a method for using the same. A two-stage cooling box is arranged outside the furnace head electrode, and an inert gas such as nitrogen is used to insulate or cool the furnace head electrode, thereby solving the problem of low material temperature near the furnace head side caused by traditional water cooling.

[0008] In order to achieve the above object, the main technical solutions adopted by the present invention include:

[0009] A two-stage cooling type furnace head electrode for a graphitization furnace, comprising a furnace head electrode, one end of the furnace head electrode is connected to a furnace core, and the other end is an extended end extending out of a concrete shell, a groove body is provided at the end of the furnace head electrode away from the furnace core, an embedded copper electrode plate is arranged in the groove body, and an aluminum top push electrode is provided, and an end of the aluminum top push electrode close to the furnace head electrode is matched with the embedded copper electrode plate of the furnace head electrode, and a two-stage cooling box is provided, wherein the two-stage cooling box comprises a primary box body and a secondary box body which are interconnected and separated by an internal box plate, a side of the primary box body away from the secondary box body is connected to the concrete shell, and the primary box body covers the extended end of the furnace head electrode close to the furnace core. The secondary box covers the part of the furnace head electrode protruding end close to the aluminum top push electrode and the part of the aluminum top push electrode close to the furnace head electrode, so that the connecting part of the aluminum top push electrode and the embedded copper electrode plate is in the secondary box, and the bottom and top of the primary box are respectively provided with a primary box air inlet hole and a primary box air outlet hole, and the bottom and top of the secondary box are respectively provided with a secondary box air inlet hole and a secondary box air outlet hole. The primary box is sealed with the concrete shell and the furnace head electrode, and the secondary box is sealed with the furnace head electrode and the aluminum top push electrode. During production, inert gas is introduced into the primary box and the secondary box, and the inert gas is used to keep the furnace head electrode warm and cool.

[0010] Furthermore, the two-stage cooling box includes an external box body with an opening toward the concrete shell, the interior of the external box body is divided into a primary box body and a secondary box body by an internal box plate, and the two-stage cooling box is fixedly and sealedly connected to the concrete shell.

[0011] Furthermore, a concrete shell reserved groove is opened on the concrete shell, and the concrete shell reserved groove is located at the connection between the concrete shell and the primary box body. One end of the two-stage cooling box close to the concrete shell is assembled in the concrete shell reserved groove. A first insulating and high-temperature resistant seal is provided in the concrete shell reserved groove. The first insulating and high-temperature resistant seal is used to seal the connection between the primary box body and the concrete shell reserved groove.

[0012] Furthermore, a fixed box plate is provided on one side of the two-stage cooling box close to the concrete shell. After the two-stage cooling box is assembled in the reserved groove of the concrete shell, the fixed box plate of the two-stage cooling box is fixed to the concrete shell by box body fixing bolts.

[0013] Furthermore, the end of the furnace head electrode close to the aluminum top push electrode is an electrode reducing section with a step-by-step diameter reduction, and a furnace head electrode reducing section through hole matching the size of the electrode reducing section is opened on the internal box plate. The length of the electrode reducing section is greater than the depth of the embedded copper electrode plate. After the electrode reducing section passes through the furnace head electrode reducing section through hole and is installed, the embedded copper electrode plate is located as a whole in the secondary box body, and the connection position between the furnace head electrode and the internal box plate is sealed by a second insulating and high-temperature resistant seal.

[0014] Furthermore, the aluminum pushing electrode includes a first pushing electrode segment and a second pushing electrode segment which are fixedly connected to each other or integrally formed, the first pushing electrode segment matches the embedded copper electrode plate, after the first pushing electrode segment is connected to the embedded copper electrode plate, the first pushing electrode segment and the embedded copper electrode plate are completely placed in the secondary box, the area of ​​the second pushing electrode segment along the vertical cross-section is larger than the area of ​​the first pushing electrode segment along the vertical cross-section, an aluminum pushing electrode through hole is provided on one side wall of the secondary box away from the furnace head electrode, the aluminum pushing electrode through hole matches the first pushing electrode segment, and the connection position between the aluminum pushing electrode and the secondary box is sealed by a third insulating and high-temperature resistant seal.

[0015] The method for using the two-stage cooling furnace head electrode of the graphitizing furnace is as follows: when starting production, the aluminum top push electrode moves toward the furnace head electrode until the aluminum top push electrode is connected to the embedded copper electrode plate and enters the power-on production state, an inert gas is introduced into the first-level box, the first-level box is filled with inert gas and then sealed, the inert gas in the first-level box keeps the furnace head electrode in the first-level box warm during the production process, an inert gas is introduced into the second-level box, the inert gas in the second-level box is in a flowing state during the production process, and cools the furnace head electrode and the aluminum top push electrode in the second-level box; after the production is completed, the introduction of inert gas into the second-level box is stopped, the aluminum top push electrode is separated from the furnace head electrode and the power is cut off, flowing inert gas for cooling the furnace head electrode is introduced into the first-level box until the surface temperature of the furnace head electrode in the first-level box drops to a preset temperature, and the introduction of inert gas into the first-level box is stopped.

[0016] The beneficial effects of the present invention are as follows: the present invention provides a two-stage cooling type furnace head electrode for a graphitization furnace and a method for using the same, wherein a two-stage cooling box is arranged outside the furnace head electrode, and an inert gas such as nitrogen is used to insulate or cool the furnace head electrode, thereby solving the problem of low material temperature near the furnace head side caused by traditional water cooling, reducing the power consumption required for cooling, and avoiding the generation of sewage, which is environmentally friendly.

[0017] In addition, the present invention adopts an embedded copper electrode plate to optimize the contact performance between the furnace head electrode and the aluminum busbar, greatly simplifying the power transmission structure and reducing the contact resistance. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the water cooling structure of the furnace head electrode of the current Acheson graphitization furnace;

[0019] Figure 2 This is a schematic diagram of the internal groove structure of the furnace head electrode of a graphitization furnace using water cooling;

[0020] Figure 3 It is a schematic diagram of the water cooling structure of the furnace head electrode of the existing graphitization furnace;

[0021] Figure 4 It is a schematic structural diagram of the two-stage cooling furnace head electrode and the aluminum push electrode in the graphitization furnace of the present invention in the energized state;

[0022] Figure 5 It is a schematic diagram of the structure of the two-stage cooling type furnace head electrode and the aluminum top push electrode of the graphitization furnace of the present invention in the power-off state;

[0023] Figure 6 This is a schematic diagram of the furnace head electrode structure of the present invention;

[0024] Figure 7 It is a schematic diagram of the structure of the two-stage cooling box of the present invention;

[0025] Figure 8 It is a schematic diagram of the internal box plate structure;

[0026] Fig. 9 It is a schematic diagram of the aluminum push electrode through hole structure on the secondary box;

[0027] Fig.10 Schematic diagram of the structure for reserving a groove for the concrete shell;

[0028] Fig.11 for Figure 5 The enlarged image at point I in the middle;

[0029] Fig.12 is a schematic cross-sectional view of a first insulating high temperature resistant sealing member having a U-shaped cross-section;

[0030] Fig.13 is a schematic cross-sectional view of a second insulating high temperature resistant sealing member having an L-shaped cross section;

[0031] Fig.14 It is a schematic diagram of the cross section of the asymmetric U-shaped third insulating high-temperature resistant seal.

[0032] Components in the figure: 1. Furnace core; 2. Insulation material; 3. Insulation bricks; 4. Concrete shell; 5. Furnace head electrode; 5-1. Targeting bolt hole; 5-2. Water cooling channel; 5-3. Water cooling device cover placement hole; 5-4. Water cooling device targeting bolt; 5-5. Water cooling device fixing bolt; 5-6. Water cooling device cover; 5-7. Water outlet; 5-8. Water inlet; 5-9. Electrode reducing section; 5-10. Embedded copper electrode plate; 6. Two-stage cooling box; 6-1. External box body; 6-11. External box body; 6-12. Aluminum push electrode through hole; 6-2 , internal box plate; 6-21, furnace head electrode reducing section through hole; 6-3, fixed box plate; 7, aluminum push electrode; 7-1 is the first push electrode section; 7-2 is the second push electrode section; 8, the third insulating high temperature resistant seal; 9-1, the first box body air outlet; 9-2, the first box body air inlet; 10-1, the second box body air outlet; 10-2, the second box body air inlet; 11, box body fixing bolts; 12, box body and concrete shell connection structure; 12-1, concrete shell reserved groove; 12-2, the first insulating high temperature resistant seal; 13, the second insulating high temperature resistant seal. DETAILED DESCRIPTION

[0033] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.

[0034] The present invention provides a two-stage cooling type furnace head electrode for a graphitization furnace, comprising a furnace head electrode 5, one end of which is connected to a furnace core 1, and the other end is an extended end extending out of a concrete shell 4, a heat preservation material 2 is arranged on the upper part of the furnace core 1, and an insulating heat preservation brick 3 is arranged between the concrete shell 4 and the furnace head electrode 5. Figure 4-6 As shown, the end of the furnace head electrode 5 away from the furnace core 1 is provided with a groove body that is recessed toward the furnace core 1, and the groove body is provided with an embedded copper electrode plate 5-10. Specifically, the recessed groove body can be a cylindrical groove, and the embedded copper electrode plate 5-10 is arranged in contact with the inner wall of the cylindrical groove. The use of the embedded copper electrode plate 5-10 can optimize the contact performance between the furnace head electrode 5 and the aluminum busbar, greatly simplify the power transmission structure, and reduce the contact resistance. It also includes an aluminum push electrode 7, and the end of the aluminum push electrode 7 close to the furnace head electrode 5 matches the embedded copper electrode plate 5-10 of the furnace head electrode 5. Specifically, the aluminum push electrode 7 includes a first push electrode segment 7-1 and a second push electrode segment 7-2 that are fixedly connected to each other or integrally formed, and the first push electrode segment 7-1 is cylindrical, which matches the embedded copper electrode plate 5-10. During production, the first pushing electrode segment 7 - 1 of the aluminum pushing electrode 7 is inserted into the embedded copper electrode plate 5 - 10 of the furnace head electrode 5 to achieve power-on.

[0035] Also includes a two-stage cooling box 6, such as Figure 7 As shown, the two-stage cooling box 6 includes a primary box body and a secondary box body that are connected to each other and separated by an internal box plate 6-2. The side of the primary box body away from the secondary box body is connected to the concrete shell 4. Specifically, the two-stage cooling box 6 includes an external box body 6-1 with an opening toward the concrete shell 4. The external box body 6-1 can be a rectangular box body. The interior of the external box body 6-1 is separated into a primary box body and a secondary box body by an internal box plate 6-2. The two-stage cooling box 6 is fixedly and sealedly connected to the concrete shell 4 via a box body and concrete shell connection structure 12. Specifically, as Figure 10-11 As shown, the concrete shell 4 is provided with a concrete shell reserved groove 12-1, the concrete shell reserved groove 12-1 is located at the connection between the concrete shell 4 and the primary box body, the end of the external box body 6-1 close to the concrete shell 4 is assembled in the concrete shell reserved groove 12-1, and the concrete shell reserved groove 12-1 is provided with a first insulating high temperature resistant seal 12-2, the first insulating high temperature resistant seal 12-2 is used to seal the connection between the primary box body and the concrete shell reserved groove 12-1. More specifically, as Fig.12 As shown, the first insulating high temperature resistant seal 12-2 may be a groove-shaped seal with a U-shaped cross section, which may completely cover the connection surface between the external box body 6-1 and the reserved groove 12-1 of the concrete shell to achieve insulating sealing.

[0036] The two-stage cooling box 6 is provided with a fixed box plate 6-3 on one side close to the concrete shell 4. After the two-stage cooling box 6 is assembled in the reserved groove 12-1 of the concrete shell, the fixed box plate 6-3 of the two-stage cooling box 6 is fixed to the concrete shell 4 by the box body fixing bolts 11 to ensure the stable installation of the two-stage cooling box 6.

[0037] The primary box covers the part of the protruding end of the furnace head electrode 5 close to the furnace core, and the secondary box covers the part of the protruding end of the furnace head electrode 5 close to the aluminum top push electrode 7 and the part of the aluminum top push electrode 7 close to the furnace head electrode 5, so that the connection part between the aluminum top push electrode 7 and the embedded copper electrode plate 5-10 is in the secondary box.

[0038] Specifically, the end of the furnace head electrode 5 close to the aluminum push electrode 7 is an electrode diameter reducing section 5-9 with a step-wise reduction in diameter. Figure 8 As shown, the internal box plate 6-2 is provided with a furnace head electrode diameter reducing section through hole 6-21 matching the size of the electrode diameter reducing section 5-9, and the length of the electrode diameter reducing section 5-9 is greater than the depth of the embedded copper electrode plate 5-10, so that the electrode diameter reducing section 5-9 passes through the furnace head electrode diameter reducing section through hole 6-21. After installation, the embedded copper electrode plate 5-10 is located in the secondary box as a whole, and the connection position between the furnace head electrode 5 and the internal box plate 6-2 is sealed by the second insulating high temperature resistant seal 13. More specifically, as Fig.13 As shown, the second insulating high temperature resistant sealing member 13 may be an annular sealing gasket with an L-shaped cross section, which completely covers the connection surface between the inner box plate 6 - 2 and the furnace head electrode 5 to achieve insulating sealing.

[0039] Specifically, the aluminum push electrode 7 includes a first push electrode segment 7-1 and a second push electrode segment 7-2 which are fixedly connected to each other or integrally formed. The first push electrode segment 7-1 matches the embedded copper electrode plate 5-10. After the first push electrode segment 7-1 is connected to the embedded copper electrode plate 5-10, the first push electrode segment 7-1 and the embedded copper electrode plate 5-10 are completely placed in the secondary box. The area of ​​the second push electrode segment 7-2 along the vertical cross-section is greater than the area of ​​the first push electrode segment 7-1 along the vertical cross-section. Fig. 9 As shown, an aluminum push electrode through hole 6-12 is provided on the side wall of the secondary box body away from the furnace head electrode 5, that is, the outer box plate body 6-11. The aluminum push electrode through hole 6-12 matches the first push electrode segment 7-1. The connection position between the aluminum push electrode 7 and the secondary box body is sealed by the third insulating high temperature resistant seal 8. More specifically, the first push electrode segment 7-1 and the second push electrode segment 7-2 are both cylindrical, such as Fig.14As shown, the third insulating high-temperature resistant seal 8 can be an annular sealing gasket with a symmetrical or asymmetrical U-shaped cross-section to prevent the third insulating high-temperature resistant seal 8 from being brought out when the aluminum push electrode 7 enters and exits the aluminum push electrode through hole 6-12. The third insulating high-temperature resistant seal 8 completely covers the connection surface between the aluminum push electrode 7 and the secondary box when the aluminum push electrode 7 is assembled and connected with the embedded copper electrode plate 5-10 and energized.

[0040] The first-stage box body is provided with a first-stage box body air inlet 9-2 and a first-stage box body air outlet 9-1 at the bottom and the top, respectively; the second-stage box body is provided with a second-stage box body air inlet 10-2 and a second-stage box body air outlet 10-1 at the bottom and the top, respectively; the first-stage box body is sealed with the concrete shell 4 and the furnace head electrode 5; the second-stage box body is sealed with the furnace head electrode 5 and the aluminum push electrode 7; during production, inert gas is introduced into the first-stage box body and the second-stage box body, and the inert gas is used to keep the furnace head electrode 5 warm and cool; specifically, the inert gas can be nitrogen.

[0041] The method of using the two-stage cooling type furnace head electrode of the graphitization furnace is as follows: when starting production, the aluminum top push electrode 7 moves toward the furnace head electrode 5 until the aluminum top push electrode 7 is connected to the embedded copper electrode plate 5-10, and enters the power-on production state. Inert gas is introduced into the first-level box, and the first-level box is sealed after being filled with inert gas. The inert gas in the first-level box keeps the furnace head electrode 5 in the first-level box warm during the production process to prevent the cooling process from taking away the heat of the furnace core 1 material and affecting the product quality. Inert gas is introduced into the second-level box, and the inert gas in the second-level box is in a flowing state during the production process to cool the furnace head electrode 5 and the aluminum top push electrode 7 in the second-level box to prevent the furnace head electrode 5 from overheating at the energized part in contact with the aluminum top push electrode 7. After the production is completed, the inert gas is stopped from being introduced into the secondary box, the aluminum push electrode 7 is separated from the furnace head electrode 5 and the power is cut off, and the flowing inert gas for cooling the furnace head electrode 5 is introduced into the primary box until the surface temperature of the furnace head electrode 5 inside the primary box drops to a preset temperature, such as 100°C. The inert gas is stopped from being introduced into the primary box, which can not only avoid high-temperature oxidation of the furnace head electrode 5, but also take away the heat of the furnace core 1 as soon as possible to accelerate cooling.

[0042] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are illustrative and are not to be construed as limitations on the present invention. Alterations, modifications, substitutions and variations of the above embodiments by a person skilled in the art are all within the scope of the present invention.

Claims

1. A two-stage cooling type furnace head electrode for a graphitization furnace, comprising a furnace head electrode (5), one end of the furnace head electrode (5) is connected to a furnace core (1), and the other end is an extended end extending out of a concrete shell (4), characterized in that: The end of the furnace head electrode (5) away from the furnace core (1) is provided with a groove body recessed toward the furnace core (1), and the groove body is provided with an embedded copper electrode plate (5-10), and also includes an aluminum push electrode (7), and the end of the aluminum push electrode (7) close to the furnace head electrode (5) matches the embedded copper electrode plate (5-10) of the furnace head electrode (5), and also includes a two-stage cooling box (6), the two-stage cooling box (6) includes a primary box body and a secondary box body that are connected to each other and separated by an internal box plate (6-2), the side of the primary box body away from the secondary box body is connected to the concrete shell (4), the primary box body covers the part of the furnace head electrode (5) protruding end close to the furnace core, and the secondary box body covers the part of the furnace head electrode (5) protruding end close to the aluminum push electrode (7) and the part of the aluminum push electrode (7) close to the furnace head electrode (5), so that the aluminum push electrode (7) is connected to the embedded copper electrode plate (5-10). The connecting part is in a secondary box, the bottom and top of the primary box are respectively provided with a primary box air inlet (9-2) and a primary box air outlet (9-1), the bottom and top of the secondary box are respectively provided with a secondary box air inlet (10-2) and a secondary box air outlet (10-1), the primary box is sealedly connected to the concrete shell (4) and the furnace head electrode (5), and the secondary box is sealedly connected to the furnace head electrode (5) and the aluminum top push electrode (7). During production, inert gas is introduced into the primary box and the secondary box, and the inert gas is used to keep the furnace head electrode (5) warm and cool. The primary box is introduced into the inert gas, and the primary box is sealed after being filled with the inert gas. The inert gas in the primary box keeps the furnace head electrode (5) in the primary box warm during the production process. The inert gas in the secondary box is introduced into the secondary box, and the inert gas in the secondary box is in a flowing state during the production process, so as to cool the furnace head electrode (5) and the aluminum top push electrode (7) in the secondary box.

2. The two-stage cooling type furnace head electrode of a graphitization furnace according to claim 1, characterized in that: The two-stage cooling box (6) comprises an external box body (6-1) with an opening facing the concrete shell (4); the interior of the external box body (6-1) is divided into a primary box body and a secondary box body by an internal box plate (6-2); the two-stage cooling box (6) is fixedly and hermetically connected to the concrete shell (4).

3. The two-stage cooling type furnace head electrode of a graphitization furnace according to claim 1, characterized in that: The concrete shell (4) is provided with a concrete shell reserved groove (12-1), the concrete shell reserved groove (12-1) is located at the connection between the concrete shell (4) and the primary box body, one end of the two-stage cooling box (6) close to the concrete shell (4) is assembled in the concrete shell reserved groove (12-1), and a first insulating and high-temperature resistant sealing component (12-2) is provided in the concrete shell reserved groove (12-1), and the first insulating and high-temperature resistant sealing component (12-2) is used to seal the connection between the primary box body and the concrete shell reserved groove (12-1).

4. The two-stage cooling type furnace head electrode of a graphitization furnace according to claim 3, characterized in that: A fixed box plate (6-3) is provided on one side of the two-stage cooling box (6) close to the concrete shell (4); after the two-stage cooling box (6) is assembled in the reserved groove (12-1) of the concrete shell, the fixed box plate (6-3) of the two-stage cooling box (6) is fixed to the concrete shell (4) by box body fixing bolts (11).

5. The two-stage cooling type furnace head electrode of a graphitization furnace according to claim 1, characterized in that: The end of the furnace head electrode (5) close to the aluminum push electrode (7) is an electrode diameter reducing section (5-9) with a stepped diameter reduction, and the internal box plate (6-2) is provided with a furnace head electrode diameter reducing section through hole (6-21) matching the size of the electrode diameter reducing section (5-9), and the length of the electrode diameter reducing section (5-9) is greater than the depth of the embedded copper electrode plate (5-10), so that the electrode diameter reducing section (5-9) passes through the furnace head electrode diameter reducing section through hole (6-21). After installation, the embedded copper electrode plate (5-10) is located as a whole in the secondary box body, and the connection position between the furnace head electrode (5) and the internal box plate (6-2) is sealed by a second insulating high temperature resistant seal (13).

6. The two-stage cooling type furnace head electrode of a graphitization furnace according to claim 1, characterized in that: The aluminum push electrode (7) comprises a first push electrode segment (7-1) and a second push electrode segment (7-2) which are fixedly connected to each other or integrally formed, the first push electrode segment (7-1) matches the embedded copper electrode plate (5-10), after the first push electrode segment (7-1) is connected to the embedded copper electrode plate (5-10), the first push electrode segment (7-1) and the embedded copper electrode plate (5-10) are completely placed in the secondary box, the area of ​​the second push electrode segment (7-2) along the vertical cross-section is larger than the area of ​​the first push electrode segment (7-1) along the vertical cross-section, an aluminum push electrode through hole (6-12) is provided on a side wall of the secondary box away from the furnace head electrode (5), the aluminum push electrode through hole (6-12) matches the first push electrode segment (7-1), and the connection position between the aluminum push electrode (7) and the secondary box is sealed by a third insulating high-temperature resistant seal (8).

7. The method for using the two-stage cooling type furnace head electrode of the graphitization furnace according to any one of claims 1 to 6, characterized in that: When starting production, the aluminum push electrode (7) moves toward the furnace head electrode (5) until the aluminum push electrode (7) is connected to the embedded copper electrode plate (5-10), and enters the power-on production state. Inert gas is introduced into the first-level box, and the first-level box is sealed after being filled with inert gas. The inert gas in the first-level box keeps the furnace head electrode (5) in the first-level box warm during the production process. Inert gas is introduced into the second-level box, and the inert gas in the second-level box is in a flowing state during the production process, cooling the furnace head electrode (5) and the aluminum push electrode (7) in the second-level box. After the production is completed, the introduction of inert gas into the second-level box is stopped, the aluminum push electrode (7) is separated from the furnace head electrode (5), and the power is cut off. The flowing inert gas for cooling the furnace head electrode (5) is introduced into the first-level box until the surface temperature of the furnace head electrode (5) in the first-level box drops to a preset temperature, and the introduction of inert gas into the first-level box is stopped.

Citation Information

Patent Citations

  • Special carbon material internal heat serial graphitizing production apparatus

    CN104743546A

  • Graphitization furnace end cooling device

    CN212720902U