A method for detecting and protecting load imbalance of frequency conversion equipment for mining
By building an adaptive load imbalance monitoring model and an equipment control suggestion knowledge base, the load imbalance of mining frequency conversion equipment is detected and protected in real time, solving the overload operation problem caused by equipment load deviation, extending the service life of the equipment and reducing the failure rate. .
Patent Information
- Application Number
- CN202410852692.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-06-28
AI Technical Summary
The existing technology is difficult to real-time monitor and intelligently control the load imbalance problem of mining frequency conversion equipment, which leads to mechanical failure or load deviation caused by working conditions, resulting in overload operation and equipment damage.
By obtaining device characteristic data and operating data, the device characteristic per unit value and operating per unit value are calculated, an adaptive load imbalance monitoring model is constructed, load imbalance is detected in real time, and control commands are issued for protection through the device control suggestion knowledge base.
Real-time monitoring and intelligent control of coal mine equipment load imbalance are achieved, extending the service life of equipment and reducing failure rates.
Smart Images

Figure CN118427623B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of load imbalance detection, and in particular to a load imbalance detection and protection method for mining frequency conversion equipment. Background Art
[0002] Nowadays, with the improvement of coal mine production capacity, scraper conveyors and belt conveyors are mostly driven by multiple drives. During operation, due to mechanical failure or working conditions, the load is often seriously shifted to a certain device, resulting in load imbalance, overload operation or even damage. At present, there is a large hysteresis in manual observation or fault identification through subsequent sensors, and real-time monitoring and intelligent control are required to extend the service life of the equipment and reduce the equipment failure rate. Summary of the invention
[0003] In view of the above-mentioned deficiencies in the prior art, the present invention provides a method for detecting and protecting load imbalance of mining frequency conversion equipment.
[0004] In order to achieve the above-mentioned object of the invention, the technical solution adopted by the present invention is:
[0005] In a first aspect, the present invention proposes a method for detecting load imbalance of a mining frequency conversion device, comprising the following steps:
[0006] Acquire a first data set and a second data set of a mining frequency conversion device in different scenarios; the first data set includes device feature data, and the second data set includes device operation data;
[0007] Calculate the device characteristic per unit value and the device operation per unit value respectively according to the first data set and the second data set;
[0008] A load imbalance monitoring adaptive model is constructed, and a per-unit value matrix is generated by using the device characteristic per-unit value and the device operation per-unit value to train the load imbalance monitoring adaptive model;
[0009] The trained load imbalance monitoring adaptive model is used to perform load imbalance detection on the first data set and the second data set collected in real time by the device to be detected.
[0010] Preferably, obtaining the first data set and the second data set of the mining frequency conversion equipment in different scenarios includes:
[0011] Acquire a first data set and a second data set of a mining frequency conversion device in an overspeed scenario after load imbalance;
[0012] Acquire a first data set and a second data set of a mining frequency conversion device in an overload scenario after load imbalance;
[0013] A first data set and a second data set of a mining frequency conversion device under a load imbalance scenario are obtained.
[0014] Preferably, the device characteristic data includes:
[0015] The power device model X used by the equipment, the number of equipment running simultaneously N, the rated speed Mrpm and rated current MC of the equipment drive motor, the rated power BP, rated current BC and current error threshold PC of the equipment itself.
[0016] Preferably, the equipment operation data includes:
[0017] The operating current C, operating speed rpm and operating torque T of the equipment drive motor when it is running.
[0018] Preferably, calculating the per-unit value of the device characteristic according to the first data set comprises the following steps:
[0019] According to the power device model X used by the device, query the power device safe working current XC from the data written by the host device;
[0020] According to the safe working current XC of the power device and the operating current C of the equipment driving the motor, the first current per unit value is calculated and expressed as:
[0021] ,
[0022] According to the rated current MC of the equipment drive motor and the operating current C of the equipment drive motor when it is running, the second current per unit value is calculated and expressed as:
[0023] ,
[0024] According to the rated current BC of the equipment and the operating current C of the equipment driving the motor, the third current per unit value is calculated and expressed as:
[0025] ,
[0026] Preferably, calculating the per-unit value of the equipment operation according to the second data set comprises the following steps:
[0027] According to the number of devices N running at the same time, the running current C when the device drives the motor, and the current error threshold PC, the running current error per unit value is calculated, which is expressed as:
[0028] ,
[0029] in, For the i The running current of a device driving a motor when it is running;
[0030] According to the rated speed Mrpm of the equipment drive motor and the running speed rpm of the equipment drive motor during operation, the running speed per unit value is calculated and expressed as:
[0031] .
[0032] Preferably, the load imbalance monitoring adaptive model includes:
[0033] Input layer, intermediate layer and output layer.
[0034] Preferably, the per-unit value matrix is generated by using the device characteristic per-unit value and the device operation per-unit value and is expressed as:
[0035] ,
[0036] in, is the first current per unit value, is the second current per unit value, is the third current per unit value, is the per-unit value of the operating current error, It is the per unit value of the running speed.
[0037] In a second aspect, the present invention proposes a method for protecting a load imbalance of a mining frequency conversion device using the above-mentioned method for detecting a load imbalance of a mining frequency conversion device, comprising the following steps:
[0038] Build a knowledge base of equipment control recommendations;
[0039] The load imbalance detection result output by the load imbalance monitoring adaptive model is input into the equipment control suggestion knowledge base to obtain the equipment control suggestion, and then the control command is issued to the mining frequency conversion equipment.
[0040] The present invention has the following beneficial effects:
[0041] The present invention can monitor in real time and make intelligent control when multiple devices in a coal mine are operating simultaneously and the load is seriously shifted to a certain device due to mechanical failure or working conditions, resulting in load imbalance, overload operation or even damage, thereby extending the service life of the equipment and reducing the equipment failure rate. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 The present invention is a flow chart of a method for detecting load imbalance of frequency conversion equipment for mining. DETAILED DESCRIPTION
[0043] The specific implementation modes of the present invention are described below to facilitate those skilled in the art to understand the present invention. However, it should be clear that the present invention is not limited to the scope of the specific implementation modes. For those of ordinary skill in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations utilizing the concept of the present invention are protected.
[0044] Embodiment 1:
[0045] like Figure 1 As shown, the embodiment of the present invention provides a method for detecting load imbalance of a mining frequency conversion device, comprising the following steps S1 to S4:
[0046] S1. Acquire a first data set and a second data set of mining frequency conversion equipment in different scenarios; the first data set includes equipment feature data, and the second data set includes equipment operation data;
[0047] In an optional embodiment of the present invention, the first data set and the second data set of the mining frequency conversion equipment in different scenarios are obtained in this embodiment, including:
[0048] Acquire a first data set and a second data set of a mining frequency conversion device in an overspeed scenario after load imbalance;
[0049] Acquire a first data set and a second data set of a mining frequency conversion device in an overload scenario after load imbalance;
[0050] A first data set and a second data set of a mining frequency conversion device under a load imbalance scenario are obtained.
[0051] The device characteristic data in the first data set acquired in this embodiment includes:
[0052] The power device model X used by the equipment, the number of equipment running simultaneously N, the rated speed Mrpm and rated current MC of the equipment drive motor, the rated power BP, rated current BC and current error threshold PC of the equipment itself.
[0053] The equipment operation data in the second data set acquired in this embodiment includes:
[0054] The operating current C, operating speed rpm and operating torque T of the equipment drive motor when it is running.
[0055] In this embodiment, based on the data input module, the power device code X used by the device, the number of devices running simultaneously N, the rated speed Mrpm and the rated current MC of the device drive motor, the rated power BP and the rated current BC of the device itself, and the current error threshold PC are obtained to construct a first data set. The data input module includes but is not limited to matrix keyboard input and host computer device writing.
[0056] This embodiment is based on a data acquisition module to collect real-time operating current C, real-time operating speed rpm, and real-time operating torque T when multiple devices drive motors to construct a second data set. The data acquisition module includes but is not limited to current sensors, voltage sensors, speed sensors, and parameter reading devices.
[0057] This embodiment collects data sets in the above multiple scenarios, and each scenario needs to collect multiple sets. This embodiment collects the first data set and the second data set of the device in different scenarios, and outputs sample data sets in multiple scenarios, and each sample corresponds to multiple sets of data sets.
[0058] S2. Calculate the device characteristic per unit value and the device operation per unit value respectively according to the first data set and the second data set;
[0059] In an optional embodiment of the present invention, the embodiment calculates the per-unit value of the device characteristic according to the first data set, including the following steps:
[0060] According to the power device model X used by the device, query the power device safe working current XC from the data written by the host device;
[0061] According to the safe working current XC of the power device and the operating current C of the equipment driving the motor, the first current per unit value is calculated and expressed as:
[0062] ,
[0063] According to the rated current MC of the equipment drive motor and the operating current C of the equipment drive motor when it is running, the second current per unit value is calculated and expressed as:
[0064] ,
[0065] According to the rated current BC of the equipment and the operating current C of the equipment driving the motor, the third current per unit value is calculated and expressed as:
[0066] .
[0067] In order to solve the problem that the prior art only compares the motor operating current with the rated current of the motor to protect the motor but fails to ensure the safe and stable operation of the frequency conversion equipment, this embodiment adds a comparison of the safe operating current of the power device and the rated current of the equipment, and uses the current size of the equipment driving the motor during operation as an important indicator to characterize the health status of the equipment and the motor. This can prevent the motor operating current from exceeding the driving capacity of the equipment and causing damage to the equipment.
[0068] In this embodiment, calculating the per-unit value of the device operation according to the second data set includes the following steps:
[0069] According to the number of devices N running at the same time, the running current C when the device drives the motor, and the current error threshold PC, the running current error per unit value is calculated, which is expressed as:
[0070] ,
[0071] in, For the i The running current of a device driving a motor when it is running;
[0072] According to the rated speed Mrpm of the equipment drive motor and the running speed rpm of the equipment drive motor during operation, the running speed per unit value is calculated and expressed as:
[0073] .
[0074] When multiple devices are running in the same system, the current balance must be maintained to avoid the load shifting to a certain device or some devices operating in an abnormal state. The existing technology only tries its best to maintain the current balance, and the detection and protection of imbalance need to be achieved by a third party. This embodiment adds operating current deviation detection, speed out of control detection and monitoring of time constants to achieve protection against current imbalance.
[0075] S3, constructing a load imbalance monitoring adaptive model, and generating a per-unit value matrix using the device feature per-unit value and the device operation per-unit value to train the load imbalance monitoring adaptive model;
[0076] In an optional embodiment of the present invention, the load imbalance monitoring adaptive model constructed in this embodiment includes: an input layer, an intermediate layer and an output layer.
[0077] In this embodiment, the per-unit value matrix is generated by using the device characteristic per-unit value and the device operation per-unit value as shown in the following expression:
[0078] ,
[0079] in, is the first current per unit value, is the second current per unit value, is the third current per unit value, is the per-unit value of the operating current error, It is the per unit value of the running speed.
[0080] In this embodiment, the load imbalance monitoring adaptive model includes 1 input layer containing 5 elements, and the element values are the data in the per-unit value matrix PU; it includes 3 intermediate layers, each intermediate layer includes 5 elements, and the values of the first layer elements are calculated by the input layer elements and their weights; the values of the second layer elements are calculated by the first layer elements and their weights, and the values of the third layer factors are calculated by the second layer elements and their weights; it includes 1 output layer, and the output value is calculated by the third layer intermediate layer elements and their weights.
[0081] In this embodiment, the generated per-unit value matrix is input into the load imbalance monitoring adaptive model, and the output result is calibrated, that is, multiple sets of data collected in multiple scenarios are input into the adaptive network model, and then the output results to be output are calibrated according to the on-site working conditions and equipment performance.
[0082] This embodiment is based on the error feedback method. After multiple trainings, the parameters in the model are automatically adjusted, and the expected model is finally obtained, and the parameters of the trained model are saved; that is, the model is initialized first, and the weights between the elements of the input layer, the middle layer, and the output layer are initialized. During the first training, each weight is assigned a random value between [-1, 1], and the threshold of the middle layer is initialized, and the neuron excitation function Sigmoid is given; then the hidden layer output is calculated, and the hidden layer output is calculated according to the input layer value, the weight between the input layer and the hidden layer, and the excitation function; then the output layer is calculated, and the predicted output of the adaptive model is calculated according to the hidden layer output and the weight between the hidden layer and the output layer; then the error calculation is performed, and the predicted output of the model and the expected output are calculated. Network prediction error; then update the weights, update the network connection weights according to the network prediction error, specifically calculate the square of the error, and modify the weight values layer by layer from the output layer to the middle layer according to the principle of minimizing the square of the error; finally, after modifying the weight values, calculate the network prediction output again, and calculate the network prediction difference again. If the square of the network difference meets the expected requirements, the training ends; if the square of the network prediction difference does not meet the expected requirements, modify the weights again, and then calculate the network prediction output again. The cycle continues until the square of the prediction difference meets the expected requirements and the training ends, or the training number reaches the set upper limit and the training ends. The trained model parameters are saved. Specifically, after the training ends, the weights between the input layer, the middle layer, and the output layer are saved to the data storage area.
[0083] S4. Use the trained load imbalance monitoring adaptive model to perform load imbalance detection on the first data set and the second data set collected in real time by the detection device.
[0084] In an optional embodiment of the present invention, this embodiment collects the first data set and the second data set of the device to be detected in real time through the method of step S1; then the collected data is normalized through the method of step S2 to generate a real-time per-unit value matrix; finally, the real-time per-unit value matrix is input into the trained load imbalance monitoring adaptive model, and the real-time output result is calculated, and the output result is the per-unit value, which represents the severity of the current device load imbalance.
[0085] Embodiment 2:
[0086] The embodiment of the present invention provides a method for protecting a load imbalance of a frequency conversion device for a mine using the method for detecting a load imbalance of a frequency conversion device for a mine described in Embodiment 1, comprising the following steps:
[0087] Build a knowledge base of equipment control recommendations;
[0088] The load imbalance detection result output by the load imbalance monitoring adaptive model is input into the equipment control suggestion knowledge base to obtain the equipment control suggestion, and then the control command is issued to the mining frequency conversion equipment.
[0089] In this embodiment, the equipment control suggestion knowledge base is constructed through expert opinions, historical data analysis, historical fault analysis and customer mandatory demand setting, taking into account various working conditions, safety standards and equipment service life, and the output results of the load adaptation model correspond to the following:
[0090] ,
[0091] Sending control commands to the mining frequency conversion equipment specifically means sending commands to the mining equipment through a data sending module. The data sending module includes but is not limited to bus control devices based on CAN bus, MODBUS RTU / TCP, etc., and hard-wired devices based on I / O control.
[0092] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0093] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0094] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0095] The present invention uses specific embodiments to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.
[0096] Those skilled in the art will appreciate that the embodiments described herein are intended to help readers understand the principles of the present invention, and should be understood that the protection scope of the present invention is not limited to such specific statements and embodiments. Those skilled in the art can make various other specific variations and combinations that do not deviate from the essence of the present invention based on the technical revelations disclosed by the present invention, and these variations and combinations are still within the protection scope of the present invention.
Claims
1. A method for detecting load imbalance of frequency conversion equipment for mining, characterized in that: The following steps are involved: Acquire a first data set and a second data set of a mining frequency conversion device in different scenarios; the first data set includes device feature data, and the second data set includes device operation data; Calculate the device characteristic per unit value and the device operation per unit value respectively according to the first data set and the second data set; Calculating the per-unit value of the device characteristic according to the first data set comprises the following steps: According to the power device model X used by the device, query the power device safe working current XC from the data written by the host device; According to the safe working current XC of the power device and the operating current C of the equipment driving the motor, the first current per unit value is calculated and expressed as: , According to the rated current MC of the equipment drive motor and the operating current C of the equipment drive motor when it is running, the second current per unit value is calculated and expressed as: , According to the rated current BC of the equipment and the operating current C of the equipment driving the motor, the third current per unit value is calculated and expressed as: , Calculating the per-unit value of the equipment operation according to the second data set comprises the following steps: According to the number of devices N running at the same time, the running current C when the device drives the motor, and the current error threshold PC, the running current error per unit value is calculated, which is expressed as: , in, For the i The running current of a device driving a motor when it is running; According to the rated speed Mrpm of the equipment drive motor and the running speed rpm of the equipment drive motor during operation, the running speed per unit value is calculated and expressed as: , Construct a load imbalance monitoring adaptive model, and use the per-unit value of the equipment characteristic and the per-unit value of the equipment to generate a per-unit value matrix to train the load imbalance monitoring adaptive model; the per-unit value matrix generated by the equipment characteristic and the per-unit value of the equipment operation is expressed as: , in, is the first current per unit value, is the second current per unit value, is the third current per unit value, is the per-unit value of the operating current error, is the per unit value of the running speed; The trained load imbalance monitoring adaptive model is used to perform load imbalance detection on the first data set and the second data set collected in real time by the device to be detected.
2. A method for detecting load imbalance of frequency conversion equipment for mining according to claim 1, characterized in that: Acquiring the first data set and the second data set of the mining frequency conversion equipment in different scenarios includes: Acquire a first data set and a second data set of a mining frequency conversion device in an overspeed scenario after load imbalance; Acquire a first data set and a second data set of a mining frequency conversion device in an overload scenario after load imbalance; A first data set and a second data set of a mining frequency conversion device under a load imbalance scenario are obtained.
3. A method for detecting load imbalance of frequency conversion equipment for mining according to claim 1, characterized in that: Device characteristic data includes: The power device model X used by the equipment, the number of equipment running simultaneously N, the rated speed Mrpm and rated current MC of the equipment drive motor, the rated power BP, rated current BC and current error threshold PC of the equipment itself.
4. A method for detecting load imbalance of frequency conversion equipment for mining according to claim 1, characterized in that: Equipment operation data includes: The operating current C, operating speed rpm and operating torque T of the equipment drive motor when it is running.
5. A method for detecting load imbalance of frequency conversion equipment for mining according to claim 1, characterized in that: The load imbalance monitoring adaptive model includes: Input layer, intermediate layer and output layer.
6. A method for protecting a mine frequency conversion equipment load imbalance using the mine frequency conversion equipment load imbalance detection method according to any one of claims 1 to 5, characterized in that: The following steps are involved: Build a knowledge base of equipment control recommendations; The load imbalance detection result output by the load imbalance monitoring adaptive model is input into the equipment control suggestion knowledge base to obtain the equipment control suggestion, and then the control command is issued to the mining frequency conversion equipment.