A fully automatic blow molding equipment and process for multi-layer film for tarpaulin
By designing multi-layer film fully automatic blow molding equipment and using technologies such as temperature sensors and spray barrels, we have solved the problems of existing equipment being unable to achieve multi-layer blow molding and temperature instability, achieving efficient and stable production of films to meet the needs of tarpaulins. usage requirements.
Patent Information
- Application Number
- CN202410730410.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-06-06
AI Technical Summary
Existing film blow molding equipment for tarpaulins cannot achieve multi-layer blow molding, and the plasticizing temperature is unstable, making it difficult to achieve consistent film quality and unable to meet the use needs of tarpaulins.
A fully automatic blow molding equipment for multi-layer films is designed, which uses components such as extrusion cylinders, coils, contact rings, and temperature sensors to monitor and adjust the temperature of the film raw materials, and forms a circular tubular film through a spray cylinder and an air ring. Pressure chambers and adhesives enable multi-layer lamination.
It realizes multi-layer blow molding without manual bonding, the film temperature is more stable, saves time and effort, and ensures uniform film quality.
Smart Images

Figure CN118456906B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of film blowing, in particular to a fully automatic multi-layer film blowing device and process for tarpaulins. Background Art
[0002] When making tarpaulins, thin films need to be woven, and the films are mainly blown by blow molding equipment. The existing method mainly uses a circular tubular film to be blown, and then another film is manually bonded with an adhesive to form a multi-layer film. This processing method is time-consuming and labor-intensive, and the quality is difficult to uniform. When the film raw materials are plasticized, the temperature is unstable, resulting in the film not meeting the use requirements. Therefore, the existing film blowing equipment for tarpaulins has the following main problems: (1) After blowing, it is folded in half, which is only double-layer blow molding, which cannot meet the use requirements of tarpaulins; (2) The plasticizing temperature is not detected, and the area with low plasticizing temperature cannot be supplemented with heating. Summary of the Invention
[0003] The object of the present invention is to provide a fully automatic blow molding device and process for multi-layer films for tarpaulins, so as to solve the problems raised in the above background technology.
[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: a fully automatic blow-molding device for multi-layer films for tarpaulins, comprising a frame, an extrusion cylinder is installed on the frame, a coil is sleeved on the outer side of the extrusion cylinder, a contact ring A and a contact ring B are in sliding contact on the outer side of the coil, multiple groups of extrusion sheets are installed inside the extrusion cylinder, a temperature sensor is installed between two adjacent groups of extrusion sheets, a filter box is installed on one side of the extrusion cylinder, a filter membrane and a cam are installed in the filter box, a pressure plate is installed on one side of the cam, a mold body is installed above the filter box, an injection cylinder is installed in the mold body, an isolation cylinder A is installed on the outer side of the injection cylinder, an isolation cylinder B is installed on the outer side of the isolation cylinder A, a first injection molding port is formed between the injection cylinder and the isolation cylinder A, a second injection molding port is formed between the isolation cylinder A and the isolation cylinder B, and an air ring is installed above the mold body;
[0005] The extrusion sheet plasticizes the film raw material and extrude it into the filter box. The temperature sensor monitors the temperature of the raw material in the extrusion cylinder. The coil, contact ring A and contact ring B adjust the temperature of the raw material according to the data of the temperature sensor. The filter membrane filters the raw material. The cam and the pressure plate cooperate to achieve air pressurization. The first and second spray nozzles form the raw material into a circular tube shape. The spray cylinder blows the circular tube-shaped raw material, and the air ring cools the film.
[0006] The extrusion cylinder comprises an inner sleeve and an outer sleeve, both of which are made of insulating material. The inner sleeve is arranged inside the outer sleeve, and both of which are mounted on a frame. The coil is sleeved on the inner sleeve, and a plurality of poles are arranged on the outside of the coil. The contact ring A and the contact ring B are slidably mounted on the outer sleeve, and both of the contact ring A and the contact ring B are in sliding contact with the poles.
[0007] A spring A is connected between the contact ring A and the outer sleeve, and a spring B is connected between the contact ring B and the outer sleeve. The spring A, spring B, contact ring A, contact ring B and the coil are all electrically connected to the control system. Multiple groups of temperature sensors are all electrically connected to the control system. Multiple groups of extrusion sheets are connected in a spiral shape. A transmission shaft is installed in the middle of multiple groups of extrusion sheets. One side of the transmission shaft passes through the extrusion cylinder and is connected to the drive mechanism, and the other side of the transmission shaft passes through the extrusion cylinder and is connected to the inside of the filter box. The drive mechanism is installed on the frame.
[0008] Conductors are provided in multiple groups of the extruded sheets, and the multiple groups of the conductors are electrically connected to the control system. A first heating wire is provided on the blades of the extruded sheets, and the first heating wire is electrically connected to the control system. Insulation material is provided on the opposite side of the inner sleeve and the outer sleeve. Two semiconductor materials of different materials are provided on the inner side of the inner sleeve and the outer side of the outer sleeve. One end of the two semiconductor materials of different materials is connected to the metal plate. The two semiconductors on the inner sleeve and the two semiconductors on the outer sleeve are connected by wires, and one of the wires is electrically connected to the control system.
[0009] The semiconductors of two different materials and the metal plate on the inner sleeve are the hot ends of the Seebeck effect, and the semiconductors of two different materials and the metal plate on the outer sleeve are the cold ends of the Seebeck effect.
[0010] The cam is mounted on the transmission shaft and is located on one side of the filter membrane. The pressure plate is slidably mounted on the filter box. The pressure plate and the filter box are connected by a spring, and a pressure chamber is formed between the pressure plate and the filter box.
[0011] The injection cylinder is installed on the filter box. The interior of the injection cylinder is hollow. A first chamber and a second chamber are provided in the injection cylinder. The first chamber is located above the second chamber. Adhesive is provided in the first chamber. A plurality of first injection ports are provided on the injection cylinder near the first chamber, and a plurality of second injection ports are provided on the injection cylinder near the second chamber. Control valves A are installed in the plurality of first injection ports and second injection ports. The pressurized chamber is connected to the first chamber, the second chamber and the external air through pipes respectively. Control valves B are installed on the pipes connected to the pressurized chamber. The control valves A and B are electrically connected to the control system.
[0012] It includes a feeding mechanism, the filter box is connected to the first injection molding port, the filter membrane is installed on the side close to the first injection molding port, the outlet of the feeding mechanism is connected to the second injection molding port through a pipeline passing through the mold body, the feeding mechanism is installed on the frame, and sensors are installed in the first injection molding port and the second injection molding port, and the sensors are electrically connected to the control system.
[0013] The feeding mechanism plasticizes the first type of film raw material, the extrusion sheet plasticizes the second type of film raw material, the driving mechanism drives the transmission shaft to rotate, the transmission shaft drives the extrusion sheet and the cam to rotate, the control system connects the first heating wire to the circuit, the first heating wire heats the second type of film raw material to plasticize the second type of film raw material, and the extrusion sheet drives the plasticized second type of film raw material to be transported forward.
[0014] The plasticizing effect of the first film raw material is detected by the sensor in the feeding mechanism, and the data is fed back to the control system. The plasticizing effect of the second film raw material is detected by the temperature sensor, and the data is fed back to the control system. Since multiple groups of temperature sensors are provided, the temperature of the second film raw material can be monitored in real time.
[0015] When the temperature sensor detects that the plasticizing temperature on the right side of the inner sleeve is low, springs A and B are not energized, and contact rings A and B are located in the middle of the inner sleeve. The control system energizes spring B, generating a mutually attractive magnetic field between each turn of spring B. This magnetic field compresses spring B, shortening both ends of spring B, and spring B pulls contact ring B to the right. At this time, the control system connects contact rings A, B, and the coil to the circuit. Current enters contact ring A, passes through the effective turns of the coil (effective turns refers to the number of turns of the coil between contact rings A and B), and then flows out of contact ring B. A magnetic field is generated at the position of the effective turns of the coil, and the extrusion plate drives the conductor to rotate synchronously. The conductor in the extrusion plate below the coil moves in the magnetic field of the coil, cutting the magnetic lines of flux, causing the conductor to heat up. The conductor heats the second film material on the right side of the inner sleeve and cooperates with the first heating wire to rapidly increase the temperature on the right side to reach the required plasticizing temperature. The plasticizing temperature adjustment method for the left and middle positions is similar to the above.
[0016] The moving distances of the contact rings A and B driven by springs A and B respectively are determined by the contraction degree of springs A and B, and the contraction degree of springs A and B is determined by the magnitude of the current passed through. Therefore, the control system adjusts the position of the contact rings A and B by adjusting the magnitude of the current entering the springs A and B, thereby adjusting the heating range of the second film raw material in the inner sleeve.
[0017] When both the first film raw material and the second film raw material meet the plasticizing requirements, the outlet of the feeding mechanism is opened, and the plasticized first film raw material is transported to the second spray molding port through the pipeline. Since the second spray molding port is located between the isolation cylinder A and the isolation cylinder B, the second spray molding port is in the shape of a circular tube. The plasticized first film raw material becomes a circular tube after entering the second spray molding port.
[0018] The transmission shaft drives the cam to rotate. When one side of the cam moves to the maximum push stroke, the cam pushes the pressure plate to move. The pressure plate compresses the spring and compresses the air in the pressure chamber, increasing the air pressure in the pressure chamber.
[0019] When the cam moves away from the push stroke, the spring is released, and the spring pushes the pressure plate to move in the opposite direction. The volume of the pressure chamber increases, and the control valve B in the pipe connecting the pressure chamber and the external air opens. The external air enters the pressure chamber through the pipe and the control valve B, so that the air can be pressurized next time. The pressure plate is driven to move back and forth by the cam to realize the air intake and gas pressurization of the pressure chamber.
[0020] When the sensor in the second injection molding port detects that the first film raw material is ready for blow molding, the control valve B on the connecting pipe between the second pressurized chamber and the second chamber is opened, and pressurized air is delivered to the second chamber through the pipe and the control valve B. The pressurized air enters the second chamber, and the control valve A on the second injection port is opened, and the pressurized air is ejected through the second injection port. The pressurized air blows the tubular first film and makes the first film adhere to the inner wall of the mold body.
[0021] After the tubular first film is attached to the mold body, control valve B in the pipe between the pressurized chamber and the first chamber is opened. Pressurized air is delivered to the first chamber through the pipe and control valve B. The pressure in the first chamber increases, and control valve A in the first injection port is opened. The pressurized air pushes the adhesive to spray onto the first film. After spraying, control valve A in the first injection port is closed.
[0022] After the first type of film raw material is blown, the control valve C between the inner sleeve and the filter box is opened, and the second type of film raw material enters the top of the first spray port after being filtered by the filter membrane. Since the first spray port is located between the injection cylinder and the isolation cylinder A, the first spray port is in the shape of a circular tube. The plasticized second film raw material enters the first spray port and becomes a circular tube. The driving mechanism is the existing technology.
[0023] When the sensor in the first injection molding port detects that the second film raw material can be blown, the second film raw material is blown by pressurized air in the same way as the first film raw material. The second film and the first film are attached to each other and tightly bonded by adhesive to form a tubular film, forming a multi-layer bonding.
[0024] The traction mechanism transports the blown tubular film upward and cools it through an air ring. The traction mechanism is existing technology. When the blown tubular film enters the air ring, the driving motor drives the first gear to rotate. Since the first gear and the tooth structure on the lower side of the fan blade are engaged, the first gear drives the fan blade to rotate. The fan blade blows the air outside the air ring to the tubular film to cool the tubular film. After that, the traction mechanism continues to transport the cooled tubular film and folds it in half to obtain the required multi-layer film, which can then be further processed.
[0025] It includes a traction mechanism, which is located above the spray cylinder. The traction mechanism pulls and folds the blown film. The traction mechanism is installed on the frame. The air ring is installed on the frame. Fan blades are rotatably installed in the air ring through bearings. A tooth structure is provided on the lower side of the fan blade. Semiconductors and metal plates made of two different materials are provided on the fan blade. The two semiconductors on the fan blade are electrically connected to the control system. A first gear is engaged with the outer side of the tooth structure. A drive motor is installed in the middle of the first gear. The drive motor is installed on the frame.
[0026] A hopper is installed on the outer sleeve, and the hopper is connected to the inner sleeve. A control panel is installed on the frame, and the inner sleeve is connected to the filter box. A control valve C is installed between the inner sleeve and the filter box, and the control valve C is electrically connected to the control system. A control system is set in the control panel, and a start button, an emergency stop button and a stop button are set on the control panel.
[0027] A fully automatic blow molding process for a multi-layer film for a tarpaulin is disclosed. The blow molding process uses a fully automatic blow molding device for a multi-layer film for a tarpaulin and includes the following process steps:
[0028] S1, respectively putting the first film raw material and the second film raw material into the feeding mechanism and the hopper;
[0029] S2, the feeding mechanism and the extrusion sheet plasticize and extrude the first film raw material and the second film raw material respectively;
[0030] S3, the jet cylinder blows up the tubular film;
[0031] S4. The air ring cools the film.
[0032] The step S2 further includes the following specific steps:
[0033] S201, the temperature sensor detects the temperature of the second film raw material and feeds the data back to the control system;
[0034] S202, the control system adjusts the heating range between contact ring A and contact ring B according to the temperature sensor data;
[0035] The step S3 further includes the following specific steps:
[0036] S301, the spray cylinder blows up the film tube in the second spray nozzle;
[0037] S302, spraying adhesive with a spray barrel;
[0038] S303, the injection cylinder blows up the film tube in the first injection port.
[0039] Compared with the prior art, the present invention has the following beneficial effects:
[0040] 1. Multi-layer blow molding eliminates the need for manual bonding, saving time and effort. After the first tubular film is attached to the mold, the control valve B in the pipe between the pressurized chamber and the first chamber opens, and pressurized air is delivered to the first chamber through the pipe and control valve B. The pressure in the first chamber increases, and the control valve A in the first injection port opens. The pressurized air pushes the adhesive to spray onto the first film. After spraying, the control valve A in the first injection port closes. When the sensor in the first injection port detects that the second film material is ready for blow molding, the second film material is blown in the same way as the first film material. The second film and the first film are attached and tightly bonded by the adhesive to form a tubular film. Finally, the film is folded in half by a traction mechanism to form a multi-layer bonding, eliminating the need for manual bonding and saving time and effort.
[0041] 2. Raw material temperature monitoring and local temperature regulation make the raw material temperature more stable. The control system connects contact ring A, contact ring B and coil to the circuit. The current enters from contact ring A, passes through the effective turns of the coil (effective turns refers to the number of turns of the coil between contact ring A and contact ring B), and then flows out from contact ring B. The position of the effective turns of the coil will generate a magnetic field, and the extrusion plate drives the conductor to rotate synchronously. The conductor in the extrusion plate below the coil cuts the magnetic flux lines in the magnetic field of the coil, and the conductor will heat up. The conductor heats the second film material on the right side of the inner sleeve and cooperates with the first heating wire to quickly increase the temperature on the right side to reach the required plasticizing temperature, making the temperature of the film material more stable.
[0042] 3. Heat is recovered and used for air ring cooling. Because there is a thermal insulation material between the inner sleeve and the outer sleeve, a temperature difference is generated between the hot end of the inner sleeve and the cold end of the outer sleeve. Due to the Seebeck effect, a current flows between the cold end and the hot end and is transmitted to the control system through a wire. After processing by the control system, the current is transmitted to the two semiconductors of different materials on the fan blades. The two semiconductors of different materials and the metal plate on the fan blades serve as the cooling end of the Boltier effect. The tubular film is cooled by the rotation of the fan blades and the cooling end. When the current generated by the Seebeck effect is low, the control system supplements the current flowing into the semiconductors and metal plates on the fan blades to ensure the cooling effect of the air ring. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0044] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0045] Figure 2 It is a schematic diagram of the three-dimensional structure of the present invention;
[0046] Figure 3 yes Figure 2 Schematic diagram of the structure on the left;
[0047] Figure 4 yes Figure 3 sectional view of
[0048] Figure 5 yes Figure 2 A cross-sectional view without the cam, pressure plate, etc.;
[0049] Figure 6 yes Figure 3 Schematic diagram of the three-dimensional structure without part of the outer shell and filter box;
[0050] Figure 7 yes Figure 6 A partial enlarged view of area A in the middle.
[0051] In the figure: 1. Control panel; 11. Frame; 12. Hopper; 13. Drive shaft; 14. Filter box; 141. Pressure plate; 142. Pressurized chamber; 143. Cam; 15. Mold body; 16. Air ring; 17. Filter membrane; 2. Extrusion sheet; 21. Extrusion cylinder; 22. Pole; 23. Coil; 24. Contact ring A; 241. Contact ring B; 3. Injection cylinder; 31. First injection port; 32. Second injection port; 33. Isolation cylinder A; 34. Isolation cylinder B; 35. Drive motor; 36. Fan blade. DETAILED DESCRIPTION
[0052] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0053] See also Figure 1-Figure 7 The present invention provides a technical solution: it includes a frame 11, an extrusion cylinder 21 is installed on the frame 11, a coil 23 is sleeved on the outside of the extrusion cylinder 21, and a contact ring A24 and a contact ring B241 are in sliding contact on the outside of the coil 23. Multiple groups of extrusion sheets 2 are installed inside the extrusion cylinder 21, and a temperature sensor is installed between two adjacent groups of extrusion sheets 2. A filter box 14 is installed on one side of the extrusion cylinder 21, a filter membrane 17 and a cam 143 are installed in the filter box 14, a pressure plate 141 is installed on one side of the cam 143, a mold body 15 is installed above the filter box 14, an injection cylinder 3 is installed in the mold body 15, and an isolation cylinder is installed on the outside of the injection cylinder 3. A33, an isolation cylinder B34 is installed on the outside of the isolation cylinder A33, a first injection molding port 31 is formed between the injection cylinder 3 and the isolation cylinder A33, and a second injection molding port 32 is formed between the isolation cylinder A33 and the isolation cylinder B34. An air ring 16 is installed above the mold body 15, a hopper 12 is installed on the outer sleeve, and the hopper 12 is connected to the inner sleeve. A control panel 1 is installed on the frame 11, and the inner sleeve is connected to the filter box 14. A control valve C is installed between the inner sleeve and the filter box 14, and the control valve C is electrically connected to the control system. A control system is provided in the control panel 1, and a start button, an emergency stop button and a stop button are provided on the control panel 1;
[0054] The extrusion sheet 2 plasticizes the film raw material and extrude it into the filter box 14. The temperature sensor monitors the temperature of the raw material in the extrusion cylinder 21. The coil 23, contact ring A24 and contact ring B241 adjust the temperature of the raw material according to the data of the temperature sensor. The filter membrane 17 filters the raw material. The cam 143 and the pressure plate 141 cooperate to realize air pressurization. The first injection molding port 31 and the second injection molding port 32 form the raw material into a circular tube. The injection cylinder 3 blows the circular tube-shaped raw material. The air ring 16 cools the film and includes a driving mechanism. The extrusion cylinder 21 consists of an inner sleeve and an outer sleeve. The inner sleeve and the outer sleeve are both made of insulating material. The inner sleeve is arranged inside the outer sleeve. The inner sleeve and the outer sleeve are both installed on the frame 11. The coil 23 is sleeved on the inner sleeve. A plurality of poles 22 are arranged on the outside of the coil 23. The contact ring A24 and the contact ring B241 is slidably installed on the outer sleeve, and the contact ring A24 and the contact ring B241 are both in sliding contact with the pole 22. Conductors are provided in multiple groups of extruded sheets 2, and multiple groups of conductors are electrically connected to the control system. A first heating wire is provided on the blades of the extruded sheet 2, and the first heating wire is electrically connected to the control system. Insulation material is provided on the opposite side of the inner sleeve and the outer sleeve. Two semiconductor materials of different materials are provided on the inner side of the inner sleeve and the outer side of the outer sleeve. One end of the two semiconductor materials of different materials is connected to the metal plate. The two semiconductors on the inner sleeve and the two semiconductors on the outer sleeve are connected by wires, and one of the wires is electrically connected to the control system; the two semiconductors of different materials on the inner sleeve and the metal plate are the hot ends of the Seebeck effect, and the two semiconductors of different materials and the metal plate on the outer sleeve are the cold ends of the Seebeck effect.
[0055] A spring A is connected between the contact ring A24 and the outer sleeve, and a spring B is connected between the contact ring B241 and the outer sleeve. The spring A, spring B, contact ring A24, contact ring B241 and coil 23 are all electrically connected to the control system. Multiple groups of temperature sensors are all electrically connected to the control system. Multiple groups of extrusion sheets 2 are connected in a spiral shape. A transmission shaft 13 is installed in the middle of the multiple groups of extrusion sheets 2. One side of the transmission shaft 13 passes through the extrusion cylinder 21 and is connected to the drive mechanism, and the other side of the transmission shaft 13 passes through the extrusion cylinder 21 and is connected to the inside of the filter box 14. The drive mechanism is installed on the frame 11.
[0056] The cam 143 is installed on the transmission shaft 13, and the cam 143 is located on one side of the filter membrane 17. The pressure plate 141 is slidably installed on the filter box 14. The pressure plate 141 and the filter box 14 are connected by a spring. A pressurized chamber 142 is formed between the pressure plate 141 and the filter box 14. The injection cylinder 3 is installed on the filter box 14. The interior of the injection cylinder 3 is hollow. A first chamber and a second chamber are provided in the injection cylinder 3. The first chamber is located above the second chamber. An adhesive is provided in the first chamber. A plurality of first injection ports are provided on the injection cylinder 3 near the first chamber, and a plurality of second injection ports are provided on the injection cylinder 3 near the second chamber. Control valves A are installed in the plurality of first injection ports and second injection ports. The pressure chamber 142 is connected to the first chamber, the second chamber and the external air respectively through pipes. Control valves B are installed on the pipes connected to the pressure chamber 142. Both control valves A and control valve B are electrically connected to the control system.
[0057] It includes a feeding mechanism, a filter box 14 is connected to the first injection molding port 31, a filter membrane 17 is installed on a side close to the first injection molding port 31, the outlet of the feeding mechanism is connected to the second injection molding port 32 through a pipeline through the mold body 15, the feeding mechanism is installed on the frame 11, and sensors are installed in the first injection molding port 31 and the second injection molding port 32, the sensors are electrically connected to the control system, including a traction mechanism, the traction mechanism is located above the injection cylinder 3, the traction mechanism pulls and folds the blown film, the traction mechanism is installed on the frame 11, the air ring 16 is installed on the frame 11, and a fan blade 36 is installed in the air ring 16 through a bearing for rotation, a tooth structure is provided on the lower side of the fan blade 36, two semiconductors and a metal plate of two different materials are provided on the fan blade 36, the two semiconductors on the fan blade 36 are electrically connected to the control system, a first gear is meshed on the outer side of the tooth structure, a drive motor 35 is installed in the middle of the first gear, and the drive motor 35 is installed on the frame 11.
[0058] A fully automatic blow molding process for a multi-layer film for a tarpaulin uses a fully automatic blow molding device for a multi-layer film for a tarpaulin and includes the following process steps:
[0059] S1, respectively putting the first film raw material and the second film raw material into the feeding mechanism and the hopper 12;
[0060] S2, the feeding mechanism and the extrusion sheet 2 plasticize and extrude the first film raw material and the second film raw material respectively;
[0061] S3, the spray cylinder 3 blows up the tubular film;
[0062] S4. The air ring 16 cools the film.
[0063] Step S2 also includes the following specific steps:
[0064] S201, the temperature sensor detects the temperature of the second film raw material and feeds the data back to the control system;
[0065] S202, the control system adjusts the heating range between the contact ring A24 and the contact ring B241 according to the temperature sensor data;
[0066] Step S3 also includes the following specific steps:
[0067] S301, the spray cylinder 3 blows up the film tube in the second spray port 32;
[0068] S302, spraying tube 3 sprays adhesive;
[0069] S303 , the injection cylinder 3 inflates the film tube in the first injection port 31 .
[0070] The working principle of the present invention is as follows: the start button on the control panel 1 is pressed, the device starts, the first film raw material is put into the feeding mechanism, and the second film raw material is put into the hopper 12. The feeding mechanism is the existing technology, and the feeding mechanism plasticizes and extrude the first film raw material;
[0071] The feeding mechanism plasticizes the first film raw material, the extrusion sheet 2 plasticizes the second film raw material, the driving mechanism drives the transmission shaft 13 to rotate, the transmission shaft 13 drives the extrusion sheet 2 and the cam 143 to rotate, the control system connects the first heating wire to the circuit, the first heating wire heats the second film raw material to plasticize the second film raw material, and the extrusion sheet 2 drives the plasticized second film raw material to be transported forward.
[0072] The plasticizing effect of the first film raw material is detected by the sensor in the feeding mechanism, and the data is fed back to the control system. The plasticizing effect of the second film raw material is detected by the temperature sensor, and the data is fed back to the control system. Since multiple groups of temperature sensors are provided, the temperature of the second film raw material can be monitored in real time.
[0073] When the plasticizing temperature on the right side of the inner sleeve is low, spring A and spring B are not energized, contact ring A24 and contact ring B241 are located in the middle of the inner sleeve, and the control system energizes spring B. A magnetic field of mutual attraction is generated between each turn of spring B. This magnetic field compresses spring B, shortening both ends of spring B. Spring B pulls contact ring B241 to move to the right. At this time, the control system connects contact ring A24, contact ring B241 and coil 23 to the circuit. Current enters from contact ring A24 and passes through the effective turns of coil 23. The effective turns are It refers to the number of turns of the coil 23 between the contact ring A24 and the contact ring B241, and then flows out from the contact ring B241. The position of the effective turns of the coil 23 will generate a magnetic field, and the extrusion sheet 2 drives the conductor to rotate synchronously. The conductor in the extrusion sheet 2 below the coil 23 moves in the magnetic field of the coil 23 to cut the magnetic flux lines, and the conductor will heat up. The conductor heats the second film raw material on the right side of the inner sleeve, and cooperates with the first heating wire to quickly increase the temperature on the right side to reach the required plasticizing temperature. The plasticizing temperature adjustment on the left and the middle position is the same as above.
[0074] The moving distances of the contact rings A24 and B241 driven by springs A and B respectively are determined by the contraction degree of springs A and B, and the contraction degree of springs A and B is determined by the magnitude of the current passed through. Therefore, the control system adjusts the position of the contact rings A24 and B241 by adjusting the magnitude of the current entering the springs A and B, thereby adjusting the heating range of the second film raw material in the inner sleeve.
[0075] When both the first film raw material and the second film raw material meet the plasticizing requirements, the outlet of the feeding mechanism is opened, and the plasticized first film raw material is transported to the second injection molding port 32 through the pipeline. Since the second injection molding port 32 is located between the isolation cylinder A 33 and the isolation cylinder B 34, the second injection molding port 32 is in the shape of a circular tube. The plasticized first film raw material enters the second injection molding port 32 and changes into a circular tube.
[0076] The transmission shaft 13 drives the cam 143 to rotate. When one side of the cam 143 moves to the maximum stroke, the cam 143 pushes the pressure plate 141 to move. The pressure plate 141 compresses the spring and compresses the air in the pressure chamber 142, thereby increasing the air pressure in the pressure chamber 142.
[0077] When the cam 143 moves away from the pushing range, the spring is released, and the spring pushes the pressure plate 141 to move in the opposite direction. The volume of the pressure chamber 142 increases, and the control valve B in the pipe connecting the pressure chamber 142 and the external air opens. The external air enters the pressure chamber 142 through the pipe and the control valve B to facilitate the pressurization of the air next time. The cam 143 drives the pressure plate 141 to move back and forth, thereby realizing the air intake and gas pressurization of the pressure chamber 142.
[0078] When the sensor in the second injection port 32 detects that the first film material is ready for blow molding, the control valve B on the connecting pipe between the pressurized chamber 142 and the second chamber is opened, and pressurized air is delivered to the second chamber through the pipe and the control valve B. The pressurized air enters the second chamber, and the control valve A on the second injection port is opened, and the pressurized air is ejected through the second injection port. The pressurized air blows the tubular first film and makes the first film adhere to the inner wall of the mold body 15.
[0079] After the tubular first film is attached to the mold body 15, the control valve B in the pipe between the pressurized chamber 142 and the first chamber is opened. Pressurized air is delivered to the first chamber through the pipe and the control valve B. The pressure in the first chamber increases, and the control valve A in the first injection port is opened. The pressurized air pushes the adhesive to spray onto the first film. After spraying, the control valve A in the first injection port is closed.
[0080] After the first type of film raw material is blown, the control valve C between the inner sleeve and the filter box 14 is opened, and the second type of film raw material is filtered through the filter membrane 17 and enters the top of the first injection molding port 31. Since the first injection molding port 31 is located between the injection cylinder 3 and the isolation cylinder A33, the first injection molding port 31 is in the shape of a circular tube. The plasticized second film raw material enters the first injection molding port 31 and becomes a circular tube. The driving mechanism is the existing technology.
[0081] When the sensor in the first injection molding port 31 detects that the second film raw material can be blown, the second film raw material is blown by pressurized air in the same way as the first film raw material. The second film and the first film are attached to each other and tightly bonded by adhesive to form a tubular film, forming a multi-layer bonding.
[0082] The traction mechanism transports the tubular film after blow molding upward and cools it through the air ring 16. The traction mechanism is existing technology. When the tubular film after blow molding enters the air ring 16, the driving motor 35 drives the first gear to rotate. Since the first gear and the tooth structure on the lower side of the fan blade 36 are engaged, the first gear drives the fan blade 36 to rotate. The fan blade 36 blows the air outside the air ring 16 toward the tubular film to cool the tubular film. The traction mechanism continues to transport the cooled tubular film and folds it in half to obtain the required multi-layer film, which is then further processed. The traction mechanism is existing technology.
[0083] When the second type of film raw material is plasticized, since an insulating material is provided between the inner sleeve and the outer sleeve, a temperature difference is generated between the hot end on the inner sleeve and the cold end on the outer sleeve. Due to the Seebeck effect, current flows between the cold end and the hot end and is transmitted to the control system through a wire. After processing by the control system, the current is transmitted to the two semiconductors of different materials on the fan blade 36. The two semiconductors of different materials and the metal plate on the fan blade 36 serve as the cooling end of the Boltier effect. The tubular film is cooled by the rotation and cooling end of the fan blade 36. When the current generated by the Seebeck effect is low, the current flowing into the semiconductor and metal plate on the fan blade 36 is supplemented from the control system to ensure the cooling effect of the air ring 16.
[0084] Press the stop button on the control panel 1 to power off the device.
[0085] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus.
[0086] Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art will be able to modify the technical solutions described in the aforementioned embodiments or substitute equivalents for some of the technical features. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention shall be included within the scope of protection of the present invention.
Claims
1. A fully automatic blow molding device for multi-layer films for tarpaulins, comprising a driving mechanism, characterized in that: The machine comprises a frame (11), an extrusion cylinder (21) is mounted on the frame (11), a coil (23) is sleeved on the outside of the extrusion cylinder (21), a contact ring A (24) and a contact ring B (241) are slidably contacted on the outside of the coil (23), a plurality of groups of extrusion sheets (2) are mounted inside the extrusion cylinder (21), a temperature sensor is mounted between two adjacent groups of the extrusion sheets (2), a filter box (14) is mounted on one side of the extrusion cylinder (21), a filter membrane (17) and a cam (143) are mounted inside the filter box (14), and the cam (143) is mounted on the filter box (14). 43) a pressure plate (141) is installed on one side, a mold body (15) is installed above the filter box (14), an injection cylinder (3) is installed inside the mold body (15), an isolation cylinder A (33) is installed outside the injection cylinder (3), an isolation cylinder B (34) is installed outside the isolation cylinder A (33), a first injection port (31) is formed between the injection cylinder (3) and the isolation cylinder A (33), a second injection port (32) is formed between the isolation cylinder A (33) and the isolation cylinder B (34), and an air ring (16) is installed above the mold body (15); The extrusion sheet (2) plasticizes the film raw material and extrude it into the filter box (14); the temperature sensor monitors the temperature of the raw material in the extrusion barrel (21); the coil (23), the contact ring A (24) and the contact ring B (241) adjust the temperature of the raw material according to the data of the temperature sensor; the filter membrane (17) filters the raw material; the cam (143) and the pressure plate (141) cooperate to achieve air pressurization; the first injection port (31) and the second injection port (32) form the raw material into a circular tube; the injection barrel (3) blows the circular tube-shaped raw material; and the air ring (16) cools the film; The extrusion cylinder (21) is composed of an inner sleeve and an outer sleeve, the inner sleeve and the outer sleeve are both made of insulating material, the inner sleeve is arranged inside the outer sleeve, the inner sleeve and the outer sleeve are both installed on the frame (11), the coil (23) is sleeved on the inner sleeve, a plurality of poles (22) are arranged on the outside of the coil (23), the contact ring A (24) and the contact ring B (241) are slidably installed on the outer sleeve, and the contact ring A (24) and the contact ring B (241) are both in sliding contact with the poles (22); A spring A is connected between the contact ring A (24) and the outer sleeve, a spring B is connected between the contact ring B (241) and the outer sleeve, the spring A, spring B, contact ring A (24), contact ring B (241) and coil (23) are all electrically connected to a control system, multiple groups of temperature sensors are all electrically connected to the control system, multiple groups of extrusion sheets (2) are connected in a spiral shape, a transmission shaft (13) is installed in the middle of the multiple groups of extrusion sheets (2), one side of the transmission shaft (13) passes through the extrusion cylinder (21) to be connected to the drive mechanism, and the other side of the transmission shaft (13) passes through the extrusion cylinder (21) to be connected to the inside of the filter box (14), and the drive mechanism is installed on the frame (11); Conductors are arranged in the plurality of groups of extruded sheets (2), and the plurality of groups of conductors are electrically connected to the control system. A first heating wire is arranged on the blades of the extruded sheets (2), and the first heating wire is electrically connected to the control system. A thermal insulation material is arranged on the opposite side of the inner sleeve and the outer sleeve. Two semiconductor materials of different materials are arranged on the inner side of the inner sleeve and the outer side of the outer sleeve. One end of the semiconductor materials of two different materials is connected to the metal plate. The two semiconductors on the inner sleeve and the two semiconductors on the outer sleeve are connected by wires, and one of the wires is electrically connected to the control system. The semiconductors of two different materials and the metal plate on the inner sleeve are the hot ends of the Seebeck effect, and the semiconductors of two different materials and the metal plate on the outer sleeve are the cold ends of the Seebeck effect; The cam (143) is mounted on the transmission shaft (13); the cam (143) is located on one side of the filter membrane (17); the pressure plate (141) is slidably mounted on the filter box (14); the pressure plate (141) and the filter box (14) are connected via a spring; a pressure chamber (142) is formed between the pressure plate (141) and the filter box (14); The injection cylinder (3) is installed on the filter box (14). The interior of the injection cylinder (3) is hollow. A first chamber and a second chamber are arranged in the injection cylinder (3). The first chamber is located above the second chamber. An adhesive is arranged in the first chamber. A plurality of first injection ports are arranged on the injection cylinder (3) near the first chamber. A plurality of second injection ports are arranged on the injection cylinder (3) near the second chamber. A control valve A is installed in each of the plurality of first injection ports and second injection ports. The pressurizing chamber (142) is connected to the first chamber, the second chamber and the external air through pipes, respectively. A control valve B is installed on the pipes connected to the pressurizing chamber (142). The control valve A and the control valve B are both electrically connected to the control system.
2. The fully automatic blow molding equipment for multi-layer film for tarpaulin according to claim 1, comprising a feeding mechanism, characterized in that: The filter box (14) is in communication with the first injection molding port (31), the filter membrane (17) is installed on a side close to the first injection molding port (31), the outlet of the feed mechanism is connected to the second injection molding port (32) through a pipeline passing through the mold body (15), the feed mechanism is installed on the frame (11), and sensors are installed in the first injection molding port (31) and the second injection molding port (32), and the sensors are electrically connected to the control system.
3. The fully automatic blow molding equipment for multi-layer film for tarpaulin according to claim 2 comprises a traction mechanism, characterized in that: The traction mechanism is located above the injection cylinder (3), and the traction mechanism tractions and folds the blown film. The traction mechanism is mounted on the frame (11), and the air ring (16) is mounted on the frame (11). A fan blade (36) is rotatably mounted in the air ring (16) via a bearing, and a toothed structure is arranged on the lower side of the fan blade (36). The fan blade (36) is provided with two semiconductors and a metal plate made of two different materials, and the two semiconductors on the fan blade (36) are electrically connected to a control system. A first gear is meshed on the outer side of the toothed structure, and a drive motor (35) is mounted in the middle of the first gear. The drive motor (35) is mounted on the frame (11).
4. The fully automatic blow molding equipment for multi-layer films for tarpaulins according to claim 3 is characterized in that: A hopper (12) is mounted on the outer sleeve, the hopper (12) is connected to the inner sleeve, a control panel (1) is mounted on the frame (11), the inner sleeve is connected to a filter box (14), a control valve C is mounted between the inner sleeve and the filter box (14), the control valve C is electrically connected to a control system, a control system is arranged in the control panel (1), and a start button, an emergency stop button and a stop button are arranged on the control panel (1).
5. A fully automatic blow molding process for multi-layer films for tarpaulins, characterized in that: The blow molding process adopts a fully automatic blow molding device for a multi-layer film for a tarpaulin according to any one of claims 1 to 4, and includes the following process steps: S1, respectively putting a first film raw material and a second film raw material into a feeding mechanism and a hopper (12); S2, the feeding mechanism and the extrusion sheet (2) plasticize and extrude the first film raw material and the second film raw material respectively; S3, the jet cylinder (3) blows up the tubular film; S4, the air ring (16) cools the film.
6. The fully automatic blow molding process for multi-layer film for tarpaulin according to claim 5, characterized in that: The step S2 also includes the following specific steps: S201, the temperature sensor detects the temperature of the second film raw material and feeds the data back to the control system; S202, the control system adjusts the heating range between the contact ring A (24) and the contact ring B (241) according to the temperature sensor data; The step S3 also includes the following specific steps: S301, the injection cylinder (3) inflates the film tube in the second injection port (32); S302, spraying adhesive with a spraying tube (3); S303, the injection cylinder (3) inflates the film tube in the first injection port (31).
