Battery parameter testing method, device, electronic device and storage medium

By obtaining the voltage of the battery during the SOC change process and the voltage change rate of the static time, the existing SOC-OCV test time is solved, and a more efficient test method is realized, which can more accurately determine the corresponding SOC of the battery. OCV.

CN118465583BActive Publication Date: 2024-11-12CATL (JIANGSU) NEW ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410917839.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-12
Estimated Expiration
2044-07-10

AI Technical Summary

Technical Problem

The existing SOC-OCV testing methods take a long time, requiring frequent adjustment of SOC and shelving batteries, resulting in longer testing time.

Method used

By obtaining the voltage corresponding to the plurality of SOCs during the process of changing the battery to be tested from the first SOC to the second SOC, and obtaining the voltage change rate of the preset duration of the second SOC, according to the voltage change rate and the voltage corresponding to the SOC. Determine OCV, reduce the time to stand and shorten the test time.

Benefits of technology

It effectively reduces the length of stability, improves the testing efficiency, can more accurately reflect the voltage changes under each SOC, and shortens the test time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118465583B_ABST
    Figure CN118465583B_ABST
Patent Text Reader

Abstract

The present application provides a battery parameter testing method, device, electronic device and storage medium, which relate to the field of battery technology. By obtaining the voltages corresponding to multiple SOCs during the process of the battery to be tested changing from a first SOC to a second SOC, and then obtaining the voltage change rate during the process of being stationary for a preset time at the second SOC, the OCV corresponding to each SOC can be obtained according to the voltage change rate and the voltage corresponding to each SOC. Since the voltage change rate can be used to reflect the voltage change at each SOC in this solution, there is no need to frequently adjust the SOC and station the battery, which can effectively reduce the stationary time, shorten the test time, and improve the test efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of battery technology, and in particular to a battery parameter testing method, device, electronic device and storage medium. Background Art

[0002] During the use of the battery, the state of charge (SOC) is the ratio of the actual power that can be provided in the current state to the power that can be provided in the fully charged state. It is a very important indicator. For pure electric vehicles, accurate SOC estimation is the main basis for ensuring that the power battery is charged and discharged within the working range. The open-circuit voltage (OCV) is the voltage at both ends of the battery after the battery has been stationary for a long time. At a certain temperature, the battery's state of charge and open-circuit voltage are in a one-to-one correspondence.

[0003] The current SOC-OCV test method is generally based on the rated capacity of the battery. After a certain capacity is discharged, it is left to stand (for example, 3 hours at room temperature, 12 hours at high temperature (>25°C), and 18 hours at low temperature (<25°C)). The voltage value recorded after the voltage stabilizes is the OCV under this SOC. Under normal conditions, an OCV is measured every 5% SOC to obtain the SOC-OCV curve. The test process requires frequent adjustment of the SOC and storage of the battery, and the entire test process takes a long time; and the obtained SOC-OCV curve is an intermittent curve. When the SOC points are densely taken, the test time is further extended. Summary of the invention

[0004] The purpose of the embodiments of the present application is to provide a battery parameter testing method, device, electronic device and storage medium to improve the problem of long testing time in the existing method.

[0005] In a first aspect, an embodiment of the present application provides a battery parameter testing method, the method comprising:

[0006] Acquire voltages corresponding to multiple SOCs during a process in which the battery under test changes from a first state of charge SOC to a second state of charge SOC;

[0007] Obtaining a voltage change rate of the battery under test during a process in which the battery under test is left at rest for a preset time at the second SOC;

[0008] According to the voltage change rate and the voltage corresponding to each SOC, the open circuit voltage OCV corresponding to each SOC is determined.

[0009] In the above implementation process, by obtaining the voltages corresponding to multiple SOCs during the process of the battery under test changing from the first SOC to the second SOC, and then obtaining the voltage change rate during the process of standing still for a preset time at the second SOC, the OCV corresponding to each SOC can be obtained according to the voltage change rate and the voltage corresponding to each SOC. Since the voltage change rate can be used to reflect the voltage change at each SOC in this solution, there is no need to frequently adjust the SOC and stand the battery, which can effectively reduce the standing time, shorten the test time, and improve the test efficiency.

[0010] Optionally, the obtaining of the voltage change rate of the battery under test during the process of being left at rest for a preset time at the second SOC includes:

[0011] Obtaining a first variation relationship between voltage and time of the battery under test when the battery under test is left at rest for a preset time at the second SOC;

[0012] The voltage change rate is determined according to the first change relationship.

[0013] In the above implementation process, by obtaining the first variation relationship between the voltage and time during the static process, and then determining the voltage variation rate according to the first variation relationship, the voltage variation rate at any time point can be easily obtained.

[0014] Optionally, the voltage change rate includes a voltage change rate of the voltage over time, and determining the open circuit voltage OCV corresponding to each SOC according to the voltage change rate and the voltage corresponding to each SOC includes:

[0015] According to the voltage change rate and the voltage corresponding to each SOC, obtaining a second change relationship between the voltage corresponding to each SOC and time;

[0016] The OCV corresponding to each SOC is determined according to the second change relationship.

[0017] In the above implementation process, the second change relationship between the voltage and time corresponding to each SOC can be obtained according to the voltage change rate, so that the voltage change under each SOC can be obtained, and then the OCV corresponding to the SOC can be determined more accurately according to the voltage change.

[0018] Optionally, determining the OCV corresponding to each SOC according to the second change relationship includes:

[0019] The voltage at the end time point in the second variation relationship corresponding to each SOC is used as the OCV corresponding to the SOC.

[0020] In the above implementation process, since the voltage at the end time point may be the voltage when the voltage reaches stability after being stationary, this voltage is determined as the OCV corresponding to the SOC to obtain a more accurate OCV.

[0021] Optionally, acquiring a second variation relationship between the voltage corresponding to each SOC and time according to the voltage variation rate and the voltage corresponding to each SOC includes:

[0022] Determine the voltage change amount of each SOC at each time point according to the voltage corresponding to each SOC and the voltage change rate corresponding to each time point;

[0023] According to the voltage corresponding to each SOC and the voltage change at each time point, a second change relationship between the voltage corresponding to each SOC and time is obtained.

[0024] In the above implementation process, according to the voltage corresponding to the SOC and the voltage change rate at each time point, the voltage change at each time point can be obtained, and then the change of the voltage corresponding to the SOC over time can be accurately obtained.

[0025] Optionally, the step of obtaining voltages corresponding to a plurality of SOCs during a process in which the battery under test changes from a first state of charge SOC to a second state of charge SOC includes:

[0026] Acquire charging voltages corresponding to multiple SOCs during the process of charging the battery under test from a first state of charge SOC to a second state of charge SOC;

[0027] And / or, obtaining discharge voltages corresponding to a plurality of SOCs during a process in which the battery to be tested is discharged from a first state of charge SOC to a second state of charge SOC.

[0028] In the above implementation process, the voltages corresponding to multiple SOCs during the charging process or the discharging process can be obtained, so that the SOC-OCV relationship during the charging process or the discharging process can be detected.

[0029] Optionally, the test conditions of the battery parameter test method include: setting the test temperature and / or setting the charge and discharge current, which can be applied to the detection of SOC-OCV under different test temperatures and / or different charge and discharge currents.

[0030] Optionally, each SOC between the first SOC and the second SOC is determined based on a rated capacity of the battery to be tested, and the rated capacity is an average of discharge capacities of the battery to be tested obtained after multiple discharges.

[0031] In the above implementation process, the rated capacity of the battery to be tested is determined by obtaining the average value of the discharge capacity of multiple discharges, which can improve the accuracy of the rated capacity measurement of the battery and reduce the error of SOC measurement.

[0032] In a second aspect, an embodiment of the present application provides a battery parameter testing device, the device comprising:

[0033] A voltage acquisition module, used to acquire voltages corresponding to multiple SOCs when the battery under test changes from a first state of charge SOC to a second state of charge SOC;

[0034] A voltage change rate acquisition module, used to acquire the voltage change rate of the battery under test during the process of being left at rest for a preset time at the second SOC;

[0035] The voltage determination module is used to determine the open circuit voltage OCV corresponding to each SOC according to the voltage change rate and the voltage corresponding to each SOC.

[0036] In a third aspect, an embodiment of the present application provides an electronic device, comprising a processor and a memory, wherein the memory stores computer-readable instructions, and when the computer-readable instructions are executed by the processor, the steps in the method provided in the first aspect are performed.

[0037] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps in the method provided in the first aspect are performed.

[0038] In a fifth aspect, an embodiment of the present application provides a computer program product, comprising computer program instructions, which, when read and executed by a processor, execute the steps in the method provided in the first aspect above.

[0039] Other features and advantages of the present application will be described in the following description, and partly become apparent from the description, or be understood by practicing the embodiments of the present application. The purpose and other advantages of the present application can be realized and obtained by the structures specifically pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0041] Figure 1A flow chart of a battery parameter testing method provided in an embodiment of the present application;

[0042] Figure 2 A graph showing the relationship between SOC and voltage during charging provided in an embodiment of the present application;

[0043] Figure 3 A graph showing the relationship between voltage and time during a static state provided in an embodiment of the present application;

[0044] Figure 4 A graph showing a relationship between a voltage change rate and time provided in an embodiment of the present application;

[0045] Figure 5 A graph showing a voltage change over time corresponding to a 90% SOC provided in an embodiment of the present application;

[0046] Figure 6 A schematic diagram of the corresponding relationship between SOC and OCV during a charging process provided in an embodiment of the present application;

[0047] Figure 7 A structural block diagram of a battery parameter testing device provided in an embodiment of the present application;

[0048] Figure 8 A schematic diagram of the structure of an electronic device for executing a battery parameter testing method provided in an embodiment of the present application. DETAILED DESCRIPTION

[0049] The technical solutions in the embodiments of the present application will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present application.

[0050] It should be noted that the terms "system" and "network" in the embodiments of the present invention can be used interchangeably. "Multiple" means two or more. In view of this, in the embodiments of the present invention, "multiple" can also be understood as "at least two". "And / or" describes the association relationship of associated objects, indicating that three relationships can exist. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / ", unless otherwise specified, generally indicates that the previously associated objects are in an "or" relationship.

[0051] At present, the most common test method for testing the OCV of a battery is to use a constant current (such as 0.3C-1.0C) to charge and discharge the battery to a specified SOC, and then let it stand for a long time (such as 3 hours at room temperature, 12 hours at high temperature (>25°C), and 18 hours at low temperature (<25°C)). After the battery voltage stabilizes, the voltage value recorded is the OCV at that SOC. Under normal conditions, an OCV is measured every 5% SOC, and then the OCV at each SOC is obtained by interpolation. The entire test time is about 7 days. It can be seen that this test method has a long test time and low test efficiency, and cannot meet some application scenarios that require quick access to the OCV at each SOC.

[0052] Based on the above problems, an embodiment of the present application provides a battery parameter testing method, which obtains the voltages corresponding to multiple SOCs during the process of the battery under test changing from a first SOC to a second SOC, and then obtains the voltage change rate during the process of standing still for a preset time at the second SOC. According to the voltage change rate and the voltage corresponding to each SOC, the OCV corresponding to each SOC can be obtained. Since the voltage change rate can be used to reflect the voltage change at each SOC in this solution, there is no need to frequently adjust the SOC and stand the battery, which can effectively reduce the standing time, shorten the test time, and improve the test efficiency.

[0053] The defects existing in the solutions in the above-mentioned prior art are the results obtained by the inventor after practice and careful research. Therefore, the discovery process of the above-mentioned problems and the solutions proposed in the embodiments of the present invention for the above-mentioned problems below should all be the contributions made by the inventor to the present invention during the process of the present invention.

[0054] Please refer to Figure 1 , Figure 1 A flow chart of a battery parameter testing method provided in an embodiment of the present application, the method comprising the following steps:

[0055] Step S110: obtaining voltages corresponding to multiple SOCs when the battery under test changes from a first SOC to a second SOC.

[0056] The battery to be tested may refer to a battery that needs to undergo a SOC-OCV test.

[0057] The SOC of a battery refers to the ratio of the actual capacity of the battery to the rated capacity. The first SOC and the second SOC in this solution refer to two different SOC states, for example, the first SOC refers to 20% SOC and the second SOC refers to 50% SOC, or the first SOC refers to 50% SOC and the second SOC refers to 20% SOC. In the process of changing from the first SOC to the second SOC, the corresponding voltages at different SOCs can be recorded.

[0058] In the method of recording the corresponding voltages under different SOCs, the voltage of the battery to be tested can be obtained by detecting the voltage of the battery to be tested through a voltage detection module, and the SOC can be obtained based on the detected current of the battery to be tested. For example, the capacity change of the battery to be tested can be obtained by multiplying the current by time, and then the SOC is determined based on the capacity change, such as SOC=total capacity-(discharge current-charge current)*time, wherein the discharge current and the charge current can be obtained by detecting the current of the battery to be tested by a current detection module, and the current detection module can be a current shunt, a Hall effect sensor and other devices.

[0059] Among them, multiple SOCs may refer to the SOC between the first SOC and the second SOC, such as the SOC at each time point in the process of changing from the first SOC to the second SOC, for example, the first SOC is 0% and the second SOC is 100%. Multiple SOCs may refer to the SOCs recorded at 1% intervals, such as 0% SOC, 1% SOC, 2% SOC, ..., 100% SOC. A total of 101 SOCs can be obtained, and then the voltage of the battery to be tested corresponding to each SOC is recorded. Of course, the intervals here can also be set according to actual needs, such as 0% SOC, 1% SOC, 1.5% SOC, 2.5% SOC, 3% SOC... Such intervals. If the test time is taken into consideration, it is not necessary to record all SOCs. The SOCs that are not collected in the middle can use the interpolation method to obtain their voltages, or the interpolation method can be used to obtain their corresponding OCVs later. Figure 2 As shown, Figure 2 The corresponding relationship between each SOC and voltage during the charging process is shown. Here, 0% SOC refers to the SOC when the battery terminal voltage drops to the discharge cut-off voltage during the actual discharge process, and 100% refers to the SOC when the battery terminal voltage rises to the charge cut-off voltage during the battery charging process.

[0060] When detecting the SOC of the battery to be tested, it can also be obtained through other algorithms, such as the integral method, and its calculation formula is as follows:

[0061] ;

[0062] in, Indicates the SOC obtained at the last moment, represents the theoretical SOC change from the previous moment to the current moment, Q represents the rated capacity of the battery to be tested, and I represents the current of the battery to be tested. The SOC at each moment can be calculated through this formula.

[0063] In practical applications, the SOC of the battery to be tested at each moment can also be obtained by other methods, such as the Kalman filter method.

[0064] Step S120: obtaining the voltage change rate of the battery under test when it is left at rest for a preset time at the second SOC.

[0065] In order to measure the OCV at each SOC, after the SOC of the battery to be tested changes to the second SOC, the battery to be tested can be left at rest for a preset time at the second SOC, where the preset time can be set based on experience, such as 3 hours, 5 hours, etc. Then, the voltage change of the battery to be tested during the preset time period is recorded, that is, the voltage change rate is obtained.

[0066] Step S130: Determine the OCV corresponding to each SOC according to the voltage change rate and the voltage corresponding to each SOC.

[0067] Generally, in order to accurately measure the OCV at each SOC, the battery will be left to stand for a period of time after each SOC is obtained. The voltage measured after standing for a period of time can be used as the OCV at that SOC.

[0068] The inventors found in their research that after obtaining different SOCs, after a period of standing, the voltage changes during the standing process are roughly the same. For example, after standing for 5 hours at 40% SOC, the voltage changes during the standing process are obtained. After standing for 5 hours at 50% SOC, the voltage changes during the standing process are obtained. At this time, the two voltage changes are roughly the same. Therefore, in this scheme, a voltage change rate can be obtained through one standing. The voltage change rate can be used to reflect the voltage change of the battery to be tested during the standing process at each SOC. Therefore, the OCV corresponding to each SOC can be obtained based on this voltage change rate.

[0069] In some embodiments, the voltage change rate may refer to the rate of change of the voltage after a preset time period compared to the voltage before the preset time period. For example, if the preset time period is 3 hours, the voltage of the battery to be tested at the second SOC may be obtained first to obtain V1, and then the battery may be allowed to stand for 3 hours, and the voltage of the battery to be tested 3 hours later may be obtained to obtain V2. The voltage change rate = (V2-V1) / 3 hours.

[0070] Alternatively, in other implementations, the voltage change rate is the rate of change of the voltage over time, which may be obtained by taking the derivative with respect to time t.

[0071] The voltage change rate can characterize the change of voltage during the stationary process. When obtaining the OCV corresponding to each SOC, the calculation formula can be as follows:

[0072] OCV=V*(1+voltage change rate); wherein V represents the voltage corresponding to a certain SOC, and the voltage can be obtained through the above step S110.

[0073] In the above implementation process, by obtaining the voltages corresponding to multiple SOCs during the process of the battery under test changing from the first SOC to the second SOC, and then obtaining the voltage change rate during the process of standing still for a preset time at the second SOC, the OCV corresponding to each SOC can be obtained according to the voltage change rate and the voltage corresponding to each SOC. Since the voltage change rate can be used to reflect the voltage change at each SOC in this solution, there is no need to frequently adjust the SOC and stand the battery, which can effectively reduce the standing time, shorten the test time, and improve the test efficiency.

[0074] Based on the above embodiment, if the voltage change rate represents the relationship between the voltage and time, then when obtaining the voltage change rate, the first change relationship between the voltage and time during the process of the battery to be tested being stationary for a preset period of time at the second SOC can be obtained, and the voltage change rate can be determined based on the first change relationship.

[0075] Here, when recording the first variation relationship between voltage and time, the voltage of the battery to be tested may be sampled at each sampling time point within a preset time period, so that the first variation relationship between voltage and time may be obtained. The first variation relationship may be recorded by a voltage-time curve, such as Figure 3 shown.

[0076] After the first change relationship is obtained, the voltage corresponding to each time point can be obtained, so that the voltage change rate corresponding to each time point can be calculated according to the first change relationship.

[0077] According to the voltage-time curve, the voltage gradually tends to be stable as time goes by, and the voltage only changes rapidly in the initial period of time. Therefore, in order to reduce the amount of calculation, the voltage change rate here can also refer to the voltage change rate in the initial period of time, such as the voltage change rate after 1 hour of standing still. Then this voltage change rate is used as the final voltage change rate and substituted into the above OCV calculation formula. In this way, the OCV corresponding to each SOC can be obtained.

[0078] In some implementations, the voltage change rate corresponding to each sampling time point may be obtained first, and then the largest voltage change rate is used as the final voltage change rate and substituted into the above OCV calculation formula.

[0079] In the above implementation process, by obtaining the first variation relationship between the voltage and time during the static process, and then determining the voltage variation rate according to the first variation relationship, the voltage variation rate at any time point can be easily obtained.

[0080] Based on the above embodiment, the voltage change rate includes the voltage change rate of the voltage over time. Then, according to the voltage change rate and the voltage corresponding to each SOC, the second change relationship of the voltage corresponding to each SOC over time is obtained, and then the OCV corresponding to each SOC is determined according to the second change relationship.

[0081] The voltage change rate here may refer to the voltage change rate at each time point during the period of the preset static time. For example, the voltage change rate at each time point can be obtained according to the first change relationship, such as Figure 4 As described above, the voltage change rate at each time point can be obtained by calculating the derivative with respect to time t, and the specific calculation formula is not introduced in detail here. Figure 4 The obtained voltage change rate can be characterized by a curve of the relationship between the voltage change rate and time, so that the voltage change rate corresponding to each time point can be obtained, that is, the second change relationship.

[0082] After obtaining the second change relationship, the voltage corresponding to each SOC is obtained, so that the OCV corresponding to each SOC can be obtained. For example, if the OCV corresponding to n% SOC is to be obtained, the voltage corresponding to the SOC can be obtained first (obtained through step S110), and then the voltage change rate during the static process can be obtained, and the voltage change rate corresponding to each time point can be obtained. In some embodiments, the largest voltage change rate can be selected and substituted into the above formula to calculate the OCV, or in other embodiments, the voltage change rate at each time point can be substituted into the above formula to obtain the OCV at each time point.

[0083] In some embodiments, the OCV at each time point may be averaged as the final OCV corresponding to the SOC, or in other embodiments, after obtaining the OCV at each time point, the smallest OCV may be selected as the final OCV corresponding to the SOC.

[0084] In the above implementation process, the second change relationship between the voltage and time corresponding to each SOC can be obtained according to the voltage change rate, so that the voltage change under each SOC can be obtained, and then the OCV corresponding to the SOC can be determined more accurately according to the voltage change.

[0085] Based on the above embodiment, since the battery voltage tends to be stable after being left at rest, in determining the OCV corresponding to each SOC, the voltage at the end time point in the second change relationship corresponding to each SOC may be used as the OCV corresponding to the SOC.

[0086] The second change relationship is Figure 5As shown, it represents the second change relationship corresponding to 90% SOC, that is, the curve of voltage change with time under 90% SOC. It can be seen that the voltage gradually tends to be stable with time. At this time, the voltage at the end time point can be used as the OCV corresponding to 90% SOC. For example, the OCV corresponding to 90% SOC is 4.185V.

[0087] In the above implementation process, since the voltage at the end time point may be the voltage when the voltage reaches stability after being stationary, this voltage is determined as the OCV corresponding to the SOC to obtain a more accurate OCV.

[0088] On the basis of the above embodiments, in the above method of obtaining the second change relationship, the voltage change amount of each SOC at each time point can be determined according to the voltage corresponding to each SOC and the voltage change rate corresponding to each time point, and the second change relationship between the voltage corresponding to each SOC and time can be obtained according to the voltage corresponding to each SOC and the voltage change amount at each time point.

[0089] For example, for each SOC corresponding voltage, multiply it by the voltage change rate corresponding to each time point to obtain the voltage change at each time point. For example, the voltage corresponding to 90% SOC is 4.241, and the voltage change rate at each time point may be different. Then, multiply the voltage by the voltage change rate at each time point to obtain the voltage change at each time point, and then add the voltage to the voltage change at each time point to obtain the second change relationship of the voltage corresponding to the SOC over time, that is, to obtain the voltage corresponding to the SOC at each time point during the static process.

[0090] In the above implementation process, according to the voltage corresponding to the SOC and the voltage change rate at each time point, the voltage change at each time point can be obtained, and then the change of the voltage corresponding to the SOC over time can be accurately obtained.

[0091] On the basis of the above embodiments, this solution can obtain the OCV corresponding to multiple SOCs during the charging process or the discharging process. Therefore, the above-mentioned change of the battery to be tested from the first SOC to the second SOC may refer to the battery to be tested being charged from the first SOC to the second SOC. Then, the charging voltage corresponding to multiple SOCs during the process of charging the battery to be tested from the first SOC to the second SOC can be obtained, and / or the discharge voltage corresponding to multiple SOCs during the process of discharging the battery to be tested from the first SOC to the second SOC can be obtained.

[0092] It can be understood that the method of obtaining the OCV corresponding to each SOC is similar for both the discharge process and the charge process, except that the initial voltage is different. When charging, the second SOC is greater than the first SOC, and when discharging, the second SOC is less than the first SOC. In this way, the OCV detection of the SOC in the discharge or charge state can be realized. Figure 6 As shown, Figure 6 The figure is a schematic diagram of the SOC-OCV correspondence during the charging process, so that the OCV corresponding to each SOC can be obtained.

[0093] In the above implementation process, the voltages corresponding to multiple SOCs during the charging process or the discharging process can be obtained, so that the SOC-OCV relationship during the charging process or the discharging process can be detected.

[0094] On the basis of the above embodiments, since different test environments have certain influences on the detection of OCV, the test conditions of the battery parameter test method may include: setting the test temperature and / or setting the charge and discharge current.

[0095] The test temperature and the charge and discharge current can be set according to the actual test requirements. For example, if you want to test the OCV corresponding to each SOC at a certain temperature, you can place the battery under test under the temperature environment for testing. Alternatively, if you want to test the OCV corresponding to each SOC under a certain charge and discharge current, you can set the desired charge and discharge current and then charge and discharge the battery under test, such as charging the battery under test from the first SOC to the second SOC with the set charge current, or discharging the battery under test from the first SOC to the second SOC with the set discharge current.

[0096] In the above implementation process, this can be applied to the detection of SOC-OCV under different test temperatures and / or different charge and discharge currents.

[0097] On the basis of the above embodiment, in the above step S110, the SOC of the battery to be tested needs to be obtained, and the rated capacity of the battery to be tested needs to be obtained in the method of obtaining the SOC, that is, each SOC between the first SOC and the second SOC is determined based on the rated capacity of the battery to be tested. In order to obtain a more accurate rated capacity, the battery to be tested can be discharged multiple times to obtain the discharge capacity of each discharge, and then the average of the discharge capacity of each discharge is used as the rated capacity of the battery to be tested, that is, the rated capacity is the average of the discharge capacities obtained by the battery to be tested after multiple discharges.

[0098] If the corresponding test conditions are set, the battery to be tested can be charged and discharged under the test conditions. For example, the battery to be tested can be charged with a set charging current at a set temperature. After being fully charged, the battery to be tested can be completely discharged with a set discharge current. Then, the discharge capacity after each discharge is obtained. The average of the discharge capacities can be taken as the rated capacity of the battery to be tested.

[0099] As an example, for example, the battery to be tested is charged and then discharged for the first time to obtain a first discharge capacity, and the battery to be tested is charged and then discharged for the second time to obtain a second discharge capacity, until the battery to be tested is charged and then discharged for the nth time to obtain an nth discharge capacity. At this time, the rated capacity of the battery to be tested can be the average of these n discharge capacities.

[0100] Of course, if you want to quickly obtain the rated capacity of the battery to be tested, you can also take the discharge capacity after one discharge as the rated capacity.

[0101] In the above implementation process, the rated capacity of the battery to be tested is determined by obtaining the average value of the discharge capacity of multiple discharges, which can improve the accuracy of the rated capacity measurement of the battery and reduce the error of SOC measurement.

[0102] On the basis of the above embodiment, the battery to be tested in the above scheme only needs to be left to stand for once to obtain the OCV corresponding to each SOC. In order to improve the accuracy of OCV detection, it can of course be left to stand for multiple times to obtain the voltage change rate during multiple standing processes. It can also be selected to stand at some specific SOCs, and the number of standing times is set to n. For example, after the battery to be tested is changed from the first SOC to the second SOC for the first time, it is left to stand to obtain the first voltage change rate during the standing process. After the battery to be tested is changed from the second SOC to the third SOC for the second time, it is left to stand to obtain the second voltage change rate during the standing process. The SOC is continued to be changed until it changes n times. At this time, n voltage change rates can be obtained, that is, the battery to be tested is left to stand for n times in the process of changing from the first SOC to the final SOC, and n voltage change rates in the n standing processes are obtained. Of course, in order to shorten the test time, n can be set to a smaller value, such as less than 100 (because the conventional method requires standing for 100 times), such as n can be 50 or a smaller value, so that both test accuracy and test time can be taken into account.

[0103] After obtaining n voltage change rates, the average of the n voltage change rates can be used as the final voltage change rate. If each voltage change rate is the rate of change of voltage over time, the average here can be the average of the n voltage change rates corresponding to each time point, that is, the final voltage change rate at each time point is obtained, and the subsequent method of using the final voltage change rate to obtain the OCV of each SOC is the same as the above embodiment. Or if each voltage change rate refers to a value, the average of the n voltage change rates can be directly calculated.

[0104] For example, if n is 2, the battery to be tested is charged from 0% SOC to 50% SOC for the first time, and then left at 50% SOC for a preset time to obtain the first voltage change rate during the static process. The battery to be tested is charged from 50% SOC to 100% for the second time, and then left at 100% SOC for a preset time to obtain the second voltage change rate during the static process. At this time, two voltage change rates are obtained, and then these two voltage change rates can be combined to obtain the final voltage change rate.

[0105] The way to combine the two voltage change rates can be to calculate the average of the voltage change rates at the same time point, or other calculation methods, such as taking the largest or smallest or median voltage change rate of the n voltage change rates corresponding to each time point as the final voltage change rate at that time point, so that the final voltage change rate can be obtained. The final voltage change rate can be used to obtain the OCV corresponding to each SOC. This method performs two static tests, shortens the overall test time, and improves the accuracy of OCV acquisition.

[0106] The above example is a method for obtaining the voltage change rate when the value of n is 2. In practical applications, in order to further improve the accuracy, the number of static times can be slightly increased, and then the voltage change rates obtained during multiple static processes are combined, such as taking the average calculation, to obtain a final voltage change rate.

[0107] Please refer to Figure 7 , Figure 7 The structure block diagram of a battery parameter testing device 200 provided in an embodiment of the present application, the device 200 may be a module, program segment or code on an electronic device. It should be understood that the device 200 is similar to the above Figure 1 The method embodiment corresponds to and can be executed Figure 1 The various steps involved in the method embodiment and the specific functions of the device 200 can be found in the above description. To avoid repetition, the detailed description is appropriately omitted here.

[0108] Optionally, the device 200 includes:

[0109] The voltage acquisition module 210 is used to acquire voltages corresponding to multiple SOCs when the battery under test changes from a first state of charge SOC to a second state of charge SOC;

[0110] A voltage change rate acquisition module 220 is used to acquire a voltage change rate of the battery under test during a process in which the battery under test is left at rest for a preset time at the second SOC;

[0111] The voltage determination module 230 is used to determine the open circuit voltage OCV corresponding to each SOC according to the voltage change rate and the voltage corresponding to each SOC.

[0112] Optionally, the voltage change rate acquisition module 220 is used to acquire a first change relationship between voltage and time when the battery to be tested is left stationary for a preset time at the second SOC; and determine the voltage change rate according to the first change relationship.

[0113] Optionally, the voltage change rate includes the voltage change rate of the voltage over time, and the voltage determination module 230 is used to obtain a second change relationship between the voltage corresponding to each SOC and time based on the voltage change rate and the voltage corresponding to each SOC; and determine the OCV corresponding to each SOC based on the second change relationship.

[0114] Optionally, the voltage determination module 230 is configured to use the voltage at the terminal time point in the second change relationship corresponding to each SOC as the OCV corresponding to the SOC.

[0115] Optionally, the voltage determination module 230 is used to determine the voltage change of each SOC at each time point based on the voltage corresponding to each SOC and the voltage change rate corresponding to each time point; and obtain a second change relationship between the voltage corresponding to each SOC and time based on the voltage corresponding to each SOC and the voltage change at each time point.

[0116] Optionally, the voltage acquisition module 210 is used to obtain charging voltages corresponding to multiple SOCs during the process of charging the battery under test from a first state of charge SOC to a second state of charge SOC; and / or, to obtain discharge voltages corresponding to multiple SOCs during the process of discharging the battery under test from a first state of charge SOC to a second state of charge SOC.

[0117] Optionally, the test conditions of the battery parameter test method include: setting a test temperature and / or setting a charge and discharge current.

[0118] Optionally, each SOC between the first SOC and the second SOC is determined based on a rated capacity of the battery to be tested, and the rated capacity is an average of discharge capacities of the battery to be tested obtained after multiple discharges.

[0119] It should be noted that those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0120] Please refer to Figure 8 , Figure 8A structural diagram of an electronic device for executing a battery parameter testing method provided in an embodiment of the present application, the electronic device may include: at least one processor 310, such as a CPU, at least one communication interface 320, at least one memory 330 and at least one communication bus 340. Among them, the communication bus 340 is used to realize the connection and communication between these components. Among them, the communication interface 320 of the device in the embodiment of the present application is used to communicate signaling or data with other node devices. The memory 330 can be a high-speed RAM memory or a non-volatile memory (non-volatile memory), such as at least one disk storage. The memory 330 can optionally also be at least one storage device located away from the aforementioned processor. Computer-readable instructions are stored in the memory 330. When the computer-readable instructions are executed by the processor 310, the electronic device executes the above-mentioned Figure 1 The method process is shown.

[0121] Understandably, Figure 8 The structure shown is for illustration only, and the electronic device may also include Figure 8 More or fewer components as shown, or with Figure 8 Different configurations shown. Figure 8 Each component shown in the figure can be implemented by hardware, software or a combination thereof.

[0122] The present application embodiment provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the following is performed: Figure 1 The method process in the method embodiment shown is executed by the electronic device.

[0123] This embodiment discloses a computer program product, which includes a computer program stored on a non-transitory computer-readable storage medium. The computer program includes program instructions. When the program instructions are executed by a computer, the computer can perform the methods provided by the above method embodiments, for example, including:

[0124] Acquire voltages corresponding to multiple SOCs during a process in which the battery under test changes from a first state of charge SOC to a second state of charge SOC;

[0125] Obtaining a voltage change rate of the battery under test during a process in which the battery under test is left at rest for a preset time at the second SOC;

[0126] According to the voltage change rate and the voltage corresponding to each SOC, the open circuit voltage OCV corresponding to each SOC is determined.

[0127] In summary, the embodiments of the present application provide a battery parameter testing method, device, electronic device and storage medium, which obtains the voltages corresponding to multiple SOCs during the process of the battery to be tested changing from the first SOC to the second SOC, and then obtains the voltage change rate during the process of being stationary for a preset time at the second SOC. According to the voltage change rate and the voltage corresponding to each SOC, the OCV corresponding to each SOC can be obtained. Since the voltage change rate can be used to reflect the voltage change at each SOC in this solution, there is no need to frequently adjust the SOC and station the battery, which can effectively reduce the stationary time, shorten the test time, and improve the test efficiency.

[0128] In the embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, and the indirect coupling or communication connection of the devices or units can be electrical, mechanical or other forms.

[0129] In addition, the units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0130] Furthermore, the functional modules in the various embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.

[0131] In this document, relational terms such as first and second, etc. are used merely to distinguish one entity or operation from another entity or operation, but do not necessarily require or imply any such actual relationship or order between these entities or operations.

[0132] The above description is only an embodiment of the present application and is not intended to limit the protection scope of the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A battery parameter testing method, characterized in that: The method comprises: Acquire voltages corresponding to multiple SOCs during a process in which the battery under test changes from a first state of charge SOC to a second state of charge SOC; Obtaining a voltage change rate of the battery under test during a process in which the battery under test is left at rest for a preset time period in the second state of charge SOC; Determine the open circuit voltage OCV corresponding to each SOC according to the voltage change rate and the voltage corresponding to each SOC; Among them, the open circuit voltage OCV corresponding to each SOC is determined by the following calculation formula: OCV=V*(1+voltage change rate); Wherein, V represents the voltage corresponding to SOC.

2. The method according to claim 1, characterized in that The step of obtaining the voltage change rate of the battery under test during the process of standing still for a preset time period in the second state of charge SOC includes: Obtaining a first variation relationship between voltage and time of the battery under test when the battery is kept at rest for a preset time in the second state of charge SOC; The voltage change rate is determined according to the first change relationship.

3. The method according to claim 2, characterized in that The voltage change rate includes a voltage change rate of voltage over time, and determining the open circuit voltage OCV corresponding to each SOC according to the voltage change rate and the voltage corresponding to each SOC includes: According to the voltage change rate and the voltage corresponding to each SOC, obtaining a second change relationship between the voltage corresponding to each SOC and time; The OCV corresponding to each SOC is determined according to the second change relationship.

4. The method according to claim 3, characterized in that The determining the OCV corresponding to each SOC according to the second change relationship includes: The voltage at the end time point in the second variation relationship corresponding to each SOC is used as the OCV corresponding to the SOC.

5. The method according to claim 3, characterized in that: The acquiring, according to the voltage change rate and the voltage corresponding to each SOC, a second change relationship between the voltage corresponding to each SOC and time, includes: Determine the voltage change amount of each SOC at each time point according to the voltage corresponding to each SOC and the voltage change rate corresponding to each time point; According to the voltage corresponding to each SOC and the voltage change at each time point, a second change relationship between the voltage corresponding to each SOC and time is obtained.

6. The method according to any one of claims 1 to 5, characterized in that: The step of obtaining voltages corresponding to a plurality of SOCs during a process in which the battery under test changes from a first state of charge SOC to a second state of charge SOC includes: Acquire charging voltages corresponding to multiple SOCs during the process of charging the battery under test from a first state of charge SOC to a second state of charge SOC; and / or, The discharge voltages corresponding to a plurality of SOCs are obtained during the process of the battery under test being discharged from a first state of charge SOC to a second state of charge SOC.

7. The method according to any one of claims 1 to 5, characterized in that: The test conditions of the battery parameter test method include: setting a test temperature and / or setting a charge and discharge current.

8. The method according to any one of claims 1 to 5, characterized in that: Each SOC between the first state of charge SOC and the second state of charge SOC is determined based on the rated capacity of the battery to be tested, and the rated capacity is an average of the discharge capacities of the battery to be tested obtained after multiple discharges.

9. A battery parameter testing device, characterized in that: The device comprises: A voltage acquisition module, used to acquire voltages corresponding to multiple SOCs when the battery under test changes from a first state of charge SOC to a second state of charge SOC; A voltage change rate acquisition module, used to acquire the voltage change rate of the battery under test during the process of being stationary for a preset time period in the second state of charge SOC; A voltage determination module, used to determine an open circuit voltage OCV corresponding to each SOC according to the voltage change rate and the voltage corresponding to each SOC; Among them, the open circuit voltage OCV corresponding to each SOC is determined by the following calculation formula: OCV=V*(1+voltage change rate); Wherein, V represents the voltage corresponding to SOC.

10. An electronic device, characterized in that: The method comprises a processor and a memory, wherein the memory stores computer-readable instructions. When the computer-readable instructions are executed by the processor, the method according to any one of claims 1 to 8 is executed.

11. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 8 is executed.