Prediction method of bank collapse width of loess slope

By measuring and calculating the physical and mechanical indicators of loess bank slopes, drawing bank collapse models and conducting mechanical balance analysis, the problem of poor accuracy in predicting reservoir bank collapse in loess areas has been solved, and the reliability of the prediction results has been improved.

CN118467894BActive Publication Date: 2024-10-29NORTHWEST ENGINEERING CORPORATION LIMITED
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410943611.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-10-29
Estimated Expiration
2044-07-15

AI Technical Summary

Technical Problem

The existing technology has poor accuracy in predicting reservoir bank slope collapse in loess areas, especially because the bank slope morphology description is not accurate enough, resulting in unreliable prediction results.

Method used

Using the loess bank collapse width prediction method, by measuring the current topography of the bank slope, obtaining physical and mechanical indicators, drawing the bank collapse model and calculating the stable slope angle, combined with mechanical balance to calculate the volume of a single bank collapse and the volume of underwater accumulations, we will gradually Predict bank collapse width.

Benefits of technology

It improves the accuracy of prediction of loess bank collapse width, reduces prediction workload, and effectively reduces the error between prediction results and actual measurement results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118467894B_ABST
    Figure CN118467894B_ABST
Patent Text Reader

Abstract

The invention discloses a method for predicting the width of a loess bank collapse, which belongs to the technical fields of water conservancy and hydropower engineering and geotechnical engineering, and comprises the following steps: 1. measuring the existing topographic section of the bank slope; 2. determining the physical and mechanical indicators of the rock and soil of the bank slope; 3. calculating the stable slope angle of the original soil and remolded soil of the bank slope α , 4. Draw a schematic diagram of the bank collapse model, 5. Calculate the single bank collapse volume S1 and the volume of underwater deposits after the first bank collapse S2, 6. Predict the bank collapse width. The present invention solves the problem of the inconsistency between the actual bank collapse width and the predicted result after the reservoir is filled with water in the prior art, and at the same time has the characteristics of accurately describing the bank slope morphology after the bank collapse, and has the advantages of being simple and easy to operate, highly reliable, and having accurate prediction results.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of water conservancy and hydropower engineering and geotechnical engineering, and relates to a method for predicting the width of a loess bank slope collapse. Background Art

[0002] The bank slopes of reservoirs in the western Loess Plateau are prone to deformation and damage, resulting in serious soil and water loss problems, which has become one of the topics of reservoir engineering geology.

[0003] Reservoir bank collapse is an unavoidable problem in the process of reservoir operation, especially in reservoirs in loess areas. The special properties of loess make bank collapse prone to occur, causing serious harm.

[0004] At present, the graphical method and engineering geological analogy method are commonly used to predict the collapse of loess reservoir banks. The calculation parameters are obtained through on-site investigations and are somewhat empirical. At the same time, the description of the slope morphology is not accurate, and the prediction results are less accurate. Summary of the invention

[0005] The invention aims to provide a method for predicting the width of a loess bank collapse, thereby improving the accuracy of the prediction result of the width of a loess bank collapse.

[0006] The technical solution adopted by the present invention is a method for predicting the width of a loess bank collapse, comprising the following steps:

[0007] Step 1: Measure the existing topographic section of the bank slope, obtain the bank slope height, slope angle and bank slope topographic line before the reservoir is filled with water, and obtain the characteristic water level of the reservoir;

[0008] Step 2: Sample the silt at the bottom of the existing river channel at equal intervals to determine its moisture content, and measure the physical and mechanical indicators of the slope rock and soil through indoor tests;

[0009] Step 3: Calculate the stable slope angle of the original soil and remolded soil on the bank slope according to the physical and mechanical indicators of the bank slope rock and soil. α ;

[0010] Step 4: Draw a schematic diagram of the bank collapse model;

[0011] Step 5: Calculate the single bank collapse volume S1 and the volume of underwater deposits after the first bank collapse S2 according to the bank collapse model schematic diagram;

[0012] Step 6: Predict the width of the collapsed bank by comparing the volume of a single bank collapse S1 and the volume of underwater deposits after the first bank collapse S2.

[0013] The present invention is also characterized in that:

[0014] The method for predicting the width of collapsed loess bank slope, in step 1, the existing terrain section of the bank slope is measured, the above-water terrain section is measured by millimeter-level RTK, and the underwater terrain section is measured by sonar survey instrument; the characteristic water level in step 1 includes normal water level and dead water level.

[0015] The prediction method of the width of the collapsed loess bank slope, in step 2, the silt at the bottom of the existing river channel is sampled at equal intervals, and the interval distance of the equal intervals is 0.2m~1m; the physical and mechanical indicators of the rock and soil mass of the bank slope in step 2 include shear strength t、 Density of rock mass r、 Internal friction angle f、 Cohesion c.

[0016] Method for predicting the width of loess bank collapse. Step 3 calculates the stable slope angle of the original soil and remolded soil on the bank. α , the calculation method is as follows:

[0017] (1)

[0018] (2)

[0019] in, f is the friction coefficient; r is the density of rock and soil, kN / m 3 ; c is cohesion, kPa; is the internal friction angle, °; t is the shear strength, kPa; α is the stable slope angle, °; h is the vertical distance from the top of the slope to different positions on the slope, m; the density of natural rock and soil is used to calculate the part above the normal water level; the density of saturated rock and soil is used to calculate the part below the normal water level.

[0020] The method for predicting the width of the collapsed bank on the loess slope is as follows:

[0021] The intersection points of the bank slope topographic line with the normal water level and the dead water level are recorded as points D and C respectively. A characteristic point is taken at the top of the bank slope and recorded as E. A characteristic point is taken at the bottom of the bank slope below the dead water level and recorded as B. Taking B as the starting point, lines are drawn in sequence with the stable slope angles of the original soil at different positions as the inclination angles and extended to intersect with the bank slope topographic line at point G. Then BG is the bank slope trajectory after the first bank collapse, and BG intersects with the normal water level at point H. Taking point H as the starting point, lines are drawn in sequence with the stable slope angles of the reshaped soil at different positions as the inclination angles and extended to intersect with the bank slope topographic line at point I. Then HI is the bank slope trajectory of the underwater deposits after the first bank collapse.

[0022] The method for predicting the width of the bank collapse on the loess slope is as follows:

[0023] The area of ​​BCDEG is calculated according to mechanical equilibrium, and after multiplying it by the unit width, the single bank collapse volume S1 is obtained; the area of ​​IBH is calculated, and after multiplying it by the unit width, the volume of underwater deposits after the first bank collapse S2 is obtained.

[0024] The method for predicting the width of the collapsed bank of the loess slope in step 6 is as follows:

[0025] If S1>S2, the horizontal distance between point E and point G is the width of the collapsed bank;

[0026] If S1<S2, then the slope trajectory BG after the first bank collapse is translated toward the inside of the bank by the horizontal distance between points E and G to obtain the slope trajectory B′G′ after the second bank collapse. B′G′ intersects with the normal water level at point H′. At this time, the underwater deposits after the second bank collapse intersect with the bank topography line at point I′. The single bank collapse volume S1′ is the area of ​​BEG′B′ multiplied by the unit width, and the underwater deposit volume S2′ after the second bank collapse is the area of ​​I′B′H′ multiplied by the unit width. Compare the single bank collapse volume S1′ and the underwater deposit volume S2′ after the second bank collapse again.

[0027] If S1′>S2′, the horizontal distance between point E and point G′ is the width of the collapsed bank;

[0028] If S1′<S2′, the slope trajectory B′G′ after the second bank collapse is translated again toward the inside of the slope by the horizontal distance between points E and G, and the above steps are repeated until the volume of single bank collapse is greater than the volume of underwater deposits after the nth bank collapse, and the final predicted value of bank collapse width is obtained.

[0029] The beneficial effects of the present invention are:

[0030] The invention fully considers the shape of the loess bank slope and adopts physical and mechanical indicators as calculation parameters, so as to describe the bank slope shape more accurately and effectively reduce the workload of bank collapse prediction. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of the bank collapse model of the present invention.

[0032] In the figure: 1. Normal water level, 2. Dead water level. DETAILED DESCRIPTION

[0033] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0034] The present invention provides a method for predicting the width of a loess bank collapse, comprising the following steps:

[0035] Step 1: Measure the existing topographic section of the bank slope, obtain the bank slope height, slope angle and bank slope topographic line before the reservoir is filled with water, and obtain the characteristic water level of the reservoir, the characteristic water level includes the normal water level 1 and the dead water level 2; when measuring the existing topographic section of the bank slope, the above-water topographic section measurement adopts millimeter-level RTK, and the underwater topographic section measurement adopts a sonar survey instrument; the determination of the above-mentioned bank slope topographic line, normal water level 1 and dead water level 2 is the same as the determination method of the prior art.

[0036] Step 2: Sample the silt at the bottom of the existing river channel at regular intervals of 0.2m~1m to determine its moisture content, and measure the physical and mechanical indicators of the slope rock and soil through indoor tests; the physical and mechanical indicators of the slope rock and soil include shear strength t、 Density of rock mass r、 Internal friction angle f、 Cohesion c. Among them, sampling the silt at the bottom of the existing river channel at equal intervals is specifically as follows: first, holes are arranged at equal intervals in the horizontal direction on the plane, and then samples are taken at equal intervals in the vertical direction in each hole.

[0037] Step 3: Calculate the stable slope angles of the original soil and remolded soil on the slope according to the physical and mechanical indicators of the rock and soil mass on the slope in step 2. α , the calculation method is as follows:

[0038] (1)

[0039] (2)

[0040] in, f is the friction coefficient; r is the density of rock and soil, kN / m 3 ; c is cohesion, kPa; is the internal friction angle, °; t is the shear strength, kPa; α is the stable slope angle, °; h is the vertical distance from the top of the slope to different positions on the slope, m; the density of natural rock and soil is used for calculation above the normal water level 1; the density of saturated rock and soil is used for calculation below the normal water level 1;

[0041] The stable slope angle of the original soil and remolded soil on the bank slope is calculated by the formula α It can effectively overcome the defect of the existing empirical graphical method that it cannot take into account the physical and mechanical properties of the slope soil, making the prediction results of the collapsed bank width of the loess slope more reliable.

[0042] The derivation process of the above formula (1) is as follows:

[0043] Mohr-Coulomb equation Substitute into the friction coefficient calculation formula In, we have:

[0044] ,

[0045] Combined with normal stress = density multiplied by height, that is , and substitute it into In, you can get .

[0046] Step 4: Draw a schematic diagram of the bank collapse model. The drawing method is as follows:

[0047] The intersection points of the bank slope topography line with the constant water level 1 and the dead water level 2 are recorded as points D and C respectively. A characteristic point is taken at the top of the bank slope and recorded as E. A characteristic point is taken at the bottom of the bank slope below the dead water level and recorded as B. Taking B as the starting point, lines are drawn in sequence with the stable slope angles of the original soil at different positions as the inclination angles and extended to intersect with the bank slope topography line at point G. Then BG is the bank slope trajectory after the first bank collapse. BG intersects with the constant water level 1 at point H. Taking point H as the starting point, lines are drawn in sequence with the stable slope angles of the reshaped soil at different positions as the inclination angles and extended to intersect with the bank slope topography line at point I. Then HI is the bank slope trajectory of the underwater deposits after the first bank collapse. At the same time, the following is obtained: Figure 1 Schematic diagram of the bank collapse model shown.

[0048] Step 5: Calculate the single bank collapse volume S1 and the volume of underwater deposits after the first bank collapse S2 according to the bank collapse model schematic diagram. The calculation method is as follows:

[0049] The area of ​​BCDEG is calculated according to mechanical equilibrium, and after multiplying it by the unit width, the single bank collapse volume S1 is obtained; the area of ​​IBH is calculated, and after multiplying it by the unit width, the volume of underwater deposits after the first bank collapse S2 is obtained.

[0050] Step 6: By comparing the single bank collapse volume S1 and the underwater sediment volume S2 after the first bank collapse, the width of the bank collapse is predicted. The prediction method is as follows:

[0051] If S1>S2, the horizontal distance between point E and point G is the width of the collapsed bank;

[0052] If S1<S2, then the slope trajectory BG after the first bank collapse is translated toward the inside of the bank by the horizontal distance between points E and G to obtain the slope trajectory B′G′ after the second bank collapse. B′G′ intersects with the constant water level 1 at point H′. At this time, the underwater deposits after the second bank collapse intersect with the bank topographic line at point I′. The single bank collapse volume S1′ is the area of ​​BEG′B′ multiplied by the unit width, and the underwater deposit volume S2′ after the second bank collapse is the area of ​​I′B′H′ multiplied by the unit width. Compare the single bank collapse volume S1′ and the underwater deposit volume S2′ after the second bank collapse again.

[0053] If S1′>S2′, the horizontal distance between point E and point G′ is the width of the collapsed bank;

[0054] If S1′<S2′, the slope trajectory B′G′ after the second bank collapse is translated again toward the inside of the slope by the horizontal distance between point E and point G, and the above steps are repeated until the single bank collapse volume is greater than the volume of underwater deposits after the nth bank collapse, and the final predicted value of bank collapse width is obtained;

[0055] This step fully considers the morphological characteristics of the slope and the stage characteristics of the slope collapse process, and corrects the lower limit of the single collapse volume of the loess slope from infinitesimal to the minimum volume of steady-state slope collapse. It is more accurate than the existing empirical graphical method when applied to the prediction of loess slope collapse width.

[0056] The present invention calculates the stable slope angle of the original soil of the bank slope and the remolded soil accumulated after the collapse through a formula α , effectively reducing the workload of bank collapse prediction, improving the accuracy of the prediction results of the collapsed bank width of loess slopes, and effectively reducing the error between the predicted results and the measured results.

[0057] Example 1

[0058] The present invention provides a method for predicting the width of a loess bank collapse, and the specific steps are as follows:

[0059] Step 1: Measure the existing topographic section of the bank slope, obtain the bank slope height, slope angle and bank slope topographic line before the reservoir is filled with water, and obtain the characteristic water level of the reservoir. The characteristic water level includes the normal water level 1 and the dead water level 2. When measuring the existing topographic section of the bank slope, millimeter-level RTK is used for water topographic section measurement, and sonar survey instrument is used for underwater topographic section measurement.

[0060] Step 2: Sample the silt at the bottom of the existing river channel at an interval of 0.2m to determine its moisture content, and measure the physical and mechanical indicators of the slope rock and soil through indoor tests; the physical and mechanical indicators of the slope rock and soil include shear strength t、 Density of rock mass r、 Internal friction angle f、 Cohesion c.

[0061] Step 3: Calculate the stable slope angles of the original soil and remolded soil on the slope according to the physical and mechanical indicators of the rock and soil mass on the slope in step 2. α , the calculation method is as follows:

[0062] (1)

[0063] (2)

[0064] in, f is the friction coefficient; r is the density of rock and soil, kN / m 3 ; c is cohesion, kPa; is the internal friction angle, °; t is the shear strength, kPa; α is the stable slope angle, °; h is the vertical distance from the top of the slope to different positions on the slope, m; the density of natural rock and soil is used to calculate the part above the normal water level 1; the density of saturated rock and soil is used to calculate the part below the normal water level 1.

[0065] Step 4: Draw a schematic diagram of the bank collapse model, such as Figure 1 As shown, the drawing method is as follows:

[0066] The intersection points of the bank slope topography line with the normal water level 1 and the dead water level 2 are recorded as points D and C respectively. A characteristic point is taken at the top of the bank slope and recorded as E. A characteristic point is taken at the bottom of the bank slope below the dead water level and recorded as B. Taking B as the starting point, lines are drawn in sequence with the stable slope angles of the original soil at different positions as the inclination angles and extended to intersect with the bank slope topography line at point G. Then BG is the bank slope trajectory after the first bank collapse, and BG intersects with the normal water level 1 at point H. Taking point H as the starting point, lines are drawn in sequence with the stable slope angles of the reshaped soil at different positions as the inclination angles and extended to intersect with the bank slope topography line at point I. Then HI is the bank slope trajectory of the underwater deposits after the first bank collapse.

[0067] Step 5: Calculate the single bank collapse volume S1 and the volume of underwater deposits after the first bank collapse S2 according to the bank collapse model schematic diagram. The calculation method is as follows:

[0068] The area of ​​BCDEG is calculated according to mechanical equilibrium, and after multiplying it by the unit width, the single bank collapse volume S1 is obtained; the area of ​​IBH is calculated, and after multiplying it by the unit width, the volume of underwater deposits after the first bank collapse S2 is obtained.

[0069] Step 6: By comparing the single bank collapse volume S1 and the underwater sediment volume S2 after the first bank collapse, the width of the bank collapse is predicted. The prediction method is as follows:

[0070] If S1>S2, the horizontal distance between point E and point G is the width of the collapsed bank;

[0071] If S1<S2, then the slope trajectory BG after the first bank collapse is translated toward the inside of the bank by the horizontal distance between points E and G to obtain the slope trajectory B′G′ after the second bank collapse. B′G′ intersects with the constant water level 1 at point H′. At this time, the underwater deposits after the second bank collapse intersect with the bank topographic line at point I′. The single bank collapse volume S1′ is the area of ​​BEG′B′ multiplied by the unit width, and the underwater deposit volume S2′ after the second bank collapse is the area of ​​I′B′H′ multiplied by the unit width. Compare the single bank collapse volume S1′ and the underwater deposit volume S2′ after the second bank collapse again.

[0072] If S1′>S2′, the horizontal distance between point E and point G′ is the width of the collapsed bank;

[0073] If S1′<S2′, the slope trajectory B′G′ after the second bank collapse is translated again toward the inside of the slope by the horizontal distance between points E and G, and the above steps are repeated until the volume of single bank collapse is greater than the volume of underwater deposits after the nth bank collapse, and the final predicted value of bank collapse width is obtained.

[0074] Example 2

[0075] The present invention provides a method for predicting the width of a loess bank collapse, and the specific steps are as follows:

[0076] Step 1: Measure the existing topographic section of the bank slope, obtain the bank slope height, slope angle and bank slope topographic line before the reservoir is filled with water, and obtain the characteristic water level of the reservoir. The characteristic water level includes the normal water level 1 and the dead water level 2. When measuring the existing topographic section of the bank slope, millimeter-level RTK is used for water topographic section measurement, and sonar survey instrument is used for underwater topographic section measurement.

[0077] Step 2: Sample the silt at the bottom of the existing river channel at regular intervals of 0.6m to determine its moisture content, and measure the physical and mechanical indicators of the slope rock and soil through indoor tests; the physical and mechanical indicators of the slope rock and soil include shear strength t、 Density of rock mass r、 Internal friction angle f、 Cohesion c.

[0078] Step 3: Calculate the stable slope angles of the original soil and remolded soil on the slope according to the physical and mechanical indicators of the rock and soil mass on the slope in step 2. α , the calculation method is as follows:

[0079] (1)

[0080] (2)

[0081] in, f is the friction coefficient; r is the density of rock and soil, kN / m 3 ; c is cohesion, kPa; is the internal friction angle, °; t is the shear strength, kPa; α is the stable slope angle, °; h is the vertical distance from the top of the slope to different positions on the slope, m; the density of natural rock and soil is used to calculate the part above the normal water level 1; the density of saturated rock and soil is used to calculate the part below the normal water level 1.

[0082] Step 4: Draw a schematic diagram of the bank collapse model, such as Figure 1 As shown, the drawing method is as follows:

[0083] The intersection points of the bank slope topography line with the normal water level 1 and the dead water level 2 are recorded as points D and C respectively. A characteristic point is taken at the top of the bank slope and recorded as E. A characteristic point is taken at the bottom of the bank slope below the dead water level and recorded as B. Taking B as the starting point, lines are drawn in sequence with the stable slope angles of the original soil at different positions as the inclination angles and extended to intersect with the bank slope topography line at point G. Then BG is the bank slope trajectory after the first bank collapse, and BG intersects with the normal water level 1 at point H. Taking point H as the starting point, lines are drawn in sequence with the stable slope angles of the reshaped soil at different positions as the inclination angles and extended to intersect with the bank slope topography line at point I. Then HI is the bank slope trajectory of the underwater deposits after the first bank collapse.

[0084] Step 5: Calculate the single bank collapse volume S1 and the volume of underwater deposits after the first bank collapse S2 according to the bank collapse model schematic diagram. The calculation method is as follows:

[0085] The area of ​​BCDEG is calculated according to mechanical equilibrium, and after multiplying it by the unit width, the single bank collapse volume S1 is obtained; the area of ​​IBH is calculated, and after multiplying it by the unit width, the volume of underwater deposits after the first bank collapse S2 is obtained.

[0086] Step 6: By comparing the single bank collapse volume S1 and the underwater sediment volume S2 after the first bank collapse, the width of the bank collapse is predicted. The prediction method is as follows:

[0087] If S1>S2, the horizontal distance between point E and point G is the width of the collapsed bank;

[0088] If S1<S2, then the slope trajectory BG after the first bank collapse is translated toward the inside of the bank by the horizontal distance between points E and G to obtain the slope trajectory B′G′ after the second bank collapse. B′G′ intersects with the constant water level 1 at point H′. At this time, the underwater deposits after the second bank collapse intersect with the bank topographic line at point I′. The single bank collapse volume S1′ is the area of ​​BEG′B′ multiplied by the unit width, and the underwater deposit volume S2′ after the second bank collapse is the area of ​​I′B′H′ multiplied by the unit width. Compare the single bank collapse volume S1′ and the underwater deposit volume S2′ after the second bank collapse again.

[0089] If S1′>S2′, the horizontal distance between point E and point G′ is the width of the collapsed bank;

[0090] If S1′<S2′, the slope trajectory B′G′ after the second bank collapse is translated again toward the inside of the slope by the horizontal distance between points E and G, and the above steps are repeated until the volume of single bank collapse is greater than the volume of underwater deposits after the nth bank collapse, and the final predicted value of bank collapse width is obtained.

[0091] Example 3

[0092] The present invention provides a method for predicting the width of a loess bank collapse, and the specific steps are as follows:

[0093] Step 1: Measure the existing topographic section of the bank slope, obtain the bank slope height, slope angle and bank slope topographic line before the reservoir is filled with water, and obtain the characteristic water level of the reservoir. The characteristic water level includes the normal water level 1 and the dead water level 2. When measuring the existing topographic section of the bank slope, millimeter-level RTK is used for water topographic section measurement, and sonar survey instrument is used for underwater topographic section measurement.

[0094] Step 2: Sample the silt at the bottom of the existing river channel at regular intervals of 1m to determine its moisture content, and measure the physical and mechanical indicators of the slope rock and soil through indoor tests; the physical and mechanical indicators of the slope rock and soil include shear strength t、 Density of rock mass r、 Internal friction angle f、 Cohesion c.

[0095] Step 3: Calculate the stable slope angles of the original soil and remolded soil on the slope according to the physical and mechanical indicators of the rock and soil mass on the slope in step 2. α , the calculation method is as follows:

[0096] (1)

[0097] (2)

[0098] in, f is the friction coefficient; r is the density of rock and soil, kN / m 3 ; c is cohesion, kPa; is the internal friction angle, °; t is the shear strength, kPa; α is the stable slope angle, °; h is the vertical distance from the top of the slope to different positions on the slope, m; the density of natural rock and soil is used to calculate the part above the normal water level 1; the density of saturated rock and soil is used to calculate the part below the normal water level 1.

[0099] Step 4: Draw a schematic diagram of the bank collapse model, such as Figure 1 As shown, the drawing method is as follows:

[0100] The intersection points of the bank slope topography line with the normal water level 1 and the dead water level 2 are recorded as points D and C respectively. A characteristic point is taken at the top of the bank slope and recorded as E. A characteristic point is taken at the bottom of the bank slope below the dead water level and recorded as B. Taking B as the starting point, lines are drawn in sequence with the stable slope angles of the original soil at different positions as the inclination angles and extended to intersect with the bank slope topography line at point G. Then BG is the bank slope trajectory after the first bank collapse, and BG intersects with the normal water level 1 at point H. Taking point H as the starting point, lines are drawn in sequence with the stable slope angles of the reshaped soil at different positions as the inclination angles and extended to intersect with the bank slope topography line at point I. Then HI is the bank slope trajectory of the underwater deposits after the first bank collapse.

[0101] Step 5: Calculate the single bank collapse volume S1 and the volume of underwater deposits after the first bank collapse S2 according to the bank collapse model schematic diagram. The calculation method is as follows:

[0102] The area of ​​BCDEG is calculated according to mechanical equilibrium, and after multiplying it by the unit width, the single bank collapse volume S1 is obtained; the area of ​​IBH is calculated, and after multiplying it by the unit width, the volume of underwater deposits after the first bank collapse S2 is obtained.

[0103] Step 6: By comparing the single bank collapse volume S1 and the underwater sediment volume S2 after the first bank collapse, the width of the bank collapse is predicted. The prediction method is as follows:

[0104] If S1>S2, the horizontal distance between point E and point G is the width of the collapsed bank;

[0105] If S1<S2, then the slope trajectory BG after the first bank collapse is translated toward the inside of the bank by the horizontal distance between points E and G to obtain the slope trajectory B′G′ after the second bank collapse. B′G′ intersects with the constant water level 1 at point H′. At this time, the underwater deposits after the second bank collapse intersect with the bank topographic line at point I′. The single bank collapse volume S1′ is the area of ​​BEG′B′ multiplied by the unit width, and the underwater deposit volume S2′ after the second bank collapse is the area of ​​I′B′H′ multiplied by the unit width. Compare the single bank collapse volume S1′ and the underwater deposit volume S2′ after the second bank collapse again.

[0106] If S1′>S2′, the horizontal distance between point E and point G′ is the width of the collapsed bank;

[0107] If S1′<S2′, the slope trajectory B′G′ after the second bank collapse is translated again toward the inside of the slope by the horizontal distance between points E and G, and the above steps are repeated until the volume of single bank collapse is greater than the volume of underwater deposits after the nth bank collapse, and the final predicted value of bank collapse width is obtained.

Claims

1. A method for predicting the width of a loess bank collapse, characterized in that: The following steps are involved: Step 1: Measure the existing topographic section of the bank slope, obtain the bank slope height, slope angle and bank slope topographic line before the reservoir is filled with water, and obtain the characteristic water level of the reservoir; Step 2: Sample the silt at the bottom of the existing river channel at equal intervals to determine its moisture content, and measure the physical and mechanical indicators of the slope rock and soil through indoor tests; Step 3: Calculate the stable slope angle of the original soil and remolded soil on the bank slope according to the physical and mechanical indicators of the bank slope rock and soil. α ; Step 4: Draw a schematic diagram of the bank collapse model; The intersection points of the bank slope topography line with the normal water level (1) and the dead water level (2) are recorded as points D and C respectively. A characteristic point is taken at the top of the bank slope and recorded as E. A characteristic point is taken at the bottom of the bank slope below the dead water level and recorded as B. With B as the starting point, lines are drawn in sequence with the stable slope angles of the original soil at different positions as the inclination angles and extended to intersect with the bank slope topography line at point G. Then BG is the bank slope trajectory after the first bank collapse. BG intersects with the normal water level (1) at point H. With point H as the starting point, lines are drawn in sequence with the stable slope angles of the remolded soil at different positions as the inclination angles and extended to intersect with the bank slope topography line at point I. Then HI is the bank slope trajectory of the underwater deposits after the first bank collapse. Step 5: Calculate the single bank collapse volume S1 and the volume of underwater deposits after the first bank collapse S2 according to the bank collapse model schematic diagram; Step 6: Predict the width of bank collapse by comparing the single bank collapse volume S1 and the volume of underwater deposits after the first bank collapse S2; The prediction method is as follows: If S1>S2, the horizontal distance between point E and point G is the width of the collapsed bank; If S1<S2, then the slope trajectory BG after the first bank collapse is translated toward the inside of the bank by the horizontal distance between points E and G to obtain the slope trajectory B′G′ after the second bank collapse. B′G′ intersects with the constant water level 1 at point H′. At this time, the underwater deposits after the second bank collapse intersect with the bank topographic line at point I′. The single bank collapse volume S1′ is the area of ​​BEG′B′ multiplied by the unit width, and the underwater deposit volume S2′ after the second bank collapse is the area of ​​I′B′H′ multiplied by the unit width. Compare the single bank collapse volume S1′ and the underwater deposit volume S2′ after the second bank collapse again. If S1′>S2′, the horizontal distance between point E and point G′ is the width of the collapsed bank; If S1′<S2′, the slope trajectory B′G′ after the second bank collapse is translated again toward the inside of the slope by the horizontal distance between points E and G, and the above steps are repeated until the volume of single bank collapse is greater than the volume of underwater deposits after the nth bank collapse, and the final predicted value of bank collapse width is obtained.

2. The method for predicting the width of loess bank collapse according to claim 1, characterized in that: In the step 1 of measuring the existing topographic section of the bank slope, the above-water topographic section is measured using millimeter-level RTK, and the underwater topographic section is measured using a sonar survey instrument; the characteristic water level in the step 1 includes a normal water level (1) and a dead water level (2).

3. The method for predicting the width of loess bank collapse according to claim 2, characterized in that: In step 2, the silt at the bottom of the existing river channel is sampled at equal intervals, and the interval distance of the equal intervals is 0.2m~1m; the physical and mechanical indicators of the slope rock and soil in step 2 include shear strength τ, Density of rock mass ρ, Internal friction angle φ、 Cohesion c.

4. The method for predicting the width of loess bank collapse according to claim 3 is characterized in that: The stable slope angles of the original soil and remolded soil of the bank slope are calculated in step 3. α , the calculation method is as follows: (1) (2) in, f is the friction coefficient; ρ is the density of rock and soil, kN / m 3 ; c is cohesion, kPa; is the internal friction angle, °; τ is the shear strength, kPa; α is the stable slope angle, °; h is the vertical distance from the top of the slope to different positions on the slope, m; the density of natural rock and soil is used for calculation above the normal water level (1); the density of saturated rock and soil is used for calculation below the normal water level (1).

5. The method for predicting the width of loess bank collapse according to claim 4, characterized in that: The method for calculating the single bank collapse volume S1 and the underwater accumulation volume S2 after the first bank collapse in step 5 is as follows: The area of ​​BCDEG is calculated according to mechanical equilibrium, and after multiplying it by the unit width, the single bank collapse volume S1 is obtained; the area of ​​IBH is calculated, and after multiplying it by the unit width, the volume of underwater deposits after the first bank collapse S2 is obtained.

Citation Information

Patent Citations

  • Three-grade four-level division method-based reservoir bank collapse prediction method

    CN107908840A