Building information processing method and system based on BIM technology

By classifying and lightening the BIM model, building a GIS three-dimensional scene and setting a benchmark indicator, the problem that the general contractor is difficult to quickly and conveniently display the construction content when displaying engineering information to the subcontract is achieved, and the limited hardware resources and Display of efficient BIM model under environmental conditions.

CN118484433BActive Publication Date: 2024-11-29SHAANXI TRANSPORTATION VOCATIONAL & TECH COLLEGE
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311164819.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-11
Publication Date
2024-11-29
Estimated Expiration
2043-09-11

AI Technical Summary

Technical Problem

In the application of BIM technology, when the general contractor displays engineering information to the subcontract, it is difficult to quickly and conveniently display the specific construction content of the subcontracting project, especially when the hardware equipment and environmental conditions are incomplete.

Method used

A building information processing method based on BIM technology is adopted. By classifying and lightening the BIM model, three-dimensional model representations based on points and lines are extracted, and a GIS three-dimensional scene is constructed, and a reference indicator is set for loading and visual display.

Benefits of technology

It realizes the rapid generation of three-dimensional images under limited hardware resources and environmental conditions, reduces the total amount of BIM model display, improves the efficiency of BIM model display, and ensures the accuracy of display.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The present invention discloses a method for processing building information based on BIM technology. When a display request for a subcontractor is received from a general contractor, a lightweight display step is executed; when a download request is received from a subcontractor, a complete BIM model of the construction content corresponding to the subcontract is transmitted to the subcontractor. When the general contractor makes a display request for a subcontractor, the scheme performs display based on the above lightweight display step, and can use a small amount of on-site hardware resources to quickly generate three-dimensional images for display in introductory occasions such as bidding instructions and information releases. When the intended subcontractor needs to provide detailed three-dimensional images to clarify the project requirements and calculate accurate quotations after the meeting, detailed three-dimensional data is provided. This scheme can facilitate the general contractor to display engineering information to the subcontractor according to the needs of different stages during the investment process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The technical field of BIM information management particularly relates to a building information processing method and system based on BIM technology. Background Art

[0002] Since the concept of Building Information Modeling (BIM) was proposed, computer-aided design technology has achieved rapid development. Combining BIM with positioning and three-dimensional software systems can provide intuitive guidance for complex engineering projects and improve the management capabilities of strip-line projects and large-scale regional projects. For large-scale BIM model management, existing technologies encode BIM models, classify BIM models, and import BIM models into GIS systems in batches for display.

[0003] In the actual application of BIM, Building Information Management is the management of the construction process based on BIM. In the actual operation process, it is necessary to face the use of BIM by multiple participants for different purposes. Usually, BIM is controlled by the general contractor as a whole, and a complete BIM is built based on its own architectural design capabilities or an outsourced BIM design team. After that, the specific construction of the project is subcontracted. The above subcontractors include pipeline contractors, pavement contractors, various building contractors, etc.

[0004] In the process of subcontracting the construction, the general contractor will show the BIM content of different parts to the subcontractor. In the process of subcontract inquiry, for the convenience of explanation and display, the general contractor needs to extract the BIM of the corresponding engineering part of the subcontractor and generate a three-dimensional effect to show it to the subcontractor, and explain the engineering situation and overall needs to the subcontractor. This part of the work usually does not accurately explain and display the details of the construction. What the general contractor needs more is to display the subcontracted projects quickly and conveniently to adapt to places such as conference rooms where hardware equipment is not perfect, so as to help the smooth progress of the display work. When the subcontractor has a clear intention to accept the construction work, the general contractor will provide the subcontractor with the complete BIM of the corresponding part required for the construction. Correspondingly, at this time, it is necessary to provide a complete and accurately positioned BIM so that the subcontractor can read the construction requirements in detail and provide a quotation later. Summary of the invention

[0005] The purpose of the embodiment of the present application is to propose a building information processing method and system based on BIM technology that can facilitate the general contractor to display engineering information to the subcontractor during the investment process.

[0006] In order to solve the above technical problems, the embodiment of the present application provides a building information processing method based on BIM technology, which adopts the following technical solution:

[0007] A building information processing method based on BIM technology comprises the following steps:

[0008] Summarize all BIM models included in the project in the general package;

[0009] Classify the BIM model according to the subcontracted construction content to obtain several BIM classifications containing the BIM model;

[0010] Lightweight display step, lightweight processing is performed on each BIM model in the BIM classification;

[0011] Extracting a point- and line-based 3D model representation from the lightweight BIM model, and extracting the corresponding graphic texture identification;

[0012] Extract the specific GIS information required for the lightweight BIM model display, and construct a GIS three-dimensional scene based on the lightweight BIM model contained in the BIM classification and the selected specific GIS information; the GIS three-dimensional scene includes one or more of the image information, topographic and hydrological information, existing road and building information, and zoning information of the landing environment of the lightweight BIM model; in the GIS three-dimensional scene, a reference indicator is set, and the position and posture of the reference indicator are defined in the GIS three-dimensional scene;

[0013] Based on the position and posture of the reference indicator, determine the position and posture relationship between the lightweight BIM model and the reference indicator, load the lightweight BIM model and visualize it in the GIS three-dimensional scene;

[0014] The loading is to clear the invisible parts of the lightweight BIM model in the visual range of the user in the GIS three-dimensional scene, and load the three-dimensional model of the displayable part in the GIS three-dimensional scene according to the position and posture relationship between the three-dimensional model and the reference indicator, so as to perform hierarchical loading;

[0015] A specific rendering scene is set according to the BIM classification. When displaying visually, the depth information of each lightweight BIM model within the visual range of the user in the GIS three-dimensional scene is refreshed. In the rendering scene, according to the projection area of ​​the surface composed of the points and lines included in each lightweight BIM model under the current depth information, the rendering task amount is proportionally allocated to the surface, and in the surface, according to the graphic texture identifier, specific patterns and textures are extracted to perform rendering; then the image displayed to the user is refreshed;

[0016] When receiving a display request for a subcontract from the general contractor, executing a lightweight display step;

[0017] When a download request is received from a subcontractor, the complete BIM model of the construction content corresponding to the subcontractor will be transmitted to the subcontractor.

[0018] Furthermore, when a request for replacement of the displayed BIM category is received from the general contractor, a new GIS three-dimensional scene is established for the lightweight BIM model contained in the replaced BIM category;

[0019] A lightweight BIM model is extracted based on point and line three-dimensional model representation according to the replaced BIM classification;

[0020] Compare the 3D model extracted by the lightweight BIM model in the BIM classification before the replacement, and when a 3D model already exists in the BIM classification before the replacement, copy and move the loaded 3D model to the new GIS 3D scene; perform secondary rendering on the facet according to the graphic texture identifier based on the rendering scene of the replaced IBM classification, and superimpose the secondary rendering on the existing rendering to update the display effect of the facet on the 3D model that already exists in the BIM classification before the replacement, and display it to the user; so as to realize the visual display of the lightweight BIM model in the new GIS 3D scene;

[0021] When a three-dimensional model does not exist in the BIM classification before the replacement, the lightweight BIM model is loaded and visualized in the new GIS three-dimensional scene.

[0022] Further, after responding to the request to replace the displayed BIM classification, when the general contractor selects a lightweight BIM model that already exists in a specific BIM classification before the replacement;

[0023] Extracting specific GIS information required for displaying the lightweight BIM model to select image information of the landing environment of the lightweight BIM model, and adjusting the visual range with the selected lightweight BIM model as the center so that the image information of the landing environment is presented within the visual range;

[0024] According to the change of the position and posture of the benchmark indicator when the visual range is adjusted, the position and posture of the lightweight BIM model in the replaced BIM category are rotated, and according to the position and posture of the benchmark indicator, the position and posture relationship between the lightweight BIM model and the benchmark indicator is determined; and the silhouette of the lightweight BIM model included in the BIM category before the replacement is displayed.

[0025] Furthermore, when a point-and-line based three-dimensional model appears multiple times in the BIM classification, one of the three-dimensional models is loaded into the GIS three-dimensional scene. Then, based on the position and posture relationship between the remaining three-dimensional models and the benchmark indicators in the GIS three-dimensional scene, copying and moving are performed in the GIS three-dimensional scene to realize the loading of the three-dimensional model.

[0026] Furthermore, the performing classification on the BIM model further includes dividing the core classification according to the frequency of use of the BIM model, and when the number of the BIM classifications including the BIM model exceeds a preset value, or the proportion of the BIM classifications including the BIM model to all BIM classifications exceeds a preset value, the BIM model is classified into the core classification;

[0027] A point- and line-based three-dimensional model representation is extracted in advance for the lightweight BIM model in the core classification. When a GIS three-dimensional scene is constructed, the three-dimensional model is preloaded for the lightweight BIM model in the core classification in the GIS three-dimensional scene.

[0028] In order to solve the above technical problems, the embodiment of the present application further provides a building information processing device based on BIM technology, which adopts the following technical solution:

[0029] A building information processing device based on BIM technology, comprising:

[0030] Classification module, used to summarize all BIM models included in the project in the general package;

[0031] Classify the BIM model according to the subcontracted construction content to obtain several BIM classifications containing the BIM model;

[0032] Lightweight display module, used to perform lightweight processing on each BIM model in the BIM classification;

[0033] Extracting a point- and line-based 3D model representation from the lightweight BIM model, and extracting the corresponding graphic texture identification;

[0034] Extract the specific GIS information required for the lightweight BIM model display, and construct a GIS three-dimensional scene based on the lightweight BIM model contained in the BIM classification and the selected specific GIS information; the GIS three-dimensional scene includes one or more of the image information, topographic and hydrological information, existing road and building information, and zoning information of the landing environment of the lightweight BIM model; in the GIS three-dimensional scene, a reference indicator is set, and the position and posture of the reference indicator are defined in the GIS three-dimensional scene;

[0035] Based on the position and posture of the reference indicator, determine the position and posture relationship between the lightweight BIM model and the reference indicator, load the lightweight BIM model and visualize it in the GIS three-dimensional scene;

[0036] The loading is to clear the invisible parts of the lightweight BIM model in the visual range of the user in the GIS three-dimensional scene, and load the three-dimensional model of the displayable part in the GIS three-dimensional scene according to the position and posture relationship between the three-dimensional model and the reference indicator, so as to perform hierarchical loading;

[0037] A specific rendering scene is set according to the BIM classification. When displaying visually, the depth information of each lightweight BIM model within the visual range of the user in the GIS three-dimensional scene is refreshed. In the rendering scene, according to the projection area of ​​the surface composed of the points and lines included in each lightweight BIM model under the current depth information, the rendering task amount is proportionally allocated to the surface, and in the surface, according to the graphic texture identifier, specific patterns and textures are extracted to perform rendering; then the image displayed to the user is refreshed;

[0038] A general package module, configured to call the lightweight display module when receiving a display request for a sub-package proposed by the general package;

[0039] The subcontracting module is used to transmit the complete BIM model of the construction content corresponding to the subcontract to the subcontractor when receiving a download request from the subcontractor.

[0040] A computer device is also disclosed, including a memory and a processor, wherein a computer program is stored in the memory, and wherein the processor implements the steps of the above-mentioned building information processing method based on BIM technology when executing the computer program.

[0041] A computer-readable storage medium is also disclosed, characterized in that a computer program is stored on the computer-readable storage medium, and when the computer program is executed by a processor, the steps of a building information processing method based on BIM technology as described above are implemented.

[0042] Compared with the prior art, the embodiments of the present application have the following beneficial effects: the BIM model is classified according to the subcontract construction content to obtain the BIM classification. When the general contractor needs to extract information from the subcontract for display, the BIM classification is displayed, thereby reducing the total amount of BIM model display and improving the efficiency of BIM model display.

[0043] On this basis, for the bidding description site, project negotiation site, etc., where there is no need to check the details in detail, and the on-site equipment does not support it, and the on-site environment does not allow the BIM model to be displayed in detail, the BIM model in the BIM model is lightweight displayed. Specifically, by reducing the three-dimensional structure fixed point edges and display surfaces, the BIM model itself is lightweight processed, and then the corresponding GIS three-dimensional scene is constructed according to the lightweight BIM model that needs to be displayed in the BIM classification, so that when the model is displayed, only the image processing is performed based on the minimum environment, and the benchmark indicator is set, so that a small number of lightweight BIM models in the classification are loaded in the GIS three-dimensional scene with a unified reference. On the one hand, the specifications of the constructed GIS scene are small, and on the other hand, only a small number of lightweight BIM models need to be positioned and loaded. Therefore, when the lightweight BIM model is directly loaded in the GIS three-dimensional scene with a unified reference, the accuracy can be guaranteed. In this way, there is no need to perform model mapping between each lightweight BIM model and the GIS three-dimensional scene, and then load it into the GIS three-dimensional scene, which improves the loading speed of the lightweight BIM model.

[0044] Afterwards, based on the BIM classification, a unified rendering scene is set to render the 3D model of the BIM model loaded in the GIS 3D scene. The rendering scene includes light parameters, ambient light parameters, ripples, surface effects, etc. The lightweight BIM model is rendered based on the unified rendering scene. On this basis, its respective material, texture and other specific indicators are rendered separately, and the results of the unified rendering and the results of the separate rendering are superimposed to obtain the final rendering result. In the rendering process, the rendering workload is evenly distributed based on the visual range. Because the BIM model is lightweight and has a small number of patches, more rendering tasks are set for patches with a large projection area in the visual range, and relatively fewer rendering tasks are set for patches with a small projection area. This can minimize the density of rendering tasks and improve the display speed of the lightweight BIM model.

[0045] When the general contractor makes a display request for the subcontractor, the display is performed based on the above lightweight display steps, and a small amount of on-site hardware resources can be used to quickly generate 3D images for display in introductory occasions such as bidding instructions and information release. When the intended subcontractor needs to provide detailed 3D images to clarify project requirements and calculate accurate quotations after the meeting, detailed 3D data is provided. This solution can facilitate the general contractor to display engineering information to the subcontractor according to the needs of different stages during the investment process. DETAILED DESCRIPTION

[0046] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs; the terms used in the specification of the application herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" and any variations thereof in the specification and claims of this application are intended to cover non-exclusive inclusions. The terms "first", "second", etc. in the specification and claims of this application are used to distinguish different objects, not to describe a specific order.

[0047] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0048] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application is described clearly and completely.

[0049] A building information processing method based on BIM technology comprises the following steps:

[0050] Summarize all BIM models included in the project in the general package;

[0051] Classify the BIM model according to the subcontracted construction content to obtain several BIM classifications containing the BIM model;

[0052] Lightweight display step, lightweight processing is performed on each BIM model in the BIM classification;

[0053] Extracting a point- and line-based 3D model representation from the lightweight BIM model, and extracting the corresponding graphic texture identification;

[0054] Extract the specific GIS information required for the lightweight BIM model display, and construct a GIS three-dimensional scene based on the lightweight BIM model contained in the BIM classification and the selected specific GIS information; the GIS three-dimensional scene includes one or more of the image information, topographic and hydrological information, existing road and building information, and zoning information of the landing environment of the lightweight BIM model; in the GIS three-dimensional scene, a reference indicator is set, and the position and posture of the reference indicator are defined in the GIS three-dimensional scene;

[0055] Based on the position and posture of the reference indicator, determine the position and posture relationship between the lightweight BIM model and the reference indicator, load the lightweight BIM model and visualize it in the GIS three-dimensional scene;

[0056] The loading is to clear the invisible parts of the lightweight BIM model in the visual range of the user in the GIS three-dimensional scene, and load the three-dimensional model of the displayable part in the GIS three-dimensional scene according to the position and posture relationship between the three-dimensional model and the reference indicator, so as to perform hierarchical loading;

[0057] A specific rendering scene is set according to the BIM classification. When displaying visually, the depth information of each lightweight BIM model within the visual range of the user in the GIS three-dimensional scene is refreshed. In the rendering scene, according to the projection area of ​​the surface composed of the points and lines included in each lightweight BIM model under the current depth information, the rendering task amount is proportionally allocated to the surface, and in the surface, according to the graphic texture identifier, specific patterns and textures are extracted to perform rendering; then the image displayed to the user is refreshed;

[0058] When receiving a display request for a subcontract from the general contractor, executing a lightweight display step;

[0059] When a download request is received from a subcontractor, the complete BIM model of the construction content corresponding to the subcontractor will be transmitted to the subcontractor.

[0060] Compared with the prior art, the embodiments of the present application have the following beneficial effects: the BIM model is classified according to the subcontract construction content to obtain the BIM classification. When the general contractor needs to extract information from the subcontract for display, the BIM classification is displayed, thereby reducing the total amount of BIM model display and improving the efficiency of BIM model display.

[0061] On this basis, for the bidding description site, project negotiation site, etc., where there is no need to check the details in detail, and the on-site equipment does not support it, and the on-site environment does not allow the BIM model to be displayed in detail, the BIM model in the BIM model is lightweight displayed. Specifically, by reducing the three-dimensional structure fixed point edges and display surfaces, the BIM model itself is lightweight processed, and then the corresponding GIS three-dimensional scene is constructed according to the lightweight BIM model that needs to be displayed in the BIM classification, so that when the model is displayed, only the image processing is performed based on the minimum environment, and the benchmark indicator is set, so that a small number of lightweight BIM models in the classification are loaded in the GIS three-dimensional scene with a unified reference. On the one hand, the specifications of the constructed GIS scene are small, and on the other hand, only a small number of lightweight BIM models need to be positioned and loaded. Therefore, when the lightweight BIM model is directly loaded in the GIS three-dimensional scene with a unified reference, the accuracy can be guaranteed. In this way, there is no need to perform model mapping between each lightweight BIM model and the GIS three-dimensional scene, and then load it into the GIS three-dimensional scene, which improves the loading speed of the lightweight BIM model.

[0062] Afterwards, based on the BIM classification, a unified rendering scene is set to render the 3D model of the BIM model loaded in the GIS 3D scene. The rendering scene includes light parameters, ambient light parameters, ripples, surface effects, etc. The lightweight BIM model is rendered based on the unified rendering scene. On this basis, its respective material, texture and other specific indicators are rendered separately, and the results of the unified rendering and the results of the separate rendering are superimposed to obtain the final rendering result. In the rendering process, the rendering workload is evenly distributed based on the visual range. Because the BIM model is lightweight and has a small number of patches, more rendering tasks are set for patches with a large projection area in the visual range, and relatively fewer rendering tasks are set for patches with a small projection area. This can minimize the density of rendering tasks and improve the display speed of the lightweight BIM model.

[0063] When the general contractor makes a display request for the subcontractor, the display is performed based on the above lightweight display steps, and a small amount of on-site hardware resources can be used to quickly generate 3D images for display in introductory occasions such as bidding instructions and information release. When the intended subcontractor needs to provide detailed 3D images to clarify project requirements and calculate accurate quotations after the meeting, detailed 3D data is provided. This solution can facilitate the general contractor to display engineering information to the subcontractor according to the needs of different stages during the investment process.

[0064] The BIM model is established based on the components in the construction project. Each BIM model can display specific components in the BIM system. The BIM model or lightweight BIM model needs to be actually loaded and visualized in the GIS three-dimensional scene before it can be seen by users. Specifically, the vertices and edges of the components are constructed in the GIS three-dimensional scene according to the three-dimensional model to form several display surfaces, and then the display surfaces are rendered to complete the visualization. The rendering process can choose rendering methods such as ray tracing or rasterization processing according to the actual situation.

[0065] Furthermore, when a request for replacement of the displayed BIM category is received from the general contractor, a new GIS three-dimensional scene is established for the lightweight BIM model contained in the replaced BIM category;

[0066] A lightweight BIM model is extracted based on point and line three-dimensional model representation according to the replaced BIM classification;

[0067] Compare the 3D model extracted by the lightweight BIM model in the BIM classification before the replacement, and when a 3D model already exists in the BIM classification before the replacement, copy and move the loaded 3D model to the new GIS 3D scene; perform secondary rendering on the facet according to the graphic texture identifier based on the rendering scene of the replaced IBM classification, and superimpose the secondary rendering on the existing rendering to update the display effect of the facet on the 3D model that already exists in the BIM classification before the replacement, and display it to the user; so as to realize the visual display of the lightweight BIM model in the new GIS 3D scene;

[0068] When a three-dimensional model does not exist in the BIM classification before the replacement, the lightweight BIM model is loaded and visualized in the new GIS three-dimensional scene.

[0069] When the general contractor meets with the subcontractor, if the plan is introduced to multiple subcontractors in succession, the construction information of the subcontractors needs to be displayed separately. Before the first subcontractor arrives, the general contractor can perform the display work in advance. However, when displaying the construction information of the second subcontractor, the preparation time is short. At this time, the general contractor proposes a request to replace the displayed BIM classification for the subcontractor. When extracting the replaced BIM classification, the 3D model in the replaced BIM classification is extracted and compared with the 3D model in the BIM classification before the replacement, so as to find some 3D models that have been completed before the request to replace the displayed BIM classification. When such 3D models exist, regardless of whether the 3D model is a representation of the same BIM model, it can be directly copied to the new GIS 3D scene for use. In the process of rendering such copied and moved 3D models, secondary rendering is performed according to the rendering scene defined by the replaced BIM classification and the graphic texture mark of the lightweight BIM model itself, and the display is superimposed with the existing rendering, which can greatly reduce the amount of calculation for displaying the lightweight BIM model and speed up the display.

[0070] Further, after responding to the request to replace the displayed BIM classification, when the general contractor selects a lightweight BIM model that already exists in a specific BIM classification before the replacement;

[0071] Extracting specific GIS information required for displaying the lightweight BIM model to select image information of the landing environment of the lightweight BIM model, and adjusting the visual range with the selected lightweight BIM model as the center so that the image information of the landing environment is presented within the visual range;

[0072] According to the change of the position and posture of the benchmark indicator when the visual range is adjusted, the position and posture of the lightweight BIM model in the replaced BIM category are rotated, and according to the position and posture of the benchmark indicator, the position and posture relationship between the lightweight BIM model and the benchmark indicator is determined; and the silhouette of the lightweight BIM model included in the BIM category before the replacement is displayed.

[0073] When the general contractor presents a project to a subcontractor, and this subcontractor overlaps with the engineering project that the subcontractor previously communicated with the general contractor is responsible for, it is necessary for the general contractor to inform the subcontractor of the relevant situation. For example, when the general contractor first explains to the pipeline contractor and then to the ventilation system contractor, the BIM classification of both of them includes the BIM model of a group of components called the shaft. At this time, the general contractor has the need to explain the associated area, that is, the shaft, and can propose a joint presentation.

[0074] Specifically, the viewing angle is first adjusted in combination with the GIS information, and the viewing angle is shifted according to the GIS information to switch to a position that can clearly display the shaft, pipeline and ventilation system. The position and posture of the 3D model are adjusted based on the position of the reference indicator. At this time, the displayed BIM category has been changed, and the 3D model is loaded based on the new GIS 3D scene. Therefore, only the 3D model corresponding to the ventilation system, that is, the lightweight BIM model in the replaced BIM category, can be displayed according to the aforementioned rules, while the lightweight BIM model contained in the BIM category before the replacement can only be reflected in the form of a silhouette. This solution can provide a joint display of the BIM category before the replacement and the BIM category after the replacement.

[0075] Furthermore, when a point- and line-based three-dimensional model appears multiple times in the BIM classification, one of the three-dimensional models is loaded into the GIS three-dimensional scene. Then, based on the position and posture relationship between the remaining three-dimensional models and the benchmark indicators in the GIS three-dimensional scene, copying and moving are performed in the GIS three-dimensional scene to realize the loading of the three-dimensional model.

[0076] Furthermore, the performing classification on the BIM model further includes dividing the core classification according to the frequency of use of the BIM model, and when the number of the BIM classifications including the BIM model exceeds a preset value, or the proportion of the BIM classifications including the BIM model to all BIM classifications exceeds a preset value, the BIM model is classified into the core classification;

[0077] A point- and line-based three-dimensional model representation is extracted in advance for the lightweight BIM model in the core classification. When a GIS three-dimensional scene is constructed, the three-dimensional model is preloaded for the lightweight BIM model in the core classification in the GIS three-dimensional scene.

[0078] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, the aforementioned storage medium can be a non-volatile storage medium such as a disk, an optical disk, a read-only memory (ROM), or a random access memory (RAM).

[0079] It should be understood that there is no strict order restriction for the execution of the steps, and they can be executed in other orders.

[0080] The present application provides an embodiment of a building information processing device based on BIM technology. The device embodiment corresponds to the above-mentioned building information processing method embodiment based on BIM technology. The device can be specifically applied to various electronic devices.

[0081] A building information processing device based on BIM technology, comprising:

[0082] Classification module, used to summarize all BIM models included in the project in the general package;

[0083] Classify the BIM model according to the subcontracted construction content to obtain several BIM classifications containing the BIM model;

[0084] Lightweight display module, used to perform lightweight processing on each BIM model in the BIM classification;

[0085] Extracting a point- and line-based 3D model representation from the lightweight BIM model, and extracting the corresponding graphic texture identification;

[0086] Extract the specific GIS information required for the lightweight BIM model display, and construct a GIS three-dimensional scene based on the lightweight BIM model contained in the BIM classification and the selected specific GIS information; the GIS three-dimensional scene includes one or more of the image information, topographic and hydrological information, existing road and building information, and zoning information of the landing environment of the lightweight BIM model; in the GIS three-dimensional scene, a reference indicator is set, and the position and posture of the reference indicator are defined in the GIS three-dimensional scene;

[0087] Based on the position and posture of the reference indicator, determine the position and posture relationship between the lightweight BIM model and the reference indicator, load the lightweight BIM model and visualize it in the GIS three-dimensional scene;

[0088] The loading is to clear the invisible parts of the lightweight BIM model in the visual range of the user in the GIS three-dimensional scene, and load the three-dimensional model of the displayable part in the GIS three-dimensional scene according to the position and posture relationship between the three-dimensional model and the reference indicator, so as to perform hierarchical loading;

[0089] A specific rendering scene is set according to the BIM classification. When displaying visually, the depth information of each lightweight BIM model within the visual range of the user in the GIS three-dimensional scene is refreshed. In the rendering scene, according to the projection area of ​​the surface composed of the points and lines included in each lightweight BIM model under the current depth information, the rendering task amount is proportionally allocated to the surface, and in the surface, according to the graphic texture identifier, specific patterns and textures are extracted to perform rendering; then the image displayed to the user is refreshed;

[0090] A general package module, configured to call the lightweight display module when receiving a display request for a sub-package proposed by the general package;

[0091] The subcontracting module is used to transmit the complete BIM model of the construction content corresponding to the subcontract to the subcontractor when receiving a download request from the subcontractor.

[0092] In order to solve the above technical problems, the embodiments of the present application also provide a computer device.

[0093] The computer device includes a memory, a processor, and a network interface that are interconnected and communicated through a system bus. It should be noted that those skilled in the art can understand that the computer device here is a device that can automatically perform numerical calculations and / or information processing according to pre-set or stored instructions, and its hardware includes but is not limited to a microprocessor, an application specific integrated circuit (ASIC), a field programmable gate array (FPGA), a digital signal processor (DSP), an embedded device, etc.

[0094] The computer device may be a computing device such as a desktop computer, a notebook, a PDA, a cloud server, etc. The computer device may interact with a user through a keyboard, a mouse, a remote controller, a touch pad, or a voice control device.

[0095] The memory includes at least one type of readable storage medium, and the readable storage medium includes flash memory, hard disk, multimedia card, card-type memory (for example, SD or DX memory, etc.), random access memory (RAM), static random access memory (SRAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), programmable read-only memory (PROM), magnetic memory, disk, optical disk, etc. In some embodiments, the memory can be an internal storage unit of the computer device 6, such as a hard disk or memory of the computer device. In other embodiments, the memory can also be an external storage device of the computer device, such as a plug-in hard disk equipped on the computer device, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. Of course, the memory can also include both the internal storage unit of the computer device and its external storage device. In this embodiment, the memory is generally used to store the operating system and various application software installed on the computer device, such as a program code of a building information processing method based on BIM technology, etc. In addition, the memory can also be used to temporarily store various types of data that have been output or are to be output.

[0096] In some embodiments, the processor may be a central processing unit (CPU), a controller, a microcontroller, a microprocessor, or other data processing chips. The processor is generally used to control the overall operation of the computer device. In this embodiment, the processor is used to run the program code stored in the memory or process data, such as running the program code of the building information processing method based on BIM technology.

[0097] The network interface may include a wireless network interface or a wired network interface, which is generally used to establish a communication connection between the computer device and other electronic devices.

[0098] The present application also provides another implementation, namely, providing a computer-readable storage medium, wherein the computer-readable storage medium stores a building information processing program based on BIM technology, and the building information processing program based on BIM technology can be executed by at least one processor so that the at least one processor performs the steps of a building information processing method based on BIM technology as described above.

[0099] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, computer, server, air conditioner, or network device, etc.) to execute the methods described in each embodiment of the present application.

[0100] Obviously, the embodiments described above are only a part of the embodiments of the present application, rather than all the embodiments. The present application can be implemented in many different forms. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present application more thorough and comprehensive. Although the present application is described in detail with reference to the aforementioned embodiments, for those skilled in the art, it is still possible to modify the technical solutions recorded in the aforementioned specific implementation methods, or to perform equivalent replacement of some of the technical features therein. Any equivalent structure made using the specification of the present application, directly or indirectly used in other related technical fields, is similarly within the scope of patent protection of the present application.

Claims

1. A building information processing method based on BIM technology, characterized in that: The steps include: Summarize all BIM models included in the project in the general package; Classify the BIM model according to the subcontracted construction content to obtain several BIM classifications containing the BIM model; Lightweight display step, lightweight processing is performed on each BIM model in the BIM classification; Extracting a point- and line-based 3D model representation from the lightweight BIM model, and extracting the corresponding graphic texture identification; Extract the specific GIS information required for the lightweight BIM model display, and construct a GIS three-dimensional scene based on the lightweight BIM model included in the BIM classification and the selected specific GIS information; the GIS three-dimensional scene includes one or more of the image information of the landing environment of the lightweight BIM model, topographic and hydrological information, existing road and building information, and zoning information; A reference indicator is provided in the GIS three-dimensional scene, and the position and posture of the reference indicator are defined in the GIS three-dimensional scene; Based on the position and posture of the reference indicator, determine the position and posture relationship between the lightweight BIM model and the reference indicator, load the lightweight BIM model and visualize it in the GIS three-dimensional scene; The loading is to clear the invisible parts of the lightweight BIM model in the visual range of the user in the GIS three-dimensional scene, and load the three-dimensional model of the displayable part in the GIS three-dimensional scene according to the position and posture relationship between the three-dimensional model and the reference indicator, so as to perform hierarchical loading; A specific rendering scene is set according to the BIM classification. When displaying visually, the depth information of each lightweight BIM model within the visual range of the user in the GIS three-dimensional scene is refreshed. In the rendering scene, according to the projection area of ​​the facets composed of the points and lines included in each lightweight BIM model under the current depth information, the rendering task amount is proportionally allocated to the facets, and in the facets, according to the graphic texture identifier, specific patterns and textures are extracted to perform rendering; Then refresh the image displayed to the user; When receiving a display request for a subcontract from the general contractor, executing a lightweight display step; When a download request is received from a subcontractor, the complete BIM model of the construction content corresponding to the subcontractor will be transmitted to the subcontractor.

2. A building information processing method based on BIM technology according to claim 1, characterized in that: When receiving a request from the general contractor to change the displayed BIM category, a new GIS 3D scene is created for the lightweight BIM model contained in the changed BIM category; A lightweight BIM model is extracted based on point and line three-dimensional model representation according to the replaced BIM classification; Compare the 3D model extracted by lightweight BIM model with the BIM classification before the replacement. If a 3D model already exists in the BIM classification before the replacement, copy and move the loaded 3D model to the new GIS 3D scene. Based on the rendering scene of the replaced IBM classification, secondary rendering is performed on the facet according to the graphic texture identifier, and the secondary rendering is superimposed on the existing rendering to update the display effect of the facet on the three-dimensional model that already exists in the BIM classification before the replacement, and display it to the user; so as to realize the visual display of the lightweight BIM model in the new GIS three-dimensional scene; When a three-dimensional model does not exist in the BIM classification before the replacement, the lightweight BIM model is loaded and visualized in the new GIS three-dimensional scene.

3. A building information processing method based on BIM technology according to claim 2, characterized in that: After responding to a request to change the displayed BIM category, when the general contractor selects a lightweight BIM model that already exists in a specific BIM category before the change; Extracting specific GIS information required for displaying the lightweight BIM model to select image information of the landing environment of the lightweight BIM model, and adjusting the visual range with the selected lightweight BIM model as the center so that the image information of the landing environment is presented within the visual range; According to the change of the position and posture of the benchmark indicator when the visual range is adjusted, the position and posture of the lightweight BIM model in the replaced BIM category are rotated, and according to the position and posture of the benchmark indicator, the position and posture relationship between the lightweight BIM model and the benchmark indicator is determined; and the silhouette of the lightweight BIM model included in the BIM category before the replacement is displayed.

4. The method for processing building information based on BIM technology according to claim 3, characterized in that: When a point-and-line based 3D model appears multiple times in the BIM classification, one of the 3D models is loaded into the GIS 3D scene. Then, based on the position and posture relationship between the remaining 3D models and the benchmark indicators in the GIS 3D scene, copying and moving are performed in the GIS 3D scene to realize the loading of the 3D model.

5. The method for processing building information based on BIM technology according to claim 4, characterized in that: The classifying of the BIM models further includes dividing the core classification according to the frequency of use of the BIM models, and when the number of the BIM classifications including the BIM models exceeds a preset value, or the proportion of the BIM classifications including the BIM models to all BIM classifications exceeds a preset value, the BIM models are classified into the core classifications; A point- and line-based three-dimensional model representation is extracted in advance for the lightweight BIM model in the core classification. When a GIS three-dimensional scene is constructed, the three-dimensional model is preloaded for the lightweight BIM model in the core classification in the GIS three-dimensional scene.

6. A building information processing device based on BIM technology, characterized in that: include: Classification module, used to summarize all BIM models included in the project in the general package; Classify the BIM model according to the subcontracted construction content to obtain several BIM classifications containing the BIM model; Lightweight display module, used to perform lightweight processing on each BIM model in the BIM classification; Extracting a point- and line-based 3D model representation from the lightweight BIM model, and extracting the corresponding graphic texture identification; Extract the specific GIS information required for the lightweight BIM model display, and construct a GIS three-dimensional scene based on the lightweight BIM model included in the BIM classification and the selected specific GIS information; the GIS three-dimensional scene includes one or more of the image information of the landing environment of the lightweight BIM model, topographic and hydrological information, existing road and building information, and zoning information; A reference indicator is provided in the GIS three-dimensional scene, and the position and posture of the reference indicator are defined in the GIS three-dimensional scene; Based on the position and posture of the reference indicator, determine the position and posture relationship between the lightweight BIM model and the reference indicator, load the lightweight BIM model and visualize it in the GIS three-dimensional scene; The loading is to clear the invisible parts of the lightweight BIM model in the visual range of the user in the GIS three-dimensional scene, and load the three-dimensional model of the displayable part in the GIS three-dimensional scene according to the position and posture relationship between the three-dimensional model and the reference indicator, so as to perform hierarchical loading; A specific rendering scene is set according to the BIM classification. When displaying visually, the depth information of each lightweight BIM model within the visual range of the user in the GIS three-dimensional scene is refreshed. In the rendering scene, according to the projection area of ​​the surface composed of the points and lines included in each lightweight BIM model under the current depth information, the rendering task amount is proportionally allocated to the surface, and in the surface, according to the graphic texture identifier, specific patterns and textures are extracted to perform rendering; then the image displayed to the user is refreshed; A general package module, configured to call the lightweight display module when receiving a display request for a sub-package proposed by the general package; The subcontracting module is used to transmit the complete BIM model of the construction content corresponding to the subcontract to the subcontractor when receiving a download request from the subcontractor.

7. A computer device comprising a memory and a processor, wherein a computer program is stored in the memory, wherein: When the processor executes the computer program, the steps of a building information processing method based on BIM technology as described in any one of claims 1 to 5 are implemented.

8. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of a building information processing method based on BIM technology as described in any one of claims 1 to 5 are implemented.

Citation Information

Patent Citations

  • Lightweight visualization method of building information model based on Web3D

    CN109145366A

  • BIM (Building Information Modeling) and GIS (Geographic Information System) information fusion display method and related components

    CN114663324A