A safety monitoring method for power loads based on chaotic phase space neural network model

By considering factors such as temperature, humidity, wind speed, and holidays, environmental and human correlation coefficients are generated, and a neural network model is constructed for power load prediction, which solves the problem of low prediction accuracy in the existing technology and improves prediction accuracy and model training efficiency. .

CN118521007BActive Publication Date: 2024-10-18INFORMATION & COMM CO OF STATE GRID JILIN ELECTRIC POWER CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410970222.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-10-18
Estimated Expiration
2044-07-19

AI Technical Summary

Technical Problem

The existing chaotic phase space neural network model of power load does not consider many factors when predicting power load, such as temperature, humidity, wind speed and holidays, resulting in unsatisfactory prediction accuracy.

Method used

Collect power load, temperature, humidity, wind speed, power price and holiday data at multiple historical moments, calculate correlation coefficients, generate environmental and man-made correlation coefficients, form comprehensive time series data through chaotic phase space reconstruction technology, and build a neural network model to conduct forecasts and take these factors into account when forecasting.

Benefits of technology

It improves the accuracy of power load prediction, enhances the learning ability and prediction accuracy of the chaotic phase space neural network model, reduces the calculation amount of model training, and improves training efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118521007B_ABST
    Figure CN118521007B_ABST
Patent Text Reader

Abstract

The present invention provides a chaotic phase space neural network model safety monitoring method for electric load, and relates to the technical field of electric load safety monitoring. The present invention comprises: calculating the correlation coefficient between electric load and temperature, humidity and wind speed data, and combining temperature, humidity, wind speed and the correlation coefficient to generate an environmental correlation coefficient; calculating the correlation coefficient between electric load and electric power price and holiday value assignment data, and combining electric power price, holiday value assignment and the correlation coefficient to generate an artificial correlation coefficient; when predicting the electric load, the present invention introduces the influencing factors of temperature, humidity, wind speed, electric power price and whether it is a holiday, so as to improve the accuracy of electric load prediction, and by merging temperature, humidity and wind speed into the environmental correlation coefficient, merging holiday value assignment and electric power price into the setting of artificially correlated load, the calculation amount of model training is reduced to improve the efficiency of model training.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of power load safety monitoring, and in particular to a chaotic phase space neural network model safety monitoring method for power load. Background Art

[0002] Power load forecasting plays a very important role in the safe and economic operation of power systems. The power load time series obtained in practice show the characteristics of complexity, uncertainty and nonlinearity. Neural networks can map any complex nonlinear relationship and distribute the implicit characteristics and laws of samples on the connection weights of neural networks through learning. Based on chaos theory, it is very meaningful to reconstruct the power load phase space, couple the neural network model, study how to extract the dynamic information characteristics of the power load, explore the nonlinear prediction scheme in the load phase space, and then apply it to actual prediction and safety monitoring.

[0003] In the prior art, a chaotic phase space neural network model safety monitoring method for power load with publication number "CN102915511A" (main classification number is G06Q) takes daily power load as the research object, reconstructs the phase space based on chaos theory, explores the nonlinear prediction scheme in the load phase space, and then applies it to the physical modeling analysis method in actual prediction and safety monitoring. Its technical scheme is as follows: A. Collect daily load data of the power system to form a time series; B. Obtain the autocorrelation function of the sequence; C. Calculate the saturated correlation dimension of the daily load sequence to prove the chaotic characteristics of the sequence; D. Establish a multidimensional phase space of the power load to form learning samples and teacher values; E. Determine the neural network structure; F. Normalize the data; G. Learn the network; H. Output the predicted value; I. The output value of the neural network is restored to the actual load value, which has the advantage of monitoring the change law of daily power load and thus ensuring the safe and economical operation of the power system.

[0004] However, the existing technology still has major defects. For example, when reconstructing the phase space and establishing a model to predict the power load, the existing technology only uses the daily load data of the power load to reconstruct the phase space and train the model, and does not take into account the problem that the power system must consider many factors when supplying power. For example, the power system will be affected by the external environment (such as temperature, humidity, wind speed) and the man-made environment (such as electricity prices, whether it is a holiday) when supplying power. Therefore, the existing technology does not consider many factors when predicting the power load, has a certain one-sidedness, and the prediction accuracy is not ideal.

[0005] The above information disclosed in this Background section is only for enhancement of understanding of the background of the present disclosure and therefore it may contain information that does not constitute the prior art that is already known to one of ordinary skill in the art. Summary of the invention

[0006] The purpose of the present invention is to provide a chaotic phase space neural network model safety monitoring method for power load to solve the problems raised in the above background technology.

[0007] To achieve the above object, the present invention provides the following technical solutions:

[0008] A chaotic phase space neural network model safety monitoring method for power loads comprises the following steps:

[0009] S1, continuously collect power load, temperature, humidity, wind speed, and power price at multiple historical moments to form power load time series data, temperature time series data, humidity time series data, wind speed time series data, and power price time series data;

[0010] S2, preprocessing the data in step S1, and generating holiday-assigned time series data by assigning historical moments that are holidays to 1 and historical moments that are not holidays to 0, the preprocessing includes replacing abnormal values, supplementing missing values, and normalizing;

[0011] S3, calculating the correlation coefficient between the power load and the temperature, humidity, and wind speed data, and combining the temperature, humidity, wind speed, and each correlation coefficient to generate an environmental correlation coefficient related to the power load, and summarizing the environmental correlation coefficients to form environmental time series data for improving the learning ability and prediction accuracy of the chaotic phase space neural network model;

[0012] S4, calculating the correlation coefficient between the power load and the power price and holiday value data, and combining the power price, holiday value and each correlation coefficient to generate an artificial correlation coefficient related to the power load, and summarizing the artificial correlation coefficient to form artificial time series data for improving the learning ability and prediction accuracy of the chaotic phase space neural network model;

[0013] S5, based on the chaotic phase space reconstruction technology, the power load time series data, the environmental time series data and the artificial time series data are processed to determine the delay time and the embedding dimension of the power load time series data, the environmental time series data and the artificial time series data, and the average value of all the delay times is used as the comprehensive delay time, and the maximum value of all the embedding dimensions is used as the comprehensive embedding dimension;

[0014] S6, combining the power load time series data, the environmental time series data and the human time series data to form comprehensive time series data, and reconstructing the chaotic phase space of the comprehensive time series data through comprehensive delay time and comprehensive embedding dimension;

[0015] S7, constructing a neural network model, extracting historical trajectory data from the chaotic phase space, dividing the historical trajectory data into a training set and a test set in chronological order, and ensuring that the data in the training set and the test set are continuous time series, inputting the training set into the neural network model for training, and inputting the test set into the trained neural network model for testing, so as to obtain a trained power load forecasting model, wherein the input of the power load forecasting model is the power load at the previous moment, the environmental correlation coefficient and the human correlation coefficient, and the output is the power load at the next moment;

[0016] S8, collect and process the data of the power coefficient to be monitored according to the method of steps S1-S6, input the processed data into the power load prediction model to predict the future power load, and compare the predicted future power load with the safe power load threshold of the power system, and alarm when the predicted future power load exceeds the safe power load threshold.

[0017] Further, the holiday value at the kth historical moment and the power load, the temperature, the humidity, the wind speed, and the power price preprocessed in step S2 are calibrated as JF k , P k , T k RH k 、V k , JG k , k represents the number of different historical moments, and k = 1, 2, 3, ..., K, K represents the total number of historical moments, and K∈N + .

[0018] Furthermore, the correlation coefficients between power load and temperature, humidity, and wind speed data are calculated, and the temperature, humidity, wind speed, and each correlation coefficient are combined to generate an environmental correlation coefficient related to power load. The environmental correlation coefficients are summarized to form environmental time series data for improving the learning ability and prediction accuracy of the chaotic phase space neural network model. The specific logic is as follows:

[0019] S31, calculate the temperature correlation coefficient between power load and temperature, the calculation formula is as follows:

[0020]

[0021] in, Represents the average value of each power load data in the power load time series data, Represents the average value of each temperature data in the temperature time series data, r (P,T) represents the temperature correlation coefficient;

[0022] S32, calculate the humidity correlation coefficient between the power load and humidity, the calculation formula is as follows:

[0023]

[0024] in, Represents the average value of each humidity data in the humidity time series data, r (P,RH) represents the humidity correlation coefficient;

[0025] S33, calculating the wind speed correlation coefficient between the power load and the wind speed, the calculation formula is as follows:

[0026]

[0027] in, Represents the average value of each wind speed data in the wind speed time series data, r (P,V) represents the wind speed correlation coefficient;

[0028] S34, scaling the temperature correlation coefficient, the humidity correlation coefficient, and the wind speed correlation coefficient in equal proportion to generate a temperature weight, a humidity weight, and a wind speed weight, wherein the temperature weight, the humidity weight, and the wind speed weight satisfy that the absolute value accumulation is equal to 1;

[0029] S35, combining the temperature weight, the humidity weight, the wind speed weight, the temperature, the humidity and the wind speed to generate an environmental correlation coefficient related to the power load, and aggregating the environmental correlation coefficients to form environmental time series data;

[0030] The calculation formula of the environmental correlation coefficient is as follows:

[0031] HJ k =T k *w T +RH k *w RH +V k *w V

[0032] Among them, w T Represents the temperature correlation coefficient r (P,T) The corresponding temperature weight, w RH Represents the correlation coefficient with humidity r (P,RH) The corresponding humidity weight, w V Represents the correlation coefficient with wind speed r (P,V) Corresponding wind speed weight, HJ k Represents the environmental correlation coefficient at the kth historical moment.

[0033] Furthermore, the correlation coefficients between power load and power price and holiday value data are calculated, and the power price, holiday value and each correlation coefficient are combined to generate an artificial correlation coefficient related to power load. The artificial correlation coefficients are summarized to form artificial time series data for improving the learning ability and prediction accuracy of the chaotic phase space neural network model. The specific logic is:

[0034] S41, calculate the price correlation coefficient between power load and power price, the calculation formula is as follows:

[0035]

[0036] in, represents the average value of each electricity price data in the electricity price time series data, r (P,JG) represents the price correlation coefficient;

[0037] S42, calculate the holiday correlation coefficient between the power load and the holiday assignment, the calculation formula is as follows:

[0038]

[0039] in, represents the average value of each holiday value in the holiday value time series data, r (P,JF) represents the holiday correlation coefficient;

[0040] S43, scaling the price correlation coefficient and the holiday correlation coefficient in equal proportion to generate a price weight and a holiday weight, and the price weight and the holiday weight satisfy that the absolute value accumulation is equal to 1;

[0041] S44, combining the price weight, the holiday weight, the power price and the holiday assignment to generate an artificial correlation coefficient related to the power load, and aggregating the artificial correlation coefficient to form artificial time series data;

[0042] The calculation formula of the artificial correlation coefficient is as follows:

[0043] R k =JG k *w JG +JF k *w JF

[0044] Among them, w JG Represents the correlation coefficient with price r (P,JG) The corresponding price weight, w JF Represents the correlation coefficient with holidays r (P,JF) Corresponding holiday weight, RW k represents the artificial correlation coefficient at the kth historical moment.

[0045] Furthermore, the delay time is determined by an average mutual information method, and the embedding dimension is determined by a pseudo-false neighbor point method.

[0046] Furthermore, the environmental time series data is calibrated as HJ, then HJ=(HJ 1 ,HJ 2 ,…,HJ k ,…,HJ K ), the artificial time series data is marked as RW, then RW=(RW 1 ,RW 2 ,…,RW k ,…,RW K ), the comprehensive time series data is calibrated as ZH, and ZH=(ZH 1 ,ZH 2 ,…,ZH k ,…,ZH K ), and ZH k =(P k ,HJ k ,RW k ), the comprehensive embedding dimension is calibrated as m, the comprehensive delay time is calibrated as τ, and the value of the i-th phase space point in the reconstructed chaotic phase space is calibrated as φ i ,but:

[0047]

[0048] Among them, i=1,2,…,K-(m-1)τ;

[0049] More specifically, expanding it yields the following results:

[0050]

[0051] Compared with the prior art, the present invention has the following beneficial effects:

[0052] The chaotic phase space neural network model safety monitoring method for power load of the present invention introduces the influencing factors of temperature, humidity, wind speed, electricity price and whether it is a holiday when predicting the power load, so as to improve the accuracy of power load prediction, and by combining temperature, humidity and wind speed into environmental correlation coefficients, and combining holiday assignments and electricity prices into artificial related load settings, while improving the learning ability and prediction accuracy of the chaotic phase space neural network model, the calculation amount of model training is reduced to improve the efficiency of model training. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 It is a schematic flow chart of the chaotic phase space neural network model safety monitoring method of power load in the present invention. DETAILED DESCRIPTION

[0054] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments.

[0055] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0056] Example:

[0057] See also Figure 1 The present invention provides a chaotic phase space neural network model safety monitoring method for power load, comprising the following steps:

[0058] S1, continuously collect power load, temperature, humidity, wind speed, and power price at multiple historical moments to form power load time series data, temperature time series data, humidity time series data, wind speed time series data, and power price time series data;

[0059] It should be noted that power load data can be obtained through report data from power companies or relevant government energy departments. Temperature, humidity and wind speed data can be collected on-site by installing temperature sensors, humidity sensors and wind speed sensors near the power system, or obtained from the website of the meteorological department. Power price data can be obtained from the power market website. This is existing technology and will not be elaborated here.

[0060] S2, preprocessing the data in step S1, and generating holiday-assigned time series data by assigning historical moments of holidays to 1 and historical moments of non-holidays to 0, the preprocessing includes multiple conventional data preprocessing steps such as replacing abnormal values, supplementing missing values, and normalization, and specifically, existing data preprocessing methods can be used;

[0061] As an implementation mode, replacing an outlier value specifically involves calculating the relative error between the current data value and the two data values ​​before and after it. If the relative error is greater than a preset error threshold, the current data value is determined to be an outlier, and the average of the two data values ​​before and after it is used as the replacement value of the outlier. The specific value of the preset error threshold is set by a person skilled in the art according to actual conditions, such as 20%, 30%, 40%, etc., which is not limited here. Supplementing missing values ​​specifically involves taking the average of the two data values ​​before and after the missing value position as the supplementary value of the missing value. Normalization processing specifically involves normalizing the data after replacing the outlier value and supplementing the missing value according to the minimum-maximum scaling method, so that the scales of different data are unified within the range of 0-1 to avoid numerical deviations in the model training process. Of course, replacing outliers, supplementing missing values, and normalization processing can also adopt other existing technologies, which are not limited here.

[0062] The holiday value at the kth historical moment and the power load, temperature, humidity, wind speed, and power price preprocessed in step S2 are calibrated as JF k , P k , T k RH k 、V k , JG k , k represents the number of different historical moments, and k = 1, 2, 3, ..., K, K represents the total number of historical moments, and K∈N + The interval between adjacent historical moments can be 15 minutes, 30 minutes, 1 hour, 2 hours, etc., which is specifically set by those skilled in the art according to actual conditions and is not limited here.

[0063] S3, calculate the correlation coefficient between the power load and the temperature, humidity, and wind speed data, and combine the temperature, humidity, wind speed, and each correlation coefficient to generate an environmental correlation coefficient related to the power load, and summarize the environmental correlation coefficient to form environmental time series data for improving the learning ability and prediction accuracy of the chaotic phase space neural network model, as follows:

[0064] S31, calculate the temperature correlation coefficient between power load and temperature, the calculation formula is as follows:

[0065]

[0066] It should be noted that Represents the average value of each power load data in the power load time series data, Represents the average value of each temperature data in the temperature time series data, r (P,T)It indicates the temperature correlation coefficient. The larger the absolute value of the temperature correlation coefficient is, the stronger the correlation between the power load and the temperature is. On the contrary, the smaller the absolute value of the temperature correlation coefficient is, the weaker the correlation between the power load and the temperature is.

[0067] S32, calculate the humidity correlation coefficient between the power load and humidity, the calculation formula is as follows:

[0068]

[0069] It should be noted that Represents the average value of each humidity data in the humidity time series data, r (P,RH) It represents the humidity correlation coefficient. The larger the absolute value of the humidity correlation coefficient is, the stronger the correlation between the power load and humidity is. On the contrary, the smaller the absolute value of the humidity correlation coefficient is, the weaker the correlation between the power load and humidity is.

[0070] S33, calculating the wind speed correlation coefficient between the power load and the wind speed, the calculation formula is as follows:

[0071]

[0072] It should be noted that Represents the average value of each wind speed data in the wind speed time series data, r (P,V) It indicates the wind speed correlation coefficient. The larger the absolute value of the wind speed correlation coefficient is, the stronger the correlation between the power load and the wind speed is. On the contrary, the smaller the absolute value of the wind speed correlation coefficient is, the weaker the correlation between the power load and the wind speed is.

[0073] S34, scaling the temperature correlation coefficient, the humidity correlation coefficient, and the wind speed correlation coefficient in equal proportion to generate a temperature weight, a humidity weight, and a wind speed weight, wherein the temperature weight, the humidity weight, and the wind speed weight satisfy that the absolute value accumulation is equal to 1;

[0074] S35, combining the temperature weight, the humidity weight, the wind speed weight, the temperature, the humidity and the wind speed to generate an environmental correlation coefficient related to the power load, and aggregating the environmental correlation coefficients to form environmental time series data;

[0075] The calculation formula of the environmental correlation coefficient is as follows:

[0076] HJ k =T k *w T +RH k *w RH +V k *w V

[0077] It should be noted that w T Represents the temperature correlation coefficient r(P,T) The corresponding temperature weight, w RH Represents the correlation coefficient with humidity r (P,RH) The corresponding humidity weight, w V Represents the correlation coefficient with wind speed r (P,V) Corresponding wind speed weight, HJ k It represents the environmental correlation coefficient at the kth historical moment. The environmental correlation coefficient is obtained by multiplying the temperature, humidity, and wind speed by their respective corresponding weights and then accumulating them. This comprehensively considers the correlation between temperature, humidity, wind speed, and power load. By integrating the correlation between temperature, humidity, wind speed, and power load into the correlation between the environmental correlation coefficient and the power load, only the environmental correlation coefficient needs to be introduced in the subsequent model training, without introducing temperature, humidity, and wind speed. This ensures the learning ability and prediction accuracy of the chaotic phase space neural network model, reduces the amount of calculation for model training, and improves the efficiency of model training.

[0078] Wherein, the environmental time series data is calibrated as HJ, then HJ=(HJ 1 ,HJ 2 ,…,HJ k ,…,HJ K ).

[0079] S4, calculate the correlation coefficient between power load and power price and holiday value data, and combine the power price, holiday value and each correlation coefficient to generate an artificial correlation coefficient related to power load, and summarize the artificial correlation coefficient to form artificial time series data for improving the learning ability and prediction accuracy of the chaotic phase space neural network model, as follows:

[0080] S41, calculate the price correlation coefficient between power load and power price, the calculation formula is as follows:

[0081]

[0082] It should be noted that represents the average value of each electricity price data in the electricity price time series data, r (P,JG) It represents the price correlation coefficient. The larger the absolute value of the price correlation coefficient is, the stronger the correlation between power load and power price is. On the contrary, the smaller the absolute value of the price correlation coefficient is, the weaker the correlation between power load and power price is.

[0083] S42, calculate the holiday correlation coefficient between the power load and the holiday assignment, the calculation formula is as follows:

[0084]

[0085] It should be noted that represents the average value of each holiday value in the holiday value time series data, r (P,JF) It indicates the holiday correlation coefficient. The larger the absolute value of the holiday correlation coefficient is, the stronger the correlation between the power load and whether it is a holiday is. On the contrary, the smaller the absolute value of the holiday correlation coefficient is, the weaker the correlation between the power load and whether it is a holiday is.

[0086] S43, scaling the price correlation coefficient and the holiday correlation coefficient in equal proportion to generate a price weight and a holiday weight, and the price weight and the holiday weight satisfy that the absolute value accumulation is equal to 1;

[0087] S44, combining the price weight, the holiday weight, the power price and the holiday assignment to generate an artificial correlation coefficient related to the power load, and aggregating the artificial correlation coefficient to form artificial time series data;

[0088] The calculation formula of the artificial correlation coefficient is as follows:

[0089] R k =JG k *w JG +JF k *w JF

[0090] It should be noted that w JG Represents the correlation coefficient with price r (P,JG) The corresponding price weight, w JF Represents the correlation coefficient with holidays r (P,JF) Corresponding holiday weight, RW k It represents the artificial correlation coefficient at the kth historical moment. The artificial correlation coefficient is obtained by multiplying the electricity price and holiday assignment by their corresponding weights and then accumulating them. This comprehensively considers the correlation between electricity price, holiday assignment and power load. By integrating the correlation between electricity price, holiday assignment and power load into the correlation between artificial correlation coefficient and power load, only the artificial correlation coefficient needs to be introduced in the subsequent model training, without introducing electricity price and holiday assignment. This ensures the learning ability and prediction accuracy of the chaotic phase space neural network model, reduces the calculation amount of model training and improves the efficiency of model training.

[0091] Among them, the artificial time series data is marked as RW, then RW=(RW 1 ,RW 2 ,…,RW k ,…,RW K ).

[0092] S5, based on the chaotic phase space reconstruction technology, the power load time series data, the environmental time series data and the artificial time series data are processed to determine the delay time and the embedding dimension of the power load time series data, the environmental time series data and the artificial time series data, and the average value of all the delay times is used as the comprehensive delay time, and the maximum value of all the embedding dimensions is used as the comprehensive embedding dimension;

[0093] It should be noted that the existing technology can be used to determine the delay time and the embedding dimension through the chaotic phase space reconstruction technology. For example, the delay time can be determined by the average mutual information method, and the embedding dimension can be determined by the pseudo-false neighbor point method, which will not be elaborated here.

[0094] S6, combining the power load time series data, the environmental time series data and the human time series data to form the comprehensive time series data, and reconstructing the chaotic phase space of the comprehensive time series data by comprehensive delay time and comprehensive embedding dimension, as follows:

[0095] The comprehensive time series data is calibrated as ZH, and ZH=(ZH 1 ,ZH 2 ,…,ZH k ,…,ZH K ), and ZH k =(P k ,HJ k ,RW k ), the comprehensive embedding dimension is calibrated as m, and the comprehensive delay time is calibrated as τ. Then, the reconstructed chaotic phase space can be obtained according to the coordinate delay reconstruction method, as follows:

[0096]

[0097] It should be noted that φ i represents the value of the i-th phase space point in the reconstructed chaotic phase space, and i=1,2,…,K-(m-1)τ;

[0098] More specifically, expanding it yields the following results:

[0099]

[0100] S7, constructing a neural network model, extracting historical trajectory data from the chaotic phase space, dividing the historical trajectory data into a training set and a test set in chronological order, and ensuring that the data in the training set and the test set are continuous time series, inputting the training set into the neural network model for training, and inputting the test set into the trained neural network model for testing, so as to obtain a trained power load forecasting model, wherein the input of the power load forecasting model is the power load at the previous moment, the environmental correlation coefficient and the human correlation coefficient, and the output is the power load at the next moment;

[0101] It should be noted that the neural network model can use neural networks such as recurrent neural networks and long short-term memory networks, and can use mean square error or mean absolute error as a loss function to measure the difference between the model prediction value and the true value. When the model is trained using a training set, the weights and biases in the neural network can be updated by back propagation according to the loss function. This is a prior art and will not be elaborated on here. When the accuracy of the output value of the neural network model after the test set test reaches a predetermined standard, the training is considered to be completed, thereby obtaining a power load prediction model after training. The predetermined standard can be that the relative error between the model output value and the true value does not exceed 3%, 5%, 7%, etc., which is not limited here.

[0102] It should be noted that the data in the training set and the test set both include an input sequence and an output label corresponding to the input sequence. The input sequence is a plurality of consecutive power loads, environmental correlation coefficients, and human correlation coefficients. The output label is the power load located after the last power load. Dividing the historical trajectory data into a training set and a test set is a prior art and will not be elaborated here. The data ratio between the training set and the test set can be 70:30 or 80:20, which is not limited here.

[0103] S8, collecting and processing the data of the power coefficient to be monitored according to the method of steps S1-S6, inputting the processed data into the power load prediction model to predict the future power load, and comparing the predicted future power load with the safe power load threshold of the power system, and alarming when the predicted future power load exceeds the safe power load threshold;

[0104] It should be noted that the safe power load threshold of the power system is set by power production personnel based on actual conditions and is not restricted here.

[0105] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.

[0106] The above embodiments may be implemented in whole or in part by software, hardware, firmware or any other combination thereof. When implemented using software, the above embodiments may be implemented in whole or in part in the form of a computer program product. Those skilled in the art may appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein may be implemented by electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed by hardware or software methods depends on the specific application and design constraints of the technical solution.

[0107] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, and may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0108] The above description is only a specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application.

Claims

1. A chaotic phase space neural network model safety monitoring method for power load, characterized in that: The steps include: S1, continuously collect power load, temperature, humidity, wind speed, and power price at multiple historical moments to form power load time series data, temperature time series data, humidity time series data, wind speed time series data, and power price time series data; S2, preprocessing the data in step S1, and generating holiday-assigned time series data by assigning historical moments that are holidays to 1 and historical moments that are not holidays to 0, the preprocessing includes replacing abnormal values, supplementing missing values, and normalizing; S3, calculating the correlation coefficient between the power load and the temperature, humidity, and wind speed data, and combining the temperature, humidity, wind speed, and each correlation coefficient to generate an environmental correlation coefficient related to the power load, and summarizing the environmental correlation coefficients to form environmental time series data for improving the learning ability and prediction accuracy of the chaotic phase space neural network model; S4, calculating the correlation coefficient between the power load and the power price and holiday value data, and combining the power price, holiday value and each correlation coefficient to generate an artificial correlation coefficient related to the power load, and summarizing the artificial correlation coefficient to form artificial time series data for improving the learning ability and prediction accuracy of the chaotic phase space neural network model; S5, based on the chaotic phase space reconstruction technology, the power load time series data, the environmental time series data and the artificial time series data are processed to determine the delay time and the embedding dimension of the power load time series data, the environmental time series data and the artificial time series data, and the average value of all the delay times is used as the comprehensive delay time, and the maximum value of all the embedding dimensions is used as the comprehensive embedding dimension; S6, combining the power load time series data, the environmental time series data and the human time series data to form comprehensive time series data, and reconstructing the chaotic phase space of the comprehensive time series data through comprehensive delay time and comprehensive embedding dimension; S7, constructing a neural network model, extracting historical trajectory data from the chaotic phase space, dividing the historical trajectory data into a training set and a test set in chronological order, and ensuring that the data in the training set and the test set are continuous time series, inputting the training set into the neural network model for training, and inputting the test set into the trained neural network model for testing, so as to obtain a trained power load forecasting model, wherein the input of the power load forecasting model is the power load at the previous moment, the environmental correlation coefficient and the human correlation coefficient, and the output is the power load at the next moment; S8, collecting and processing the data of the power coefficient to be monitored according to the method of steps S1-S6, inputting the processed data into the power load prediction model to predict the future power load, and comparing the predicted future power load with the safe power load threshold of the power system, and alarming when the predicted future power load exceeds the safe power load threshold; The holiday value at the kth historical moment and the power load, the temperature, the humidity, the wind speed, and the power price preprocessed in step S2 are calibrated as JF k , P k , T k RH k 、V k , JG k , k represents the number of different historical moments, and k = 1, 2, 3, ..., K, K represents the total number of historical moments, and K∈N + ; The correlation coefficients between power load and temperature, humidity, and wind speed data are calculated, and the temperature, humidity, wind speed, and each correlation coefficient are combined to generate an environmental correlation coefficient related to power load. The environmental correlation coefficients are summarized to form environmental time series data for improving the learning ability and prediction accuracy of the chaotic phase space neural network model. The specific logic is as follows: S31, calculate the temperature correlation coefficient between power load and temperature, the calculation formula is as follows: in, Represents the average value of each power load data in the power load time series data, Represents the average value of each temperature data in the temperature time series data, r (P,T) represents the temperature correlation coefficient; S32, calculate the humidity correlation coefficient between the power load and humidity, the calculation formula is as follows: in, Represents the average value of each humidity data in the humidity time series data, r (P,RH) represents the humidity correlation coefficient; S33, calculating the wind speed correlation coefficient between the power load and the wind speed, the calculation formula is as follows: in, Represents the average value of each wind speed data in the wind speed time series data, r (P,V) represents the wind speed correlation coefficient; S34, scaling the temperature correlation coefficient, the humidity correlation coefficient, and the wind speed correlation coefficient in equal proportion to generate a temperature weight, a humidity weight, and a wind speed weight, wherein the temperature weight, the humidity weight, and the wind speed weight satisfy that the absolute value accumulation is equal to 1; S35, combining the temperature weight, the humidity weight, the wind speed weight, the temperature, the humidity and the wind speed to generate an environmental correlation coefficient related to the power load, and aggregating the environmental correlation coefficients to form environmental time series data; The calculation formula of the environmental correlation coefficient is as follows: HJ k =T k *In T +RH k *In RH +V k *In V Among them, w T Represents the temperature correlation coefficient r (P,T) The corresponding temperature weight, w RH Represents the correlation coefficient with humidity r (P,RH) The corresponding humidity weight, w V Represents the correlation coefficient with wind speed r (P,V) Corresponding wind speed weight, HJ k represents the environmental correlation coefficient at the kth historical moment; The correlation coefficients between power load and power price and holiday value data are calculated, and the power price, holiday value and each correlation coefficient are combined to generate an artificial correlation coefficient related to power load. The artificial correlation coefficients are summarized to form artificial time series data for improving the learning ability and prediction accuracy of the chaotic phase space neural network model. The specific logic is as follows: S41, calculate the price correlation coefficient between power load and power price, the calculation formula is as follows: in, represents the average value of each electricity price data in the electricity price time series data, r (P,JG) represents the price correlation coefficient; S42, calculate the holiday correlation coefficient between the power load and the holiday assignment, the calculation formula is as follows: in, represents the average value of each holiday value in the holiday value time series data, r (P,JF) represents the holiday correlation coefficient; S43, scaling the price correlation coefficient and the holiday correlation coefficient in equal proportion to generate a price weight and a holiday weight, and the price weight and the holiday weight satisfy that the absolute value accumulation is equal to 1; S44, combining the price weight, the holiday weight, the power price and the holiday assignment to generate an artificial correlation coefficient related to the power load, and aggregating the artificial correlation coefficient to form artificial time series data; The calculation formula of the artificial correlation coefficient is as follows: RW k =JG k *w JG +JF k *w JF Among them, w JG Represents the correlation coefficient with price r (P,JG) The corresponding price weight, w JF Represents the correlation coefficient with holidays r (P,JF) Corresponding holiday weight, RW k represents the artificial correlation coefficient at the kth historical moment.

2. The chaotic phase space neural network model safety monitoring method for power load according to claim 1 is characterized by: The delay time is determined by an average mutual information method, and the embedding dimension is determined by a pseudo-false neighbor method.

3. The chaotic phase space neural network model safety monitoring method for power load according to claim 1 is characterized by: The environmental time series data is calibrated as HJ, then HJ=(HJ1, HJ2, ..., HJ k , …, HJ K ), the artificial time series data is marked as RW, then RW=(RW1, RW2, …, RW k , …, RW K ), the comprehensive time series data is marked as ZH, and ZH=(ZH1, ZH2, ..., ZH k ,…,ZH K ), and ZH k =(P k , H.J. k , R.W. k ), the comprehensive embedding dimension is calibrated as m, the comprehensive delay time is calibrated as τ, and the value of the i-th phase space point in the reconstructed chaotic phase space is calibrated as φ i ,but: Among them, i=1, 2,...,K-(m-1)τ; Expanding it gives the following result:

Citation Information

Patent Citations

  • Safety monitoring method for neural network model of power-loaded chaotic phase space

    CN102915511A

  • Power load prediction method based on phase space reconstruction and data driving

    CN112232593A