A method for constructing bored piles at the bottom of a pit by combining pressure reduction with weight pressing

By setting up a pressure relief well at the bottom of the pit and controlling the height of the pressurized water, combined with the use of heavy-weight mud, the problem of the spread of contaminated soil and the rise of pressurized water is solved, the structural settlement is reduced, and the construction safety and quality of the cast-in-place piles at the bottom of the pit are ensured. .

CN118531778BActive Publication Date: 2024-10-08SHANGHAI CONSTRUCTION FIRST CONSTRUCTION (GROUP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410961938.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-10-08
Estimated Expiration
2044-07-18

AI Technical Summary

Technical Problem

In underground projects containing contaminated soil layers and confined water layers, it is difficult to avoid the spread of contaminated soil and the rise of confined water with existing technology. At the same time, the depressurization of conventional confined water to the bottom of the pit will cause excessive settlement of the structure, affecting the foundation pit and The safety of surrounding buildings and facilities.

Method used

The construction method of bored piles at the bottom of the pit that combines pressure reduction and pressure weight is adopted. By setting up a pressure relief well in the foundation pit, the height of the pressurized water is controlled to a certain height above the bottom of the pit as the design water level, and the pressure is set in the pit. For the bottom construction of bored piles, large specific gravity mud is used to resist water pressure and avoid the spread of contaminated soil and the upwelling of pressurized water.

Benefits of technology

It effectively avoids the spread of contaminated soil and the rise of pressurized water, reduces structural settlement, ensures the hole forming quality and construction safety of cast-in-place piles at the bottom of the pit, and protects the soil and surrounding building facilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118531778B_ABST
    Figure CN118531778B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for constructing a bottom bored cast-in-place pile combining pressure reduction and weight pressure, including constructing foundation pit retaining piles; constructing a drainage well and a pressure relief well in the foundation pit, so that the pressure relief well penetrates the upper water-proof layer downward along the ground and is constructed into the confined water layer; reducing and maintaining the height of the confined water in the pressure relief well to a certain height position above the bottom of the pit as the design water level; excavating the soil to form a foundation pit and discharging the polluted water in the polluted soil layer through the drainage well, and constructing a support; constructing a cushion layer at the bottom of the pit, and constructing bored cast-in-place piles at the bottom of the pit by the water pressure whose minimum weight of the mud specific gravity of the bored cast-in-place piles is greater than or equal to the design water level. The present invention can avoid the spread of polluted soil and the upwelling of underground confined water in underground projects containing polluted soil layers and confined water layers, and can also avoid the problem of excessive settlement affecting the safety of foundation pits and surrounding construction facilities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction engineering, and in particular to a pit bottom bored cast-in-place pile construction method combining pressure reduction with weight pressing. Background Art

[0002] Bored piles are piles that are formed by drilling a hole underground, placing a steel cage in the hole, and pouring concrete into the pile. Bored piles are widely used in underground space development projects because of their high bearing capacity, convenient construction, short construction period, no vibration, no ground uplift or lateral displacement, little harm to surrounding buildings, and applicability to various geological conditions. During the construction of bored piles, when the mud circulates, the pressure difference between the mud and the groundwater is used to control the groundwater pressure, so that the mud can form a mud skin on the hole wall to reinforce the hole wall and prevent collapse, while stabilizing the water level in the pile hole. Among them, mud density is the most important indicator for controlling mud quality. If the mud density is too small, it will cause hole collapse during construction. If the hole collapse occurs during the pouring process, mud blocks will be trapped in the concrete at the top of the pile, and the quality of the pile head cannot be guaranteed. If the density is too large, it will affect the pouring of the pile foundation. The concrete pressure is insufficient during pouring, and it is difficult to rise to the top. The floating slurry layer is thick in the later stage of pouring, and the pouring overpressure is reduced, causing a large amount of coarse aggregate in the concrete to concentrate at the pile core. The pile body lacks coarse aggregate due to insufficient pressure, which affects the pouring quality of the pile foundation. Section 6.3 of the Technical Specifications for Building Pile Foundations JGJ94-2008 stipulates that the mud should be designed according to the construction machinery, process, and soil layer conditions, and the relative density of the mud within 500mm of the bottom of the hole should be less than 1.25. However, in underground projects where underground space is developed in soil environments containing contaminated soil layers and confined water layers, especially in soft soil areas where the confined water is shallow, when bored cast-in-place piles are constructed before soil excavation, the bored cast-in-place piles will penetrate the contaminated soil layers and confined water layers along the ground when forming holes, causing the upper contaminated soil and contaminated water to spread along the hole wall to the adjacent upper and lower layers, polluting the soil environment. In order to avoid soil environment pollution, bored cast-in-place piles cannot be constructed on the ground. It is necessary to first excavate the contaminated soil layer to form a foundation pit, and then construct bored cast-in-place piles at the bottom of the foundation pit (i.e., the bottom of the pit). However, since the self-weight pressure of the upper soil becomes smaller after the contaminated soil layer is excavated, the mud specific gravity specified in the above specification cannot withstand the head of the confined water, which will cause the confined water to surge up along the hole, and the pile quality of the bored cast-in-place piles cannot be guaranteed. If the confined water is first lowered to the bottom of the pit, then the contaminated soil layer is excavated, and finally the bored cast-in-place piles are constructed at the bottom of the pit, the initial structure will settle too much, affecting the safety of the foundation pit and surrounding building facilities. Summary of the invention

[0003] The purpose of the present invention is to provide a method for constructing bored cast-in-place piles at the bottom of a pit that combines pressure reduction with weight pressing, so as to solve the problem of how to avoid the spread of contaminated soil in underground projects containing contaminated soil layers and confined water layers, and how to avoid the upwelling of underground confined water caused by the construction of bored cast-in-place piles at the bottom of the pit, and how to avoid the problem of conventional confined water being reduced in pressure to the bottom of the pit, resulting in excessive settlement of the early structure, which affects the safety of the foundation pit and surrounding construction facilities.

[0004] In order to solve the above technical problems, the present invention provides a method for constructing bored piles at the bottom of a pit by combining pressure reduction with weight pressing, comprising:

[0005] Step S1, covering the contaminated soil layer area to delineate the scope of the foundation pit, and constructing bored interlocking piles from the ground to the underground using a full-casing dry-drilling process at the boundary of the foundation pit to form foundation pit retaining piles, so that the foundation pit retaining piles are located in the confined water layer;

[0006] Step S2, constructing a drainage well and a pressure relief well in the foundation pit, so that the drainage well is located in the foundation pit retaining piles and is constructed downward along the ground to the bottom elevation of the foundation pit to be excavated, and the pressure relief well is located in the foundation pit retaining piles and is constructed downward along the ground through the waterproof layer to the pressure water layer, wherein the bottom elevation of the pressure relief well is not lower than the bottom elevation of the foundation pit retaining piles;

[0007] Step S3, lowering the height of the pressure water in the pressure relief well to a certain height position above the pit bottom as the design water level, and making the minimum pressure of the mud weight of the bored piles to be constructed at the pit bottom in the pressure water layer greater than or equal to the water pressure of the design water level according to the height of the design water level;

[0008] Step S4, maintaining the height of the pressurized water in the pressure relief well at the designed water level, excavating the soil within the foundation pit to the bottom elevation of the foundation pit, draining the contaminated water in the contaminated soil layer through the drainage well during the soil excavation process, and constructing various supports in the foundation pit as the soil is excavated;

[0009] Step S5, maintaining the height of the pressurized water in the pressure relief well at the designed water level, pouring concrete at the bottom of the pit to form a cushion layer, and constructing bored piles at the bottom of the pit using high-density mud through the cushion layer according to formula (1) to form a pile foundation;

[0010] h2×γ mud ≥ (h2+h1)×γ water (1);

[0011] Among them, h2 is the mud height of the bored pile at the bottom of the pit at the confined water layer, γmud is the mud specific gravity, h2×γmud is the minimum pressure weight of the mud specific gravity of the bored pile, h1 is the distance from the design water level to the bottom of the pit, h2+h1 is the height of the design water level, γwater is the specific gravity of the confined water, and (h2+h1)×γwater is the water pressure of the design water level.

[0012] Furthermore, the method for constructing bored piles at the bottom of a pit by combining pressure reduction with weight pressing provided by the present invention further includes:

[0013] Step S6, after the pile foundation construction is completed, the bottom plate is poured on the cushion layer, and after the bottom plate is poured, the drainage well is closed.

[0014] Furthermore, the method for constructing bored piles at the bottom of a pit by combining pressure reduction with weight pressing provided by the present invention further includes:

[0015] Step S7, stop lowering the water in the pressure relief well, and after the bottom plate reaches the designed strength and meets the anti-floating requirements, close the pressure relief well to restore the pressurized water in the pressure relief well to the initial pressure head height.

[0016] Furthermore, in the method for constructing bored piles at the bottom of a pit that combines pressure reduction with weight pressing provided by the present invention, the method for calculating the height of the design water level is as follows: the distance h1 from the design water level elevation to the bottom of the pit is calculated according to formula (2);

[0017] h1=h2×( -1) (2);

[0018] Determine the height of the design water level using formula (3);

[0019] The height of the design water level = h2 + h1 (3).

[0020] Furthermore, in the method for constructing bored piles at the bottom of a pit that combines pressure reduction with weight pressing provided by the present invention, the height of the designed water level is determined by the pressure water drop difference, wherein the pressure water drop difference is formula (4) or formula (5):

[0021] ∆h=L-h1-h2 (4);

[0022] ∆h=L-h2× (5);

[0023] Where L is the height of the initial confined water head and ∆h is the confined water drop.

[0024] The method for constructing bored piles at the bottom of a pit by combining pressure reduction with weight pressing provided by the present invention adopts a non-polluted soil layer to replace the polluted soil layer.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] The method for constructing bored cast-in-place piles at the bottom of a pit that combines pressure reduction and weight pressing provided by the present invention provides a pressure relief well in the foundation pit, controls the height of the pressurized water in the pressure relief well to a certain height position above the bottom of the pit as the design water level, instead of conventionally controlling the height of the pressurized water in the pressure relief well to reduce the pressure to the bottom of the pit, firstly excavates the contaminated soil to form the foundation pit, and then constructs bored cast-in-place piles at the bottom of the foundation pit to form the pile foundation, thereby avoiding the problem that the construction of bored cast-in-place piles at the bottom of the pit to form the pile foundation causes too much settlement of the initial structure, thereby affecting the safety of the foundation pit and surrounding building facilities; by controlling and maintaining the height of the pressurized water to the design water level, firstly excavates the contaminated soil, and then constructs the bored cast-in-place piles at the bottom of the foundation pit to form the pile foundation, thereby avoiding the contaminated soil and the contaminated water that may exist in it being poured along the borehole when the bored cast-in-place piles are constructed on the ground to form the pile foundation The problem of the pile hole spreading to the upper and lower adjacent layers is avoided, and the problem of pollution spreading and polluting the soil environment is avoided; by controlling and maintaining the height of the pressurized water in the pressure relief well at a certain height position above the design water level to the pit bottom as the design water level, and increasing the mud density of the bored cast-in-place pile, that is, by combining the reduction of the water level of the pressurized water and the increase of the mud density of the bored cast-in-place pile, the minimum pressure of the mud density of the bored cast-in-place pile to be constructed at the bottom of the pit in the pressurized water layer is made greater than or equal to the water pressure of the design water level, thereby avoiding the problem that the dead weight pressure of the soil above the bored cast-in-place pile after the contaminated soil is excavated is reduced during the process of hole formation and mud wall formation, resulting in the conventional mud density being unable to withstand the head of the pressurized water and the pressurized water surging upward along the pile hole, thereby ensuring the construction quality of the hole formation and mud wall of the bored cast-in-place pile at the bottom of the pit.

[0027] The method for constructing bored piles at the bottom of a pit by combining pressure reduction with weight pressing provided by the present invention is suitable for constructing bored piles at the bottom of a pit in an underground project in a soil environment containing pressurized water, thereby ensuring the safety of pile construction, soil, foundation pit and surrounding areas. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the elevation structure of the construction pit retaining piles covering the contaminated soil layer area;

[0029] Figure 2 It is a schematic diagram of the elevation structure of the dewatering well and the pressure relief well constructed in the foundation pit;

[0030] Figure 3 It is a schematic diagram of the elevation structure for lowering the pressurized water of the pressure relief well to the designed water level;

[0031] Figure 4 It is a schematic diagram of the elevation structure of the foundation pit formed by excavating the contaminated soil layer to maintain the designed water level;

[0032] Figure 5 It is a schematic diagram of the elevation structure of the construction support, cushion layer and bored piles in the foundation pit;

[0033] Figure 6 It is a schematic diagram of the elevation structure of the base plate constructed on the cushion layer;

[0034] Figure 7 It is a schematic diagram of the elevation structure for restoring the pressurized water in the pressure relief well to the initial water level;

[0035] Figure 8 It is a flow chart of bored piles at the bottom of a pit constructed by combining pressure reduction and weight pressing;

[0036] As shown in the figure:

[0037] 101. Contaminated soil layer, 102. Aquiclude, 103. Confined water layer, 104. Ground, 105. Retaining piles, 106. Dewatering well, 107. Pressure relief well, 108. Support, 109. Cushion, 110. Bored piles, 111. Mud wall, 112. Base plate. DETAILED DESCRIPTION

[0038] The present invention is described in detail below in conjunction with the accompanying drawings: The advantages and features of the present invention will become more apparent from the following description. It should be noted that the accompanying drawings are in very simplified form and in non-precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0039] Example 1, please refer to Figure 8 The first embodiment of the present invention provides a method for constructing a bored pile at the bottom of a pit by combining pressure reduction and weight pressing, which may include the following steps:

[0040] Step S1, please refer to Figure 1 , the contaminated soil layer 101 area is covered to define the scope of the foundation pit, and the full-casing dry-drilling process is used to construct bored interlocking piles along the ground 104 to the underground at the boundary of the foundation pit to form foundation pit retaining piles 105, so that the foundation pit retaining piles 105 are located in the confined water layer 103. The soil environment in the foundation pit includes the contaminated soil layer 101, the impermeable layer 102, and the confined water layer 103 from top to bottom. In order to protect the confined water from being polluted by the contaminated soil, the foundation pit retaining piles 105 are selected as the retaining form of bored interlocking piles, and the full-casing dry-drilling construction process is used, which can prevent the contaminated soil layer 101 and the contaminated water therein from diffusing downward to the confined water layer 103 during the construction of the foundation pit retaining piles 105, thereby preventing the confined water layer 103 from being polluted.

[0041] Step S2, please refer to Figure 2, a drainage well 106 and a pressure relief well 107 are constructed in the foundation pit, the drainage well 106 is located in the foundation pit retaining pile 105 and is constructed downward along the ground 104 to the bottom elevation of the foundation pit to be excavated, and the pressure relief well 107 is located in the foundation pit retaining pile 105 and is constructed downward along the ground 104 through the waterproof layer 102 to the pressure water layer 103, wherein the bottom elevation of the pressure relief well 107 is not lower than the bottom elevation of the foundation pit retaining pile 105. The bottom of the foundation pit refers to the bottom of the pit, Figure 2 The pit bottom in the example is the bottom of the contaminated soil layer 101, that is, the junction of the contaminated soil layer 101 and the impermeable layer 102, but it is not limited to this. The pit bottom can be located in the contaminated soil layer 101 or in the impermeable layer 102. The pressure relief well 107 uses a combination of an impermeable casing and a casing with filter holes, wherein the upper section is an impermeable casing, and the lower section is a casing with filter holes, and the lower section is located in the confined water layer 103, which can prevent the contaminated soil layer 101 and the contaminated water that may be contained therein from contaminating the pressure relief well 107 and the confined water layer 103. The bottom elevation of the pressure relief well 107 is not lower than the bottom elevation of the foundation pit retaining pile 105, which can increase the bypass path of the confined water and play a role in reducing the surrounding soil settlement caused by the precipitation of the confined water.

[0042] Step S3, please refer to Figure 3 , the height of the pressurized water in the pressure relief well 107 is lowered to a certain height position above the pit bottom as the design water level, and the minimum pressure of the mud weight of the bored piles to be constructed at the pit bottom in the pressure relief water layer 103 is made greater than or equal to the water pressure of the design water level according to the height of the design water level. That is, the following formula (1). The height of the pressurized water in the pressure relief well 107 connected to the pressure relief water layer 103 is set to a certain height position above the pit bottom as the design water level, instead of reducing the pressure to the pit bottom elevation in traditional construction. The purpose is to reduce the pressure with a smaller pumping flow, prevent the sudden surge of pressurized water when the foundation pit is excavated to a certain depth, and reduce the ground deformation and settlement caused by the decrease of water head outside the pit. Figure 3 The design water level is the pressure head after pressure reduction. The initial pressure head is before pressure reduction.

[0043] Step S4, please refer to Figure 4 , keep the height of the pressurized water in the pressure relief well 107 at the designed water level, excavate the soil within the foundation pit to the bottom elevation of the foundation pit, and drain the contaminated water in the contaminated soil layer 101 through the drainage well 106 during the soil excavation process. As the soil is excavated, various supports 108 are constructed in the foundation pit. The drainage well 106 can drain the contaminated water in the contaminated soil layer 101, ensuring that the foundation pit excavation can be constructed under dry conditions and reducing the difficulty of construction. The soil excavation can be limited to the contaminated soil layer 101, or it can be located above the contaminated soil layer 101, and it can continue to excavate downward to the impermeable layer 102. Specifically, it can be excavated to a predetermined depth according to the design requirements of the underground project.

[0044] Step S5, please refer to Figures 4 to 5 , keep the height of the pressurized water in the pressure relief well 107 at the designed water level, pour concrete at the bottom of the pit to form a cushion layer 109, and use high-density mud at the bottom of the pit through the cushion layer 109 to construct bored piles 110 according to formula (1), wherein the bored piles 110 include a pile hole and a mud wall 111 thereof.

[0045] h2×γ mud ≥ (h2+h1)×γ water (1);

[0046] Among them, h2 is the mud height of the bored pile at the bottom of the pit at the confined water layer 103, that is, the distance from the bottom of the pit to the confined water layer 103, γmud is the mud specific gravity, h2×γmud is the minimum pressure weight of the mud specific gravity of the bored pile 110, h1 is the distance from the design water level to the bottom of the pit, h2+h1 is the height of the design water level, that is, the confined water head after pressure reduction, γwater is the specific gravity of the confined water, and (h2+h1)×γwater is the water pressure of the design water level. Among them, the specific gravity of water is 1g / cm³, the mud specific gravity of the bored pile 110 is high-density mud, and the conventional mud specific gravity is 1.1.

[0047] In step S5, the bored pile 110 can be constructed according to the construction process of measuring and setting out - drilling holes in the cushion layer - burying casing - drilling - mud wall protection and primary hole cleaning - lowering the steel cage - mud wall protection and secondary hole cleaning - pouring concrete.

[0048] The method for constructing bored cast-in-place piles at the bottom of a pit that combines pressure reduction with weight pressing provided in the first embodiment of the present invention provides a pressure relief well 107 in the foundation pit, and controls the height of the pressurized water in the pressure relief well 107 to a certain height position above the bottom of the pit as the design water level, rather than conventionally controlling the height of the pressurized water in the pressure relief well 107 to reduce the pressure to the bottom of the pit. This can reduce the amount of precipitation in the pressure relief well 107, thereby reducing ground settlement and deformation caused by reducing the pressure of the pressurized water, and protecting the surrounding environment. The foundation pit is formed by first excavating contaminated soil, and then bored cast-in-place piles 110 are constructed at the bottom of the foundation pit to form a pile foundation, thereby avoiding the problem of excessive settlement of the early structure caused by constructing bored cast-in-place piles 110 at the bottom of the pit to form a pile foundation, thereby affecting the safety of the foundation pit and surrounding construction facilities.

[0049] The method for constructing bored piles at the bottom of a pit that combines pressure reduction and weight pressing provided in the first embodiment of the present invention controls and maintains the height of the pressurized water to the designed water level, first removes the contaminated soil, and then constructs bored piles 110 at the bottom of the pit to form a pile foundation. This avoids the problem of contaminated soil and possible contaminated water therein spreading along the pile holes of the bored piles 110 to the upper and lower adjacent layers when the bored piles 110 are constructed on the ground 104 to form the pile foundation, and avoids the problem of pollution spreading and polluting the soil environment.

[0050] The method for constructing bored piles at the bottom of a pit by combining pressure reduction and weight pressing provided in the first embodiment of the present invention controls and maintains the height of the pressurized water in the pressure reducing well 107 at a certain height position above the design water level to the bottom of the pit as the design water level, and increases the mud density of the bored piles 110, that is, by combining the reduction of the water level of the pressurized water with the increase of the mud density of the bored piles 110, so that the minimum weight of the mud density of the bored piles 110 to be constructed at the bottom of the pit in the pressurized water layer 103 is greater than or equal to the water pressure of the design water level, thereby avoiding the problem that the conventional mud density cannot withstand the head of the pressurized water and the pressurized water surges upward along the pile hole due to the reduced self-weight pressure of the soil above the bored piles 110 after the contaminated soil is excavated during the process of forming the hole and the mud protective wall 111 of the bored piles 110 at the bottom of the pit, thereby ensuring the construction quality of the hole and the mud protective wall 111 of the bored piles at the bottom of the pit.

[0051] The method for constructing bored cast-in-place piles at the bottom of a pit that combines pressure reduction with weight pressing provided in the first embodiment of the present invention is suitable for constructing bored cast-in-place piles 110 at the bottom of a pit in an underground project in a soil environment containing pressurized water and contaminated soil, thereby ensuring the safety of pile construction, soil, foundation pit and surrounding areas.

[0052] In order to control the deformation of the foundation pit, the method for constructing bored piles at the bottom of the pit by combining pressure reduction and weight pressing provided in the first embodiment of the present invention may further include:

[0053] Step S6, please refer to Figure 6 After the bored pile 110 is constructed, the bottom plate 112 is cast on the cushion layer 109. After the bottom plate 112 is cast, the drainage well 106 is closed. The cushion layer 109 can control the deformation of the foundation pit to prevent and ensure the safety of the foundation pit and surrounding buildings and infrastructure. At the same time, after the cushion layer 109 is cast, it is convenient for the pile construction machinery to enter the pit and be placed at the bottom of the pit, without the need to set up drilling machinery and long casing from the ground.

[0054] In order to ensure the safety of subsequent construction of underground engineering, the method for constructing bored piles at the bottom of a pit by combining pressure reduction and weight pressing provided in the first embodiment of the present invention may further include:

[0055] Step S7, stop the dewatering of the pressure relief well 107, and after the bottom plate 112 reaches the design strength and meets the anti-floating requirements, close the pressure relief well 107, so that the pressure water in the pressure relief well 107 is restored to the initial pressure water head height. At this time, the subsequent construction of the underground project can be carried out. The initial pressure water head may be above the ground, below the ground, or level with the ground. The figure illustrates the situation where the initial pressure water head is level with the ground.

[0056] In order to calculate the height of the design water level, the first embodiment of the present invention provides a method for constructing bored piles at the bottom of a pit by combining pressure reduction and weight pressing. The method for calculating the height of the design water level is as follows: the distance h1 from the design water level to the bottom of the pit is calculated according to formula (2).

[0057] h1=h2×( -1) (2);

[0058] Determine the height of the design water level using formula (3);

[0059] The height of the design water level = h2 + h1 (3).

[0060] In order to determine the amount of water drop in the pressure relief well 107 and control the height of the design water level, the first embodiment of the present invention provides a method for constructing a pit bottom bored pile 110 that combines pressure reduction and weight pressing. The height of the design water level is determined by the pressure water drop difference, wherein the pressure water drop difference is formula (4) or formula (5):

[0061] ∆h=L-h1-h2 (4);

[0062] ∆h=L-h2× (5);

[0063] Where L is the height of the initial confined water head and ∆h is the confined water drop.

[0064] Embodiment 2: Embodiment 2 of the present invention provides a method for constructing bored piles at the bottom of a pit by combining pressure reduction with weight pressing, which is improved on the basis of the above-mentioned embodiment 1, and the difference lies in that a non-contaminated soil layer is used to replace the contaminated soil layer 101.

[0065] The method for constructing bored piles at the bottom of a pit by combining pressure reduction and weight pressing provided in the second embodiment of the present invention is applicable to similar projects in which soil needs to be excavated to form a foundation pit in an underground project with a soil environment containing pressurized water, and then bored piles are constructed at the bottom of the pit. In other words, the method can be used to construct bored piles 110 at the bottom of a pit by installing the non-polluted soil layer 101 instead of the contaminated soil layer in the steps of the first embodiment. At this time, in the second embodiment, since there is no contaminated soil, the problem of contaminated soil diffusion in the first embodiment does not exist.

[0066] The present invention is not limited to the above-mentioned specific implementation modes. Obviously, the above-mentioned embodiments are only some embodiments of the embodiments of the present invention, but not all embodiments. Based on the described embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention. Those skilled in the art can make other levels of modifications and changes to the present invention. In this way, if these modifications and changes of the present invention fall within the scope of the claims of the present invention, the present invention is also intended to include these changes and changes.

Claims

1. A method for constructing bored piles at the bottom of a pit by combining pressure reduction with weight pressing. It is characterized in that include: Step S1, covering the contaminated soil layer area to delineate the scope of the foundation pit, and constructing bored interlocking piles from the ground to the underground using a full-casing dry-drilling process at the boundary of the foundation pit to form foundation pit retaining piles, so that the foundation pit retaining piles are located in the confined water layer; Step S2, constructing a drainage well and a pressure relief well in the foundation pit, so that the drainage well is located in the foundation pit retaining piles and is constructed downward along the ground to the bottom elevation of the foundation pit to be excavated, and the pressure relief well is located in the foundation pit retaining piles and is constructed downward along the ground through the waterproof layer to the pressure water layer, wherein the bottom elevation of the pressure relief well is not lower than the bottom elevation of the foundation pit retaining piles; Step S3, lowering the height of the pressure water in the pressure relief well to a certain height position above the pit bottom as the design water level, and making the minimum pressure of the mud weight of the bored piles to be constructed at the pit bottom in the pressure water layer greater than or equal to the water pressure of the design water level according to the height of the design water level; Step S4, maintaining the height of the pressurized water in the pressure relief well at the designed water level, excavating the soil within the foundation pit to the bottom elevation of the foundation pit, draining the contaminated water in the contaminated soil layer through the drainage well during the soil excavation process, and constructing various supports in the foundation pit as the soil is excavated; Step S5, maintaining the height of the pressurized water in the pressure relief well at the designed water level, pouring concrete at the bottom of the pit to form a cushion layer, and constructing bored piles at the bottom of the pit using high-density mud through the cushion layer according to formula (1) to form a pile foundation; h2×γ mud ≥ (h2+h1)×γ water (1); Among them, h2 is the mud height of the bored pile at the bottom of the pit at the confined water layer, γmud is the mud specific gravity, h2×γmud is the minimum pressure weight of the mud specific gravity of the bored pile, h1 is the distance from the design water level to the bottom of the pit, h2+h1 is the height of the design water level, γwater is the specific gravity of the confined water, and (h2+h1)×γwater is the water pressure of the design water level.

2. The method for constructing bored piles at the bottom of a pit by combining pressure reduction and weight pressing according to claim 1, It is characterized in that Also includes: Step S6, after the pile foundation construction is completed, the bottom plate is poured on the cushion layer, and after the bottom plate is poured, the drainage well is closed.

3. The method for constructing bored piles at the bottom of a pit by combining pressure reduction and weight pressing according to claim 2, It is characterized in that Also includes: Step S7, stop lowering the water in the pressure relief well, and after the bottom plate reaches the designed strength and meets the anti-floating requirements, close the pressure relief well to restore the pressurized water in the pressure relief well to the initial pressure head height.

4. The method for constructing bored piles at the bottom of a pit by combining pressure reduction and weight pressing according to claim 1, It is characterized in that The calculation method of the height of the design water level is as follows: according to formula (2), the distance h1 from the design water level to the bottom of the pit is calculated; h1=h2×( -1) (2); Determine the height of the design water level using formula (3); The height of the design water level = h2 + h1 (3).

5. The method for constructing bored piles at the bottom of a pit by combining pressure reduction and weight pressing according to claim 4, It is characterized in that The height of the design water level is determined by the pressure water drop difference, wherein the pressure water drop difference is formula (4) or formula (5): ∆h=L-h1-h2 (4); ∆h=L-h2× (5); Where L is the height of the initial confined water head and ∆h is the confined water drop.

6. The method for constructing bored piles at the bottom of a pit by combining pressure reduction and weight pressing according to claim 1, It is characterized in that The contaminated soil layer is replaced by a non-contaminated soil layer.