Intelligent production management method and system

CN118536768BActive Publication Date: 2024-12-03HUIZHOU DIGITAL CITY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410711669.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2024-12-03
Estimated Expiration
2044-06-04

Smart Images

  • Figure CN118536768B_ABST
    Figure CN118536768B_ABST
Patent Text Reader

Abstract

The present invention discloses an intelligent production management method and system, and relates to the field of production management. The intelligent production management method obtains production equipment information and received customer information, the production equipment information includes the number of available production equipment and the historical production data of each equipment, and the customer information includes customer order information and customer historical transaction information; the historical production data of each equipment and the received customer information are analyzed respectively to obtain the actual production efficiency of each production equipment and the customer importance index of each customer. The present invention obtains and analyzes the historical production data of the production equipment and the customer's order information and historical transaction information, so as to accurately calculate the actual production efficiency of each production equipment and the customer importance index of each customer, and formulates a production plan based on the actual production efficiency and customer importance, so that order allocation is more reasonable, and it can ensure that high-priority orders are processed first, and reduce delivery delays.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of production management, and in particular to an intelligent production management method and system. Background Art

[0002] With the continuous development of the manufacturing industry, modern production management faces increasingly complex challenges. Traditional production management methods are unable to cope with diverse customer needs, complex production processes and highly dynamic market environments. There are mainly the following problems: data acquisition and processing are not timely. Traditional production management methods rely on manual data collection and processing, data updates lag, and it is difficult to reflect the status of production equipment and production progress in real time. This leads to a lack of data support for the formulation and adjustment of production plans, affecting production efficiency and resource utilization. The production plan is unscientific. Due to the lack of comprehensive analysis of the actual efficiency of production equipment and customer needs, traditional methods often rely on experience and subjective judgment when formulating production plans, resulting in unreasonable resource allocation and low production efficiency. In addition, the flexibility and adjustment ability of production plans are insufficient, making it difficult to cope with emergencies and changes in the production process. The equipment utilization rate is low. Due to the lack of effective analysis and utilization of historical data of production equipment, traditional methods are difficult to fully understand the production capacity and failure conditions of equipment, resulting in low equipment utilization, difficulty in improving production efficiency, and low customer satisfaction. Traditional methods have large uncertainties in order priority sorting and delivery time prediction, which easily lead to order delays and affect customer satisfaction and corporate reputation.

[0003] In the existing technology, it is difficult to obtain and analyze production equipment and customer information in real time, which leads to a lack of flexibility and accuracy in production plans, and the utilization rate and production efficiency of production equipment are not intelligently optimized. Equipment failures and energy efficiency issues are difficult to detect and deal with in a timely manner. At the same time, the delivery time of customer orders is difficult to accurately predict, resulting in delivery delays, which in turn leads to reduced customer satisfaction. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides an intelligent production management method and system, which solves the problems that it is difficult to obtain and analyze production equipment and customer information in real time, which leads to a lack of flexibility and accuracy in production plans, and the utilization rate and production efficiency of production equipment are not intelligently optimized, and equipment failures and energy efficiency issues are difficult to detect and handle in a timely manner. At the same time, the delivery time of customer orders is difficult to accurately predict, resulting in delivery delays, which in turn leads to reduced customer satisfaction.

[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: an intelligent production management method, comprising the following steps: obtaining production equipment information and received customer information, the production equipment information including the number of available production equipment and the historical production data of each equipment, and the customer information including customer order information and customer historical transaction information; performing analysis based on the historical production data of each equipment and the received customer information to obtain the actual production efficiency of each production equipment and the customer importance index of each customer; formulating a production plan based on the number of available production equipment, the actual production efficiency of each production equipment and the customer importance index of each customer; monitoring the production plan in real time and dynamically adjusting it according to the monitoring results.

[0006] Furthermore, the historical production data specifically includes the historical production period rate, the historical period production value, and the historical period energy consumption value for each historical time period; the customer order information specifically includes the order quantity requirement value and order delivery time for each customer; the customer historical transaction information includes the historical number of transactions for each customer, the historical order quantity requirement value for each transaction, and the first transaction time.

[0007] Furthermore, the specific process of obtaining the actual production efficiency of each production equipment is as follows: read the historical production period rate, historical period production value, and historical period energy consumption value of each historical time period of each equipment, and obtain the production equipment failure rate of each equipment; perform mean analysis based on the historical production period rate of each historical time period of each equipment, and obtain the historical production rate mean of each equipment; perform energy efficiency analysis based on the historical period production value and historical period energy consumption value of each equipment, and obtain the production equipment energy efficiency value of each equipment; for each equipment, read the production equipment failure rate, historical production rate mean, and production equipment energy efficiency value respectively and perform normalization processing, and perform comprehensive analysis based on the results after normalization processing to obtain the actual production efficiency of each production equipment.

[0008] Furthermore, the specific formula for calculating the actual production efficiency is as follows: Among them, SCL is the actual production efficiency of the production equipment, LsJ is the historical production rate average of the production equipment after normalization, Gz is the normalized production equipment failure rate of the production equipment, E is the normalized production equipment energy efficiency value of the production equipment, β 1 is the adjustment coefficient of the preset historical production rate mean, β 2 is the adjustment coefficient of the preset production equipment failure rate, β 3 is the adjustment coefficient of the energy efficiency value of the preset production equipment, β 4 is the adjustment coefficient of the product of the preset historical production rate mean and the production equipment failure rate, β1 +β 2 +β 3 +β 4 =1.

[0009] Furthermore, the specific process of obtaining the customer importance index of each customer is as follows: read each customer's historical transaction times, historical order quantity requirement value for each transaction, and first transaction time; subtract each customer's first transaction time from the set transaction time for analysis, and count the analysis results in minutes to obtain each customer's historical transaction duration; perform dimension processing on each customer's historical transaction duration; perform a comprehensive analysis based on each customer's historical transaction times, historical order quantity requirement value for each transaction, and historical transaction duration after dimension processing to obtain each customer's customer importance index.

[0010] Furthermore, the specific formula for calculating the customer importance index is as follows: Among them, KHz is the customer importance index, N is the customer's historical transaction number, JyS i is the transaction order quantity requirement value of the customer's i-th transaction in history, i = 1, 2, 3, ..., N, CcJ is the historical transaction duration of the customer after dimension processing, δ 1 is the adjustment coefficient of the preset number of historical transactions, δ 2 is the adjustment coefficient of the preset transaction order quantity demand value, δ 3 is the adjustment coefficient of the historical transaction duration after the preset dimension processing, δ 4 is the adjustment coefficient of the ratio of the preset number of historical transactions to the historical transaction duration after dimension processing, δ 1 +δ 2 +δ 3 +δ 4 =1.

[0011] Furthermore, a production plan is formulated based on the number of available production equipment, the actual production efficiency of each production equipment, and the customer importance index of each customer. Specifically, the total number of all available production equipment, the actual production efficiency of each equipment, the order quantity demand value and order delivery time of each customer, and the customer importance index are read; the order delivery time of each customer is read and analyzed with the current time respectively to obtain the order delivery time of each customer, and determine whether the order delivery time is within the set time range; each customer order whose order delivery time is within the set time range and whose order delivery time is outside the set time range is marked as the first production sequence and the second production sequence respectively; each customer order in the first production sequence and the second production sequence is sorted based on the customer importance index, and for orders with the same priority, further sorted according to the order delivery time, with orders with earlier delivery time being given priority; all equipment is sorted according to the actual production efficiency of each equipment; starting from the highest priority customer order, the orders are allocated to the production equipment with the highest actual production efficiency in turn, ensuring that each equipment allocates customer orders within its production capacity; for customer order requirements that cannot be fully met, the remaining orders are allocated to the next priority equipment until all customer orders are allocated.

[0012] Furthermore, the production plan is monitored in real time and dynamically adjusted according to the monitoring results. Specifically, the real-time production volume and production progress information of each production equipment is obtained, and the predicted delivery date of each customer order is predicted based on the current production plan; the predicted delivery date of each customer order is compared with the corresponding order delivery time to determine whether there is a delay; if there is a delay between the predicted delivery date and the corresponding order delivery time, optimization is performed based on the genetic algorithm, and the production tasks and production sequence of the equipment are adjusted according to the optimized production plan to ensure that the orders are delivered on time.

[0013] An intelligent production management system includes: a data acquisition and monitoring subsystem, a data processing and analysis subsystem, a production plan formulation subsystem, a production execution and control subsystem, and a customer relationship management subsystem; the data acquisition and monitoring subsystem is used to monitor the status of production equipment and production progress, and to collect data in real time, and to provide a real-time monitoring interface, generate alarms and notifications, and store and back up data; the data processing and analysis subsystem is used to clean, normalize and integrate data, prepare data required for analysis, analyze production efficiency and customer importance, generate delivery date forecasts, and generate reports and charts to display analysis results; the production plan formulation subsystem, Used to formulate production plans based on the number of available production equipment, the actual production efficiency of each production equipment and the customer importance index of each customer; the production execution and control subsystem is used to assign production tasks, track task progress, and provide feedback on task completion, and control the start, stop and operating parameters of production equipment, and handle equipment failures, while updating the production progress in real time, monitoring production anomalies, and predicting production progress; the customer relationship management subsystem is used to manage basic customer information, historical transaction records and interaction records, and enter and process orders, track order progress, and manage order delivery, while collecting customer satisfaction surveys, complaints and suggestions, and handling customer feedback.

[0014] Furthermore, the production plan formulation subsystem includes a plan generation module, an optimization algorithm module, and a plan adjustment module; the plan generation module is used to generate a preliminary production plan based on the analysis results, sort order priorities and assign equipment tasks; the optimization algorithm module is used to optimize the production plan using a genetic algorithm; the plan adjustment module is used to adjust the production plan in real time and optimize resource scheduling and delivery time.

[0015] The present invention has the following beneficial effects:

[0016] (1) This intelligent production management method obtains and analyzes the historical production data of production equipment and the customer's order information and historical transaction information, so as to accurately calculate the actual production efficiency of each production equipment and the customer importance index of each customer. The production plan is formulated based on the actual production efficiency and customer importance, making order allocation more reasonable, ensuring that high-priority orders are processed first, reducing delivery delays, and improving customer satisfaction.

[0017] (2) This intelligent production management method can continuously optimize and adjust the production process through real-time monitoring and dynamic adjustment of production plans to adapt to changes and emergencies in actual production. By obtaining the real-time production volume and production progress information of each production equipment, it can predict the delivery date of each customer order in real time and promptly identify possible delays. By using genetic algorithms for optimization, it can quickly adjust production tasks and sequences to ensure that orders are delivered on time.

[0018] (3) The intelligent production management system realizes real-time monitoring of production equipment status and production progress through the data acquisition and monitoring subsystem, and provides a visual monitoring interface and alarm notification function. At the same time, the data storage and backup functions ensure the security and traceability of production data, providing reliable data support for subsequent data analysis and decision-making.

[0019] (4) The intelligent production management system combines the plan generation module, the optimization algorithm module and the plan adjustment module through the production planning subsystem, so that it can be dynamically adjusted and optimized according to the actual production situation. The preliminary production plan is generated based on the analysis results, and the rational allocation of resources is ensured by sorting order priorities and allocating equipment tasks. The optimization algorithm module uses genetic algorithms to optimize the production plan, improving the scientific nature and execution efficiency of the plan. The plan adjustment module dynamically adjusts the production plan according to real-time monitoring data, optimizes resource scheduling and delivery time, and ensures that orders are delivered on time.

[0020] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 The present invention is a flow chart of an intelligent production management method.

[0022] Figure 2 This is a flowchart of the specific steps for obtaining the actual production efficiency of each production equipment in an intelligent production management method of the present invention.

[0023] Figure 3 This is a block diagram of an intelligent production management system of the present invention. DETAILED DESCRIPTION

[0024] The embodiments of the present application solve the problem that it is difficult to obtain and analyze production equipment and customer information in real time through an intelligent production management method and system, which leads to a lack of flexibility and accuracy in production plans, and the utilization rate and production efficiency of production equipment are not intelligently optimized, and equipment failures and energy efficiency issues are difficult to detect and handle in a timely manner. At the same time, the delivery time of customer orders is difficult to accurately predict, resulting in delivery delays, which in turn leads to reduced customer satisfaction.

[0025] The overall idea of ​​the problem in the embodiment of this application is as follows:

[0026] First, obtain the production equipment information, including the number of available production equipment and the historical production data of each equipment. At the same time, receive customer information, including customer order information and customer historical transaction information. Based on the historical production data of each equipment, analyze the actual production efficiency of each production equipment separately. Based on the customer order information and historical transaction information, calculate the customer importance index of each customer. Based on the number of available production equipment, the actual production efficiency of each production equipment and the customer importance index of each customer, formulate a production plan, read the total number of all available production equipment, the actual production efficiency of each equipment, the order quantity demand value and order delivery time of each customer, and the customer importance index, make plan allocation, monitor the execution of the production plan in real time, obtain the real-time production volume and production progress information of each production equipment, predict the delivery date of each customer order based on the current production plan, compare the predicted delivery date with the order delivery time, if it is found that there is a delay between the predicted delivery date and the order delivery time, use genetic algorithm for optimization, and adjust the production plan according to the optimization results to ensure that the order is delivered on time.

[0027] See also Figure 1 The embodiment of the present invention provides a technical solution: an intelligent production management method, comprising the following steps: obtaining production equipment information and received customer information, the production equipment information including the number of available production equipment and the historical production data of each equipment, and the customer information including customer order information and customer historical transaction information; performing analysis based on the historical production data of each equipment and the received customer information to obtain the actual production efficiency of each production equipment and the customer importance index of each customer; formulating a production plan based on the number of available production equipment, the actual production efficiency of each production equipment and the customer importance index of each customer; monitoring the production plan in real time and dynamically adjusting it according to the monitoring results.

[0028] The historical production data specifically include the historical production period rate, historical period production value, and historical period total energy consumption for each historical time period. The customer order information specifically includes the order quantity requirement value and order delivery time for each customer. The customer historical transaction information includes the historical number of transactions for each customer, the historical order quantity requirement value for each transaction, and the first transaction time.

[0029] Specifically, Figure 2As shown in the figure, the specific process of obtaining the actual production efficiency of each production equipment is as follows: read the historical production period rate, historical period production value, and historical period energy consumption value of each equipment in each historical time period, and obtain the production equipment failure rate of each equipment; perform mean analysis based on the historical production period rate of each equipment in each historical time period to obtain the historical production rate mean of each equipment; perform energy efficiency analysis based on the historical period production value and historical period energy consumption value of each equipment to obtain the production equipment energy efficiency value of each equipment; for each equipment, read the production equipment failure rate, historical production rate mean, and production equipment energy efficiency value respectively and perform normalization processing, and perform comprehensive analysis based on the results after normalization processing to obtain the actual production efficiency of each production equipment.

[0030] The specific formula for calculating actual production efficiency is as follows: Among them, SCL is the actual production efficiency of the production equipment, LsJ is the historical production rate average of the production equipment after normalization, Gz is the normalized production equipment failure rate of the production equipment, that is, the stability of the production equipment, E is the normalized production equipment energy efficiency value of the production equipment, that is, the ratio of the energy consumption of the production equipment to the output, β 1 is the adjustment coefficient of the preset historical production rate mean, β 2 is the adjustment coefficient of the preset production equipment failure rate, β 3 is the adjustment coefficient of the energy efficiency value of the preset production equipment, β 4 is the adjustment coefficient of the product of the preset historical production rate mean and the production equipment failure rate, β 1 +β 2 +β 3 +β 4 =1, and Specifically, it is the inverse of the production equipment failure rate, indicating that the lower the production equipment failure rate, the greater the contribution to the actual production efficiency. exp(-E) is specifically the energy efficiency value of the production equipment, indicating that the higher the energy efficiency value of the production equipment, that is, the lower the energy consumption, the greater the contribution to the actual production efficiency. LsJ*Gz is specifically the interaction term between the historical production rate mean and the production equipment failure rate, indicating the joint impact of high historical production rate mean and high reliability on the actual production efficiency. High historical production rate refers to the higher the historical production rate, and high reliability refers to the lower the production equipment failure rate.

[0031] The calculation formula for the mean historical production rate is as follows: Among them, LsL j is the historical production period rate of the production equipment in the jth period, W jis the weight value of the historical production time period rate of the jth time period of the production equipment, j = 1, 2, 3, ..., M, M is the number of time periods obtained.

[0032] The calculation formula for the failure rate of production equipment is as follows: Among them, Gc is the set operating time of the production equipment, and Fg is the total number of failures of the production equipment within the set operating time of the production equipment.

[0033] The calculation formula for the energy efficiency value of production equipment is as follows: Among them, LsS j is the historical period production value of the production equipment in the jth period, LsN j is the total energy consumption of the production equipment in the jth historical time period.

[0034] The actual production efficiency calculation data example is as follows:

[0035] Table 1 Example of actual production efficiency calculation data

[0036]

[0037] In Table 1, SCL is the actual production efficiency of the production equipment, LsJ is the normalized historical production rate mean of the production equipment, Gz is the normalized production equipment failure rate of the production equipment, E is the normalized production equipment energy efficiency value of the production equipment, and the preset adjustment coefficient β of the historical production rate mean 1 , the preset adjustment coefficient of production equipment failure rate β 2 , the adjustment coefficient β of the energy efficiency value of the preset production equipment 3 , the adjustment coefficient β of the product of the preset historical production rate mean and the production equipment failure rate 4 The values ​​are 0.4, 0.3, 0.2, and 0.1 respectively.

[0038] The first set of data: the normalized historical production rate mean of production equipment: 0.95; the normalized production equipment failure rate of production equipment: 0.05; the normalized production equipment energy efficiency value of production equipment: 0.3; the adjustment coefficient of the preset historical production rate mean: 0.4; the adjustment coefficient of the preset production equipment failure rate: 0.3; the adjustment coefficient of the preset energy efficiency value of production equipment: 0.2; the adjustment coefficient of the product of the preset historical production rate mean and the production equipment failure rate: 0.1; the actual production efficiency of production equipment: 0.8186.

[0039] The second set of data: the normalized historical production rate average of production equipment: 0.85; the normalized production equipment failure rate of production equipment: 0.1; the normalized production equipment energy efficiency value of production equipment: 0.2; the adjustment coefficient of the preset historical production rate average: 0.4; the adjustment coefficient of the preset production equipment failure rate: 0.3; the adjustment coefficient of the preset energy efficiency value of production equipment: 0.2; the adjustment coefficient of the product of the preset historical production rate average and the production equipment failure rate: 0.1; the actual production efficiency of production equipment: 0.7850.

[0040] The third set of data: the normalized historical production rate average of production equipment: 0.75; the normalized production equipment failure rate of production equipment: 0.15; the normalized production equipment energy efficiency value of production equipment: 0.4; the adjustment coefficient of the preset historical production rate average: 0.4; the adjustment coefficient of the preset production equipment failure rate: 0.3; the adjustment coefficient of the preset energy efficiency value of production equipment: 0.2; the adjustment coefficient of the product of the preset historical production rate average and the production equipment failure rate: 0.1; the actual production efficiency of production equipment: 0.7062.

[0041] The fourth set of data: the normalized historical production rate average of production equipment: 0.65; the normalized production equipment failure rate of production equipment: 0.2; the normalized production equipment energy efficiency value of production equipment: 0.1; the adjustment coefficient of the preset historical production rate average: 0.4; the adjustment coefficient of the preset production equipment failure rate: 0.3; the adjustment coefficient of the preset energy efficiency value of production equipment: 0.2; the adjustment coefficient of the product of the preset historical production rate average and the production equipment failure rate: 0.1; the actual production efficiency of production equipment: 0.7040.

[0042] The fifth set of data: the normalized historical production rate average of production equipment: 0.55; the normalized production equipment failure rate of production equipment: 0.12; the normalized production equipment energy efficiency value of production equipment: 0.35; the adjustment coefficient of the preset historical production rate average: 0.4; the adjustment coefficient of the preset production equipment failure rate: 0.3; the adjustment coefficient of the preset energy efficiency value of production equipment: 0.2; the adjustment coefficient of the product of the preset historical production rate average and the production equipment failure rate: 0.1; the actual production efficiency of production equipment: 0.6354.

[0043] The sixth set of data: the normalized historical production rate average of production equipment: 0.9; the normalized production equipment failure rate of production equipment: 0.08; the normalized production equipment energy efficiency value of production equipment: 0.25; the adjustment coefficient of the preset historical production rate average: 0.4; the adjustment coefficient of the preset production equipment failure rate: 0.3; the adjustment coefficient of the preset energy efficiency value of production equipment: 0.2; the adjustment coefficient of the product of the preset historical production rate average and the production equipment failure rate: 0.1; the actual production efficiency of production equipment: 0.7510.

[0044] In this implementation scheme, by reading the historical production data and failure rate information of each device, the production status and stability of each device can be fully reflected, providing a detailed data basis to support subsequent production efficiency analysis and plan formulation. By calculating the historical production rate mean and energy efficiency analysis, the production capacity and energy efficiency level of the equipment can be comprehensively evaluated to help identify high-efficiency equipment and inefficient equipment, providing a basis for optimizing equipment utilization and improving overall production efficiency. Normalization processing eliminates the dimensional differences between different indicators, making different indicators comparable in comprehensive analysis, ensuring the scientificity and consistency of the analysis results, and laying the foundation for formulating accurate production plans. By comprehensively analyzing the historical production rate, failure rate and energy efficiency value, the actual production efficiency of each device is calculated, providing a comprehensive evaluation of the overall performance of the equipment, which helps to fully understand the production efficiency of each device and provide a reliable basis for optimal resource allocation.

[0045] Specifically, the specific process of obtaining the customer importance index of each customer is as follows: read each customer's historical transaction times, historical order quantity requirement value for each transaction, and first transaction time; subtract each customer's first transaction time from the set transaction time for analysis, and count the analysis results in minutes to obtain each customer's historical transaction duration; perform dimension processing on each customer's historical transaction duration; perform a comprehensive analysis based on each customer's historical transaction times, historical order quantity requirement value for each transaction, and historical transaction duration after dimension processing to obtain each customer's customer importance index.

[0046] The specific formula for calculating the customer importance index is as follows: Among them, KHz is the customer importance index, N is the customer's historical transaction number, JyS i is the transaction order quantity requirement value of the customer's i-th transaction in history, i = 1, 2, 3, ..., N, CcJ is the historical transaction duration of the customer after dimension processing, δ 1 is the adjustment coefficient of the preset number of historical transactions, δ 2 is the adjustment coefficient of the preset transaction order quantity demand value, δ 3is the adjustment coefficient of the historical transaction duration after the preset dimension processing, δ 4 is the adjustment coefficient of the ratio of the preset number of historical transactions to the historical transaction duration after dimension processing, δ 1 +δ 2 +δ 3 +δ 4 =1, and log(N+1) is specifically the logarithm of the number of historical transactions of the customer, which means alleviating the excessive impact of large transaction times on the customer importance index, so that the impact of each increase decreases. Specifically, the transaction order quantity demand value of each historical transaction is first summed up to obtain the total historical transaction order quantity demand value, and then the square root of the total historical transaction order quantity demand value is taken, which means that the larger the transaction order quantity demand value after the summation processing is, the smaller the impact on the customer importance index will be. Specifically, the inverse of the historical transaction duration after dimension processing is taken, which means that the earlier the transaction with the customer begins, that is, the longer the historical transaction duration is, the more important it is to the customer. Specifically, it is the interaction term between the number of historical transactions and the historical transaction duration after dimension processing, which represents the joint impact of the number of historical transactions and the historical transaction duration after dimension processing on the customer importance index.

[0047] The calculation data of customer importance index is shown in the following table:

[0048] Table 2 Example of calculation data for customer importance index

[0049]

[0050] In Table 2, KHz is the customer importance index, N is the customer's historical transaction number, is the total demand value of the number of historical transaction orders, CcJ is the historical transaction duration after the customer's dimension processing, and the preset adjustment coefficient of the number of historical transactions δ 1 , the adjustment coefficient δ of the preset transaction order quantity demand value 2 , the adjustment coefficient δ of the historical transaction duration after the preset dimension processing 3 , the adjustment coefficient δ of the ratio of the preset number of historical transactions to the historical transaction duration after dimension processing 4 The values ​​are 0.3, 0.2, 0.25, and 0.25 respectively.

[0051] The first set of data: The customer's historical transaction times: 5; The square root of the total value of the historical transaction order quantity demand: 56.68; The customer's historical transaction duration after dimension processing: 3136; The adjustment coefficient of the preset historical transaction times: 0.3; The adjustment coefficient of the preset transaction order quantity demand value: 0.2; The adjustment coefficient of the preset historical transaction duration after dimension processing: 0.25; The adjustment coefficient of the ratio of the preset historical transaction times to the historical transaction duration after dimension processing: 0.25; Customer importance index: 11.34.

[0052] The second set of data: The customer's historical transaction times: 12; The square root of the total value of the historical transaction order quantity demand: 109.54; The customer's historical transaction duration after dimension processing: 5632; The adjustment coefficient of the preset historical transaction times: 0.3; The adjustment coefficient of the preset transaction order quantity demand value: 0.2; The adjustment coefficient of the preset historical transaction duration after dimension processing: 0.25; The adjustment coefficient of the ratio of the preset historical transaction times to the historical transaction duration after dimension processing: 0.25; Customer importance index: 22.52.

[0053] The third set of data: The customer's historical transaction times: 18; The square root of the total value of the historical transaction order quantity demand: 90.48; The customer's historical transaction duration after dimension processing: 0.3; The adjustment coefficient of the preset historical transaction times: 0.3; The adjustment coefficient of the preset transaction order quantity demand value: 0.2; The adjustment coefficient of the preset historical transaction duration after dimension processing: 0.25; The adjustment coefficient of the ratio of the preset historical transaction times to the historical transaction duration after dimension processing: 0.25; Customer importance index: 18.12.

[0054] The fourth set of data: The customer's historical transaction times: 22; The square root of the total value of the historical transaction order quantity demand: 142.49; The customer's historical transaction duration after dimension processing: 0.3; The adjustment coefficient of the preset historical transaction times: 0.3; The adjustment coefficient of the preset transaction order quantity demand value: 0.2; The adjustment coefficient of the preset historical transaction duration after dimension processing: 0.25; The adjustment coefficient of the ratio of the preset historical transaction times to the historical transaction duration after dimension processing: 0.25; Customer importance index: 29.75.

[0055] The fifth set of data: The customer's historical transaction times: 27; The square root of the total value of the historical transaction order quantity demand: 102.52; The customer's historical transaction duration after dimension processing: 0.3; The adjustment coefficient of the preset historical transaction times: 0.3; The adjustment coefficient of the preset transaction order quantity demand value: 0.2; The adjustment coefficient of the preset historical transaction duration after dimension processing: 0.25; The adjustment coefficient of the ratio of the preset historical transaction times to the historical transaction duration after dimension processing: 0.25; Customer importance index: 20.99.

[0056] The sixth set of data: The customer's historical transaction times: 35; The square root of the total value of the historical transaction order quantity demand: 158.47; The customer's historical transaction duration after dimension processing: 6301; The adjustment coefficient of the preset historical transaction times: 0.3; The adjustment coefficient of the preset transaction order quantity demand value: 0.2; The adjustment coefficient of the preset historical transaction duration after dimension processing: 0.25; The adjustment coefficient of the ratio of the preset historical transaction times to the historical transaction duration after dimension processing: 0.25; Customer importance index: 34.44.

[0057] In this implementation plan, by reading each customer's historical transaction times, the order quantity requirement value for each transaction, and the first transaction time, the customer's transaction data is comprehensively collected, and a comprehensive analysis is performed in combination with the historical transaction duration, transaction times, and order quantity requirement values ​​to obtain a more accurate and comprehensive customer importance index. The first transaction time is subtracted from the set transaction time to obtain the historical transaction duration, and dimension processing is performed to make the data more comparable. The logarithm of the transaction times, the square root of the sum of the order quantity requirement values, and the reciprocal of the historical transaction duration are taken to eliminate the dimensional differences in the data and ensure that the data are comparable in the comprehensive analysis. A comprehensive analysis is performed based on the historical transaction times, order quantity requirement values, and the historical transaction duration after dimension processing to obtain the customer importance index for each customer. By comprehensively considering multiple factors, the customer importance evaluation is made more accurate, which helps companies to reasonably allocate resources and optimize production plans and customer service.

[0058] Specifically, the production plan is formulated based on the number of available production equipment, the actual production efficiency of each production equipment, and the customer importance index of each customer. Specifically, the total number of all available production equipment, the actual production efficiency of each equipment, the order quantity demand value and order delivery time of each customer, and the customer importance index are read; the order delivery time of each customer is read and analyzed with the current time respectively to obtain the order delivery time of each customer, and determine whether the order delivery time is within the set time range; each customer order with an order delivery time within the set time range and an order delivery time outside the set time range is marked as the first production sequence and the second production sequence respectively; the first production sequence and the second production sequence are marked based on the customer importance index. Each customer order in the second production sequence is sorted separately. The higher the customer importance index, the higher the order priority. For orders with the same priority, they are further sorted according to the order delivery time, and orders with earlier delivery time are given priority. All equipment is sorted according to the actual production efficiency of each equipment. The higher the actual production efficiency, the higher the equipment priority. Starting from the highest priority customer order, the orders are allocated to the production equipment with the highest actual production efficiency in turn, ensuring that each equipment allocates customer orders within its production capacity to maximize equipment utilization and meet order requirements. For customer order requirements that cannot be fully met, the remaining orders are allocated to the next priority equipment until all customer orders are allocated or the production capacity of all equipment has been exhausted.

[0059] In this implementation scheme, by reading the total number of all available production equipment and the actual production efficiency of each equipment, the current status of production resources can be accurately understood. Based on the customer's importance and order requirements, production tasks can be reasonably allocated to ensure maximum utilization of production resources and optimal satisfaction of order requirements. The order delivery time is compared with the set time range to ensure that urgent orders are given priority. Orders are sorted based on customer importance indicators to ensure that orders from high-value customers are given priority. At the same time, the urgency of delivery time is taken into consideration to further optimize the sorting. Equipment is sorted according to the actual production efficiency of each equipment to ensure that high-efficiency equipment has priority in executing production tasks and improve overall production efficiency. Through reasonable task allocation and dynamic adjustment, all orders can be optimally allocated within the equipment's production capacity to improve the on-time delivery rate and customer satisfaction.

[0060] Specifically, the production plan is monitored in real time and dynamically adjusted according to the monitoring results. Specifically, the real-time production volume and production progress information of each production equipment are obtained, and the predicted delivery date of each customer order is predicted based on the current production plan; the predicted delivery date of each customer order is compared with the corresponding order delivery time to determine whether there is a delay; if there is a delay between the predicted delivery date and the corresponding order delivery time, optimization is performed based on the genetic algorithm, and according to the optimized production plan, the production tasks and production sequence of the equipment are adjusted to ensure that the orders are delivered on time.

[0061] The specific steps of optimization based on genetic algorithm are as follows: S1. Initialize the population: generate a set of random initial production plans as the initial individuals of the population; S2. Evaluate fitness: evaluate each individual, that is, the production plan, and calculate its fitness, including the degree of on-time delivery of orders, that is, high scores for on-time delivery and low scores for delayed delivery, equipment utilization, that is, high scores for equipment utilization, and production efficiency, that is, high scores for production efficiency; S3. Selection operation: select better individuals as parents according to fitness. Commonly used methods include roulette selection and tournament selection; S4. Crossover operation: select two parent individuals and perform Crossover operation, generating new offspring individuals. Commonly used crossover methods include single-point crossover and multi-point crossover. S5, mutation operation: performing mutation operation on offspring individuals, introducing random changes to increase the diversity of the population. Commonly used mutation methods include bit flipping and swapping. S6, generating a new population: adding the newly generated offspring individuals to the population, replacing individuals with lower fitness, and forming a new generation of population. S7, iterative optimization: repeating S2 to S6, iterative optimization, until the termination condition is met, such as reaching the maximum number of iterations or the fitness is no longer significantly improved; and after optimization by genetic algorithm, selecting the individual with the highest fitness as the final production plan.

[0062] In this implementation scheme, by obtaining the real-time production volume and production progress information of each production equipment, the actual situation of the production process is timely understood, the delivery date of each customer order is predicted based on the current production plan, and compared with the actual order delivery time, potential delay problems are discovered in time, and the production plan is optimized using a genetic algorithm to ensure that the production tasks and sequence can be quickly adjusted when delivery delays are discovered. The genetic algorithm gradually optimizes the production plan through steps such as initializing the population, evaluating fitness, selecting operations, crossover operations, and mutation operations, improves equipment utilization and production efficiency, and adjusts the production tasks of the equipment in time through the optimized production plan to ensure that orders are delivered on time. The iterative optimization process of the genetic algorithm can continuously improve the production plan, reduce the risk of delays in the production process, and improve the on-time delivery rate of orders.

[0063] See also Figure 3The embodiment of the present invention provides a technical solution: an intelligent production management system, including: a data acquisition and monitoring subsystem, a data processing and analysis subsystem, a production plan formulation subsystem, a production execution and control subsystem, and a customer relationship management subsystem; the data acquisition and monitoring subsystem is used to monitor the status of production equipment and production progress, and collect data in real time, and provide a real-time monitoring interface, generate alarms and notifications, and store and back up data; the data processing and analysis subsystem is used to clean, normalize and integrate data, prepare data required for analysis, analyze production efficiency and customer importance, generate delivery date forecasts, and generate reports and charts to display analysis results; the production plan The planning subsystem is used to formulate production plans based on the number of available production equipment, the actual production efficiency of each production equipment, and the customer importance index of each customer; the production execution and control subsystem is used to assign production tasks, track task progress, and provide feedback on task completion, and control the start, stop and operating parameters of production equipment, and handle equipment failures, while updating the production progress in real time, monitoring production anomalies, and predicting production progress; the customer relationship management subsystem is used to manage basic customer information, historical transaction records and interaction records, and enter and process orders, track order progress, and manage order delivery, while collecting customer satisfaction surveys, complaints and suggestions, and handling customer feedback.

[0064] Specifically, the production planning subsystem includes a plan generation module, an optimization algorithm module, and a plan adjustment module; the plan generation module is used to generate a preliminary production plan based on the analysis results, sort order priorities and assign equipment tasks; the optimization algorithm module is used to optimize the production plan using a genetic algorithm; the plan adjustment module is used to adjust the production plan in real time and optimize resource scheduling and delivery time.

[0065] In this implementation scheme, the plan generation module ensures that each order and equipment task allocation is scientific and reasonable, improves the efficiency of production plan formulation and the initial quality, and optimizes the algorithm module. The genetic algorithm is used to optimize the production plan to ensure maximum resource utilization and improved production efficiency. By simulating the natural selection process, a better production plan can be quickly found to improve equipment utilization and overall production efficiency. The plan adjustment module is used to adjust the production plan in real time, optimize resource scheduling and delivery time, and make dynamic adjustments based on real-time data. It can flexibly respond to emergencies and changes in the production process, ensure that the execution of the production plan is highly matched with the actual production situation, and improve the on-time delivery rate of orders and customer satisfaction.

[0066] In summary, this application has at least the following effects:

[0067] By acquiring and analyzing the historical production data of production equipment, customer order information and historical transaction information, we can accurately calculate the actual production efficiency of each production equipment and the customer importance index of each customer. Production plans based on the actual production efficiency and customer importance can make order allocation more reasonable, ensure that high-priority orders are given priority, reduce delivery delays, and improve customer satisfaction.

[0068] Through real-time monitoring and dynamic adjustment of production plans, continuous optimization and adjustment can be made during the production process to adapt to changes and emergencies in actual production. By obtaining real-time production volume and production progress information of each production equipment, the delivery date of each customer order can be predicted in real time, and possible delays can be discovered in time. By using genetic algorithms for optimization, production tasks and sequences can be adjusted quickly to ensure that orders are delivered on time.

[0069] The data acquisition and monitoring subsystem enables real-time monitoring of production equipment status and production progress, and provides a visual monitoring interface and alarm notification function. At the same time, the data storage and backup functions ensure the security and traceability of production data, providing reliable data support for subsequent data analysis and decision-making.

[0070] The production planning subsystem combines the plan generation module, optimization algorithm module and plan adjustment module, so that dynamic adjustment and optimization can be carried out according to the actual production situation. The preliminary production plan is generated based on the analysis results, and the rational allocation of resources is ensured by sorting order priorities and allocating equipment tasks. The optimization algorithm module uses genetic algorithms to optimize the production plan, which improves the scientific nature of the plan and the efficiency of execution. The plan adjustment module dynamically adjusts the production plan according to real-time monitoring data, optimizes resource scheduling and delivery time, and ensures that orders are delivered on time.

[0071] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0072] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. An intelligent production management method, characterized in that: The following steps are involved: Acquire production equipment information and received customer information, wherein the production equipment information includes the number of available production equipment and historical production data of each equipment, and the customer information includes customer order information and customer historical transaction information; Analyze the historical production data of each device and the received customer information to obtain the actual production efficiency of each production device and the customer importance index of each customer; Develop production plans based on the number of available production equipment, the actual production efficiency of each production equipment, and the customer importance index of each customer; Monitor production plans in real time and make dynamic adjustments based on monitoring results; The historical production data specifically includes the historical production period rate, the historical period production value, and the historical period energy consumption value of each historical time period; the customer order information specifically includes the order quantity requirement value and order delivery time of each customer; the customer historical transaction information includes the historical transaction times of each customer, the historical order quantity requirement value for each transaction, and the initial transaction time; The specific process of obtaining the actual production efficiency of each production equipment is as follows: Read the historical production period rate, historical period production value, and historical period energy consumption value of each device in each historical time period, and obtain the production equipment failure rate of each device; Based on the historical production period rate of each equipment in each time period, the mean value analysis is performed to obtain the mean value of the historical production rate of each equipment; Energy efficiency analysis is performed based on the total production value and total energy consumption value of each device in the historical period to obtain the production equipment energy efficiency value of each device; For each equipment, the production equipment failure rate, historical production rate average, and production equipment energy efficiency value are read and normalized respectively, and a comprehensive analysis is performed based on the normalized results to obtain the actual production efficiency of each production equipment; The specific formula for calculating actual production efficiency is as follows: ; in, The actual production efficiency of the production equipment, is the normalized historical production rate mean of the production equipment, is the normalized failure rate of production equipment, is the normalized energy efficiency value of the production equipment, is the adjustment coefficient of the preset historical production rate mean, is the adjustment coefficient of the preset production equipment failure rate, The adjustment coefficient for the energy efficiency value of the preset production equipment, The adjustment coefficient is the product of the preset historical production rate mean and the production equipment failure rate. .

2. The intelligent production management method according to claim 1, characterized in that: The specific process of obtaining the customer importance index for each customer is as follows: Read each customer's historical transaction times, historical order quantity requirements for each transaction, and initial transaction time; Subtract the first transaction time of each customer from the set transaction time, and calculate the analysis results in minutes to obtain the historical transaction time of each customer; Dimensionalize the historical transaction duration of each customer; Based on a comprehensive analysis of each customer's historical transaction times, the historical order quantity requirement for each transaction, and the historical transaction duration after dimension processing, we obtain the customer importance index for each customer.

3. The intelligent production management method according to claim 2, characterized in that: The specific formula for calculating the customer importance index is as follows: ; in, is an indicator of customer importance. The number of historical transactions of the customer. For the customer's history The required value of the number of transaction orders for each transaction, , The historical transaction duration after processing for the customer dimension, It is the adjustment factor of the preset historical transaction number. The adjustment coefficient for the preset transaction order quantity requirement value. The adjustment coefficient of the historical transaction duration after processing the preset dimensions. It is the adjustment coefficient of the ratio of the preset number of historical transactions to the historical transaction duration after dimension processing. .

4. The intelligent production management method according to claim 1, characterized in that: The production plan is formulated based on the number of available production equipment, the actual production efficiency of each production equipment and the customer importance index of each customer. Specifically: Read the total number of all available production equipment, the actual production efficiency of each equipment, the order quantity required value and order delivery time of each customer, and the customer importance index; Read the order delivery time of each customer and analyze it with the current time to obtain the order delivery time of each customer, and determine whether the order delivery time is within the set time range; Mark each customer order whose order delivery time is within the set time range and whose order delivery time is outside the set time range as a first production sequence and a second production sequence respectively; Sort each customer order in the first production sequence and the second production sequence based on the customer importance index. For orders with the same priority, further sort them according to the order delivery time, with orders with earlier delivery time being given priority. Sort all equipment according to the actual production efficiency of each equipment; Starting from the highest priority customer orders, the orders are allocated to the production equipment with the highest actual production efficiency in turn, ensuring that each equipment allocates customer orders within its production capacity; For customer order demands that cannot be fully met, the remaining orders are allocated to the next priority equipment until all customer orders are allocated.

5. The intelligent production management method according to claim 1, characterized in that: Real-time monitoring of production plans and dynamic adjustments based on monitoring results are as follows: Obtain real-time production volume and production progress information for each production equipment, and predict the delivery date of each customer order based on the current production plan; Compare the predicted delivery date of each customer order with the corresponding order delivery time to determine whether there is a delay; If there is a delay between the predicted delivery date and the corresponding order delivery time, optimization is performed based on the genetic algorithm, and the production tasks and production sequence of the equipment are adjusted according to the optimized production plan to ensure that the order is delivered on time.

6. An intelligent production management system, applying the intelligent production management method according to any one of claims 1 to 5, characterized in that: include: Data collection and monitoring subsystem, data processing and analysis subsystem, production planning subsystem, production execution and control subsystem, customer relationship management subsystem; The data acquisition and monitoring subsystem is used to monitor the status of production equipment and production progress, collect data in real time, provide a real-time monitoring interface, generate alarms and notifications, and store and back up data; The data processing and analysis subsystem is used to clean, normalize and integrate data, prepare data required for analysis, analyze production efficiency and customer importance, generate delivery date forecasts, and generate reports and charts to display analysis results; The production plan making subsystem is used to make a production plan based on the number of available production equipment, the actual production efficiency of each production equipment and the customer importance index of each customer; The production execution and control subsystem is used to assign production tasks, track task progress, and provide feedback on task completion, and control the start, stop and operating parameters of production equipment, and handle equipment failures, while updating production progress in real time, monitoring production anomalies, and predicting production progress; The customer relationship management subsystem is used to manage basic customer information, historical transaction records and interaction records, enter and process orders, track order progress, and manage order delivery. It also collects customer satisfaction surveys, complaints and suggestions, and processes customer feedback.

7. The intelligent production management system according to claim 6, characterized in that: The production plan formulation subsystem includes a plan generation module, an optimization algorithm module, and a plan adjustment module; The plan generation module is used to generate a preliminary production plan based on the analysis results, sort the order priorities and assign equipment tasks; The optimization algorithm module is used to optimize the production plan using a genetic algorithm; The plan adjustment module is used to adjust the production plan in real time and optimize resource scheduling and delivery time.