Activity creation method, device, electronic device, storage medium and program product
By preconfiguring multiple preset activities in the financial system and creating activities in the business system, the problem of excessive load on the financial system is solved, the flexibility of local activity creation and function authorization in the business system is achieved, and system efficiency and resources are improved. Utilization.
Patent Information
- Application Number
- CN202410970641.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-07-19
AI Technical Summary
When there are many business systems, the load on the financial system is too high because each business system needs to log in to the financial system to perform financial-related operations, resulting in increased access pressure, and different business systems may authorize the same or useless financial functions, resulting in a waste of resources.
By preconfiguring multiple preset activities in the financial system and displaying these preset activities in the business system, users are allowed to create activities locally in the business system, reducing access pressure to the financial system, and performing different authorizations based on the needs of the business system. , to avoid the existence of useless functions.
Users can complete activity creation locally in the business system, reduce the load on the financial system, improve system efficiency, and authorize financial functions according to actual needs to avoid waste of resources.
Smart Images

Figure CN118537066B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing systems suitable for administration, management and supervision purposes in the field of new generation information technology, and specifically to an activity creation method, device, electronic device, storage medium and program product. Background Art
[0002] In the related art, business systems usually have functions related to finance. For example, users can create various promotional activities or membership activities in business systems. In order to facilitate the business system to perform financial operations, the business management logic is usually moved to the financial system. In this way, when there are a large number of business systems, each business system needs to log in to the financial system before it can perform financial operations, which leads to the problem of excessive load on the financial system. Summary of the invention
[0003] The purpose of the embodiments of the present application is to provide an activity creation method, device, electronic device, storage medium and program product, which are helpful to alleviate the access pressure of the financial system.
[0004] In a first aspect, an embodiment of the present application provides an activity creation method, which is applied to a first business system, wherein the first business system is in communication connection with a financial system, and the financial system is pre-configured with at least two preset activities, and the method includes:
[0005] In the case of receiving the first input, an activity creation interface is displayed, wherein the activity creation interface includes at least one first preset activity pre-authorized by the financial system for the first business system, the first preset activity is a preset activity among the at least two preset activities, the financial system is used to authorize activities for at least two business systems, the at least two business systems include the first business system; among the at least two business systems, different business systems have different pre-authorized preset activity information;
[0006] Receiving a configuration input for parameter configuration of a target activity, wherein the target activity is any one of the at least one first preset activity, and the configuration input is used to input an activity rule for the target activity;
[0007] In response to the configuration input, the target activity is created in the activity interface of the first business system, and activity information of the target activity is sent to the financial system so that users in the first business system participate in the target activity, so that the financial system generates budget information corresponding to the target activity, wherein the activity information includes: the target activity and the activity rule;
[0008] After creating the target activity in the activity interface of the first business system in response to the configuration input, the method further includes:
[0009] Upon receiving the permission change information sent by the financial system, hiding the target activity in the activity interface of the first business system and outputting second prompt information, wherein the permission change information is used to indicate the release of the first business system's operation permission for the target activity; the second prompt information is used to prompt the first business system to change the permission information for the target activity, and prompt the target activity to enter a hidden state;
[0010] When a second input is received and the authority of the first business system is verified and passed, the target activity is restored to be displayed on the activity interface of the first business system, wherein the second input is an input of a user requesting to display the target activity.
[0011] In a second aspect, an embodiment of the present application provides an activity creation device, which is applied to a first business system, wherein the first business system is in communication connection with a financial system, and the financial system is pre-configured with at least two preset activities, and the device includes:
[0012] a display module, configured to display an activity creation interface upon receiving a first input, wherein the activity creation interface includes at least one first preset activity pre-authorized by the financial system for the first business system, the first preset activity being a preset activity among the at least two preset activities, the financial system being configured to perform activity authorization on at least two business systems, the at least two business systems including the first business system; and among the at least two business systems, different business systems have different pre-authorized preset activity information;
[0013] A receiving module, configured to receive a configuration input for parameter configuration of a target activity, wherein the target activity is any one of the at least one first preset activity, and the configuration input is used to input an activity rule for the target activity;
[0014] a response module, configured to create the target activity in the activity interface of the first business system in response to the configuration input, and to send activity information of the target activity to the financial system so that users in the first business system participate in the target activity, so that the financial system generates budget information corresponding to the target activity, wherein the activity information includes: the target activity and the activity rule;
[0015] The device also includes:
[0016] a hiding module, configured to hide the target activity in the activity interface of the first business system and output second prompt information upon receiving the permission change information sent by the financial system, wherein the permission change information is used to indicate the release of the first business system's operation permission for the target activity; and the second prompt information is used to prompt the first business system to change the permission information for the target activity, and to prompt the target activity to enter a hidden state;
[0017] The display module is further used to restore the display of the target activity on the activity interface of the first business system when a second input is received and the authority of the first business system is verified and passed, wherein the second input is an input of a user requesting to display the target activity.
[0018] In a third aspect, an embodiment of the present application further provides an electronic device, comprising a processor, a memory, and a program stored in the memory and executable on the processor, wherein the program, when executed by the processor, implements the steps of the method described in the first aspect.
[0019] In a fourth aspect, an embodiment of the present application further provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the method described in the first aspect are implemented.
[0020] In a fifth aspect, an embodiment of the present application further provides a computer program product, comprising computer instructions, which, when executed by a processor, implement the steps of the method described in the first aspect.
[0021] In the embodiment of the present application, since the financial system can pre-authorize the configured activities to each business system, users of the business system can complete the creation of activities locally in the business system, that is, the business system does not need to log in to the financial system to create the activities during the creation process, which helps to alleviate the access pressure of the financial system. In addition, since the financial system can pre-authorize different preset activity information for different business systems, it can realize the authorization of corresponding financial functions according to the actual needs of the business system. Compared with authorizing all financial functions to the business system, it can avoid the problem of a large number of useless functions in the business system. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the description of the embodiments of the present application will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0023] Figure 1 A flowchart of an activity creation method provided in an embodiment of the present application;
[0024] Figure 2 This is a schematic diagram of an activity creation method and an activity execution process in a promotion scenario in an embodiment of the present application;
[0025] Figure 3 A schematic diagram of the structure of an activity creation device provided in an embodiment of the present application;
[0026] Figure 4 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present application to clearly describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application belong to the scope of protection of this application.
[0028] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.
[0029] See also Figure 1 , Figure 1 1 is a flow chart of an activity creation method provided in an embodiment of the present application. The activity creation method is applied to a first business system, the first business system is in communication connection with a financial system, and at least two preset activities are pre-configured in the financial system. The method comprises the following steps:
[0030] Step 101: upon receiving a first input, displaying an activity creation interface, wherein the activity creation interface includes at least one first preset activity pre-authorized by the financial system for the first business system, the first preset activity being a preset activity among the at least two preset activities, the financial system being used to authorize activities for at least two business systems, the at least two business systems including the first business system; and among the at least two business systems, different business systems have different pre-authorized preset activity information;
[0031] Step 102: receiving a configuration input for parameter configuration of a target activity, wherein the target activity is any one of the at least one first preset activity, and the configuration input is used to input an activity rule for the target activity;
[0032] Step 103: In response to the configuration input, the target activity is created in the activity interface of the first business system, and activity information of the target activity is sent to the financial system so that users in the first business system can participate in the target activity, and the financial system generates budget information corresponding to the target activity, wherein the activity information includes: the target activity and the activity rules.
[0033] The above-mentioned business system can be various office systems within the enterprise. Specifically, since enterprises usually develop various types of office systems according to their own needs, users in the business system can view relevant business data in the business system, or edit relevant business data, etc. For example, when there are multiple brands of products within the enterprise, there may be different management systems for products of different brands. In addition, different business systems can also be set up according to different business functions. For example, the at least two business systems include: a procurement system, a sales system, an after-sales system, an integrated member operation platform, a channel self-service platform, an employee self-service platform, and a shopping guide management platform. In addition, in some embodiments of the present application, the at least two business systems include at least two of the following: an integrated member operation platform, a channel self-service platform, an employee self-service platform, a shopping guide management platform, and a marketing expense control system.
[0034] The above-mentioned preset activities may be various promotional activities or membership activities, etc. For example, the at least two preset activities may include: points redemption activities, expiring product promotion activities, new product promotion activities, coupon giving activities, product collection activities, etc.
[0035] The preset activity information may include at least one of the following: the type of the preset activity, and the authorization function for the same preset activity.
[0036] The personnel related to the above-mentioned financial system can authorize preset activities from the financial system to various business systems according to the usage requirements of each business system. Specifically, the financial system authorizes different types of preset activities for different business systems, which may include: the number of preset activities authorized to different business systems is different, or the types of preset activities authorized to different business systems are not exactly the same. For example, for a business system of sales nature, it can authorize preset activities such as "points redemption activities, near-expiring product discount activities, new product discount activities, and coupon gift activities", and for business systems of different sales nature, the authorized preset activities may also be different. For example, for a pre-sales business system, "new product discount activities, coupon gift activities" can be authorized, for a sales business system, "points redemption activities, near-expiring product discount activities, new product discount activities, coupon gift activities" can be authorized, and for an after-sales business system, "coupon gift activities, product collection activities" can be authorized. In addition, for other non-sales business systems, only "product collection activities" are authorized, wherein the "product collection activities" may refer to the relevant users in the business system collecting samples or other welfare items, etc.
[0037] In addition, for the same preset activity, the financial system can also authorize different authorization functions to different business systems, wherein the authorization functions may include: product collection function, product sales function, product distribution function, wherein the product collection function means that the user of the first business platform can collect the product. The product sales function may mean that the user of the first business platform can sell the product. The product distribution function may mean that the user of the first business platform can distribute the product to a specific user group, wherein the user group may include: member users of the first business platform, or users who purchase specific products, etc.
[0038] The above-mentioned first business system can be any one of the at least two business systems. The above-mentioned first input can be an input by the management user of the first business system clicking on the display activity creation interface in the operation interface of the first business system. Among them, the above-mentioned at least one first preset activity can include all preset activities pre-authorized by the financial system to the first business system, and the activity creation interface can display other data related to activity creation in addition to displaying at least one first preset activity pre-authorized by the financial system to the first business system. For example, the first preset activity can include the monthly budget, annual budget and other relevant data of the first business system, so that the management user can select the corresponding activity within the corresponding budget range, and configure the activity rules within the budget range.
[0039] The preset activities configured in the above-mentioned financial system may be activities for configuring activity rules. For example, for a point redemption activity, the preset activities may only include redeemable goods, without configuring the specific points required to redeem each commodity and other related content. Therefore, when configuring the activity rules for the point redemption activity, the management user of the first business system may configure the points required to redeem each commodity, as well as configure the upper limit of each user's ability to redeem the same commodity and other related content. Correspondingly, for a coupon gifting activity, the financial system may only include coupons of a specific face value, without configuring the coupon collection conditions. Therefore, when configuring the activity rules for coupons, the management user of the first business system may configure the coupon collection conditions. For example, when a user's consumption exceeds a specific amount, the user can only collect a specific coupon. It is understandable that the management user can configure the activity rules for the corresponding activity in the activity creation interface through the above-mentioned configuration input.
[0040] The above-mentioned process of creating the target activity in the activity interface of the first business system in response to the configuration input, and sending the activity information of the target activity to the financial system may be: after the management user performs configuration input and clicks to generate the activity, the target activity is created in the activity interface of the first business system, and the activity information of the target activity is sent to the financial system. Alternatively, after the user clicks to generate the activity, the corresponding approval process may be triggered, and after the approval is passed, the target activity is created in the activity interface of the first business system, and the activity information of the target activity is sent to the financial system. The approval process may be a pre-configured process in the first business system, and the activity information created by the management user may be pushed to the corresponding approval node for approval. Only after the user of the approval node approves it, the subsequent process will be triggered. Otherwise, the subsequent process will not be triggered.
[0041] The above-mentioned creating the target activity in the activity interface of the first business system in response to the configuration input, and sending the activity information of the target activity to the financial system so that users in the first business system can participate in the target activity, so that the financial system generates budget information corresponding to the target activity specifically refers to: creating the target activity in the activity interface of the first business system in response to the configuration input, so that users in the first business system can participate in the target activity; and sending the activity information of the target activity to the financial system in response to the configuration input, so that the financial system generates budget information corresponding to the target activity.
[0042] The activity interface may be an interface for users in the first business system to display activities. Users of the first business system or consumers who purchase products of the first business system may access the activity interface to participate in the target activity. It is understandable that only activities created by the management user can be displayed in the activity interface, that is, not all activities authorized by the financial system to the first business system can be displayed in the activity interface.
[0043] The above-mentioned financial system generates budget information corresponding to the target activity: that is, after the first business system completes the creation of the target activity, the first business system automatically sends the activity information to the financial system, and the financial system automatically completes the occupation of the budget of the target activity according to the activity information to ensure that the target activity can proceed smoothly. After receiving the activity information, the financial system can predict the possible expenses of the target activity and occupy the budget based on the predicted expenses. The generation of budget information corresponding to the target activity may include: completing the occupation of the budget amount corresponding to the target activity. The predicted expenses that may be spent on the target activity can be determined by predicting the number of people who may participate in the target activity, or can also be determined by referring to the actual expenditure amount of previous activities of the same type.
[0044] In this implementation, since the financial system can pre-authorize the configured activities to each business system, users of the business system can complete the creation of activities locally in the business system, that is, the business system does not need to log in to the financial system to create activities during the creation process, which helps to alleviate the access pressure of the financial system. In addition, since the financial system can pre-authorize different preset activity information for different business systems, it can realize the authorization of corresponding financial functions according to the actual needs of the business system. Compared with authorizing all financial functions to the business system, it can avoid the problem of a large number of useless functions in the business system.
[0045] Optionally, after creating the target activity in the activity interface of the first business system in response to the configuration input, the method further includes:
[0046] Obtaining the user's consumption information of the target activity at preset time intervals;
[0047] The consumption information is sent to the financial system so that the financial system updates the budget information based on the consumption information.
[0048] The consumption information may include the actual amount of all parameters participating in the target activity, as well as user information of all users participating in the target activity and other related information. For example, when the target activity is to issue coupons with a fixed face value, the consumption information may include the number of times the coupons have been received, and the actual amount generated by the target activity can be calculated by multiplying the number of times by the face value of the coupons, so that the subsequent financial system can deduct the actual amount generated by the target activity from the budget amount occupied by the target activity.
[0049] Specifically, since the number of users who actually participate in the target activity and the actual amount generated by the target activity are usually random during the actual execution of the target activity, in some scenarios, the actual amount generated may exceed the budgeted amount. In this case, the budget amount needs to be adjusted to ensure that the budget amount can pay the actual amount generated. Therefore, the financial system can determine the actual amount through the above consumption information, and if the actual amount exceeds the budgeted amount, the budget amount in the budget information will be updated.
[0050] The above-mentioned preset time period can be every other month, specifically the last day of each month, or the first day of each month, obtaining the user's consumption information for the target activity and sending the consumption information to the financial system, so that the financial system updates the budget information based on the consumption information.
[0051] Optionally, when the target activity is an activity of the first type, the budget information includes: information of users participating in the target activity; the consumption information includes information of users actually participating in the target activity, and the financial system is configured to: update the user information in the budget information based on the received consumption information at intervals of the preset time; or,
[0052] In the case where the target activity is an activity of the second type, the budget information includes a budget amount, and the consumption information includes an actual amount generated by the target activity; wherein the financial system is configured as follows:
[0053] When the actual amount is less than the budget amount, the budget information is not updated; when the actual amount is greater than the budget amount and less than the monthly budget of the first business system, the budget amount is updated to the actual amount; when the actual amount is greater than the monthly budget of the first business system and less than the annual budget of the first business system, the monthly budget of the first business system is updated to the actual amount, and the budget amount is updated to the actual amount; when the actual amount is greater than the annual budget of the first business system, a first prompt message is output, wherein the first prompt message is used to prompt the user to add to the annual budget of the first business system.
[0054] The first type of activity mentioned above may refer to an activity where the total budget amount is determined, but the number of users participating in the activity is uncertain. For example, in a member activity, the total amount of expenditure can be clearly defined in the plan, such as issuing a certain fixed-value card voucher for a single event, but members can redeem the card voucher through points malls, offline stores, etc., so the business object cannot be clearly defined. In this case, the financial system can automatically generate a cost application form according to the activity plan, and the cost application form is used to apply for a budget, wherein the cost application form may include user information of users who may participate in the target activity determined by prediction, for example, the number of users who may participate in the target obtained by prediction may be included. Since the face value of the card voucher issued by the target activity is fixed, the budget amount can be predicted after the number of users is determined, and the above budget information may include the cost application form. Then, the financial system automatically generates a cost application change for the actual execution of the plan on a monthly basis, and changes the estimated business object to a real object, wherein the estimated business object may refer to the estimated number of users who may participate in the target activity, and the real object may refer to the number of users who actually participate in the target activity in the current month. The user information actually participating in the target activity may include: the number of users who actually participated in the target activity in the current month. The preset time period may be one month.
[0055] The second type of activity may include a first sub-activity and a second sub-activity, wherein the first sub-activity may refer to an activity where the budget amount cannot be determined, but the scope of users participating in the target activity can be determined. For example, the first sub-activity may be a member points redemption activity. In the member points redemption business scenario, it is impossible to estimate the amount of points that members redeem with the company during the current period, but it can be ensured that the points can only be redeemed through the points mall. Therefore, the scope of users participating in the target activity can be determined. In this case, the financial system can be configured as follows:
[0056] Based on the exchange estimate submission application, the financial system automatically generates an expense application form.
[0057] Based on the actual redemption data of members on a monthly basis, the financial system calculates the actual amount based on the value of the redeemed products. The financial system automatically determines the relative size of the actual execution amount and the application amount, monthly budget, and annual budget.
[0058] If the actual execution amount is ≤ the application amount, the financial system will automatically settle the expenses.
[0059] If the application execution is less than the actual amount ≤ the monthly budget, the financial system will automatically change the expense application, update the occupied amount according to the actual amount, and then automatically close the expense.
[0060] If the application is executed < monthly budget < actual amount ≤ annual budget, the financial system will automatically add to the monthly budget, then change the expense application, update the occupied amount according to the actual amount, and finally automatically close the expense.
[0061] If the application is less than the monthly budget and less than the annual budget and the actual amount, the financial system will automatically report an error. After supplementing the annual budget, the monthly budget can be added, the expense application can be changed, and the expense settlement can be carried out.
[0062] The second sub-activity mentioned above may refer to an activity where neither the budget amount nor the scope of users participating in the target activity can be determined. For example, in the promotion rules, dealer rebates, and store rebate businesses, since the policies are all set according to company regulations, the cost forecasts are all estimated using estimated orders, which means that it is impossible to ensure that the actual order quantity is within the estimated order range, and it is impossible to ensure the order situation of the estimated order object. In this case, the financial system can be configured as follows:
[0063] Based on the estimated order application, the financial system automatically generates an expense application form.
[0064] Based on the actual redemption data of members on a monthly basis, the financial system totals the actual amount based on the value of the redeemed products. The financial system automatically determines the actual execution amount and application amount, the monthly budget, and the annual budget size.
[0065] If the actual execution amount is ≤ the application amount, the financial system will automatically settle the expenses.
[0066] If the application execution is less than the actual amount ≤ the monthly budget, the financial system will automatically change the expense application, update the occupied amount according to the actual amount, and then automatically close the expense.
[0067] If the application is executed < monthly budget < actual amount ≤ annual budget, the financial system will automatically add to the monthly budget, then change the expense application, update the occupied amount according to the actual amount, and finally automatically close the expense.
[0068] If the application is less than the monthly budget and less than the annual budget and the actual amount, the financial system will automatically report an error. After supplementing the annual budget, you can then add the monthly budget, change the expense application, and close the expense.
[0069] In addition, the preset activities may include other types of activities in addition to the first and second types of activities. For example, the preset activities may also include third types of activities, wherein the third type of activities refers to activities that must be strictly executed in accordance with the budget plan, that is, the budget information cannot be changed during the execution process. Specifically, in business management activities such as scene activities and publicity activities, actual business operations are strictly carried out in accordance with the plan. In this case, the financial system can be configured as follows:
[0070] The financial system automatically generates expense requisitions based on the activity plan.
[0071] Carry out activities according to the activity plan.
[0072] After execution is completed, reimbursement will be submitted in the business system, and the financial system will automatically generate the expense settlement.
[0073] After the case is closed, the accounts will be posted uniformly in the financial system.
[0074] All approvals are processed through the business system, and the financial system synchronizes the business status of the financial system.
[0075] It is understandable that the above financial system can be configured with various types of budget update rules, so that the financial system can call the corresponding budget update rule according to the activity type to perform budget update.
[0076] Optionally, the budget information includes a budget amount, which is determined based on an actual amount generated by at least one historical activity, wherein the historical activity and the target activity are activities of the same type, and the user group corresponding to the historical activity is the same as the user group corresponding to the target activity.
[0077] It is understandable that the budget system can pre-select the activity type classification, for example, the activity type can include the first type, the second type, the third type, etc. In addition, the activity type can also be classified according to the activity type, for example, it can be divided into the following types: coupon collection activities, points redemption activities, etc., and the activity content of the same type of activities is the same. Since the user groups corresponding to different activities may be different, the user group refers to the users who can participate in the corresponding activities. Specifically, for member points activities, the user group usually targeted is the member users of a specific platform. Correspondingly, for some member activities, users can participate in both the points mall and offline stores. In this case, the corresponding user groups include: members of a specific platform and physical customers of offline stores. Based on this, the historical activities can be: activities that have ended, the same activity type as the target activity, and the same corresponding user group. Specifically, it can be a historical activity within a historical time period not long from the current point, for example, the historical activities can be historical activities in the past three months, or the historical activities can be historical activities in the past six months, or the historical activities can be historical activities in the past nine months, etc.
[0078] Since the above historical activities are completed activities, the actual expenses incurred by the above historical activities are determined, that is, the actual amount corresponding to the historical activities is determined, so the average of the actual amount of the at least one historical activity can be determined as the budget amount of the target activity. Alternatively, the median of the actual amount of the at least one historical activity can be determined as the budget amount of the target activity.
[0079] In this implementation, the budget amount of the target activity is determined based on the actual amount generated by the historical activities. This helps to improve the accuracy of the determined budget amount, thereby avoiding the problem of budget shortage or budget overrun.
[0080] Optionally, after creating the target activity in the activity interface of the first business system in response to the configuration input, the method further includes:
[0081] Upon receiving the permission change information sent by the financial system, hiding the target activity in the activity interface of the first business system and outputting second prompt information, wherein the permission change information is used to indicate the release of the first business system's operation permission for the target activity; the second prompt information is used to prompt the first business system to change the permission information for the target activity, and prompt the target activity to enter a hidden state;
[0082] When a second input is received and the authority of the first business system is verified and passed, the target activity is restored to be displayed on the activity interface of the first business system, wherein the second input is an input of a user requesting to display the target activity.
[0083] Among them, the management user of the financial system can also change the permissions of the preset activities that have been authorized by each business system as needed. For example, the operation permissions of the preset activities that have been authorized by the business system can be revoked, or the operation permissions of unauthorized preset activities can be added to the business system.
[0084] Specifically, when the first business system receives the above-mentioned permission change information, that is, the financial system has released the first business system's operating authority for the target activity. Therefore, in order to prevent the first business system from continuing to execute the target activity, the relevant information of the target activity can be hidden in the activity interface of the first business system. In addition, when the first business system receives the permission change information, if the user of the first business system determines that it is necessary to continue to execute the target activity, the target activity can be restored through the above-mentioned second input request, wherein the second input may include the reason for requesting to restore the execution of the target activity. After receiving the second input, the first business system may send a restoration application to the financial system, and the restoration application may include the input content of the second input. After receiving the restoration application, the relevant user of the financial system may approve the restoration application. If the approval is passed, the first business system can restore the operating authority of the target activity. Accordingly, the first business system can restore the display of the relevant information of the target activity in the activity interface. Wherein, the above-mentioned process of verifying the authority of the first business system may refer to: the approval process of the restoration application by the relevant personnel of the financial system, and accordingly, the verification is determined to be passed in the case of approval.
[0085] In addition, in some other embodiments of the present application, the above-mentioned permission change information may also be information mistakenly triggered by a system failure, that is, the financial system has not released the first business system's operating authority over the target activity, but due to the system failure, the permission change information is sent to the first business system, resulting in the target activity being hidden in the activity interface of the first business system. In this case, the first business system can send a recovery application to the financial system through the above-mentioned second input. After receiving the recovery application, the financial system can automatically verify whether the first business system has the operating authority over the target activity. If so, a notification of permission verification success can be sent to the first business system. After receiving the notification of permission verification success, the first business system can respond to the notification of permission verification success and restore the display of the target activity on the activity interface of the first business system.
[0086] Optionally, after creating the target activity in the first business system in response to the configuration input, the method further includes:
[0087] When monitoring the delivery information corresponding to the target activity, the delivery information is sent to the financial system so that the financial system closes the order corresponding to the delivery information and releases the budget amount corresponding to the delivery information in the budget information.
[0088] Specifically, for activity scenarios involving physical products such as points redemption activities, the transaction can be determined to be completed after the goods are shipped to the user. In this case, the first business system can send the shipping information to the financial system so that the financial system can close the order corresponding to the shipping information, and release the budget amount in the budget information corresponding to the shipping information.
[0089] See also Figure 2 , below, taking the promotion activity as an example, the above-mentioned activity creation method is further explained, and the activity creation method may include the following process: the user of the first business system can view the monthly budget in the activity creation interface, and create a promotion plan according to the monthly budget, wherein the promotion plan may include promotion rules. After the first business system completes the creation of the promotion plan, it can send the promotion plan to the financial system, and the financial system automatically completes the expense application according to the promotion plan, that is, completes the budget occupation of the promotion activity. During the execution of the promotion activity, the first business system can monitor the order situation of the dealer, and the order situation is the above-mentioned consumption information. Then, the first business system can send the dealer's order situation to the financial system at a preset time interval, and the financial system can determine the actual amount generated by the promotion activity according to the dealer's order situation, and monitor the cost execution according to the actual amount, and can update the budget amount when the actual amount is greater than the budget amount. In addition, the first business system can monitor the order delivery status, and if the order delivery is monitored, the delivery information can be sent to the financial system, and the financial system closes the corresponding order according to the received delivery information.
[0090] In the above process, the business system initiates the business submission to connect with the budget system to generate a budget document. The document status of the two systems is processed synchronously, and the submission of the business system is completed, and the budget determination and budget occupation of the financial system are completed. The business system executes and completes the associated financial system to generate a closing document. The document status of the two systems is processed synchronously, and the business system is executed and the budget usage and budget difference release of the financial system are completed. The business execution process involves the synchronization of business action changes with the financial system to adjust the budget occupation and synchronize the actual execution of the business. In addition, all business systems can unify the accounting caliber to ensure a single export, that is, all business data is integrated into the financial system and the accounting caliber is unified.
[0091] In the embodiment of the present application, from the perspective of business execution and budget management, both the characteristics of business execution and the internal control management requirements are guaranteed, and the management platform is unified to ensure data uniqueness. The timeliness and accuracy of data are also guaranteed through the system integration double closed loop.
[0092] See also Figure 3 , Figure 3 : is a schematic diagram of the structure of an activity creation device 300 provided in an embodiment of the present application. The activity creation device 300 is applied to a first business system, the first business system is in communication connection with a financial system, and at least two preset activities are pre-configured in the financial system. The device includes:
[0093] The display module 301 is used to display an activity creation interface when receiving a first input, wherein the activity creation interface includes at least one first preset activity pre-authorized by the financial system for the first business system, the first preset activity is a preset activity among the at least two preset activities, the financial system is used to authorize activities for at least two business systems, the at least two business systems include the first business system; among the at least two business systems, different business systems have different pre-authorized preset activity information;
[0094] A receiving module 302 is used to receive a configuration input for parameter configuration of a target activity, wherein the target activity is any one of the at least one first preset activity, and the configuration input is used to input an activity rule for the target activity;
[0095] The response module 303 is used to create the target activity in the activity interface of the first business system in response to the configuration input, and to send activity information of the target activity to the financial system so that users in the first business system can participate in the target activity, so that the financial system generates budget information corresponding to the target activity, and the activity information includes: the target activity and the activity rules.
[0096] Optionally, the device further comprises:
[0097] An acquisition module, used to acquire the user's consumption information of the target activity at preset intervals;
[0098] The response module 303 is further configured to send the consumption information to the financial system, so that the financial system updates the budget information based on the consumption information.
[0099] Optionally, when the target activity is an activity of the first type, the budget information includes: information of users participating in the target activity; the consumption information includes information of users actually participating in the target activity, and the financial system is configured to: update the user information in the budget information based on the received consumption information at intervals of the preset time; or,
[0100] In the case where the target activity is an activity of the second type, the budget information includes a budget amount, and the consumption information includes an actual amount generated by the target activity; wherein the financial system is configured as follows:
[0101] When the actual amount is less than the budget amount, the budget information is not updated; when the actual amount is greater than the budget amount and less than the monthly budget of the first business system, the budget amount is updated to the actual amount; when the actual amount is greater than the monthly budget of the first business system and less than the annual budget of the first business system, the monthly budget of the first business system is updated to the actual amount, and the budget amount is updated to the actual amount; when the actual amount is greater than the annual budget of the first business system, a first prompt message is output, wherein the first prompt message is used to prompt the user to add to the annual budget of the first business system.
[0102] Optionally, the budget information includes a budget amount, which is determined based on an actual amount generated by at least one historical activity, wherein the historical activity and the target activity are activities of the same type, and the user group corresponding to the historical activity is the same as the user group corresponding to the target activity.
[0103] Optionally, the device further comprises:
[0104] a hiding module, configured to hide the target activity in the activity interface of the first business system and output second prompt information upon receiving the permission change information sent by the financial system, wherein the permission change information is used to indicate the release of the first business system's operation permission for the target activity; and the second prompt information is used to prompt the first business system to change the permission information for the target activity, and to prompt the target activity to enter a hidden state;
[0105] The display module 301 is used to restore the display of the target activity on the activity interface of the first business system when a second input is received and the authority of the first business system is verified and the verification is passed, wherein the second input is an input of a user requesting to display the target activity.
[0106] Optionally, the response module 303 is also used to send the shipping information to the financial system while monitoring the shipping information corresponding to the target activity, so that the financial system closes the order corresponding to the shipping information, and releases the budget amount corresponding to the shipping information in the budget information.
[0107] It should be noted that the activity creation device 300 provided in the embodiment of the present application can achieve the following Figure 1 The entire technical process of the activity creation method shown in the embodiment achieves the same technical effect and will not be described again here to avoid repetition.
[0108] The embodiment of the present application also provides an electronic device, comprising: a processor, a memory, and a program stored in the memory and executable on the processor, wherein the program is executed by the processor to implement the above Figure 1 The various processes of the activity creation method embodiment shown in the figure can achieve the same technical effect, and to avoid repetition, they will not be described again here.
[0109] For details, see Figure 4 As shown, an embodiment of the present application further provides an electronic device, including a bus 401 , a transceiver 402 , an antenna 403 , a bus interface 404 , a processor 405 and a memory 406 .
[0110] In this embodiment, the electronic device further includes: a computer program stored in the memory 406 and executable on the processor 405. When the computer program is executed by the processor 405, the following can be achieved: Figure 1 The various processes of the activity creation method shown in the embodiment can achieve the same technical effect, and will not be described again here to avoid repetition.
[0111] exist Figure 4 In the embodiment, the bus architecture (represented by bus 401) may include any number of interconnected buses and bridges, and bus 401 links various circuits including one or more processors represented by processor 405 and memory represented by memory 406. Bus 401 may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. Bus interface 404 provides an interface between bus 401 and transceiver 402. Transceiver 402 may be one element or multiple elements, such as multiple receivers and transmitters, providing a unit for communicating with various other devices on a transmission medium. Data processed by processor 405 is transmitted on a wireless medium via antenna 403, and further, antenna 403 also receives data and transmits the data to processor 405.
[0112] Processor 405 is responsible for managing bus 401 and general processing, and may also provide various functions, including timing, peripheral interfaces, voltage regulation, power management, and other control functions. Memory 406 may be used to store data used by processor 405 when performing operations.
[0113] Optionally, the processor 405 may be a CPU, an ASIC, an FPGA or a CPLD.
[0114] The present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the above Figure 1 The various processes of the method embodiment shown can achieve the same technical effect, and are not described here in detail to avoid repetition. The computer-readable storage medium is, for example, a ROM, RAM, a magnetic disk or an optical disk.
[0115] The present application also provides a computer program product, including computer instructions, which, when executed by a processor, implement the above Figure 1 The various processes of the method embodiment shown can achieve the same technical effect, and will not be described again here to avoid repetition.
[0116] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0117] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the relevant technology, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, a disk, or an optical disk), and includes a number of instructions for a terminal (which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to execute the methods described in each embodiment of the present application.
[0118] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.
Claims
1. A method for creating an activity, applied to a first business system, It is characterized in that The first business system is in communication with a financial system, the financial system is pre-configured with at least two preset activities, and the method includes: In the case of receiving the first input, an activity creation interface is displayed, wherein the activity creation interface includes at least one first preset activity pre-authorized by the financial system for the first business system, the first preset activity is a preset activity among the at least two preset activities, the financial system is used to authorize activities for at least two business systems, the at least two business systems include the first business system; among the at least two business systems, different business systems have different pre-authorized preset activity information; Receiving a configuration input for parameter configuration of a target activity, wherein the target activity is any one of the at least one first preset activity, and the configuration input is used to input an activity rule for the target activity; In response to the configuration input, the target activity is created in the activity interface of the first business system, and activity information of the target activity is sent to the financial system so that users in the first business system participate in the target activity, so that the financial system generates budget information corresponding to the target activity, wherein the activity information includes: the target activity and the activity rule; After creating the target activity in the activity interface of the first business system in response to the configuration input, the method further includes: Upon receiving the permission change information sent by the financial system, hiding the target activity in the activity interface of the first business system and outputting second prompt information, wherein the permission change information is used to indicate the release of the first business system's operation permission for the target activity; the second prompt information is used to prompt the first business system to change the permission information for the target activity, and prompt the target activity to enter a hidden state; Upon receiving a second input and verifying the authority of the first business system and passing the verification, restoring the display of the target activity on the activity interface of the first business system, wherein the second input is an input by a user requesting to display the target activity; After creating the target activity in the activity interface of the first business system in response to the configuration input, the method further includes: Obtaining the user's consumption information of the target activity at preset time intervals; Sending the consumption information to the financial system so that the financial system updates the budget information based on the consumption information; When the target activity is an activity of the first type, the budget information includes: user information participating in the target activity; the consumption information includes user information actually participating in the target activity, and the financial system is configured to update the user information in the budget information based on the received consumption information at intervals of the preset time period.
2. The method according to claim 1, It is characterized in that In the case where the target activity is an activity of the second type, the budget information includes a budget amount, and the consumption information includes an actual amount generated by the target activity; wherein the financial system is configured as follows: If the actual amount is less than the budget amount, the budget information is not updated; if the actual amount is greater than the budget amount and less than the monthly budget of the first business system, the budget amount is updated to the actual amount; if the actual amount is greater than the monthly budget of the first business system and less than the annual budget of the first business system, the monthly budget of the first business system is updated to the actual amount, and the budget amount is updated to the actual amount; if the actual amount is greater than the annual budget of the first business system, a first prompt message is output, wherein the first prompt message is used to prompt the user to add to the annual budget of the first business system.
3. The method according to claim 1, It is characterized in that The budget information includes a budget amount, which is determined based on an actual amount generated by at least one historical activity, wherein the historical activity and the target activity are activities of the same type, and the user group corresponding to the historical activity is the same as the user group corresponding to the target activity.
4. The method according to claim 1, It is characterized in that After creating the target activity in the first business system in response to the configuration input, the method further includes: When monitoring the delivery information corresponding to the target activity, the delivery information is sent to the financial system so that the financial system closes the order corresponding to the delivery information and releases the budget amount corresponding to the delivery information in the budget information.
5. An activity creation device, applied to a first business system, It is characterized in that The first business system is in communication with a financial system, the financial system is pre-configured with at least two preset activities, and the device includes: a display module, configured to display an activity creation interface upon receiving a first input, wherein the activity creation interface includes at least one first preset activity pre-authorized by the financial system for the first business system, the first preset activity being a preset activity among the at least two preset activities, the financial system being configured to perform activity authorization on at least two business systems, the at least two business systems including the first business system; and among the at least two business systems, different business systems have different pre-authorized preset activity information; A receiving module, configured to receive a configuration input for parameter configuration of a target activity, wherein the target activity is any one of the at least one first preset activity, and the configuration input is used to input an activity rule for the target activity; a response module, configured to create the target activity in the activity interface of the first business system in response to the configuration input, and to send activity information of the target activity to the financial system so that users in the first business system participate in the target activity, so that the financial system generates budget information corresponding to the target activity, wherein the activity information includes: the target activity and the activity rule; The device also includes: a hiding module, configured to hide the target activity in the activity interface of the first business system and output second prompt information upon receiving the permission change information sent by the financial system, wherein the permission change information is used to indicate the release of the first business system's operation permission for the target activity; and the second prompt information is used to prompt the first business system to change the permission information for the target activity, and to prompt the target activity to enter a hidden state; The display module is further configured to restore the display of the target activity on the activity interface of the first business system when a second input is received and the authority of the first business system is verified and the verification is passed, wherein the second input is an input of a user requesting to display the target activity; The device also includes: An acquisition module, used to acquire the user's consumption information of the target activity at preset intervals; The response module is further used to send the consumption information to the financial system, so that the financial system updates the budget information based on the consumption information; When the target activity is an activity of the first type, the budget information includes: user information participating in the target activity; the consumption information includes user information actually participating in the target activity, and the financial system is configured to update the user information in the budget information based on the received consumption information at intervals of the preset time period.
6. An electronic device, It is characterized in that include: A processor, a memory, and a program stored in the memory and executable on the processor, wherein the program implements the steps of the method according to any one of claims 1 to 4 when executed by the processor.
7. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 4 are implemented.
8. A computer program product, It is characterized in that The method comprises computer instructions, which, when executed by a processor, implement the steps of the method according to any one of claims 1 to 4.
Citation Information
Patent Citations
Integral management method and equipment as well as computer readable storage medium
CN108564413A
Data processing method, device and equipment and computer storage medium
CN114118866A
Coupon marketing system based on global tourism
CN114240508A
System and method for management of marketing campaigns
US20150310481A1
Systems and methods for publishing marketing campaigns over digital platforms
US20230342818A1
