Electromechanical support and hanger for beam-slab integrated unit and use method thereof

By pre-installing the electromechanical supports and hangers in the cavity of the beam plate, and using transmission components and timing belts to lower them, the problem of complicated installation and damage of the electromechanical supports and hangers is solved, and construction efficiency and cost-effectiveness are improved.

CN118548368BActive Publication Date: 2024-10-01FUJIAN CONSTRUCTION ENGINEERING PREFABRICATED BUILDING RESEARCH INSTITUTE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411026795.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-10-01
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

In the process of rapid building construction, the installation of electromechanical supports and hangers requires a long construction period, requires the erection of a high working platform, is complex and time-consuming to install, and is easily damaged during transportation and hoisting, affecting the appearance and performance.

Method used

Design an electromechanical support and hanger for a beam-slab integrated unit. Its main body is a prefabricated integrated beam plate. The support and hanger is placed in the cavity of the beam plate. The support and hanger is pre-installed through metal support seats and supporting components. and adjustment, using transmission components and timing belts to achieve smooth lowering of the support and hanger, simplifying the installation process and avoiding damage.

Benefits of technology

It significantly shortens the construction period, reduces labor costs and installation difficulty, avoids damage to the supports and hangers during transportation and hoisting, and improves construction efficiency and the integrity of the supports and hangers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118548368B_ABST
    Figure CN118548368B_ABST
Patent Text Reader

Abstract

The present invention is an electromechanical support and hanger for an integrated beam-slab unit and a method of using the same. The electromechanical support and hanger for an integrated beam-slab unit has a prefabricated integrated beam-slab as its main body, including a flat plate and two rib beams disposed on the left and right sides of the flat plate; it also includes a support and hanger and a plurality of metal support seats; the support and hanger is placed in a cavity enclosed between the bottom surface of the flat plate and the two rib beams; a plurality of metal support seats are arranged on the opposite sides of the two rib beams, a threaded channel is provided on the metal support seat, a supporting assembly is screwed into each threaded channel, and the support and hanger is supported on the supporting assembly. The present invention places the support and hanger in the cavity of the integrated beam-slab unit, ensuring transportation efficiency and installation cost; the support and hanger can be installed in place through simple operations later, which can significantly improve construction efficiency and reduce labor costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of prefabricated buildings, and in particular to an electromechanical support and hanger for a beam-slab integrated unit and a use method thereof. Background Art

[0002] With the development of building industrialization, the prefabricated floor with integrated beam-slab prefabricated units provides new solutions for key technologies such as the combination of prefabricated components, the production of large prefabricated components, on-site lifting, and precision control, realizing the rapid construction of prefabricated floor with "planar modularization" characteristics.

[0003] However, when rapidly constructing a building, the synchronous laying of electromechanical pipelines must also be considered. In the past, the conventional practice was to fix several hangers at the bottom of the cast-in-place floor slab with post-bolts, and then lock and install the electromechanical support brackets on several hangers. This traditional practice has some defects, such as:

[0004] 1. The mechanical and electrical support and hanger brackets can only be installed after the cast-in-place floor slab has a certain design strength, which requires a long construction period;

[0005] 2. The installation of electromechanical supports and hangers requires a working platform of a certain height to be set up on the lower floor. The installers need to stand on the working platform to have sufficient operating height to install the electromechanical supports and hangers at the bottom of the upper floor;

[0006] 3. When installing the electromechanical support and hanger, it is necessary to lift it from the lower floor to the bottom of the upper floor for installation. In addition, the electromechanical support and hanger is large in size and heavy in weight, and the installation process is complicated and difficult, the construction takes a long time, and the labor cost is high;

[0007] 4. During storage, transportation and on-site lifting, electromechanical supports and hangers are prone to squeezing or collision, which may damage the electromechanical supports and hangers and affect their appearance and performance. Summary of the invention

[0008] The purpose of the present invention is to provide an electromechanical support and hanger for a beam-slab integrated unit, which places the support and hanger used for the laying of electromechanical pipelines into the cavity of the beam-slab integrated unit, thereby ensuring transportation efficiency and installation cost; the support and hanger can be installed in place through simple operations, which can significantly improve construction efficiency and reduce labor costs.

[0009] The purpose of the present invention is achieved through the following technical solutions:

[0010] An electromechanical support and hanger for a beam-slab integrated unit, the main body of which is a prefabricated integrated beam-slab, the prefabricated integrated beam-slab is a reinforced concrete structure, including a flat plate and two rib beams arranged on the left and right sides of the flat plate, a notch is arranged on the outer edge of the top surface of the rib beam, and stirrups extending from the rib beam are arranged at the notch;

[0011] The invention is characterized in that: it also includes a support bracket and a plurality of metal support seats;

[0012] The support brackets are placed in the cavity formed between the bottom surface of the slab and the two rib beams;

[0013] A plurality of metal support seats are arranged from front to back on the opposite surfaces of the two rib beams, and a longitudinally extending threaded channel is provided on the metal support seats, and a supporting assembly is screwed into each threaded channel, and the support and hanger bracket is supported on the supporting assembly;

[0014] The supporting assembly includes a longitudinally extending screw rod and a supporting platform connected to the upper end surface of the screw rod; the screw rod is threadedly matched with the threaded channel, the supporting platform is used to support the support bracket, and a limit column extending upward is provided on the top of the supporting platform;

[0015] The support and hanger are provided with ear plates corresponding to each supporting platform, and the ear plates are provided with through holes for the limit column to pass through;

[0016] An engagement groove is provided on the upper end surface of the limiting column, and a reserved hole is opened on the flat plate at a position corresponding to the engagement groove.

[0017] The method for using the electromechanical support and hanger for the beam-slab integrated unit includes the following steps:

[0018] S1: The prefabricated integrated beams and slabs, supports and hangers, metal bearing seats and supporting components are installed as a whole in the factory and transported to the construction site, and hoisted to the designated location using hoisting equipment;

[0019] S2: Pass each transmission rod through the corresponding reserved hole and align and insert it into the engagement groove;

[0020] S3: Install the transmission assembly on the top of the flat plate, and connect the synchronous belt drive to the top of each transmission rod, adjust the installation position of the driving pulley, make the wheel surface of the driving pulley and the synchronous belt fully tensioned, drive the driving pulley to make each transmission rod rotate synchronously, so that each supporting assembly is synchronously screwed and lowered in the threaded through hole, and then the support and hanger can move downward smoothly;

[0021] S4: When the bottom surface of the support platform in the support assembly abuts against the upper surface of the nut base, the support bracket is lowered into place, and then the transmission assembly is evacuated and the electromechanical installation personnel carry out the installation of the electromechanical pipelines according to the construction plan.

[0022] Compared with the prior art, the advantages of the present invention are:

[0023] 1. Through the coordination of prefabricated integrated beams and slabs, metal support seats and supporting components, the supports and hangers can be installed in the cavity of the prefabricated integrated beams and slabs in advance in the prefabrication factory. After the hoisting construction of the prefabricated integrated beams and slabs is completed, the electromechanical supports and hangers are installed synchronously with the beam and slab structure, thereby significantly shortening the construction period and improving the overall construction efficiency. In addition, the present invention also effectively avoids the technical difficulties in the traditional method, such as the need to wait for the cast-in-place floor slab to reach the strength standard before installation, the need to build a working platform on the lower floor of the cast-in-place floor slab during installation, and the difficulty in installing the supports and hangers.

[0024] 2. Through the cooperation of supporting components and adjusting mechanisms, the operator can stand on the surface of the prefabricated integrated beam and slab to lower the support and hanger in the cavity, which is convenient for the subsequent connection between the mechanical and electrical pipelines, thereby reducing the difficulty of installation and reducing the labor cost and time cost of the installation process.

[0025] 3. Since the supports and hangers are installed in the cavity of the prefabricated integrated beam and slab in advance, the supports and hangers are protected by the prefabricated integrated beam and slab during storage, transportation and lifting, thereby avoiding squeezing and collision of the supports and hangers, and ensuring the integrity and aesthetics of the supports and hangers. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the structure of the present invention;

[0027] Figure 2 yes Figure 1 Structural schematic diagram of prefabricated integrated beam and slab;

[0028] Figure 3 It is a schematic diagram of the structure of the supporting assembly of the present invention;

[0029] Figure 4 It is a structural schematic diagram of the transmission rod of the present invention;

[0030] Figure 5 It is a structural schematic diagram of the support and hanger of the present invention;

[0031] Figure 6 It is a structural schematic diagram of the transmission assembly of the present invention;

[0032] Figure 7 It is a structural schematic diagram of the metal support seat of the present invention;

[0033] Figure 8 It is a side view of the present invention after being hoisted in place;

[0034] Fig. 9 is Figure 8 State diagram of the adjustment mechanism installed on the foundation;

[0035] Fig.10 yes Fig. 9Side view of

[0036] Fig.11 is Fig. 9 The state diagram of the transmission assembly being installed on the foundation and rotating;

[0037] Fig.12 make Fig.11 Side view of

[0038] Fig.13 is Fig.11 The state diagram of the transmission assembly on the foundation completing the downward movement of the metal support seat;

[0039] Fig.14 for Fig.13 Side view of

[0040] Fig.15 is Fig.13 The state diagram after the transmission component is removed on the basis;

[0041] Fig.16 yes Fig.15 Side view of.

[0042] Explanation of numbers: 1- prefabricated integrated beam and slab, 11- flat plate, 12- rib beam, 13- notch, 14- stirrups, 101- reserved hole, 2- support bracket, 201- ear plate, 3- metal support seat, 31- L-shaped connector, 32 - U-shaped anchor ring, 33- reinforcing rib, 34- nut base, 4- supporting assembly, 41- screw rod, 42- supporting platform, 43- limiting column, 44- meshing groove, 5- adjusting mechanism, 501- transmission rod, 6- transmission assembly, 61- driving pulley, 62- synchronous belt. DETAILED DESCRIPTION

[0043] The present invention is described in detail below with reference to the accompanying drawings and embodiments:

[0044] like Figure 1-7 The figure is a schematic diagram of an embodiment of an electromechanical support and hanger for a beam-slab integrated unit provided by the present invention: the main body thereof is a prefabricated integrated beam-slab 1, the prefabricated integrated beam-slab 1 is a reinforced concrete structure, including a flat plate 11 and two rib beams 12 arranged on the left and right sides of the flat plate 11, a notch 13 is arranged on the outer edge of the top surface of the rib beam 12, and a stirrup 14 extending from the rib beam 12 is arranged at the notch 13;

[0045] It also includes a support bracket 2 and a plurality of metal support seats 3;

[0046] The support bracket 2 is placed in the cavity formed between the bottom surface of the flat plate 11 and the two rib beams 12;

[0047] A plurality of metal support seats 3 are arranged from front to back on the opposite surfaces of the two rib beams 12. The metal support seats 3 are provided with longitudinally extending threaded channels. A supporting assembly 4 is screwed into each threaded channel. The support bracket 2 is supported on the supporting assembly 4.

[0048] The supporting assembly 4 includes a longitudinally extending screw rod 41 and a supporting platform 42 connected to the upper end surface of the screw rod 41; the screw rod 41 is threadedly matched with the threaded channel, the supporting platform 42 is used to support the support bracket 2, and an upwardly extending limiting column 43 is provided on the top of the supporting platform 42;

[0049] The support bracket 2 is provided with ear plates 201 corresponding to each supporting platform 42, and the ear plates 201 are provided with through holes for the limit column 43 to pass through;

[0050] An engagement groove 44 is formed on the upper end surface of the limiting column 43 , and a reserved hole 101 is formed on the flat plate 11 at a position corresponding to the engagement groove 44 .

[0051] The detailed structure and usage of the prefabricated integrated beam slab 1 here have been disclosed in patents such as CN113123516A, so they will not be described here in detail.

[0052] Here, the screw rod 41 itself is threadedly matched with the threaded channel on the support seat 3, and rotating the screw rod 41 can realize the up and down movement of the screw rod 41; since the support bracket 2 is supported on the supporting platform 42 of the screw rod 41, the descent of the screw rod 41 will cause the support bracket 2 to descend synchronously, thereby achieving the purpose of the support bracket 2 leaving the cavity of the prefabricated integrated beam slab 1 downward, facilitating the subsequent installation of mechanical and electrical pipelines.

[0053] The ear plate 201 and the support bracket 2 are both made of steel material, and the ear plate 201 and the support bracket 2 are fixed by welding.

[0054] The supporting assembly 4 is provided with an adjusting mechanism 5 for driving the support bracket 2 to move up and down; the adjusting mechanism 5 includes a transmission rod 501 inserted into the engagement groove 44, and the upper part of the transmission rod 501 passes through the plate 11 through the reserved hole 101.

[0055] The upper end surface of the limit column 43 is provided with an engagement groove 44, which is mainly used to cooperate with the adjustment mechanism 5 in the later stage, specifically connected with the transmission rod 501, and the limit column 43 and even the screw 41 are driven to rotate through the transmission rod 501. Considering that the working surface is on the flat plate 11 of the prefabricated integrated beam plate 1, a reserved hole 101 corresponding to the position of the engagement groove 44 is added on the flat plate 11.

[0056] Although the reserved hole 101 can be opened later, it will increase the workload and it is difficult to ensure that it cannot be aligned with the engagement groove 44, so it is better to reserve the reserved hole 101 in the early stage of production.

[0057] The plate 11 is provided with a transmission assembly 6 for driving the transmission rod 501 to rotate synchronously;

[0058] The transmission assembly 6 includes a driving pulley 61 and a synchronous belt 62 which are detachably connected to the top of the flat plate 11;

[0059] The synchronous belt 62 is connected to the upper part of each transmission rod 501, and the driving pulley 61 is located between any two adjacent transmission rods 501. The wheel surface thereof tightens the synchronous belt 62 and drives the synchronous belt 62 to transmit.

[0060] The synchronous belt 62 is preferably a synchronous toothed belt (the synchronous toothed belt is a conventional synchronous belt, so its structure and selection are not described in detail. The synchronous toothed belt is selected according to the actual needs. The corresponding length is selected). The upper outer periphery of the transmission rod 501 is provided with matching teeth that match the inner convex teeth of the synchronous toothed belt. The active pulley 61 is driven by an external circuit and drives the synchronous toothed belt transmission, so that each transmission rod 501 rotates forward or reverse synchronously, thereby realizing the longitudinal and stable displacement of the support bracket 2.

[0061] It should be noted that the driving pulley 61 itself is slidably mounted on the surface of the flat plate 11 , so that the tension of the synchronous belt 62 is ensured by moving the driving pulley 61 .

[0062] The horizontal cross-section of the engagement groove 44 can be selected to be a cross, a straight line, a triangle, a rectangle, etc., so as to stably transmit the torque when the transmission rod 501 rotates.

[0063] The metal support seat 3 includes an L-shaped connector 31, the threaded channel is provided on the bottom plate of the L-shaped connector 31, and the back of the side plate of the L-shaped connector 31 is provided with a plurality of U-shaped anchor rings 32 embedded in the rib beam 12; two stiffening ribs 33 are provided between the side plate and the bottom plate of the L-shaped connector 31. There are two U-shaped anchor rings 32, which are arranged at intervals and embedded in the rib beam 12, and the steel bars in the rib beam 12 pass through the two U-shaped anchor rings 32, thereby ensuring the connection strength between the metal support seat 3 and the rib beam 12. In addition, it should be noted that, generally speaking, the width of the ear plate 201 is less than the spacing between the two stiffening ribs 33.

[0064] The bottom plate of the L-shaped connector 31 is provided with holes, and the corresponding holes of the bottom plate are connected with nut bases 34; the nut bases 34 and the holes together form a threaded channel.

[0065] There are four metal support seats 3 , and the four metal support seats 3 are respectively arranged opposite to the front and rear sides of the opposite surfaces of the two rib beams 12 .

[0066] In some embodiments, the meshing groove 44 is provided on the lower end surface of the screw rod 41. The operator is located below the support and hanger 2, and then inserts a transmission rod 501 of sufficient length into the meshing groove 44. The transmission rod 501 can also be rotated to drive the screw rod 41 to screw in the threaded through hole, thereby driving the support and hanger 2 supported on the support platform 42 to move longitudinally.

[0067] Furthermore, the transmission assembly 6 can be detachably connected to the floor below the support bracket 2. At this time, the synchronous belt 62 is correspondingly connected to the lower part of each transmission rod 501.

[0068] The construction method of the present invention is roughly as follows:

[0069] S1: transport the prefabricated integrated beam slab 1 to the construction site and use hoisting equipment to hoist it to the designated location (such as Figure 1 , 8 shown);

[0070] S2: Pass each transmission rod 501 through the corresponding reserved hole 101 and align and insert it into the engagement groove 44 (such as Fig. 9 , 10 shown);

[0071] S3: Install the transmission assembly 6 on the top of the flat plate 11, and connect the synchronous belt 62 to the top of each transmission rod 501, adjust the installation position of the driving pulley 61, make the wheel surface of the driving pulley 61 and the synchronous belt 62 fully tensioned, drive the driving pulley 61 to make each transmission rod 501 rotate synchronously, so that each supporting assembly 4 is synchronously screwed and lowered in the threaded through hole, thereby realizing the smooth downward movement of the support bracket 2 (such as Fig.11 , 12 shown);

[0072] In the absence of sufficient external conditions, multiple operators can also be used to rotate the transmission rods 501 one by one at the same time.

[0073] S4: When the bottom surface of the support platform 42 in the support assembly 4 abuts against the upper surface of the nut base 34, the support bracket 2 is lowered into place, and then the transmission assembly 6 is evacuated and the electromechanical installation personnel carry out the installation of the electromechanical pipeline according to the construction plan (such as Figure 13-16 as shown).

[0074] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An electromechanical support and hanger for a beam-slab integrated unit, wherein the main body is a prefabricated integrated beam-slab (1), the prefabricated integrated beam-slab (1) is a reinforced concrete structure, comprising a flat plate (11) and two rib beams (12) arranged on the left and right sides of the flat plate (11), a notch (13) being arranged at the outer edge of the top surface of the rib beam (12), and a stirrup (14) extending from the rib beam (12) being arranged at the notch (13); Features: It also includes a support bracket (2) and a plurality of metal support seats (3); The support bracket (2) is placed in a cavity formed between the bottom surface of the flat plate (11) and the two rib beams (12); A plurality of metal support seats (3) are arranged from front to back on the opposite surfaces of the two rib beams (12), the metal support seats (3) are provided with longitudinally extending threaded channels, a support assembly (4) is screwed into each threaded channel, and the support bracket (2) is supported on the support assembly (4); The supporting assembly (4) comprises a longitudinally extending screw rod (41) and a supporting platform (42) connected to the upper end surface of the screw rod (41); the screw rod (41) is threadedly matched with the threaded channel; the supporting platform (42) is used to support the support bracket (2); and a limiting column (43) extending upward is provided on the top of the supporting platform (42); The support and hanger (2) is provided with ear plates (201) corresponding to each supporting platform (42) one by one, and the ear plates (201) are provided with through holes through which the limit position columns (43) pass; An engagement groove (44) is provided on the upper end surface of the limiting column (43), and a reserved hole (101) is provided on the flat plate (11) at a position corresponding to the engagement groove (44); The support assembly (4) is provided with an adjustment mechanism (5) for driving the support bracket (2) to move up and down; the adjustment mechanism (5) comprises a transmission rod (501) inserted into the engagement groove (44), and the upper part of the transmission rod (501) passes through the plate (11) through the reserved hole (101); The flat plate (11) is provided with a transmission assembly (6) for driving the transmission rod (501) to rotate synchronously; The transmission assembly (6) comprises a driving pulley (61) and a synchronous belt (62) which are detachably connected to the top of the plate (11); The synchronous belt (62) is transmission-connected to the upper part of each transmission rod (501); the driving pulley (61) is located between any two adjacent transmission rods (501); its wheel surface tensions the synchronous belt (62) and drives the synchronous belt (62) for transmission.

2. The electromechanical support and hanger for beam-slab integrated unit according to claim 1, characterized in that: The metal support seat (3) comprises an L-shaped connecting piece (31), the threaded channel is arranged on the bottom plate of the L-shaped connecting piece (31), a plurality of U-shaped anchor rings (32) pre-embedded in the rib beam (12) are arranged on the back of the side plate of the L-shaped connecting piece (31); and two stiffening ribs (33) are arranged between the side plate and the bottom plate of the L-shaped connecting piece (31).

3. The electromechanical support and hanger for beam-slab integrated unit according to claim 2, characterized in that: The bottom plate of the L-shaped connecting piece (31) is provided with a hole, and a nut base (34) is connected to the hole at a corresponding position of the bottom plate; the nut base (34) and the hole together form a threaded channel.

4. The electromechanical support and hanger for beam-slab integrated unit according to claim 1, characterized in that: Four metal support seats (3) are provided, and the four metal support seats (3) are respectively arranged opposite to each other on the front and rear sides of the opposite surfaces of the two rib beams (12).

5. The method for using the electromechanical support and hanger for the beam-slab integrated unit according to any one of claims 1 to 4, characterized in that: The steps include: S1: The prefabricated integrated beam and slab (1), the support bracket (2), the metal support seat (3) and the supporting assembly (4) are assembled as a whole in the factory and transported to the construction site, and hoisted to the designated location using hoisting equipment; S2: Pass each transmission rod (501) through the corresponding reserved hole (101) and align and insert it into the engagement groove (44); S3: Install the transmission assembly (6) on the top of the flat plate (11), and connect the synchronous belt (62) to the top of each transmission rod (501), adjust the installation position of the driving pulley (61), make the wheel surface of the driving pulley (61) and the synchronous belt (62) fully tensioned, drive the driving pulley (61) to make each transmission rod (501) rotate synchronously, so that each supporting assembly (4) is synchronously screwed and lowered in the threaded through hole, thereby realizing the smooth downward movement of the support bracket (2); S4: When the bottom surface of the support platform (42) in the support assembly (4) abuts against the upper surface of the nut base (34), the support bracket (2) is lowered into place, and then the transmission assembly (6) is evacuated and the electromechanical installation personnel carry out the installation of the electromechanical pipelines according to the construction plan.