An analysis method and system for intelligently identifying debris flow hazard points
Through intelligent identification methods, historical hazard points and environmental information are used to establish analysis models, which solves the problem of inaccuracy in debris flow hazard analysis, achieves efficient and reliable hazard point identification and treatment, and ensures safety.
Patent Information
- Application Number
- CN202411018832.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-29
AI Technical Summary
The existing technology has problems of inaccurate and unreliable analysis in debris flow hazard analysis, which affects work efficiency and cost. There is an urgent need for an improved technical solution.
Using intelligent identification methods, by acquiring historical hazard point data, natural environment information and geological condition information, we establish and train hazard analysis models, generate samples and target hazard data, determine target losses and optimize the model to achieve accurate processing of the data to be analyzed.
It improves the accuracy and reliability of the analysis of hidden danger points of debris flow, and can detect hidden danger points in advance and carry out treatment to ensure the safety of life and property.
Smart Images

Figure CN118551945B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data analysis technology, and in particular to an analysis method and system for intelligently identifying debris flow hazard points. Background Art
[0002] With the continuous development and progress of artificial intelligence, the fields involved in artificial intelligence are becoming more and more extensive. The inventors have combined artificial intelligence with mudslide hazard analysis and found that there are significant changes to the existing technology, which not only saves labor costs but also improves work efficiency.
[0003] In the actual operation process, because there are many uncontrollable natural and human factors that affect the occurrence of debris flow, there are problems of inaccurate and unreliable analysis in the actual analysis process. In order to improve the above technical problems, a technical solution is urgently needed to improve the above technical problems. Summary of the invention
[0004] In order to improve the technical problems existing in the relevant technologies, the present application provides an analysis method and system for intelligently identifying debris flow hazard points.
[0005] In a first aspect, an analysis method for intelligently identifying debris flow hazard points is provided, comprising:
[0006] Obtaining a debris flow hazard example, a first hazard analysis model, and a second hazard analysis model, wherein the debris flow hazard example includes a historical hazard point data set, a natural environment information set, and a geological condition information set, the model coefficient of the first hazard analysis model is fixed, the natural environment information set and the historical hazard point data set have a first connection in key features, and the geological condition information set and the historical hazard point data set have a second connection in key features;
[0007] Using the first hidden danger analysis model to generate debris flow hidden danger data on the historical hidden danger point data set to obtain sample debris flow hidden danger data, and using the second hidden danger analysis model to generate debris flow hidden danger data on the natural environment information set and the geological condition information set to obtain first debris flow hidden danger data and second debris flow hidden danger data;
[0008] Determining a target loss of the second hazard analysis model based on the sample debris flow hazard data, the first debris flow hazard data, and the second debris flow hazard data;
[0009] Based on the target loss, training the second hidden danger analysis model to obtain a target hidden danger analysis model;
[0010] When a hidden danger data set to be analyzed is obtained, the target hidden danger analysis model is used to perform debris flow hidden danger data generation processing on the hidden danger data set to be analyzed to obtain target debris flow hidden danger data.
[0011] In the present application, determining the target loss of the second hazard analysis model based on the sample debris flow hazard data, the first debris flow hazard data and the second debris flow hazard data includes:
[0012] Obtaining a sample debris flow hazard data label corresponding to the historical hazard point data set, a first debris flow hazard data label corresponding to the natural environment information set, and a second debris flow hazard data label corresponding to the geological condition information set;
[0013] Determining a target major loss and a target minor loss of the second hazard analysis model based on the sample debris flow hazard data, the first debris flow hazard data, the second debris flow hazard data, the sample debris flow hazard data label, the first debris flow hazard data label, and the second debris flow hazard data label;
[0014] The target loss is determined based on the target major loss and the target minor loss.
[0015] In the present application, determining the target important loss of the second hazard analysis model based on the sample debris flow hazard data, the first debris flow hazard data, the second debris flow hazard data, the sample debris flow hazard data label, the first debris flow hazard data label and the second debris flow hazard data label includes:
[0016] Determining the first important loss according to the sample debris flow hidden danger data and the sample debris flow hidden danger data label;
[0017] Determining the second most important loss according to the first debris flow hazard data and the first debris flow hazard data label;
[0018] Determining a third important loss according to the second debris flow hazard data and the second debris flow hazard data label;
[0019] The first important loss, the second important loss and the third important loss are integrated to obtain a target important loss.
[0020] In the present application, determining the target secondary loss of the second hazard analysis model based on the sample debris flow hazard data, the first debris flow hazard data, the second debris flow hazard data, the sample debris flow hazard data label, the first debris flow hazard data label, and the second debris flow hazard data label includes:
[0021] Determining a first secondary loss according to the sample debris flow hidden danger data label and the first debris flow hidden danger data;
[0022] Determining the second major loss according to the sample debris flow hidden danger data label and the second debris flow hidden danger data;
[0023] determining a third secondary loss according to the first debris flow hazard data and the second debris flow hazard data;
[0024] The first secondary loss, the second secondary loss and the third secondary loss are integrated to obtain a target secondary loss.
[0025] In the present application, the first secondary loss, the second secondary loss and the third secondary loss are integrated to obtain the target secondary loss, including:
[0026] Obtaining a first importance level corresponding to the first secondary loss, a second importance level corresponding to the second secondary loss, and a third importance level corresponding to the third secondary loss;
[0027] Based on the first importance level, the second importance level, and the third importance level, the first secondary loss, the second secondary loss, and the third secondary loss are integrated to obtain the target secondary loss.
[0028] In the present application, the determining of the target loss based on the target major loss and the target minor loss includes:
[0029] The comparison result of the target major loss and the target minor loss is used as the target loss.
[0030] In the present application, the step of obtaining the sample debris flow hazard data label corresponding to the historical hazard point data set, the first debris flow hazard data label corresponding to the natural environment information set, and the second debris flow hazard data label corresponding to the geological condition information set includes:
[0031] Using a third hidden danger analysis model to generate debris flow hidden danger data for the historical hidden danger point data set to obtain sample debris flow hidden danger data labels, wherein the model architecture of the third hidden danger analysis model is consistent with the model architecture of the first hidden danger analysis model;
[0032] Obtaining a first coefficient update and a second coefficient update for debris flow hazard data;
[0033] The sample debris flow hazard data label is optimized by updating the first coefficient to obtain the first debris flow hazard data label;
[0034] The sample debris flow hazard data label is optimized by updating the second coefficient to obtain the second debris flow hazard data label.
[0035] In the present application, the model architecture of the first hidden danger analysis model is consistent with the model architecture of the second hidden danger analysis model, and the method further includes:
[0036] In the process of using the second hazard analysis model to generate and process debris flow hazard data, a first feature of a first transition unit and a second feature of a second transition unit are obtained, wherein the first transition unit is any transition unit of the second hazard analysis model, and the second transition unit is a transition unit in the first hazard analysis model corresponding to the first transition unit;
[0037] The first characteristic of the first transition unit is optimized based on the second characteristic of the second transition unit.
[0038] In the present application, the optimizing the first characteristic of the first transition unit based on the second characteristic of the second transition unit includes:
[0039] Integrate the first feature of the first transition unit with the second feature of the second transition unit to obtain an integration result;
[0040] The integration result is used as a new first feature of the first transition unit.
[0041] In the present application, the first feature of the first transition unit and the second feature of the second transition unit are integrated to obtain an integrated result, including:
[0042] Simplify the first feature of the first transition unit and the second feature of the second transition unit respectively to obtain a simplified processing result of the first feature of the first transition unit and a simplified processing result of the second feature of the second transition unit;
[0043] Cleaning the first feature simplification processing result of the first transition unit and the second feature simplification processing result of the second transition unit to obtain a first cleaning result and a second cleaning result;
[0044] The first cleaning result and the second cleaning result are integrated to obtain an integrated result.
[0045] In a second aspect, an analysis system for intelligently identifying debris flow hazard points is provided, comprising a processor and a memory that communicate with each other, wherein the processor is used to read a computer program from the memory and execute it to implement the above method.
[0046] The embodiment of the present application provides an analysis method and system for intelligently identifying debris flow hazard points, obtaining a debris flow hazard example, a first hazard analysis model, and a second hazard analysis model, wherein the debris flow hazard example includes a historical hazard point data set, a natural environment information set, and a geological condition information set, the model coefficient of the first hazard analysis model is fixed, the natural environment information set and the historical hazard point data set have a first connection in key features, and the geological condition information set and the historical hazard point data set have a second connection in key features; the first hazard analysis model is used to generate debris flow hazard data on the historical hazard point data set to obtain a sample debris flow hazard. rock flow hazard data; using the second hazard analysis model to generate and process the natural environment information set and the geological condition information set respectively, to obtain the first rock flow hazard data and the second rock flow hazard data; based on the sample rock flow hazard data, the first rock flow hazard data and the second rock flow hazard data, determine the target loss of the second hazard analysis model; based on the target loss, train the second hazard analysis model to obtain the target hazard analysis model; when the hazard data set to be analyzed is obtained, using the target hazard analysis model to generate and process the hazard data set to be analyzed, to obtain the target rock flow hazard data.
[0047] The embodiment of the present invention can train the second hidden danger analysis model by using the natural environment information set corresponding to the historical hidden danger point data set and the geological condition information set corresponding to the historical hidden danger point data set, so that the second hidden danger analysis model can analyze the key features, thereby improving the training effect of the second hidden danger analysis model. In addition, by using the first hidden danger analysis model to generate and process the historical hidden danger point data set, sample mudslide hidden danger data is obtained; the second hidden danger analysis model is used to generate and process the natural environment information set and the geological condition information set, respectively, to obtain the first mudslide hidden danger data and the second mudslide hidden danger data; and based on the sample mudslide hidden danger data, the first mudslide hidden danger data and the second mudslide hidden danger data, the target loss of the second hidden danger analysis model is determined. Since the model coefficient of the first hidden danger analysis model is fixed, the first hidden danger analysis model can be used as a sample, and the historical data information described by the sample mudslide hidden danger data generated by the first hidden danger analysis model can be used to improve the processing accuracy and efficiency of the second hidden danger analysis model, so that the hidden danger situation of the mudslide hidden danger point can be accurately and reliably determined, and the hidden danger point can be governed in advance, so that people's life safety and property safety can be guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0049] Figure 1 A flow chart of an analysis method for intelligently identifying debris flow hazard points provided in an embodiment of the present application. DETAILED DESCRIPTION
[0050] In order to better understand the above technical scheme, the technical scheme of the present application is described in detail below through the accompanying drawings and specific embodiments. It should be understood that the embodiments of the present application and the specific features in the embodiments are detailed descriptions of the technical scheme of the present application, rather than limitations on the technical scheme of the present application. In the absence of conflict, the embodiments of the present application and the technical features in the embodiments can be combined with each other.
[0051] See also Figure 1 , shows an analysis method for intelligently identifying debris flow hazard points, which may include the technical solutions described in the following steps 101-105.
[0052] 101. Obtain a debris flow hazard example, a first hazard analysis model, and a second hazard analysis model. The debris flow hazard example includes a historical hazard point data set, a natural environment information set, and a geological condition information set. The model coefficient of the first hazard analysis model is fixed. There is a first connection between the natural environment information set and the historical hazard point data set in key features, and there is a second connection between the geological condition information set and the historical hazard point data set in key features.
[0053] Exemplarily, there is a first connection between the natural environment information set recorded in this application and the historical hidden danger point data set in terms of key features, wherein the key features include: rainfall features, material source features and other features.
[0054] There is a second connection between the geological condition information set recorded in this application and the historical hidden danger point data set in terms of key features, wherein the key features include: crust movement features, slope features and other features.
[0055] Among them, the debris flow hazard example is a data set used to train text to generate a debris flow hazard data model, and these data combinations are mainly used to describe the target debris flow hazard data that want to be generated, wherein a data set may include a historical hazard point data set, a natural environment information set corresponding to the historical hazard point data set, and a geological condition information set corresponding to the historical hazard point data set.
[0056] The second hidden danger analysis model may be a model having the same model architecture as the first hidden danger analysis model. For specific description, reference may be made to the first hidden danger analysis model, so it will not be described here. In this embodiment, the model coefficients of the second hidden danger analysis model may be updated and need to be determined through model training.
[0057] 102. Use a first hidden danger analysis model to generate and process debris flow hidden danger data on a historical hidden danger point data set to obtain sample debris flow hidden danger data, and use a second hidden danger analysis model to generate and process debris flow hidden danger data on a natural environment information set and a geological condition information set to obtain first debris flow hidden danger data and second debris flow hidden danger data.
[0058] In a possible implementation embodiment, the historical hazard point data set can be loaded into a data set generated debris flow hazard data model based on the first hazard analysis model, and the data set generated debris flow hazard data model outputs sample debris flow hazard data.
[0059] In a possible implementation example, the natural environment information set can be first loaded into the data set generated based on the second hazard analysis model to generate a debris flow hazard data model, and the data set generated debris flow hazard data model outputs the first debris flow hazard data. Then, the geological condition information set is loaded into the data set generated based on the second hazard analysis model to generate a debris flow hazard data model, and the data set generated debris flow hazard data model outputs the geological condition information set.
[0060] In a possible implementation embodiment, the model architecture of the first hidden danger analysis model is consistent with the model architecture of the second hidden danger analysis model. The analysis method for intelligently identifying debris flow hidden danger points may also include: in the process of using the second hidden danger analysis model to generate and process debris flow hidden danger data, obtaining the first feature of the first transition unit and the second feature of the second transition unit, the first transition unit is any transition unit of the second hidden danger analysis model, and the second transition unit is a transition unit in the first hidden danger analysis model corresponding to the first transition unit.
[0061] Among them, since the model architecture of the first hidden danger analysis model is consistent with the model architecture of the second hidden danger analysis model, the multiple transition units in the first hidden danger analysis model and the multiple transition units in the second hidden danger analysis model are in one-to-one correspondence.
[0062] The first transition unit and the second transition unit may specifically be decision-making units in the model.
[0063] Then, the first characteristic of the first transition unit is optimized based on the second characteristic of the second transition unit.
[0064] It can be understood that, since the first feature of the first transition unit is to be optimized based on the second feature of the second transition unit, the above-mentioned step of using the first hazard analysis model to generate and process the debris flow hazard data on the historical hazard point data set and the step of using the second hazard analysis model to generate and process the debris flow hazard data on the natural environment information set can be performed simultaneously, or the above-mentioned step of using the first hazard analysis model to generate and process the debris flow hazard data on the historical hazard point data set and the step of using the second hazard analysis model to generate and process the debris flow hazard data on the geological condition information set can be performed simultaneously.
[0065] Since the first hidden danger analysis model is used to learn the basic concepts expressed by the historical hidden danger point data set, and the second hidden danger analysis model is used to learn the positive concepts expressed by the natural environment information set compared to the basic concepts and the negative concepts expressed by the geological condition information set compared to the basic concepts, in this embodiment, by updating the first feature of the first transition unit based on the second feature of the second transition unit in the process of generating and processing debris flow hidden danger data using the second hidden danger analysis model, the feature output of each transition unit in the first hidden danger analysis model can be passed to each corresponding transition unit in the second hidden danger analysis model, so that the second hidden danger analysis model is not affected by the key features of the positive concepts and the negative concepts when learning the basic concepts, thereby ensuring the analysis accuracy of the second hidden danger analysis model.
[0066] In an alternative embodiment, a specific implementation of optimizing the first feature of the first transition unit based on the second feature of the second transition unit may include: integrating the first feature of the first transition unit with the second feature of the second transition unit to obtain an integrated result.
[0067] The integration result is used as the new first feature of the first transition unit.
[0068] Exemplarily, after a series of splicing processes are performed on the first feature of the first transition unit and the second feature of the second transition unit, a corresponding integration result can be obtained.
[0069] In a possible implementation example, the specific implementation method of the step of "integrating the first feature of the first transition unit with the second feature of the second transition unit to obtain an integrated result" may include: integrating the first feature of the first transition unit with the second feature of the second transition unit to obtain an integrated feature.
[0070] The integration result is simplified to obtain the integration result.
[0071] 103. Determine the target loss of the second hazard analysis model based on the sample debris flow hazard data, the first debris flow hazard data, and the second debris flow hazard data.
[0072] In a possible implementation example, in step 103, based on the sample debris flow hazard data, the first debris flow hazard data, and the second debris flow hazard data, a specific implementation method for determining the target loss of the second hazard analysis model may include:
[0073] A1. Obtain a sample debris flow hazard data label corresponding to a historical hazard point data set, a first debris flow hazard data label corresponding to a natural environment information set, and a second debris flow hazard data label corresponding to a geological condition information set.
[0074] Among them, the sample debris flow hazard data label can be the debris flow hazard data expected to be generated according to the historical hazard point data set, and the sample debris flow hazard data label can be the debris flow hazard data pre-labeled and associated with the historical hazard point data set.
[0075] Among them, the first debris flow hazard data label can be the debris flow hazard data expected to be generated according to the natural environment information set, and the first debris flow hazard data label can be the debris flow hazard data associated with the natural environment information set that is pre-labeled. Its specific role can refer to the sample debris flow hazard data label, so it will not be repeated here.
[0076] Among them, the second debris flow hazard data label can be the debris flow hazard data expected to be generated according to the geological condition information set, and the second debris flow hazard data label can be the debris flow hazard data associated with the geological condition information set that is pre-labeled. Its specific role can refer to the sample debris flow hazard data label, so it will not be repeated here.
[0077] In a possible implementation, in step A1, the specific implementation method of obtaining the sample debris flow hazard data label corresponding to the historical hazard point data set may include: manually screening the debris flow hazard data corresponding to the historical hazard point data set in the debris flow hazard data database, and marking the debris flow hazard data to obtain the sample debris flow hazard data label. Similarly, the first debris flow hazard data label corresponding to the natural environment information set and the second debris flow hazard data label corresponding to the geological condition information set can also be marked from the debris flow hazard data database by the above-mentioned manual screening method.
[0078] In other embodiments, in step A1, the specific implementation of obtaining the sample debris flow hazard data label corresponding to the historical hazard point data set, the first debris flow hazard data label corresponding to the natural environment information set, and the second debris flow hazard data label corresponding to the geological condition information set may include:
[0079] A11. Use the third hidden danger analysis model to generate debris flow hidden danger data for the historical hidden danger point data set to obtain sample debris flow hidden danger data labels. The model architecture of the third hidden danger analysis model is consistent with the model architecture of the first hidden danger analysis model.
[0080] Among them, the third hidden danger analysis model can be a model with the same function as the first hidden danger analysis model, so it will not be described here in detail.
[0081] Exemplarily, the historical hazard point data set may be loaded into the third hazard analysis model, and the debris flow hazard data output by the third hazard analysis model may be obtained as a sample debris flow hazard data label.
[0082] A12. Obtain a first coefficient update and a second coefficient update for debris flow hazard data.
[0083] Among them, the first coefficient update can be a coefficient used to optimize the object presented in the debris flow hazard data.
[0084] A13. Optimize the sample debris flow hazard data label by updating the first coefficient to obtain a first debris flow hazard data label.
[0085] A14. Optimize the sample debris flow hazard data label by updating the second coefficient to obtain a second debris flow hazard data label.
[0086] In this embodiment, the first debris flow hazard data label is obtained by obtaining the first coefficient update and the second coefficient update for the debris flow hazard data, and the sample debris flow hazard data label is optimized through the first coefficient update to obtain the first debris flow hazard data label, and the sample debris flow hazard data label is optimized through the second coefficient update to obtain the second debris flow hazard data label. In this way, the first debris flow hazard data label and the second debris flow hazard data label can be accurately and efficiently obtained in the absence of a large amount of existing debris flow hazard data, and thus the first debris flow hazard data label and the second debris flow hazard data label cannot be screened out.
[0087] It can be understood that in this embodiment, the method of obtaining the sample debris flow hazard data label corresponding to the historical hazard point data set can be replaced by the above-mentioned manual screening method. After obtaining the sample debris flow hazard data label, the method of obtaining the first debris flow hazard data label and the second debris flow hazard data label can be completed through the above-mentioned steps A12 to A14.
[0088] A2. Determine the target important loss and target minor loss of the second hazard analysis model based on the sample debris flow hazard data, the first debris flow hazard data, the second debris flow hazard data, the sample debris flow hazard data label, the first debris flow hazard data label and the second debris flow hazard data label.
[0089] In one possible implementation, in step A2, based on the sample debris flow hazard data, the first debris flow hazard data, the second debris flow hazard data, the sample debris flow hazard data label, the first debris flow hazard data label, and the second debris flow hazard data label, a specific implementation method for determining the target important loss of the second hazard analysis model may include: determining the first important loss according to the sample debris flow hazard data and the sample debris flow hazard data label. Determine the second important loss according to the first debris flow hazard data and the first debris flow hazard data label. Determine the third important loss according to the second debris flow hazard data and the second debris flow hazard data label. Integrate the first important loss, the second important loss, and the third important loss to obtain the target important loss.
[0090] In a possible implementation example, in step A2, based on the sample debris flow hazard data, the first debris flow hazard data, the second debris flow hazard data, the sample debris flow hazard data label, the first debris flow hazard data label, and the second debris flow hazard data label, a specific implementation method of determining the target secondary loss of the second hazard analysis model may include:
[0091] A21. Determine the first secondary loss based on the sample debris flow hazard data label and the first debris flow hazard data.
[0092] A22. Determine the second major loss based on the sample debris flow hazard data label and the second debris flow hazard data.
[0093] A23. Determine the third secondary loss based on the first debris flow hazard data and the second debris flow hazard data.
[0094] A24. Integrate the first secondary loss, the second secondary loss and the third secondary loss to obtain the target secondary loss.
[0095] In a possible implementation example, in step A24, the first secondary loss, the second secondary loss, and the third secondary loss are integrated to obtain the target secondary loss. The specific implementation method may include:
[0096] A first importance level corresponding to the first secondary loss, a second importance level corresponding to the second secondary loss, and a third importance level corresponding to the third secondary loss are obtained.
[0097] Based on the first importance level, the second importance level and the third importance level, the first secondary loss, the second secondary loss and the third secondary loss are integrated to obtain the target secondary loss.
[0098] A3. Determine the target loss based on the target major loss and target minor loss.
[0099] In a possible implementation example, in step A3, based on the target major loss and the target minor loss, a specific implementation method of determining the target loss may include:
[0100] The comparison result of the target important loss and the target minor loss is taken as the target loss.
[0101] 104. Based on the target loss, a second hidden danger analysis model is trained to obtain a target hidden danger analysis model.
[0102] In one possible implementation, the model coefficients in the second hidden danger analysis model can be optimized according to the target loss, such as optimizing the importance of each transition unit in the second hidden danger analysis model, and repeating the operations of steps 101 to 104 until the data set covering the second hidden danger analysis model converges to generate a debris flow hidden danger data model, and the second hidden danger analysis model obtained when the data set converges to generate the debris flow hidden danger data model is used as the target hidden danger analysis model.
[0103] 105. When a hidden danger data set to be analyzed is obtained, a target hidden danger analysis model is used to generate debris flow hidden danger data for the hidden danger data set to be analyzed, so as to obtain target debris flow hidden danger data.
[0104] In one possible implementation, the obtained hidden danger data set to be analyzed can be loaded into a data set covering a target hidden danger analysis model to generate a debris flow hidden danger data model, and the debris flow hidden danger data output by the data set to generate the debris flow hidden danger data model can be obtained as the target debris flow hidden danger data.
[0105] It can be seen that in this embodiment, the second hidden danger analysis model is trained by using the natural environment information set corresponding to the historical hidden danger point data set and the geological condition information set corresponding to the historical hidden danger point data set, so that the second hidden danger analysis model can analyze the key features, thereby improving the training effect of the second hidden danger analysis model. In addition, by using the first hidden danger analysis model to generate and process the historical hidden danger point data set, sample mudslide hidden danger data is obtained; the second hidden danger analysis model is used to generate and process the natural environment information set and the geological condition information set, respectively, to obtain the first mudslide hidden danger data and the second mudslide hidden danger data; and based on the sample mudslide hidden danger data, the first mudslide hidden danger data and the second mudslide hidden danger data, the target loss of the second hidden danger analysis model is determined. Since the model coefficient of the first hidden danger analysis model is fixed, the first hidden danger analysis model can be used as a sample, and the historical data information described by the sample mudslide hidden danger data generated by the first hidden danger analysis model can be used to improve the processing accuracy and efficiency of the second hidden danger analysis model, so that the hidden danger situation of the mudslide hidden danger point can be accurately and reliably determined, and the hidden danger point can be governed in advance, so that people's life safety and property safety can be guaranteed.
[0106] On the basis of the above, an analysis system for intelligently identifying debris flow hazard points is shown, including a processor and a memory that communicate with each other, and the processor is used to read and execute a computer program from the memory to implement the above method.
[0107] Based on the above, a computer-readable storage medium is also provided, on which a computer program stored implements the above method when running.
[0108] In summary, based on the above scheme, an example of debris flow hazard, a first hazard analysis model, and a second hazard analysis model are obtained. The example of debris flow hazard includes a historical hazard point data set, a natural environment information set, and a geological condition information set. The model coefficient of the first hazard analysis model is fixed, and there is a first connection between the natural environment information set and the historical hazard point data set in key features, and there is a second connection between the geological condition information set and the historical hazard point data set in key features; the first hazard analysis model is used to generate and process the historical hazard point data set to obtain sample debris flow hazard data; the second hazard analysis model is used to generate and process the natural environment information set and the geological condition information set, respectively, to obtain the first debris flow hazard data and the second debris flow hazard data; based on the sample debris flow hazard data, the first debris flow hazard data, and the second debris flow hazard data, the target loss of the second hazard analysis model is determined; based on the target loss, the second hazard analysis model is trained to obtain the target hazard analysis model; when the hazard data set to be analyzed is obtained, the target hazard analysis model is used to generate and process the hazard data set to be analyzed to obtain the target debris flow hazard data.
[0109] The embodiment of the present invention can train the second hidden danger analysis model by using the natural environment information set corresponding to the historical hidden danger point data set and the geological condition information set corresponding to the historical hidden danger point data set, so that the second hidden danger analysis model can analyze the key features, thereby improving the training effect of the second hidden danger analysis model. In addition, by using the first hidden danger analysis model to generate and process the historical hidden danger point data set, sample mudslide hidden danger data is obtained; the second hidden danger analysis model is used to generate and process the natural environment information set and the geological condition information set, respectively, to obtain the first mudslide hidden danger data and the second mudslide hidden danger data; and based on the sample mudslide hidden danger data, the first mudslide hidden danger data and the second mudslide hidden danger data, the target loss of the second hidden danger analysis model is determined. Since the model coefficient of the first hidden danger analysis model is fixed, the first hidden danger analysis model can be used as a sample, and the historical data information described by the sample mudslide hidden danger data generated by the first hidden danger analysis model can be used to improve the processing accuracy and efficiency of the second hidden danger analysis model, so that the hidden danger situation of the mudslide hidden danger point can be accurately and reliably determined, and the hidden danger point can be governed in advance, so that people's life safety and property safety can be guaranteed.
[0110] It should be understood that the system and its modules shown above can be implemented in various ways. For example, in some embodiments, the system and its modules can be implemented by hardware, software, or a combination of software and hardware. Among them, the hardware part can be implemented using dedicated logic; the software part can be stored in a memory and executed by an appropriate instruction execution system, such as a microprocessor or a dedicated design hardware. Those skilled in the art will understand that the above methods and systems can be implemented using computer executable instructions and / or included in a processor control code, such as a carrier medium such as a disk, CD or DVD-ROM, a programmable memory such as a read-only memory (firmware), or a data carrier such as an optical or electronic signal carrier. Such code is provided on the carrier medium such as a disk, CD or DVD-ROM, a programmable memory such as a read-only memory (firmware), or a data carrier such as an optical or electronic signal carrier. The system and its modules of the present application can not only be implemented by hardware circuits such as ultra-large-scale integrated circuits or gate arrays, semiconductors such as logic chips, transistors, or programmable hardware devices such as field programmable gate arrays, programmable logic devices, etc., but can also be implemented by software such as executed by various types of processors, and can also be implemented by a combination of the above hardware circuits and software (e.g., firmware).
[0111] It should be noted that different embodiments may produce different beneficial effects. In different embodiments, the beneficial effects that may be produced may be any one or a combination of the above, or any other possible beneficial effects.
Claims
1. An analysis method for intelligently identifying potential debris flow hazards. It is characterized in that include: Obtaining a debris flow hazard example, a first hazard analysis model, and a second hazard analysis model, wherein the debris flow hazard example includes a historical hazard point data set, a natural environment information set, and a geological condition information set, the model coefficient of the first hazard analysis model is fixed, the natural environment information set and the historical hazard point data set have a first connection in key features, and the geological condition information set and the historical hazard point data set have a second connection in key features; Using the first hidden danger analysis model to generate debris flow hidden danger data on the historical hidden danger point data set to obtain sample debris flow hidden danger data, and using the second hidden danger analysis model to generate debris flow hidden danger data on the natural environment information set and the geological condition information set to obtain first debris flow hidden danger data and second debris flow hidden danger data; Determining a target loss of the second hazard analysis model based on the sample debris flow hazard data, the first debris flow hazard data, and the second debris flow hazard data; Based on the target loss, training the second hidden danger analysis model to obtain a target hidden danger analysis model; When a hidden danger data set to be analyzed is obtained, the target hidden danger analysis model is used to perform debris flow hidden danger data generation processing on the hidden danger data set to be analyzed to obtain target debris flow hidden danger data; The step of determining the target loss of the second hazard analysis model based on the sample debris flow hazard data, the first debris flow hazard data, and the second debris flow hazard data includes: Obtaining a sample debris flow hazard data label corresponding to the historical hazard point data set, a first debris flow hazard data label corresponding to the natural environment information set, and a second debris flow hazard data label corresponding to the geological condition information set; Determining a target major loss and a target minor loss of the second hazard analysis model based on the sample debris flow hazard data, the first debris flow hazard data, the second debris flow hazard data, the sample debris flow hazard data label, the first debris flow hazard data label, and the second debris flow hazard data label; Determining the target loss based on the target major loss and the target minor loss; Wherein, determining the target important loss of the second hazard analysis model based on the sample debris flow hazard data, the first debris flow hazard data, the second debris flow hazard data, the sample debris flow hazard data label, the first debris flow hazard data label and the second debris flow hazard data label includes: Determining the first important loss according to the sample debris flow hidden danger data and the sample debris flow hidden danger data label; Determining the second most important loss according to the first debris flow hazard data and the first debris flow hazard data label; Determining a third important loss according to the second debris flow hazard data and the second debris flow hazard data label; Integrate the first significant loss, the second significant loss, and the third significant loss to obtain a target significant loss; Wherein, determining the target secondary loss of the second hazard analysis model based on the sample debris flow hazard data, the first debris flow hazard data, the second debris flow hazard data, the sample debris flow hazard data label, the first debris flow hazard data label and the second debris flow hazard data label includes: Determining a first secondary loss according to the sample debris flow hidden danger data label and the first debris flow hidden danger data; Determining the second major loss according to the sample debris flow hidden danger data label and the second debris flow hidden danger data; determining a third secondary loss according to the first debris flow hazard data and the second debris flow hazard data; Integrate the first secondary loss, the second secondary loss, and the third secondary loss to obtain a target secondary loss; The step of integrating the first secondary loss, the second secondary loss and the third secondary loss to obtain a target secondary loss includes: Obtaining a first importance level corresponding to the first secondary loss, a second importance level corresponding to the second secondary loss, and a third importance level corresponding to the third secondary loss; Based on the first importance level, the second importance level, and the third importance level, the first secondary loss, the second secondary loss, and the third secondary loss are integrated to obtain the target secondary loss; Wherein, determining the target loss based on the target major loss and the target minor loss includes: The comparison result of the target major loss and the target minor loss is used as the target loss.
2. The method for intelligently identifying debris flow potential risk points according to claim 1, It is characterized in that The obtaining of the sample debris flow hazard data label corresponding to the historical hazard point data set, the first debris flow hazard data label corresponding to the natural environment information set, and the second debris flow hazard data label corresponding to the geological condition information set includes: Using a third hidden danger analysis model to generate debris flow hidden danger data for the historical hidden danger point data set to obtain sample debris flow hidden danger data labels, wherein the model architecture of the third hidden danger analysis model is consistent with the model architecture of the first hidden danger analysis model; Obtaining a first coefficient update and a second coefficient update for debris flow hazard data; The sample debris flow hazard data label is optimized by updating the first coefficient to obtain the first debris flow hazard data label; The sample debris flow hazard data label is optimized by updating the second coefficient to obtain the second debris flow hazard data label.
3. The analysis method for intelligently identifying debris flow potential points according to claim 2, It is characterized in that The model architecture of the first hidden danger analysis model is consistent with the model architecture of the second hidden danger analysis model, and the method further includes: In the process of using the second hazard analysis model to generate and process debris flow hazard data, a first feature of a first transition unit and a second feature of a second transition unit are obtained, wherein the first transition unit is any transition unit of the second hazard analysis model, and the second transition unit is a transition unit in the first hazard analysis model corresponding to the first transition unit; The first characteristic of the first transition unit is optimized based on the second characteristic of the second transition unit.
4. The method for intelligently identifying debris flow potential risk points according to claim 3, It is characterized in that The optimizing the first characteristic of the first transition unit based on the second characteristic of the second transition unit includes: Integrate the first feature of the first transition unit with the second feature of the second transition unit to obtain an integration result; Using the integration result as a new first feature of the first transition unit; The step of integrating the first feature of the first transition unit with the second feature of the second transition unit to obtain an integration result includes: Simplify the first feature of the first transition unit and the second feature of the second transition unit respectively to obtain a simplified processing result of the first feature of the first transition unit and a simplified processing result of the second feature of the second transition unit; Cleaning the first feature simplification processing result of the first transition unit and the second feature simplification processing result of the second transition unit to obtain a first cleaning result and a second cleaning result; The first cleaning result and the second cleaning result are integrated to obtain an integrated result.
5. An analysis system for intelligently identifying potential debris flow hazards. It is characterized in that The invention comprises a processor and a memory communicating with each other, wherein the processor is used to read a computer program from the memory and execute the computer program to implement the method according to any one of claims 1 to 4.
Citation Information
Patent Citations
Method for early recognition of small watershed geological disaster hidden danger points
CN113378396A
Geological disaster hidden danger point management method and system
CN115203185A
Fine identification and verification method for geological disaster hidden danger risk
CN116665035A
Ice collapse type debris flow disaster chain hidden danger identification method
CN118279752A
Debris flow hidden danger susceptibility evaluation method and system based on curvature parameters
CN118333386A
