Energy efficiency analysis method and system for railway tunnel lighting monitoring system

By obtaining and analyzing multiple energy efficiency evaluation indicators of railway tunnel lighting systems, conducting single and multiple joint analysis to determine abnormal energy efficiency equipment, solving the analysis inaccuracy problem caused by the collaborative work of lighting equipment in the existing technology, and improving energy efficiency evaluation accuracy and reliability.

CN118568445BActive Publication Date: 2024-11-22BEIJING BROADWIT TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411048461.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-22
Estimated Expiration
2044-08-01

AI Technical Summary

Technical Problem

The existing railway tunnel lighting energy efficiency analysis method has the inseparable railway tunnel lighting energy efficiency analysis method. Since some lighting equipment works in concert with other equipment, the data evaluated separately is not objective, resulting in the accuracy and reliability of the analysis results being reduced, and the accuracy of the analysis cannot be guaranteed.

Method used

By acquiring multiple energy efficiency evaluation indicators, determining the evaluation indicators and detection data types, using sensor components and data acquisition components for data acquisition, conducting single energy efficiency analysis and multiple joint analysis, determining abnormal energy efficiency equipment based on the analysis results and generating improvement plans.

Benefits of technology

It improves the accuracy and accuracy of energy efficiency evaluation, ensures the objectivity and reliability of the analysis results, and solves the problem of unobjective evaluation in separate evaluations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118568445B_ABST
    Figure CN118568445B_ABST
Patent Text Reader

Abstract

The present invention discloses an energy efficiency analysis method and system for a railway tunnel lighting monitoring system, the method comprising: obtaining multiple energy efficiency evaluation indicators, determining the evaluation indicators of each energy efficiency evaluation indicator, and determining the detection data type according to the evaluation indicators; selecting a sensor component and a data acquisition component based on the detection data type, using the sensor component and the data acquisition component to collect data, and obtaining a collection data sample; performing a single energy efficiency analysis and a multiple joint analysis on the collection data sample to obtain a first analysis result and a second analysis result; determining abnormal energy efficiency lighting equipment through a preset energy efficiency benchmark value according to the first analysis result and the second analysis result, and generating an improvement plan based on the working area of ​​the abnormal lighting energy efficiency equipment. The energy efficiency of the entire lighting system can be objectively evaluated based on the common working characteristics of the lighting equipment, ensuring the evaluation precision and accuracy as well as the compatibility with the actual usage, and improving the reliability and accuracy of the analysis.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of energy efficiency analysis, and in particular to an energy efficiency analysis method and system for a railway tunnel lighting monitoring system. Background Art

[0002] At present, with the continuous development of my country's infrastructure and the continuous growth of the country's comprehensive national strength, high-speed EMUs have been extended to almost every city, and railways have been developed to many mountainous areas. The number of tunnels is also growing rapidly. Due to the rapid growth in the number and mileage of tunnels, a large amount of electricity consumption will inevitably be generated in tunnel lighting. Therefore, energy efficiency control of lighting systems in railway tunnels is of utmost importance.

[0003] Railway tunnel lighting can be divided into normal lighting, emergency lighting and landscape lighting according to different functions. Normal lighting, also known as functional lighting, is mainly used to improve visibility in the tunnel and ensure the normal operation of the train; emergency lighting refers to the lighting that is activated when normal lighting fails, and includes evacuation lighting, safety lighting and backup lighting; landscape lighting refers to special lighting settings set up in special tunnels or local sections of long tunnels to reflect the unique structure, location, cultural connotation of the tunnel, or to relieve the visual depression of passengers. For different lighting components, it is very likely to achieve independent lighting or to be combined with other lighting components for lighting. The existing railway lighting energy efficiency analysis methods are to collect the working parameters and usage of each lighting device through manual experience to perform energy efficiency analysis, which has the following problems: Since some lighting equipment works in coordination with other lighting equipment, the energy efficiency conclusion of the separate evaluation of its own collected data is not objective, and the accuracy and reliability of the final analysis results cannot be guaranteed, which reduces the accuracy of the analysis. Summary of the invention

[0004] In response to the above-mentioned problems, the present invention provides an energy efficiency analysis method and system for a railway tunnel lighting monitoring system to solve the problem mentioned in the background technology that since some lighting equipment works in coordination with other lighting equipment, the energy efficiency conclusions of a separate evaluation of its own collected data are not objective, and the accuracy and reliability of the final analysis results cannot be guaranteed, thereby reducing the accuracy of the analysis.

[0005] An energy efficiency analysis method for a railway tunnel lighting monitoring system comprises the following steps:

[0006] Acquire multiple energy efficiency evaluation indicators, determine the evaluation indicator of each energy efficiency evaluation indicator, and determine the type of detection data according to the evaluation indicator;

[0007] Selecting a sensor component and a data acquisition component based on the type of detected data, using the sensor component and the data acquisition component to collect data, and obtaining collected data samples;

[0008] Perform single-item energy efficiency analysis and multiple-item joint analysis on the collected data samples to obtain the first analysis result and the second analysis result;

[0009] According to the first analysis result and the second analysis result, abnormal energy efficiency lighting equipment is determined by preset energy efficiency reference values, and an improvement plan is generated based on the working area of ​​the abnormal lighting energy efficiency equipment.

[0010] Preferably, the acquiring of multiple energy efficiency evaluation indicators, determining an evaluation indicator for each energy efficiency evaluation indicator, and determining the type of detection data according to the evaluation indicator includes:

[0011] Determine a plurality of first energy efficiency evaluation indicators in the lighting dimension, and select a second energy efficiency evaluation indicator from the plurality of first energy efficiency evaluation indicators according to a tunnel application scenario;

[0012] Determine a reference dimension of each second energy efficiency evaluation indicator, determine a direct mapping indicator under the reference dimension, and determine an evaluation indicator of each second energy efficiency evaluation indicator according to the direct mapping indicator;

[0013] Determine the physical quantity that needs to be tested for the evaluation indicators, determine the dimensional unit of the physical quantity, and determine the field to which the data belongs based on the dimensional unit;

[0014] The detection data type of each second energy efficiency evaluation indicator is determined according to the field to which the data belongs.

[0015] Preferably, the selecting of a sensor component and a data acquisition component based on the type of detected data, using the sensor component and the data acquisition component to perform data acquisition, and obtaining a sample of collected data includes:

[0016] Determine the detection component type of each second energy efficiency evaluation indicator based on the detection data type, and select the sensor component and the data acquisition component according to the detection component type;

[0017] Setting the performance index and working index of the sensor component according to the data detection requirements of each second energy efficiency evaluation index;

[0018] Obtain the integrated framework of the railway tunnel lighting system, and configure the collection parameters of the data collection components according to the integrated framework;

[0019] The set sensor components and configured data acquisition components are used to collect data from the railway tunnel lighting system within a periodic period to obtain collected data samples.

[0020] Preferably, the performing of single-item energy efficiency analysis and multiple-item joint analysis on the collected data samples to obtain a first analysis result and a second analysis result includes:

[0021] Divide the sampled data samples to obtain the respective working data of multiple lighting devices in the tunnel lighting system;

[0022] The energy efficiency value of each lighting device is evaluated based on the respective working data of the plurality of lighting devices by using a preset lighting energy efficiency evaluation model, and an independent working energy efficiency value of each lighting device is obtained and used as a first analysis result;

[0023] Determine the multiple sets of joint lighting equipment groups in the railway tunnel lighting system and the associated operation conditions between the lighting equipment in each joint lighting group according to the design documents of the railway tunnel lighting system;

[0024] Energy efficiency analysis is performed on each set of joint lighting groups according to the associated operating conditions between the lighting devices in each set of joint lighting groups and the working data of each lighting device in the set of joint lighting groups to obtain a second analysis result.

[0025] Preferably, the step of determining the abnormal energy efficiency lighting equipment by preset energy efficiency benchmark values ​​according to the first analysis result and the second analysis result and generating an improvement plan based on the working area of ​​the abnormal lighting energy efficiency equipment includes:

[0026] Comparing the first analysis result with a preset energy efficiency benchmark value, and screening out the first abnormal lighting device according to the comparison result;

[0027] The second abnormal lighting device which is an independent lighting device among the first abnormal lighting devices is regarded as an abnormal energy efficiency lighting device;

[0028] Determine an abnormal energy consumption lighting device group according to the second analysis result and count the third abnormal lighting devices as abnormal energy efficiency lighting devices;

[0029] The lighting demand condition parameters are determined according to the working area of ​​each abnormal lighting energy efficiency device, and the improvement plan for each abnormal energy efficiency lighting device is generated according to the lighting demand condition parameters.

[0030] Preferably, the energy efficiency value of each lighting device is evaluated based on the respective working data of the plurality of lighting devices by using a preset lighting energy efficiency evaluation model, including:

[0031] Obtaining usage scenario description parameters of each lighting device, and determining usage condition parameters of each lighting device according to the usage scenario description parameters;

[0032] Determine standard scene feedback information of each lighting device according to the use condition parameters of the lighting device, and construct a standard scene feedback sequence according to the standard scene feedback information;

[0033] Determine the lighting effect characteristics of each lighting device under standard operation based on the standard scene feedback sequence;

[0034] Determine the energy consumption data of each lighting device under standard operation according to the lighting effect characteristics of the lighting device under standard operation;

[0035] Generate energy efficiency value reference representation based on energy consumption data of each lighting device under standard operation and service status;

[0036] Acquire the working data of each lighting device, and divide the working data of the lighting device into working energy consumption data and service energy consumption data according to the energy consumption data of each lighting device under standard operation;

[0037] The working energy consumption data and service energy consumption data of each lighting device and the reference representation of the energy efficiency value of the lighting device are input into a preset lighting energy efficiency evaluation model to evaluate the energy efficiency value of each lighting device.

[0038] An energy efficiency analysis system for a railway tunnel lighting monitoring system, the system comprising:

[0039] A determination module is used to obtain multiple energy efficiency evaluation indicators, determine the evaluation indicator of each energy efficiency evaluation indicator, and determine the detection data type according to the evaluation indicator;

[0040] An acquisition module is used to select a sensor component and a data acquisition component based on the type of detected data, and use the sensor component and the data acquisition component to perform data acquisition and obtain a sample of the collected data;

[0041] An analysis module, used to perform single-item energy efficiency analysis and multiple-item joint analysis on the collected data samples to obtain a first analysis result and a second analysis result;

[0042] A generating module is used to determine abnormal energy-efficiency lighting equipment according to the first analysis result and the second analysis result by using a preset energy efficiency reference value and to generate an improvement plan based on a working area of ​​the abnormal lighting energy-efficiency equipment.

[0043] Preferably, the determining module includes:

[0044] A selection submodule, used to determine a plurality of first energy efficiency evaluation indicators in the lighting dimension, and select a second energy efficiency evaluation indicator from the plurality of first energy efficiency evaluation indicators according to a tunnel application scenario;

[0045] A first determination submodule is used to determine a reference dimension of each second energy efficiency evaluation indicator, determine a direct mapping indicator under the reference dimension, and determine an evaluation indicator of each second energy efficiency evaluation indicator according to the direct mapping indicator;

[0046] The second determination submodule is used to determine the physical quantity that needs to be detected by the evaluation index, determine the dimensional unit of the physical quantity, and determine the field to which the data belongs according to the dimensional unit;

[0047] The third determination submodule is used to determine the detection data type of each second energy efficiency evaluation indicator according to the field to which the data belongs.

[0048] Preferably, the acquisition module includes:

[0049] A selection submodule is used to determine the detection component type of each second energy efficiency evaluation indicator based on the detection data type, and select a sensor component and a data acquisition component according to the detection component type;

[0050] A setting submodule is used to set the performance index and working index of the sensor component according to the data detection requirements of each second energy efficiency evaluation index;

[0051] A configuration submodule is used to obtain the integrated framework of the railway tunnel lighting system and configure the collection parameters of the data collection component according to the integrated framework;

[0052] The acquisition submodule is used to collect data from the railway tunnel lighting system within a periodic period using the set sensor components and the configured data acquisition components to obtain collected data samples.

[0053] Preferably, the analysis module comprises:

[0054] A division submodule is used to divide the sampled data samples and obtain the respective working data of multiple lighting devices in the tunnel lighting system;

[0055] A model analysis submodule, configured to evaluate the energy efficiency value of each lighting device based on the respective working data of the plurality of lighting devices by using a preset lighting energy efficiency evaluation model, obtain the independent working energy efficiency value of each lighting device and use it as the first analysis result;

[0056] A fourth determination submodule is used to determine the associated operation conditions between multiple sets of joint lighting equipment groups in the railway tunnel lighting system and the lighting equipment in each joint lighting group according to the design document of the railway tunnel lighting system;

[0057] The analysis submodule is used to perform energy efficiency analysis on each set of joint lighting groups according to the associated operation conditions between the lighting devices in each set of joint lighting groups and the working data of each lighting device in the set of joint lighting groups to obtain a second analysis result.

[0058] Preferably, the generating module comprises:

[0059] A first screening submodule, used for comparing the first analysis result with a preset energy efficiency reference value, and screening out a first abnormal lighting device according to the comparison result;

[0060] A second screening submodule, configured to select a second abnormal lighting device that is an independent lighting device among the first abnormal lighting devices as an abnormal energy efficiency lighting device;

[0061] A third screening submodule is used to determine the abnormal energy consumption lighting device group according to the second analysis result and count the third abnormal lighting devices as abnormal energy efficiency lighting devices;

[0062] The generation submodule is used to determine the lighting demand condition parameters according to the working area of ​​each abnormal lighting energy efficiency device, and generate an improvement plan for each abnormal energy efficiency lighting device according to the lighting demand condition parameters.

[0063] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description and the accompanying drawings.

[0064] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.

[0066] Figure 1 A flowchart of an energy efficiency analysis method for a railway tunnel lighting monitoring system provided by the present invention;

[0067] Figure 2 Another work flow chart of an energy efficiency analysis method for a railway tunnel lighting monitoring system provided by the present invention;

[0068] Figure 3 A schematic diagram of the structure of an energy efficiency analysis system for a railway tunnel lighting monitoring system provided by the present invention;

[0069] Figure 4 This is a structural schematic diagram of a central acquisition module of an energy efficiency analysis system for a railway tunnel lighting monitoring system provided by the present invention. DETAILED DESCRIPTION

[0070] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present disclosure. Instead, they are merely examples of devices and methods consistent with some aspects of the present disclosure as detailed in the appended claims.

[0071] At present, with the continuous development of my country's infrastructure and the continuous growth of the country's comprehensive national strength, high-speed EMUs have been extended to almost every city, and railways have been developed to many mountainous areas. The number of tunnels is also growing rapidly. Due to the rapid growth in the number and mileage of tunnels, a large amount of electricity consumption will inevitably be generated in tunnel lighting. Therefore, energy efficiency control of lighting systems in railway tunnels is of utmost importance.

[0072] Railway tunnel lighting can be divided into normal lighting, emergency lighting and landscape lighting according to different functions. Normal lighting, also known as functional lighting, is mainly used to improve visibility in the tunnel and ensure the normal operation of the train; emergency lighting refers to lighting that is activated when normal lighting fails, and includes evacuation lighting, safety lighting and backup lighting; landscape lighting refers to special lighting settings set up in special tunnels or local sections of long tunnels to reflect the unique structure, location, cultural connotation of the tunnel, or to relieve the visual oppression of passengers. For different lighting components, it is very likely to achieve independent lighting or to be combined with other lighting components for lighting. The existing railway lighting energy efficiency analysis methods are all based on collecting the working parameters and usage of each lighting device to perform energy efficiency analysis through manual experience. It has the following problems: Since some lighting equipment works in coordination with other lighting equipment, the energy efficiency conclusion of the separate evaluation of its own collected data is not objective, and the accuracy and reliability of the final analysis result cannot be guaranteed, which reduces the accuracy of the analysis. In order to solve the above problems, this embodiment discloses an energy efficiency analysis method for a railway tunnel lighting monitoring system.

[0073] An energy efficiency analysis method for railway tunnel lighting monitoring system, such as Figure 1 As shown, the following steps are included:

[0074] Step S101, obtaining multiple energy efficiency evaluation indicators, determining the evaluation indicator of each energy efficiency evaluation indicator, and determining the detection data type according to the evaluation indicator;

[0075] Step S102: selecting a sensor component and a data acquisition component based on the type of detected data, and using the sensor component and the data acquisition component to collect data to obtain collected data samples;

[0076] Step S103: Perform single-item energy efficiency analysis and multiple-item joint analysis on the collected data samples to obtain a first analysis result and a second analysis result;

[0077] Step S104: determine abnormal energy-efficiency lighting equipment according to the first analysis result and the second analysis result by using a preset energy efficiency reference value, and generate an improvement plan based on the working area of ​​the abnormal lighting energy-efficiency equipment.

[0078] In this embodiment, the energy efficiency evaluation index is represented as a reference evaluation index for evaluating the energy consumption and working efficiency of the railway lighting system, such as: energy consumption, utilization rate, visual comfort, lighting effect, etc.;

[0079] In this embodiment, the evaluation index is represented as a mapping evaluation index of each energy efficiency evaluation index. For example, the mapping index of energy consumption can be: power, current, power consumption, etc., and the mapping index of utilization rate can be: the ratio of the maximum lighting area of ​​the lighting fixture to the tunnel area, the ratio of the single working cycle of the lighting fixture to the time taken by the train to travel in the tunnel, etc.;

[0080] In this embodiment, the detection data type is represented as a data measurement unit type used to represent each mapping indicator, for example: the detection data type of the ratio of the maximum lighting area of ​​the lighting fixture to the tunnel area is data of area unit type;

[0081] In this embodiment, the single energy efficiency analysis is represented by performing energy efficiency analysis on lighting equipment working independently;

[0082] In this embodiment, the multiple joint analysis is represented by energy efficiency analysis of lighting equipment in a common working system according to working setting conditions. For example, in a system, one lamp is turned on by default, and the other lamp must also be turned on. At this time, we consider combining the energy efficiency of the two lamps for overall analysis. If the energy efficiency of the other lamp is abnormal under the single analysis, the energy efficiency of one lamp may be normal under the combined overall analysis, depending on the working condition restrictions of the lamp.

[0083] In this embodiment, the improvement scheme is expressed as a description of the scheme for improving abnormal energy efficiency equipment. For example, if the utilization rate of a certain lamp is not high, we can adjust the installation height of the lamp to maximize the lighting area and improve the utilization rate without increasing power consumption.

[0084] The working principle of the above technical solution is: obtain multiple energy efficiency evaluation indicators, determine the evaluation indicators of each energy efficiency evaluation indicator, and determine the detection data type according to the evaluation indicators; select sensor components and data acquisition components based on the detection data type, use the sensor components and data acquisition components to collect data, and obtain collected data samples; perform single energy efficiency analysis and multiple joint analysis on the collected data samples to obtain a first analysis result and a second analysis result; determine abnormal energy efficiency lighting equipment through a preset energy efficiency benchmark value based on the first analysis result and the second analysis result, and generate an improvement plan based on the working area of ​​the abnormal lighting energy efficiency equipment.

[0085] The beneficial effects of the above technical solution are as follows: by determining the evaluation index, the reference index for evaluating the energy efficiency of the tunnel lighting system can be accurately determined, and then rapid data collection and analysis can be carried out, thereby improving work efficiency. Furthermore, by performing multiple joint analyses on the collected data samples of each lighting device, the energy efficiency of the entire lighting system can be objectively evaluated based on the common working characteristics of the lighting equipment, thereby ensuring the evaluation accuracy and compatibility with actual usage conditions, improving the reliability and accuracy of the analysis, and solving the problem in the prior art that since some lighting devices work in coordination with other lighting devices, the energy efficiency conclusions of the collected data themselves are not objective, the accuracy and reliability of the final analysis results cannot be guaranteed, and the accuracy of the analysis is reduced.

[0086] In one embodiment, Figure 2 As shown, the acquisition of multiple energy efficiency evaluation indicators, determining the evaluation indicator of each energy efficiency evaluation indicator, and determining the detection data type according to the evaluation indicator include:

[0087] Step S201: determining a plurality of first energy efficiency evaluation indicators in the lighting dimension, and selecting a second energy efficiency evaluation indicator from the plurality of first energy efficiency evaluation indicators according to a tunnel application scenario;

[0088] Step S202: determining a reference dimension of each second energy efficiency evaluation indicator, determining a direct mapping indicator under the reference dimension, and determining an evaluation indicator of each second energy efficiency evaluation indicator according to the direct mapping indicator;

[0089] Step S203, determining the physical quantity that needs to be detected by the evaluation index, determining the dimensional unit of the physical quantity, and determining the field to which the data belongs according to the dimensional unit;

[0090] Step S204: determining the detection data type of each second energy efficiency evaluation indicator according to the field to which the data belongs.

[0091] In this embodiment, the first energy efficiency evaluation index is represented by all evaluation indexes used to evaluate lighting energy efficiency;

[0092] In this embodiment, the second energy efficiency evaluation index is represented as an evaluation index adapted in a tunnel scene for evaluating lighting energy efficiency;

[0093] In this embodiment, the reference dimension is represented as a data reference dimension of the energy efficiency evaluation index, for example: the reference dimension of the lighting effect may be a display dimension;

[0094] In this embodiment, the direct mapping index is represented as a relevant evaluation index under the reference dimension, for example, the relevant evaluation index of the display dimension is brightness, illumination, etc.

[0095] The beneficial effects of the above technical solution are: determining the evaluation index of the energy efficiency evaluation index through the direct mapping index of the reference dimension of the energy efficiency index under the lighting dimension, determining the dimensional unit of the evaluation index, and thus determining the detection data type of the energy efficiency evaluation index, which can accurately evaluate the data type and provide conditions for the subsequent selection of components.

[0096] In one embodiment, the selecting of the sensor component and the data acquisition component based on the detected data type, using the sensor component and the data acquisition component to perform data acquisition, and obtaining the collected data sample includes:

[0097] Determine the detection component type of each second energy efficiency evaluation indicator based on the detection data type, and select the sensor component and the data acquisition component according to the detection component type;

[0098] Setting the performance index and working index of the sensor component according to the data detection requirements of each second energy efficiency evaluation index;

[0099] Obtain the integrated framework of the railway tunnel lighting system, and configure the collection parameters of the data collection components according to the integrated framework;

[0100] The set sensor components and configured data acquisition components are used to collect data from the railway tunnel lighting system within a periodic period to obtain collected data samples.

[0101] The beneficial effects of the above technical solution are: the performance indicators and working indicators of the sensor components are set according to the data detection requirements of each second energy efficiency evaluation indicator. At the same time, the collection parameters of the data acquisition components are configured according to the integrated architecture. The data of the railway tunnel lighting system within a periodic period is collected by the set components, and the operating status of the railway tunnel lighting system can be monitored in real time. At the same time, by setting and configuring the sensor components and the data acquisition components, the various parameters of the lighting system can be accurately measured to avoid errors caused by human factors.

[0102] In one embodiment, performing single-item energy efficiency analysis and multiple-item joint analysis on the collected data samples to obtain a first analysis result and a second analysis result includes:

[0103] Divide the sampled data samples to obtain the respective working data of multiple lighting devices in the tunnel lighting system;

[0104] By using a preset lighting energy efficiency evaluation model, an energy efficiency value of each lighting device is evaluated based on the respective working data of the plurality of lighting devices, and an independent working energy efficiency value of each lighting device is obtained and used as a first analysis result;

[0105] Determine the multiple sets of joint lighting equipment groups in the railway tunnel lighting system and the associated operation conditions between the lighting equipment in each joint lighting group according to the design documents of the railway tunnel lighting system;

[0106] Energy efficiency analysis is performed on each set of joint lighting groups according to the associated operating conditions between the lighting devices in each set of joint lighting groups and the working data of each lighting device in the set of joint lighting groups to obtain a second analysis result.

[0107] The beneficial effects of the above technical solution are: by presetting the lighting energy efficiency evaluation model, the energy efficiency value of each lighting device is evaluated based on the respective working data of multiple lighting devices, so that the energy efficiency of each lighting device can be evaluated quickly and accurately. Furthermore, multiple sets of joint lighting device groups in the railway tunnel lighting system and the associated operating conditions between the lighting devices in each joint lighting group are obtained, and energy efficiency analysis is performed, so that the relationship and working status of each device can be understood, and objective energy efficiency analysis can be performed according to the collected parameters based on the common working characteristics between the various lighting devices, thereby further ensuring the objectivity and accuracy of the analysis results.

[0108] In one embodiment, determining abnormal energy efficiency lighting equipment by preset energy efficiency benchmark values ​​according to the first analysis result and the second analysis result and generating an improvement plan based on the working area of ​​the abnormal lighting energy efficiency equipment includes:

[0109] Comparing the first analysis result with a preset energy efficiency benchmark value, and screening out the first abnormal lighting device according to the comparison result;

[0110] The second abnormal lighting device which is an independent lighting device among the first abnormal lighting devices is regarded as an abnormal energy efficiency lighting device;

[0111] Determine an abnormal energy consumption lighting device group according to the second analysis result and count the third abnormal lighting devices as abnormal energy efficiency lighting devices;

[0112] The lighting demand condition parameters are determined according to the working area of ​​each abnormal lighting energy efficiency device, and the improvement plan for each abnormal energy efficiency lighting device is generated according to the lighting demand condition parameters.

[0113] The beneficial effects of the above technical solution are: through the first analysis result and the second analysis result, the abnormal energy efficiency lighting devices in the independent lighting devices and the abnormal energy consumption lighting devices group are determined, so as to determine the lighting demand condition parameters, generate an improvement plan for each abnormal energy efficiency lighting device, and improve the abnormal devices in a targeted manner to ensure the maximization of the energy efficiency of the lighting devices.

[0114] In one embodiment, the energy efficiency value of each lighting device is evaluated based on the respective working data of the plurality of lighting devices by using a preset lighting energy efficiency evaluation model, including:

[0115] Obtaining usage scenario description parameters of each lighting device, and determining usage condition parameters of each lighting device according to the usage scenario description parameters;

[0116] Determine standard scene feedback information of each lighting device according to the use condition parameters of the lighting device, and construct a standard scene feedback sequence according to the standard scene feedback information;

[0117] Determine the lighting effect characteristics of each lighting device under standard operation based on the standard scene feedback sequence;

[0118] Determine the energy consumption data of each lighting device under standard operation according to the lighting effect characteristics of the lighting device under standard operation;

[0119] Generate energy efficiency value reference representation based on energy consumption data of each lighting device under standard operation and service status;

[0120] Acquire the working data of each lighting device, and divide the working data of the lighting device into working energy consumption data and service energy consumption data according to the energy consumption data of each lighting device under standard operation;

[0121] The working energy consumption data and service energy consumption data of each lighting device and the reference representation of the energy efficiency value of the lighting device are input into a preset lighting energy efficiency evaluation model to evaluate the energy efficiency value of each lighting device.

[0122] The beneficial effects of the above technical solution are: by generating a reference representation of the energy efficiency value of each lighting device and then evaluating it using a model based on the working data of the lighting device, it is possible to objectively and accurately evaluate the energy efficiency of each lighting device based on its working characteristics, thereby ensuring the accuracy and reliability of the evaluation results, laying a reference condition for subsequent lighting improvements, and improving practicality and stability.

[0123] In one embodiment, this embodiment also discloses an energy efficiency analysis system for a railway tunnel lighting monitoring system. Figure 3 As shown, the system includes:

[0124] The determination module 301 is used to obtain multiple energy efficiency evaluation indicators, determine the evaluation indicator of each energy efficiency evaluation indicator, and determine the detection data type according to the evaluation indicator;

[0125] The acquisition module 302 is used to select a sensor component and a data acquisition component based on the type of detected data, and use the sensor component and the data acquisition component to perform data acquisition to obtain a sample of the collected data;

[0126] An analysis module 303 is used to perform single-item energy efficiency analysis and multiple-item joint analysis on the collected data samples to obtain a first analysis result and a second analysis result;

[0127] The generating module 304 is used to determine abnormal energy-efficiency lighting equipment according to the first analysis result and the second analysis result by using a preset energy efficiency reference value and to generate an improvement plan based on the working area of ​​the abnormal lighting energy-efficiency equipment.

[0128] The working principle of the above technical solution is: first, a plurality of energy efficiency evaluation indicators are obtained through a determination module, an evaluation indicator of each energy efficiency evaluation indicator is determined, and the detection data type is determined according to the evaluation indicator; secondly, a collection module is used to select a sensor component and a data collection component based on the detection data type, and the sensor component and the data collection component are used to collect data to obtain collected data samples; then, based on the analysis module, a single energy efficiency analysis and multiple joint analyses are performed on the collected data samples to obtain a first analysis result and a second analysis result; finally, a generation module is used to determine abnormal energy efficiency lighting equipment according to the first analysis result and the second analysis result through a preset energy efficiency benchmark value, and an improvement plan is generated based on the working area of ​​the abnormal lighting energy efficiency equipment.

[0129] The beneficial effects of the above technical solution are: by determining the evaluation indicators, the reference indicators for evaluating the energy efficiency of the tunnel lighting system can be accurately determined, and then rapid data collection and analysis can be carried out, thereby improving work efficiency. Furthermore, by performing multiple joint analyses on the collected data samples of each lighting device, the energy efficiency of the entire lighting system can be objectively evaluated based on the common working characteristics of the lighting equipment, thereby ensuring the evaluation precision and accuracy as well as compatibility with actual usage conditions, and improving the reliability and accuracy of the analysis.

[0130] In one embodiment, the determining module includes:

[0131] A selection submodule, used to determine a plurality of first energy efficiency evaluation indicators in the lighting dimension, and select a second energy efficiency evaluation indicator from the plurality of first energy efficiency evaluation indicators according to a tunnel application scenario;

[0132] A first determination submodule is used to determine a reference dimension of each second energy efficiency evaluation indicator, determine a direct mapping indicator under the reference dimension, and determine an evaluation indicator of each second energy efficiency evaluation indicator according to the direct mapping indicator;

[0133] The second determination submodule is used to determine the physical quantity that needs to be detected by the evaluation index, determine the dimensional unit of the physical quantity, and determine the field to which the data belongs according to the dimensional unit;

[0134] The third determination submodule is used to determine the detection data type of each second energy efficiency evaluation indicator according to the field to which the data belongs.

[0135] The beneficial effects of the above technical solution are: determining the evaluation index of the energy efficiency evaluation index through the direct mapping index of the reference dimension of the energy efficiency index under the lighting dimension, determining the dimensional unit of the evaluation index, and thus determining the detection data type of the energy efficiency evaluation index, which can accurately evaluate the data type and provide conditions for the subsequent selection of components.

[0136] In one embodiment, Figure 4 As shown, the acquisition module 302 includes:

[0137] A selection submodule 3021 is used to determine the detection component type of each second energy efficiency evaluation indicator based on the detection data type, and select a sensor component and a data acquisition component according to the detection component type;

[0138] A setting submodule 3022 is used to set the performance index and the working index of the sensor component according to the data detection requirements of each second energy efficiency evaluation index;

[0139] The configuration submodule 3023 is used to obtain the integrated framework of the railway tunnel lighting system and configure the collection parameters of the data collection component according to the integrated framework;

[0140] The acquisition submodule 3024 is used to collect data from the railway tunnel lighting system within a periodic period using the set sensor components and the configured data acquisition components to obtain collected data samples.

[0141] The beneficial effects of the above technical solution are: the performance indicators and working indicators of the sensor components are set according to the data detection requirements of each second energy efficiency evaluation indicator. At the same time, the collection parameters of the data acquisition components are configured according to the integrated architecture. The data of the railway tunnel lighting system within a periodic period is collected by the set components, and the operating status of the railway tunnel lighting system can be monitored in real time. At the same time, by setting and configuring the sensor components and the data acquisition components, the various parameters of the lighting system can be accurately measured to avoid errors caused by human factors.

[0142] In one embodiment, the analysis module comprises:

[0143] A division submodule is used to divide the sampled data samples and obtain the respective working data of multiple lighting devices in the tunnel lighting system;

[0144] A model analysis submodule, configured to evaluate the energy efficiency value of each lighting device based on the respective working data of the plurality of lighting devices by using a preset lighting energy efficiency evaluation model, obtain the independent working energy efficiency value of each lighting device and use it as the first analysis result;

[0145] A fourth determination submodule is used to determine the associated operation conditions between multiple sets of joint lighting equipment groups in the railway tunnel lighting system and the lighting equipment in each joint lighting group according to the design document of the railway tunnel lighting system;

[0146] The analysis submodule is used to perform energy efficiency analysis on each set of joint lighting groups according to the associated operation conditions between the lighting devices in each set of joint lighting groups and the working data of each lighting device in the set of joint lighting groups to obtain a second analysis result.

[0147] The beneficial effects of the above technical solution are: by presetting the lighting energy efficiency evaluation model, the energy efficiency value of each lighting device is evaluated based on the respective working data of multiple lighting devices, so that the energy efficiency of each lighting device can be evaluated quickly and accurately. Furthermore, multiple sets of joint lighting device groups in the railway tunnel lighting system and the associated operating conditions between the lighting devices in each joint lighting group are obtained, and energy efficiency analysis is performed, so that the relationship and working status of each device can be understood, and objective energy efficiency analysis can be performed according to the collected parameters based on the common working characteristics between the various lighting devices, thereby further ensuring the objectivity and accuracy of the analysis results.

[0148] In one embodiment, the generating module comprises:

[0149] A first screening submodule, used for comparing the first analysis result with a preset energy efficiency reference value, and screening out a first abnormal lighting device according to the comparison result;

[0150] A second screening submodule, configured to select a second abnormal lighting device that is an independent lighting device among the first abnormal lighting devices as an abnormal energy efficiency lighting device;

[0151] A third screening submodule is used to determine the abnormal energy consumption lighting device group according to the second analysis result and count the third abnormal lighting devices as abnormal energy efficiency lighting devices;

[0152] The generation submodule is used to determine the lighting demand condition parameters according to the working area of ​​each abnormal lighting energy efficiency device, and generate an improvement plan for each abnormal energy efficiency lighting device according to the lighting demand condition parameters.

[0153] The beneficial effects of the above technical solution are: through the first analysis result and the second analysis result, the abnormal energy efficiency lighting devices in the independent lighting devices and the abnormal energy consumption lighting devices group are determined, so as to determine the lighting demand condition parameters, generate an improvement plan for each abnormal energy efficiency lighting device, and improve the abnormal devices in a targeted manner to ensure the maximization of the energy efficiency of the lighting devices.

[0154] Those skilled in the art should understand that the first and second in the present invention merely refer to different application stages.

[0155] Other embodiments of the present disclosure will be readily apparent to those skilled in the art after considering the specification and practicing the disclosure disclosed herein. This application is intended to cover any variations, uses, or adaptations of the present disclosure that follow the general principles of the present disclosure and include common knowledge or customary techniques in the art that are not disclosed in the present disclosure. The specification and examples are to be considered exemplary only, and the true scope and spirit of the present disclosure are indicated by the following claims.

[0156] It should be understood that the present disclosure is not limited to the exact structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present disclosure is limited only by the appended claims.

Claims

1. An energy efficiency analysis method for a railway tunnel lighting monitoring system, characterized in that: The following steps are involved: Acquire multiple energy efficiency evaluation indicators, determine the evaluation indicator of each energy efficiency evaluation indicator, and determine the type of detection data according to the evaluation indicator; Selecting a sensor component and a data acquisition component based on the type of detected data, using the sensor component and the data acquisition component to collect data, and obtaining collected data samples; Perform single-item energy efficiency analysis and multiple-item joint analysis on the collected data samples to obtain the first analysis result and the second analysis result; Determine abnormal energy efficiency lighting equipment through preset energy efficiency benchmark values ​​according to the first analysis result and the second analysis result, and generate an improvement plan based on the working area of ​​the abnormal lighting energy efficiency equipment; The step of obtaining a plurality of energy efficiency evaluation indicators, determining an evaluation indicator for each energy efficiency evaluation indicator, and determining the type of detection data according to the evaluation indicator includes: Determine a plurality of first energy efficiency evaluation indicators in the lighting dimension, and select a second energy efficiency evaluation indicator from the plurality of first energy efficiency evaluation indicators according to a tunnel application scenario; Determine a reference dimension of each second energy efficiency evaluation indicator, determine a direct mapping indicator under the reference dimension, and determine an evaluation indicator of each second energy efficiency evaluation indicator according to the direct mapping indicator; Determine the physical quantity that needs to be tested for the evaluation indicators, determine the dimensional unit of the physical quantity, and determine the field to which the data belongs based on the dimensional unit; Determine the detection data type of each second energy efficiency evaluation indicator according to the field to which the data belongs; The step of selecting a sensor component and a data acquisition component based on the type of detected data, using the sensor component and the data acquisition component to perform data acquisition, and obtaining a sample of the acquired data includes: Determine the detection component type of each second energy efficiency evaluation indicator based on the detection data type, and select the sensor component and the data acquisition component according to the detection component type; Setting the performance index and working index of the sensor component according to the data detection requirements of each second energy efficiency evaluation index; Obtain the integrated framework of the railway tunnel lighting system, and configure the collection parameters of the data collection components according to the integrated framework; Using the set sensor components and configured data acquisition components to collect data from the railway tunnel lighting system within a periodic period, and obtain collected data samples; The single-item energy efficiency analysis and multiple-item joint analysis are performed on the collected data samples to obtain the first analysis result and the second analysis result, including: Divide the sampled data samples to obtain the respective working data of multiple lighting devices in the tunnel lighting system; By using a preset lighting energy efficiency evaluation model, an energy efficiency value of each lighting device is evaluated based on the respective working data of the plurality of lighting devices, and an independent working energy efficiency value of each lighting device is obtained and used as a first analysis result; Determine the multiple sets of joint lighting equipment groups in the railway tunnel lighting system and the associated operation conditions between the lighting equipment in each joint lighting group according to the design documents of the railway tunnel lighting system; Energy efficiency analysis is performed on each set of joint lighting groups according to the associated operating conditions between the lighting devices in each set of joint lighting groups and the working data of each lighting device in the set of joint lighting groups to obtain a second analysis result.

2. The energy efficiency analysis method for a railway tunnel lighting monitoring system according to claim 1 is characterized in that: The energy efficiency value of each lighting device is evaluated based on the working data of multiple lighting devices through a preset lighting energy efficiency evaluation model, including: Obtaining usage scenario description parameters of each lighting device, and determining usage condition parameters of each lighting device according to the usage scenario description parameters; Determine standard scene feedback information of each lighting device according to the use condition parameters of the lighting device, and construct a standard scene feedback sequence according to the standard scene feedback information; Determine the lighting effect characteristics of each lighting device under standard operation based on the standard scene feedback sequence; Determine the energy consumption data of each lighting device under standard operation according to the lighting effect characteristics of the lighting device under standard operation; Generate energy efficiency value reference representation based on energy consumption data of each lighting device under standard operation and service status; Acquire the working data of each lighting device, and divide the working data of the lighting device into working energy consumption data and service energy consumption data according to the energy consumption data of each lighting device under standard operation; The working energy consumption data and service energy consumption data of each lighting device and the reference representation of the energy efficiency value of the lighting device are input into a preset lighting energy efficiency evaluation model to evaluate the energy efficiency value of each lighting device.

3. The energy efficiency analysis method for a railway tunnel lighting monitoring system according to claim 1, characterized in that: The method of determining abnormal energy efficiency lighting equipment by preset energy efficiency reference values ​​according to the first analysis result and the second analysis result and generating an improvement plan based on the working area of ​​the abnormal lighting energy efficiency equipment includes: Compare the first analysis result with a preset energy efficiency benchmark value, and screen out the first abnormal lighting device according to the comparison result; The second abnormal lighting device which is an independent lighting device among the first abnormal lighting devices is regarded as an abnormal energy efficiency lighting device; Determine an abnormal energy consumption lighting device group according to the second analysis result and count the third abnormal lighting devices as abnormal energy efficiency lighting devices; The lighting demand condition parameters are determined according to the working area of ​​each abnormal lighting energy efficiency device, and the improvement plan for each abnormal energy efficiency lighting device is generated according to the lighting demand condition parameters.

4. An energy efficiency analysis system for a railway tunnel lighting monitoring system, characterized in that: The system includes: A determination module is used to obtain multiple energy efficiency evaluation indicators, determine the evaluation indicator of each energy efficiency evaluation indicator, and determine the detection data type according to the evaluation indicator; An acquisition module is used to select a sensor component and a data acquisition component based on the type of detected data, and use the sensor component and the data acquisition component to perform data acquisition and obtain a sample of the collected data; An analysis module, used to perform single-item energy efficiency analysis and multiple-item joint analysis on the collected data samples to obtain a first analysis result and a second analysis result; A generating module, configured to determine abnormal energy efficiency lighting equipment by preset energy efficiency reference values ​​according to the first analysis result and the second analysis result, and to generate an improvement plan based on a working area of ​​the abnormal lighting energy efficiency equipment; The determining module comprises: A selection submodule, used to determine a plurality of first energy efficiency evaluation indicators in the lighting dimension, and select a second energy efficiency evaluation indicator from the plurality of first energy efficiency evaluation indicators according to a tunnel application scenario; A first determination submodule is used to determine a reference dimension of each second energy efficiency evaluation indicator, determine a direct mapping indicator under the reference dimension, and determine an evaluation indicator of each second energy efficiency evaluation indicator according to the direct mapping indicator; The second determination submodule is used to determine the physical quantity that needs to be detected by the evaluation index, determine the dimensional unit of the physical quantity, and determine the field to which the data belongs according to the dimensional unit; A third determination submodule is used to determine the detection data type of each second energy efficiency evaluation indicator according to the field to which the data belongs; The acquisition module comprises: A selection submodule is used to determine the detection component type of each second energy efficiency evaluation indicator based on the detection data type, and select a sensor component and a data acquisition component according to the detection component type; A setting submodule is used to set the performance index and working index of the sensor component according to the data detection requirements of each second energy efficiency evaluation index; A configuration submodule is used to obtain the integrated framework of the railway tunnel lighting system and configure the collection parameters of the data collection component according to the integrated framework; The acquisition submodule is used to collect data of the railway tunnel lighting system within a period of time by using the set sensor components and the configured data acquisition components to obtain collected data samples; The analysis module comprises: A division submodule is used to divide the sampled data samples and obtain the respective working data of multiple lighting devices in the tunnel lighting system; A model analysis submodule, configured to evaluate the energy efficiency value of each lighting device based on the respective working data of the plurality of lighting devices by using a preset lighting energy efficiency evaluation model, obtain the independent working energy efficiency value of each lighting device and use it as the first analysis result; A fourth determination submodule is used to determine the associated operation conditions between multiple sets of joint lighting equipment groups in the railway tunnel lighting system and the lighting equipment in each joint lighting group according to the design document of the railway tunnel lighting system; The analysis submodule is used to perform energy efficiency analysis on each set of joint lighting groups according to the associated operation conditions between the lighting devices in each set of joint lighting groups and the working data of each lighting device in the set of joint lighting groups to obtain a second analysis result.

5. The energy efficiency analysis system for railway tunnel lighting monitoring system according to claim 4 is characterized in that: The energy efficiency value of each lighting device is evaluated based on the respective working data of the plurality of lighting devices by using the preset lighting energy efficiency evaluation model, including: Obtaining usage scenario description parameters of each lighting device, and determining usage condition parameters of each lighting device according to the usage scenario description parameters; Determine standard scene feedback information of each lighting device according to the use condition parameters of the lighting device, and construct a standard scene feedback sequence according to the standard scene feedback information; Determine the lighting effect characteristics of each lighting device under standard operation based on the standard scene feedback sequence; Determine the energy consumption data of each lighting device under standard operation according to the lighting effect characteristics of the lighting device under standard operation; Generate energy efficiency value reference representation based on energy consumption data of each lighting device under standard operation and service status; Acquire the working data of each lighting device, and divide the working data of the lighting device into working energy consumption data and service energy consumption data according to the energy consumption data of each lighting device under standard operation; The working energy consumption data and service energy consumption data of each lighting device and the reference representation of the energy efficiency value of the lighting device are input into a preset lighting energy efficiency evaluation model to evaluate the energy efficiency value of each lighting device.

6. The energy efficiency analysis system for railway tunnel lighting monitoring system according to claim 4, characterized in that: The generating module comprises: A first screening submodule, used for comparing the first analysis result with a preset energy efficiency reference value, and screening out a first abnormal lighting device according to the comparison result; A second screening submodule, configured to select a second abnormal lighting device that is an independent lighting device among the first abnormal lighting devices as an abnormal energy efficiency lighting device; A third screening submodule is used to determine the abnormal energy consumption lighting device group according to the second analysis result and count the third abnormal lighting devices as abnormal energy efficiency lighting devices; The generation submodule is used to determine the lighting demand condition parameters according to the working area of ​​each abnormal lighting energy efficiency device, and generate an improvement plan for each abnormal energy efficiency lighting device according to the lighting demand condition parameters.