Pumped storage power station identification method, device and equipment based on parallel computing
Through parallel computing technology, the site generation and screening of pumped storage power station site selection is solved, and the problem of low efficiency and time-consuming traditional methods is achieved, achieving an efficient and accurate site selection process.
Patent Information
- Application Number
- CN202411034267.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-07-29
AI Technical Summary
The site selection method of traditional pumped storage power stations is inefficient and time-consuming, making it easy to miss high-quality sites, especially when the space range is large, it is difficult to meet the needs.
The parallel calculation method is adopted, and the elevation value and hydropower parameters of the reservoir are processed simultaneously through multiple idle computing node machines, and pumped storage power stations are generated and screened. Parallel calculations are used to improve identification efficiency and accuracy, and avoid the disadvantages of manual site selection.
It greatly improves the identification efficiency of pumped storage power stations, shortens the identification time, ensures that high-quality sites are not missed, and solves the efficiency and accuracy problems of traditional methods.
Smart Images

Figure CN118569444B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of new energy identification technology, and in particular to a pumped storage power station identification method, device and equipment based on parallel computing. Background Art
[0002] Pumped storage power stations are green, low-carbon, clean, flexible and adjustable power sources with mature technology, optimal economic efficiency and the best conditions for large-scale development. Accelerating the development of pumped storage plays an important role in accelerating the construction of new energy power systems, promoting large-scale and high-proportion development of renewable energy, ensuring the safe and stable operation of power systems, improving the level of energy security, and promoting the expansion of effective investment and maintaining stable and healthy economic and social development. The green and low-carbon transformation of energy has become an irreversible development trend in the world. The large-scale and high-proportion development of clean energy will give rise to huge demand for pumped storage.
[0003] Traditional pumped storage power plant planning and site selection adopts manual experience method, which has accumulated rich experience and technology in the past and contributed a number of high-quality pumped storage power stations to the power system. However, there are also many problems. For example, the manual experience method involves a lot of repetitive work, low work efficiency and long time consumption. Affected by the level of planners, the site selection results are uneven and it is easy to miss high-quality sites. Especially when the spatial scope of the site selection is large, it is often difficult to meet application requirements. Summary of the invention
[0004] In view of this, the present invention provides a method, device and equipment for identifying a pumped-storage power station based on parallel computing to solve the problems of low efficiency and long time consumption in site selection of a pumped-storage power station.
[0005] In a first aspect, the present invention provides a pumped storage power station identification method based on parallel computing, which is applied to a main controller. The method comprises:
[0006] Get multiple reservoirs in a preset area and the elevation value of each reservoir;
[0007] Control multiple idle computing nodes to generate multiple pumped storage power stations by combining multiple reservoirs based on the elevation values of the reservoirs through parallel computing;
[0008] Control multiple idle computing nodes to screen multiple pumped storage power stations based on preset threshold intervals of water energy parameters and preset threshold intervals of restrictive factor areas through parallel computing.
[0009] The pumped-storage power station identification method based on parallel computing provided by the present invention controls multiple idle computing node machines to generate multiple pumped-storage power stations based on the elevation values of multiple reservoirs through parallel computing, and screens multiple pumped-storage power stations based on the preset threshold interval of the water energy parameter and the preset threshold interval of the restrictive factor area, so that multiple idle computing node machines can simultaneously process the tasks to be calculated for parallel computing, which not only greatly improves the identification efficiency of the pumped-storage power station and shortens the identification time, but also overcomes the drawbacks of the traditional manual site selection method, will not miss high-quality pumping sites, and solves the problems of low efficiency and long time consumption in the site selection of pumped-storage power stations.
[0010] In an optional implementation, controlling a plurality of idle computing nodes to generate a plurality of pumped storage power stations by combining a plurality of reservoirs based on elevation values of the reservoirs through parallel computing includes:
[0011] Read each reservoir one by one, combine multiple reservoirs to generate a pumped storage power station as the first task to be calculated and distribute them to multiple idle computing node machines respectively;
[0012] Control multiple idle computing node machines to read the corresponding reservoir in the first task to be calculated and the first elevation value of the corresponding reservoir;
[0013] Control multiple idle computing node machines to extract all reservoirs whose elevation values are less than the first elevation value except the corresponding reservoir in the first task to be calculated, and respectively calculate the elevation difference between the first elevation value and all the extracted reservoirs;
[0014] Control multiple idle computing node machines to combine the corresponding reservoir in the first task to be calculated with other reservoirs except themselves based on the relationship between the elevation difference and the preset elevation threshold interval, so as to generate multiple pumped storage power stations.
[0015] The pumped-storage power station identification method based on parallel computing provided by the present invention controls multiple idle computing node machines to read the corresponding reservoir in the first task to be calculated and the first elevation value of the corresponding reservoir, extracts all reservoirs whose elevation values are less than the first elevation value except the corresponding reservoir in the first task to be calculated, and respectively calculates the elevation difference between the first elevation value and all the extracted reservoirs, and combines the corresponding reservoir in the first task to be calculated with other reservoirs except itself based on the relationship between the elevation difference and the preset elevation threshold interval to generate multiple pumped-storage power stations, thereby improving the efficiency of combining each reservoir with other reservoirs except itself, reducing the amount of calculation data, and shortening the time for generating multiple pumped-storage power stations.
[0016] In an optional implementation, before controlling a plurality of idle computing nodes to screen a plurality of pumped-storage power stations based on a preset threshold interval of a water energy parameter and a preset threshold interval of a restrictive factor area through parallel computing, the method for identifying a pumped-storage power station based on parallel computing further includes:
[0017] Control multiple idle computing nodes to calculate the virtual storage capacity of each pumped storage power station;
[0018] The energy storage conditions of multiple pumped-storage power stations are evaluated based on the virtual energy storage, and the pumped-storage power stations whose energy storage conditions do not meet the preset energy storage threshold are deleted.
[0019] In an optional implementation, the virtual storage capacity of each pumped storage power station is expressed by the following formula:
[0020]
[0021] in: It is the virtual storage capacity of the pumped storage power station. is the comprehensive output coefficient of the pumped storage power station, is the time step, , It is the maximum storage capacity of the upper and lower reservoirs in a pumped storage power station; It is the elevation difference between the upper and lower reservoirs in a pumped-storage power station.
[0022] The pumped-storage power station identification method based on parallel computing provided by the present invention first controls multiple idle computing node machines to evaluate the energy storage conditions of multiple pumped-storage power stations based on virtual energy storage through parallel computing before controlling multiple idle computing node machines to screen multiple pumped-storage power stations based on preset thresholds of water energy parameters through parallel computing, and deletes the pumped-storage power stations whose energy storage conditions do not meet the preset energy storage thresholds, thereby providing accurate and reliable pumped-storage power stations for subsequent screening work, further improving the efficiency of pumped-storage power station screening, and reducing the amount of data calculation.
[0023] In an optional embodiment, the water energy parameters of the pumped storage power station include the normal water storage level of the upper and lower reservoirs in the pumped storage power station, the dead water level of the upper and lower reservoirs, the installed capacity, the average water head and the distance-to-height ratio; the preset threshold intervals of the water energy parameters include the installed capacity threshold interval, the average water head threshold interval and the distance-to-height ratio preset threshold interval;
[0024] Controlling multiple idle computing nodes to screen multiple pumped storage power stations based on preset threshold intervals of water energy parameters and preset threshold intervals of restrictive factor areas through parallel computing includes:
[0025] Read each pumped-storage power station one by one, and select the pumped-storage power stations that meet the preset threshold interval of installed capacity, the preset threshold interval of average water head, the preset threshold interval of distance-to-height ratio, and the preset threshold interval of restrictive factor area as the second tasks to be calculated and assign them to multiple idle computing node machines respectively;
[0026] Control multiple idle computing nodes to obtain the normal water level, dead water level and average water head of the upper and lower reservoirs in the pumped storage power station;
[0027] Calculate the distance-to-height ratio of a pumped-storage power station based on the dead water level and average hydraulic head of the upper and lower reservoirs of the pumped-storage power station;
[0028] The inundation range of the upper and lower reservoirs in the pumped storage power station is obtained based on the normal water levels of the upper and lower reservoirs, and the intersection area between the inundation range of the upper and lower reservoirs and the restrictive factors is calculated;
[0029] Compare the installed capacity of the pumped-storage power station with the installed capacity threshold interval and the average water head with the average water head threshold interval, and delete the pumped-storage power station that does not meet the installed capacity threshold interval and the average water head threshold interval;
[0030] Based on the remaining pumped-storage power stations after deleting the pumped-storage power stations that do not meet the installed capacity threshold interval and the average head threshold interval, the pumped-storage power stations whose restrictive factor types meet the preset requirements and whose distance-to-height ratios meet the preset threshold intervals of the distance-to-height ratio and whose intersection areas meet the preset threshold intervals of the restrictive factor areas are retained.
[0031] The pumped-storage power station identification method based on parallel computing provided by the present invention controls multiple idle computing nodes to obtain the normal water storage level of the upper and lower reservoirs in the pumped-storage power station, the dead water level and the average water head of the upper and lower reservoirs; calculates the distance-to-height ratio of the pumped-storage power station based on the dead water level and the average water head of the upper and lower reservoirs in the pumped-storage power station; obtains the flooding range of the upper and lower reservoirs in the pumped-storage power station based on the normal water storage level of the upper and lower reservoirs, and calculates the intersection area between the flooding range of the upper and lower reservoirs and the restrictive factors; compares the installed capacity of the pumped-storage power station with the installed capacity threshold interval and the average water head with the average water head threshold interval, and deletes the water that does not meet the installed capacity threshold interval and pumped-storage power stations within the average head threshold interval; based on the remaining pumped-storage power stations after deleting the pumped-storage power stations that do not meet the installed capacity threshold interval and the average head threshold interval, retain the pumped-storage power stations whose restrictive factor types meet the preset requirements and whose distance-to-height ratios meet the preset distance-to-height ratio threshold intervals and whose intersection areas meet the preset threshold intervals of restrictive factor areas. When the restrictive factor type meets the preset requirements, the above-mentioned distance-to-height ratios and intersection areas are compared with the preset thresholds respectively, and the pumped-storage power stations that meet the requirements are retained, and high-quality sites will not be missed, thereby improving the efficiency of pumped-storage power station identification, reducing the computational workload, and shortening the identification time. By selecting multiple parameters for screening, the parameter identification is comprehensive, which improves the identification accuracy of pumped-storage power stations that meet the requirements.
[0032] In an optional implementation, calculating the distance-to-height ratio of a pumped-storage power station based on the dead water level and average water head of the upper and lower reservoirs in the pumped-storage power station includes:
[0033] Calculate the shortest straight-line distance between the dead water levels of the upper and lower reservoirs of the pumped-storage power station, and use the shortest straight-line distance as the horizontal length of the water delivery system of the upper and lower reservoirs of the pumped-storage power station;
[0034] The distance-to-height ratio of the pumped-storage power station is calculated based on the horizontal length and average hydraulic head of the water transmission system.
[0035] The parallel computing-based pumped-storage power station identification method provided by the present invention calculates the shortest straight-line distance between the dead water levels of the upper and lower reservoirs in the pumped-storage power station, and uses the shortest straight-line distance as the horizontal length of the water transmission system of the upper and lower reservoirs in the pumped-storage power station. The distance-to-height ratio of the pumped-storage power station is calculated based on the horizontal length of the water transmission system and the average water head, which provides a data basis for comparing the distance-to-height ratio with a preset threshold range, and provides data support for identifying pumped-storage power stations that meet the requirements.
[0036] In an optional implementation, calculating the intersection area between the flooding range of the upper and lower reservoirs in the pumped storage power station and the restrictive factors includes:
[0037] Obtain the inundation range and limiting factor area of the upper and lower reservoirs of the pumped storage power station;
[0038] The inundation range of the upper and lower reservoirs in each pumped-storage power station is superimposed on the area of the restrictive factors to obtain the overlapping area between the upper and lower reservoirs in the pumped-storage power station and the restrictive factors, and the overlapping area is taken as the intersection area.
[0039] The invention provides a method for identifying pumped-storage power stations based on parallel computing. The flooded ranges of the upper and lower reservoirs in each pumped-storage power station are superimposed on the area of restrictive factors to obtain the intersection area, thereby improving the accuracy of determining the intersection area and providing data support for identifying pumped-storage power stations that meet the requirements.
[0040] In a second aspect, the present invention provides a pumped storage power station identification device based on parallel computing, which is applied to a main controller, and the device includes:
[0041] An acquisition module is used to obtain multiple reservoirs in a preset area and the elevation value of each reservoir;
[0042] A combination module, used to control multiple idle computing node machines to combine multiple reservoirs based on the elevation values of the reservoirs to generate multiple pumped storage power stations through parallel computing;
[0043] The screening module is used to control multiple idle computing node machines to screen multiple pumped storage power stations based on the preset threshold interval of the water energy parameter and the preset threshold interval of the restrictive factor area through parallel calculation.
[0044] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the pumped-storage power station identification method based on parallel computing of the above-mentioned first aspect or any corresponding embodiment thereof by executing the computer instructions.
[0045] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the pumped-storage power station identification method based on parallel computing of the above-mentioned first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0047] Figure 1is a flow chart of a method for identifying a pumped storage power station based on parallel computing according to an embodiment of the present invention;
[0048] Figure 2 is a flow chart of another method for identifying a pumped storage power station based on parallel computing according to an embodiment of the present invention;
[0049] Figure 3 is a flow chart of another method for identifying a pumped storage power station based on parallel computing according to an embodiment of the present invention;
[0050] Figure 4 is a structural block diagram of a pumped storage power station identification device based on parallel computing according to an embodiment of the present invention;
[0051] Figure 5 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0052] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0053] According to an embodiment of the present invention, an embodiment of a pumped-storage power station identification method based on parallel computing is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although the logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0054] In this embodiment, a pumped storage power station identification method based on parallel computing is provided, which can be used for a main controller. Figure 1 is a flow chart of a method for identifying a pumped storage power station based on parallel computing according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:
[0055] Step S101, obtaining multiple reservoirs in a preset area and the elevation value of each reservoir.
[0056] Specifically, the preset area can be located by the operator through the geographic information system software. For example, an area containing multiple reservoirs determined by comprehensively considering the topographic conditions, geological conditions, water source conditions, social conditions and climatic conditions of the reservoir site selection is used as the preset area. Digital Elevation Model (DEM) is a geographic information system used to describe the topography of the surface of a preset area. The digital simulation of the ground terrain of the identified area is achieved through limited terrain elevation attribute values (hereinafter referred to as elevation values), that is, the digital expression of the terrain surface morphology. The elevation value refers to the distance from a point along the plumb line to the absolute base surface, which is called the absolute elevation. The elevation value can represent the absolute height of a certain place, the relative height difference, or the ups and downs of the terrain.
[0057] Exemplarily, a digital elevation model (DEM) is used to describe the topography of the surface of a preset area, and multiple reservoirs in the preset area and the elevation value corresponding to each reservoir are obtained.
[0058] Step S102, controlling a plurality of idle computing node machines to generate a plurality of pumped-storage power stations by combining a plurality of reservoirs based on the elevation values of the reservoirs through parallel computing.
[0059] Specifically, a pumped storage power station refers to a hydropower station (including multiple reservoirs) that can pump water to an upper reservoir for energy storage. It is generally used for peak load regulation, frequency regulation, phase regulation, and emergency standby of the power grid. For example, a pumped storage power station uses electricity during low load periods to pump water to an upper reservoir, and then releases water to a lower reservoir for power generation during peak load periods. Multiple reservoirs are spatially intersected and combined using the elevation values of the preset regional terrain to generate multiple pumped storage power stations.
[0060] The main controller can be implemented by a main control computer, which includes an engine management center. The engine management center is also used to monitor the load status of multiple computing node machines. When the engine management center monitors that the load status of the computing node machine is not 0, it is determined that the computing node machine is in a busy state; when the engine management center monitors that the load status of the computing node machine is 0, it is determined that the computing node machine is an idle computing node machine.
[0061] Exemplarily, the engine management center will generate a pumped storage power station based on the reservoir combination as a task to be calculated and publish it. When the load state of the computing node machine is not 0, which is a busy state, the main control computer will not assign the task to be calculated. When the load state of the computing node machine is 0, which is an idle state, the computing node machine is determined to be an idle computing node machine, and the main control computer assigns the task to be calculated to the idle computing node machine. Each idle computing node machine analyzes the elevation value relationship between its corresponding reservoir and other reservoirs. For example, when the elevation value of the corresponding reservoir and the elevation value of other reservoirs are obtained, the corresponding reservoir and other reservoirs are combined based on the elevation value to generate multiple pumped storage power stations.
[0062] Step S103, controlling a plurality of idle computing nodes to screen a plurality of pumped-storage power stations based on a preset threshold interval of a water energy parameter and a preset threshold interval of a restrictive factor area through parallel computing.
[0063] Specifically, the water energy parameters of a pumped storage power station can be the normal water level of the upper and lower reservoirs of the pumped storage power station, the dead water level, the installed capacity of the power station, the average head, the distance-to-height ratio and other parameters. The normal water level of the upper and lower reservoirs refers to the highest water level stored at the pumped storage station under normal operation, also known as the normal high water level. The normal water level can determine the flooding range of the upper and lower reservoirs. The dead water level refers to the lowest water level of each reservoir in the normal operation of the pumped storage power station. It is generally to maintain a certain working head of the hydropower station, and the storage capacity below the dead water level is not used. The average head is the arithmetic mean of the maximum head and the minimum head of the pumped storage power station. The normal water level of the upper reservoir minus the dead water level of the lower reservoir, minus the head loss, is the maximum head, and the dead water level of the upper reservoir minus the normal water level of the lower reservoir, minus the head loss, is the minimum head, and the average of the two is the average head. The average head is one of the factors measuring the technical and economic performance of a pumped storage power station. The distance-to-height ratio refers to the ratio of the horizontal distance between the upper and lower reservoirs of a pumped-storage power station to the average water head.
[0064] The flooding range can be obtained based on the normal water levels of the upper and lower reservoirs in the pumped storage power station, and the distance-to-height ratio is related to the dead water level and the average head.
[0065] Restrictive factors include, but are not limited to, one or more nature reserves, ecological red lines, national parks, and scenic spots. The restrictive factor area refers to the intersection area between the pumped storage power station and the restrictive factor area. The preset threshold intervals of the water energy parameters and the preset threshold intervals of the restrictive factor area can be selected according to actual conditions and are not specifically limited here.
[0066] Exemplarily, the engine management center publishes the pumped-storage power station that meets the preset threshold interval of the water energy parameter and the preset threshold interval of the restrictive factor area as a task to be calculated. When the load state of the computing node machine is not 0, which is a busy state, the main control computer does not assign the task to be calculated. When the load state of the computing node machine is 0, which is an idle state, the computing node machine is determined to be an idle computing node machine, and the main control computer assigns the task to be calculated to the idle computing node machine. Each idle computing node machine compares the relationship between the distance-to-height ratio and the restrictive factor area of the corresponding pumped-storage power station and the preset threshold interval, selects the pumped-storage power station that meets the requirements of the preset threshold interval for retention, and obtains the best quality pumped-storage power station.
[0067] The present embodiment provides a method for identifying pumped-storage power stations at pumped-storage sites based on parallel computing, controls a plurality of idle computing node machines to combine a plurality of reservoirs based on the elevation values of the reservoirs through parallel computing to generate a plurality of pumped-storage power stations, controls a plurality of idle computing node machines to combine a plurality of reservoirs based on spatial intersection relationships through parallel computing to generate a plurality of pumped-storage sites, and screens a plurality of pumped-storage power stations based on a preset threshold interval of a water energy parameter and a preset threshold interval of a restrictive factor area, and screens a plurality of pumped-storage power stations based on a preset threshold interval of a characteristic parameter, so that a plurality of idle computing node machines simultaneously process the tasks to be calculated and perform parallel computing, which not only greatly improves the recognition efficiency of pumped-storage power stations at pumped-storage sites and shortens the recognition time, but also overcomes the drawbacks of traditional manual site selection methods, does not miss high-quality pumping sites, and solves the problems of low efficiency and long time consumption in site selection of pumped-storage power stations.
[0068] In this embodiment, a pumped storage power station identification method based on parallel computing is provided, which can be used for the above-mentioned main controller. Figure 2 is a flow chart of a method for identifying a pumped storage power station based on parallel computing according to an embodiment of the present invention. Figure 2 As shown, the process includes the following steps:
[0069] Step S201, obtain multiple reservoirs in a preset area and the elevation value of each reservoir. Figure 1 Step S101 of the illustrated embodiment will not be described in detail here.
[0070] Step S202, controlling a plurality of idle computing node machines to generate a plurality of pumped-storage power stations by combining a plurality of reservoirs based on the elevation values of the reservoirs through parallel computing.
[0071] Specifically, the above step S202 includes:
[0072] Step S2021, read each reservoir one by one, combine multiple reservoirs to generate a pumped storage power station as the first task to be calculated and distribute it to multiple idle computing node machines respectively.
[0073] Specifically, the main controller can be implemented by a main control computer, and the main control computer includes an engine management center. Exemplarily, the engine management center reads each reservoir one by one, and publishes the combination of reservoirs to generate a pumped storage power station as the first task to be calculated. When the load state of the computing node machine is not 0, which is a busy state, the main control computer does not assign the first task to be calculated. When the load state of the computing node machine is 0, which is an idle state, the computing node machine is determined to be an idle computing node machine, and the main control computer assigns the first task to be calculated to the idle computing node machine.
[0074] Step S2022, control multiple idle computing node machines to read the corresponding reservoir in the first task to be calculated and the first elevation value of the corresponding reservoir.
[0075] Specifically, since the elevation value of each reservoir has been obtained when obtaining multiple reservoirs in the preset area, when multiple idle computing node machines all have the first task to be calculated, the multiple idle computing node machines are controlled to directly read the corresponding reservoir in the first task to be calculated and the first elevation value of the corresponding reservoir, and the corresponding reservoir is used as the selected arbitrary reservoir .
[0076] Step S2023, control multiple idle computing node machines to extract all reservoirs whose elevation values are less than the first elevation value except the corresponding reservoir in the first task to be calculated, and calculate the elevation difference between the first elevation value and all the extracted reservoirs respectively.
[0077] Specifically, control multiple idle computing nodes to search for selected reservoirs The elevation values of other reservoirs besides the selected reservoir are determined, and the elevation values are lower than the selected reservoir. Other reservoirs . The elevation value is lower than the selected reservoir Other reservoirs The number of is at least one, and the selected reservoir is calculated separately The corresponding first elevation value and the elevation difference of each reservoir extracted.
[0078] Step S2024, controlling multiple idle computing node machines to combine the corresponding reservoir in the first task to be calculated with other reservoirs except themselves based on the relationship between the elevation difference and the preset elevation threshold interval, to generate multiple pumped storage power stations.
[0079] Specifically, the preset elevation threshold interval is set according to the actual situation, including an upper limit and a lower limit. The upper limit and the lower limit are not specifically limited here. The main controller controls multiple idle computing nodes to compare whether each elevation difference is within the preset elevation threshold interval. If it is within the preset elevation threshold interval, the selected reservoir With other reservoirs The combination is performed to generate at least one pumped storage power station in each idle computing node machine.
[0080] The pumped-storage power station identification method based on parallel computing provided in the present embodiment controls a plurality of idle computing node machines to read the corresponding reservoir in the first task to be calculated and the first elevation value of the corresponding reservoir, extracts all reservoirs whose elevation values are less than the first elevation value except the corresponding reservoir in the first task to be calculated, and respectively calculates the elevation difference between the first elevation value and all the extracted reservoirs, and combines the corresponding reservoir in the first task to be calculated with other reservoirs except itself based on the relationship between the elevation difference and the preset elevation threshold interval to generate a plurality of pumped-storage power stations, thereby improving the efficiency of combining each reservoir with other reservoirs except itself, reducing the amount of calculation data, and shortening the time for generating a plurality of pumped-storage power stations.
[0081] Step S203, control multiple idle computing nodes to calculate the virtual storage capacity of each pumped-storage power station; evaluate the storage capacity conditions of multiple pumped-storage power stations based on the virtual storage capacity, and delete the pumped-storage power stations whose storage capacity conditions do not meet the preset storage capacity threshold.
[0082] Where: The virtual storage capacity of each pumped storage power station is expressed by the following formula:
[0083]
[0084] in: It is the virtual storage capacity of the pumped storage power station. is the comprehensive output coefficient of the pumped storage power station, is the time step, , It is the maximum storage capacity of the upper and lower reservoirs in a pumped storage power station; It is the elevation difference between the upper and lower reservoirs in a pumped-storage power station.
[0085] Specifically, the preset storage energy threshold is set according to the actual situation and is not specifically limited here. Control multiple idle computing nodes to calculate the virtual storage energy of each pumped storage power station. When the storage energy condition of the pumped storage power station is less than the preset storage energy threshold, delete the pumped storage power station. Perform an initial evaluation on the generated multiple pumped storage power stations based on the virtual storage energy, and then perform subsequent screening processing on the pumped storage power stations after the initial evaluation.
[0086] Step S204, control multiple idle computing nodes to screen multiple pumped storage power stations based on preset threshold intervals of water energy parameters and preset threshold intervals of restrictive factor areas through parallel computing. Figure 1 Step S103 of the illustrated embodiment will not be described in detail here.
[0087] The pumped-storage power station identification method based on parallel computing provided in this embodiment controls multiple idle computing node machines to read the corresponding reservoir in the first task to be calculated and the first elevation value of the corresponding reservoir, extracts all reservoirs whose elevation values are less than the first elevation value except the corresponding reservoir in the first task to be calculated, and respectively calculates the elevation difference between the first elevation value and all the extracted reservoirs, and combines the corresponding reservoir in the first task to be calculated with other reservoirs except itself based on the relationship between the elevation difference and the preset elevation threshold interval, and generates multiple pumped-storage power stations, thereby improving the efficiency of combining each reservoir with other reservoirs except itself, reducing the amount of calculated data, and shortening the time for generating multiple pumped-storage power stations. Before controlling multiple idle computing node machines to screen multiple pumped-storage power stations based on the preset threshold value of water energy parameters through parallel computing, first control multiple idle computing node machines to evaluate the energy storage conditions of multiple pumped-storage power stations based on virtual energy storage through parallel computing, and delete the pumped-storage power stations whose energy storage conditions do not meet the preset energy storage threshold, providing accurate and reliable pumped-storage power stations for subsequent screening work.
[0088] In this embodiment, a pumped storage power station identification method based on parallel computing is provided, which can be used for the above-mentioned main controller. Figure 3 is a flow chart of a method for identifying a pumped storage power station based on parallel computing according to an embodiment of the present invention. Figure 3 As shown, the process includes the following steps:
[0089] Step S301, obtain multiple reservoirs in a preset area and the elevation value of each reservoir. Figure 2 Step S201 of the illustrated embodiment will not be described in detail here.
[0090] Step S302, control multiple idle computing nodes to generate multiple pumped storage power stations based on the elevation values of multiple reservoirs through parallel computing. Figure 2 Step S202 of the illustrated embodiment will not be described in detail here.
[0091] Step S303, controlling a plurality of idle computing nodes to screen a plurality of pumped-storage power stations based on a preset threshold interval of a water energy parameter and a preset threshold interval of a restrictive factor area through parallel computing.
[0092] Specifically, the water energy parameters of the pumped storage power station include the normal water storage level of the upper and lower reservoirs in the pumped storage power station, the dead water level of the upper and lower reservoirs, the installed capacity, the average water head and the distance-to-height ratio, etc.; the preset threshold intervals of the water energy parameters include the installed capacity threshold interval, the average water head threshold interval and the distance-to-height ratio preset threshold interval. The installed capacity threshold interval, the average water head threshold interval, the distance-to-height ratio preset threshold interval and the restrictive factor area preset threshold interval are set according to actual conditions and are not specifically limited here.
[0093] The above step S303 includes:
[0094] Step S3031, read each pumped-storage power station one by one, and select the pumped-storage power stations that meet the preset threshold interval of installed capacity, the preset threshold interval of average head, the preset threshold interval of distance-to-height ratio, and the preset threshold interval of restrictive factor area as the second task to be calculated and allocate them to multiple idle computing node machines respectively.
[0095] Step S3032, control multiple idle computing node machines to obtain the normal water level of the upper and lower reservoirs in the pumped storage power station, the dead water level and the average water head of the upper and lower reservoirs.
[0096] Specifically, when multiple idle computing node machines have a second task to be calculated, the multiple idle computing node machines can be controlled to read the pumped-storage power station in the second task to be calculated through parallel computing, and obtain the normal water level of the upper and lower reservoirs in the pumped-storage power station, the dead water level of the upper and lower reservoirs, the average head and other parameters.
[0097] Step S3033, calculating the distance-to-height ratio of the pumped-storage power station based on the dead water levels and average water heads of the upper and lower reservoirs in the pumped-storage power station.
[0098] In an optional implementation, the above step S3033 includes:
[0099] Step b1, calculate the shortest straight-line distance between the dead water levels of the upper and lower reservoirs in the pumped-storage power station, and use the shortest straight-line distance as the horizontal length of the water delivery system of the upper and lower reservoirs in the pumped-storage power station.
[0100] Specifically, multiple idle node machines are controlled to read the upper and lower reservoirs of the corresponding pumped storage power station, connect the distances between the dead water levels of the two upper and lower adjacent reservoirs, and select the shortest straight-line distance, which is used as the horizontal length of the water delivery system of the upper and lower reservoirs in the pumped storage power station. The horizontal length of the water delivery system represents the total length of the line for conveying water in the pumped storage power station. The horizontal length of the water delivery system can be set to be less than or equal to 5 kilometers.
[0101] Step b2, calculating the distance-to-height ratio of the pumped-storage power station based on the horizontal length of the water transmission system and the average water head.
[0102] Specifically, a plurality of idle node machines are controlled to read the average water head of the corresponding pumped storage power station, and the ratio of the horizontal length of the water transmission system to the average water head is calculated to obtain the distance-to-height ratio of each pumped storage power station.
[0103] The parallel computing-based pumped-storage power station identification method provided in this embodiment calculates the shortest straight-line distance between the dead water levels corresponding to the elevation values of the upper and lower reservoirs in the pumped-storage power station, and uses the shortest straight-line distance as the horizontal length of the water transmission system of the upper and lower reservoirs in the pumped-storage power station. The distance-to-height ratio of the pumped-storage power station is calculated based on the horizontal length of the water transmission system and the average water head, which provides a data basis for comparing the distance-to-height ratio with a preset threshold range, and provides data support for identifying pumped-storage power stations that meet the requirements.
[0104] Step S3034, obtaining the flooding range of the upper and lower reservoirs in the pumped-storage power station based on the normal water levels of the upper and lower reservoirs, and calculating the intersection area between the flooding range of the upper and lower reservoirs and the restrictive factors.
[0105] In an optional implementation, the restrictive factors include, but are not limited to, at least one or more of nature reserves, ecological red lines, national parks, and scenic spots. The above step S3034 includes:
[0106] Step c1, obtaining the flooding range and restrictive factor area of the upper and lower reservoirs in the pumped storage power station;
[0107] Specifically, the flooding ranges of the upper and lower reservoirs in the pumped storage power station are obtained based on the normal water levels of the upper and lower reservoirs, and the restrictive factor area is obtained from a pre-set hydropower station database.
[0108] Step c2, superimpose and calculate the catchment area of the upper and lower reservoirs in each pumped storage power station and the area of the restrictive factor to obtain the overlapping area between the upper and lower reservoirs in the pumped storage power station and the restrictive factor, and use the overlapping area as the intersection area.
[0109] Specifically, if the upper and lower reservoirs in each pumped-storage power station have an intersecting relationship with the restrictive factors in space, the catchment area of the upper and lower reservoirs in each pumped-storage power station and the area of the restrictive factors are superimposed and calculated to obtain the overlapping area between the upper and lower reservoirs in the pumped-storage power station and the restrictive factors, and this overlapping area is used as the intersection area.
[0110] The present embodiment provides a method for identifying pumped-storage power stations based on parallel computing. In each pumped-storage power station, the flooded ranges of the upper and lower reservoirs are superimposed on the area of restrictive factors to obtain the intersection area, thereby improving the accuracy of determining the intersection area and providing data support for identifying pumped-storage power stations that meet the requirements.
[0111] Step S3035, respectively compare the installed capacity of the pumped-storage power station with the installed capacity threshold interval and the average water head with the average water head threshold interval, and delete the pumped-storage power station that does not meet the installed capacity threshold interval and the average water head threshold interval.
[0112] Specifically, the installed capacity threshold interval and the average head threshold interval both include an upper limit and a lower limit. The installed capacity threshold interval refers to the installed capacity between the lower limit and the upper limit of the installed capacity threshold. The average head threshold interval refers to the average head between the lower limit and the upper limit of the average head threshold. For example, the installed capacity threshold interval is greater than or equal to one gigawatt, and the average head threshold interval is greater than or equal to 300 meters and less than or equal to 750 meters. First, the pumped-storage power stations that do not meet the installed capacity threshold interval and the average head threshold interval are numerically deleted, which reduces the subsequent calculation workload of the pumped-storage power stations whose restrictive factor types meet the preset requirements and whose distance-to-height ratios meet the preset threshold intervals of the distance-to-height ratios and whose intersection areas meet the preset threshold intervals of the restrictive factor areas.
[0113] Step S3036, based on the remaining pumped-storage power stations after deleting the pumped-storage power stations that do not meet the installed capacity threshold interval and the average head threshold interval, retain the pumped-storage power stations whose restrictive factor types meet the preset requirements and whose distance-to-height ratios meet the preset threshold intervals of the distance-to-height ratios and whose intersection areas meet the preset threshold intervals of the restrictive factor areas.
[0114] Specifically, the type of restrictive factor is set according to the actual situation, but the type of restrictive factor includes but is not limited to at least one or more of nature reserves, ecological red lines, national parks and scenic spots. The preset requirement means that the type of restrictive factor does not belong to any one or more of nature reserves, ecological red lines, national parks and scenic spots. The installed capacity threshold interval, the average head threshold interval, the distance-to-height ratio preset threshold interval and the restrictive factor area preset threshold interval all include upper and lower limits. The distance-to-height ratio satisfies the distance-to-height ratio preset threshold interval, which means that the value of the distance-to-height ratio is between the lower limit value and the upper limit value of the distance-to-height ratio preset threshold. The intersection area satisfies the restrictive factor area preset threshold interval, which means that the value of the intersection area is between the lower limit value and the upper limit value of the restrictive factor area preset threshold. For example, the distance-to-height ratio threshold interval is set to be greater than or equal to 2 and less than or equal to 10.
[0115] Control multiple idle computing node machines to delete pumped-storage power stations that do not meet the preset requirements of restrictive factor types and do not meet the preset threshold interval of distance-to-height ratio and whose intersection area meets the preset threshold interval of restrictive factor area through parallel computing, and summarize the pumped-storage power stations that meet the preset requirements of restrictive factor types and the preset threshold interval of distance-to-height ratio and whose intersection area meets the preset threshold interval of restrictive factor area as identification results.
[0116] The pumped-storage power station identification method based on parallel computing provided in this embodiment controls multiple idle computing nodes to obtain the normal water storage level of the upper and lower reservoirs in the pumped-storage power station, the dead water level and the average water head of the upper and lower reservoirs; calculates the distance-to-height ratio of the pumped-storage power station based on the dead water level and the average water head of the upper and lower reservoirs in the pumped-storage power station; obtains the flooding range of the upper and lower reservoirs in the pumped-storage power station based on the normal water storage level of the upper and lower reservoirs, and calculates the intersection area between the flooding range of the upper and lower reservoirs and the restrictive factors; compares the installed capacity of the pumped-storage power station with the installed capacity threshold interval and the average water head with the average water head threshold interval, and deletes the water that does not meet the installed capacity threshold. Pumped-storage power stations that meet the threshold interval of installed capacity and the threshold interval of average water head are selected; based on the remaining pumped-storage power stations after deleting the pumped-storage power stations that do not meet the threshold interval of installed capacity and the threshold interval of average water head, the pumped-storage power stations whose restrictive factor types meet the preset requirements and whose distance-to-height ratios meet the preset threshold interval of distance-to-height ratios and whose intersection areas meet the preset threshold interval of restrictive factor areas are retained. When the restrictive factor type meets the preset requirements, the above-mentioned distance-to-height ratios and intersection areas are compared with the preset thresholds respectively, and the pumped-storage power stations that meet the requirements are retained, and high-quality sites will not be missed, which improves the efficiency of pumped-storage power station identification and shortens the identification time. By selecting multiple parameters for screening, the parameter identification is comprehensive, which improves the identification accuracy of pumped-storage power stations that meet the requirements.
[0117] It should be noted that the embodiments of the present invention control multiple idle computing nodes to perform parallel computing, including the following situations, which are as follows:
[0118] When the number of pending computing tasks to be processed is the same as the number of idle computing node machines, one pending computing task is assigned to each idle computing node machine, and computing can be performed simultaneously. For example, if there are 10 pending computing tasks to be processed, then there are 10 corresponding idle computing node machines, and one pending computing task is assigned to each idle computing node machine. At this time, all 10 computing node machines have computing tasks and can perform computing simultaneously, which improves computing efficiency.
[0119] When the number of pending tasks to be processed is inconsistent with the number of idle computing node machines, at least one pending task needs to be allocated according to the number of idle computing node machines, and the pending tasks need to be added to the task buffer until all pending tasks are allocated and processed. For example, there are 9 pending tasks to be processed, but there are only 3 idle computing node machines. After allocating 1 pending task to each idle computing node machine, there are 6 pending tasks left. At this time, the remaining 6 pending tasks are waiting to be allocated. If a computing node machine has processed the task and is idle, one of the 6 pending tasks will be allocated to this idle computing node machine. At this time, there are 5 pending tasks left, and so on, until all pending tasks are allocated and processed. For the same pending task, the pending tasks can be allocated to the idle computing node machines on average. For different pending tasks, the computing node machines take different time to process the tasks, so they are not allocated evenly according to the number of pending tasks.
[0120] In this embodiment, a pumped storage power station identification device based on parallel computing is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0121] This embodiment provides a pumped storage power station identification device based on parallel computing, such as Figure 4 As shown, including:
[0122] An acquisition module 401 is used to acquire a plurality of reservoirs in a preset area and the elevation value of each reservoir;
[0123] A combination module 402 is used to control multiple idle computing node machines to combine multiple reservoirs based on the elevation values of the reservoirs to generate multiple pumped storage power stations through parallel calculation;
[0124] The screening module 403 is used to control multiple idle computing nodes to screen multiple pumped storage power stations based on the preset threshold interval of the water energy parameter and the preset threshold interval of the restrictive factor area through parallel computing.
[0125] In some optional implementations, the combining module 402 includes:
[0126] A first allocation unit is used to read each reservoir one by one, and to combine multiple reservoirs to generate a pumped storage power station as a first task to be calculated and allocate them to multiple idle computing node machines respectively;
[0127] A reading unit, used to control a plurality of idle computing node machines to read a corresponding reservoir in a first task to be calculated and a first elevation value of the corresponding reservoir;
[0128] An extraction calculation unit, used to control a plurality of idle computing node machines to extract all reservoirs whose elevation values are less than the first elevation value except for the corresponding reservoir in the first task to be calculated, and respectively calculate the elevation differences between the first elevation value and all the extracted reservoirs;
[0129] The combination unit is used to control multiple idle computing node machines to combine the corresponding reservoir in the first task to be calculated with other reservoirs except itself based on the relationship between the elevation difference and the preset elevation threshold interval to generate multiple pumped storage power stations.
[0130] In some optional implementations, the screening module 403 includes:
[0131] The second allocation unit is used to read each pumped storage power station one by one, and select the pumped storage power stations that meet the preset threshold interval of the water energy parameter and the preset threshold interval of the restrictive factor area as the second task to be calculated and allocate them to multiple idle computing node machines respectively;
[0132] An acquisition unit, used to control multiple idle computing nodes to acquire the normal water level of the upper and lower reservoirs in the pumped storage power station, the dead water level of the upper and lower reservoirs, and the average water head;
[0133] A first calculation unit is used to calculate the distance-to-height ratio of the pumped-storage power station based on the dead water level and average water head of the upper and lower reservoirs in the pumped-storage power station;
[0134] The second calculation unit is used to obtain the flooding range of the upper and lower reservoirs in the pumped storage power station based on the normal water levels of the upper and lower reservoirs, and calculate the intersection area between the flooding range of the upper and lower reservoirs and the restrictive factor;
[0135] The screening unit is used to retain the pumped-storage power stations whose restrictive factor types meet the preset requirements and whose distance-to-height ratios meet the preset threshold intervals of the distance-to-height ratios and whose intersection areas meet the preset threshold intervals of the restrictive factor areas.
[0136] In some optional implementations, the first computing unit includes:
[0137] The first calculation subunit is used to calculate the shortest straight-line distance between the dead water levels of the upper and lower reservoirs in the pumped-storage power station, and use the shortest straight-line distance as the horizontal length of the water conveyance system of the upper and lower reservoirs in the pumped-storage power station;
[0138] The second calculation subunit is used to calculate the distance-to-height ratio of the pumped-storage power station based on the horizontal length of the water transmission system and the average water head.
[0139] In some optional implementations, the second computing unit includes:
[0140] The acquisition subunit is used to obtain the inundation range and the restrictive factor area of the upper and lower reservoirs in the pumped storage power station;
[0141] The third calculation subunit is used to superimpose the flooding range of the upper and lower reservoirs in each pumped-storage power station and the area of the restrictive factor to obtain the overlapping area between the upper and lower reservoirs in the pumped-storage power station and the restrictive factor, and use the overlapping area as the intersection area.
[0142] The pumped storage power station identification device based on parallel computing also includes:
[0143] The calculation comparison module is used to control multiple idle computing nodes to calculate the virtual storage capacity of each pumped-storage power station; evaluate the storage capacity conditions of multiple pumped-storage power stations based on the storage capacity, and delete the pumped-storage power stations whose storage capacity conditions do not meet the preset storage capacity threshold.
[0144] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0145] The pumped-storage power station identification device based on parallel computing in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0146] The embodiment of the present invention also provides a computer device having the above Figure 4 The pumped storage power station identification device based on parallel computing is shown.
[0147] See also Figure 5 , Figure 5 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 5As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 5 A processor 10 is taken as an example.
[0148] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0149] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.
[0150] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0151] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0152] The computer device also includes an input device 30 and an output device 40. The processor 10, the memory 20, the input device 30 and the output device 40 may be connected via a bus or other means. Figure 5 The example of connecting through bus is taken in the following.
[0153] The input device 30 can receive input digital or character information, and generate key signal input related to the user settings and function control of the computer device, such as a touch screen, a keypad, a mouse, a track pad, a touch pad, an indicator bar, one or more mouse buttons, a trackball, a joystick, etc. The output device 40 may include a display device, an auxiliary lighting device (e.g., an LED) and a tactile feedback device (e.g., a vibration motor), etc. The above-mentioned display device includes but is not limited to a liquid crystal display, a light emitting diode, a display and a plasma display. In some optional embodiments, the display device may be a touch screen.
[0154] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0155] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A method for identifying a pumped storage power station based on parallel computing, characterized in that: Applied in a main controller, the method comprises: Get multiple reservoirs in a preset area and the elevation value of each reservoir; Controlling a plurality of idle computing node machines to generate a plurality of pumped storage power stations by combining the plurality of reservoirs based on elevation values of the reservoirs through parallel computing; Controlling a plurality of idle computing node machines to screen the plurality of pumped-storage power stations based on a preset threshold interval of a water energy parameter and a preset threshold interval of a restrictive factor area through parallel computing; The controlling of the plurality of idle computing nodes to generate a plurality of pumped storage power stations by combining the plurality of reservoirs based on the elevation values of the reservoirs through parallel computing comprises: Read each reservoir one by one, combine multiple reservoirs to generate a pumped storage power station as the first task to be calculated and distribute them to multiple idle computing node machines respectively; Control multiple idle computing node machines to read the corresponding reservoir in the first task to be calculated and the first elevation value of the corresponding reservoir; Control multiple idle computing node machines to extract all reservoirs whose elevation values are less than the first elevation value except the corresponding reservoir in the first task to be calculated, and respectively calculate the elevation difference between the first elevation value and all the extracted reservoirs; Control multiple idle computing node machines to combine the corresponding reservoir in the first task to be calculated with other reservoirs except the reservoir itself based on the relationship between the elevation difference and the preset elevation threshold interval, so as to generate multiple pumped storage power stations; The water energy parameters of the pumped storage power station include the normal water storage level of the upper and lower reservoirs in the pumped storage power station, the dead water level of the upper and lower reservoirs, the installed capacity, the average water head and the distance-to-height ratio; the preset threshold intervals of the water energy parameters include the installed capacity threshold interval, the average water head threshold interval and the distance-to-height ratio preset threshold interval; The controlling of the plurality of idle computing nodes to screen the plurality of pumped storage power stations based on the preset threshold interval of the water energy parameter and the preset threshold interval of the limiting factor area through parallel computing comprises: Read each pumped-storage power station one by one, and select the pumped-storage power stations that meet the preset threshold interval of installed capacity, the preset threshold interval of average water head, the preset threshold interval of distance-to-height ratio, and the preset threshold interval of restrictive factor area as the second tasks to be calculated and assign them to multiple idle computing node machines respectively; Control multiple idle computing nodes to obtain the normal water level, dead water level and average water head of the upper and lower reservoirs in the pumped storage power station; Calculate the distance-to-height ratio of a pumped-storage power station based on the dead water level and average hydraulic head of the upper and lower reservoirs of the pumped-storage power station; The inundation range of the upper and lower reservoirs in the pumped storage power station is obtained based on the normal water levels of the upper and lower reservoirs, and the intersection area between the inundation range of the upper and lower reservoirs and the restrictive factors is calculated; Compare the installed capacity of the pumped-storage power station with the installed capacity threshold interval and the average water head with the average water head threshold interval, and delete the pumped-storage power station that does not meet the installed capacity threshold interval and the average water head threshold interval; Based on the remaining pumped-storage power stations after deleting the pumped-storage power stations that do not meet the installed capacity threshold interval and the average head threshold interval, retain the pumped-storage power stations whose restrictive factor types meet the preset requirements and whose distance-to-height ratios meet the distance-to-height ratio preset threshold intervals and whose intersection areas meet the restrictive factor area preset threshold intervals; The calculation of the distance-to-height ratio of the pumped-storage power station based on the dead water level and average water head of the upper and lower reservoirs of the pumped-storage power station includes: Calculate the shortest straight-line distance between the dead water levels of the upper and lower reservoirs of the pumped-storage power station, and use the shortest straight-line distance as the horizontal length of the water conveyance system of the upper and lower reservoirs of the pumped-storage power station; Calculate the distance-to-height ratio of the pumped storage power station based on the horizontal length and average hydraulic head of the water transmission system; The calculation of the intersection area between the catchment area of the upper and lower reservoirs in the pumped storage power station and the restrictive factors includes: Obtain the inundation range and limiting factor area of the upper and lower reservoirs of the pumped storage power station; The flooding range of the upper and lower reservoirs in each pumped-storage power station is superimposed on the area of the restrictive factor to obtain the overlapping area between the upper and lower reservoirs in the pumped-storage power station and the restrictive factor, and the overlapping area is used as the intersection area.
2. The method for identifying a pumped storage power station based on parallel computing according to claim 1, characterized in that: Before controlling the plurality of idle computing nodes to screen the plurality of pumped storage power stations based on the preset threshold interval of the water energy parameter and the preset threshold interval of the limiting factor area through parallel computing, the method further includes: Control multiple idle computing nodes to calculate the virtual storage capacity of each pumped storage power station; The energy storage conditions of a plurality of pumped-storage power stations are evaluated based on the virtual energy storage, and the pumped-storage power stations whose energy storage conditions do not meet a preset energy storage threshold are deleted.
3. The method for identifying a pumped storage power station based on parallel computing according to claim 2, characterized in that: The virtual storage capacity of each pumped storage power station is expressed by the following formula: in: It is the virtual storage capacity of the pumped storage power station. is the comprehensive output coefficient of the pumped storage power station, is the time step, , It is the maximum storage capacity of the upper and lower reservoirs in a pumped storage power station; It is the elevation difference between the upper and lower reservoirs in a pumped-storage power station.
4. A pumped storage power station identification device based on parallel computing, characterized in that: Applied in a main controller, the device comprises: An acquisition module is used to obtain multiple reservoirs in a preset area and the elevation value of each reservoir; A combination module, used for controlling a plurality of idle computing node machines to combine the plurality of reservoirs based on the elevation values of the reservoirs through parallel computing to generate a plurality of pumped storage power stations; A screening module, used for controlling a plurality of idle computing nodes to screen the plurality of pumped-storage power stations based on a preset threshold interval of a water energy parameter and a preset threshold interval of a restrictive factor area through parallel computing; The controlling of the plurality of idle computing nodes to generate a plurality of pumped storage power stations by combining the plurality of reservoirs based on the elevation values of the reservoirs through parallel computing comprises: Read each reservoir one by one, combine multiple reservoirs to generate a pumped storage power station as the first task to be calculated and distribute them to multiple idle computing node machines respectively; Control multiple idle computing node machines to read the corresponding reservoir in the first task to be calculated and the first elevation value of the corresponding reservoir; Control multiple idle computing node machines to extract all reservoirs whose elevation values are less than the first elevation value except the corresponding reservoir in the first task to be calculated, and respectively calculate the elevation difference between the first elevation value and all the extracted reservoirs; Control multiple idle computing node machines to combine the corresponding reservoir in the first task to be calculated with other reservoirs except the reservoir itself based on the relationship between the elevation difference and the preset elevation threshold interval, so as to generate multiple pumped storage power stations; The water energy parameters of the pumped storage power station include the normal water storage level of the upper and lower reservoirs in the pumped storage power station, the dead water level of the upper and lower reservoirs, the installed capacity, the average water head and the distance-to-height ratio; the preset threshold intervals of the water energy parameters include the installed capacity threshold interval, the average water head threshold interval and the distance-to-height ratio preset threshold interval; The controlling of the plurality of idle computing nodes to screen the plurality of pumped storage power stations based on the preset threshold interval of the water energy parameter and the preset threshold interval of the limiting factor area through parallel computing comprises: Read each pumped-storage power station one by one, and select the pumped-storage power stations that meet the preset threshold interval of installed capacity, the preset threshold interval of average water head, the preset threshold interval of distance-to-height ratio, and the preset threshold interval of restrictive factor area as the second tasks to be calculated and assign them to multiple idle computing node machines respectively; Control multiple idle computing nodes to obtain the normal water level, dead water level and average water head of the upper and lower reservoirs in the pumped storage power station; Calculate the distance-to-height ratio of a pumped-storage power station based on the dead water level and average hydraulic head of the upper and lower reservoirs of the pumped-storage power station; The inundation range of the upper and lower reservoirs in the pumped storage power station is obtained based on the normal water levels of the upper and lower reservoirs, and the intersection area between the inundation range of the upper and lower reservoirs and the restrictive factors is calculated; Compare the installed capacity of the pumped-storage power station with the installed capacity threshold interval and the average water head with the average water head threshold interval, and delete the pumped-storage power station that does not meet the installed capacity threshold interval and the average water head threshold interval; Based on the remaining pumped-storage power stations after deleting the pumped-storage power stations that do not meet the installed capacity threshold interval and the average head threshold interval, retain the pumped-storage power stations whose restrictive factor types meet the preset requirements and whose distance-to-height ratios meet the distance-to-height ratio preset threshold intervals and whose intersection areas meet the restrictive factor area preset threshold intervals; The method of calculating the distance-to-height ratio of a pumped-storage power station based on the dead water level and average water head of the upper and lower reservoirs of the pumped-storage power station comprises: Calculate the shortest straight-line distance between the dead water levels of the upper and lower reservoirs of the pumped-storage power station, and use the shortest straight-line distance as the horizontal length of the water conveyance system of the upper and lower reservoirs of the pumped-storage power station; Calculate the distance-to-height ratio of the pumped storage power station based on the horizontal length and average hydraulic head of the water transmission system; The calculation of the intersection area between the catchment area of the upper and lower reservoirs in the pumped storage power station and the restrictive factors includes: Obtain the inundation range and limiting factor area of the upper and lower reservoirs of the pumped storage power station; The flooding range of the upper and lower reservoirs in each pumped-storage power station is superimposed on the area of the restrictive factor to obtain the overlapping area between the upper and lower reservoirs in the pumped-storage power station and the restrictive factor, and the overlapping area is used as the intersection area.
5. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the pumped-storage power station identification method based on parallel computing as described in any one of claims 1 to 4 by executing the computer instructions.
6. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the pumped-storage power station identification method based on parallel computing according to any one of claims 1 to 4.