Information processing method and related equipment for battery swap station
Through dynamic inventory management and multi-interval discretization, an initial dispatch model is constructed, which solves the problem of the battery swap station management system being difficult to cope with dynamic changes, achieves optimal dispatch of battery resources, and improves operational efficiency and battery life.
Patent Information
- Application Number
- CN202411063496.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-08-05
AI Technical Summary
The existing battery swap station management system relies on static inventory and dispatch management models, which is difficult to cope with dynamically changing demands in actual operations, resulting in battery life issues and low operational efficiency.
By obtaining the operating information of electric two-wheelers and battery swapping stations, a dynamic inventory management model is established, battery classification management and multi-interval discretization are performed, an initial scheduling model of multiple time scales is constructed, and the problem structure is decomposed and coordinated to solve the problem, and the optimal solution is obtained. Optimal scheduling scheme to realize dynamic scheduling of battery resources.
It improves the operating efficiency of battery swap stations, optimizes battery use and management, meets dynamically changing needs, extends battery life, and reduces operating costs.
Smart Images

Figure CN118569621B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of information processing, and in particular to an information processing method and related equipment for a battery swap station. Background Art
[0002] With the popularity of electric two-wheelers, battery swap stations, as an important infrastructure, have gradually become an important link in supporting the widespread use of electric two-wheelers. Electric two-wheelers are favored by more and more consumers due to their environmental protection, economy, convenience and other advantages. However, the battery life issue is still a major obstacle to the development of electric two-wheelers. Traditional battery charging methods take a long time, while battery swap stations provide a fast and battery replacement solution, allowing electric two-wheelers to complete battery replacement in a short time, improving the utilization efficiency of the vehicle.
[0003] The operation and management of battery swap stations involves many aspects, including battery inventory management, charge and discharge management, scheduling optimization, etc. Most of the existing battery swap station management systems rely on static inventory and scheduling management modes, which are difficult to cope with various dynamic changes in actual operations. Summary of the invention
[0004] The main purpose of the present invention is to solve the technical problem that the existing information processing method of the battery swap station relies on a static inventory and scheduling management mode and is difficult to cope with various dynamic changes that occur in actual operations.
[0005] A first aspect of the present invention provides an information processing method for a battery swap station, the information processing method for a battery swap station comprising:
[0006] Obtaining vehicle operation information of the electric two-wheeled vehicle and battery swap station operation information of the battery swap station to obtain a comprehensive information set;
[0007] According to the comprehensive information set, the batteries in the battery swap station are classified and managed, a dynamic inventory management model of the batteries in the battery swap station is established, and the number of batteries and the charge and discharge status in each SOC interval in each time period are obtained according to the dynamic inventory management model;
[0008] Based on the battery quantity and the charging and discharging status, the uncertainty factors of the battery swap station are discretized into multiple intervals to obtain a corresponding uncertainty set, and an initial scheduling model of multiple time scales is constructed according to the uncertainty set;
[0009] Decomposing the problem structure of the initial scheduling model at each time scale to obtain corresponding sub-problems, and solving each sub-problem in a coordinated manner to obtain the optimal scheduling plan of the battery swap station;
[0010] The battery swapping resources of the battery swapping station are scheduled according to the optimal scheduling plan.
[0011] Optionally, in a first implementation of the first aspect of the present invention, the battery swap station operation information includes battery remaining power information, and the vehicle operation information includes actual battery swap demand;
[0012] According to the comprehensive information set, the batteries in the battery swap station are classified and managed, a dynamic inventory management model for the batteries in the battery swap station is established, and the number of batteries and the charge and discharge status of each SOC interval in each time period are obtained according to the dynamic inventory management model, including:
[0013] Performing interval division processing on the battery remaining power data in the comprehensive information set to obtain a plurality of SOC intervals;
[0014] According to the SOC interval, the batteries in each time period are classified and statistically processed to obtain the number of batteries corresponding to the SOC interval;
[0015] Performing time series analysis on the number of batteries to obtain a trend of battery quantity changes, and building a dynamic inventory management model for batteries in a battery swap station based on the trend of battery quantity changes;
[0016] The batteries in each SOC interval in each time period are reallocated according to the dynamic inventory management model to obtain the number of batteries and the charge and discharge status in each SOC interval in each time period.
[0017] Optionally, in a second implementation of the first aspect of the present invention, constructing a dynamic inventory management model of batteries in a battery swap station according to the battery quantity change trend includes:
[0018] Prioritizing the batteries in each SOC interval according to the battery quantity change trend to obtain a charge and discharge indicator variable, wherein the charge and discharge indicator variable is used to characterize the charge and discharge state of each SOC interval;
[0019] Modeling the migration of the battery between different SOC intervals according to the charge and discharge indicator variables to obtain an interval migration model, and predicting the battery inventory change according to the interval migration model to obtain a predicted inventory level for each time period;
[0020] Comparing the predicted inventory level with the actual battery replacement demand to obtain battery inventory status, and generating corresponding charging and discharging instructions according to the battery inventory status;
[0021] A dynamic inventory management model for the batteries in the battery swap station is constructed according to the charging and discharging instructions.
[0022] Optionally, in a third implementation of the first aspect of the present invention, the uncertainty factors of the battery swap station based on the battery quantity and the charging and discharging status are discretized in multiple intervals to obtain a corresponding uncertainty set, and an initial scheduling model of multiple time scales is constructed according to the uncertainty set, including:
[0023] Determine a battery usage mode of the battery swap station according to the battery quantity and charge and discharge status, and determine a set of uncertain factors of the battery swap station according to the battery usage mode;
[0024] Counting historical data of each uncertain factor in the set of uncertain factors to obtain a fluctuation range of each uncertain factor, and dividing the fluctuation range into multiple intervals to obtain multiple discrete intervals for each uncertain factor;
[0025] Performing probability distribution analysis on the discrete intervals to obtain the occurrence probability of each interval, and allocating deviation budgets to each discrete interval according to the occurrence probability to obtain a deviation budget value for each discrete interval;
[0026] According to the multiple discrete intervals and the deviation budget value corresponding to each discrete interval, an uncertainty set of each uncertain factor is constructed, and an initial scheduling model of multiple time scales is constructed according to the uncertainty set.
[0027] Optionally, in a fourth implementation manner of the first aspect of the present invention, constructing an initial scheduling model of multiple time scales according to the uncertainty set includes:
[0028] Based on the uncertainty set, the operating state of the battery swap station is divided into multiple time scales to obtain sub-models of multiple time scales;
[0029] Constructing the objective function of each of the sub-models, and determining the cost minimization optimization target of the battery swap station according to the objective function;
[0030] According to the cost minimization optimization objective and the uncertainty set, constraining conditions are constructed for each of the sub-models to obtain a corresponding constraint set;
[0031] The optimization objective, constraint set and uncertainty set are transformed into a mathematical model to obtain an initial scheduling model of multiple time scales.
[0032] Optionally, in a fifth implementation of the first aspect of the present invention, the problem structure decomposition of the initial scheduling model of each time scale to obtain corresponding sub-problems, and the coordinated solution of each sub-problem to obtain the optimal scheduling plan of the battery swap station includes:
[0033] The initial scheduling model of each time scale performs decision variable identification respectively to obtain the corresponding first decision variable set and second decision variable set;
[0034] According to the first decision variable set and the second decision variable set of each initial scheduling model, a main problem and a sub-problem are constructed for each initial scheduling model to obtain a corresponding problem pair, wherein the problem pair includes a main problem and a sub-problem;
[0035] According to the size of the time scale, the corresponding problem pairs are optimized and solved in turn to obtain the corresponding optimal scheduling plan, and the optimal scheduling plan of each time scale is coordinated and solved to obtain the optimal scheduling plan of the battery swap station.
[0036] Optionally, in a sixth implementation of the first aspect of the present invention, the time scale includes a first time scale, a second time scale and a third time scale according to the size of the scale;
[0037] According to the size of the time scale, the corresponding problem pairs are optimized and solved in turn to obtain the corresponding optimal scheduling scheme, and the optimal scheduling scheme of each time scale is coordinated and solved to obtain the optimal scheduling scheme of the battery swap station, including:
[0038] Solving the problem pair corresponding to the first time scale using a nested column generation constraint algorithm to obtain a first optimal scheduling solution, and performing constraint update on the problem pair of the second time scale according to the first optimal scheduling solution;
[0039] Perform rolling optimization processing on the updated problem pair of the second time scale to obtain a second optimal scheduling solution, and perform boundary condition setting processing on the problem pair of the third time scale according to the second optimal scheduling solution;
[0040] The problem of the third time scale after the boundary conditions are set is solved in real time to obtain the third optimal scheduling solution;
[0041] The third optimal scheduling scheme, the third optimal scheduling scheme and the third optimal scheduling scheme are coordinated and solved to obtain the optimal scheduling scheme of the battery swap station.
[0042] A second aspect of the present invention provides an information processing device for a battery swap station, the information processing device for the battery swap station comprising:
[0043] An information acquisition module, used to acquire vehicle operation information of the electric two-wheeled vehicle and battery swap station operation information of the battery swap station, to obtain a comprehensive information set;
[0044] A battery management module, configured to classify and manage the batteries in the battery swap station according to the comprehensive information set, establish a dynamic inventory management model for the batteries in the battery swap station, and obtain the number of batteries and the charge and discharge status in each SOC interval in each time period according to the dynamic inventory management model;
[0045] A model building module, used to perform multi-interval discretization processing on the uncertainty factors of the battery swap station based on the battery quantity and the charging and discharging status, obtain a corresponding uncertainty set, and build an initial scheduling model of multiple time scales according to the uncertainty set;
[0046] A solution solving module is used to decompose the problem structure of the initial scheduling model of each time scale, obtain the corresponding sub-problems, and coordinately solve each sub-problem to obtain the optimal scheduling solution of the battery swap station;
[0047] A scheduling module is used to schedule the battery swapping resources of the battery swapping station according to the optimal scheduling plan.
[0048] The third aspect of the present invention provides an information processing device for a battery swap station, comprising: a memory and at least one processor, the memory storing instructions, the memory and the at least one processor being interconnected via lines; the at least one processor calling the instructions in the memory so that the information processing equipment of the battery swap station executes the steps of the above-mentioned information processing method for the battery swap station.
[0049] A fourth aspect of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores instructions, which, when executed on a computer, enable the computer to execute the steps of the above-mentioned information processing method for a battery swap station.
[0050] The information processing method and related equipment of the above-mentioned battery swap station classifies and manages the batteries in the battery swap station according to the comprehensive information set, establishes a dynamic inventory management model for the batteries in the battery swap station, and obtains the number of batteries and the charge and discharge status of each SOC interval in each time period according to the dynamic inventory management model; based on the uncertainty factors of the battery number and charge and discharge status of the battery swap station, multi-interval discretization is performed to obtain the corresponding uncertainty set, and an initial scheduling model of multiple time scales is constructed based on the uncertainty set; the initial scheduling model is decomposed into a problem structure to obtain the corresponding sub-problems, and each sub-problem is coordinated and solved to obtain the optimal scheduling plan. This method obtains the operating information of electric two-wheeled vehicles and battery swap stations, establishes a dynamic inventory management model, classifies and manages the batteries and discretizes them in multiple intervals, and constructs an initial scheduling model, and finally realizes the optimal scheduling plan for the battery swap station.
[0051] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description, claims and drawings.
[0052] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 This is a schematic diagram of a first embodiment of an information processing method for a battery swap station according to an embodiment of the present invention;
[0054] Figure 2 A schematic diagram of an embodiment of an information processing device of a battery swap station in an embodiment of the present invention;
[0055] Figure 3 It is a schematic diagram of an embodiment of an information processing device of a battery swap station in an embodiment of the present invention. DETAILED DESCRIPTION
[0056] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0057] The terms "including" and "having" and any variations thereof mentioned in the embodiments of the present invention are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device end including a series of steps or units is not limited to the listed steps or units, but may optionally include other steps or units that are not listed, or may optionally include other steps or units that are inherent to these processes, methods, products or device ends.
[0058] To facilitate understanding of this embodiment, firstly, a method for processing information of a battery swap station disclosed in an embodiment of the present invention is described in detail. Figure 1 As shown, the method comprises the following steps:
[0059] 101. Obtain vehicle operation information of the electric two-wheeled vehicle and battery swap station operation information of the battery swap station to obtain a comprehensive information set;
[0060] In one embodiment of the present invention, first, the operation data of the vehicle is collected in real time by installing IoT devices on the electric two-wheeled vehicle. These devices usually include GPS positioning systems, battery management systems (BMS) and other sensors to record the geographic location, driving speed, battery status and other information of the vehicle. The specific implementation steps are as follows: IoT devices are installed on the vehicle, and data is continuously collected through these devices, and the collected data is uploaded to the cloud server through a wireless communication network. These data include timestamps, longitude and latitude coordinates, mileage, remaining battery power, etc. Next, these data need to be processed for subsequent analysis. First, the location data is reconstructed by trajectory, and the driving trajectory is generated by connecting continuous GPS points. At the same time, according to the change of the remaining battery power, the power consumption mode and charging demand of the vehicle are calculated. If the remaining battery power of the vehicle at a certain moment is lower than a certain threshold (for example, 20%), it is deemed that the battery needs to be replaced, and the geographic location at this time is recorded as the battery replacement demand point. At the same time, in order to obtain the operation information of the battery replacement station, corresponding monitoring equipment needs to be installed at each battery replacement station. These devices can record the operation of the battery replacement station, including the number of battery replacements, the time of each battery replacement, and the waiting time in queue. The specific implementation steps are as follows: Install data collection equipment at the battery swap station to record the timestamp of each battery swap, two-wheeled vehicle ID, battery swap start and end time, waiting time, etc., and upload these data to the cloud server for storage and processing. After obtaining the above two types of data, data fusion and comprehensive analysis are required.
[0061] 102. According to the comprehensive information set, the batteries in the battery swap station are classified and managed, a dynamic inventory management model for the batteries in the battery swap station is established, and the number of batteries and the charge and discharge status in each SOC interval in each time period are obtained according to the dynamic inventory management model;
[0062] In one embodiment of the present invention, the battery swap station operation information includes battery remaining power information, and the vehicle operation information includes actual battery swapping demand; the batteries in the battery swap station are classified and managed according to the comprehensive information set, a dynamic inventory management model for batteries in the battery swap station is established, and the number of batteries and the charge and discharge status of each SOC interval in each time period are obtained according to the dynamic inventory management model, including: performing interval division processing on the battery remaining power data in the comprehensive information set to obtain multiple SOC intervals; classifying and statistically processing the batteries in each time period according to the SOC intervals to obtain the number of batteries corresponding to the SOC intervals; performing time series analysis processing on the battery number to obtain the battery number change trend, and constructing a dynamic inventory management model for batteries in the battery swap station through the battery number change trend; reallocating the batteries in each SOC interval in each time period according to the dynamic inventory management model to obtain the battery number and the charge and discharge status of each SOC interval in each time period.
[0063] Specifically, a large amount of operating data needs to be collected from electric two-wheeled vehicles and battery swap stations, including the battery's remaining power (State of Charge, SOC) information and the actual battery swap demand of electric two-wheeled vehicles. By installing IoT devices on electric two-wheeled vehicles and battery swap stations, the battery's SOC and information such as the time, location, and frequency of battery swap operations can be monitored in real time. The specific implementation steps include: installing IoT devices on electric two-wheeled vehicles and battery swap stations, continuously collecting data through these devices and uploading them to cloud servers for storage and processing. The initial processing of these data is to divide the battery's SOC information into intervals. Assuming that the SOC range is 0% to 100%, it can be divided into several intervals, such as 0-20%, 20-40%, 40-60%, 60-80%, and 80-100%. Each interval represents a different level of remaining battery power. According to these SOC intervals, the batteries in each time period are classified and counted, and the number of batteries in each SOC interval is counted. Next, the data are analyzed in time series to calculate the trend of the number of batteries in each SOC interval. Time series models, such as the autoregressive moving average model (ARMA), can be used to fit and predict the number of batteries in each SOC interval. After obtaining the changing trend of the number of batteries in each SOC interval, a dynamic inventory management model for the battery swap station can be established. The core of the dynamic inventory management model is to redistribute batteries based on the predicted number of batteries and charging and discharging requirements to ensure that the number of batteries in each SOC interval meets actual demand. The specific optimization goal can be to minimize the idle time and charging and discharging loss of the battery while meeting the constraints of battery swapping demand and battery life. The objective function is as follows:
[0064] ;
[0065] in, represents the idle cost of the battery, represents the number of idle batteries in the kth SOC interval at time t, represents the battery charging cost, Indicates the number of charged batteries in the kth SOC interval at time t.
[0066] The constraints of the objective function include the dynamic balance constraint of the number of batteries in each SOC interval:
[0067] ;
[0068] in, Indicates the battery replacement demand in the $k$th SOC interval at time $t$;
[0069] Battery charge state constraints: ; Indicates that the number of charged batteries cannot exceed the total number of batteries within the SOC range.
[0070] Battery life and charge cycle constraints: ;
[0071] in, Indicates the maximum number of times the battery is charged to ensure the battery life. By solving the above optimization model, the number of batteries in each SOC interval can be redistributed in each time period to obtain the best charging and discharging strategy and inventory management plan. This can not only ensure the reasonable configuration of batteries in the battery swap station, but also maximize the battery efficiency and life, reduce operating costs, and improve service quality.
[0072] Furthermore, the construction of a dynamic inventory management model for batteries in a battery swap station through the battery quantity change trend includes: performing priority allocation processing on batteries in each SOC interval according to the battery quantity change trend to obtain a charge and discharge indicator variable, wherein the charge and discharge indicator variable is used to characterize the charge and discharge state of each SOC interval; modeling the migration of batteries between different SOC intervals according to the charge and discharge indicator variable to obtain an interval migration model, and predicting the battery inventory changes according to the interval migration model to obtain the predicted inventory level for each time period; comparing the predicted inventory level with the actual battery swap demand to obtain the battery inventory situation, and generating corresponding charge and discharge instructions according to the battery inventory situation; constructing a dynamic inventory management model for batteries in the battery swap station according to the charge and discharge instructions. Through the above-mentioned interval migration model, the battery inventory changes can be predicted to obtain the predicted inventory level for each time period. Next, the predicted inventory level is compared with the actual battery swap demand to obtain the battery inventory situation, and the corresponding charge and discharge instructions are generated. The comparison process can be achieved by calculating the difference between the predicted inventory and the actual demand. When the comparison result is greater than 0, it means that the number of batteries is sufficient and no additional charging is required; when the comparison result is less than 0, it means that the number of batteries is sufficient and no additional charging is required, it means that the number of batteries is insufficient and charging is required. Based on the comparison results, charge and discharge instructions are generated to adjust the number of batteries in each SOC interval. Finally, based on the generated charge and discharge instructions, a dynamic inventory management model for batteries in the battery swap station can be constructed.
[0073] Specifically, next, according to the predicted battery quantity change trend, it is necessary to prioritize the batteries in each SOC interval and generate charge and discharge indicator variables. These indicator variables are used to characterize the charge and discharge status of each SOC interval. Assume that the charge and discharge indicator variable of the kth SOC interval at time t is , where 0 means no charging, 1 means charging, and -1 means discharging. Based on these charging and discharging indicator variables, the migration of the battery between different SOC intervals is modeled to obtain an interval migration model, which is the dynamic balance constraint above.
[0074] 103. Based on the uncertainty factors of the battery quantity and charging and discharging status of the battery swap station, multi-interval discretization processing is performed to obtain the corresponding uncertainty set, and the initial scheduling model of multiple time scales is constructed according to the uncertainty set;
[0075] In one embodiment of the present invention, the uncertainty factors of the battery swap station based on the battery quantity and the charge and discharge status are discretized into multiple intervals to obtain the corresponding uncertainty set, and the initial scheduling model of multiple time scales is constructed according to the uncertainty set, including: determining the battery usage mode of the battery swap station according to the battery quantity and the charge and discharge status, and determining the uncertainty factor set of the battery swap station according to the battery usage mode; statistically analyzing the historical data of each uncertainty factor in the uncertainty factor set to obtain the fluctuation range of each uncertainty factor, and dividing the fluctuation range into multiple intervals to obtain multiple discrete intervals for each uncertainty factor; performing probability distribution analysis on the discrete intervals to obtain the occurrence probability of each interval, and allocating deviation budgets to each discrete interval according to the occurrence probability to obtain the deviation budget value of each discrete interval; constructing an uncertainty set of each uncertain factor according to the multiple discrete intervals and the deviation budget values corresponding to each discrete interval, and constructing the initial scheduling model of multiple time scales according to the uncertainty set.
[0076] Specifically, it is necessary to determine the battery usage pattern of the battery swap station based on the number of batteries and the charge and discharge status. This can be achieved by performing time series analysis on the number of batteries and the charge and discharge status, using models such as the Autoregressive Integrated Moving Average (ARIMA) model to capture the time characteristics and periodic patterns of battery usage. Based on these patterns, key uncertainties that affect the operation of the battery swap station can be identified, such as new energy output, load demand, and electricity prices. Next, the historical data of these uncertainties are statistically analyzed to determine their fluctuation ranges. In order to more accurately describe these uncertainties, multi-interval discretization is used to divide the fluctuation range of each uncertain factor into multiple discrete intervals. This division can be achieved by using clustering algorithms (such as K-means) or expert knowledge-based methods. For each discrete interval, a probability distribution analysis is required to determine the probability of occurrence of each interval. This can be achieved by fitting historical data to appropriate probability distribution models (such as normal distribution, Weibull distribution, etc.). Based on these probability distributions, a deviation budget value can be assigned to each interval. With these discrete intervals and the corresponding deviation budget values, an uncertainty set can be constructed. In this scenario, an uncertainty set is a mathematical representation used to describe the possible range and characteristics of various uncertainties in the system. These uncertainties mainly include variables that may affect the operation of battery swap stations, such as renewable energy output (such as wind power and solar energy), user demand for battery swapping, and grid electricity prices. The role of the uncertainty set is to provide a clear uncertainty boundary for subsequent robust optimization scheduling, so that the scheduling scheme can remain feasible and effective in the worst case. To construct the uncertainty set, first, the main uncertainties are identified based on historical data and battery usage patterns. For each uncertain factor, its historical data is analyzed to determine its range of variation. Then, this range is divided into multiple discrete intervals, each of which represents a subset of possible values of the uncertain factor. Next, a probability analysis is performed on each discrete interval to determine the probability of occurrence of each interval. This step usually involves statistical analysis of historical data, and may require the use of techniques such as probability distribution fitting. Then, a deviation budget value is assigned to each interval. Deviation budget is a key concept that limits the extent to which uncertain factors may deviate from the predicted value within a certain time range. The allocation of deviation budgets usually takes into account the probability of occurrence of intervals and the system's tolerance for uncertainty. Finally, this information is integrated to form an uncertainty set. Specifically, the uncertainty set contains all possible combinations of uncertainty factor values, which are constrained by the deviation budget. Mathematically, this is usually expressed as a series of equations and inequalities that describe the range of uncertainties and the relationships between them. This construction allows for a reasonable representation of uncertainty in the system while maintaining computational feasibility. It takes into account both the range of uncertainty and the probability of different situations occurring, thus providing a comprehensive and practical description of uncertainty for subsequent robust optimization.
[0077] Furthermore, constructing the initial scheduling model of multiple time scales according to the uncertainty set includes: based on the uncertainty set, dividing the operating status of the battery swap station into multiple time scales to obtain sub-models of multiple time scales; constructing the objective function of each of the sub-models, and determining the cost minimization optimization target of the battery swap station according to the objective function; based on the cost minimization optimization target and the uncertainty set, constructing constraints for each of the sub-models to obtain a corresponding constraint set; converting the optimization target, the constraint set and the uncertainty set into a mathematical model to obtain the initial scheduling model of multiple time scales.
[0078] Specifically, the operation status of the battery swap station is divided into multiple time scales. This process usually involves dividing the entire scheduling cycle into three levels: day-ahead, intraday long time scale, and intraday short time scale. Day-ahead scheduling focuses on long-term planning of more than 24 hours, intraday long time scale scheduling usually covers a time range of several hours to half a day, and intraday short time scale scheduling focuses on real-time adjustment at the minute level. This multi-time scale division can effectively capture the uncertainty characteristics at different time scales and formulate corresponding scheduling strategies for each time scale. After completing the time scale division, the next step is to construct objective functions for each sub-model. For battery swap stations, the most important optimization goal is usually cost minimization. This cost includes multiple components, such as battery charging and discharging costs, equipment maintenance costs, and grid interaction costs. Next, based on the optimization goal of cost minimization and the uncertainty set, constraints need to be constructed for each sub-model. These constraints usually include power balance constraints, equipment capacity constraints, charging and discharging power constraints, battery SOC constraints, etc. In addition, the connection constraints between different time scales need to be considered. For example, the results of day-ahead scheduling will affect the initial conditions of intraday long-time-scale scheduling, while the results of intraday long-time-scale scheduling will affect the boundary conditions of intraday short-time-scale scheduling. These connection constraints ensure the consistency and continuity of scheduling results at different time scales. Finally, the optimization objectives, constraint sets, and uncertainty sets are transformed into mathematical models to obtain initial scheduling models for multiple time scales. This model structure allows the optimal scheduling strategy to be found while considering the uncertainty in the worst case. By solving these models, initial scheduling schemes at various time scales can be obtained. These schemes not only take into account the dynamic characteristics and uncertainty of the system, but also improve the flexibility and robustness of scheduling through multi-time scale processing.
[0079] 104. Based on the uncertainty factors of the battery quantity and charging and discharging status of the battery swap station, multi-interval discretization processing is performed to obtain the corresponding uncertainty set, and the initial scheduling model of multiple time scales is constructed according to the uncertainty set;
[0080] In one embodiment of the present invention, the problem structure decomposition of the initial scheduling model at each time scale to obtain corresponding sub-problems, and the coordinated solution of each sub-problem to obtain the optimal scheduling plan of the battery swap station includes: identifying decision variables for the initial scheduling model at each time scale to obtain the corresponding first decision variable set and second decision variable set; constructing the main problem and sub-problem for each initial scheduling model according to the first decision variable set and the second decision variable set of each initial scheduling model to obtain a corresponding problem pair, wherein the problem pair includes a main problem and a sub-problem; according to the size of the time scale, optimizing and solving the corresponding problem pairs in turn to obtain the corresponding optimal scheduling plan, and coordinating and solving the optimal scheduling plan at each time scale to obtain the optimal scheduling plan of the battery swap station.
[0081] Specifically, the decision variables are divided into two categories: the first decision variable set and the second decision variable set. The first decision variable set usually includes variables that need to make decisions before the uncertainty is realized, such as the switching state of the equipment, the day-ahead power procurement plan, etc.; while the second decision variable set includes variables that can be adjusted after the uncertainty is realized, such as real-time charging and discharging power, real-time interactive power with the power grid, etc. This variable classification lays the foundation for subsequent problem decomposition and solution. Next, based on the identified decision variable set, it is necessary to construct the main problem and sub-problems for each initial scheduling model. The main problem usually focuses on the first decision variable set, aiming to minimize the expected cost or the worst-case cost; while the sub-problem focuses on the second decision variable set, with the goal of optimizing the operation of the system given the first-stage decision and the realization of uncertainty.
[0082] Furthermore, the time scale includes a first time scale, a second time scale and a third time scale according to the size of the scale; according to the size of the time scale, the corresponding problem pairs are optimized and solved in turn to obtain the corresponding optimal scheduling plan, and the optimal scheduling plan of each time scale is coordinated and solved to obtain the optimal scheduling plan of the battery swap station, including: solving the problem pair corresponding to the first time scale by a nested column generation constraint algorithm to obtain the first optimal scheduling plan, and updating the constraints of the problem pair of the second time scale according to the first optimal scheduling plan; performing rolling optimization processing on the updated problem pair of the second time scale to obtain the second optimal scheduling plan, and setting boundary conditions for the problem pair of the third time scale according to the second optimal scheduling plan; performing real-time optimization and solving the problem pair of the third time scale after the boundary conditions are set to obtain the third optimal scheduling plan; and coordinating and solving the third optimal scheduling plan, the third optimal scheduling plan and the third optimal scheduling plan to obtain the optimal scheduling plan of the battery swap station.
[0083] Specifically, after constructing the main problem and sub-problems, the corresponding problem pairs need to be optimized and solved in turn according to the size of the time scale. Usually, it starts from the largest time scale (such as day-ahead scheduling) and gradually advances to smaller time scales (such as intraday long time scales and intraday short time scales). This solution order ensures that the decisions of larger time scales can provide boundary conditions and initial values for the optimization of smaller time scales. For the day-ahead scheduling problem, the nested column generation constraint (C&CG) algorithm can be used for solution. This algorithm approximates the optimal solution of the original problem by iteratively generating constraints and scenarios. Specifically, the algorithm solves a main problem and a sub-problem in each iteration. The main problem provides a candidate solution, and the sub-problem tests the performance of this solution in the worst case. If the sub-problem finds a worse scenario, it is added to the main problem and then the next round of iteration is performed. This process continues until the convergence condition is met. For intraday long time scale scheduling problems, a rolling optimization method can be used. This method allows predictions and decisions to be updated when new information arrives. Specifically, at the beginning of each time period, the scheduling plan for the next few hours is re-optimized based on the latest information and day-ahead scheduling results. This method can effectively balance the needs of long-term planning and short-term adjustment. For intraday short-time scale scheduling problems, due to the small time scale, it is necessary to respond quickly to system changes. Therefore, a real-time optimization method can be used. This method usually simplifies the problem model and only considers the most critical constraints in order to obtain a feasible scheduling solution in a very short time. After obtaining the optimal scheduling solution for each time scale, it is necessary to coordinate the solution to ensure the consistency and continuity between the scheduling solutions of different time scales. This process usually involves checking and adjusting the connection points between each time scale to ensure that the scheduling solution of the smaller time scale can smoothly execute the decision of the larger time scale. If inconsistencies are found, local adjustments or re-optimization may be required. Ultimately, through this multi-time scale problem decomposition, optimization solution and solution coordination, a comprehensive and robust battery swap station scheduling solution can be obtained. This solution not only takes into account the needs of long-term planning and short-term adjustment, but also can effectively deal with various uncertainties. It can maximize economic benefits while ensuring the stable operation of the system, and realize the multi-objective optimization of battery swap station operation.
[0084] 105. Dispatch the battery swapping resources of the battery swapping station according to the optimal dispatching plan.
[0085] In one embodiment of the present invention, the resource scheduling of the battery swapping resources of the battery swapping station according to the optimal scheduling scheme is the final execution stage of the entire optimization process. This step converts the theoretical optimization results into actual operation instructions. First, the optimal scheduling scheme needs to be parsed, which contains decision information on different time scales, such as the equipment switching plan of the day before, the charging and discharging power arrangement within the day, and the real-time battery swap strategy. Then, these decision information needs to be converted into specific operation instructions, for example, the number of charging devices to be enabled in each period is determined according to the day-ahead plan, the charging power is adjusted according to the intraday plan, and the battery replacement sequence is arranged according to the real-time plan. During the execution process, it is necessary to monitor the operating status of the system in real time, including the SOC level of the battery, the use of the charging equipment, the actual battery swapping demand, etc., and compare this information with the predicted value. If it is found that there is a significant deviation between the actual situation and the prediction, it is necessary to trigger the re-optimization mechanism and use the scheduling model of the short time scale within the day for rapid adjustment. For example, if the actual battery swapping demand in a certain period exceeds expectations, it may be necessary to temporarily increase the charging power or enable additional charging equipment. At the same time, the health status and life management of the battery also need to be considered. According to the charging and discharging strategy in the optimal scheduling plan, the use of batteries can be optimized, such as charging when the electricity price is low and considering discharging to the grid when the electricity price is high. In addition, it is also necessary to balance the use of different batteries according to the frequency and depth of battery use to extend the service life of the entire battery pack.
[0086] In this embodiment, the batteries in the battery swap station are classified and managed according to the comprehensive information set, and a dynamic inventory management model for the batteries in the battery swap station is established. The number of batteries and the charge and discharge status of each SOC interval in each time period are obtained according to the dynamic inventory management model; the uncertainty factors of the battery number and charge and discharge status of the battery swap station are discretized in multiple intervals to obtain the corresponding uncertainty set, and the initial scheduling model of multiple time scales is constructed according to the uncertainty set; the initial scheduling model is decomposed into the problem structure to obtain the corresponding sub-problems, and each sub-problem is coordinated and solved to obtain the optimal scheduling plan. This method obtains the operating information of electric two-wheeled vehicles and battery swap stations, establishes a dynamic inventory management model, classifies and manages the batteries and discretizes them in multiple intervals, and constructs an initial scheduling model, and finally realizes the optimal scheduling plan of the battery swap station.
[0087] The above describes the information processing method of the battery swap station in the embodiment of the present invention. The following describes the information processing device of the battery swap station in the embodiment of the present invention. Figure 2 , an embodiment of the information processing device of the battery swap station in the embodiment of the present invention includes:
[0088] The information acquisition module 201 is used to acquire vehicle operation information of the electric two-wheeled vehicle and the battery swap station operation information of the battery swap station to obtain a comprehensive information set;
[0089] The battery management module 202 is used to classify and manage the batteries in the battery swap station according to the comprehensive information set, establish a dynamic inventory management model for the batteries in the battery swap station, and obtain the number of batteries and the charge and discharge status in each SOC interval in each time period according to the dynamic inventory management model;
[0090] The model building module 203 is used to perform multi-interval discretization processing on the uncertainty factors of the battery swap station based on the battery quantity and the charging and discharging status, obtain a corresponding uncertainty set, and build an initial scheduling model of multiple time scales according to the uncertainty set;
[0091] The solution solving module 204 is used to decompose the problem structure of the initial scheduling model of each time scale to obtain the corresponding sub-problems, and coordinately solve each sub-problem to obtain the optimal scheduling solution of the battery swap station;
[0092] The scheduling module 205 is used to schedule the battery swapping resources of the battery swapping station according to the optimal scheduling plan.
[0093] In an embodiment of the present invention, the information processing device of the battery swap station runs the information processing method of the battery swap station. The information processing device of the battery swap station classifies and manages the batteries in the battery swap station according to the comprehensive information set, establishes a dynamic inventory management model for the batteries in the battery swap station, and obtains the number of batteries and the charge and discharge status of each SOC interval in each time period according to the dynamic inventory management model; performs multi-interval discretization processing based on the uncertainty factors of the battery number and charge and discharge status of the battery swap station to obtain the corresponding uncertainty set, and constructs an initial scheduling model of multiple time scales according to the uncertainty set; decomposes the problem structure of the initial scheduling model to obtain the corresponding sub-problems, and coordinates and solves each sub-problem to obtain the optimal scheduling plan. This method comprehensively obtains the operating information of electric two-wheeled vehicles and battery swap stations, establishes a dynamic inventory management model, classifies and manages the batteries and performs multi-interval discretization processing, and constructs an initial scheduling model, and finally realizes the optimal scheduling plan of the battery swap station.
[0094] above Figure 2 The information processing device of the battery swap station in the embodiment of the present invention is described in detail from the perspective of modular functional entities. The information processing equipment of the battery swap station in the embodiment of the present invention is described in detail from the perspective of hardware processing.
[0095] Figure 33 is a structural diagram of an information processing device of a battery swap station provided by an embodiment of the present invention. The information processing device 300 of the battery swap station may have relatively large differences due to different configurations or performances, and may include one or more processors (central processing units, CPU) 310 (for example, one or more processors) and a memory 320, and one or more storage media 330 (for example, one or more mass storage device terminals) storing application programs 333 or data 332. Among them, the memory 320 and the storage medium 330 may be short-term storage or permanent storage. The program stored in the storage medium 330 may include one or more modules (not shown in the figure), and each module may include a series of instruction operations in the information processing device 300 of the battery swap station. Furthermore, the processor 310 may be configured to communicate with the storage medium 330, and execute a series of instruction operations in the storage medium 330 on the information processing device 300 of the battery swap station to implement the steps of the information processing method of the battery swap station described above.
[0096] The information processing device 300 of the battery swap station may also include one or more power supplies 340, one or more wired or wireless network interfaces 350, one or more input and output interfaces 360, and / or one or more operating systems 331, such as Windows Serve, Mac OS X, Unix, Linux, FreeBSD, etc. Those skilled in the art will appreciate that Figure 3 The information processing equipment structure of the illustrated battery swap station does not constitute a limitation on the information processing equipment of the battery swap station provided by the present invention, and may include more or fewer components than illustrated, or a combination of certain components, or a different arrangement of components.
[0097] The present invention also provides a computer-readable storage medium, which may be a non-volatile computer-readable storage medium or a volatile computer-readable storage medium. Instructions are stored in the computer-readable storage medium. When the instructions are executed on a computer, the computer executes the steps of the information processing method of the battery swap station.
[0098] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the above-described system, device, or unit can refer to the corresponding process in the aforementioned method embodiment and will not be repeated here.
[0099] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or the whole or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk and other media that can store program code.
[0100] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An information processing method for a battery swap station, characterized in that: The information processing method of the battery swap station includes: Obtaining vehicle operation information of the electric two-wheeled vehicle and battery swap station operation information of the battery swap station to obtain a comprehensive information set; According to the comprehensive information set, the batteries in the battery swap station are classified and managed, a dynamic inventory management model for the batteries in the battery swap station is established, and the number of batteries and the charge and discharge status of each SOC interval in each time period are obtained according to the dynamic inventory management model; the battery swap station operation information includes battery remaining power information, and the vehicle operation information includes actual battery swapping demand; according to the comprehensive information set, the batteries in the battery swap station are classified and managed, a dynamic inventory management model for the batteries in the battery swap station is established, and the number of batteries and the charge and discharge status of each SOC interval in each time period are obtained according to the dynamic inventory management model, including: performing interval division processing on the battery remaining power data in the comprehensive information set to obtain multiple SOC intervals; according to the SOC intervals, classifying and statistically processing the batteries in each time period to obtain the number of batteries corresponding to the SOC interval; performing time series analysis processing on the number of batteries to obtain the battery number change trend, and constructing the dynamic inventory management model of the batteries in the battery swap station through the battery number change trend; reallocating the batteries in each SOC interval in each time period according to the dynamic inventory management model to obtain the battery number and the charge and discharge status of each SOC interval in each time period; The construction of a dynamic inventory management model for batteries in a battery swap station through the battery quantity change trend includes: performing priority allocation processing on batteries in each SOC interval according to the battery quantity change trend to obtain a charge and discharge indicator variable, wherein the charge and discharge indicator variable is used to characterize the charge and discharge state of each SOC interval; modeling the migration of batteries between different SOC intervals according to the charge and discharge indicator variable to obtain an interval migration model, and predicting the battery inventory changes according to the interval migration model to obtain a predicted inventory level for each time period; comparing the predicted inventory level with the actual battery swap demand to obtain the battery inventory status, and generating corresponding charge and discharge instructions according to the battery inventory status; and constructing a dynamic inventory management model for batteries in the battery swap station according to the charge and discharge instructions; Based on the battery quantity and charge and discharge status, the uncertainty factors of the battery swap station are discretized into multiple intervals to obtain corresponding uncertainty sets, and initial scheduling models of multiple time scales are constructed according to the uncertainty sets; the uncertainty factors of the battery swap station are discretized into multiple intervals to obtain corresponding uncertainty sets based on the battery quantity and charge and discharge status, and initial scheduling models of multiple time scales are constructed according to the uncertainty sets, including: determining the battery usage mode of the battery swap station according to the battery quantity and charge and discharge status, and determining the uncertainty factor set of the battery swap station according to the battery usage mode; statistically analyzing the historical data of each uncertainty factor in the uncertainty factor set to obtain the fluctuation range of each uncertainty factor, and dividing the fluctuation range into multiple intervals to obtain multiple discrete intervals for each uncertainty factor; performing probability distribution analysis on the discrete intervals to obtain the occurrence probability of each interval, and allocating deviation budgets to each discrete interval according to the occurrence probability to obtain the deviation budget value of each discrete interval; constructing uncertainty sets of each uncertainty factor according to the multiple discrete intervals and the deviation budget values corresponding to each discrete interval, and constructing initial scheduling models of multiple time scales according to the uncertainty set; Decomposing the problem structure of the initial scheduling model at each time scale to obtain corresponding sub-problems, and solving each sub-problem in a coordinated manner to obtain the optimal scheduling plan of the battery swap station; The battery swapping resources of the battery swapping station are scheduled according to the optimal scheduling plan.
2. The information processing method of the battery swap station according to claim 1, characterized in that: The constructing of the initial scheduling model of multiple time scales according to the uncertainty set includes: Based on the uncertainty set, the operating state of the battery swap station is divided into multiple time scales to obtain sub-models of multiple time scales; Constructing the objective function of each of the sub-models, and determining the cost minimization optimization target of the battery swap station according to the objective function; According to the cost minimization optimization objective and the uncertainty set, constraining conditions are constructed for each of the sub-models to obtain a corresponding constraint set; The optimization objective, constraint set and uncertainty set are transformed into a mathematical model to obtain an initial scheduling model of multiple time scales.
3. The information processing method of the battery swap station according to claim 1, characterized in that: The problem structure of the initial scheduling model of each time scale is decomposed to obtain corresponding sub-problems, and each sub-problem is solved in a coordinated manner to obtain the optimal scheduling solution of the battery swap station, including: The initial scheduling model of each time scale performs decision variable identification respectively to obtain the corresponding first decision variable set and second decision variable set; According to the first decision variable set and the second decision variable set of each initial scheduling model, a main problem and a sub-problem are constructed for each initial scheduling model to obtain a corresponding problem pair, wherein the problem pair includes a main problem and a sub-problem; According to the size of the time scale, the corresponding problem pairs are optimized and solved in turn to obtain the corresponding optimal scheduling plan, and the optimal scheduling plan of each time scale is coordinated and solved to obtain the optimal scheduling plan of the battery swap station.
4. The information processing method of the battery swap station according to claim 3, characterized in that: The time scale includes a first time scale, a second time scale and a third time scale according to the size of the scale; According to the size of the time scale, the corresponding problem pairs are optimized and solved in turn to obtain the corresponding optimal scheduling scheme, and the optimal scheduling scheme of each time scale is coordinated and solved to obtain the optimal scheduling scheme of the battery swap station, including: Solving the problem pair corresponding to the first time scale using a nested column generation constraint algorithm to obtain a first optimal scheduling solution, and performing constraint update on the problem pair of the second time scale according to the first optimal scheduling solution; Perform rolling optimization processing on the updated problem pair of the second time scale to obtain a second optimal scheduling solution, and perform boundary condition setting processing on the problem pair of the third time scale according to the second optimal scheduling solution; The problem of the third time scale after the boundary conditions are set is solved in real time to obtain the third optimal scheduling solution; The third optimal scheduling scheme, the third optimal scheduling scheme and the third optimal scheduling scheme are coordinated and solved to obtain the optimal scheduling scheme of the battery swap station.
5. An information processing device for a battery swap station, characterized in that: The information processing device of the battery swap station includes: An information acquisition module, used to acquire vehicle operation information of the electric two-wheeled vehicle and battery swap station operation information of the battery swap station, to obtain a comprehensive information set; A battery management module, used for classifying and managing the batteries in the battery swap station according to the comprehensive information set, establishing a dynamic inventory management model for the batteries in the battery swap station, and obtaining the number of batteries and the charge and discharge status of each SOC interval in each time period according to the dynamic inventory management model; the battery swap station operation information includes battery remaining power information, and the vehicle operation information includes actual battery swap demand; the classifying and managing the batteries in the battery swap station according to the comprehensive information set, establishing a dynamic inventory management model for the batteries in the battery swap station, and obtaining the number of batteries and the charge and discharge status of each SOC interval in each time period according to the dynamic inventory management model includes: performing interval division processing on the battery remaining power data in the comprehensive information set to obtain multiple SOC intervals; classifying and statistically processing the batteries in each time period according to the SOC intervals to obtain the number of batteries corresponding to the SOC intervals; performing time series analysis processing on the number of batteries to obtain a battery number change trend, and constructing a dynamic inventory management model for the batteries in the battery swap station through the battery number change trend; reallocating the batteries in each SOC interval in each time period according to the dynamic inventory management model to obtain the number of batteries and the charge and discharge status of each SOC interval in each time period; The construction of a dynamic inventory management model for batteries in a battery swap station through the battery quantity change trend includes: performing priority allocation processing on batteries in each SOC interval according to the battery quantity change trend to obtain a charge and discharge indicator variable, wherein the charge and discharge indicator variable is used to characterize the charge and discharge state of each SOC interval; modeling the migration of batteries between different SOC intervals according to the charge and discharge indicator variable to obtain an interval migration model, and predicting the battery inventory changes according to the interval migration model to obtain a predicted inventory level for each time period; comparing the predicted inventory level with the actual battery swap demand to obtain the battery inventory status, and generating corresponding charge and discharge instructions according to the battery inventory status; and constructing a dynamic inventory management model for batteries in the battery swap station according to the charge and discharge instructions; A model building module, used to discretize the uncertainty factors of the battery swap station based on the battery quantity and the charge and discharge status to obtain a corresponding uncertainty set, and construct an initial scheduling model of multiple time scales according to the uncertainty set; the discretization of the uncertainty factors of the battery swap station based on the battery quantity and the charge and discharge status to obtain a corresponding uncertainty set, and constructing an initial scheduling model of multiple time scales according to the uncertainty set includes: determining the battery usage mode of the battery swap station according to the battery quantity and the charge and discharge status, and determining the uncertainty factor set of the battery swap station according to the battery usage mode; statistically analyzing the historical data of each uncertainty factor in the uncertainty factor set to obtain the fluctuation range of each uncertainty factor, and dividing the fluctuation range into multiple intervals to obtain multiple discrete intervals for each uncertainty factor; performing probability distribution analysis on the discrete intervals to obtain the occurrence probability of each interval, and allocating deviation budgets to each discrete interval according to the occurrence probability to obtain the deviation budget value of each discrete interval; constructing an uncertainty set of each uncertainty factor according to the multiple discrete intervals and the deviation budget values corresponding to each discrete interval, and constructing an initial scheduling model of multiple time scales according to the uncertainty set; A solution solving module is used to decompose the problem structure of the initial scheduling model of each time scale, obtain the corresponding sub-problems, and coordinately solve each sub-problem to obtain the optimal scheduling solution of the battery swap station; A scheduling module is used to schedule the battery swapping resources of the battery swapping station according to the optimal scheduling plan.
6. An information processing device for a battery swap station, characterized in that: The information processing device of the battery swap station includes: a memory and at least one processor, wherein the memory stores instructions; The at least one processor calls the instructions in the memory to enable the information processing device of the battery swap station to execute the steps of the information processing method for the battery swap station as described in any one of claims 1-4.
7. A computer-readable storage medium having instructions stored thereon, characterized in that: When the instructions are executed by the processor, the steps of the information processing method for the battery swap station as described in any one of claims 1 to 4 are implemented.
