A dam seepage state simulation early warning method and system based on multi-state estimation
Through the multi-state estimation method, the multi-state correlation calculation model and the state benchmark calculation model are used to deeply explore the intrinsic relationship between the dam seepage variables and environmental variables, achieve accurate early warning of the dam seepage status, and solve the problem of low early warning accuracy in the existing technology. and the problem of large errors.
Patent Information
- Application Number
- CN202411058358.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-08-02
AI Technical Summary
The existing dam seepage monitoring system is difficult to accurately judge changes in seepage status, resulting in low early warning accuracy, and cannot effectively eliminate the effects of accidental factors and erroneous measurements.
Using the multi-state estimation method, by creating a multi-state correlation calculation model, a multi-state coupling simulation model and a state benchmark calculation model, we can deeply explore the intrinsic relationship between seepage variables and environmental variables, calculate the similarity between relevant information and memory information, and then realize the dam Accurate early warning of seepage status.
It improves the accuracy of dam seepage early warning, avoids the inaccuracy of directly using the design allowable seepage pressure value and statistical error to determine the threshold, ensures the correct identification of seepage status, and reduces the impact of accidental factors and erroneous measurements.
Smart Images

Figure CN118586318B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a dam seepage state simulation early warning method and system based on multi-state estimation, belonging to the technical field of dam seepage early warning. Background Art
[0002] A dam is a common water conservancy structure with complex structure and large impact area. Seepage is a typical physical process of a dam, and its state is directly related to the safety of the dam structure. Nowadays, there are many seepage monitoring systems that can monitor dam seepage, but they are basically limited to process line descriptions, making it difficult to accurately determine changes in seepage state.
[0003] Furthermore, the Chinese patent (CN112504934B) discloses a method for predicting the seepage pressure of a concrete dam and determining the monitoring threshold, including: first, calculating the seepage pressure reduction coefficient of the measuring point based on the existing monitoring data and the measured value of the upstream water level. Then, through data fitting, the functional relationship between the seepage pressure reduction coefficient and the upstream water level is obtained, and the seepage pressure of the measuring point can be predicted using this functional relationship. Finally, based on the predicted value of the seepage pressure of the measuring point, combined with the statistical error and the design allowable seepage pressure, the multi-level monitoring threshold of the seepage pressure of the measuring point can be determined.
[0004] The above scheme calculates the design allowable seepage pressure values of the measuring points at different times according to industry specifications, and then determines the multi-level monitoring thresholds of the seepage pressure of the measuring points based on statistical errors. However, the construction conditions and environment of each dam are different. Directly determining the multi-level monitoring thresholds based on industry specifications, according to the design allowable seepage pressure values and statistical errors will result in large errors and fail to accurately capture the healthy status of the dam's seepage, making it difficult to meet the requirements for early warning accuracy.
[0005] Furthermore, the above scheme provides warning based on the absolute error analysis between the predicted seepage pressure value and the actual seepage pressure monitoring value. It cannot exclude the influence of accidental factors or even erroneous measurements, and cannot guarantee the correct identification of the seepage state.
[0006] The information disclosed in this Background Art is only for understanding the background of the inventive concept and therefore it may include information that does not constitute the prior art. Summary of the invention
[0007] In response to the above problem or one of the above problems, an object of the present invention is to provide a dam seepage state simulation early warning method based on multi-state estimation, by creating a multi-state association calculation model, a multi-state coupling simulation model, and a state benchmark calculation model, using the dam's own seepage variables and environmental variables as modeling objects, and deeply exploring the intrinsic relationship between the seepage variables and environmental variables, so as to obtain accurate state benchmark estimation data as a seepage health state benchmark, and then by creating a state early warning model, accurate dam seepage early warning information can be obtained, effectively improving the accuracy of the early warning.
[0008] In response to the above problem or one of the above problems, the second purpose of the present invention is to provide a dam seepage state simulation early warning system based on multi-state estimation. By setting a monitoring data processing module, a multi-state coupling simulation module, and a state benchmark calculation module, the dam's own seepage monitoring data is used as a modeling object, and the inherent change law of the seepage monitoring data is deeply explored. The interaction of seepage variables at different measuring points is fully considered, so that accurate state benchmark estimation data can be obtained as a seepage health state benchmark. Then, through the state early warning module, accurate dam seepage early warning information can be obtained, effectively improving the accuracy of the early warning. The scheme is scientific, reasonable, feasible, and easy to promote and use.
[0009] In response to the above problem or one of the above problems, the third object of the present invention is to provide a dam seepage state simulation early warning method and system based on multi-state estimation, by calculating the relevant information of the dam monitoring data, obtaining memory information that can characterize the dam state; then calculating the similarity between the relevant information and the memory information, and then estimating the dam seepage state based on the similarity, which can effectively avoid the influence of accidental factors and erroneous measurements, and ensure the correct identification of the seepage state.
[0010] To achieve one of the above purposes, the first technical solution of the present invention is:
[0011] A dam seepage state simulation early warning method based on multi-state estimation comprises the following steps:
[0012] Step 1: Obtain dam monitoring data, which includes one or more seepage variables and environmental variables;
[0013] Step 2: Calculate the correlation coefficients between the seepage variables and the environmental variables using the multi-state correlation calculation model created in advance, and obtain relevant information based on the correlation coefficients;
[0014] Step 3: Through the multi-state coupling simulation model created in advance, the relevant information is simplified in the time dimension to form memory information for characterizing the dam state;
[0015] Step 4: Use the state benchmark calculation model created in advance to calculate the similarity between the relevant information and the memory information, and estimate the seepage state of the dam based on the similarity to obtain the state benchmark estimation data;
[0016] Step 5: Based on the state warning model created in advance, the difference between the observed information to be analyzed and the state benchmark estimation data is calculated to obtain the dam seepage warning information, and the dam seepage state simulation warning based on multi-state estimation is completed.
[0017] After continuous exploration and experiments, the present invention fully considers the construction conditions and the environment of each dam, creates a multi-state association calculation model, a multi-state coupling simulation model, and a state benchmark calculation model, uses the dam's own seepage variables and environmental variables as modeling objects, and deeply explores the intrinsic relationship between the seepage variables and environmental variables, so as to obtain accurate state benchmark estimation data as a seepage health state benchmark, avoiding the inaccuracy of directly using the design allowable seepage pressure value and statistical error to determine the seepage pressure monitoring threshold, and then through the state warning model, accurate dam seepage warning information can be obtained, thereby effectively improving the accuracy of the warning.
[0018] Furthermore, the present invention obtains memory information that can characterize the state of the dam by calculating the relevant information of the seepage variables and environmental variables; then calculates the similarity between the relevant information and the memory information, and then estimates the seepage state of the dam based on the similarity, which can effectively avoid the influence of accidental factors and erroneous measurements and ensure the correct identification of the seepage state.
[0019] As the preferred technical measures:
[0020] In the step 1: seepage variables and environmental variables are collected through the seepage monitoring points of the dam;
[0021] Seepage variables include osmotic pressure and / or seepage volume and / or uplift pressure; environmental variables include air temperature and / or water level.
[0022] As the preferred technical measures:
[0023] In step 2: the method of obtaining relevant information using the multi-state association calculation model is as follows:
[0024] Step 21: Obtain seepage variables and environmental variables of a number of seepage monitoring points in a plurality of sampling windows;
[0025] Step 22: Use Pearson's formula to process the seepage variables and environmental variables to obtain several correlation coefficients;
[0026] Step 23: assemble several correlation coefficients into a correlation vector according to the order of seepage monitoring points;
[0027] Step 24: Assemble the correlation vectors of multiple windows into a correlation matrix to obtain the relevant information.
[0028] Therefore, the present invention can consider the interaction of seepage variables at different measuring points and the impact on the seepage state of the dam. At the same time, the present invention calculates the correlation coefficient through a sliding window, dynamically and deeply explores the influence mode of each environmental variable and seepage variable, and further improves the accuracy of dam leakage warning.
[0029] As the preferred technical measures:
[0030] In step 3: the method for data simplification of relevant information through the multi-state coupling simulation model is as follows:
[0031] Step 31: clustering the relevant vectors in the relevant information using a clustering algorithm to obtain a number of relevant class vectors;
[0032] Step 32: Based on the Mahalanobis distance algorithm, reconstruct each relevant class vector to obtain multiple reconstructed vectors;
[0033] Step 33: Couple multiple reconstruction vectors to obtain a memory matrix, and form memory information based on the memory matrix.
[0034] As the preferred technical measures:
[0035] In step 31: the method of clustering the related vectors using a clustering algorithm is as follows:
[0036] Step 311: Based on a number of related vectors in the related information, a core vector set, a clustering cluster, a non-queried related vector set, a cluster partition value, a neighborhood parameter minimum value, and a neighborhood parameter maximum value are set;
[0037] Step 312: Find the neighborhood sub-correlation vector set of the correlation vector by using the Manhattan distance calculation formula;
[0038] Step 313: If the number of vectors in the neighborhood sub-correlation vector set is greater than or equal to the neighborhood parameter maximum value, the correlation vector is taken as a correlation class vector, added to the core vector set, and step 314 is executed; otherwise, step 312 is executed:
[0039] Step 314: If the core vector set is equal to the initial value of the core vector set, clustering ends, otherwise, execute step 315;
[0040] Step 315: randomly select a related class vector in the core vector set as the current cluster core vector, set the class number and the current cluster related vector set, and update the unqueried related vector set;
[0041] If the current cluster core vector is equal to the initial value of the core vector set, the current cluster search ends, the cluster partition value is updated, and the core vector set is updated based on the current cluster related vector set, and then step 314 is executed; otherwise, step 316 is executed;
[0042] Step 316: Find the neighborhood sub-correlation vector set of the current cluster core vector through the neighborhood distance threshold, and update the current cluster correlation vector set and the unqueried correlation vector set based on the neighborhood sub-correlation vector set, and then execute step 315.
[0043] As the preferred technical measures:
[0044] In step 32: the method for obtaining the reconstructed vector based on the Mahalanobis distance algorithm is as follows:
[0045] Step 321: constructing an original memory matrix based on a number of related class vectors;
[0046] Step 322: Calculate the center value and covariance matrix of the original memory matrix;
[0047] Step 323: Based on the center value and the covariance matrix, calculate the Mahalanobis distance of the relevant class vector in the original memory matrix to the original memory matrix;
[0048] Step 324: Compare the Mahalanobis distance of the related class vector with a preset threshold value. When the Mahalanobis distance is less than the preset threshold value, the related class vector is retained. When the Mahalanobis distance is greater than the preset threshold value, the related class vector is deleted.
[0049] Step 325: Use the retained relevant class vector as the reconstructed vector.
[0050] As the preferred technical measures:
[0051] In step 4: the method of using the state reference calculation model to obtain the state reference estimation data is as follows:
[0052] Step 41: Obtain the relevant vector in the relevant information and the reconstruction vector in the memory information;
[0053] Step 42: Calculate the similarity between the correlation vector and the reconstructed vector using the Euclidean distance formula to obtain a similarity value;
[0054] Step 43: Generate a weight vector according to the similarity value and the correlation vector and based on the principle of minimum residual between the correlation vector and the reconstructed vector;
[0055] Step 44: Estimate the seepage state of the dam according to the weight vector and the reconstruction vector to obtain an estimated vector;
[0056] Step 45: Combine and arrange multiple estimation vectors to obtain state reference estimation data.
[0057] As the preferred technical measures:
[0058] In step 5: the method for calculating the difference information based on the status warning model is as follows:
[0059] Step 51: obtaining real-time collected monitoring parameters, which include real-time seepage variables and environmental variables;
[0060] Step 52: Calculate the correlation coefficient between the real-time seepage variable and the environmental variable using a multi-state correlation calculation model;
[0061] Step 53: Based on the correlation coefficient, construct several observation vectors as observation information to be analyzed;
[0062] Step 54: Calculate the difference between the observed information and the state reference estimation data by using the Euclidean distance formula to obtain a residual sequence with a plurality of residual values;
[0063] Step 55: Compare the residual value in the residual sequence with the preset control limit value to obtain dam seepage warning information.
[0064] As the preferred technical measures:
[0065] In step 55, the method of comparing the residual value with the control limit value is as follows:
[0066] Step 551: Based on the statistical algorithm, calculate the mean and variance of the residual sequence:
[0067] Step 552: Determine two control limit values according to the mean and the variance, which include a first control limit value and a second control limit value; the maximum value of the first control limit value is less than the maximum value of the second control limit value, and the difference between the two is a variance of the residual sequence;
[0068] Step 553: If the residual value is within the first control limit value, the real-time observation vector is added to the correlation matrix and the control limit value is updated; if the residual value is not within the first control limit value, no update is performed;
[0069] When M residual values in the residual sequence exceed the first control limit value, or N residual values in the residual sequence exceed the second control limit value, it is considered that the seepage state is abnormal, otherwise the seepage state is normal.
[0070] To achieve one of the above purposes, the second technical solution of the present invention is:
[0071] A dam seepage state simulation early warning system based on multi-state estimation, which adopts the above-mentioned dam seepage state simulation early warning method based on multi-state estimation, and includes a monitoring data processing module, a multi-state coupling simulation module, a state reference calculation module and a state early warning module;
[0072] The monitoring data processing module is used to collect the seepage monitoring data and arrange the seepage monitoring data into raw data files for storage in time sequence and space sequence; at the same time, the seepage monitoring data is preprocessed by conventional interpolation method and abnormal point elimination method to obtain dam monitoring data;
[0073] The multi-state coupling simulation module is used to calculate the dam monitoring data, obtain the correlation coefficient, and simplify the data of the correlation coefficient in the time dimension based on the clustering algorithm and Mahalanobis distance to form the final memory information;
[0074] The state benchmark calculation module is used to calculate the correlation between the memory information and the correlation coefficient, and express it through weights to obtain the state benchmark estimation data;
[0075] The status warning module is used to calculate the residual sequence between the real-time observation information and the status benchmark estimation data; at the same time, based on the statistical characteristics of the residual sequence, the residual sequence is judged to obtain the dam seepage warning information.
[0076] Compared with the prior art solutions, the present invention has the following beneficial effects:
[0077] After continuous exploration and experiments, the present invention fully considers the construction conditions and the environment of each dam, creates a multi-state association calculation model, a multi-state coupling simulation model, and a state benchmark calculation model, uses the dam's own seepage variables and environmental variables as modeling objects, and deeply explores the intrinsic relationship between the seepage variables and environmental variables, so as to obtain accurate state benchmark estimation data as a seepage health state benchmark, avoiding the inaccuracy of directly using the design allowable seepage pressure value and statistical error to determine the seepage pressure monitoring threshold, and then through the state warning model, accurate dam seepage warning information can be obtained, thereby effectively improving the accuracy of the warning.
[0078] Furthermore, the present invention obtains memory information that can characterize the state of the dam by calculating the relevant information of the seepage variables and environmental variables; then calculates the similarity between the relevant information and the memory information, and then estimates the seepage state of the dam based on the similarity, which can effectively avoid the influence of accidental factors and erroneous measurements and ensure the correct identification of the seepage state.
[0079] The present invention is provided with a monitoring data processing module, a multi-state coupling simulation module, and a state reference calculation module, uses the dam's own seepage monitoring data as a modeling object, deeply explores the inherent variation law of the seepage monitoring data, and fully considers the interaction of seepage variables at different measuring points, so as to obtain accurate state reference estimation data as a seepage health state reference, thereby avoiding the inaccuracy of directly using the design allowable seepage pressure value and statistical error to determine the seepage pressure monitoring threshold value, and then through the state warning module, accurate dam seepage warning information can be obtained, thereby effectively improving the accuracy of the warning, and the scheme is scientific, reasonable, feasible, and easy to promote and use. BRIEF DESCRIPTION OF THE DRAWINGS
[0080] Figure 1 This is a first flow chart of the dam seepage state simulation early warning method of the present invention;
[0081] Figure 2 A second flow chart of the dam seepage state simulation early warning method of the present invention;
[0082] Figure 3 A schematic diagram of a framework of a dam seepage state simulation early warning system of the present invention;
[0083] Figure 4 This is a schematic diagram of the seepage state change trend of a concrete hyperbolic thin arch dam. DETAILED DESCRIPTION
[0084] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0085] On the contrary, the present invention covers any substitution, modification, equivalent method and scheme made on the essence and scope of the present invention as defined by the claims. Further, in order to make the public have a better understanding of the present invention, some specific details are described in detail in the detailed description of the present invention below. Those skilled in the art can fully understand the present invention without the description of these details.
[0086] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which the present invention pertains. The terms used herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "or / and" as used herein includes any and all combinations of one or more of the associated listed items.
[0087] like Figure 1 As shown, the first specific embodiment of the dam seepage state simulation early warning method of the present invention is:
[0088] A dam seepage state simulation early warning method based on multi-state estimation comprises the following steps:
[0089] Step 1: Obtain dam monitoring data, which includes one or more seepage variables and environmental variables;
[0090] Step 2: Calculate the correlation coefficients between the seepage variables and the environmental variables using the multi-state correlation calculation model created in advance, and obtain relevant information based on the correlation coefficients;
[0091] Step 3: Through the multi-state coupling simulation model created in advance, the relevant information is simplified in the time dimension to form memory information for characterizing the dam state;
[0092] Step 4: Use the state benchmark calculation model created in advance to calculate the similarity between the relevant information and the memory information, and estimate the seepage state of the dam based on the similarity to obtain the state benchmark estimation data;
[0093] Step 5: Based on the state warning model created in advance, the difference between the observed information to be analyzed and the state benchmark estimation data is calculated to obtain the dam seepage warning information, and the dam seepage state simulation warning based on multi-state estimation is completed.
[0094] like Figure 2 As shown, the second specific embodiment of the dam seepage state simulation early warning method of the present invention is:
[0095] A dam seepage state simulation early warning method based on multi-state estimation comprises the following steps:
[0096] S1: Based on the seepage monitoring points of the dam, the objects to be calculated are constructed to obtain the initial dam monitoring data, which include several seepage variables (osmotic pressure, seepage volume) and environmental variables (temperature, water level). Then, the multi-state association calculation model created in advance is used to calculate the correlation coefficients between several seepage variables and environmental variables using the Pearson formula, which are assembled into correlation vectors according to the order of the measurement points, and the correlation vectors of multiple windows are assembled into a correlation matrix.
[0097] S2: Through the multi-state coupling simulation model created in advance, the clustering algorithm DBSCAN is used to cluster the correlation matrix obtained in S1, and a memory matrix based on the Mahalanobis distance is constructed for each category. The construction results of each category are merged to obtain the final memory matrix.
[0098] S3: Using the state benchmark calculation model created in advance, the observation vector and the operating state in the memory matrix are similarly calculated and a weight vector is generated. The percolation state is estimated according to the weight vector to obtain an estimated vector. Each vector group in the original time series vector group is estimated as an observation vector, the error between the estimated vector and the observation vector is calculated, and the corresponding relationship between the error performance and the health state of the percolation is determined.
[0099] S4: Based on the status warning model created in advance, obtain the new dam monitoring data collected in real time, calculate the new observation vector, and analyze the error performance between the observation vector and the estimation vector; then, according to the analysis results, issue an alarm or update the memory matrix and related models.
[0100] In S1 of this embodiment, the method of assembling the correlation matrix is as follows:
[0101] Determine appropriate seepage monitoring points according to the scale of the dam, collect seepage variables (seepage volume, osmotic pressure), and calculate the Pearson correlation coefficient between seepage variables and environmental variables (temperature, water level) based on monitoring data within a certain period of time. The specific calculation formula is as follows:
[0102]
[0103] in, represents the seepage variable data collected at the i-th seepage measuring point within this time length, Indicates the corresponding temperature data or water level data, represents the function for calculating the covariance of variables, Representation calculation and The covariance of , Respectively and The standard deviation of m time windows is calculated, and the corresponding correlation coefficient within a time length is calculated. The sliding window is taken as a step of one day to calculate the correlation vectors of different windows. Finally, the correlation vectors of m time windows are calculated and merged into the following correlation matrix :
[0104]
[0105] in, Indicates Seepage measurement point, The correlation coefficient calculated in time windows is Indicates In the time window The correlation vector is composed of the correlation coefficients of the seepage measurement points.
[0106] In S2 of this embodiment, the method for obtaining the estimated vector is as follows:
[0107] Use the clustering algorithm DBSCAN to cluster the matrix of correlation coefficients:
[0108] Step 1. Get the original matrix correlation matrix , and for the core vector set , the number of clusters , the related variable set was not queried , cluster partition Initialize; at the same time set the neighborhood parameters ( The initialization expression is as follows:
[0109]
[0110]
[0111]
[0112]
[0113] in, represents the radius, which refers to a vector from a related vector such as To another related vector such as The maximum distance beyond which two vectors are no longer considered adjacent. Represents the minimum number of sample points. If an observation value is found to have more than this minimum number of neighbors around it, then the observation value is considered to be a core vector. This surrounding refers to the observation value as the center. The range constructed for the radius; Represents the empty set.
[0114] Step 2. Loop correlation vectors;
[0115] Step 3. Find relevant variables using the Manhattan distance calculation formula of Neighborhood sub-variable set ;
[0116] Calculate relevant variables and related variables Manhattan distance , and its calculation formula is as follows:
[0117]
[0118] Step 4. If The number of correlated variables in the neighborhood sub-correlated variable set , then the relevant vector Add a core vector set, the expression is as follows:
[0119]
[0120] Step 5. If the core vector set , the algorithm ends, otherwise continue to step 6;
[0121] Step 6. In the core vector collection In the example, randomly select a vector , for the current core vector , Category No. , the current cluster related variables set , Unqueried related variable set Re-assign the value, and the expression for re-assignment is as follows:
[0122]
[0123]
[0124]
[0125]
[0126] Step 7. If the current core vector , then the current cluster After the search is completed, the cluster division is updated, and the expression is as follows:
[0127]
[0128] Update core vector collection , then proceed to step 5;
[0129] Step 8. In the current cluster core vector Take a core vector from , through the neighborhood distance threshold Find all sets of neighborhood-dependent variables ,make , for the current cluster related variable set , Unqueried related variable set Make the update and then execute step 7. The updated expression is as follows:
[0130]
[0131]
[0132] Step 9. Cluster division is completed and the algorithm ends.
[0133] In this embodiment, the method for constructing the memory matrix based on the Mahalanobis distance is as follows:
[0134] Step 1. Loop correlation vectors;
[0135] Step 2. For Class cluster, calculate the Mahalanobis distance of each correlation vector to the correlation matrix in the cluster, and compare it with the threshold Compare and merge the related vectors smaller than the threshold into the memory matrix of the cluster. Loop through all clusters to get the final memory matrix. .
[0136] A sub-correlation vector The correlation matrix R composed of all related vectors of the cluster n×p The calculation formula of Mahalanobis distance is as follows:
[0137]
[0138] Among them, R n×p is the correlation matrix A subset of , whose expression is as follows:
[0139]
[0140] in, For R n×p The central vector of is calculated as follows:
[0141]
[0142] Where V is R n×p The covariance matrix of is calculated as follows:
[0143]
[0144] In step S3 of this embodiment, the method for calculating the estimated vector is as follows:
[0145] For the correlation matrix of the observation vector composed of the correlation coefficients of q time states , which is expressed as follows:
[0146]
[0147] To obtain an estimate of the current state , the residuals of the estimation matrix and the observation matrix need to be Minimize, the corresponding equivalent expression is as follows:
[0148]
[0149] in, is the memory matrix, is the weight matrix.
[0150] when When the residual is the smallest, the corresponding weight matrix The expression is as follows:
[0151]
[0152] Using similarity operators Instead of the dot product operation, the above formula can be rewritten as:
[0153]
[0154] In this embodiment, the following Euclidean distance formula is used to calculate the similarity between two vectors. The Euclidean distance formula is as follows:
[0155]
[0156]
[0157]
[0158] in, Represent the two vectors for which the Euclidean distance needs to be calculated; Represents the two vector elements whose Euclidean distance needs to be calculated.
[0159] Finally, the relationship between the current state estimation matrix and the observation matrix is obtained, and the calculation formula is as follows:
[0160]
[0161] The original matrix The vector in the middle is used as the observation vector for estimation, and the difference between each observation vector and the estimated vector, i.e., the residual, is calculated using the Euclidean distance formula. , and obtain a residual sequence of length m, which is expressed as follows:
[0162]
[0163] Calculate the mean of the statistical indicators of the residual sequence and variance , which is expressed as follows:
[0164]
[0165]
[0166] Then, based on the mean and variance, two control limits are determined: and .
[0167] For the real-time generated observation matrix, if the residual is Within the control limit, add the corresponding vector to the original matrix , and update the control limit value; if the residual is not Within the control limit, no update is made.
[0168] According to statistical process theory, the seepage state is considered abnormal when the residuals show the following conditions:
[0169] (1) There are 5 Value exceeds Control limit values;
[0170] (2) There are 3 in a time window Value exceeds Control limit value.
[0171] It can be seen from the above scheme that this embodiment forms the original matrix with the Pearson correlation coefficients of the seepage monitoring parameters and environmental parameters under different time states, and obtains new observation vectors and estimation vectors, and then can provide real-time and accurate judgment criteria for the dam seepage state warning based on residual evaluation. At the same time, the present invention uses the correlation coefficients of multiple seepage variables and environmental variables as modeling objects, which can better explore the influence patterns of seepage state and environmental parameters, and avoid the inaccuracy of directly using seepage variables for monitoring. Furthermore, the present invention uses a sliding window to calculate and update the model to judge the seepage state in real time, without the need for long-term calculations, and avoid the influence of accidental factors. And the present invention determines whether it is necessary to include new monitoring data in the original matrix for updating by controlling the limit value, so that it can follow the changes in the seepage state of the dam in time.
[0172] like Figure 3 As shown, a specific embodiment of the dam seepage state simulation early warning system based on multi-state estimation of the present invention is as follows:
[0173] A dam seepage state simulation early warning system based on multi-state estimation comprises a monitoring data processing module, a multi-state coupling simulation module, a state reference calculation module and a state early warning module.
[0174] The monitoring data processing module is used to collect, transmit, store and pre-process the dam seepage monitoring data, including but not limited to. The monitoring content includes at least environmental variables such as upstream and downstream water levels and air temperature, as well as seepage variables such as seepage volume, osmotic pressure, and uplift pressure, which are arranged in time sequence and spatial sequence into raw data files for storage; at the same time, conventional interpolation methods (linear interpolation, quadratic interpolation, etc.) and abnormal point elimination methods (box method, etc.) are provided to facilitate data pre-processing, so that dam monitoring data can be obtained.
[0175] In the multi-state coupling simulation module, the preprocessed data is input to calculate the matrix of correlation coefficients, and the time dimension is simplified based on the clustering method DBSCAN and Mahalanobis distance to form the final memory matrix.
[0176] The state reference calculation module is used to calculate the estimated vector of a given observation vector, calculate the correlation measure between the memory matrix and it, express it through weights, and then obtain the estimated vector.
[0177] The state warning module continuously calculates a series of real-time observation vectors based on the sliding window, and uses the state benchmark calculation module to calculate the estimated vector. The two can calculate the residual sequence; at the same time, the statistical characteristics of the residual sequence of the original observation vector and the memory matrix are calculated to judge the real-time seepage state.
[0178] Therefore, the present invention uses the correlation coefficients of multiple seepage variables and environmental variables as modeling objects, which can better explore the influence mode of seepage state and environmental parameters, and avoid the inaccuracy of directly using seepage variables for monitoring. At the same time, the sliding window is used to calculate and update the model, and the seepage state is judged in real time, without the need for long-term calculation, to avoid the influence of accidental factors.
[0179] A specific embodiment of applying the present invention to early warning of a concrete hyperbolic thin arch dam:
[0180] A parabolic concrete hyperbolic thin arch dam in the Yangtze River Delta region has a dam crest elevation of 450 meters, a dam bottom elevation of 346 meters, a dam bottom width of 17.49 to 18.88 meters, and a total storage capacity of 82.6 million cubic meters. The concrete hyperbolic thin arch dam is divided into 13 dam sections for construction. The installed capacity of the concrete hyperbolic thin arch dam is 60 megawatts, the average runoff over many years is 298 million cubic meters, the normal water storage level is 444 meters, and the arch crown beam thickness-to-height ratio is 0.168. It is a relatively thin dam body, and the seepage state of the dam is easily affected by the water level and climate. Therefore, it is necessary to monitor and warn the seepage state of the arch dam to prevent serious accidents in the arch dam.
[0181] The arch dam is equipped with seepage-related monitoring, including but not limited to air temperature monitoring, water level monitoring, leakage monitoring, seepage pressure monitoring, dam foundation uplift pressure monitoring, and bypass dam leakage monitoring, among which uplift pressure and seepage pressure monitoring points are installed at every other dam section, and there are a total of 5 leakage measurement points.
[0182] Based on the dam seepage state early warning method and system of the present invention, the monitoring data processing module is first used to obtain the seepage parameters and environmental parameters from September 2005 to December 2005, as follows:
[0183] 1. The air temperature is monitored by a self-recording thermometer placed in a shutter box on the top of the middle dam section, with a measurement accuracy of ±1°C;
[0184] 2. The reservoir water level is obtained by a telemetered water level gauge with a measurement accuracy of ±1cm;
[0185] 3. The uplift pressure is observed through a pressure measuring tube and a telemetering pressure sensor, expressed as water head with an accuracy of 0.1m;
[0186] 4. The osmotic pressure is observed through a pressure measuring tube and an electric water level gauge, expressed as water head with an accuracy of 0.1m;
[0187] 5. The leakage volume is calculated by measuring the water weir and the water level probe, with an accuracy of 0.0001L / S;
[0188] 6. Combine the above measurement data based on the collection date, remove outliers and interpolate missing values to obtain a length of Sample of raw dam monitoring data. represents the window length, which is generally determined based on engineering experience and statistical theory. In this embodiment, it is recommended to take 30, which represents a natural month length of 30 days.
[0189] Using the multi-state correlation calculation model and the multi-state coupling simulation model in the multi-state coupling simulation module, the correlation matrix is calculated from the original data samples, and then the memory matrix is obtained. Specifically, it includes the following contents:
[0190] Step 1. For the dam monitoring data obtained through the monitoring data processing module , the corresponding correlation coefficient is obtained by the Pearson coefficient calculation formula, and then the correlation matrix is assembled , and its corresponding expression is as follows:
[0191] data= =[T,H,U,S,L] 5×N
[0192]
[0193]
[0194]
[0195]
[0196]
[0197]
[0198]
[0199] in, Represents the dam temperature monitoring data, Represents water level monitoring data, Represents the dam foundation pressure monitoring data, Represents the dam pressure monitoring data, Represents the dam body seepage monitoring data; represents the dam temperature monitoring value, Represents the water level monitoring value, Represents the dam foundation pressure monitoring value, Represents the dam pressure monitoring value, Represents the monitoring value of dam seepage.
[0200] The calculation formula for each element in the correlation matrix is as follows:
[0201]
[0202]
[0203]
[0204]
[0205]
[0206]
[0207] in Represents the i-th row to the The temperature data of the line, Represents the i-th row to the The water level data of the row, Represents the i-th row to the The dam foundation pressure data is Represents the i-th row to the The dam pressure data is as follows: Represents the i-th row to the The seepage flow data of the line.
[0208] Step 2. Enter the correlation matrix , for the core vector set , number of clusters , Unqueried related variable set , cluster partition C is initialized; and the neighborhood parameters are set ( ); specifically including the following contents:
[0209] a) Loop through m related vectors, for each vector Calculate all other vectors (such as ) and its Manhattan distance, the specific calculation formula is as follows:
[0210]
[0211] b) If Greater than ,Will Join of Neighborhood sub-variable set middle;
[0212] c) If the relevant variable set The number of variables in is greater than or equal to , then Add to collection as core vector middle;
[0213] d) In the collection A core vector is randomly selected from , the current category is 1, and its initial cluster for All relevant variables, loop analysis The neighborhood sub-correlated variable set of all relevant variable vectors in , and find the intersection with the unqueried relevant variable set ,Will Join to cluster , all relevant variable vectors are queried and the output cluster is ,renew .
[0214] e) Output cluster, which is expressed as follows:
[0215]
[0216] Step 3. Construct the memory matrix based on the Mahalanobis distance, which includes the following contents:
[0217] Step 31. For a certain type of cluster , calculate the correlation matrix , and its corresponding calculation formula is as follows:
[0218]
[0219] Step 32. For the nth cluster, calculate the Mahalanobis distance of each column vector in the cluster to the whole of the cluster, and compare it with the threshold Compare and merge the vectors smaller than the threshold into the memory matrix of the cluster. All clusters are judged in a loop to obtain the final memory matrix D, thus realizing multivariate state modeling.
[0220] In this embodiment, the method for calculating the estimation vector based on the state reference calculation module is as follows:
[0221] For the observation vector matrix R consisting of the correlation coefficients of m time states, it is expressed as follows:
[0222]
[0223] The relationship between the current state estimation matrix and the observation matrix is as follows:
[0224]
[0225] Calculate the residual sequence of the estimation matrix and the observation matrix, and its expression is as follows:
[0226]
[0227] Calculate the residual sequence The statistical mean of and variance Get the initial values of the two control limits and , and save the control limit values.
[0228] In this embodiment, the state warning module is used to realize the dam seepage state warning, which specifically includes the following contents: Input into the state benchmark calculation module to obtain its corresponding estimation matrix , the corresponding calculation formula is as follows:
[0229]
[0230]
[0231] =
[0232] in, Represents the first An estimated vector, Represents real-time correlation coefficient The estimated value after transformation according to the memory matrix.
[0233] Calculate the residuals of the two, and the calculation formula is as follows:
[0234]
[0235]
[0236] in, represents the real-time correlation coefficient, , Represents real-time correlation coefficient According to the estimated value after the memory matrix conversion. By calculating the control limit value and the residual trend in real time, it can be concluded that the upper and lower limits of the seepage state are continuously updated with the addition of new observation vectors. Figure 4 , Figure 4 The black scattered points in the graph represent new observation vectors, and the blue and yellow lines represent two control limits that determine the dynamic safety interval of the seepage state. It can be seen that during the observation period from 2018 to 2021, no abnormal points beyond the safety interval were found, so the seepage state alarm was not triggered, indicating that the seepage state of this dam has always been relatively healthy.
[0237] An embodiment of a device applying the method of the present invention:
[0238] An electronic device comprising:
[0239] one or more processors;
[0240] A storage device for storing one or more programs;
[0241] When the one or more programs are executed by the one or more processors, the one or more processors implement the above-mentioned dam seepage state simulation early warning method based on multi-state estimation.
[0242] A computer medium embodiment using the method of the present invention:
[0243] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the above-mentioned dam seepage state simulation early warning method based on multi-state estimation.
[0244] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, and computer program products. Therefore, the present application may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present application may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
[0245] The present application is described by flowcharts or / and block diagrams of the methods, devices (systems), and computer program products of the embodiments of the present application. It should be understood that each process or / and block in the flowchart or / and block diagram and the combination of the processes or / and blocks in the flowchart or / and block diagram can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart or / and block diagram. Figure 1 Process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0246] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 Process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0247] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1Process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0248] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field can still modify or replace the specific implementation methods of the present invention with equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be included in the scope of protection of the claims of the present invention.
Claims
1. A dam seepage state simulation early warning method based on multi-state estimation, characterized by: The steps include: Step 1: Obtain dam monitoring data, which includes one or more seepage variables and environmental variables; Step 2: Calculate the correlation coefficients between the seepage variables and the environmental variables using the multi-state correlation calculation model created in advance, and obtain relevant information based on the correlation coefficients; Step 3: Through the multi-state coupling simulation model created in advance, the relevant information is simplified in the time dimension to form memory information for characterizing the dam state; The method of data simplification of relevant information through multi-state coupled simulation model is as follows: Step 31: clustering the relevant vectors in the relevant information using a clustering algorithm to obtain a number of relevant class vectors; Step 32: Based on the Mahalanobis distance algorithm, reconstruct each relevant class vector to obtain multiple reconstructed vectors; The method for obtaining the reconstructed vector based on the Mahalanobis distance algorithm is as follows: Step 321: constructing an original memory matrix based on a number of related class vectors; Step 322: Calculate the center value and covariance matrix of the original memory matrix; Step 323: Based on the center value and the covariance matrix, calculate the Mahalanobis distance of the relevant class vector in the original memory matrix to the original memory matrix; Step 324: Compare the Mahalanobis distance of the related class vector with a preset threshold value. When the Mahalanobis distance is less than the preset threshold value, the related class vector is retained. When the Mahalanobis distance is greater than the preset threshold value, the related class vector is deleted. Step 325: Use the retained relevant class vector as the reconstruction vector; Step 33: coupling the multiple reconstruction vectors to obtain a memory matrix, and forming memory information based on the memory matrix; Step 4: Use the state benchmark calculation model created in advance to calculate the similarity between the relevant information and the memory information, and estimate the seepage state of the dam based on the similarity to obtain the state benchmark estimation data; The method of obtaining the state benchmark estimation data using the state benchmark calculation model is as follows: Step 41: Obtain the relevant vector in the relevant information and the reconstruction vector in the memory information; Step 42: Calculate the similarity between the correlation vector and the reconstructed vector using the Euclidean distance formula to obtain a similarity value; Step 43: Generate a weight vector according to the similarity value and the correlation vector and based on the principle of minimum residual between the correlation vector and the reconstructed vector; Step 44: Estimate the seepage state of the dam according to the weight vector and the reconstruction vector to obtain an estimated vector; Step 45: Combining and arranging multiple estimation vectors to obtain state reference estimation data; Step 5: Based on the state warning model created in advance, the difference between the observed information to be analyzed and the state benchmark estimation data is calculated to obtain the dam seepage warning information, and the dam seepage state simulation warning based on multi-state estimation is completed.
2. A dam seepage state simulation early warning method based on multi-state estimation as claimed in claim 1, characterized in that: In the step 1: seepage variables and environmental variables are collected through the seepage monitoring points of the dam; Seepage variables include osmotic pressure and / or seepage volume and / or uplift pressure; environmental variables include air temperature and / or water level.
3. A dam seepage state simulation early warning method based on multi-state estimation as claimed in claim 1, characterized in that: In step 2: the method of obtaining relevant information using the multi-state association calculation model is as follows: Step 21: Obtain seepage variables and environmental variables of a number of seepage monitoring points in a plurality of sampling windows; Step 22: Use Pearson's formula to process the seepage variables and environmental variables to obtain several correlation coefficients; Step 23: assemble several correlation coefficients into a correlation vector according to the order of seepage monitoring points; Step 24: Assemble the correlation vectors of multiple windows into a correlation matrix to obtain the relevant information.
4. A dam seepage state simulation early warning method based on multi-state estimation as claimed in claim 3, characterized in that: In step 31: the method of clustering the related vectors using a clustering algorithm is as follows: Step 311: Based on a number of related vectors in the related information, a core vector set, a clustering cluster, a non-queried related vector set, a cluster partition value, a neighborhood parameter minimum value, and a neighborhood parameter maximum value are set; Step 312: Find the neighborhood sub-correlation vector set of the correlation vector by using the Manhattan distance calculation formula; Step 313: If the number of vectors in the neighborhood sub-correlation vector set is greater than or equal to the neighborhood parameter maximum value, the correlation vector is taken as a correlation class vector, added to the core vector set, and step 314 is executed; Otherwise, execute step 312: Step 314: If the core vector set is equal to the initial value of the core vector set, clustering ends, otherwise, execute step 315; Step 315: randomly select a related class vector in the core vector set as the current cluster core vector, set the class number and the current cluster related vector set, and update the unqueried related vector set; If the current cluster core vector is equal to the initial value of the core vector set, the current cluster search ends, the cluster partition value is updated, and the core vector set is updated based on the current cluster related vector set, and then step 314 is executed; Otherwise, execute step 316; Step 316: Find the neighborhood sub-correlation vector set of the current cluster core vector through the neighborhood distance threshold, and update the current cluster correlation vector set and the unqueried correlation vector set based on the neighborhood sub-correlation vector set, and then execute step 315.
5. A dam seepage state simulation early warning method based on multi-state estimation as claimed in claim 4, characterized in that: In step 5: the method for calculating the difference information based on the status warning model is as follows: Step 51: obtaining real-time collected monitoring parameters, which include real-time seepage variables and environmental variables; Step 52: Calculate the correlation coefficient between the real-time seepage variable and the environmental variable using a multi-state correlation calculation model; Step 53: Based on the correlation coefficient, construct several observation vectors as observation information to be analyzed; Step 54: Calculate the difference between the observed information and the state reference estimation data by using the Euclidean distance formula to obtain a residual sequence with a plurality of residual values; Step 55: Compare the residual value in the residual sequence with the preset control limit value to obtain dam seepage warning information.
6. A dam seepage state simulation early warning method based on multi-state estimation as claimed in claim 5, characterized in that: In step 55, the method of comparing the residual value with the control limit value is as follows: Step 551: Based on the statistical algorithm, calculate the mean and variance of the residual sequence: Step 552: Determine two control limit values according to the mean and the variance, which include a first control limit value and a second control limit value; the maximum value of the first control limit value is less than the maximum value of the second control limit value, and the difference between the two is a variance of the residual sequence; Step 553: If the residual value is within the first control limit value, the real-time observation vector is added to the correlation matrix and the control limit value is updated; If the residual value is not within the first control limit, no update is performed; When M residual values in the residual sequence exceed the first control limit value, or N residual values in the residual sequence exceed the second control limit value, it is considered that the seepage state is abnormal, otherwise the seepage state is normal.
7. A dam seepage state simulation early warning system based on multi-state estimation, characterized by: A dam seepage state simulation early warning method based on multi-state estimation as described in any one of claims 1 to 6 is adopted, which comprises a monitoring data processing module, a multi-state coupling simulation module, a state reference calculation module and a state early warning module; The monitoring data processing module is used to collect the seepage monitoring data and arrange the seepage monitoring data into raw data files for storage in time sequence and space sequence; at the same time, the seepage monitoring data is preprocessed by conventional interpolation method and abnormal point elimination method to obtain dam monitoring data; The multi-state coupling simulation module is used to calculate the dam monitoring data, obtain the correlation coefficient, and simplify the data of the correlation coefficient in the time dimension based on the clustering algorithm and Mahalanobis distance to form the final memory information; The state benchmark calculation module is used to calculate the correlation between the memory information and the correlation coefficient, and express it through weights to obtain the state benchmark estimation data; The status warning module is used to calculate the residual sequence between the real-time observation information and the status benchmark estimation data; at the same time, based on the statistical characteristics of the residual sequence, the residual sequence is judged to obtain the dam seepage warning information.
Citation Information
Patent Citations
A method for predicting and determining the threshold for seepage pressure in concrete dams
CN112504934B
Parallel calculation method for power system state estimation
CN107069696A
Dam state prediction method and system based on data assimilation
CN114547951A
Urban inland inundation prediction method and system based on runoff coupling simulation
CN115130264A
Double-curvature arch dam foundation seepage evaluation method and system based on cohesion algorithm
CN115146565A