Battery life evaluation model construction and battery life evaluation method, device and equipment

By constructing a battery life evaluation model and using multiple battery relationship models and machine learning technology, the problem of deviation in battery expected life prediction results is solved, the accuracy of battery life evaluation is improved, and losses caused by unqualified battery cycles are reduced. .

CN118604639BActive Publication Date: 2024-10-29THREE GORGES GROUP IND DEVELOPMENT (BEIJING) CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411089454.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-10-29
Estimated Expiration
2044-08-09

AI Technical Summary

Technical Problem

The consistency difference between batteries in new energy storage technologies leads to large deviations in the prediction results of the expected service life of the battery, which may lead to the problem of unqualified battery cycles in later use, causing losses to users.

Method used

By obtaining the relationship models of multiple different batteries, we can characterize the relationship between battery capacity and cycle times, build a battery life evaluation model based on these models, and use machine learning model training to improve the accuracy of prediction and distinguish batteries that meet the standard from those that do not. .

Benefits of technology

It improves the accuracy of battery life prediction, can more effectively evaluate batteries of the same type that meet and fail to meet standards, and reduces losses caused by unqualified battery cycles during use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118604639B_ABST
    Figure CN118604639B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of electronic technology, and discloses the construction of a battery life assessment model and a battery life assessment method, device and equipment. The method of the present invention determines the target number of cycles corresponding to the corresponding battery under the target battery capacity condition through the relationship model of each battery, and takes the battery whose target number of cycles is greater than or equal to the expected number of cycles among multiple batteries as the first type of battery that meets the demand, and takes the battery whose target number of cycles is less than the expected number of cycles as the second type of battery that does not meet the demand, and associates multiple target data sequences of each first type of battery with a first label, and associates multiple target data sequences of each second type of battery with a second label, respectively, to obtain an associated data set, and uses the associated data set to train a machine learning model to obtain a battery life assessment model. The battery life assessment model can realize the assessment of battery life based on the target data sequence of the battery to be tested.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electronic technology, and in particular to battery life assessment model construction and battery life assessment methods, devices and equipment. Background Art

[0002] With the continuous development of energy technology, new battery energy storage technologies such as sodium ion batteries, aqueous sodium ion batteries, and zinc-air batteries have gradually shown their unique advantages and great application potential in the field of energy storage. However, on the road to industrial promotion and application, these technologies still face many challenges, especially in the prediction and evaluation of cycle life.

[0003] In the related art, in order to predict the service life of multiple batteries of the same type, at least one battery to be tested is selected from multiple batteries, and the correlation between the number of cycles and capacity attenuation of the battery to be tested is determined through testing. The expected service life of the battery to be tested is determined based on the relationship, and the expected service life of the battery to be tested is used as the expected service life of the battery of this type. However, the process of the new energy storage technology is not yet fully mature, resulting in generally poor consistency between batteries. This inconsistency makes it significantly difficult to evaluate whether the battery can achieve the expected number of cycles. Because even in the same batch of batteries, there may be large performance differences, which brings great uncertainty to the prediction and evaluation of the expected cycle life. Due to the generally poor consistency between batteries, if the expected service life of other batteries of the same type is predicted based on the predicted service life of a certain battery, the prediction result will be large. If the battery cannot reach the expected service life, it will cause losses to the user in later use due to unqualified battery cycles. Therefore, it is urgent to propose a method to evaluate the accuracy of the expected service life of the battery. Summary of the invention

[0004] In view of this, the present invention provides a battery life assessment model construction and a battery life assessment method, device and equipment to solve the problem that the expected battery life determined by a small number of battery tests in the related art is not accurate enough, which will cause losses to users in later use due to unqualified battery cycles.

[0005] In a first aspect, the present invention provides a method for constructing a battery life assessment model, the method comprising: obtaining relationship models corresponding to a plurality of different batteries, the relationship models being used to characterize the correlation between battery capacity within a target range and battery cycle number, the battery capacity within the target range being determined according to the initial capacity of the battery, the battery capacity within the target range including the target battery capacity, and the plurality of different batteries being batteries of the same type; determining the target cycle number corresponding to each battery under the target battery capacity condition based on the relationship models corresponding to the different batteries and the target battery capacity; determining a plurality of target data sequences of the corresponding battery based on the relationship models of each battery, the target data sequence including a plurality of capacity data and cycle number data corresponding to each capacity data; associating the plurality of target data sequences of each first type battery with a first label, and associating the plurality of target data sequences of each second type battery with a second label, to obtain an associated data set, the first type battery being used to characterize batteries having a target cycle number greater than or equal to an expected cycle number, and the second type battery being used to characterize batteries having a target cycle number less than an expected cycle number; training a preset machine learning model using the associated data set until the model accuracy meets the preset conditions, and obtaining a battery life assessment model.

[0006] The present invention provides a method for constructing a battery life assessment model. The target number of cycles corresponding to each battery under a target battery capacity condition is determined through relationship models corresponding to different batteries. The relationship model is used to characterize the correlation between the battery capacity and the battery cycle number within a target range. Based on the relationship model of each battery, multiple target data sequences of the corresponding battery are determined. The multiple target data sequences of each first type battery are respectively associated with a first label, and the multiple target data sequences of each second type battery are respectively associated with a second label to obtain an associated data set. The first type battery is used to characterize batteries whose target cycle number is greater than or equal to the expected cycle number, and the second type battery is used to characterize batteries whose target cycle number is less than the expected cycle number. The associated data set is used to train a preset machine learning model to obtain a battery life assessment model. The method provided by the present invention determines the target number of cycles corresponding to the corresponding battery under the target battery capacity condition through the relationship model of each battery. The target number of cycles is used to characterize the life of the battery. The battery whose target number of cycles is greater than or equal to the expected number of cycles among multiple batteries is regarded as the first type of battery that meets the demand, and the battery whose target number of cycles is less than the expected number of cycles is regarded as the second type of battery that does not meet the demand. The multiple target data sequences of each first type of battery are respectively associated with the first label, and the multiple target data sequences of each second type of battery are respectively associated with the second label to obtain an associated data set, and the associated data set is used to train the machine learning model to obtain a battery life evaluation model. The battery life evaluation model can realize the evaluation of the battery life based on the target data sequence of the battery to be tested, and can determine the qualified and unqualified batteries among multiple batteries of the same type based on the evaluation results.

[0007] In an optional embodiment, the step of obtaining relationship models corresponding to multiple different batteries includes: obtaining test data corresponding to the multiple batteries, the test data including capacity data corresponding to the batteries in different numbers of cycles; and constructing corresponding relationship models based on the capacity data corresponding to each battery in different numbers of cycles.

[0008] The method provided in this optional implementation manner constructs a corresponding relationship model through the test data of each battery, so as to facilitate the subsequent calculation of the target number of cycles of each battery based on the relationship model.

[0009] In an optional embodiment, the step of obtaining test data corresponding to multiple batteries includes: obtaining target performance parameter values ​​corresponding to each battery at different numbers of cycles and a pre-constructed target model, the target model being used to characterize the correlation between the target performance parameter and the battery capacity; and determining the test data of the corresponding battery based on the target performance parameter values ​​corresponding to each battery at different numbers of cycles and the target model.

[0010] In an optional embodiment, the step of determining multiple target data sequences corresponding to the batteries based on the relationship models of the batteries includes: determining multiple target data sequences corresponding to the batteries based on a time window of a preset length and the relationship models of the batteries.

[0011] In a second aspect, the present invention provides a battery life assessment method, the method comprising: obtaining a target data sequence of a battery to be evaluated, the target data sequence comprising multiple capacity data and cycle number data corresponding to each capacity data; inputting the target data sequence into a battery life assessment model so that the battery life assessment model outputs a life assessment result of the battery to be evaluated, the battery life assessment model being constructed by the battery life assessment model construction method of the first aspect or any corresponding embodiment thereof.

[0012] In a third aspect, the present invention provides a device for constructing a battery life assessment model, the device comprising: a first acquisition module, used to acquire relationship models corresponding to a plurality of different batteries, the relationship models being used to characterize the correlation between the battery capacity within a target range and the battery cycle number, the battery capacity within the target range being determined according to the initial capacity of the battery, the battery capacity within the target range including the target battery capacity, and the plurality of different batteries being batteries of the same type; a first determination module, used to determine the target cycle number corresponding to each battery under the target battery capacity condition based on the relationship models corresponding to the different batteries and the target battery capacity; a second determination module, used to determine a plurality of target data sequences of the corresponding battery based on the relationship models of each battery, the target data sequence including a plurality of capacity data and the cycle number data corresponding to each capacity data; an association module, used to associate a plurality of target data sequences of each first type battery with a first label, and a plurality of target data sequences of each second type battery with a second label, to obtain an associated data set, the first type battery being used to characterize a battery whose target cycle number is greater than or equal to the expected cycle number, and the second type battery being used to characterize a battery whose target cycle number is less than the expected cycle number; a training module, used to train a preset machine learning model using the associated data set until the model accuracy meets the preset conditions, and obtain a battery life assessment model.

[0013] In a fourth aspect, the present invention provides a device for evaluating battery life, the device comprising: a second acquisition module, used to acquire a target data sequence of a battery to be evaluated, the target data sequence comprising a plurality of capacity data and cycle number data corresponding to each capacity data; an evaluation module, used to input the target data sequence into a battery life evaluation model, so that the battery life evaluation model outputs a life evaluation result of the battery to be evaluated, the battery life evaluation model being constructed by the battery life evaluation model construction method of the first aspect or any corresponding embodiment thereof.

[0014] In a fifth aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor are communicatively connected to each other, computer instructions are stored in the memory, and the processor executes the battery life assessment model construction method of the above-mentioned first aspect or any corresponding embodiment thereof, or executes the battery life assessment method of the above-mentioned second aspect by executing the computer instructions.

[0015] In a sixth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the battery life assessment model building method of the first aspect or any corresponding embodiment thereof, or to execute the battery life assessment method of the second aspect.

[0016] In the seventh aspect, the present invention provides a computer program product, including computer instructions, which are used to enable a computer to execute the battery life assessment model construction method of the above-mentioned first aspect or any corresponding embodiment, or execute the battery life assessment method of the above-mentioned second aspect. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 is a flow chart of a method for constructing a battery life evaluation model according to an embodiment of the present invention;

[0019] Figure 2 is a flow chart of another method for constructing a battery life evaluation model according to an embodiment of the present invention;

[0020] Figure 3 is a flow chart of a battery life evaluation method according to an embodiment of the present invention;

[0021] Figure 4 is a structural block diagram of a device for constructing a battery life evaluation model according to an embodiment of the present invention;

[0022] Figure 5 is a structural block diagram of a battery life evaluation device according to an embodiment of the present invention;

[0023] Figure 6 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0024] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0025] In the related art, in order to predict the service life of multiple batteries of the same type, at least one battery to be tested is selected from multiple batteries, and the correlation between the number of cycles and capacity attenuation of the battery to be tested is determined through testing. The expected service life of the battery to be tested is determined based on the relationship, and the expected service life of the battery to be tested is used as the expected service life of the battery of this type. However, the process of the new energy storage technology is not yet fully mature, resulting in generally poor consistency between batteries. This inconsistency makes it significantly difficult for construction units to assess whether the battery can achieve the expected number of cycles. Because even in the same batch of batteries, there may be large performance differences, which brings great uncertainty to the prediction and evaluation of the expected cycle life. Due to the generally poor consistency between batteries, if the expected service life of other batteries of the same type is predicted based only on the predicted service life of a certain battery, the prediction result will be large. If the battery cannot reach the expected service life, it will cause losses to the user in later use due to unqualified battery cycles.

[0026] In view of this, a method for constructing a battery life evaluation model provided in an embodiment of the present application can be applied to a server to realize the construction of a battery life evaluation model. The method provided in an embodiment of the present application determines the target number of cycles corresponding to the corresponding battery under the target battery capacity condition through the relationship model of each battery. The target number of cycles is used to characterize the life of the battery. The battery whose target number of cycles among multiple batteries is greater than or equal to the expected number of cycles is regarded as the first type of battery that meets the demand, and the battery whose target number of cycles is less than the expected number of cycles is regarded as the second type of battery that does not meet the demand. The multiple target data sequences of each first type of battery are respectively associated with the first label, and the multiple target data sequences of each second type of battery are respectively associated with the second label to obtain an associated data set, and the associated data set is used to train the machine learning model to obtain a battery life evaluation model. The battery life evaluation model can realize the evaluation of the battery life based on the target data sequence of the battery to be tested, and the qualified and unqualified batteries among multiple batteries of the same type can be determined based on the evaluation results.

[0027] According to an embodiment of the present invention, an embodiment of a method for constructing a battery life assessment model is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.

[0028] In this embodiment, a method for constructing a battery life evaluation model is provided, which can be used for the above-mentioned server. Figure 1 is a flowchart of a method for constructing a battery life evaluation model according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:

[0029] Step S101, obtaining relationship models corresponding to a plurality of different batteries.

[0030] Exemplarily, the relationship model is used to characterize the correlation between the battery capacity within the target range and the number of battery cycles. The battery capacity within the target range is determined according to the initial capacity of the battery. The battery capacity within the target range includes the target battery capacity, and multiple different batteries are batteries of the same type. In the embodiment of the present application, the types of multiple different batteries are not limited, and those skilled in the art can determine according to needs. Multiple different batteries are tested for N cycles respectively, and a relationship model of each battery is constructed based on the test result data. The battery capacity within the target range can be 100% to 80% of the initial capacity of the battery, and the target battery capacity can include but is not limited to 80% of the initial capacity of the battery.

[0031] Step S102, determining a target number of cycles corresponding to each battery under a target battery capacity condition based on the relationship models corresponding to different batteries and the target battery capacity.

[0032] For example, in an embodiment of the present application, the target battery capacity is substituted into the relationship model of each battery for calculation to obtain the target number of cycles of each battery under the target battery capacity condition. The target number of cycles can be used to characterize the predicted life of the battery.

[0033] Step S103, determining a plurality of target data sequences corresponding to the batteries based on the relationship model of each battery, wherein the target data sequences include a plurality of capacity data and cycle number data corresponding to each capacity data.

[0034] Exemplarily, in an embodiment of the present application, the capacity data of the first T cycles of the corresponding battery is determined based on the relationship model of each battery, and the capacity data of the first T cycles of each battery is divided based on preset rules to obtain corresponding multiple target data sequences.

[0035] Step S104, associating the multiple target data sequences of each first type battery with the first tag respectively, and associating the multiple target data sequences of each second type battery with the second tag respectively, to obtain an associated data set.

[0036] Exemplarily, the first type of battery is used to characterize a battery whose target cycle number is greater than or equal to the expected cycle number, and the second type of battery is used to characterize a battery whose target cycle number is less than the expected cycle number. In the embodiment of the present application, the first type of battery is a battery whose cycle number meets the standard, and the second type of battery is a battery whose cycle number does not meet the standard.

[0037] Step S105, using the associated data set to train the preset machine learning model until the model accuracy meets the preset conditions, thereby obtaining a battery life evaluation model.

[0038] Exemplarily, in an embodiment of the present application, the preset machine learning model may include but is not limited to a random forest model. The random forest model is trained by associating a data set until the model accuracy meets preset conditions to obtain a battery life evaluation model.

[0039] The method for constructing a battery life evaluation model provided in this embodiment determines the target number of cycles corresponding to the corresponding battery under the target battery capacity condition through the relationship model of each battery. The target number of cycles is used to characterize the life of the battery. Batteries with a target number of cycles greater than or equal to the expected number of cycles among multiple batteries are regarded as first-type batteries that meet the requirements, and batteries with a target number of cycles less than the expected number of cycles are regarded as second-type batteries that do not meet the requirements. Multiple target data sequences of each first-type battery are respectively associated with a first label, and multiple target data sequences of each second-type battery are respectively associated with a second label to obtain an associated data set. The associated data set is used to train a machine learning model to obtain a battery life evaluation model. The battery life evaluation model can evaluate the battery life based on the target data sequence of the battery to be tested, and can determine the qualified and unqualified batteries among multiple batteries of the same type based on the evaluation results.

[0040] The method provided in the embodiment of the present application can also consider the characteristics that affect the battery life, such as the voltage change rate, current change rate, temperature change trend, etc., to train the battery life prediction model. Features that affect the prediction of battery life, such as the voltage change rate, current change rate, temperature change trend, etc., are extracted from the battery's charge and discharge cycle data. Using the sliding window technology, the continuous cycle data is divided into multiple time windows, and the relevant features are calculated in each time window. Based on the characteristics of the random forest algorithm itself, features with a high correlation with the target variable can be selected by their importance scores. By training a preliminary random forest model, the importance score of each feature is calculated, and features with higher scores are selected for subsequent training. Select the random forest algorithm to build a battery life prediction model. Random forest is an integrated learning method that improves the accuracy and stability of the model by constructing multiple decision trees and combining their prediction results. The specific process is as follows:

[0041] 1. Build a decision tree: Randomly extract some samples from the training data set with replacement as sub-training sets to build multiple decision trees. When building each decision tree, randomly select some features from all features as candidate feature sets, and split nodes based on the candidate feature sets.

[0042] 2. Ensemble decision trees: Integrate the prediction results of multiple decision trees to obtain the final prediction results of the random forest model. The prediction results of decision trees can be integrated by simple voting or averaging.

[0043] 3. Parameter adjustment: Adjust the parameters of the random forest model, such as the number of decision trees, the number of features considered when splitting each node, etc., to optimize the performance of the model. Parameter adjustment can be performed through methods such as cross-validation and grid search.

[0044] 4. Model evaluation: Use an independent validation dataset to evaluate the trained random forest model to test the generalization ability and prediction performance of the model. Evaluation indicators can include accuracy, recall, F1 score, root mean square error (RMSE), etc.

[0045] In this embodiment, a method for constructing a battery life evaluation model is provided, which can be used for the above-mentioned server. Figure 2 is a flowchart of a method for constructing a battery life evaluation model according to an embodiment of the present invention. Figure 2 As shown, the process includes the following steps:

[0046] Step S201, obtain the relationship models corresponding to multiple different batteries respectively, the relationship model is used to characterize the correlation between the battery capacity within the target range and the battery cycle number, the battery capacity within the target range is determined according to the initial capacity of the battery, the battery capacity within the target range includes the target battery capacity, and the multiple different batteries are batteries of the same type. For details, please refer to Figure 1 Step S101 of the illustrated embodiment will not be described in detail here.

[0047] Specifically, the above step S201 includes:

[0048] Step S2011, obtaining test data corresponding to a plurality of batteries, wherein the test data includes capacity data corresponding to the batteries at different cycle times.

[0049] In some optional implementations, the above step S2011 includes:

[0050] Step a1, obtaining the target performance parameter values ​​corresponding to each battery at different cycle times and the pre-built target model.

[0051] Exemplarily, the target performance parameter value may include, but is not limited to, resistance and capacitance values ​​(RC values). In an embodiment of the present application, X batteries are randomly selected and tested for N cycles. During each test, after every M cycles, a genetic algorithm (GA) is used to process the RC value of the battery to obtain a series of data of multiple groups of RC values. The target model is used to characterize the correlation between the target performance parameter and the battery capacity. The RC value and corresponding capacity data of the battery at different numbers of cycles. These data are usually obtained through experiments, and the accuracy and reliability of the data need to be ensured. The target model can be obtained by fitting multiple RC values ​​and corresponding capacity data of the battery. Taking polynomial fitting as an example, it is assumed that the relationship between the RC value and the capacity can be shown as follows:

[0052] C=a 0 R 0+ a 1 R 1 2 + a 2 R 2 3 + a 3

[0053] in, R 0 is the resistance value during the test, R 1 is the polarization resistance value during the test, R2 is the battery resistance value during the test, a 0. a 1. a 2. a 3 is the fitting parameter,C is the battery capacity.

[0054] Step a2, determining the test data of the corresponding battery based on the target performance parameter values ​​and the target model corresponding to each battery at different cycle times.

[0055] Exemplarily, by substituting the target performance parameter values ​​corresponding to each battery at different cycle numbers into the target model for calculation, the battery capacity information corresponding to each target performance parameter can be obtained, and then the battery test data can be obtained.

[0056] Step S2012, constructing a corresponding relationship model based on the capacity data corresponding to each battery in different cycle times.

[0057] Exemplarily, in the embodiment of the present application, a suitable mathematical model is selected to fit the data to obtain the relationship model of each battery. Common fitting models include polynomial fitting, exponential smoothing, nonlinear regression, etc. When selecting a model, it is necessary to consider the characteristics of the data and the accuracy of the fitting. Use an optimization algorithm such as the least squares method to determine the fitting parameters so that the sum of squared errors between the model prediction value and the actual data is minimized. In the embodiment of the present application, the RC value and the corresponding capacity data of the battery at different cycle times are obtained by experiment, and the accuracy and reliability of the data need to be ensured. The collected data are classified according to the number of cycles, and a RC value-capacity-cycle number relationship diagram is drawn. This can be achieved through a scatter plot, where the horizontal axis represents the number of cycles, the vertical axis represents the capacity, and the color or size can represent the RC value. To evaluate the accuracy of the fitting model, commonly used evaluation indicators include mean square error (MSE), determination coefficient (R²), etc. Ensure that the model can better describe the relationship between RC value, capacity and cycle number. According to the fitted model, the data is extended outward until the capacity drops to 80% of the initial capacity. This step requires a reasonable assumption of the trend of battery performance degradation and ensures the rationality of the extension. For example, if polynomial fitting is used, it can be solved by solving the equation C =0.8 C 0 (where C 0 is the initial capacity) to find the corresponding number of cycles, thereby completing the data extension.

[0058] Specifically, in the embodiment of the present application, the relationship models corresponding to different batteries can be constructed through the following steps:

[0059] Step b1, obtaining initial resistance and capacitance values ​​and initial capacity values ​​of different batteries.

[0060] Exemplarily, the initial resistance and capacitance values ​​are the product of the initial resistance value (InitialResistance) and the initial capacitance value (InitialCapacitance) of the electrochemical energy storage battery. Among them, the initial resistance value can be understood as the resistance value R0, which is the total resistance value measured by the sample electrochemical energy storage battery in the initial state (for example, the open circuit state after uncharged or charged). The initial capacity value is the capacitance value before the first charge after the assembly is completed. Specifically, a batch of electrochemical energy storage battery samples to be studied is selected. Different batteries can be products of the same model and the same batch, or batteries prepared in the laboratory. Use appropriate testing equipment, such as an AC impedance analyzer (AC Impedance Analyzer) and a capacitance meter to measure the initial resistance and capacitance of each battery. For example, the resistance of the sample electrochemical energy storage battery in the initial state can be measured by an AC impedance analyzer. The initial resistance value reflects the degree of obstruction of the internal resistance of the sample electrochemical energy storage battery to the flow of current. The initial capacitance of the sample electrochemical energy storage battery can be measured using a capacitance meter. The initial capacitance value reflects the amount of charge that the battery can store in the initial state. The initial resistance and capacitance values ​​of the sample electrochemical energy storage battery are obtained by multiplying the measured initial resistance and initial capacitance values.

[0061] The initial capacity value is the total amount of charge that the battery can store in its initial state, measured in ampere-hours (Ah) or milliampere-hours (mAh). Specifically, the initial capacity value of each battery is measured through a standard charge and discharge test or cycle test. For example, the battery is charged to a set voltage or current, and then discharged to measure the amount of electricity that the battery can release under specific conditions.

[0062] Record the measurement data of each battery, including the initial resistance value, initial capacitance value, and initial capacity value. These measurement data can serve as the basis for subsequent analysis and modeling.

[0063] Step b2, performing multiple cycle charge and discharge tests on each battery, and collecting battery performance data in each test; wherein the performance data includes the corresponding test resistance and capacitance values, power data and test capacity values ​​after each preset number of cycles.

[0064] For example, multiple cycle charge and discharge test is a common test method for electrochemical energy storage batteries, which is designed to simulate the performance of batteries under actual use. Each test process includes multiple charge and discharge cycles to evaluate the stability and performance changes of the battery in long-term use.

[0065] The test resistance and capacitance values ​​are the product of the test resistance and the test capacitance values ​​measured after each cycle of charge and discharge test. Among them, the test resistance values ​​include polarization resistance R1 and battery resistance R2. Polarization resistance R1 refers to the resistance change caused by electrochemical reaction during the charge and discharge process of the battery, which can be measured by techniques such as AC impedance spectroscopy analysis, reflecting the electrochemical response between the electrolyte and the electrode of the electrochemical energy storage battery under different charge states. Battery resistance R2 is the resistance inside the electrochemical energy storage battery under actual working conditions, including the overall resistance composed of electrodes, electrolytes, electrolytes, etc. during charge and discharge. The test capacitance values ​​include battery capacitance C1 and polarization capacitance C2. Battery capacitance C1 is the amount of charge that the sample electrochemical energy storage battery can store under charge, which can be obtained by measuring the charge curve of the electrochemical energy storage battery or a capacitance meter. Polarization capacitance C2 refers to the capacitance change formed by electrochemical reaction during the charge and discharge process of the electrochemical energy storage battery, reflecting the charge distribution of the electrolyte and electrode interface of the electrochemical energy storage battery under different charge states. Specifically, the test resistance and capacitance values ​​are determined after determining the polarization resistance value R1, battery resistance value R2, battery capacitance value C1 and polarization capacitance value C2 after each cycle charge and discharge test. Calculated by the formula.

[0066] The test capacity value is the battery capacity measured after each cyclic charge and discharge test. The charge data is used to calculate the energy storage and conversion efficiency of the electrochemical energy storage battery under different charge and discharge states. For example, it can be the battery voltage data measured in each cyclic charge and discharge test. The preset number of cycles is the number of cycles or repetitions expected to be performed at the beginning of the measurement. Specifically, after each preset number of cycles, the resistance and capacitance values ​​of the electrochemical energy storage battery will be measured and recorded, that is, the test resistance and capacitance values. The test resistance and capacitance values ​​can help analyze the electrochemical characteristics of the electrochemical energy storage battery under different charge and discharge states, such as internal resistance changes and charge storage capacity. In each cycle test, the voltage changes during the charge and discharge process of the battery are recorded. Measure the actual capacity of the electrochemical energy storage battery after each test, that is, the amount of charge that the battery can store.

[0067] For example, X electrochemical energy storage batteries are randomly selected and tested for N cycles. In each test process, after each M cycles, a genetic algorithm (GA) is used to process the resistance value R0, polarization resistance value R1, battery resistance value R2, battery capacitance value C1 and polarization capacitance value C2 of the X sample electrochemical energy storage batteries to obtain multiple groups of test resistance and capacitance values. Among them, X can be 5, N can be 500, and M can be 50, but they are not limited here.

[0068] Step b3, establishing a target relationship model between target resistance and capacitance values, target battery capacity and target cycle number according to the preset cycle number, initial resistance and capacitance values, initial capacity value, test resistance and capacitance values ​​and test capacity value.

[0069] The target relationship model is to establish a relationship or mathematical model between the target resistance and capacitance values, the target battery capacity and the target number of cycles through experimental data (preset number of cycles, initial resistance and capacitance values, initial capacity values, test resistance and capacitance values ​​and test capacity values). Among them, the target fitting relationship can be a mathematical equation, a statistical model or a machine learning model. Specifically, when the preset number of cycles, the initial resistance and capacitance values, the initial capacity values, the test resistance and capacitance values ​​and the test capacity values ​​are known, a mathematical model or statistical relationship is established to characterize the relationship between the target resistance and capacitance values, the target battery capacity and the target number of cycles.

[0070] Specifically, the above step b3 includes:

[0071] Step b31, establishing a first corresponding curve between the target battery capacity and the target cycle number according to the preset cycle number, the initial capacity value and the test capacity value.

[0072] The first corresponding curve refers to the relationship curve between capacity and cycle number, that is, the actual capacity change of the battery under different charge and discharge cycle numbers. Specifically, according to the preset cycle number, initial capacity value and test capacity value, a curve is established to describe the change of battery capacity with cycle number. Among them, the first corresponding curve can be used C ( t ) =C 0 × (1 -k×t ) to indicate, C ( t ) indicates that t The test capacity value after the cycle, C 0 is the initial capacity value, k is the decay rate, t is the number of cycles.

[0073] Step b32, establishing a second corresponding curve between target resistance and capacitance values ​​and target cycle times according to the preset cycle times, the initial resistance and capacitance values, and the test resistance and capacitance values.

[0074] The second corresponding curve refers to the relationship curve between resistance and capacitance and the number of cycles, which is used to describe the changes in resistance and capacitance of the battery under different charge and discharge cycle numbers. Specifically, according to the preset number of cycles, the initial resistance and capacitance values, and the test resistance and capacitance values, a curve is established to describe the changes in resistance and capacitance of the battery with the number of cycles. Among them, the second corresponding curve can be used RC ( t )= RC 0+ a × t To express, RC ( t ) indicates the t The test resistance and capacitance values ​​after the cycle are: RC 0 is the initial resistance and capacitance value, a It is the growth coefficient of resistance and capacitance value as the number of cycles increases.

[0075] Step b33, establishing a third corresponding curve between the target battery capacity and the target resistance and capacitance values ​​according to the test capacity value and the test resistance and capacitance values.

[0076] The third corresponding curve describes the relationship between the resistance and capacitance values ​​and the actual capacity of the battery. Specifically, based on the test capacity value and the test resistance and capacitance values ​​obtained by the test, a curve is established to describe the relationship between the battery capacity and the resistance and capacitance values. Among them, the third corresponding curve can be used C=a 0 R 0+ a 1 R 1 2 + a 2 R 2 3 + a 3 to indicate that R 0 is the resistance value during the test, R 1 is the polarization resistance value during the test, R2 is the battery resistance value during the test, a 0. a 1. a 2. a 3 is a fitting parameter, wherein the fitting parameter can be obtained by using the least squares method or other optimization algorithms, which are not limited here.

[0077] Step b34, establishing an initial fitting relationship between the target resistance and capacitance values, the target battery capacity and the target number of cycles according to the first corresponding curve, the second corresponding curve and the third corresponding curve.

[0078] The initial fitting relationship is to preliminarily establish a quantitative relationship model between the target resistance and capacitance values, the target battery capacity and the target number of cycles. Specifically, the first corresponding curve, the second corresponding curve and the third corresponding curve are integrated to establish an initial fitting relationship between the target resistance and capacitance values, the target battery capacity and the target number of cycles to preliminarily predict the performance of the battery at different cycle numbers.

[0079] Step b35, extending the first corresponding curve according to the initial fitting relationship to obtain a fourth corresponding curve.

[0080] The fourth corresponding curve is obtained by extending the first corresponding curve, showing the change of battery capacity with the number of cycles predicted according to the initial fitting relationship until the capacity drops to the preset remaining battery capacity value. Specifically, the initial fitting relationship is used to predict the change of battery capacity when the number of cycles continues to increase, that is, the fourth corresponding curve.

[0081] In some optional implementations, the above step b35 includes:

[0082] (1) Get the preset remaining battery capacity value. The preset remaining battery capacity value is the initial capacity value set according to user settings or system requirements. C The product of 0 and a specific percentage, for example, the specific percentage can be 80%, which is the remaining battery capacity value C 1=0.8 C 0.

[0083] (2) Determine the first cycle number corresponding to the remaining battery capacity value according to the first corresponding curve. Determine the remaining battery capacity value according to the first corresponding curve, i.e., the relationship curve between battery capacity and cycle number. C 1 corresponds to the first cycle number t 1.

[0084] (3) Determine the correction resistance and capacitance values ​​corresponding to the first cycle number according to the second corresponding curve. Determine the first cycle number according to the second corresponding curve, i.e., the relationship curve between resistance and capacitance values ​​and the cycle number. t 1Corresponding correction resistor and capacitor value RC 1.

[0085] (4) Determine the correction capacitance value corresponding to the correction resistance capacitance value according to the third corresponding curve.

[0086] According to the third corresponding curve, i.e. the relationship curve between the resistance and capacitance value and the battery capacity, the correction resistance and capacitance value is determined. RC 1 corresponds to the corrected capacity value C 2.

[0087] (5) Calculate the average value of the remaining battery capacity value and the correction capacity value, and determine the second cycle number corresponding to the average value according to the first corresponding curve.

[0088] The remaining battery capacity value C 1 and the corrected capacity value C 2Average to get the corrected battery capacity C 3, namely C 3=( C 1+ C 2) / 2. According to the first corresponding curve, determine the corrected battery capacity C 3 corresponds to the second cycle number t2.

[0089] (6) Modify the first corresponding curve according to the second cycle number and the average value to obtain the fourth corresponding curve. t 2 and average C 3. The first corresponding curve is modified to reconstruct a new capacity-cycle number curve, namely the fourth corresponding curve, so that the change of the remaining capacity of the battery with time and cycle number can be more accurately predicted.

[0090] In the above implementation, by gradually correcting and calculating the remaining battery capacity value, the correction capacity value and other parameters, a more accurate prediction of the remaining battery life can be provided. At the same time, by calculating the average value and feeding it back to the first corresponding curve, the accuracy of the prediction is further improved. A cyclic feedback mechanism is adopted, that is, the first corresponding curve is readjusted according to the calculated average value. This feedback mechanism can ensure that the prediction model has better adaptability and stability in practical applications and can more accurately reflect the actual use of the battery.

[0091] Step b36, establishing a target relationship model according to the second corresponding curve, the third corresponding curve and the fourth corresponding curve.

[0092] The second corresponding curve, the third corresponding curve and the fourth corresponding curve are combined to establish a target system model, that is, a mapping relationship between the capacity, the number of cycles and the resistance and capacitance values ​​of the battery.

[0093] Step S202: Determine the target number of cycles for each battery under the target battery capacity condition based on the relationship models corresponding to different batteries and the target battery capacity. Figure 1 Step S102 of the illustrated embodiment will not be described in detail here.

[0094] Step S203: Determine multiple target data sequences of the corresponding batteries based on the relationship model of each battery, where the target data sequences include multiple capacity data and cycle number data corresponding to each capacity data. Figure 1 Step S103 of the illustrated embodiment will not be described in detail here.

[0095] Specifically, the above step S203 includes:

[0096] Step S2031 , determining a plurality of target data sequences corresponding to the battery based on a time window of a preset length and a relationship model of each battery.

[0097] Exemplarily, in an embodiment of the present application, battery capacity sequence data at different cycle numbers within a range of 100% to 80% can be determined based on a relationship model of each battery, and battery capacity sequence data at different cycle numbers within a range of 100% to 80% can be divided based on a time window of a preset length to obtain multiple target data sequences for the corresponding battery.

[0098] Step S204, associate multiple target data sequences of each first type battery with the first tag, and associate multiple target data sequences of each second type battery with the second tag, to obtain an associated data set, where the first type battery is used to characterize batteries whose target cycle number is greater than or equal to the expected cycle number, and the second type battery is used to characterize batteries whose target cycle number is less than the expected cycle number. For details, please refer to Figure 1 Step S104 of the illustrated embodiment will not be described in detail here.

[0099] Step S205: Use the associated data set to train the preset machine learning model until the model accuracy meets the preset conditions, thereby obtaining a battery life evaluation model. Figure 1 Step S103 of the illustrated embodiment will not be described in detail here.

[0100] In this embodiment, a battery life evaluation method is provided, which can be used for a server. Figure 3 is a flow chart of a battery life evaluation method according to an embodiment of the present invention. Figure 3 As shown, the process includes the following steps:

[0101] Step S301, obtaining a target data sequence of a battery to be evaluated, wherein the target data sequence includes a plurality of capacity data and cycle number data corresponding to each capacity data.

[0102] Exemplarily, the target data sequence of the battery to be evaluated can be obtained through battery testing.

[0103] Step S302, inputting the target data sequence into a battery life evaluation model so that the battery life evaluation model outputs a life evaluation result of the battery to be evaluated. The battery life evaluation model is constructed by the battery life evaluation model construction method in the above embodiment.

[0104] Exemplarily, in an embodiment of the present application, the target data sequence is input into a battery life assessment model, and the model outputs corresponding label information. The label information can characterize whether the battery to be evaluated meets the expected number of cycles, and the life assessment result of the battery to be evaluated can be determined through the label information.

[0105] The battery life evaluation model construction method and the battery life evaluation method provided by the present invention are described below through a specific embodiment.

[0106] Example:

[0107] 1. Test the initial RC and other impedance values ​​of the battery;

[0108] 2. Randomly select X (e.g., 10) batteries and test them for N cycles (e.g., 100 to 500 times), where a series of data containing multiple groups of RC values ​​(i.e., a multidimensional vector formed by multiple impedance parameters, with an adjustable number of groups) is obtained every M cycles (e.g., 50 cycles) through a genetic algorithm (GA);

[0109] 3. According to the existing RC value-capacity-cycle number relationship diagram, fit and extend outward until the capacity reaches 80% of the initial capacity, and then any correlation between RC value-capacity-cycle number in the range of 100% to 80% can be obtained;

[0110] 4. Based on the correlation in step 3, they are divided into two groups according to the number of cycles, one group that can meet the expected cycle index L, and the other group that cannot meet L. If all batteries can meet L, please ask the battery manufacturer to provide the charge and discharge cycle data of Y (for example, 5) batteries that cannot meet L.

[0111] 5. Learning the cycle data of the first T cycles (e.g., 10) of the above battery by a labeled machine learning method;

[0112] 6. Based on the charge and discharge data of the first T cycles of the actual operating battery to be tested, the machine learning model trained in step 5 is used to determine whether the battery can meet the expected cycle index L.

[0113] In this embodiment, a battery life evaluation model construction device is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0114] This embodiment provides a battery life assessment model construction device, such as Figure 4 As shown, including:

[0115] A first acquisition module 401 is used to acquire relationship models corresponding to a plurality of different batteries, the relationship model is used to characterize the correlation between the battery capacity within a target range and the number of battery cycles, the battery capacity within the target range is determined according to the initial capacity of the battery, the battery capacity within the target range includes the target battery capacity, and the plurality of different batteries are batteries of the same type;

[0116] A first determination module 402 is used to determine a target number of cycles corresponding to each battery under a target battery capacity condition based on the relationship models corresponding to different batteries and the target battery capacity;

[0117] A second determination module 403 is used to determine a plurality of target data sequences corresponding to the battery based on the relationship model of each battery, wherein the target data sequence includes a plurality of capacity data and cycle number data corresponding to each capacity data;

[0118] An association module 404 is used to associate multiple target data sequences of each first type battery with the first tag, and associate multiple target data sequences of each second type battery with the second tag, to obtain an associated data set, wherein the first type battery is used to characterize batteries whose target cycle number is greater than or equal to the expected cycle number, and the second type battery is used to characterize batteries whose target cycle number is less than the expected cycle number;

[0119] The training module 405 is used to train the preset machine learning model using the associated data set until the model accuracy meets the preset conditions to obtain a battery life evaluation model.

[0120] In some optional implementations, the first acquisition module 401 includes:

[0121] An acquisition submodule is used to acquire test data corresponding to a plurality of batteries, wherein the test data includes capacity data corresponding to the batteries at different cycle times;

[0122] The construction submodule is used to construct a corresponding relationship model based on the capacity data corresponding to each battery in different cycle times.

[0123] In some optional implementations, the acquisition submodule includes:

[0124] An acquisition unit is used to obtain the target performance parameter values ​​corresponding to each battery at different cycle times and a pre-built target model, where the target model is used to characterize the correlation between the target performance parameter and the battery capacity;

[0125] The determination unit is used to determine the test data of the corresponding battery based on the target performance parameter values ​​and the target model corresponding to each battery at different cycle numbers.

[0126] In some optional implementations, the second determining module 403 includes:

[0127] The division submodule is used to determine multiple target data sequences corresponding to the battery based on a time window of a preset length and a relationship model of each battery.

[0128] This embodiment provides a battery life assessment model construction device, such as Figure 5 As shown, including:

[0129] The second acquisition module 501 is used to acquire a target data sequence of the battery to be evaluated, where the target data sequence includes a plurality of capacity data and cycle number data corresponding to each capacity data;

[0130] The evaluation module 502 is used to input the target data sequence into the battery life evaluation model so that the battery life evaluation model outputs the life evaluation result of the battery to be evaluated. The battery life evaluation model is constructed by the battery life evaluation model construction method of the above embodiment.

[0131] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.

[0132] The battery life assessment model building device and the battery life assessment device in this embodiment are presented in the form of functional units, where the units refer to ASIC (Application Specific Integrated Circuit) circuits, processors and memories that execute one or more software or fixed programs, and / or other devices that can provide the above functions.

[0133] The embodiment of the present invention also provides a computer device having the above Figure 4 The battery life evaluation model building device shown, or having the above Figure 5 The battery life evaluation device.

[0134] See also Figure 6 , Figure 6 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 6 As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 6 A processor 10 is taken as an example.

[0135] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.

[0136] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.

[0137] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0138] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.

[0139] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.

[0140] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.

[0141] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.

[0142] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A method for constructing a battery life evaluation model, characterized in that: The method comprises: Obtaining relationship models corresponding to a plurality of different batteries respectively, wherein the relationship models are used to characterize the correlation between the battery capacity within a target range and the number of battery cycles, wherein the battery capacity within the target range is determined according to the initial capacity of the battery, the battery capacity within the target range includes the target battery capacity, and the plurality of different batteries are batteries of the same type; Determine the target number of cycles corresponding to each battery under the target battery capacity condition based on the relationship models corresponding to different batteries and the target battery capacity; Determine a plurality of target data sequences corresponding to the battery based on the relationship model of each battery, wherein the target data sequences include a plurality of capacity data and cycle number data corresponding to each capacity data; Associating multiple target data sequences of each first type battery with a first tag, and associating multiple target data sequences of each second type battery with a second tag, to obtain an associated data set, wherein the first type battery is used to characterize batteries whose target cycle number is greater than or equal to the expected cycle number, and the second type battery is used to characterize batteries whose target cycle number is less than the expected cycle number; The preset machine learning model is trained using the associated data set until the model accuracy meets the preset conditions, thereby obtaining a battery life evaluation model; The steps of obtaining the relationship models corresponding to the multiple different batteries include: Acquire test data corresponding to a plurality of batteries, wherein the test data includes capacity data corresponding to the batteries at different cycle times; Building a corresponding relationship model based on the capacity data corresponding to each battery at different cycle times; The steps of obtaining test data corresponding to a plurality of batteries respectively include: Obtaining target performance parameter values ​​corresponding to each battery at different cycle times and a pre-built target model, wherein the target model is used to characterize the correlation between the target performance parameter and the battery capacity; The test data of the corresponding battery is determined based on the target performance parameter values ​​corresponding to each battery at different cycle times and the target model.

2. The method according to claim 1, characterized in that: The step of determining a plurality of target data sequences corresponding to the batteries based on the relationship model of each battery includes: A plurality of target data sequences corresponding to the battery are determined based on a time window of a preset length and the relationship model of each battery.

3. A battery life evaluation method, characterized in that: The method comprises: Acquire a target data sequence of a battery to be evaluated, wherein the target data sequence includes a plurality of capacity data and cycle number data corresponding to each capacity data; The target data sequence is input into a battery life assessment model so that the battery life assessment model outputs a life assessment result of the battery to be assessed. The battery life assessment model is constructed by the battery life assessment model construction method according to claim 1 or 2.

4. A battery life assessment model construction device, characterized in that: For executing the method according to claim 1, the device comprises: A first acquisition module is used to acquire relationship models corresponding to a plurality of different batteries, wherein the relationship models are used to characterize the correlation between the battery capacity within a target range and the number of battery cycles, wherein the battery capacity within the target range is determined according to the initial capacity of the battery, the battery capacity within the target range includes a target battery capacity, and the plurality of different batteries are batteries of the same type; A first determination module, configured to determine a target number of cycles corresponding to each battery under a target battery capacity condition based on relationship models corresponding to different batteries and the target battery capacity; A second determination module is used to determine a plurality of target data sequences of the corresponding battery based on the relationship model of each battery, wherein the target data sequence includes a plurality of capacity data and cycle number data corresponding to each capacity data; an association module, used to associate multiple target data sequences of each first type battery with a first tag, and associate multiple target data sequences of each second type battery with a second tag, to obtain an associated data set, wherein the first type battery is used to characterize batteries whose target cycle number is greater than or equal to the expected cycle number, and the second type battery is used to characterize batteries whose target cycle number is less than the expected cycle number; The training module is used to train the preset machine learning model using the associated data set until the model accuracy meets the preset conditions to obtain a battery life evaluation model.

5. A battery life evaluation device, characterized in that: The device comprises: A second acquisition module is used to acquire a target data sequence of the battery to be evaluated, wherein the target data sequence includes a plurality of capacity data and cycle number data corresponding to each capacity data; An evaluation module is used to input the target data sequence into a battery life evaluation model so that the battery life evaluation model outputs a life evaluation result of the battery to be evaluated. The battery life evaluation model is constructed by the battery life evaluation model construction method described in claim 1 or 2.

6. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the battery life assessment model construction method described in claim 1 or 2, or executes the battery life assessment method described in claim 3 by executing the computer instructions.

7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the battery life assessment model construction method described in claim 1 or 2, or execute the battery life assessment method described in claim 3.

8. A computer program product, characterized in that The invention comprises computer instructions, wherein the computer instructions are used to make a computer execute the battery life assessment model construction method described in claim 1 or 2, or execute the battery life assessment method described in claim 3.

Citation Information

Patent Citations

  • Method for predicting cycle life of battery pack for electric car

    CN104714189A

  • Battery life prediction method, device and equipment

    CN114545272A