A method of economic operation within a plant under the coordination demand of source and network

By integrating the grid-side rotational inertia demand into the hydropower unit start-up and shutdown plan and adjusting the operating mode in real time, combined with the artificial bee colony algorithm to optimize load distribution, the problem of insufficient demand for grid frequency stability in the traditional hydropower station operation mode is solved, and a more efficient power grid is achieved. It has the effect of balancing frequency stability support with economy and safety.

CN118611183BActive Publication Date: 2024-10-22THREE GORGES GROUP IND DEVELOPMENT (BEIJING) CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411079754.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-10-22
Estimated Expiration
2044-08-07

AI Technical Summary

Technical Problem

When faced with the demand for grid frequency stability under the new energy system, the traditional hydropower station operation model lacks effective coordination measures, resulting in high construction costs for energy storage facilities and difficulty in fundamentally solving the problem, and the ability to support grid frequency stability is not fully exploited.

Method used

By integrating the grid-side rotational inertia requirements into the hydropower unit start-up and shutdown plan, and adjusting the unit operating mode in real time, combined with the artificial bee colony algorithm to optimize load distribution, the grid frequency stability needs are met while taking into account the economy and safety of the hydropower station.

Benefits of technology

It achieves more effective grid frequency stability support under the new energy system, improves the safe and stable operation of the grid, reduces operating costs, and adapts to the operating mode in the context of large-scale new energy grid integration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118611183B_ABST
    Figure CN118611183B_ABST
Patent Text Reader

Abstract

The present invention provides a method for economic operation within a plant under the coordination demand of the source and the network, comprising the following steps: S1, formulating the start-up and shutdown plan of the units within the plant the day before; S2, obtaining the load distribution mode of each unit within the plant the day before; S3, updating the start-up and shutdown plan of the units within the plant; S4, updating the load distribution mode of each unit within the plant during the remaining period. This scheduling method integrates the grid-side moment of inertia demand into the preparation of the start-up and shutdown plan of the hydropower units, and further reflects it in the economic operation within the plant, and considers the emergency situation of the change of the grid-side moment of inertia, and adjusts the unit operation mode in real time, meeting the grid-side demand for frequency stability while taking into account the economy, safety and other requirements of the source side of the hydropower station; the plant operation plan obtained by this method is more able to adapt to the new energy system operation mode under the background of large-scale new energy continuously fed into the power grid, and has a wider range of advantages.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of economic operation dispatching of hydropower stations, and relates to an in-plant economic operation method under the coordination demand of source and network. Background Art

[0002] As one of the core tasks of hydropower station power production, economic operation in the plant is not only related to the economic benefits of the hydropower station, but also a key measure to improve the efficiency of water resource utilization, and an important link in the safe and stable operation of the power grid. Its core content is to achieve economic and reasonable load distribution among the units in the plant according to the load instructions issued by the superior dispatching agency, combined with the operating characteristics and economic operation rules of the units in the plant. This process requires comprehensive consideration of the operating cost, efficiency, maintenance cycle of the units and the overall needs of the power grid, in order to achieve the best economic benefits and resource allocation.

[0003] In the traditional hydropower station operation mode, the economic operation of the plant mainly considers the economy and safety of the operation mode from the perspective of the station, and mainly focuses on tracking the active load instructions issued by the superior dispatching agency, while insufficient consideration is given to the grid side's demand for frequency stability and support inertia. With the rapid development of the power market and the continuous optimization of the energy structure, especially in recent years, the large-scale development and grid connection of new energy such as wind and solar energy, the grid's demand for frequency stability is increasing. In this context, the power system pays more attention to the coordination between the power generation side and the grid side, and the importance of source-grid coordination is becoming increasingly prominent.

[0004] In order to meet the grid frequency stability requirements faced by the development of new energy systems, the main measure currently taken is to equip flexible energy storage to participate in grid regulation, thereby improving the safety and stability support capabilities. However, due to the high cost, poor safety performance, high geographical requirements, and long construction period of energy storage facilities, it is difficult to fundamentally solve the above problems by simply building supporting energy storage facilities. my country's power system has a solid hydropower energy foundation. If the operation mode of hydropower stations can be optimized by optimizing operation means, and the support capacity of hydropower station operation for grid frequency stability can be tapped, the safe and stable operation level of the grid will be greatly improved. Summary of the invention

[0005] The purpose of the present invention is to provide an in-plant economic operation method under the source-grid coordination demand. This scheduling method integrates the grid-side rotational inertia demand into the preparation of the hydropower unit start-up and shutdown plan, and further reflects it in the in-plant economic operation. In addition, the emergency situation of the grid-side rotational inertia change is considered, and the unit operation mode is adjusted in real time to meet the grid-side demand for frequency stability while taking into account the economy, safety and other requirements of the source side of the hydropower station. The in-plant operation plan obtained by this method is more adaptable to the new energy system operation mode under the background of large-scale new energy continuously fed into the power grid, and has a wider range of advantages.

[0006] In order to realize the above technical features, the object of the present invention is achieved as follows: a method for economic operation within a plant under source-network coordination requirements, comprising the following steps:

[0007] S1, formulate the start-up and shutdown plan of the units in the plant in the near future:

[0008] According to the predicted load and rotational inertia grid demand for the next day, combined with the start and stop status of the units at the station side, the start and stop plan of the units in the plant on the day before is determined;

[0009] S2, obtain the load distribution mode of each unit in the plant on the previous day:

[0010] According to the predicted load demand for the next day, combined with the start-up and shutdown plan of the units in the plant determined the day before, the load distribution method of each unit in the plant on the day before is determined according to the mathematical model of economic load distribution;

[0011] S3, update the start-up and shutdown plan of the units in the plant:

[0012] According to the real-time moment of inertia demand issued by the grid side, the start-up and shutdown plans of the units in the plant are checked in real time to see if they meet the moment of inertia requirements of the grid side, and additional startable units are added when there is a shortage;

[0013] S4, update the load distribution mode of each unit in the plant during the remaining period:

[0014] According to the predicted load demand for the next day, combined with the updated start-up and shutdown plan of the units in the plant on the day before, the load distribution method of each unit in the plant on the day before is updated according to the economic load distribution mathematical model.

[0015] Preferably, the S1 specifically includes:

[0016] S1-1, determine the combination type of starting units:

[0017] According to the maintenance plan of the station units, the units that can be started are obtained; at the same time, according to the grid-side load plan and the principle that the sum of the rated powers of the starting units is greater than the load requirement, the combination type of the starting units is determined;

[0018] S1-2, determine the start and stop plan of the unit on the day before:

[0019] According to the grid-side rotational inertia demand, the starting unit combination types that meet the conditions are screened out. Among the starting unit combination types that meet the conditions, the unit start-up types that meet the conditions are further screened based on the unit start-up and shutdown time constraints, and the units are sorted according to their water consumption rates. Based on the principle of minimizing the number of units started, the unit start-up and shutdown plans for the day before are determined.

[0020] Preferably, the specific formula in S1-1 according to the principle that the sum of the rated powers of the starting units is greater than the load requirement is:

[0021] ;

[0022] Where: n is the number of starting units; For the i Rated power of each unit; is the required load power.

[0023] Preferably, S2 specifically includes:

[0024] S2-1, construct economic load dispatch model:

[0025] On the basis of the start and stop of the units determined by S1-2 on the previous day, under the premise of given load and taking the minimum water consumption as the goal, a mathematical model of economic load distribution among the units in operation of the hydropower station is constructed;

[0026] S2-2, optimize and solve to obtain the unit load distribution plan:

[0027] The artificial bee colony algorithm is used to solve the mathematical model of economic load dispatch established in S2-1.

[0028] Preferably, the economic load distribution mathematical model in S2-1, that is, the objective function is:

[0029] ;

[0030] Where: is the objective function; T is the number of time periods; K is the number of units; for t Time period k Downflow flow of each unit; is the time period granularity; for t Time period k The start and stop status of each unit. =1, it means power on. =0, it means shutdown; It is the power-on loss; For downtime loss.

[0031] Preferably, the constraints of the economic load distribution mathematical model include: active power balance limit, vibration zone avoidance requirement, downstream flow limit, reservoir capacity limit, continuity equation, water balance equation and unit start and stop limit;

[0032] The active power balance limit is:

[0033] ;

[0034] Avoid vibration zone requirements:

[0035] ;

[0036] Downflow flow limit:

[0037] ;

[0038] Reservoir capacity limit:

[0039] ;

[0040] Continuity equation and water balance equation:

[0041] ;

[0042] Unit start and stop restrictions:

[0043] ;

[0044] Where: The next day for the hydroelectric power station t Time period planned output; for k Unit No. j Vibration zone data; , They are k Unit No. j The upper and lower boundaries of the vibration zone; For hydropower station t Discharge flow rate during the period; , Hydropower Station t Minimum and maximum values ​​of the discharge flow during a period; , Hydropower Station t Minimum and maximum reservoir capacity during a period; For hydropower station t Discarded water flow during the period; for t Inbound flow during time period; for t Reservoir capacity at the beginning of the time period; , Indicates the unit k Minimum start and stop time.

[0045] Preferably, the S2-2 using the artificial bee colony algorithm to solve the objective function specifically includes the following four stages:

[0046] Initialization phase:

[0047] ;

[0048] Where: For the i Honey source d The value of the dimension, d =1, 2, …, D ; D is the dimension of the solution space; is a random number that follows a uniform distribution on (0,1); and The potential solutions are d The upper and lower limits of the dimension value;

[0049] Hired bee stage:

[0050] ;

[0051] Where: For honey source i The fitness value of For honey source i The objective function value of the corresponding solution;

[0052] Observation bee stage:

[0053] ;

[0054] ;

[0055] Where: To observe bees follow the j The probability of hiring a bee; is the number of nectar sources; is a random number that follows a uniform distribution on [-1,1]; The randomly selected k Honey source d The value of the dimension; For updated value;

[0056] Scout Bee Phase:

[0057] Randomly search for new nectar sources;

[0058] Taking the output vector of each unit as the nectar source, the initial solution is randomly generated in the feasible output of the unit, and the artificial bee colony algorithm is used for optimization and solution, and finally the optimal load distribution plan is obtained.

[0059] Preferably, S3 specifically includes:

[0060] S3-1, determine the number of units to be started based on the grid-side rotation inertia:

[0061] In an emergency, the power grid will adjust the rotation inertia demand in real time according to the power grid operation status, thereby issuing an order to increase the rotation inertia in the future, and combining the operating parameter information of the units that can be started to determine the number of additional units that need to be started;

[0062] S3-2, update the start-up and shutdown schedule of the units in the plant:

[0063] For each operating time period with new startup needs, the units that can be started will be sorted from small to large according to the water consumption rate, and the first few units with a ranking equal to the number of new startups will be selected as the startup arrangements. Based on the previous unit start-up and shutdown plans, the start-up and shutdown arrangements of the units in the plant will be updated.

[0064] Preferably, S4 specifically includes:

[0065] S4-1, Construction of the economic operation model of the remaining period:

[0066] Based on the start-up and shutdown of the in-plant units updated in S3-2, under the premise of given remaining period load and taking the minimum water consumption as the goal, a mathematical model of economic load distribution among the hydropower station start-up units in the remaining period is constructed;

[0067] S4-2, model solution:

[0068] The artificial bee colony algorithm in S2-2 is used to optimize and solve the unit load distribution plan.

[0069] Preferably, the mathematical model of economic load distribution among the operating units of the hydropower station during the remaining period constructed in S4-1 is specifically:

[0070] ;

[0071] Where: is the objective function; T is the number of remaining stay periods; K is the number of units; for t Time period k Downflow flow of each unit; is the time period granularity; for t Time period k The start and stop status of each unit. =1, it means power on. =0, it means shutdown; It is the power-on loss; For downtime loss.

[0072] The present invention has the following beneficial effects:

[0073] 1. This method incorporates the grid-side rotational inertia demand into the preparation of the hydropower unit start-up and shutdown plan, and further reflects it in the economic operation of the plant. In addition, it considers the emergency situation of the grid-side rotational inertia change and adjusts the unit operation mode in real time to meet the grid-side demand for frequency stability while taking into account the economy, safety and other needs of the source side of the hydropower station.

[0074] 2. The in-plant operation plan obtained by the method of the present invention is more adaptable to the new energy system operation mode under the background of large-scale new energy continuously fed into the power grid, and has more extensive advantages. BRIEF DESCRIPTION OF THE DRAWINGS

[0075] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0076] Figure 1 It is a schematic diagram of the overall process of the present invention.

[0077] Figure 2 It is a comparison diagram of the moment of inertia provided by the method of the present invention and the minimum water quantity model in Example 2 of the present invention. DETAILED DESCRIPTION

[0078] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0079] Embodiment 1:

[0080] See also Figure 1 , a method for economic operation within a plant under the coordination demand of a source network, comprising the following steps:

[0081] S1, formulate the start-up and shutdown plan of the units in the plant in the near future:

[0082] According to the predicted load and rotational inertia grid demand for the next day, combined with the start and stop status of the units at the station side, the start and stop plan of the units in the plant on the day before is determined;

[0083] S2, obtain the load distribution mode of each unit in the plant on the previous day:

[0084] According to the predicted load demand for the next day, combined with the start-up and shutdown plan of the units in the plant determined the day before, the load distribution method of each unit in the plant on the day before is determined according to the mathematical model of economic load distribution;

[0085] S3, update the start-up and shutdown plan of the units in the plant:

[0086] According to the real-time moment of inertia demand issued by the grid side, the start-up and shutdown plans of the units in the plant are checked in real time to see if they meet the moment of inertia requirements of the grid side, and additional startable units are added when there is a shortage;

[0087] S4, update the load distribution mode of each unit in the plant during the remaining period:

[0088] According to the predicted load demand for the next day, combined with the updated start-up and shutdown plan of the units in the plant on the day before, the load distribution method of each unit in the plant on the day before is updated according to the economic load distribution mathematical model.

[0089] Embodiment 2:

[0090] See also Figure 1 , a method for economic operation within a plant under the coordination demand of a source network, comprising the following steps:

[0091] S1, formulate the start-up and shutdown plan of the units in the plant in the day before;

[0092] S1-1, determine the combination type of starting units:

[0093] According to the maintenance plan of the station units, the units that can be started are obtained; at the same time, according to the grid-side load plan and the principle that the sum of the rated powers of the starting units is greater than the load requirement, the combination type of the starting units is determined;

[0094] In S1-1, the specific formula is as follows:

[0095] ;

[0096] Where: n is the number of starting units; For the i Rated power of each unit; is the required load power;

[0097] S1-2, determine the start and stop plan of the unit on the day before:

[0098] According to the grid-side rotational inertia demand, the starting unit combination types that meet the conditions are screened out. Among the starting unit combination types that meet the conditions, the unit start-up types that meet the conditions are further screened based on the unit start-up and shutdown time constraints, and the units are sorted according to their water consumption rates. Based on the principle of minimizing the number of units started, the unit start-up and shutdown plans for the day before are determined.

[0099] S2, obtain the load distribution mode of each unit in the plant on the previous day;

[0100] S2-1, construct economic load dispatch model:

[0101] On the basis of the start and stop of the units determined by S1-2 on the previous day, under the premise of given load and taking the minimum water consumption as the goal, a mathematical model of economic load distribution among the units in operation of the hydropower station is constructed;

[0102] S2-2, optimize and solve to obtain the unit load distribution plan:

[0103] The artificial bee colony algorithm is used to solve the mathematical model of economic load dispatch established in S2-1.

[0104] Furthermore, the economic load dispatch mathematical model in S2-1, i.e. the objective function, is:

[0105] ;

[0106] Where: is the objective function; T is the number of time periods; K is the number of units; for t Time period k Downflow flow of each unit; is the time period granularity; for t Time period k The start and stop status of each unit. =1, it means power on. =0, it means shutdown; It is the power-on loss; Downtime loss;

[0107] Furthermore, the constraints of the economic load distribution mathematical model include:

[0108] Active power balance limit, vibration zone avoidance requirement, downstream flow limit, reservoir capacity limit, continuity equation, water balance equation and unit start and stop limit;

[0109] in,

[0110] 1) Active power balance limitation:

[0111] ;

[0112] 2) Avoid vibration zone requirements:

[0113] ;

[0114] 3) Downflow flow limit:

[0115] ;

[0116] 4) Reservoir capacity limit:

[0117] ;

[0118] 5) Continuity equation and water balance equation:

[0119] ;

[0120] 6) Unit start and stop restrictions:

[0121] ;

[0122] Where: The next day for the hydroelectric power station t Time period planned output; for k Unit No. j Vibration zone data; , They are k Unit No. j The upper and lower boundaries of the vibration zone; For hydropower station t Discharge flow rate during the period; , Hydropower Station t Minimum and maximum values ​​of the discharge flow during a period; , Hydropower Station t Minimum and maximum reservoir capacity during a period; For hydropower station t Discarded water flow during the period; for t Inbound flow during time period; for t Reservoir capacity at the beginning of the time period; , Indicates the unit k Minimum start and stop time.

[0123] Furthermore, the bee colony algorithm in S2-2 adopts an artificial bee colony algorithm, and using the artificial bee colony algorithm to solve the objective function specifically includes the following four stages:

[0124] Initialization phase:

[0125] ;

[0126] Where: For the i Honey source d The value of the dimension, d =1, 2, …, D ; D is the dimension of the solution space; is a random number that follows a uniform distribution on (0,1); and The potential solutions are d The upper and lower limits of the dimension value;

[0127] Hired bee stage:

[0128] ;

[0129] Where: For honey source i The fitness value of For honey source i The objective function value of the corresponding solution;

[0130] Observation bee stage:

[0131] ;

[0132] ;

[0133] Where: To observe bees follow the j The probability of hiring a bee; is the number of nectar sources; is a random number that follows a uniform distribution on [-1,1]; The randomly selected k Honey source d The value of the dimension; For updated value;

[0134] Scout Bee Phase:

[0135] Randomly search for new nectar sources;

[0136] Taking the output vector of each unit as the nectar source, the initial solution is randomly generated in the feasible output of the unit, and the artificial bee colony algorithm is used for optimization and solution, and finally the optimal load distribution plan is obtained.

[0137] S3, update the start-up and shutdown plan of the units in the plant;

[0138] S3-1, determine the number of units to be started based on the grid-side rotation inertia:

[0139] In an emergency, the power grid will adjust the rotation inertia demand in real time according to the power grid operation status, thereby issuing an order to increase the rotation inertia in the future, and combining the operating parameter information of the units that can be started to determine the number of additional units that need to be started;

[0140] S3-2, update the start-up and shutdown schedule of the units in the plant:

[0141] For each operating time period with new startup needs, the units that can be started will be sorted from small to large according to the water consumption rate, and the first few units with a ranking equal to the number of new startups will be selected as the startup arrangements. Based on the previous unit start-up and shutdown plans, the start-up and shutdown arrangements of the units in the plant will be updated.

[0142] S4, updating the load distribution mode of each unit in the plant during the remaining period;

[0143] S4-1, Construction of the economic operation model of the remaining period:

[0144] Based on the start-up and shutdown of the in-plant units updated in S3-2, under the premise of given remaining period load and taking the minimum water consumption as the goal, a mathematical model of economic load distribution among the hydropower station start-up units in the remaining period is constructed;

[0145] S4-2, model solution:

[0146] The artificial bee colony algorithm in S2-2 is used to optimize and solve the unit load distribution plan.

[0147] Furthermore, the mathematical model of economic load distribution among the operating units of the hydropower station during the remaining period constructed in S4-1 is specifically:

[0148] ;

[0149] Where: is the objective function; T is the number of remaining stay periods; K is the number of units; for t Time period k Downflow flow of each unit; is the time period granularity; for t Time period k The start and stop status of each unit. =1, it means power on. =0, it means shutdown; It is the power-on loss; For downtime loss.

[0150] Embodiment 3:

[0151] This embodiment provides a comparison table 1 of specific data on the moment of inertia, number of units started and stopped, and downstream flow rate of this method and the traditional water consumption minimum model.

[0152] Table 1 Comparison results between the method of the present invention and the model with minimum water consumption

[0153] See Table 1 and Figure 2 In an emergency, in order to meet the frequency stability requirements of the power grid, the rotational inertia requirement increases. Although the water consumption of the minimum water consumption model is less than that of this method, it is difficult to meet the inertia requirement. The invented method can adjust the load distribution mode in real time according to the rotational inertia requirement. Considering safety and economy, this method has advantages.

Claims

1. A method for economic operation within a plant under the coordination requirements of source and network, characterized in that: The following steps are involved: S1, formulate the start-up and shutdown plan of the units in the plant in the near future: According to the predicted load and rotational inertia grid demand for the next day, combined with the start and stop status of the units at the station side, the start and stop plan of the units in the plant on the day before is determined; S2, obtain the load distribution mode of each unit in the plant on the previous day: According to the predicted load demand for the next day, combined with the start-up and shutdown plan of the units in the plant determined the day before, the load distribution method of each unit in the plant is determined according to the mathematical model of economic load distribution; S3, update the start-up and shutdown plan of the units in the plant: According to the real-time moment of inertia demand issued by the grid side, the start-up and shutdown plans of the units in the plant are checked in real time to see if they meet the moment of inertia requirements of the grid side, and additional startable units are added when there is a shortage; S4, update the load distribution method of each unit in the plant during the remaining period: Based on the predicted load demand for the next day and the updated start-up and shutdown plan of the units in the plant, the load distribution mode of each unit in the plant is updated according to the economic load distribution mathematical model; The S1 specifically includes: S1-1, determine the combination type of starting units: According to the maintenance plan of the station units, the units that can be started are obtained; at the same time, according to the grid-side load plan and the principle that the sum of the rated powers of the starting units is greater than the load requirement, the combination type of the starting units is determined; S1-2, determine the start and stop plan of the unit on the day before: According to the grid-side rotation inertia demand, the starting unit combination types that meet the conditions are screened out. Among the starting unit combination types that meet the conditions, the unit start-up and shutdown time constraints are used to further screen the qualified unit start-up types, and the units are sorted according to the water consumption rate. Based on the principle of the minimum number of units to be started, the start-up and shutdown plan of the units on the day before is determined; In S1-1, the specific formula is as follows: ; Where: n is the number of starting units; For the i Rated power of each unit; is the required load power; The S2 specifically includes: S2-1, construct economic load dispatch model: On the basis of the start and stop of the units determined by S1-2 on the previous day, under the premise of given load and taking the minimum water consumption as the goal, a mathematical model of economic load distribution among the units in operation of the hydropower station is constructed; S2-2, optimize and solve to obtain the unit load distribution plan: The artificial bee colony algorithm is used to solve the mathematical model of economic load dispatch established in S2-1; The mathematical model of economic load distribution in S2-1, i.e. the objective function, is: ; Where: is the objective function; T is the number of time periods; K is the number of units; for t Time period k Downflow flow of each unit; is the time period granularity; for t Time period k The start and stop status of each unit. =1, it means power on. =0, it means shutdown; It is the power-on loss; Downtime loss; The constraints of the mathematical model of economic load dispatch include: active power balance limit, requirement to avoid vibration zone, discharge flow limit, reservoir capacity limit, continuity equation, water balance equation and unit start-stop limit; The active power balance limit is: ; Avoid vibration zone requirements: ; Downflow flow limit: ; Reservoir capacity limit: ; Continuity equation and water balance equation: ; Unit start and stop restrictions: ; Where: The next day for the hydroelectric power station t Time period planned output; for k Unit No. j Vibration zone data; , They are k Unit No. j The upper and lower boundaries of the vibration zone; For hydropower station t Discharge flow rate during the period; , Hydropower Station t Minimum and maximum values ​​of the discharge flow during a period; , Hydropower Station t Minimum and maximum reservoir capacity during a period; For hydropower station t Discarded water flow during the period; for t Inflow flow during time period; for t Reservoir capacity at the beginning of the time period; , Indicates the unit k Minimum start and stop time; The S2-2 uses the artificial bee colony algorithm to solve the objective function, which specifically includes the following four stages: Initialization phase: ; Where: For the i Honey source d The value of the dimension, d =1, 2, …, D ; D is the dimension of the solution space; is a random number that follows a uniform distribution on (0,1); and The potential solutions are d The upper and lower limits of the dimension value; Hired bee stage: ; Where: For honey source i The fitness value of For honey source i The objective function value of the corresponding solution; Observation bee stage: ; ; Where: To observe bees follow the j The probability of hiring a bee; is the number of nectar sources; is a random number that follows a uniform distribution on [-1,1]; The randomly selected k Honey source d The value of the dimension; For updated value; Scout Bee Phase: Randomly search for new nectar sources; Taking the output vector of each unit as the honey source, the initial solution is randomly generated in the feasible output of the unit, and the artificial bee colony algorithm is used for optimization and solution, and finally the optimal load distribution plan is obtained; The S3 specifically includes: S3-1, determine the number of units to be started based on the grid-side rotation inertia: In an emergency, the power grid will adjust the rotation inertia demand in real time according to the power grid operation status, thereby issuing an order to increase the rotation inertia in the future, and combining the operating parameter information of the units that can be started to determine the number of additional units that need to be started; S3-2, update the start-up and shutdown schedule of the units in the plant: For each operating time period with new startup needs, the units that can be started will be sorted from small to large according to the water consumption rate, and the first few units with a ranking equal to the number of new startups will be selected as the startup arrangements. Based on the previous unit start-up and shutdown plans, the start-up and shutdown arrangements of the units in the plant will be updated.

2. The method for economic operation within a plant under the source-network coordination requirement according to claim 1, characterized in that: The S4 specifically includes: S4-1, Construction of the economic operation model of the remaining period: Based on the start-up and shutdown of the in-plant units updated in S3-2, under the premise of given remaining period load and taking the minimum water consumption as the goal, a mathematical model of economic load distribution among the hydropower station start-up units in the remaining period is constructed; S4-2, model solution: The artificial bee colony algorithm in S2-2 is used to optimize and solve the unit load distribution plan.

3. The method for economic operation within a plant under the source-network coordination requirement according to claim 2, characterized in that: The mathematical model of economic load distribution among the operating units of the hydropower station during the remaining period constructed in S4-1 is specifically: ; Where: is the objective function; T is the number of remaining stay periods; K is the number of units; for t Time period k Downflow flow of each unit; is the time period granularity; for t Time period k The start and stop status of each unit. =1, it means power on. =0, it means shutdown; It is the power-on loss; For downtime loss.