A utility tunnel and installation method for facilitating crossing of underground structures
By designing adjustment and fixing mechanisms, the problem of low installation efficiency when installing integrated utility tunnels across underground buildings has been solved, enabling flexible adjustment and stable installation of pipelines, and adapting to complex construction environments.
CN118621836BActive Publication Date: 2026-07-24SHANDONG JIANZHU UNIV
View PDF 2 Cites 0 Cited by
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- SHANDONG JIANZHU UNIV
- Filing Date
- 2024-06-12
- Publication Date
- 2026-07-24
Smart Images

Figure CN118621836B_ABST
Abstract
The application discloses a kind of comprehensive pipe gallery and installation method for facilitating across underground building, comprising: bottom plate, the top of bottom plate is fixedly connected with four fixed blocks, between every two fixed blocks, side plate is fixedly connected, the bottom of cover plate is fixedly connected to the top of two side plates;Adjusting mechanism, adjusting mechanism is commonly provided with multiple, each adjusting mechanism includes fixed component, adjusting component, clamping component, latching component and four groups of limiting components, fixed component is arranged on side plate, by the setting of adjusting mechanism, the height and angle of adjusting block can be adjusted according to actual situation, then the position of adjusting connecting block is adjusted, and different specifications of pipeline are fixed, the pipeline in comprehensive pipe gallery can be installed flexibly, by abutting to the fixed hole on the side of two bottom plates by moving clamp block, by rotating mounting rod, by transmission, so that the angle between two bottom plates can be adjusted, and the comprehensive pipe gallery can be conveniently installed across underground building.
Need to check novelty before this filing date? Find Prior Art