A drilling method for deep geological storage well

By installing a transition device and a preset filter at the wellhead, the problem of corrosion and blockage of the wellhead device by mine water is solved, the safe input of mine water and solid-liquid separation are achieved, the life of the equipment is extended, and the operational reliability of the storage well is improved. sex.

CN118622157BActive Publication Date: 2024-10-18GENERAL PROSPECTING INSTITUTE OF CHINA NATIONAL ADMINISTRATION OF COAL GEOLOGY
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411080806.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-10-18
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

The high salt content, high hardness and suspended particulate matter in mine water in coal mining areas pose threats to the pressure resistance and service life of wellhead devices, causing sealing wells to be prone to clogging and corrosion problems during the water injection process.

Method used

A drilling method for deep geological storage wells is designed, which includes installing a transition device and a preset filter screen and interception groove at the wellhead. The transition channel and flushing pipe are used to achieve safe input of mine water and solid-liquid separation to avoid blockage and corrosion.

Benefits of technology

It effectively avoids clogging and corrosion problems at the wellhead, extends the service life of the equipment, realizes safe input and in-situ utilization of mine water, and improves the operational reliability of the storage well.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118622157B_ABST
    Figure CN118622157B_ABST
Patent Text Reader

Abstract

The present invention relates to a drilling method for a deep geological sealing well, comprising: the sealing well comprises a plurality of wellbores, a filter screen and an interception groove are preset in the uppermost wellbore for in-situ utilization of mine water flowing in the sealing well; drilling downward from the ground, drilling out a first well section and a second well section in sequence, the diameter of the first well section being larger than the diameter of the second well section; installing the wellbore of the sealing well into the second well section, the wellbore is installed all the way to the ground, the top of the uppermost wellbore is above the ground, and is used to connect a pipeline for conveying mine water; installing a pumping pipe in the first well section, the bottom end of the pumping pipe passes through the side wall of the uppermost wellbore and extends into the interception groove, and the top end extends to a water storage tank on the ground; installing a transition device between the wellhead of the sealing well and the pipe mouth of the pipeline for conveying mine water, so that the mine water flows through a transition channel in the transition device; the water storage tank is connected to the transition device via a flushing pipe, the flushing pipe passes through the outer shell of the transition device and the transition channel, and flushes the inside of the transition channel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of sealing well drilling, and in particular relates to a drilling method for a deep geological sealing well. Background Art

[0002] A large amount of mine water is produced in coal mining areas. The mine water contains impurities such as high salt, high hardness and suspended particles, which will pose a great threat to coal mining and the safety of miners. In order to solve this problem, deep geological sealing method is a method of treating mine water. By drilling a sealing well that directly reaches the deep stratum, the mine water is injected into the deep stratum to avoid pollution of the ground environment. The mine water is injected into the wellhead of the sealing well through the ground transmission pipeline and pressure devices, pumps and other pipes, and then input into the sealing well from the wellhead. The wellhead device is a key component of the sealing well. Its working principle is to serve as an important device connecting the pump station pipeline and the sealing well. It plays an important role in bearing water pressure, monitoring pressure and preventing leakage during the water injection process. The wellhead is generally in a pressurized state to smoothly input mine water. However, due to the properties of mine water and the operation of pressurized water injection, during use, high-intensity water injection and solid waste impurities in mine wastewater will have an adverse effect on the pressure resistance and service life of the wellhead device. Therefore, it is necessary to improve the structure of the sealing well to adapt to the mine water sealing operation. Summary of the invention

[0003] In view of the above problems, the present invention provides a drilling method for a deep geological storage well, comprising the following steps:

[0004] S1: The sealed well includes several sections of wells arranged vertically, and a filter screen and an interception trough are pre-set in the top well to utilize the mine water flowing in the sealed well in situ;

[0005] S2: According to the geological survey information, the location of the sealed well is selected, and then drilling is carried out from the ground downwards to drill out the first well section and the second well section in sequence, wherein the diameter of the first well section is larger than the diameter of the second well section;

[0006] S3: Installing the shaft of the sealed well from bottom to top in the second well section, the shaft is installed all the way to the ground, and the top of the uppermost shaft is above the ground, which is used to connect the pipeline for transporting mine water;

[0007] S4: A water extraction pipe is installed in the first well section, the bottom end of which penetrates the side wall of the uppermost wellbore and extends into the interception trough, and the top end of which extends to the water storage tank on the ground, for extracting water from the interception trough;

[0008] S5: Install a transition device between the wellhead of the sealed well and the pipe mouth of the mine water delivery pipeline, so that the mine water flows through the transition channel in the transition device and directly reaches the inside of the sealed well;

[0009] S6: The water storage tank is connected to the transition device through a flushing pipe. The flushing pipe passes through the outer shell of the transition device and the transition channel in sequence, and can flush the inside of the transition channel to avoid blockage in the transition channel.

[0010] Optionally, in step S1, the filter screen is arranged above the interception tank, the filter screen is inclined, and is arranged along the inner wall of the sealing well. The top of the filter screen is fixed on the inner wall of the sealing well, and the bottom is connected to the top of the inner wall of the interception tank. The height of the top of the filter screen is higher than the bottom height.

[0011] Further optionally, the highest point of the filter is 30-50 m from the ground, and the angle between the filter and the horizontal plane is 30-65°.

[0012] Further optionally, the intercepting trough is arranged along the inner wall of the sealing well, and the intercepting trough includes a vertical inner wall and a trough bottom, the bottom of the inner wall is connected to the inner edge of the trough bottom, and the outer edge of the trough bottom is fixedly connected to the inner wall of the sealing well; preferably, the trough bottom is inclined, and the height of the inner edge of the trough bottom is higher than the height of the outer edge, so that the water in the intercepting trough is gathered to the side of the inner wall of the sealing well, and then it is convenient to be extracted by the pumping pipe.

[0013] In step S2, geological survey is performed according to the prior art in the field to select the location of the sealed well. A horizontal platform is provided at the position where the bottom of the first well section connects to the top of the second well section, and the height of the platform is the same as the height of the bottom of the interception groove.

[0014] Optionally, before step S5, the following steps are also included:

[0015] (1) In the first well section, a plurality of support rods are evenly arranged along the circumference of the sealed well, the bottom of the support rods is buried in the outer edge of the platform of the first well section, the support rods are inclined, and the top of the support rods is connected to the upper part of the uppermost wellbore to assist in supporting the uppermost wellbore;

[0016] (2) A removable cover is laid on the top of the first well section, and space is reserved at the position of the cover corresponding to the wellhead of the sealed well, allowing the wellhead to pass through the cover, and the outer edge of the cover is connected to the ground, and the position of the cover corresponding to the wellhead is connected to the outer wall of the sealed well.

[0017] Preferably, the top of the support rod, the lower surface of the cover plate, and the outer wall of the uppermost shaft are connected to each other at the same time, that is, the three can be connected at one point, thereby forming a more solid support for the uppermost shaft.

[0018] Optionally, in step S5, the transition device is a jacket structure, including an outer shell and an inner transition channel, the upper and lower lengths of the transition channel are greater than the upper and lower lengths of the outer shell, the top of the outer shell is connected to the pipe mouth of the mine water conveying pipeline through a flange, and the bottom of the outer shell is connected to the wellhead of the sealed well through another flange;

[0019] The top of the transition channel is connected to the inner wall of the pipe that transports mine water, and the bottom of the transition channel is connected to the inner wall of the uppermost shaft to fix the position of the transition channel so that the mine water does not pass through the flanges at the upper and lower ends of the outer shell, but directly enters the sealed well through the transition channel.

[0020] Further optionally, the transition channel is cylindrical, and includes a contraction section, a straight section and an expansion section connected in sequence from top to bottom, the contraction section is a truncated cone with a larger top and a smaller bottom, the inner diameter of the straight section remains unchanged, and the expansion section is a truncated cone with a smaller top and a larger bottom.

[0021] Optionally, in step S6, a high-pressure water pump is connected to the flushing pipe, which can pressurize the flushing water while delivering the flushing water;

[0022] The flushing pipe includes a horizontal pipe and a vertical pipe. One end of the horizontal pipe is detachably connected to the water outlet of the water storage tank, and the other end is fixedly connected to the top of the vertical pipe. The height of the horizontal pipe is not higher than the top of the expansion section, so that the vertical pipe is inside the expansion section.

[0023] When flushing the straight section, the horizontal tube is rotated so that the bottom opening of the vertical tube is upward; when not flushing, the horizontal tube is rotated so that the bottom opening of the vertical tube is downward. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a schematic diagram of the structure of the sealing well in the embodiment;

[0025] Figure 2 This is a schematic diagram of the coordination between the water extraction pipe and the flushing pipe and the water storage tank;

[0026] Figure 3 A schematic diagram of a large flow of fluid passing through a transition channel of another transition device.

[0027] In the attached drawings, 1-the top wellbore, 2-the filter screen, 3-the intercepting trough, 4-the first well section, 5-the second well section, 6-the pumping pipe, 7-the flushing pipe, 8-the water storage tank, 9-the transition channel, 10-the outer shell, 11-the platform, 12-the support rod, 13-the cover plate, 14-the contraction section, 15-the straight section, 16-the expansion section, 17-the vertical pipe, 18-the horizontal pipe, 19-the upper guard plate, 20-the spring. DETAILED DESCRIPTION

[0028] This embodiment provides a method for drilling a deep geological storage well. Figure 1-Figure 2 As shown, the following steps are included:

[0029] S1: The sealed well includes several sections of wells arranged vertically, and a filter screen 2 and an interception trough 3 are pre-set in the uppermost well 1 for in-situ utilization of the mine water flowing in the sealed well;

[0030] S2: According to the geological survey information, the location of the sealed well is selected, and then drilling is carried out from the ground downwards to drill out the first well section 4 and the second well section 5 in sequence, wherein the diameter of the first well section 4 is larger than the diameter of the second well section 5;

[0031] S3: Installing the shaft of the sealed well from bottom to top into the second well section 5, the shaft is installed all the way to the ground, and the top of the uppermost shaft 1 is above the ground, which is used to connect the pipeline for transporting mine water;

[0032] S4: A water extraction pipe 6 is installed in the first well section 4, the bottom end of the water extraction pipe 6 penetrates the side wall of the uppermost wellbore 1 and extends into the interception trough 3, and the top end extends to the water storage tank 8 on the ground, for extracting water in the interception trough;

[0033] S5: Install a transition device between the wellhead of the sealed well and the pipe mouth of the mine water delivery pipeline, so that the mine water flows through the transition channel 9 in the transition device and directly reaches the inside of the sealed well;

[0034] S6: The water storage tank 8 is connected to the transition device through the flushing pipe 7. The flushing pipe 7 passes through the outer shell 10 of the transition device and the transition channel 9 in sequence, and can flush the inside of the transition channel 9 to avoid blockage in the transition channel 9.

[0035] The present invention installs the transition device above the wellhead of the sealed well, and the two ends of the transition device are respectively connected to the wellhead and the pipeline for conveying mine water. The mine water in the pipeline for conveying mine water flows through the transition channel 9, so as to avoid the mine water flowing through the interfaces at the upper and lower ends of the transition device, and to avoid the mine water and its solid waste slag particles from corroding and clogging the flange at the pipeline interface. In the present invention, a filter screen 2 and an interception tank 3 are preset in advance in the sealed well to filter part of the mine water flowing down in the sealed well, and the filtrate obtained by filtration enters the water storage tank 8 on the ground through the pumping pipe 6, and is used as flushing water for standby. Since the filter screen 2 and the intercepting tank 3 are relatively close to the ground, the diameter of the well section close to the ground is larger during drilling, which is convenient for accommodating the pumping pipe 6 and the matching pump, as well as for installation operations. The present invention uses the flushing pipe 7 to draw water from the water storage tank 8, flush the inside of the transition channel 9, avoid clogging of the transition channel 9, and realize the safe input and in-situ utilization of mine water.

[0036] Optionally, in step S1, the filter screen 2 is arranged above the interception tank, the filter screen 2 is inclined, and is arranged along the inner wall of the sealing well. The top of the filter screen 2 is fixed on the inner wall of the sealing well, and the bottom is connected to the top of the inner wall of the interception tank. The height of the top of the filter screen 2 is higher than the bottom height.

[0037] Further optionally, the highest point of the filter screen 2 is 30-50m from the ground, and the angle between the filter screen 2 and the horizontal plane is 30-65°, so that the impact force of the mine water borne by the filter screen 2 is appropriate, while still being able to play a filtering role and avoiding a significant impact on the flow of water in the sealed well.

[0038] Further optionally, the intercepting groove is arranged along the inner wall of the sealing well, and the intercepting groove includes a vertical inner wall and a groove bottom, the bottom of the inner wall is connected to the inner edge of the groove bottom, and the outer edge of the groove bottom is fixedly connected to the inner wall of the sealing well; preferably, the groove bottom is inclined, and the height of the inner edge of the groove bottom is higher than the height of the outer edge, so that the water in the intercepting groove is gathered to the inner wall of the sealing well, and then it is easy to be extracted by the pumping pipe 6. The height of the inner wall of the intercepting groove and the width of the groove bottom are determined according to the actual amount of flushing water required.

[0039] In step S2, geological survey is performed according to the prior art in the field to select the location of the sealed well. A horizontal platform 11 is provided at the position where the bottom of the first well section 4 connects to the top of the second well section 5. The height of the platform 11 is the same as the height of the bottom of the interception groove 3. The platform 11 can be provided with a pumping pipe 6 and a pump, which is also convenient for installing and maintaining the pumping pipe 6 and the pump.

[0040] In step S3, the installation and cementing of the sealed wellbore are both existing technologies. The lower part of the uppermost wellbore 1 of the sealed well is in the second well section 5, and the upper part is in the first well section 4, so that the lower part of the uppermost wellbore 1 is easy to connect with the lower wellbore and cement.

[0041] Optionally, in step S4, construction is performed on the platform 11 of the first well section 4, a through hole is drilled at a position on the side wall of the uppermost wellbore 1 corresponding to the bottom of the intercepting groove 3, and one end of the pumping pipe 6 is inserted from the through hole into the intercepting groove 3 of the sealed well, with the pumping pipe 6 close to the outer edge of the groove bottom, so as to facilitate extraction of filtered water from the intercepting groove 3;

[0042] The other end of the pumping pipe 6 extends upward along the outer wall of the uppermost wellbore 1 to the ground, and then is connected to the water inlet of the water storage tank 8 to input the pumped water into the water storage tank 8.

[0043] Optionally, before step S5, the following steps are also included:

[0044] (1) A plurality of support rods 12 are evenly arranged along the circumference of the sealed well in the first well section 4, the bottom of the support rods 12 is buried in the outer edge of the platform 11 of the first well section 4, the support rods 12 are inclined, and the top of the support rods 12 is connected to the upper part of the uppermost wellbore 1, so as to assist in supporting the uppermost wellbore 1;

[0045] (2) A removable cover plate 13 is laid on the top of the first well section 4. Space is reserved for the cover plate 13 at the position corresponding to the wellhead of the sealed well, allowing the wellhead to pass through the cover plate 13. The outer edge of the cover plate 13 is connected to the ground. The cover plate 13 is connected to the outer wall of the sealed well at the position corresponding to the wellhead.

[0046] Preferably, the top of the support rod 12, the lower surface of the cover plate 13, and the outer wall of the uppermost shaft 1 are connected to each other at the same time, that is, the three can be connected at one point to form a more solid support for the uppermost shaft 1. The detachable cover plate 13 facilitates maintenance of the underground support rod 12, the pumping pipe 6, and the pump.

[0047] Optionally, in step S5, the transition device is a jacket structure, including an outer shell 10 and an inner transition channel 9, the upper and lower lengths of the transition channel 9 are greater than the upper and lower lengths of the outer shell 10, the top of the outer shell 10 is connected to the pipe mouth of the mine water conveying pipeline through a flange, and the bottom of the outer shell 10 is connected to the wellhead of the sealed well through another flange;

[0048] The top of the transition channel 9 is connected to the inner wall of the pipe for transporting mine water, and the bottom of the transition channel 9 is connected to the inner wall of the uppermost shaft 1 to fix the position of the transition channel 9 so that the mine water does not pass through the flanges at the upper and lower ends of the outer shell 10, but directly enters the sealed well through the transition channel 9.

[0049] Further optionally, the transition channel 9 is cylindrical, and includes a contraction section 14, a straight section 15 and an expansion section 16 connected in sequence from top to bottom, the contraction section 14 is a truncated cone with a larger top and a smaller bottom, the inner diameter of the straight section 15 remains unchanged, and the expansion section 16 is a truncated cone with a smaller top and a larger bottom. A sealing ring is provided at the position where the top of the contraction section 14 is connected to the inner wall of the pipeline for conveying mine water, and a sealing ring is also provided at the position where the bottom of the expansion section 16 is connected to the inner wall of the uppermost shaft 1.

[0050] Further optionally, part of the contraction section 14 is in the pipeline for conveying mine water, and the other part is in the outer shell 10; the straight section 15 is completely inside the outer shell 10; part of the expansion section 16 is in the outer shell 10, and the other part is in the sealed well.

[0051] The mine water in the pipeline for conveying mine water first enters the contraction section 14, and in the process of flowing down along the inclined inner wall of the contraction section 14, it is beneficial for the solid waste to slide along the inclined wall, which is beneficial for the preliminary solid-liquid separation. Then, the mine water flows down along the straight section 15, and then flows down along the expansion section 16. In the expansion section 16, due to the action of gravity, most of the solid waste that accelerates the flow falls from the inside of the expansion section 16, and then enters and falls from the hollow space of a circle of filter screens 2 (that is, it does not fall on the filter screen 2), while part of the water body can flow down along the inner wall of the expansion section 16, and then flow down along the inner wall of the sealing well, and then fall on the filter screen 2. After the above process, the water body falling on the filter screen 2 has been initially separated from the solid and liquid through the transition channel 9, and the solid content is relatively small. After filtering through the filter screen 2, a relatively clear mine water can be obtained in the interception tank 3, which is suitable as flushing water, and the cleaning cycle of the filter screen 2 is extended.

[0052] The mesh surface of the filter screen 2 is inclined. When filtering solid waste residue, the intercepted waste residue can also roll down into the sealing well along the inclined mesh surface. In addition, the water flow falling on the filter screen 2 has a certain cleaning effect on the filter screen 2. When the filter screen 2 needs to be cleaned, the pipeline for conveying mine water can be replaced with clean water or recycled water or water in the water storage tank 8 to clean the filter screen 2.

[0053] Optionally, in step S6, a high-pressure water pump is connected to the pipeline of the flushing pipe 7, which can pressurize the flushing water while delivering the flushing water;

[0054] The flushing pipe 7 includes a horizontal pipe 18 and a vertical pipe 17. One end of the horizontal pipe 18 is detachably connected to the water outlet of the water storage tank 8, and the other end is fixedly connected to the top of the vertical pipe 17. The height of the horizontal pipe 18 is not higher than the top of the expansion section 16, so that the vertical pipe 17 is inside the expansion section 16.

[0055] When flushing the straight section 15, the horizontal tube 18 is rotated so that the bottom opening of the vertical tube 17 is upward; when not flushing, the horizontal tube 18 is rotated so that the bottom opening of the vertical tube 17 is downward.

[0056] Due to the structural characteristics of the contraction section 14, if the diameter of the straight section 15 is small and the size of the solid waste in the mine water is large, the transition channel 9 may be partially blocked after long-term use. The manifestation of this situation is that the pressure of the input mine water needs to be increased. At this time, it is necessary to flush and dredge the straight section 15. Pause the input of mine water, temporarily cut off the connection between the flushing pipe 7 and the water storage tank 8, rotate the flushing pipe 7, so that the bottom opening of the vertical pipe 17 is upward, then connect the flushing pipe 7 and the water storage tank 8, start the high-pressure water pump, and flush the vertical pipe 17 to the bottom of the straight section 15 to dredge the straight section 15. Since the vertical pipe 17 is in a state of spraying water upward, the solid waste flushed down will not block the vertical pipe 17, but will directly fall into the sealing well. Therefore, the pollutants in the mine water of the present invention can eventually fall into the sealing well, and the purpose of using mine water as flushing water and flushing the transition channel 9 is also achieved.

[0057] Although the structural characteristics of the transition channel 9 (rigid structure) may increase the water pressure of the mine water, the pollution and blockage at the wellhead are greatly improved (the transition channel 9 can be replaced or cleaned when necessary), saving the maintenance time of the traditional direct connection form.

[0058] The present invention also provides an improved transition device, such as Figure 3 As shown, it includes an outer elliptical shell 10 and an inner flexible transition channel 9, the long axis of the shell is horizontal, and the top and bottom ends of the shell are respectively connected to the pipe opening for conveying mine water and the wellhead of the sealing well through flanges;

[0059] The top of the transition channel 9 is connected to the inner wall of the pipeline for conveying mine water, and a plurality of upper guard plates 19 are arranged on the outer side of the top of the transition channel 9. The outer side of the middle part of the transition channel 9 is connected to the inner wall of the shell 10 through a plurality of springs 20, so that the inner diameter of the transition channel 9 can be contracted or expanded; the bottom of the transition channel 9 is connected to the inner wall of the sealing well. The transition channel 9 is made of elastic rubber.

[0060] Optionally, a plurality of upper guard plates 19 are evenly arranged along the pipe opening of the mine water conveying pipe, the top of the upper guard plate is connected to the inner wall of the mine water conveying pipe, and the bottom end extends into the shell 10, and the upper guard plate 19 has an arc convex to the inside of the shell;

[0061] The upper guard plate 19 is elastic and can swing outward or inward according to the water pressure and water volume in the transition channel 9. When the water pressure and water volume in the transition channel 9 are large, the bottom end of the upper guard plate 19 swings outward, and when the water pressure and water volume in the transition channel 9 are small, the bottom end of the upper guard plate 19 swings inward to reset.

[0062] When a circle of upper guard plates 19 is reset, adjacent upper guard plates 19 contact each other across the side wall of the transition channel 9 to form a truncated cone shape that is larger at the top and smaller at the bottom.

[0063] Optionally, a plurality of springs 20 are evenly arranged along the inner wall of the housing, and a pad is provided at the position where the transition channel 9 connects to one end of the spring 20 to prevent the transition channel 9 from being punctured when the spring is under pressure;

[0064] When the water pressure and water volume in the transition channel 9 are large, the spring is compressed, the transition channel 9 expands and its side wall is close to the inner wall of the shell, allowing the internal water flow to pass; when the water pressure and water volume in the transition channel 9 are not large, the spring is reset and the transition channel 9 contracts. At this time, the diameter of the narrowest part of the transition channel 9 is smaller than the diameter of the top and bottom of the transition channel 9, making the transition channel 9 an hourglass shape; according to the different water pressure and water volume in the transition channel 9, the spring can adjust the inner diameter of the transition channel 9.

[0065] Optionally, the water storage tank is connected to the pipe mouth of the mine water transporting pipeline through an auxiliary flushing pipe. The auxiliary flushing pipe passes through the side wall of the mine water transporting pipeline and extends into the interior of the pipeline. When the transition channel 9 needs to be cleaned, flushing water is passed through.

[0066] Since the transition channel 9 is made of flexible rubber material, it is elastic and easy to expand and contract. However, after it contracts, solid waste residue will remain in the folds and may puncture the side wall of the transition channel 9. Therefore, flushing is required. The secondary flushing pipe guides the recycled water from the water storage tank to flush from the top of the transition channel 9.

Claims

1. A method for drilling a deep geological storage well, characterized in that: The following steps are involved: S1: The sealed well includes several sections of wells arranged vertically, and a filter screen and an interception trough are pre-set in the top well to utilize the mine water flowing in the sealed well in situ; S2: According to the geological survey information, the location of the sealed well is selected, and then drilling is carried out from the ground downwards to drill out the first well section and the second well section in sequence, wherein the diameter of the first well section is larger than the diameter of the second well section; S3: Installing the shaft of the sealed well from bottom to top in the second well section, the shaft is installed all the way to the ground, and the top of the uppermost shaft is above the ground, which is used to connect the pipeline for transporting mine water; S4: A water extraction pipe is installed in the first well section, the bottom end of which penetrates the side wall of the uppermost wellbore and extends into the interception trough, and the top end of which extends to the water storage tank on the ground, for extracting water from the interception trough; S5: Install a transition device between the wellhead of the sealed well and the pipe mouth of the mine water delivery pipeline, so that the mine water flows through the transition channel in the transition device and directly reaches the inside of the sealed well; S6: The water storage tank is connected to the transition device through a flushing pipe, which passes through the outer shell of the transition device and the transition channel in sequence, and can flush the inside of the transition channel to avoid blockage in the transition channel; In step S5, the transition device is a jacket structure, including an outer shell and an inner transition channel, the upper and lower lengths of the transition channel are greater than the upper and lower lengths of the outer shell, the top of the outer shell is connected to the pipe mouth of the mine water conveying pipeline through a flange, and the bottom of the outer shell is connected to the wellhead of the sealed well through another flange; The top of the transition channel is connected to the inner wall of the pipe that transports mine water, and the bottom of the transition channel is connected to the inner wall of the uppermost shaft to fix the position of the transition channel so that the mine water does not pass through the flanges at the upper and lower ends of the outer shell, but directly enters the sealed well through the transition channel.

2. The method for drilling a deep geological storage well according to claim 1, characterized in that: The filter screen is arranged above the interception trough, the filter screen is inclined, and is arranged along the inner wall of the sealing well. The top of the filter screen is fixed on the inner wall of the sealing well, and the bottom is connected to the top of the inner wall of the interception trough. The height of the top of the filter screen is higher than the bottom height.

3. The method for drilling a deep geological storage well according to claim 2, characterized in that: The highest point of the filter screen is 30-50m from the ground, and the angle between the filter screen and the horizontal plane is 30-65°.

4. The method for drilling a deep geological storage well according to claim 1, characterized in that: The intercepting trough is arranged along the inner wall of the sealing well, and the intercepting trough includes a vertical inner wall and a trough bottom. The bottom of the inner wall is connected to the inner edge of the trough bottom, and the outer edge of the trough bottom is fixedly connected to the inner wall of the sealing well. The trough bottom is inclined, and the height of the inner edge of the trough bottom is higher than the height of the outer edge, so that the water in the intercepting trough is gathered to the side of the inner wall of the sealing well, and then it is convenient to be extracted by the pumping pipe.

5. The method for drilling a deep geological storage well according to claim 1, characterized in that: In step S2, a horizontal platform is provided at the position where the bottom of the first well section connects to the top of the second well section, and the height of the platform is the same as the height of the bottom of the intercepting groove.

6. The method for drilling a deep geological storage well according to claim 5, characterized in that: Before step S5, the method further includes the following steps: (1) In the first well section, a plurality of support rods are evenly arranged along the circumference of the sealed well, the bottom of the support rods is buried in the outer edge of the platform of the first well section, the support rods are inclined, and the top of the support rods is connected to the upper part of the uppermost wellbore to assist in supporting the uppermost wellbore; (2) A removable cover is laid on the top of the first well section, and space is reserved at the position of the cover corresponding to the wellhead of the sealed well, allowing the wellhead to pass through the cover, and the outer edge of the cover is connected to the ground, and the position of the cover corresponding to the wellhead is connected to the outer wall of the sealed well.

7. The method for drilling a deep geological storage well according to claim 6, characterized in that: The top of the support rod, the lower surface of the cover plate, and the outer wall of the uppermost shaft are connected to each other at the same time, forming a more solid support for the uppermost shaft.

8. The method for drilling a deep geological storage well according to claim 1, characterized in that: The transition channel is cylindrical, and includes a contraction section, a straight section and an expansion section connected in sequence from top to bottom. The contraction section is a truncated cone with a larger top and a smaller bottom. The inner diameter of the straight section remains unchanged. The expansion section is a truncated cone with a smaller top and a larger bottom.

9. The method for drilling a deep geological storage well according to claim 8, characterized in that: In step S6, a high-pressure water pump is connected to the flushing pipe, which can pressurize the flushing water while delivering the flushing water; The flushing pipe includes a horizontal pipe and a vertical pipe. One end of the horizontal pipe is detachably connected to the water outlet of the water storage tank, and the other end is fixedly connected to the top of the vertical pipe. The height of the horizontal pipe is not higher than the top of the expansion section, so that the vertical pipe is inside the expansion section. When flushing the straight section, the horizontal tube is rotated so that the bottom opening of the vertical tube is upward; when not flushing, the horizontal tube is rotated so that the bottom opening of the vertical tube is downward.

Citation Information

Patent Citations

  • Method for treating hypersalinity mine water by reinjection of exhausted oil reservoir

    CN114483188A

  • Composite well drilling method for deep underground sealing and ground pumping drainage of mine

    CN116857008A